WO2007145481A1 - Method of cooling slag generated during preliminary treatment of molten iron - Google Patents

Method of cooling slag generated during preliminary treatment of molten iron Download PDF

Info

Publication number
WO2007145481A1
WO2007145481A1 PCT/KR2007/002905 KR2007002905W WO2007145481A1 WO 2007145481 A1 WO2007145481 A1 WO 2007145481A1 KR 2007002905 W KR2007002905 W KR 2007002905W WO 2007145481 A1 WO2007145481 A1 WO 2007145481A1
Authority
WO
WIPO (PCT)
Prior art keywords
slag
molten iron
iron pretreatment
coating
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2007/002905
Other languages
French (fr)
Inventor
Tae Ho Kim
Hyung Suk Oh
Jeong Beom Seo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Posco Holdings Inc
Original Assignee
Posco Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Posco Co Ltd filed Critical Posco Co Ltd
Priority to CN2007800220141A priority Critical patent/CN101466850B/en
Priority to JP2009515308A priority patent/JP4865858B2/en
Publication of WO2007145481A1 publication Critical patent/WO2007145481A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B3/00General features in the manufacture of pig-iron
    • C21B3/04Recovery of by-products, e.g. slag
    • C21B3/06Treatment of liquid slag
    • C21B3/08Cooling slag
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/076Use of slags or fluxes as treating agents
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2400/00Treatment of slags originating from iron or steel processes
    • C21B2400/02Physical or chemical treatment of slags
    • C21B2400/022Methods of cooling or quenching molten slag
    • C21B2400/024Methods of cooling or quenching molten slag with the direct use of steam or liquid coolants, e.g. water
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C1/00Refining of pig-iron; Cast iron
    • C21C1/02Dephosphorising or desulfurising
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B7/00Working up raw materials other than ores, e.g. scrap, to produce non-ferrous metals and compounds thereof; Methods of a general interest or applied to the winning of more than two metals
    • C22B7/04Working-up slag
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Definitions

