WO2007063324A1 - Method and apparatus for installing deflecting conductor pipe - Google Patents
Method and apparatus for installing deflecting conductor pipe Download PDFInfo
- Publication number
- WO2007063324A1 WO2007063324A1 PCT/GB2006/004497 GB2006004497W WO2007063324A1 WO 2007063324 A1 WO2007063324 A1 WO 2007063324A1 GB 2006004497 W GB2006004497 W GB 2006004497W WO 2007063324 A1 WO2007063324 A1 WO 2007063324A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- conduit
- additional
- path
- existing
- diverting means
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 72
- 239000004020 conductor Substances 0.000 title abstract description 162
- 230000008878 coupling Effects 0.000 claims abstract description 22
- 238000010168 coupling process Methods 0.000 claims abstract description 22
- 238000005859 coupling reaction Methods 0.000 claims abstract description 22
- 238000004519 manufacturing process Methods 0.000 claims abstract description 12
- 238000009434 installation Methods 0.000 claims description 9
- 238000007493 shaping process Methods 0.000 claims description 6
- 239000012530 fluid Substances 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 230000001419 dependent effect Effects 0.000 claims 1
- 230000008901 benefit Effects 0.000 description 9
- 230000035515 penetration Effects 0.000 description 6
- 229930195733 hydrocarbon Natural products 0.000 description 5
- 150000002430 hydrocarbons Chemical class 0.000 description 5
- 239000004215 Carbon black (E152) Substances 0.000 description 3
- 239000004411 aluminium Substances 0.000 description 3
- 229910052782 aluminium Inorganic materials 0.000 description 3
- 229920003023 plastic Polymers 0.000 description 3
- 239000004033 plastic Substances 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 229920002635 polyurethane Polymers 0.000 description 2
- 239000004814 polyurethane Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 150000001398 aluminium Chemical class 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/043—Directional drilling for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
- E21B7/061—Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock
Definitions
- the present invention provides a method and apparatus for delivering an additional subterranean conduit along a deflected path relative to an existing conduit.
- the invention relates to the installation of a subterranean conductor pipe along a deflected path relative to an existing conductor pipe that led to a hydrocarbon reservoir.
- each drilled well has a finite life and it is commercially and environmentally advantageous to be able to drill more wells from the existing production platform in order to tap previously undrilled reservoirs in the reachable vicinity of the platform.
- Figures 1-3 show the below mud-line method. This method is typically used when there is a conductor guide 22 close to the seabed, typically 2 to 8 feet (0.61 to 2.44 m) above the seabed.
- the conventional method shown in Figure 1 involves cutting an existing pipe 20 leading from a platform (not shown in Figure 1 ) to a subterranean reservoir (not shown) that previously contained hydrocarbons. Firstly, the uppermost section (which may be in the region of 50-80 feet or so) of the existing conductor pipe is reamed out in order to create a large diameter hole 32 in the mud extending downwardly from the mouth of the borehole, and to leave the rest of the conductor pipe 20 in situ. In order to prevent the large diameter hole 32 from collapsing, a high viscosity mud can be pumped therein. An additional conductor pipe 24, with a whipstock 26 shear bolted thereto, is then run through the conductor guide 22 and it is this stage that is shown in Figure 1.
- the lower end of the whipstock 26 is provided with a landing ring 28 having a diameter greater than that of the existing pipe 20 such that when a spear 30 is landed in the bore of the existing pipe 20, the landing ring 28 abuts the upper end of the pipe 20 to ensure that the whipstock 26 is seated thereon.
- the landing ring 28 also bears the shock when the additional conductor pipe 24 is sheared off the whipstock 26.
- Figure 2 shows an alternative method (known as overshot whipstock) of coupling the whipstock 26 to the upper end of the existing pipe 20, whereby the lower end of the whipstock 26 is provided with a large diameter portion 36, known in the art as an overshot.
- the inner diameter of the overshot 36 is greater than the outer diameter of the existing pipe 20 such that the overshot 36 accommodates the end of the existing pipe 20 therein.
- FIG. 4 shows a diagrammatic representation of the above seabed method. This method is utilised if there is no conductor guide 52 at least 60 feet (18.3 metres) above the seabed 34.
- the existing pipe 20 is cut at around 5 to 10 feet (1.5 to 3 metres) above the seabed 34.
- the new conductor pipe 24 is made up as previously described and is shear bolted to the whipstock 26.
- the new conductor 24 and coupled whipstock 26 is guided down through one or more conductor guides 52 incorporated in a platform structure 50.
- a force is then applied to the new conductor pipe 24 to shear the bolts coupling the conductor pipe 24 and the whipstock 26 and the whipstock 26 deflects the new conductor pipe 24 along a deflected path.
- the new conductor pipe 24 is then hammer driven from the platform 50 to a predetermined penetration depth.
- the main drawback associated with both the below mud-line and above seabed methods is that it is only possible to install new conductor pipe 24 that is smaller in diameter than the inner diameter of the conductor pipe guides 22, 52.
