WO2007067059A1 - All electric subsea boosting system - Google Patents

All electric subsea boosting system Download PDF

Info

Publication number
WO2007067059A1
WO2007067059A1 PCT/NO2006/000413 NO2006000413W WO2007067059A1 WO 2007067059 A1 WO2007067059 A1 WO 2007067059A1 NO 2006000413 W NO2006000413 W NO 2006000413W WO 2007067059 A1 WO2007067059 A1 WO 2007067059A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
subsea
compressor
control
boosting
Prior art date
Application number
PCT/NO2006/000413
Other languages
English (en)
French (fr)
Inventor
Bernt Bjerkreim
Harald Arnt Friisk
Asbjørn ERIKSEN
Karl Olav Haram
Ola SKRØVSETH
Geir Aalvik
Original Assignee
Statoilhydro Asa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Statoilhydro Asa filed Critical Statoilhydro Asa
Priority to US12/085,171 priority Critical patent/US20090200035A1/en
Priority to GB0811672A priority patent/GB2447383A/en
Priority to CA002632274A priority patent/CA2632274A1/en
Priority to AU2006323327A priority patent/AU2006323327A1/en
Priority to BRPI0620583-6A priority patent/BRPI0620583A2/pt
Publication of WO2007067059A1 publication Critical patent/WO2007067059A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/36Underwater separating arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/08Pipe-line systems for liquids or viscous products
    • F17D1/14Conveying liquids or viscous products by pumping

