WO2007085193A1 - Procédé et système permettant de libérer des ressources de transfert - Google Patents

Procédé et système permettant de libérer des ressources de transfert Download PDF

Info

Publication number
WO2007085193A1
WO2007085193A1 PCT/CN2007/000274 CN2007000274W WO2007085193A1 WO 2007085193 A1 WO2007085193 A1 WO 2007085193A1 CN 2007000274 W CN2007000274 W CN 2007000274W WO 2007085193 A1 WO2007085193 A1 WO 2007085193A1
Authority
WO
WIPO (PCT)
Prior art keywords
resource
mobile switch
verification
mobile
switch
Prior art date
Application number
PCT/CN2007/000274
Other languages
English (en)
Chinese (zh)
Inventor
Li Jiang
Pin Chen
Xuehai Qiu
Zhidong Yang
Original Assignee
Huawei Technologies Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co., Ltd. filed Critical Huawei Technologies Co., Ltd.
Publication of WO2007085193A1 publication Critical patent/WO2007085193A1/fr

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements

Definitions

  • the present invention relates to the field of communications, and in particular to a method and system for releasing a handover resource. Background technique
  • the mobile subscriber may initiate an inter-office handover due to a change in location during the data service process.
  • the handover is as shown in FIG. 1.
  • the specific handover and disconnection procedure is as follows:
  • the Service Switching Center (MSC) initiates a handover request message to the second MSC when the mobile station needs to switch to the second MSC during the data service for the mobile station (FACDIR2, after the second MSC receives the handover request message, allocates the mobile station
  • the related resources include a wireless channel, a terrestrial circuit, etc., and return a handover response message (facdir2) to the first MSC after the assignment is successful.
  • the second MSC sends a handover complete message (MSONCH) to the first MSC.
  • MSONCH handover complete message
  • the second MSC sends a disconnection request message (DROPSERV) to the first MSC, and the first MSC releases the relevant resource after receiving the disconnection request message.
  • DROPSERV disconnection request message
  • the second MSC sends a disconnection response message (dropserv) to the second MSC, and the second MSC releases the relevant resource after receiving the disconnection response message.
  • DROSERV disconnection request message
  • dropserv disconnection response message
  • the inter-office disconnect request message is lost, so that the first MSC retains the established resources because it has not received the disconnect request message.
  • the disconnection request message since the disconnection request message is not received, it is considered that the mobile user's call is still continuing, and the currently established resources are not released. Since the mobile subscriber status in the visitor location register (VLR) is always in a call state, the call cannot be initiated again, which inevitably affects the mobile subscriber's bill, and will also cause the first MSC's resources to be permanently occupied.
  • VLR visitor location register
  • the technical problem to be solved by the embodiment of the present invention is to provide a method and system for releasing a handover resource, which is a defect that the resource cannot be released due to the loss of the inter-office disconnection message during the inter-office handover in the prior art.
  • the technical solution adopted by the embodiment of the present invention to solve the technical problem is: a method for switching resources, including the following steps: The first mobile switch initiates resource verification to the second mobile switch, if
  • the first mobile switch determines that the resource check fails, and releases related resources on the first mobile switch.
  • An embodiment of the present invention provides a device for releasing a handover resource, including a verification unit and a handover unit, where the verification unit is configured to initiate a resource check to a peer mobile switch, and if the resource check fails, notify the handover unit to Related resources.
  • An embodiment of the present invention further provides a handover resource release system, including a first mobility switch and a second mobility switch, where the first mobility switch is configured to initiate resource verification to the second mobility switch, and according to After the response of the second mobile switch determines that the resource check fails, the related resources on the first mobile switch are released; and the second mobile switch is configured to respond to the resource check of the first mobile switch.
  • a handover resource release system including a first mobility switch and a second mobility switch, where the first mobility switch is configured to initiate resource verification to the second mobility switch, and according to After the response of the second mobile switch determines that the resource check fails, the related resources on the first mobile switch are released; and the second mobile switch is configured to respond to the resource check of the first mobile switch.
  • the method and system for switching resources of the embodiment of the present invention, through inter-office resource verification, enable normal release of related resources on the mobile switch during inter-office handover, thereby improving resource utilization.
  • 1 is a schematic diagram of an inter-office handover of an existing mobile station
  • FIG. 2 is a schematic diagram of handover resource release of an MSC according to an embodiment of the present invention.
  • FIG. 3 is a structural block diagram of an MSC according to an embodiment of the present invention.
  • FIG. 5 is a schematic flow chart of resource verification in an embodiment of the present invention.
  • the inter-office resource check is initiated by the mobile switch, and it is determined according to the verification result.
  • the related resources on the mobile switch are released, so that related resources on the mobile switch can be normally released during the inter-office handover.
  • the first mobile switch and the second mobile switch according to the embodiment of the present invention respectively include a Mobile Services Switching Center (MSG) or a Mobile Services Switching Center emulation (MSCe).
  • MSC Mobile Services Switching Center
  • the MSC is used as an example to describe how the first MSC performs resource check on the second MSC to release the handover resources.