- the inner diameter of the conductor guides 22, 52 is 32 inches (81.3 cm)
- a typical outer diameter for the new conductor pipe would be 30 inches (76.2 cm).
- the whipstock 26 has a wall thickness at the point that it is shear bolted to the conductor pipe 24 (as an example, the wall thickness could be in the region of 3 A inch (1.9 cm)).
- the outer diameter of the conductor pipe 24 must be substantially smaller than the inner diameter of the conductor guides.
- the outer diameter of the conductor pipe 24 is 30 inches (76.2 cm) and the wall thickness of the whipstock is % inch (1.9 cm)
- the total diameter of the assembly is 31.5 inches (80 cm), which is the maximum outer diameter possible for the assembly, while just enabling the assembly to run through the conductor guides 22, 52.
- a method of delivering an additional subterranean conduit along a deflected path from an existing conduit comprising the steps of:
- the method further comprises step (e) of installing the additional conduit along the deflected path.
- Step b) may be carried out simultaneously with step c). Alternatively, step b) may be carried out prior to step c).
- apparatus for delivering an additional subterranean conduit along a deflected path relative to an existing conduit, the apparatus comprising a deflecting member having a coupling means for coupling the deflecting member to a lowermost end of the additional conduit in use, wherein, in use, the deflecting member is arranged to deliver the additional conduit along the deflected path when the deflecting member contacts a predetermined structure.
- the deflecting member can comprise a surface angled with respect to the longitudinal axis of the existing conduit.
- the angled surface can be planar.
- the surface can be angled in the region of between 20° to 70°, and more preferably can be angled in the region of between 30° to 60°, and most preferably can be angled at 45° with respect to the longitudinal axis of the additional conduit although other angles, as conditions may warrant, will suffice.
- the deflecting member can have an outer surface comprising an aerodynamically efficient shape and may be somewhat or substantially conical.
- the outer surface of the deflecting member is preferably in the form of a paraboloid or bullet shaped.
- a portion of the deflecting member adjacent the lower end of the additional conduit can have a larger outer diameter than that of the conduit.
- the outer diameter of the portion of the deflecting member can be between 0.2 and 0.5 inches (0.51 and 1.27 cm) larger than that of the conduit.
- the deflecting member can be formed from a drillable material and may be provided in the form of an aluminium or hard plastics or composite material shoe.
- the deflecting member can be provided with one or more holes extending therethrough.
- the deflecting member comprises a head portion and a collar portion wherein the collar portion is preferably generally tubular in cross section and more preferably is smaller in outer diameter than the head portion.
- a neck portion is provided between the head portion and the collar portion wherein the neck portion comprises an outwardly projecting shoulder, which preferably extends in a perpendicular direction with respect to the longitudinal axis of the deflecting member.
- a coupling means is provided on the outer surface of the neck portion which is adapted to couple to a coupling means provided on the internal surface of the lower end of the additional conduit.
- the said coupling means are corresponding screw threads.
- the predetermined structure can comprise a path diverting means arranged for insertion in the upper end of the existing conduit.
- the path diverting means can comprise a whipstock.
- the inner diameter of the path diverting means can be less than the outer diameter of the additional conduit.
- the coupling means can be adapted to prevent rotation between the additional conduit and the deflecting member.
- the method according to the second aspect has the advantage that the outer diameter of the additional conduit is maximised because it is run in separately from the path diverting means.
- the method typically further relates to delivering an additional subterranean conduit along a deflected path from an existing conduit.
- the method can include removing a portion of the existing conduit prior to commencing step (a).
- the method may further comprise providing a deflecting member at the lower end of the additional conduit.
- the deflecting member is coupled to the lower end of the additional conduit.
- the deployment means may comprise an elongate member and, prior to step (a), the method can further comprise coupling the path diverting means to an elongate member via a connection means which may preferably comprise a threaded connection means.
- Step (a) of the method can further comprise applying a longitudinal force to the elongate member thereby securing the path diverting means in the upper end of the existing conduit.
- the method preferably further comprises decoupling the elongate member and the path diverting means and withdrawing the elongate member.
- the method can further comprise installing the path diverting means through the throughbore of one or more guide members.
- the method can include maximising the outer diameter of the path diverting means while enabling it to fit through the throughbore of the one or more guide members.
- the method may further include providing the deflecting member with deflecting surfaces and shaping the deflecting surfaces and thereby urging the conduit on the deflected path.
- the method may further include providing the deflecting member with an angled end member.
- the method may include angling at least a portion of the deflecting member in the region of between 20° to 70°, and more preferably in the region of between 30° to 60°, and most preferably at 45° relative to a longitudinal axis of conduit, although other angles, as conditions may warrant, will suffice.
- the method can include shaping the deflecting member in an aero-dynamic manner such as in the shape of a paraboloid and thereby splaying at least a portion of the path diverting means during step (d).
- a method of installing an additional subterranean conduit comprising the steps of: (a) providing the additional conduit with a deflecting member coupled to an end thereof;
- the method typically further relates to delivering an additional subterranean conduit along a deflected path from an existing conduit.