Definitions

  • the present invention relates to an all electric subsea boosting system for well fluid boosting by compressing hydrocarbon gases and/or pumping hydrocarbon liquids comprising one or more subsea boosting stations and one or more long step-out power supplies.
  • a boosting station may consist of compressor(s) and/or single or multiphase pump(s).
  • An offshore gas field may be developed with seabed installations which are tied back to a terminal onshore or an existing platform.
  • the seabed installation comprises of one or more production templates where each template produces well fluid through manifold headers which are connected to one or more? pipelines. Said pipelines transport well fluid to an onshore terminal or pan? existing platform (receiving facility) for further processing. Processed gas and condensate are exported to the market.
  • One or more umbilicals for power, control and utility supplies are installed from the receiving facility to said subsea installations.
  • well fluid may flow to the receiving facility by means of the reservoir pressure. Later in the production phase, or at start-up of the production, well fluid boosting is required in order to maintain the production level and to recover the anticipated gas and condensate volumes.
  • the conventional solution for such well fluid boosting facility is an offshore platform.
  • a subsea boosting system may be an alternative to or in combination to said platform solution.
  • the present invention seeks to provide an all electric subsea boosting system to replace or assist the use of an offshore platform. That the system is all electric means that it is controlled and operated with electrical power, and does not have a hydraulic system for assisting opening and closing of valves. In accordance with the present invention, this object is accomplished in an all electric subsea boosting system where said system comprises one or more subsea compression stations and one or more long step-out power supplies.
  • An all electric subsea boosting system in accordance with the present invention has a number of advantages compared to a booster platform solution.
  • Said system is safe to human injuries and fatalities due to remote operation, reliable, cost effective, environmental friendly and comprises few parts which make the system less complicated and easy to operate.
  • Fig. 1 shows a schematic overview of the all electric subsea boosting system in accordance with the present invention.
  • Figure 2 shows a subsea main power system single line diagram.
  • Figs. 3 and 4 show a typical all electric subsea boosting station layout in accordance with the present invention.
  • Figure 5 shows a boosting station process flow diagram
  • Figure 6 shows a schematic overview of main modules and parts in a subsea boosting station according to the present invention.
  • Figure 7 shows a typical power and control architecture for a subsea boosting system.
  • Figure 1 illustrates the all electric subsea boosting system.
  • Said system comprises one or more subsea boosting stations and one or more long step-out power supplies.
  • the long step-out power supply is defined from the connection point at the receiving facility to and including the main subsea transformer.
  • Such long step-out power supply comprises the following subsea components:
  • Combined or separate power and control umbilical including:
  • the boosting station is connected directly to at least one subsea production template and is designed for boosting well fluid from said production templates.
  • Well fluid from the production templates is routed via one of the template manifold headers, via the infield flow lines and to connectors on the suction side of the boosting station.
  • the boosting station is connected to export pipelines with flow lines to each pipeline. Compressed gas will be transported in said export pipelines to the receiving facility.
  • Figure 2 shows a main power system single line diagram for a subsea boosting system.
  • High voltage power, control and utilities are supplied from receiving facilities with one or more power and control umbilicals.
  • the high voltage (HV) power cables will be connected to the subsea main step- down transformer and the transformer will be installed on the subsea boosting station with the umbilical attached.
  • the single line diagram shows the power distribution system for the main subsea electrical consumers.
  • Figures 3 and 4 show a typical subsea compression station layout.
  • the subsea boosting station comprises the following modules and parts:
  • One or more compressor trains and/or single or multiphase pump(s) are provided.
  • the compressor train is the main equipment required for compressing the well stream.
  • the compressor train comprises the following modules and parts:
  • VSD Variable Speed Drive
  • Control system including control modules Common to the compressor trains is a power and control umbilical connection system and a valve manifold fitted with flow line connection systems.
  • the station power distribution system consisting of removable circuit breaker modules and variable speed drive modules are arranged together at one end of the station structure adjacent to the subsea main transformer.
  • the actual mating mechanism for the high voltage wet mate connectors will be dependent upon the chosen power connection system.
  • the piping manifold is formed to provide a balanced symmetrical routing through each of the compressor trains. Emphasis is given to avoid high stress levels, ensuring flexibility for connection operations.
  • the modules are provided with local guiding/docking and are locked into position by dedicated mechanisms.
  • Intervention for ROV is designed for minimum top and one side access. Access to modules for vertical removal/installation is provided from the top and sides of the protective structure.
  • Smaller removable modules such as control pods, control valves and certain instrumentation units are provided as individual units and/or included within one of the main modules as removable items, these modules/items are run on dedicated intervention running tools.
  • the compressor is directly driven by a high-speed motor.
  • the electrical motor is cooled with hydrocarbon gas with a pressure regulated to be equal to or as close to the suction pressure as possible.
  • Said gas source can either be conditioned gas supplied to the subsea compression station from an external source, discharge gas from the compressor module or suction gas to the compressor module.
  • Said hydrocarbon gas for electrical motor cooling might be conditioned prior to entering into the electrical motor and said hydro-carbon gas might also be replaced by other suitable gases.
  • the motor may be fully canned with main cooling from the gas flow.
  • the compressor is able to meet the design operational conditions over the production period with declining production wellhead pressure. Re-bundling of the compressor can be performed as part of a maintenance program.
  • a magnetic bearing system is used for each of the subsea compressor modules.
  • the system includes magnetic radial and axial bearings as well as run-down bearings.
  • Material properties of the compressor unit is suitable for operation with relevant content of H 2 S and CO 2 .
  • the compressor and material properties are designed for the liquid fractions and solids content coming with the gas stream from the upstream separator.
  • the size and distribution of the liquid droplets and solids particles is dependent on the separator design.