  • the present invention relates to a method of cooling slag, and more particularly to a method of rapidly cooling slag (hereinafter, simply referred to as "molten iron pre- treatment slag") generated during preliminary treatment of molten iron, at low cost.
  • molten iron pre- treatment slag a method of rapidly cooling slag generated during preliminary treatment of molten iron, at low cost.
  • the cooling rate of the molten iron pre treatment slag is generally very slow.
  • preliminary treatment or “preliminary process” according to the present invention refers to desulfurization treatment and the like of a molten pig iron.
  • blast furnace slag is produced as by-product from a blast furnace which is used in a process for producing pig iron.
  • molten iron pretreatment slag, converter slag, and electric furnace slag are respectively produced as by-products from a molten-iron pretreatment facility, a converter, and an electric furnace.
  • slag is at a temperature of 1000 0 C or higher.
  • slag is typically cooled at a site near the furnace prior to being transported for recovery and recycling of metal (base metal) contained therein.
  • Such cooling is typically conducted using water cooling, in order to reduce the treatment area and the cooling-down period.
  • the molten iron pretreatment slag is separated from molten iron and piled up at the designated site adjacent to the blast furnace, and then water-cooled. Disclosure of Invention Technical Problem
  • an object of the present invention is to provide a method of completely cooling molten iron pretreatment slag to the center thereof, with a cooling rate that is equal to or higher than the cooling rate achieved with other iron-making slag.
  • Another object of the present invention is to provide a method of cooling slag in the preliminary treatment of molten iron in an economical manner.
  • the present invention provides a method of cooling slag in the preliminary treatment of molten iron, including applying slag in a molten phase on the molten iron pretreatment slag which is piled up, prior to water- cooling the molten iron pretreatment slag, wherein the slag in the molten phase contains 10 wt% free-CaO or less, based on the total weight, and active oxygen.
  • the active oxygen may be present in the form of gaseous oxygen and/ or ferric oxide such as FeO or Fe O contained in the molten slag, and the molten slag applied on the molten iron pretreatment slag is preferably converter slag.
  • the thickness to which the molten slag is applied is preferably in the range of 50-300 mm, regardless of the height to which the molten iron pretreatment slag is piled.
  • the first fact is that the carbon component contained in molten iron pretreatment slag hinders the cooling of the molten iron pretreatment slag. More specifically, the carbon component in molten iron pretreatment slag is precipitated on the surface of the molten iron pretreatment slag in the course of cooling. Since the precipitated carbon has poor wettability with water, the precipitated carbon hinders the infiltration of the water into the molten iron pretreatment slag.
  • the second fact is that quicklime (about 15% or more), which does not react to components such as sulfur, contained in a large amount of quicklime, which is used in the preliminary treatment of molten iron and thus remains in the slag, hinders the cooling of molten iron pretreatment slag. More specifically, the remaining quicklime (CaO) reacts to atmospheric moisture (CaO + H O ⁇ Ca(OH) ), and expands (about double), thus causing the slag to be fractured/powdered.
  • the slag powder not only has small clearances therebetween but also agglomerates (forms a slurry) when water is sprinkled thereon, thus preventing water from infiltrating into the molten iron pre- treatment slag. Meanwhile, the hydration of quicklime proceeds exothermically, and the reaction heat generated in the exothermic process evaporates some of the cooling water sprinkled on the slag. The evaporation of cooling water increases the required amount of cooling water.
  • the cooling water does not infiltrate into the heaped molten iron pre- treatment slag, but flows down along the surface of the slag, thereby retarding the cooling rate of the molten iron pretreatment slag.
  • the required amount of cooling water is excessively increased.
  • the method according to the present invention applies molten slag, in particular, converter slag (hereinafter, the slag applied on the molten iron pretreatment slag is simply referred to as "coating slag"), which contains 10 wt% or less of free-CaO, based on the total weight thereof, and essential active oxygen, on the molten iron pretreatment slag.
  • molten slag in particular, converter slag
  • coating slag which contains 10 wt% or less of free-CaO, based on the total weight thereof, and essential active oxygen
  • the coating slag contains free-CaO in an amount greater than 10 wt%, or the coating slag is in a solid phase rather than in a molten phase, the effect of promoting the cooling of molten iron pretreatment slag is negligible.
  • the coating slag is not in the molten phase, the slag, which is powdered by the hydration of quicklime, is not sufficiently removed from the surface of the molten iron pretreatment slag, and, if the coating slag contains free-CaO in an amount greater than 10 wt%, the function of the coating slag, that of hindering the molten iron pretreatment slag from being powdered, is decreased or lost.
  • the slag applied on molten iron pretreatment slag forms a porous structure, which will be described below, thus enabling cooling water to easily infiltrate into the molten iron pretreatment slag.
  • the slag which is most suitable for satisfying the conditions of the coating slag, is converter slag, which is concomitantly generated in the course of operation of a converter.
  • the converter slag contains oxygen in an amount of 1 wt% or more, and free-CaO is present in an amount of 5 wt% or less, based on the weight of slag.
  • the thickness of the coating slag which is applied on the molten iron pretreatment slag, must be in the range of 50-300 mm. If the thickness of the coating slag is less than the above range, the effect of eliminating oxygen is negligible, thus precluding the realization of a porous surface. Meanwhile, if the thickness of the coating slag is greater than the above range, air bubbles cannot escape to the outside, but are trapped in the coating slag layer, thus precluding the realization of a porous coating slag layer.
  • the height to which the molten iron pretreatment slag, on which slag is applied, is piled does not play an important role. Regardless of whether or not the height to which the molten iron pretreatment slag is piled is high, where molten iron pretreatment slag is treated on the surface thereof with the coating slag according to the present invention, cooling water can quickly infiltrate into the molten iron pretreatment slag.
  • Table 1 below shows representative results of time periods for which it is required to cool molten iron pretreatment slag to a temperature of 100 0 C after the molten iron pretreatment slag is applied with coating slags having the above three different conditions to a thickness of 250 mm.
  • the coating slag used in Comparative Examples was dephosphorized slag and cast slag, and the coating slags used in Examples were converter slags.
  • Example 1 shows a result obtained by cooling molten iron pretreatment slag by directly sprinkling water without the use of coating slag.
  • Free-CaO in the coating slag when present in an amount of 10 wt% or less, effectively cooled molten iron pretreatment slag (the cooling time was shortened by about 50%), and free-CaO in the coating slag, when present in an amount of 5 wt% or less, even more effectively cooled molten iron pretreatment slag.
  • free-CaO was present in an amount greater than 10 wt%, although the cooling time was somewhat shortened, a considerably long cooling time of 20 hours of more was still required.
  • the slag having the condition of Comparative Example 1 in Table 1, that is, converter slag containing free-CaO of 5-10 wt% and oxygen of 1 wt% or more was applied on molten iron pretreatment slag, and was then sprinkled with water. At this point, the time period required to cool the molten iron pretreatment slag to 100 0 C was measured. Thereafter, the cooling time was measured while varying the coating thickness of the converter slag and the heaping height of the molten iron pretreatment slag.
  • Table 2 The exemplary results are given in Table 2 below.
  • the present invention can be applied to iron-making factories.
  • the present invention can cool slag generated during the preliminary treatment of molten iron at a cooling rate higher than that of the conventional method, the present invention contributes to cost reduction in an iron-making processes.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The present invention relates to a method of cooling slag generated during the preliminary treatment of molten iron, which is commonly executed to remove sulfur and the like contained in the molten iron. The method includes cooling slag in the preliminary treatment of molten iron, including coating slag in a molten phase on the molten iron pretreatment slag, which is piled up, prior to water-cooling the molten iron pretreatment slag, wherein the slag in a molten phase contains 10 wt% free-CaO or less, and essential active oxygen. Thanks to this cooling method, it is possible to cool molten iron pretreatment slag to the ambient temperature at a cooling rate that is accelerated by 50 % or more, compared to the conventional method. Thus, it is economical.