- the method preferably further includes orienting the path diverting means during installation with respect to the existing conduit such that the deflected path diverges away from the existing conduit and structures associated therewith.
- the method preferably further includes deflecting the additional conduit around a structure which may be a pipe guide brace coupled to the existing conduit and the method can further include shaping the deflecting member such that it comprises a planar surface angled with respect to the longitudinal axis of the additional conduit.
- the method can include shaping the deflecting member such that it comprises a somewhat or substantially conical outer surface such as in the shape of a paraboloid.
- Figures 5 and 6 are side and front views respectively of a whipstock used in one embodiment according to the present invention
- Figures 7 and 8 are side and front views of a conductor pipe having a deflecting end member and part of the whipstock shown in Figures 5 and 6 although the spear 130 is not shown in Figures 7 and 8;
- Figure 9 is a side view of a conductor pipe deflected along a deflected path
- Figures 10 and 11 are side and front views of a whipstock and an additional conductor pipe with an end member used in a second embodiment in accordance with the present invention
- Figure 12 shows the additional conductor pipe of Figures 10 and 11 along a deflected path
- Figures 13 and 14 are side and perspective views respectively of the end member of Figures 10 and 11 ; and Figures 15 and 16 are side and perspective views of the end member of Figures 7 and 8.
- a whipstock is shown generally at 126 in Figure 5.
- the whipstock 126 has a trough 102 defined by the outer edges converging towards the lower end of the whipstock 126 and providing a gently curved surface 104 therebetween.
- the surface 104 is provided with an elongate hole 106 allowing an elongate member 94 such as a relatively slim drill string 94 to be accommodated therethrough.
- a connector 108 is provided with an open end 110 having an internal thread and is in the form of a 4 V ⁇ inch drill pipe box connector 110.
- the box connector 110 engages with thread 96 provided on a pin connection located at the lower end of the drill string 94.
- box connector 110 can be replaced by any other form of suitable connection means if a different type of connector is required, such as a "J"-latch, an annular groove with associated locking ring arrangement, etc. etc..
- the whipstock 126 has a landing ring 128 and a spear 130.
- the outer diameter of the spear 130 is less than the inner diameter of an existing conductor pipe 120 in which the whipstock 126 is intended to be landed.
- the landing ring 128 is chosen to have a slightly greater inner diameter than the outer diameter of the existing conductor pipe 120 such that the landing ring 128 will abut the upper end of the existing conductor pipe 120 in use.
- an additional conductor pipe 124 having a diameter of 30 inches (76.2 cm) in this example is provided with a diverting end member in the form of a shoe 114.
- the shoe 114 is shown in greater detail in Figure 15 and is preferably formed from a drillable material such as aluminium, hard plastics such as polyurethane, a composite material or indeed any other suitable drillable material and is generally provided in two main portions, a head member 114 and a generally tubular collar 116 where there is a neck portion provided between the head member 114 and the collar 116, the neck portion providing a perpendicularly extending shoulder which can be torqued against the lower end of the replacement conductor 124, as will be subsequently described.
- a drillable material such as aluminium, hard plastics such as polyurethane, a composite material or indeed any other suitable drillable material
- the head member of the shoe 114 has a paraboloid or bullet shaped leading end having a curved substantially conical surface leading to a gently rounded point in which a central hole 118 is provided.
- the shoe 114 is coupled to the additional conductor pipe 124 via the collar 116 that is arranged for insertion into the end of the conductor pipe 124.
- a thread (not shown) is machined on an external surface of the collar 116 and the lower end of the conductor pipe 124 has an internal thread provided therein.
- the collar 116 of the shoe 114 is screwed into the conductor pipe 124 and can be secured with aluminium dowels to ensure that there is no rotation between the shoe 114 and the conductor pipe 124.
- the wide end of the head member of the bullet shaped shoe 114 has an outer diameter which is slightly larger (such as by VA inch) than the outer diameter of the conductor pipe 124. This prevents the joint between the shoe 114 and the conductor pipe 124 becoming stuck or separated as the shoe 114 contacts the surface 104 of the whipstock 126.
- FIG. 16 An alternative shoe 115 is shown in Figure 16.
- the end of the shoe 115 is also bullet shaped with a connector 116 at the other end.
- the head member of the shoe 115 has a plurality of holes 118 provided therein.
- the purpose of the holes 118 in the shoes 114, 115 is to allow fluid and muds therethrough to prevent a significant pressure building up behind the shoes 114, 115 as the shoes 114, 115 are drilled out (as will be subsequently described) and thus impeding the progress of the conductor pipe 124 as it is driven into the ground. Additionally, fluids can be pumped through the holes 118 via a drillstring (not shown) coupled to the shoe 115.