  • the boosting station manifold is equipped with a remote operated isolation valve facilitating by-pass of the compression trains.
  • the boosting system is designed to handle the continuous fines/sand production.
  • the rotating equipment is protected against wear and degradation from solids. This will ensure high efficiency, long life and reliability.
  • the compressor(s) have anti-surge control recycle line designed for full recycle flow at maximum continuous speed (105%).
  • the anti-surge control valve is electrical actuated, axial stroke and is located close to the compressor discharge at high point.
  • An anti-surge re-cycle cooler is included downstream of the anti-surge valve in the re-cycling pipe loop.
  • the compressors have a discharge pipe equipped with a remote operated isolation valve.
  • a non-return valve is fitted in the compressor discharge pipe upstream of the isolation valve.
  • the boosting station is able to handle liquid backflow from the downstream export pipeline.
  • the boosting station is isolated and pressurised to avoid liquid ingress due to back-flow from multiphase export pipelines.
  • the separator separates liquid/solids from the gas which in turn is ingested into the pump and compressor, respectively.
  • the separator is designed to separate liquids and solids from the gas flow to avoid excessive erosion of the compressor.
  • Right separator design is chosen to secure that solids are not clogged or fixed anywhere in the separator or its internals.
  • the condensate pumps are able to handle the liquid production and boost it up to the required discharge pressure.
  • the pumps are variable or fixed speed driven.
  • the pumps are able to handle the continuous and intermittent sand production in the liquid stream from the separators.
  • the boosting station has tie-in connection for well fluid discharge. Each of these are equipped with ROV (remotely operated vehicle) operated valves for routing of the well fluid to the different pipelines.
  • Figure 5 shows a subsea boosting station process flow diagram.
  • the process in the subsea boosting station is envisaged in the following paragraphs.
  • the well fluid from a tied-in production template is distributed to a separator equipped with an electric actuated isolation valve in the inlet pipe.
  • the well stream is further routed via the compressor by-pass line before compressor start-up and the by-pass valve is closed when the compressor(s) are brought into operation.
  • inlet/input coolers will depend on required compressor inlet temperature and the physical location of the compressor station in relation to the production template(s) and the heat transfer from the connecting flow lines to the seawater.
  • the cooling required is dependent on the well stream inlet temperature, the required inlet temperature to the boosting system and the hydrate formation temperature. Additional cooling in the in-field flow lines from the production templates is possible.
  • the compressor allows recirculation for anti-surge protection and start-up/shutdown operations.
  • the recycle cooler and recycle loop is designed for full recycle flow at compressor maximum continuous speed (105%). Most of the solids are removed in the separators. Sand/fines/solids entering the boosting station will be separated out in the separator and transported via the liquid pump to the discharge pipeline.
  • a sand trap for accidental sand production may be used to remove sand from the inlet well fluid.
  • Gas demisting and gas-liquid separation is performed by use of scrubbers. Tolerance to sand/solids/fines in the well stream is made acceptable with regard to entrainment, clogging in demisting equipment and drainage system and also accumulation in vessel bottom. Continuous production of fines is handled in the boosting station, without jeopardizing operation and performance.
  • the separation vessel is designed to have safe and efficient handling of liquid slugs.
  • the slug handling philosophy is to accumulate the specified slug volumes in the separator units. The liquid slugs entering the boosting station will accumulate in the separator before being pumped to the station discharge by the liquid pumps.
  • the design also ensures stable operation for moderate slugging with minimum use of liquid level control devices and minimum impact on compressor operation due to inlet pressure transients.
  • the internals are designed for the thrust and vibration caused by the expected slugging.
  • the liquid boosting system consists of single or multiphase condensate pumps with fixed or variable speed drives.
  • the pump discharge pipes are equipped with a non-return valve upstream of the discharge isolation valve.
  • Anti-surge control is made possible by monitoring the compressor suction flow rate, temperature, pressure together with compressor discharge pressure and temperature.
  • the well stream is inhibited by MEG injection at the wellheads to prevent hydrate formation.
  • the MEG, condensate and water is separated out in the separator in the boosting station and pumped to the station discharge header by the condensate pumps. Sufficient MEG content will ensure hydrate prevention of these parts of the system.
  • the gas separated out in the separator will have none or only small quantities of MEG.
  • FIG. 6 A schematic overview of main modules and parts in a subsea boosting station pilot set-up used for tests in the intended environment is shown in Figure 6.
  • the subsea facilities comprise remotely actuated valves to control the flow of produced gas and the injection of chemicals.
  • the remotely operated valves are electrically actuated
  • Local instruments is provided to measure pressure, temperature, gas flow rate and record the anti-surge valve position.
  • valves The different types of valves, the condition monitoring system and the transmitters are interfaced via the subsea control modules.
  • Interface and closing of control loops between the variable speed drives circuit breakers and compressors control system may be via the receiving facilities control system main bus. All information, alarms and interlocks between the two systems should be handled by the distributed control system.
  • the receiving facilities distributed control system controls all control loops defined “slow". This is typically opening and closing of manifold valves and condition monitoring systems.
  • the subsea control system has inter-connection links to handle potential subsea shutdown requirements.
  • Dynamic control loops which requires quick response, are the anti-surge controller and the magnetic bearing controller. These loops shall be closed subsea if required.
  • Anti-surge algorithms are identically implemented for all compressor stages.
  • the control algorithms include features for suction and discharge pressure override, i.e. limiting the discharge pressure or increasing the suction pressure.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Jet Pumps And Other Pumps (AREA)
  • Pipeline Systems (AREA)
PCT/NO2006/000413 2005-12-05 2006-11-10 All electric subsea boosting system WO2007067059A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US12/085,171 US20090200035A1 (en) 2005-12-05 2006-11-10 All Electric Subsea Boosting System
GB0811672A GB2447383A (en) 2005-12-05 2006-11-10 All electric subsea boosting system
CA002632274A CA2632274A1 (en) 2005-12-05 2006-11-10 All electric subsea boosting system
AU2006323327A AU2006323327A1 (en) 2005-12-05 2006-11-10 All electric subsea boosting system
BRPI0620583-6A BRPI0620583A2 (pt) 2005-12-05 2006-11-10 sistema de impulsionamento submarino totalmente elétrico

