WO2008067299A3 - Method and system for isolating disturbances to the power distribution system - Google Patents
Method and system for isolating disturbances to the power distribution system Download PDFInfo
- Publication number
- WO2008067299A3 WO2008067299A3 PCT/US2007/085622 US2007085622W WO2008067299A3 WO 2008067299 A3 WO2008067299 A3 WO 2008067299A3 US 2007085622 W US2007085622 W US 2007085622W WO 2008067299 A3 WO2008067299 A3 WO 2008067299A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power distribution
- distribution system
- disturbances
- isolating
- isolating disturbances
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/30—Staggered disconnection
Abstract
A method and system for isolating disturbances to an electric energy or power distribution system upon the occurrence of an initiating trigger. The electric energy or power distribution system is monitored for a fault condition and a loss of voltage. The initiating trigger is responding to and isolated to minimize the number of end users affected while further providing information t indicative of the location of the disturbance.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US86134306P | 2006-11-27 | 2006-11-27 | |
US60/861,343 | 2006-11-27 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2008067299A2 WO2008067299A2 (en) | 2008-06-05 |
WO2008067299A3 true WO2008067299A3 (en) | 2008-07-24 |
Family
ID=39400995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2007/085622 WO2008067299A2 (en) | 2006-11-27 | 2007-11-27 | Method and system for isolating disturbances to the power distribution system |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2008067299A2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010078132A2 (en) | 2008-12-31 | 2010-07-08 | Abb Research Ltd. | Hybrid distribution network power restoration control |
CN108879660A (en) * | 2018-06-22 | 2018-11-23 | 广东电网有限责任公司 | A kind of method that electric network fault loss of outage load calculates realization automatically |
CN112202166A (en) * | 2020-09-27 | 2021-01-08 | 上海电机学院 | Time interval division method in dynamic reconstruction of power distribution network |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003114294A (en) * | 2001-10-04 | 2003-04-18 | Toshiba Corp | Monitor, diagnosis, inspection and maintenance system for power-generating plant |
US20030205938A1 (en) * | 2002-02-25 | 2003-11-06 | General Electric Company | Integrated protection, monitoring, and control system |
US6667866B1 (en) * | 2000-12-28 | 2003-12-23 | Abb Technology Ag | Virtual ground following single-phase trip |
AU2004269785A1 (en) * | 2004-10-29 | 2006-05-18 | The Australian Gas Light Company | Fault detection and location in power distribution networks |
-
2007
- 2007-11-27 WO PCT/US2007/085622 patent/WO2008067299A2/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6667866B1 (en) * | 2000-12-28 | 2003-12-23 | Abb Technology Ag | Virtual ground following single-phase trip |
JP2003114294A (en) * | 2001-10-04 | 2003-04-18 | Toshiba Corp | Monitor, diagnosis, inspection and maintenance system for power-generating plant |
US20030205938A1 (en) * | 2002-02-25 | 2003-11-06 | General Electric Company | Integrated protection, monitoring, and control system |
AU2004269785A1 (en) * | 2004-10-29 | 2006-05-18 | The Australian Gas Light Company | Fault detection and location in power distribution networks |
Also Published As
Publication number | Publication date |
---|---|
WO2008067299A2 (en) | 2008-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2007015924A8 (en) | Fault management of hts power cable | |
EP2591372A4 (en) | System for monitoring electrical power usage of a structure and method of same | |
EP2097962A4 (en) | System and method for electric current and power monitoring and control of a generator | |
WO2007100479A3 (en) | Devices, systems, and methods for providing electrical power | |
WO2011153063A3 (en) | Power distribution system having priority load control | |
WO2014057181A3 (en) | Power supply system and method for an electric vehicle | |
WO2012082802A3 (en) | Methods and system for nonintrusive load monitoring | |
WO2007123835A3 (en) | Systems, devices, and methods for temperature compensation in arc fault detection systems | |
WO2006019738A3 (en) | Traveling wave based relay protection | |
WO2008042638A3 (en) | Signal distribution and surge detection and protection module and method | |
WO2012088018A3 (en) | Apparatus, method, and system for event and backup lighting | |
IL190825A0 (en) | Fault protection system and method for an electrical power distribution system | |
WO2011063053A3 (en) | Power management for electronic devices | |
WO2012165858A3 (en) | Power storage device, power storage system using same, and method for configuring power storage system | |
WO2008017754A8 (en) | Method and system of real time management and modulation of electricity consumption | |
WO2011133863A3 (en) | Monitoring of battery state of charge | |
EP2612413A4 (en) | System and method for paralleling electrical power generators | |
WO2011008506A3 (en) | High speed feedback for power load reduction using a variable generator | |
WO2011014073A3 (en) | Responsive load monitoring system and method | |
WO2011062770A3 (en) | Systems and methods for delivering power in response to a connection event | |
WO2010077759A3 (en) | Inductive battery systems and methods of operation | |
WO2011059753A3 (en) | Management techniques for electric power generation equipment | |
EP3929021A4 (en) | Electrical fault detection device and vehicle power supply system | |
IL206232A0 (en) | System and method for planning of demand for power on an electrical power network | |
WO2008067299A3 (en) | Method and system for isolating disturbances to the power distribution system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 07868858 Country of ref document: EP Kind code of ref document: A2 |
|
DPE2 | Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101) | ||
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 07868858 Country of ref document: EP Kind code of ref document: A2 |