Description

Description
METHOD OF COOLING SLAG GENERATED DURING PRELIMINARY TREATMENT OF MOLTEN IRON
Technical Field
[1] The present invention relates to a method of cooling slag, and more particularly to a method of rapidly cooling slag (hereinafter, simply referred to as "molten iron pre- treatment slag") generated during preliminary treatment of molten iron, at low cost. The cooling rate of the molten iron pre treatment slag is generally very slow.
[2] The term "preliminary treatment" or "preliminary process" according to the present invention refers to desulfurization treatment and the like of a molten pig iron. Background Art
[3] In the steel industry, various types of slag are produced as by-products, with different compositions and properties depending upon kinds of processes and facilities, and also upon kinds of steel produced by melting.
[4] For example, blast furnace slag is produced as by-product from a blast furnace which is used in a process for producing pig iron. Furthermore, molten iron pretreatment slag, converter slag, and electric furnace slag are respectively produced as by-products from a molten-iron pretreatment facility, a converter, and an electric furnace.
[5] Generally, slag is at a temperature of 1000 0C or higher. Hence, slag is typically cooled at a site near the furnace prior to being transported for recovery and recycling of metal (base metal) contained therein. Such cooling is typically conducted using water cooling, in order to reduce the treatment area and the cooling-down period.
[6] Also, the molten iron pretreatment slag is separated from molten iron and piled up at the designated site adjacent to the blast furnace, and then water-cooled. Disclosure of Invention Technical Problem
[7] However, the conventional water-cooling methods have problems in that, since the time period necessary to cool the molten iron pretreatment slag all the way to the center thereof is considerably long compared to other types of slag, an excessively high amount of water must be consumed during water-cooling process.
[8] Although the cooling rate can be improved by spreading the slag over a large area rather than piling up the slag, this process requires a considerable area.
[9] Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and an object of the present invention is to provide a method of completely cooling molten iron pretreatment slag to the center thereof, with a cooling rate that is equal to or higher than the cooling rate achieved with other iron-making slag.
[10] Another object of the present invention is to provide a method of cooling slag in the preliminary treatment of molten iron in an economical manner. Technical Solution
[11] In order to accomplish the above objects, the present invention provides a method of cooling slag in the preliminary treatment of molten iron, including applying slag in a molten phase on the molten iron pretreatment slag which is piled up, prior to water- cooling the molten iron pretreatment slag, wherein the slag in the molten phase contains 10 wt% free-CaO or less, based on the total weight, and active oxygen.
[12] In this method, the active oxygen may be present in the form of gaseous oxygen and/ or ferric oxide such as FeO or Fe O contained in the molten slag, and the molten slag applied on the molten iron pretreatment slag is preferably converter slag. The thickness to which the molten slag is applied is preferably in the range of 50-300 mm, regardless of the height to which the molten iron pretreatment slag is piled.
Advantageous Effects
[13] According to the method of cooling slag in the preliminary treatment of molten iron, which is designed in the above-described manner, it is possible to cool molten iron pretreatment slag to the ambient temperature at a cooling rate that is accelerated by 50% or more, compared to the conventional method.
[14] In addition, since the method according to the present invention can utilize converter slag, which is concomitantly generated during the process of making molten steel, it is economical. Best Mode for Carrying Out the Invention
[15] The method of cooling molten iron pretreatment slag has been derived from the following recognized facts.
[16] The first fact is that the carbon component contained in molten iron pretreatment slag hinders the cooling of the molten iron pretreatment slag. More specifically, the carbon component in molten iron pretreatment slag is precipitated on the surface of the molten iron pretreatment slag in the course of cooling. Since the precipitated carbon has poor wettability with water, the precipitated carbon hinders the infiltration of the water into the molten iron pretreatment slag.
[17] The second fact is that quicklime (about 15% or more), which does not react to components such as sulfur, contained in a large amount of quicklime, which is used in the preliminary treatment of molten iron and thus remains in the slag, hinders the cooling of molten iron pretreatment slag. More specifically, the remaining quicklime (CaO) reacts to atmospheric moisture (CaO + H O → Ca(OH) ), and expands (about double), thus causing the slag to be fractured/powdered. The slag powder not only has small clearances therebetween but also agglomerates (forms a slurry) when water is sprinkled thereon, thus preventing water from infiltrating into the molten iron pre- treatment slag. Meanwhile, the hydration of quicklime proceeds exothermically, and the reaction heat generated in the exothermic process evaporates some of the cooling water sprinkled on the slag. The evaporation of cooling water increases the required amount of cooling water.