- the fluids can wash away obtrusive cuttings from the leading end of the shoe 115 if it becomes necessary. It should be noted that any dimensions stated hereinafter are given as an example only to aid understanding of the embodiments and that actual dimensions will vary depending upon the specific conditions such as the conductor pipe 120 being replaced, the outer diameter of the replacement conductor 124, the inner and outer diameters of the whipstock 126 and the inner and outer diameters of the platform conductor guides 122.
- the existing conductor pipe 120 in this example has a diameter of 30 inches (76.2cm) and is cut at least 60 feet (18.3 metres) below the seabed.
- a hole 132 of approximately 48 inches (1.22 metres) in this example or larger is reamed in the mud above the cut conductor pipe 120; if the soil is relatively hard, it will likely be beneficial to drill a hole 132 larger than 48 inches (1.22 metres) in diameter.
- heavy viscous mud can be pumped into the hole 132 before withdrawing the drilling assembly (not shown) used to ream the hole 132.
- the hole 132 can be drilled using a hole opener or under reamer.
- the drill string 94 is coupled to the box connection 110 of the connector 108 within the whipstock 126.
- the drill string 94 passes through the hole 106 in the surface 104 of the whipstock 126.
- the whipstock 126 is then lowered through one or more conductor guides 122 and the spear 130 is landed within the end of the existing conductor pipe 120 with the whipstock trough 102 oriented in a predetermined location/direction.
- the drill string 94 is then rotated to decouple the threads 96 from the threads in the box connection 110 of the connector 108. Once the drill string 94 is decoupled from the whipstock 126, it can be withdrawn back to the platform floor.
- connection method i.e. non-screwthread or non-high torque enabled connection
- any other suitable connection means such as a "J" slot and latch arrangement, an annular groove with locking ring arrangement etc. etc.
- the additional conductor pipe 124 with the attached shoe 114 is deployed through the one or more guide members 122 towards the trough 102 of the whipstock 126.
- the inner diameter of the trough 102 in this example is 28.5 inches (72.4cm).
- the outer diameter of the shoe 114 in this example is 30 1 /4 inches (76.8cm).
- the shoe 114 is provided with a gently rounded point, this locates the shoe 114 and attached conductor pipe 124 correctly in the whipstock trough 102 and further downward movement of the shoe 114, which has a larger maximum outer diameter than the whipstock trough 102, forces the edges of the trough 102 to splay outwardly thereby accommodating the shoe 114 and the conductor pipe 124 within the trough 102.
- the contact between the shoe 114 and the surface 104 of the whipstock 126 causes the conductor pipe 124 to deflect relative to the longitudinal axis of the existing conductor pipe 120 as shown in Figure 9.
- the conductor pipe 124 can then be hammer driven to the required penetration depth such that the additional conductor pipe 124 can thereafter provide another well bore, in addition to the existing well bore provided by the existing conductor pipe 120, to provide another path for production fluids to flow from a reservoir to the surface.
- the above described method is also suitable where the closest conductor guide is above around 65 feet (19.8 metres) the seabed 134.
- Running in the whipstock 126 separately from the additional conductor pipe 124 enables the maximum possible outer diameter of the conductor pipe 124 to be used with respect to the conductor guides 122.
- the diameter of the whipstock trough 102 can also be maximised with respect to the conductor guides 122.
- the inner diameter of the trough 102 being equal to or less than the outer diameter of the conductor pipe 124 it is still possible to deflect and install the conductor pipe 124 due to the shoe 114, which causes the whipstock 126 to splay thereby increasing the diameter of the whipstock trough 102 such that it can accommodate the end of the conductor pipe 124.
- embodiments of the present invention do not require that the additional conductor pipe 124 be 2 inches (5.1 cm) less in this example than the inner diameter of the conductor guides 122. This is a great advantage since it is always desirable to be able to use the maximum conductor pipe 124 possible in the circumstances in order to maximise potential hydrocarbon production rates or to enable twin well drilling from one conductor pipe.
- the existing conductor pipe 120 is cut at least 60 feet (18.3 metres) below the sea bed as per example 1.
- the hole 132 is again reamed in the same manner as case example 1.
- the whipstock 126 is shear pinned to the lower end of the additional conductor pipe 124 with the attached shoe 114. Accordingly, in this example 2, the initial conductor pipe 124 and shoe 114 are run into the hole along with the whipstock 126 until the whipstock spear 130 is landed into the upper end of the existing conductor pipe 120.
- additional conductor pipe 124 shears the shear pins (not shown) causing the shoe 114 to enter in to the whipstock trough 102 and thus deflection of the shoe 114 and lower end of additional conductor pipe 124 occurs (as again shown in Figure 9).
- the conductor pipe 124 can then be hammer driven to the required penetration depth (either with the shoe 114 still attached or with the shoe 114 having been drilled out).
- Running in the whipstock 126 simultaneously with the additional conductor pipe 124 has the advantage that only one trip is required to install the additional conductor pipe 124 as opposed to the two separate trips of the case example 1.
- case example 2 does not have the advantage of being able to maximise the outer diameter of the additional conductor pipe 124 with respect to the conductor guides 122.
- FIG. 10-12 Another embodiment of the invention is shown in Figures 10-12.