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20055727A NO20055727L (no) 2005-12-05 2005-12-05 Elektrisk undervanns kompresjonssystem
NO20055727 2005-12-05

Publications (1)

Publication Number Publication Date
WO2007067059A1 true WO2007067059A1 (en) 2007-06-14

Family

ID=35529620

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2006/000413 WO2007067059A1 (en) 2005-12-05 2006-11-10 All electric subsea boosting system

Country Status (9)

Country Link
US (1) US20090200035A1 (no)
AU (1) AU2006323327A1 (no)
BR (1) BRPI0620583A2 (no)
CA (1) CA2632274A1 (no)
DK (1) DK200800710A (no)
GB (1) GB2447383A (no)
NO (1) NO20055727L (no)
RU (1) RU2008127358A (no)
WO (1) WO2007067059A1 (no)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010110674A3 (en) * 2009-03-27 2011-04-14 Framo Engineering As Subsea system with subsea cooler and method for cleaning the subsea cooler
WO2014006371A2 (en) * 2012-07-03 2014-01-09 Caltec Limited A system to boost the pressure of multiphase well fluids to handle slugs
CN103511218A (zh) * 2012-06-27 2014-01-15 韦特柯格雷斯堪的纳维亚有限公司 用于运行井流中的海底压缩系统的设备和方法
WO2015018945A2 (en) 2013-08-09 2015-02-12 Linde Aktiengesellschaft Subsea well stream treatment
RU2571117C2 (ru) * 2010-09-13 2015-12-20 Акер Сабси АС Система передачи электроэнергии под водой для обеспечения работы высокооборотного двигателя
DK178564B1 (da) * 2008-04-21 2016-06-27 Statoil Petroleum As Gaskompressionssystem