  • the processing flow of the MSCe is the same as that of the MSC.
  • FIG. 2 is a schematic diagram of handover resource release of an MSC.
  • a mobile station switches from a first MSC to a second MSC and is in a steady state of handover, timing is started.
  • the first MSC finds that it is in the steady state for a certain period of time, that is, after the switching steady state time reaches the first predetermined time, it initiates a resource check request message to the second MSC and starts a resource check timer.
  • the resource verification request message includes a mobile station identifier (Mobile Station ID) or an inter-office switching circuit number (Inter MS C Circuit ID), where the first predetermined time is a preset first MSC reaching a switching steady state.
  • the time gate P is depreciated.
  • the second MSC After receiving the resource check request message from the first MSC, the second MSC determines whether the state between the mobile station and the second MSC is in a steady state according to the identifier of the mobile station or the inter-office switching circuit number, for example, determining the mobile station and the second Whether the circuit resources between the MSCs are in an occupied state, or whether the IP resources between the mobile station and the second MSC are in an occupied state or whether resources of each module in the MSC are in a stable state of switching, if between the mobile station and the second MSC If the circuit resource is in an occupied state, or the IP resource between the mobile station and the second MSC is in an occupied state, or the resources of each module in the MSC are in a stable state, determining that the switching state of the mobile station and the second MSC is in a steady state, then The second MSC returns a resource verification success response message to the first MSC, where the message includes a verification success flag; if the circuit resource between the mobile station and the second MSC is in an
  • the first MSC receives the resource verification success response message of the second MSC, and determines that the resource verification is successful, and does not: perform any operation, or restarts the switching steady state timer, and waits for a certain time to re-check the resource; if the first MSC receives Returning the resource verification failure response message to the second MSC, determining that the resource verification fails, releasing the related resource; if the resource verification time exceeds the second predetermined time, and the first MSC has not received the resource verification response message from the second MSC, A MSC judges the resource core If the check fails, the related resources are released, where the second predetermined time is a preset time threshold of the resource check response message received by the first MSC.
  • the second MSC in the embodiment of the present invention also has the resource verification capability.
  • the second MSC starts the switching 5 on the steady state.
  • the second MSC starts the resource check to achieve the purpose of the handover of the resource.
  • the resource verification process is consistent with the resource verification process initiated by the first MSC, and details are not described herein.
  • the mobile station After the handover of the first MSC to the second MSC is completed, the mobile station initiates a disconnection on the second MSC, 10 and passes The second MSC forwards the disconnection request message to the first MSC, or the second MSC initiates the disconnection, and sends the disconnection request message to the first MSC, and the second MSC starts the timing waiting for the disconnection response message, if the second After the MSC has not received the disconnection response message after the third predetermined time, the second
  • the MSC releases related resources thereon, wherein the third predetermined time is a time threshold of the preset second MSC receiving the disconnection response message.
  • L5 is a mobile service switching center according to an embodiment of the present invention.
  • a block diagram of a specific embodiment of the MSC the MSC in this embodiment includes a switching module 34, a switching steady state timer 31, a resource checking module 32, and a resource checking timer 33, wherein the resource checking module 32 is respectively connected to the switching steady state.
  • the timer 31 and the resource check timer 33 are connected to the switch steady state timer 31 and the resource check module 32.
  • the switching module 34 is similar to the switching module in the existing system, and is configured to send a handover request message to the mobile service switching center of the opposite end when the handover is performed, and return to the disconnection after receiving the disconnection request message of the opposite end or releasing the resource message. Respond to messages and release related resources.
  • the above two logical timers can be implemented by two physical timers.
  • the resource check timer 33 and the resource check timer 33 can also be implemented by a physical timer, which is triggered by the switch module 34 and the resource check module 32 at different stages, thereby implementing different timing strategies. That is, it is controlled by the switching module 34 before the resource check to switch the steady state timing; and in the resource verification phase, the resource check module 32 controls the resource check timing.
  • the resource check module 32 is configured to perform resource check, and send a resource check request message to the peer mobile service switching center after the handover steady state timer 31 exceeds the first predetermined time, and start the resource check timer 33.
  • the resource verification module 32 is further configured to receive a resource verification response message from the peer mobile service switching center, and determine, according to the resource verification response message, whether the resource verification is successful. If the resource check fails, that is, the resource check failure response message is received or the resource check timer 33 exceeds the second predetermined time, the resource check module 32 sends a signal to the switch module 34 to cause the switch module 34 to release the relevant resources.
  • the mobile switch provided by the embodiment of the present invention includes a first timer, a second timer, a checking unit, and a switching unit, where the first timer is used to achieve the switching steady state, and the timing is sent to the checking unit.