[18] For this reason, the cooling water does not infiltrate into the heaped molten iron pre- treatment slag, but flows down along the surface of the slag, thereby retarding the cooling rate of the molten iron pretreatment slag. In addition, the required amount of cooling water is excessively increased.
[19] Hence, in order to remove fine powder generated by the hydration of carbon and free-CaO, which hinders the infiltration of cooling water, from the surface of the molten iron pretreatment slag, the method according to the present invention applies molten slag, in particular, converter slag (hereinafter, the slag applied on the molten iron pretreatment slag is simply referred to as "coating slag"), which contains 10 wt% or less of free-CaO, based on the total weight thereof, and essential active oxygen, on the molten iron pretreatment slag.
[20] In this method, if the coating slag contains free-CaO in an amount greater than 10 wt%, or the coating slag is in a solid phase rather than in a molten phase, the effect of promoting the cooling of molten iron pretreatment slag is negligible. That is, it is believed that if the coating slag is not in the molten phase, the slag, which is powdered by the hydration of quicklime, is not sufficiently removed from the surface of the molten iron pretreatment slag, and, if the coating slag contains free-CaO in an amount greater than 10 wt%, the function of the coating slag, that of hindering the molten iron pretreatment slag from being powdered, is decreased or lost.
[21] Furthermore, the slag applied on molten iron pretreatment slag forms a porous structure, which will be described below, thus enabling cooling water to easily infiltrate into the molten iron pretreatment slag.
[22] That is, active oxygen (most of the active oxygen is probably present in the form of ferric oxide), contained in the coating slag, reacts to carbon precipitated on the surface of the molten iron pretreatment slag, and thus removes the carbon (the carbon is removed in the form of CO). Then, gas (such as CO), generated by reaction with the carbon, escapes upward through the coating slag layer, thus forming the coating slag layer into a porous structure. At this point, the porous structure must not have separate voids formed in the inside of the coating slag layer, and must have channels (hereinafter, referred to as "permeable channels), which are connected between the inside and the surface of the coating slag layer. Thus, cooling water sprinkled on the coating slag layer can easily infiltrate into the molten iron pretreatment slag from the surface of the coating slag layer through the permeable channels.
[23] There is a question of how much oxygen must be contained in the coating slag in order to realize a porous structure. However, since the amount of oxygen contained in the coating slag may vary depending on the particular operation, it is not easy to quantify the required amount of oxygen. In most cases, when the coating slag contains oxygen in an amount of 1 wt% or more, it is believed that the effects intended by the present invention will be sufficiently obtained.
[24] According to the present invention, the slag, which is most suitable for satisfying the conditions of the coating slag, is converter slag, which is concomitantly generated in the course of operation of a converter. The converter slag contains oxygen in an amount of 1 wt% or more, and free-CaO is present in an amount of 5 wt% or less, based on the weight of slag.
[25] The thickness of the coating slag, which is applied on the molten iron pretreatment slag, must be in the range of 50-300 mm. If the thickness of the coating slag is less than the above range, the effect of eliminating oxygen is negligible, thus precluding the realization of a porous surface. Meanwhile, if the thickness of the coating slag is greater than the above range, air bubbles cannot escape to the outside, but are trapped in the coating slag layer, thus precluding the realization of a porous coating slag layer.
[26] Here, the height to which the molten iron pretreatment slag, on which slag is applied, is piled does not play an important role. Regardless of whether or not the height to which the molten iron pretreatment slag is piled is high, where molten iron pretreatment slag is treated on the surface thereof with the coating slag according to the present invention, cooling water can quickly infiltrate into the molten iron pretreatment slag. The reason why the molten iron pretreatment slag cannot infiltrate into the molten iron pretreatment slag is that fine powder, which is generated by reaction of carbon and free-CaO on the surface of the molten iron pretreatment slag, impedes the infiltration of water into the molten iron pretreatment slag. Consequently, when the blocking layer, such as the fine powder on the surface, is eliminated, the molten iron pretreatment slag can be easily infiltrated with the cooling water through the permeable channels. Mode for the Invention