Families Citing this family (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO325743B1 (no) * 2006-07-05 2008-07-14 Vetco Gray Scandinavia As Undersjoisk bryterinnretning
GB2463487A (en) * 2008-09-15 2010-03-17 Viper Subsea Ltd Subsea protection device
WO2011088517A1 (en) * 2010-01-21 2011-07-28 Energy Process Services Pty Ltd Networked infield compression
CN102947537B (zh) * 2010-04-08 2016-02-17 弗拉姆工程公司 用于海底生产系统控制的系统和方法
NO335032B1 (no) 2011-06-01 2014-08-25 Vetco Gray Scandinavia As Undersjøisk kompresjonssystem med pumpe drevet av komprimert gass
US8624530B2 (en) 2011-06-14 2014-01-07 Baker Hughes Incorporated Systems and methods for transmission of electric power to downhole equipment
EP2717401B1 (en) * 2012-10-05 2015-01-28 Siemens Aktiengesellschaft Subsea electrical power system
US10119381B2 (en) 2012-11-16 2018-11-06 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
US9893500B2 (en) 2012-11-16 2018-02-13 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US10036238B2 (en) * 2012-11-16 2018-07-31 U.S. Well Services, LLC Cable management of electric powered hydraulic fracturing pump unit
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US9410410B2 (en) 2012-11-16 2016-08-09 Us Well Services Llc System for pumping hydraulic fracturing fluid using electric pumps
US10020711B2 (en) 2012-11-16 2018-07-10 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US10526882B2 (en) 2012-11-16 2020-01-07 U.S. Well Services, LLC Modular remote power generation and transmission for hydraulic fracturing system
US10407990B2 (en) 2012-11-16 2019-09-10 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US11959371B2 (en) 2012-11-16 2024-04-16 Us Well Services, Llc Suction and discharge lines for a dual hydraulic fracturing unit
US10232332B2 (en) 2012-11-16 2019-03-19 U.S. Well Services, Inc. Independent control of auger and hopper assembly in electric blender system
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US9995218B2 (en) 2012-11-16 2018-06-12 U.S. Well Services, LLC Turbine chilling for oil field power generation
US9650879B2 (en) 2012-11-16 2017-05-16 Us Well Services Llc Torsional coupling for electric hydraulic fracturing fluid pumps
US10254732B2 (en) 2012-11-16 2019-04-09 U.S. Well Services, Inc. Monitoring and control of proppant storage from a datavan
US9970278B2 (en) 2012-11-16 2018-05-15 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US9745840B2 (en) 2012-11-16 2017-08-29 Us Well Services Llc Electric powered pump down
US9840901B2 (en) 2012-11-16 2017-12-12 U.S. Well Services, LLC Remote monitoring for hydraulic fracturing equipment
US10199975B2 (en) * 2014-05-07 2019-02-05 Aker Solutions As Power supply assembly and associated method
US10578128B2 (en) 2014-09-18 2020-03-03 General Electric Company Fluid processing system
NO338808B1 (no) * 2014-11-10 2016-10-24 Vetco Gray Scandinavia As Modularisert prosesslinje for hydrokarbonfluid
EP3054083B1 (en) * 2015-02-05 2017-05-17 Saipem S.p.A. Underwater hydrocarbon processing facility
NO339899B1 (en) * 2015-05-14 2017-02-13 Vetco Gray Scandinavia As A control system for controlling a subsea gas compression system
US10931140B2 (en) * 2016-05-05 2021-02-23 Onesubsea Ip Uk Limited Supply of auxiliary power to remote installations
US9732589B1 (en) * 2016-09-20 2017-08-15 Chevron U.S.A. Inc. Integrated subsea power distribution system with flowline direct electrical heating and pressure boosting and methods for using
CA2987665C (en) 2016-12-02 2021-10-19 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
GB201705517D0 (en) * 2017-04-05 2017-05-17 Statoil Petroleum As Fluid flow conditioning
US10280724B2 (en) 2017-07-07 2019-05-07 U.S. Well Services, Inc. Hydraulic fracturing equipment with non-hydraulic power
WO2019071086A1 (en) 2017-10-05 2019-04-11 U.S. Well Services, LLC SYSTEM AND METHOD FOR FLOWING INSTRUMENTED FRACTURING SLUDGE
US10408031B2 (en) 2017-10-13 2019-09-10 U.S. Well Services, LLC Automated fracturing system and method
US10655435B2 (en) 2017-10-25 2020-05-19 U.S. Well Services, LLC Smart fracturing system and method
CA3084596A1 (en) 2017-12-05 2019-06-13 U.S. Well Services, LLC Multi-plunger pumps and associated drive systems
CA3084607A1 (en) 2017-12-05 2019-06-13 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11114857B2 (en) 2018-02-05 2021-09-07 U.S. Well Services, LLC Microgrid electrical load management
US11035207B2 (en) 2018-04-16 2021-06-15 U.S. Well Services, LLC Hybrid hydraulic fracturing fleet
US11211801B2 (en) 2018-06-15 2021-12-28 U.S. Well Services, LLC Integrated mobile power unit for hydraulic fracturing
WO2020056258A1 (en) 2018-09-14 2020-03-19 U.S. Well Services, LLC Riser assist for wellsites
WO2020076902A1 (en) 2018-10-09 2020-04-16 U.S. Well Services, LLC Modular switchgear system and power distribution for electric oilfield equipment
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
WO2020231483A1 (en) 2019-05-13 2020-11-19 U.S. Well Services, LLC Encoderless vector control for vfd in hydraulic fracturing applications
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11009162B1 (en) 2019-12-27 2021-05-18 U.S. Well Services, LLC System and method for integrated flow supply line
NO20200357A1 (en) * 2020-03-26 2021-09-27 Fmc Kongsberg Subsea As Method and subsea system for phased installation of compressor trains
CN114458251B (zh) * 2021-12-29 2024-02-09 海洋石油工程股份有限公司 一种水下增压管汇装置
CN114876453A (zh) * 2022-05-05 2022-08-09 西南石油大学 一种能自动调整介质成分及参数的油气砂多相混输泵实验系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4235289A (en) * 1979-05-10 1980-11-25 Mobil Oil Corporation Method for producing carbon dioxide from subterranean formations
GB2226776A (en) * 1989-01-06 1990-07-11 Kvaerner Subsea Contracting Pumping station
US5203682A (en) * 1991-09-04 1993-04-20 Baker Hughes Incorporated Inclined pressure boost pump
US20030153468A1 (en) * 2002-02-11 2003-08-14 Nils-Arne Soelvik Integrated subsea power pack for drilling and production
EP1555387A1 (en) * 1999-09-10 2005-07-20 Alpha Thames Limited A retrievable module suitable for a seabed processing system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6059539A (en) * 1995-12-05 2000-05-09 Westinghouse Government Services Company Llc Sub-sea pumping system and associated method including pressure compensating arrangement for cooling and lubricating
US7931090B2 (en) * 2005-11-15 2011-04-26 Schlumberger Technology Corporation System and method for controlling subsea wells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4235289A (en) * 1979-05-10 1980-11-25 Mobil Oil Corporation Method for producing carbon dioxide from subterranean formations
GB2226776A (en) * 1989-01-06 1990-07-11 Kvaerner Subsea Contracting Pumping station
US5203682A (en) * 1991-09-04 1993-04-20 Baker Hughes Incorporated Inclined pressure boost pump
EP1555387A1 (en) * 1999-09-10 2005-07-20 Alpha Thames Limited A retrievable module suitable for a seabed processing system
US20030153468A1 (en) * 2002-02-11 2003-08-14 Nils-Arne Soelvik Integrated subsea power pack for drilling and production