  • the first timer is a switching steady state timer 31; the second timer is used to time the resource verification when it is initiated, and the timing result is sent to the verification unit,
  • the MSC is shown as an example.
  • the second timer is the resource check timer 33. After the first timer reaches the first predetermined time, the check unit initiates a resource check to the peer mobile switch.
  • the control unit If the check succeeds, the control unit If the resource check fails (ie, the resource check failure response message is received or the second timer expires for a second predetermined time), the switching unit is notified to release the related resources, for example, the MSC shown in FIG.
  • the verification unit is the resource verification module 32; the switching unit is the switching module 34 shown in FIG.
  • the mobile switch in the embodiment of the present invention may further include a third timer, where the third timer is used to start timing after the handover between the first mobile switch and the second mobile switch is completed, and the timing result is sent to the switching unit. Then, the switching unit is further configured to receive the response message of the disconnection request, and the corresponding resource is released after the response message is not received within the third predetermined time counted by the third timer.
  • the system for releasing a switching resource includes a first mobile switch and a second mobile switch, where
  • the first mobile switch After the first mobile switch reaches the first predetermined time, sending a resource check request to the second mobile switch, and determining, according to the resource check response message returned by the second mobile switch, whether the resource check is successful, and if the resource check is successful, re-time; If the resource verification fails, then # put the relevant resources on the first mobile switch;
  • the second mobility switch generates a resource check response message according to the resource check request and sends a resource check response message to the first mobile switch.
  • FIG. 4 is a flowchart of a method for dry-moving a mobile service switching center resource according to an embodiment of the present invention. In this reality In the embodiment, it is assumed that the mobile station switches from the first MSC to the second MSC, and the steps are as follows:
  • S41 The mobile station switches from the first MSC to the second MSC, the first MSC starts to switch the steady state timer 31, and the switching steady state timer 31 is started when the mobile station is in the switching steady state;
  • the first MSC If the first MSC does not receive the disconnection request message from the second MSC within a predetermined time (for example, the handover steady-state timer 31 times out), the first MSC starts a resource check to check the first MSC and the second. Whether there is a problem with the connection between the MSCs (such as inter-office link flashing, etc.);
  • the first MSC determines whether the resource check fails (step S43). If the resource check fails, the related resources on the first MSC are released (step S44); if the resource check is successful, the process returns to step S41.
  • FIG. 5 is a flow chart of resource verification for releasing a mobile service switching center resource according to an embodiment of the present invention, and the steps are as follows:
  • the first MSC sends a resource verification request message to the second MSC to check whether there is a problem in the connection between the first MSC and the second MSC (for example, the inter-office link flashes. Wait);
  • the resource check request message includes the identifier (MSID) of the mobile station or the inter-office handover circuit number for performing inter-office handover, where the inter-office handover is performed for the data service.
  • the circuit number is an invalid value, and the verification message may not be based on the interoffice switching circuit number;
  • the first MSC determines whether a resource verification success response message from the second MSC is received, that is, whether the resource verification response message from the second MSC carries a success flag.
  • An MSC If the first MSC receives the resource check success response message from the second MSC (ie, after the second MSC receives the resource check request message, if the mobile station is in the steady state of the handover state of the second MSC at this time, then An MSC returns a resource verification success response message, which carries a verification success flag, and returns to step S41.
  • the first MSC receives the resource check failure response message from the second MSC (ie, after the second MSC receives the resource check request message, if the mobile station is not in the steady state of the handover state of the second MSC at this time, The first MSC returns a resource check failure response message, where the message carries a check failure flag, and then releases related resources on the first MSC (step S56).
  • step S55 If the first MSC does not receive the resource check response message from the second MSC, it checks if the resource check timer 33 has timed out (step S55). If the resource check timer 33 times out, step S56 is executed to release the related resources on the first MSC; if the resource check timer 33 has not timed out, the process returns to step S53.
  • the second MSC initiates a second handover steady state timer thereon. After the second handover steady-state timer expires, the second MSC initiates a resource verification procedure with the first MSC (as shown in Figures 4 and 5).
  • the resource allocated to the mobile station cannot be released due to the loss of the inter-office release message.
  • the method of the resource verification is introduced in the embodiment of the present invention, and the mobile switch that is in the steady state for a certain period of time can actively contact the peer end.
  • the mobile switch initiates resource check, and determines whether the resource check is successful by querying whether the mobile switch between the peer mobile switch and the mobile station is in a steady state, and releases the related resources allocated to the mobile station in the case that the resource check fails, thereby improving the resource. Utilization of resources.