- the second described embodiment allows an additional conductor pipe 224 to be installed along a deflected path relative to an existing conductor pipe 220 in circumstances where there is a conductor guide relatively close to the seabed (say within 2 feet to 8 feet) with the existing conductor pipe 220 cemented into the seabed and providing the distance to the next conductor guide above that close to the seabed is at least 50 feet (15.2 metres) or so.
- the whipstock 226 is shown in Figures 10-12 and is generally of the same construction as that described for the previous embodiment.
- the whipstock 226 has a spear 230, a landing ring 228 and a trough 202 approximately 30 inches in length and defined by a surface 204.
- the conductor pipe 224 has a shoe 214 attached to its lower in use end. Furthermore, the lower in use end of the conductor pipe 224 is shear bolted to an upper end of the whipstock 226 via shear bolts 248 passing through holes 249 in the whipstock 226 and the conductor pipe 224.
- the shear bolts 248 shear capacity is determined from the tonnage of the conductor pipe 224 string weight.
- the shoe 214 of the second embodiment is shown in more detail in Figures 13 and 14.
- the shoe 214 has an upper connector 216 for connecting the shoe 214 to the additional conductor pipe 224 in the same manner as previously described.
- the shoe 214 has a face 212 angled at 45° relative to the longitudinal axis of the conductor pipe 224, since this angle is likely to be the most used and therefore most preferred angle but other angles could be used depending upon the conditions but the angle is likely to be in the region between 20° to 70° with respect to the longitudinal axis of the additional conduit and more likely will be in the region between 30° to 60°.
- the shoe 214 is provided with a central hole 218 in the face 212.
- the hole 218 in the shoe 214 is also useful for guiding and centralising the tapered drill bit after the installation process when the shoe 214 is to be drilled off the leading end of the conductor pipe 224.
- Figure 12 shows an upper and lower pipe guide 222U, 222L respectively.
- the lower pipe guide 222L is maintained in position by conductor guide bracings.
- a major guide brace 243 of the platform is shown in the left hand side of the conductor guide 222L in Figure 12 and a minor guide brace 242 having a smaller diameter than the major guide brace 242 is shown on the right hand side of the conductor guide 222L.
- the cemented conductor pipe 220 is surrounded by four minor guide braces 242 spaced from one another by 90° and therefore there is no restriction on the orientation of the shoe 214.
- the existing conductor pipe 220 is cut approximately 3 feet (91.4cm) above the lower conductor guide 222L.
- the additional conductor pipe 224 coupled to the whipstock 226 is then lowered through the upper conductor guide 222U.
- the whipstock 226 should be positioned within the existing conductor pipe 220 such that the trough 202 is angled towards the minor conductor guide brace 242, and markings applied to the conductor pipe 224 as it is lowered at the platform assists the operator to align the trough in the desired rotational position.
- the spear 230 is landed in the preexisting conductor pipe 220 so that the landing ring 228 abuts the upper edge of the existing conductor pipe 220.
- a force is then applied to the conductor pipe 224 to shear the shear bolts 248.
- Shearing the shear bolts 248 allows the conductor pipe 224 to deflect by virtue of the whipstock trough 202.
- the shoe 214 (angled at 45° in this specific example) allows the end of the pipe 224 to avoid minor conductor guide brace 242 which does not impede installation of the new conductor pipe 224 along its deflected path, in that if the angled face of the shoe 214 contacts the minor conductor guide brace 242, the angled face of the shoe 214 will ride over and around the minor conductor guide brace 242.
- the conductor pipe 224 is then hammer driven to the required depth along its deflected path.
- case example 1 of the second embodiment has the advantage that only one trip is required to install the additional conductor pipe 224 because it is lowered along with the whipstock 226.
- case example 1 does have the disadvantage that the diameter of the new conductor pipe 224 is not maximised because of the shear pin attachment points 248.
- the second embodiment case example 2 is largely similar to the second embodiment case example 1 with the exception that the whipstock 226 is run separately and is therefore not shear pinned to the new conductor pipe 224.
- the whipstock 226 is attached to a drill string 94 and is lowered through the upper conductor guide 222U until it is positioned within the existing conductor pipe 220.
- the trough 202 is angled in the same manner as second embodiment case example 1. The drill pipe is then decoupled from the whipstock 226 and is withdrawn back through the upper conductor guide 222U.
- the new conductor pipe 224 with the attached shoe 214 is then lowered through the upper conductor guide 222U until the angled shoe 214 is located just above the whipstock 226.
- the new conductor pipe 224 and angled shoe 214 are rotated until the angled shoe 214 is in the desired rotational configuration with respect to the whipstock 226.
- the new conductor pipe 224 is then further lowered such that the conductor pipe
- the second embodiment case example 2 has the advantage that the diameter of the new conductor pipe 224 can be maximised because the new conductor pipe 224 is run separately from the whipstock 226 and therefore the outer diameter of the new conductor pipe 224 can be chosen to be as large as possible as long as it still fits through the upper conductor guide 222U.