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK178564B1 (da) * 2008-04-21 2016-06-27 Statoil Petroleum As Gaskompressionssystem
US9163482B2 (en) 2009-03-27 2015-10-20 Framo Engineering As Subsea system with subsea cooler and method for cleaning the subsea cooler
CN102428249A (zh) * 2009-03-27 2012-04-25 弗拉莫工程公司 具有海底冷却器的海底系统及用于清洁海底冷却器的方法
WO2010110674A3 (en) * 2009-03-27 2011-04-14 Framo Engineering As Subsea system with subsea cooler and method for cleaning the subsea cooler
AU2010229458B2 (en) * 2009-03-27 2015-10-29 Framo Engineering As Subsea system with subsea cooler and method for cleaning the subsea cooler
US9601925B2 (en) 2010-09-13 2017-03-21 Aker Subsea As Stable subsea electric power transmission to run subsea high speed motors
RU2571117C2 (ru) * 2010-09-13 2015-12-20 Акер Сабси АС Система передачи электроэнергии под водой для обеспечения работы высокооборотного двигателя
CN103511218A (zh) * 2012-06-27 2014-01-15 韦特柯格雷斯堪的纳维亚有限公司 用于运行井流中的海底压缩系统的设备和方法
EP2679766A3 (en) * 2012-06-27 2015-09-30 Vetco Gray Scandinavia AS Apparatus and method for operating a subsea compression system in a well stream
GB2521060B (en) * 2012-07-03 2015-10-14 Caltec Ltd A method to boost the pressure of multiphase well fluids to handle slugs
GB2521060A (en) * 2012-07-03 2015-06-10 Caltec Ltd A system to boost the pressure of multiphase well fluids to handle slugs
WO2014006371A3 (en) * 2012-07-03 2014-06-05 Caltec Limited A system to boost the pressure of multiphase well fluids to handle slugs
WO2014006371A2 (en) * 2012-07-03 2014-01-09 Caltec Limited A system to boost the pressure of multiphase well fluids to handle slugs
WO2015018945A2 (en) 2013-08-09 2015-02-12 Linde Aktiengesellschaft Subsea well stream treatment