Abstract

La présente invention se rapporte à un procédé et à un système permettant de libérer des ressources de transfert. Le procédé selon l'invention comprend les étapes consistant à lancer, par l'intermédiaire d'un premier dispositif de commutation mobile, un contrôle de ressources vers un second dispositif de commutation, et à libérer les ressources correspondantes sur le premier dispositif de commutation mobile si ce dernier détermine que la vérification a échoué. Les procédé et système de libération de ressources selon l'invention permettent une libération normale des ressources correspondantes sur un dispositif de commutation mobile, par le contrôle des ressources inter-centraux en cas de transfert inter-centraux, ainsi qu'une augmentation du taux d'utilisation des ressources.
PCT/CN2007/000274 2006-01-25 2007-01-25 Procédé et système permettant de libérer des ressources de transfert WO2007085193A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CNB200610033397XA CN100446584C (zh) 2006-01-25 2006-01-25 释放移动交换中心资源的方法及系统
CN200610033397.X 2006-01-25

Publications (1)

Publication Number Publication Date
WO2007085193A1 true WO2007085193A1 (fr) 2007-08-02

Family

ID=37510605

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2007/000274 WO2007085193A1 (fr) 2006-01-25 2007-01-25 Procédé et système permettant de libérer des ressources de transfert

Country Status (2)