- the second embodiment has the great advantage that it can be used to install an additional conductor in circumstances where the existing conductor pipe has been cemented below the seabed, and where there is a conductor guide located just above the seabed; hitherto, it has not been possible to install an additional conductor in such a scenario.
- inventions described herein have cost and time advantages over the prior art systems for installation of additional conductor pipes (124; 224) from an existing production platform (50); furthermore the outer diameter of the additional conductor pipe (124; 224) can be maximised.
- the shoe 114, 214 could be formed of a different drillable material such as a hard plastic which may be polyurethane.
- the lower face of the landing ring 128 may be provided with teeth 129 shown in Fig. 4 which are adapted to bite into the upper end of the existing conductor 120, 220.
- the teeth 129 may point directly downwards or may point at an angle in one or both rotational directions in order to further prevent unwanted rotation occurring between the whipstock 126, 226.
- the various diameters and lengths of the components described herein can be varied in order to suit the particular platform involved.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
- Milling, Broaching, Filing, Reaming, And Others (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2006321380A AU2006321380B2 (en) | 2005-12-03 | 2006-12-01 | Method and apparatus for installing deflecting conductor pipe |
EP06831366A EP1954910A1 (en) | 2005-12-03 | 2006-12-01 | Method and apparatus for installing deflecting conductor pipe |
US12/095,334 US20090266559A1 (en) | 2005-12-03 | 2006-12-01 | Method and apparatus for installing deflecting conductor pipe |
CA002631405A CA2631405A1 (en) | 2005-12-03 | 2006-12-01 | Method and apparatus for installing deflecting conductor pipe |
NO20082927A NO20082927L (en) | 2005-12-03 | 2008-06-27 | Method and apparatus for installing deburring of conductor |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0524750A GB0524750D0 (en) | 2005-12-03 | 2005-12-03 | Method and apparatus |
GB0524750.7 | 2005-12-03 | ||
GB0620101.6 | 2006-10-11 | ||
GB0620101A GB0620101D0 (en) | 2006-10-11 | 2006-10-11 | Method and apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2007063324A1 true WO2007063324A1 (en) | 2007-06-07 |
Family
ID=37814598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/GB2006/004497 WO2007063324A1 (en) | 2005-12-03 | 2006-12-01 | Method and apparatus for installing deflecting conductor pipe |
Country Status (6)
Country | Link |
---|---|
US (1) | US20090266559A1 (en) |
EP (1) | EP1954910A1 (en) |
AU (1) | AU2006321380B2 (en) |
CA (1) | CA2631405A1 (en) |
NO (1) | NO20082927L (en) |
WO (1) | WO2007063324A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8774922B2 (en) | 2002-04-08 | 2014-07-08 | Medtronic Ardian Luxembourg S.A.R.L. | Catheter apparatuses having expandable balloons for renal neuromodulation and associated systems and methods |
US9308044B2 (en) | 2002-04-08 | 2016-04-12 | Medtronic Ardian Luxembourg S.A.R.L. | Methods for therapeutic renal neuromodulation |
US9439726B2 (en) | 2002-04-08 | 2016-09-13 | Medtronic Ardian Luxembourg S.A.R.L. | Methods for therapeutic renal neuromodulation |
NL2018742B1 (en) * | 2017-04-19 | 2018-10-29 | Nicolaas Rudolf Antonius Kampman Roelof | Well recovery assembly for recovering a well and method for well recovery |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0615550D0 (en) * | 2006-08-04 | 2006-09-13 | Conducter Installation Service | Sensor System |
US8376066B2 (en) * | 2010-11-04 | 2013-02-19 | Halliburton Energy Services, Inc. | Combination whipstock and completion deflector |
US8230920B2 (en) | 2010-12-20 | 2012-07-31 | Baker Hughes Incorporated | Extended reach whipstock and methods of use |
USD863383S1 (en) | 2018-04-17 | 2019-10-15 | Dirt Duck, Llc | Fluid drilling head |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4733732A (en) | 1985-08-02 | 1988-03-29 | Atlantic Richfield Company | Submudline drivepipe whipstock method and apparatus |
US5297638A (en) | 1992-12-08 | 1994-03-29 | Atlantic Richfield Company | Drivepipe guide and installation method for wells |
US5826651A (en) * | 1993-09-10 | 1998-10-27 | Weatherford/Lamb, Inc. | Wellbore single trip milling |
WO2001033030A1 (en) | 1999-11-02 | 2001-05-10 | Vastar Resources, Inc. | Drive pipe replacement on offshore platforms |
Family Cites Families (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2745647A (en) * | 1952-07-21 | 1956-05-15 | Phillips Petroleum Co | Production of underground cavities |