Also Published As

Publication number Publication date
RU2008127358A (ru) 2010-01-20
BRPI0620583A2 (pt) 2011-11-16
AU2006323327A1 (en) 2007-06-14
DK200800710A (da) 2008-07-07
NO20055727L (no) 2007-06-06
GB2447383A (en) 2008-09-10
US20090200035A1 (en) 2009-08-13
GB0811672D0 (en) 2008-07-30
CA2632274A1 (en) 2007-06-14
NO20055727D0 (no) 2005-12-05

Similar Documents

Publication Publication Date Title
US20090200035A1 (en) All Electric Subsea Boosting System
WO2006132541A1 (en) Subsea compression system
US7819950B2 (en) Subsea compression system and method
US7140441B2 (en) Fluid separation method and system
EP1907705B1 (en) System for cleaning a compressor
WO2002092186A2 (en) Hydrate reducing and lubrication system and method for a fluid flow system
GB2509165A (en) Towable well fluid separation unit
US20100006291A1 (en) Method of cooling a multiphase well effluent stream
NO20110802A1 (no) Undersjoisk kompresjonssystem med pumpe drevet av komprimert gass
AU2013360887A1 (en) Subsea processing of well fluids
WO2021053314A1 (en) Wellhead boosting apparatus and system
WO2007055589A1 (en) Pressure and leakage control in rotating equipment for subsea compression
US10830016B2 (en) Regulating the temperature of a subsea process flow
US11624480B2 (en) Petroleum production process system and method of operation
Fantoft Subsea gas compression-challenges and solutions
CN111980635A (zh) 一种磁性靶向水合物抑制剂输运系统及方法
WO2005040670A1 (en) Method and system for reducing liquid accumulation in a multiphase flow pipeline
CN211059818U (zh) 适用于减少湿气海管水合物抑制剂注入量的脱液析烃系统
WO2007055591A1 (en) Unit for gas treatment in rotating equipment for subsea compression
Skofteland et al. Ormen Lange Subsea compression pilot-Subsea compression station
GB2433759A (en) Subsea compression system and method
WO2007073195A1 (en) Pump unit and method for pumping a well fluid
US20230193737A1 (en) Subsea phase-separation and dense gas reinjection by using a pump
Caetano et al. Field Experience With Multiphase Boosting Systems At Campos Basin, Brazil
Wu et al. Applying Subsea Fluid-Processing Technologies for Deepwater Operations

Legal Events

Date Code Title Description
DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 4676/DELNP/2008

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 2006323327

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2632274

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2006323327

Country of ref document: AU

Date of ref document: 20061110

Kind code of ref document: A

Ref document number: 0811672

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20061110

WWE Wipo information: entry into national phase

Ref document number: 0811672.5

Country of ref document: GB

WWE Wipo information: entry into national phase

Ref document number: 2008127358

Country of ref document: RU

WWE Wipo information: entry into national phase

Ref document number: 12085171

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 06824339

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: PI0620583

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20080605