[27] In order to determine the conditions for the coating slag, molten iron, obtained in a blast furnace operation, was desulfurized, and slag was removed from the molten iron and was then heaped. Subsequently, the heaped molten iron pretreatment slag was evenly applied with coating slag, and was repeatedly subjected to sprinkling and cooling procedures.
[28] The principal point to be checked in this determination was to observe influences exerted on molten iron pretreatment slag by 1) the amount of free-CaO contained in coating slag, 2) the presence of active oxygen, and 3) the phase of the coating slag.
[29] Table 1 below shows representative results of time periods for which it is required to cool molten iron pretreatment slag to a temperature of 100 0C after the molten iron pretreatment slag is applied with coating slags having the above three different conditions to a thickness of 250 mm. Here, the coating slag used in Comparative Examples was dephosphorized slag and cast slag, and the coating slags used in Examples were converter slags. Example 1 shows a result obtained by cooling molten iron pretreatment slag by directly sprinkling water without the use of coating slag.
[30] Table 1 [Table 1] [Table ]
Figure imgf000006_0001
[31] As is apparent from Table 1, the time period required to cool molten iron pretreatment slag was 30hr or more when coating slag was not used. [32] When coating slag in a molten phase was applied on molten iron pretreatment slag, the cooling time required for the molten iron pretreatment slag was considerably shortened. As seen in Comparative Examples 5 and 6, in order to shorten the cooling time of the molten iron pretreatment slag through the modification of a surface layer of the molten iron pretreatment slag, active oxygen must be present in coating slag, and the coating slag must be in a liquid phase.
[33] Free-CaO in the coating slag, when present in an amount of 10 wt% or less, effectively cooled molten iron pretreatment slag (the cooling time was shortened by about 50%), and free-CaO in the coating slag, when present in an amount of 5 wt% or less, even more effectively cooled molten iron pretreatment slag. When free-CaO was present in an amount greater than 10 wt%, although the cooling time was somewhat shortened, a considerably long cooling time of 20 hours of more was still required.
[34] Furthermore, in order to observe the influences exerted on the water-cooling of molten iron pretreatment slag by the thickness of the coating slag applied on the molten iron pretreatment slag and the height of the piled molten iron pretreatment slag, an experiment was conducted as follows.
[35] Specifically, the slag having the condition of Comparative Example 1 in Table 1, that is, converter slag containing free-CaO of 5-10 wt% and oxygen of 1 wt% or more, was applied on molten iron pretreatment slag, and was then sprinkled with water. At this point, the time period required to cool the molten iron pretreatment slag to 100 0C was measured. Thereafter, the cooling time was measured while varying the coating thickness of the converter slag and the heaping height of the molten iron pretreatment slag. The exemplary results are given in Table 2 below.
[36] Table 2 [Table 2] [Table ]
Figure imgf000007_0001
[37] As is apparent from Table 2, the influence of the height of molten iron pretreatment slag on the cooling rate was negligible, compared to the influence of the thickness to which coating slag was applied. This result can be seen by comparing Example 1 with Example 3. Specifically, even when the heaping height of the molten iron pretreatment slag is increased to 1000 mm from 300 mm, if the coating thickness of the coating slag is maintained in the range of 100-300mm, there is only about 1 hour difference in the cooling time of the molten iron pretreatment slag. It is believed that the difference of 1 hour naturally results from the fact that the amount of molten iron pretreatment slag to be cooled is increased in proportion to the increase in the piling height of the molten iron pretreatment slag. From the above results, it is noted that the cooling water infiltrates the molten iron pretreatment slag at a considerably quick rate due to the surface modification of the molten iron pretreatment slag according to the present invention.
[38] Meanwhile, when the coating thickness of the coating slag was unduly decreased
(less than 50 mm) or increased (larger than 300 mm), the cooling efficiency was greatly lowered, and bore no relation to the height to which the molten iron pretreatment slag was piled. This result signifies that when the coating thickness of the coating slag is 50-300 mm, and preferably 100-300 mm, permeable channels are efficiently generated.
Industrial Applicability
[39] The present invention can be applied to iron-making factories. In particular, since the present invention can cool slag generated during the preliminary treatment of molten iron at a cooling rate higher than that of the conventional method, the present invention contributes to cost reduction in an iron-making processes.