US3191697A (en) * | 1953-11-30 | 1965-06-29 | Mcgaffey Taylor Corp | Subsurface earth formation treating tool |
US3215202A (en) * | 1961-10-10 | 1965-11-02 | Richfield Oil Corp | Off-shore drilling and production apparatus |
US3265130A (en) * | 1962-05-23 | 1966-08-09 | Shell Oil Co | Method and apparatus for drilling underwater wells |
US3199613A (en) * | 1962-09-28 | 1965-08-10 | Shell Oil Co | Method and apparatus for drilling an underwater well |
US3191695A (en) * | 1962-09-28 | 1965-06-29 | Shell Oil Co | Method of drilling and locating an underwater well |
US3368619A (en) * | 1966-06-13 | 1968-02-13 | Chevron Res | Method and apparatus for working on underwater wells |
US3547189A (en) * | 1967-04-06 | 1970-12-15 | Exxon Production Research Co | Locating underwater wells |
US3647007A (en) * | 1970-01-09 | 1972-03-07 | Global Marine Inc | Steering sub for underwater drilling apparatus |
US3664442A (en) * | 1970-05-11 | 1972-05-23 | Noble Drilling Corp | Underwater pipe positioning apparatus |
USRE28860F1 (en) * | 1970-09-08 | 1985-09-03 | Curved offshore well conductors | |
US3738434A (en) * | 1971-01-11 | 1973-06-12 | A Nelson | The apparatus and method to establish and sustain a subaqueous strata drilling system |
GB1343897A (en) * | 1971-03-10 | 1974-01-16 | ||
US3878889A (en) * | 1973-02-05 | 1975-04-22 | Phillips Petroleum Co | Method and apparatus for well bore work |
US3899032A (en) * | 1974-03-15 | 1975-08-12 | Cities Service Oil Co | Method and apparatus for deviating conductor casing |
US3987639A (en) * | 1975-06-26 | 1976-10-26 | Brown & Root, Inc. | Methods and apparatus for installing a drill conductor from an offshore tower |
US4266621A (en) * | 1977-06-22 | 1981-05-12 | Christensen, Inc. | Well casing window mill |
US4214842A (en) * | 1978-04-27 | 1980-07-29 | Deep Oil Technology, Inc. | Remotely controlled maneuverable tool means and method for positioning the end of a pipe string in offshore well operations |
US4527639A (en) * | 1982-07-26 | 1985-07-09 | Bechtel National Corp. | Hydraulic piston-effect method and apparatus for forming a bore hole |
JPS61207712A (en) * | 1985-03-12 | 1986-09-16 | N I T:Kk | Method and device of improving ground |
US4808037A (en) * | 1987-02-25 | 1989-02-28 | Franklin C. Wade | Method and apparatus for removal of submerged offshore objects |
US4930586A (en) * | 1989-05-12 | 1990-06-05 | Ben Wade Oakes Dickinson, III | Hydraulic drilling apparatus and method |
US4957173A (en) * | 1989-06-14 | 1990-09-18 | Underground Technologies, Inc. | Method and apparatus for subsoil drilling |
DE4122350C2 (en) * | 1991-07-05 | 1996-11-21 | Terra Ag Tiefbautechnik | Method for controlling the direction of a rough drilling device and device for producing earth bores |
US5368106A (en) * | 1992-04-06 | 1994-11-29 | Coughlin; Jerome A. | Fire-fighting tool particularly for shipboard fires and the like |
US5366030A (en) * | 1992-11-02 | 1994-11-22 | Pool Ii F W | Hydraulic device for forming a cavity in a borehole |
US5551509A (en) * | 1995-03-24 | 1996-09-03 | Tiw Corporation | Whipstock and starter mill |
US6142234A (en) * | 1998-03-16 | 2000-11-07 | Jack Crain | Apparatus and method for tieback of subsea wells |
FR2820780B1 (en) * | 2001-02-12 | 2003-05-02 | Cie Du Sol | LIQUID PRESSURE INJECTION HEAD FOR DRILLING AN EXCAVATION IN THE SOIL |
US6920945B1 (en) * | 2001-11-07 | 2005-07-26 | Lateral Technologies International, L.L.C. | Method and system for facilitating horizontal drilling |
AUPR886401A0 (en) * | 2001-11-14 | 2001-12-06 | Cmte Development Limited | Fluid drilling head |
US7090153B2 (en) * | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7320372B2 (en) * | 2005-02-05 | 2008-01-22 | Falgout Sr Thomas E | Jet assisted drilling method |
US20060243436A1 (en) * | 2005-04-27 | 2006-11-02 | Angelle Jeremy R | Conductor pipe string deflector and method of using same |
US7484575B2 (en) * | 2005-04-27 | 2009-02-03 | Frank's Casing Crew & Rental Tools, Inc. | Conductor pipe string deflector and method |
US20060260809A1 (en) * | 2005-05-18 | 2006-11-23 | Crain Jack A | Method and apparatus for replacing drive pipe |
US7669672B2 (en) * | 2005-12-06 | 2010-03-02 | Charles Brunet | Apparatus, system and method for installing boreholes from a main wellbore |
US7240744B1 (en) * | 2006-06-28 | 2007-07-10 | Jerome Kemick | Rotary and mud-powered percussive drill bit assembly and method |
-
2006
- 2006-12-01 WO PCT/GB2006/004497 patent/WO2007063324A1/en active Application Filing
- 2006-12-01 CA CA002631405A patent/CA2631405A1/en not_active Abandoned
- 2006-12-01 EP EP06831366A patent/EP1954910A1/en not_active Withdrawn