Country Link
CN (1) CN100446584C (fr)
WO (1) WO2007085193A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102316232A (zh) * 2011-05-23 2012-01-11 中兴通讯股份有限公司 通话计时处理方法、装置及系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1600043A (zh) * 2001-12-05 2005-03-23 艾利森电话股份有限公司 与msc间分组数据切换相关的电路交换呼叫建立与呼叫路由的优化
WO2005027563A1 (fr) * 2003-09-15 2005-03-24 Matsushita Electric Industrial Co., Ltd. Procede pour liberer des ressources allouees lors d'un transfert sip
CN1665342A (zh) * 2005-03-30 2005-09-07 中兴通讯股份有限公司 一种接力切换的实现方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3049056B1 (ja) * 1998-07-02 2000-06-05 日本電気通信システム株式会社 移動体通信網の加入者デ―タ制御方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1600043A (zh) * 2001-12-05 2005-03-23 艾利森电话股份有限公司 与msc间分组数据切换相关的电路交换呼叫建立与呼叫路由的优化
WO2005027563A1 (fr) * 2003-09-15 2005-03-24 Matsushita Electric Industrial Co., Ltd. Procede pour liberer des ressources allouees lors d'un transfert sip
CN1665342A (zh) * 2005-03-30 2005-09-07 中兴通讯股份有限公司 一种接力切换的实现方法

Also Published As

Publication number Publication date
CN100446584C (zh) 2008-12-24
CN1878346A (zh) 2006-12-13

Similar Documents

Publication Publication Date Title
JP4985880B2 (ja) 通信方法とモバイルネットワークシステムと装置
US8265057B2 (en) Enhanced voice pre-emption of active packet data service
WO2011116722A2 (fr) Procédé et dispositif destinés à traiter des échecs d'un dispositif de gestion de mobilité dans une scène activée en réduction de signalisation en mode repos
WO2009089704A1 (fr) Procédé, système et dispositif associé pour traiter un service du domaine à commutation de circuits dans un réseau par paquets évolué
WO2009100609A1 (fr) Procédé de transfert de domaine de la continuité d'appel vocal radio unique
KR20130136539A (ko) 무선 액세스 기술 간 서비스 재시도 동안 세션 콘텍스트를 보존하기 위한 방법들 및 장치들
JP2009284469A (ja) 接続を再確立する方法及び通信装置
JP4391730B2 (ja) ハードハンドオフ後に移動局を強制登録するための装置及び方法
WO2006010344A1 (fr) Procede et systeme permettant a un terminal de recevoir un numero appelant a l'avance
WO2012055093A1 (fr) Procédé et dispositif de traitement d'appel dans une réserve de centres de commutation de communications mobiles
WO2003030566A2 (fr) Procede et appareil facilitant les transferts mobiles de donnees par paquets en mode dormant
TWI404443B (zh) 處理封包暫時行動用戶識別變更之方法及其相關行動裝置
WO2019214606A1 (fr) Procédé de commande exécuté dans un équipement utilisateur, et équipement utilisateur
JP2013085222A (ja) モバイル機器の移動性管理層を管理する方法
WO2012163164A1 (fr) Procédé et dispositif de sélection de passerelle
WO2007085193A1 (fr) Procédé et système permettant de libérer des ressources de transfert
WO2012100566A1 (fr) Procédé, système et dispositif pour gérer un service de visiophonie
US8483677B2 (en) Method of managing mobility management layer of a mobile device
WO2008006281A1 (fr) Procédé, dispositif et centre de commutation mobile pour informer un utilisateur de l'échec d'un appel
WO2011009336A1 (fr) Procédé pour le traitement d'un message de radiomessagerie et contrôleur de station de base correspondant
WO2010124644A1 (fr) Procédé de mise en oeuvre de services d'urgence, système de mise en oeuvre de services d'urgence et dispositif réseau
US8107976B2 (en) Accounting method for ultra mobile broadband access network

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07702195

Country of ref document: EP

Kind code of ref document: A1