Claims

Claims
[1] A method of cooling slag generated during preliminary treatment of molten iron, comprising: piling up the molten iron pretreatment slag; coating the piled molten iron pretreatment slag with slag that is concomitantly generated in an iron-making process; and cooling the molten iron pretreatment slag using water; wherein the coating slag is in a molten phase containing 10 wt% or less of free-
CaO, and wherein the coating slag contains active oxygen which forms a porous structure at least in the coating slag using air bubbles generated in a reaction with carbon present on a surface of the molten iron pretreatment slag, thereby allowing water to infiltrate into the molten iron pretreatment slag. [2] The method according to claim 1, wherein the coating slag contains about 1 wt% or more of the active oxygen. [3] The method according to claim 1 or 2, wherein the coating slag is applied on the molten iron pretreatment slag to a thickness of 50-300 mm. [4] The method according to claim 1, wherein the coating slag is converter slag, which is concomitantly generated in a converter operation. [5] A method of cooling slag generated during preliminary treatment of molten iron, comprising: piling up the molten iron pretreatment slag; coating the piled molten iron pretreatment slag with slag in a molten phase, which is concomitantly generated in a converter operation, to a thickness of
50-300 mm; and sprinkling cooling water on the molten iron pretreatment slag coated with the converter slag. [6] The method according to claim 5, wherein the converter slag contains 10 wt% or less of free-CaO, based on a total weight thereof. [7] The method according to claim 5 or 6, wherein the converter slag contains 1 wt% or more of active oxygen based on the total weight.
PCT/KR2007/002905 2006-06-15 2007-06-15 Method of cooling slag generated during preliminary treatment of molten iron Ceased WO2007145481A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2007800220141A CN101466850B (en) 2006-06-15 2007-06-15 Method of cooling slag generated during preliminary treatment of molten iron
JP2009515308A JP4865858B2 (en) 2006-06-15 2007-06-15 Cooling method for slag generated during pretreatment of firewood

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20060053747A KR100775503B1 (en) 2006-06-15 2006-06-15 Cooling method of molten iron preliminary slag
KR10-2006-0053747 2006-06-15

Publications (1)

Publication Number Publication Date
WO2007145481A1 true WO2007145481A1 (en) 2007-12-21

Family

ID=38831949

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2007/002905 Ceased WO2007145481A1 (en) 2006-06-15 2007-06-15 Method of cooling slag generated during preliminary treatment of molten iron

Country Status (4)

Country Link
JP (1) JP4865858B2 (en)
KR (1) KR100775503B1 (en)
CN (1) CN101466850B (en)
WO (1) WO2007145481A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102304593A (en) * 2011-09-14 2012-01-04 山西太钢不锈钢股份有限公司 Water cooling method for molten iron pretreatment slag
JP2021147671A (en) * 2020-03-19 2021-09-27 日本製鉄株式会社 Method for cooling molten iron pre-treatment slag

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4373883A (en) * 1979-01-09 1983-02-15 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Apparatus for producing granules from molten metallurgical slags
KR20010055241A (en) * 1999-12-10 2001-07-04 이구택 A Method for Manufacturing Water-Granulated Slag Having Close-Packed Texture
JP2004026548A (en) * 2002-06-25 2004-01-29 Hitachi Zosen Corp Slag cooling method and slag generation equipment
JP2005256083A (en) * 2004-03-11 2005-09-22 Nippon Steel Corp Method for cooling iron-making slag