- 2006-12-01 AU AU2006321380A patent/AU2006321380B2/en not_active Ceased
- 2006-12-01 US US12/095,334 patent/US20090266559A1/en not_active Abandoned
-
2008
- 2008-06-27 NO NO20082927A patent/NO20082927L/en not_active Application Discontinuation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4733732A (en) | 1985-08-02 | 1988-03-29 | Atlantic Richfield Company | Submudline drivepipe whipstock method and apparatus |
US5297638A (en) | 1992-12-08 | 1994-03-29 | Atlantic Richfield Company | Drivepipe guide and installation method for wells |
US5826651A (en) * | 1993-09-10 | 1998-10-27 | Weatherford/Lamb, Inc. | Wellbore single trip milling |
WO2001033030A1 (en) | 1999-11-02 | 2001-05-10 | Vastar Resources, Inc. | Drive pipe replacement on offshore platforms |
Non-Patent Citations (1)
Title |
---|
S.M. PROVANCE: "Atlantic Richfieid Company - ARCO", 12 February 1986, ARCO OIL & GAS CO, article "Submudline Drivepipe Whipstock: A Cost Effective Method of Reclaiming Platform Slots" |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8774922B2 (en) | 2002-04-08 | 2014-07-08 | Medtronic Ardian Luxembourg S.A.R.L. | Catheter apparatuses having expandable balloons for renal neuromodulation and associated systems and methods |
US9308044B2 (en) | 2002-04-08 | 2016-04-12 | Medtronic Ardian Luxembourg S.A.R.L. | Methods for therapeutic renal neuromodulation |
US9439726B2 (en) | 2002-04-08 | 2016-09-13 | Medtronic Ardian Luxembourg S.A.R.L. | Methods for therapeutic renal neuromodulation |
US9474563B2 (en) | 2002-04-08 | 2016-10-25 | Medtronic Ardian Luxembourg S.A.R.L. | Methods for renal neuromodulation |
US9636174B2 (en) | 2002-04-08 | 2017-05-02 | Medtronic Ardian Luxembourg S.A.R.L. | Methods for therapeutic renal neuromodulation |
NL2018742B1 (en) * | 2017-04-19 | 2018-10-29 | Nicolaas Rudolf Antonius Kampman Roelof | Well recovery assembly for recovering a well and method for well recovery |
Also Published As
Publication number | Publication date |
---|---|
NO20082927L (en) | 2008-09-03 |
CA2631405A1 (en) | 2007-06-07 |
US20090266559A1 (en) | 2009-10-29 |
EP1954910A1 (en) | 2008-08-13 |
AU2006321380A1 (en) | 2007-06-07 |
AU2006321380B2 (en) | 2010-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0677135B1 (en) | Method and apparatus for setting a whipstock | |
AU2006321380B2 (en) | Method and apparatus for installing deflecting conductor pipe | |
US8534379B2 (en) | Apparatus and methods for drilling a wellbore using casing | |
AU714721B2 (en) | Apparatus for completing a subterranean well and associated methods of using same | |
CA2210561C (en) | Apparatus for completing a subterranean well and associated methods of using same | |
AU719101B2 (en) | Apparatus for completing a subterranean well and associated methods of using same | |
NO319536B1 (en) | Downhole drilling device and method for using it | |
EP1588015B1 (en) | Apparatus for drilling a wellbore using casing | |
US20090223715A1 (en) | Conductor pipe string deflector and method | |
US20060243436A1 (en) | Conductor pipe string deflector and method of using same | |
US11933174B2 (en) | Modified whipstock design integrating cleanout and setting mechanisms | |
US8833451B2 (en) | Window joint for lateral wellbore construction and method for opening same | |
CA2725717C (en) | Apparatus and methods for drilling a wellbore using casing | |
US20100132938A1 (en) | Conductor pipe string deflector and method of using same | |
US10871034B2 (en) | Whipstock assembly with a support member | |
MX2008006943A (en) | Method and apparatus for installing deflecting conductor pipe | |
AU1758800A (en) | Apparatus for completing a subterranean well and associated methods of using same | |
AU2064100A (en) | Apparatus for completing a subterranean well and associated methods of using same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2006831366 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2006321380 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2631405 Country of ref document: CA |
|
ENP | Entry into the national phase |
Ref document number: 2006321380 Country of ref document: AU Date of ref document: 20061201 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/a/2008/006943 Country of ref document: MX |
|
WWP | Wipo information: published in national office |
Ref document number: 2006321380 Country of ref document: AU |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 3421/CHENP/2008 Country of ref document: IN |
|
WWP | Wipo information: published in national office |
Ref document number: 2006831366 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 12095334 Country of ref document: US |