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5468789A (en) * 1977-11-14 1979-06-02 Nippon Steel Corp Treating method for blast furnace slag
JPS6039113A (en) * 1983-08-10 1985-02-28 Nippon Steel Corp Treatment of desulfurization slag
JPS6362811A (en) 1986-09-01 1988-03-19 Nippon Kokan Kk <Nkk> Method for refining molten iron
JPH01246161A (en) * 1988-03-29 1989-10-02 Sumitomo Metal Ind Ltd Dust scattering control in hot metal desulfurization slag
JP4634674B2 (en) 2001-09-27 2011-02-16 新日本製鐵株式会社 Method for reforming hot metal dephosphorization slag
JP4571818B2 (en) * 2004-04-21 2010-10-27 新日本製鐵株式会社 Method for reforming steelmaking slag

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4373883A (en) * 1979-01-09 1983-02-15 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Apparatus for producing granules from molten metallurgical slags
KR20010055241A (en) * 1999-12-10 2001-07-04 이구택 A Method for Manufacturing Water-Granulated Slag Having Close-Packed Texture
JP2004026548A (en) * 2002-06-25 2004-01-29 Hitachi Zosen Corp Slag cooling method and slag generation equipment
JP2005256083A (en) * 2004-03-11 2005-09-22 Nippon Steel Corp Method for cooling iron-making slag

Also Published As

Publication number Publication date
KR100775503B1 (en) 2007-11-12
CN101466850A (en) 2009-06-24
CN101466850B (en) 2011-05-18
JP2009540127A (en) 2009-11-19
JP4865858B2 (en) 2012-02-01

Similar Documents

Publication Publication Date Title
CN102264919B (en) Method for recovering iron and phosphorus from steelmaking slag
JP5569174B2 (en) Method for recovering iron and phosphorus from steelmaking slag, blast furnace slag fine powder or blast furnace slag cement, and phosphoric acid resource raw material
JP5560947B2 (en) Method for recovering iron and phosphorus from steelmaking slag, blast furnace slag fine powder or blast furnace slag cement, and phosphoric acid resource raw material
JP5573403B2 (en) Method for recycling steelmaking slag and raw material for phosphate fertilizer
BR112019013592B1 (en) PROCESSING METHOD BY DESULFURIZATION OF CAST STEEL AND DESULFURIZING AGENT
CN102094094B (en) Process for smelting ferronickel from red soil nickel ore
CN101736134A (en) Method to modify the steel slag by aluminothermic reduction reaction
JPWO2015011910A1 (en) Hot metal dephosphorization method
JP5594183B2 (en) Method for recovering iron and phosphorus from steelmaking slag and raw material for phosphate fertilizer
CN107130082A (en) A kind of method that copper is efficiently separated in high-copper iron charge
WO2007145481A1 (en) Method of cooling slag generated during preliminary treatment of molten iron
JP4267488B2 (en) Method for cooling steel slag
CN104060017A (en) Semi steel converter steelmaking method
JP2007517137A (en) Steel desulfurization agent and its use in steel desulfurization
CN103525971B (en) Vanadium slag modifier and preparation method thereof, and vanadium-extracting revolving furnace slag-splashing furnace-protecting method
CN105385809B (en) A kind of sulfur-bearing molten iron desulfurizing method
CN104711396A (en) Method removing phosphorus and sulfur simultaneously and reserving niobium, vanadium, chromium and nickel for molten iron
JP4992778B2 (en) Method for producing slag for mixed cement
CN116875770B (en) Slag regulator and preparation method and application thereof
TWI674321B (en) Steelmaking treatment agent and steelmaking method
CN113528743B (en) Converter slag modifier based on used tundish coating material, preparation method and application
CN103205525B (en) Furnace protective pellet for vanadium extracting converter and manufacturing method thereof
Li et al. Recycling of Stainless-Steel Pickling Sludge via RKEF Route
RU2304623C1 (en) Method of production of the manganese alloyed steel
JPH0372129B2 (en)

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200780022014.1

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07746939

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2009515308

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07746939

Country of ref document: EP

Kind code of ref document: A1