WO2006117522A1 - Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations - Google Patents

Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations Download PDF

Info

Publication number
WO2006117522A1
WO2006117522A1 PCT/GB2006/001561 GB2006001561W WO2006117522A1 WO 2006117522 A1 WO2006117522 A1 WO 2006117522A1 GB 2006001561 W GB2006001561 W GB 2006001561W WO 2006117522 A1 WO2006117522 A1 WO 2006117522A1
Authority
WO
WIPO (PCT)
Prior art keywords
delayed cement
cement composition
present
silica
range
Prior art date
Application number
PCT/GB2006/001561
Other languages
French (fr)
Inventor
Lance E. Brothers
Anthony V. Palmer
Robert Joseph Sepulvado
Original Assignee
Halliburton Energy Services, Inc.
Curtis, Philip, Anthony
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services, Inc., Curtis, Philip, Anthony filed Critical Halliburton Energy Services, Inc.
Publication of WO2006117522A1 publication Critical patent/WO2006117522A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/06Inhibiting the setting, e.g. mortars of the deferred action type containing water in breakable containers ; Inhibiting the action of active ingredients
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/18Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing mixtures of the silica-lime type
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/426Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells for plugging
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes

Definitions

  • the present invention relates to subterranean operations, and more particularly, to set- delayed cement compositions and methods of using such cement compositions in subterranean applications.
  • Hydraulic cement compositions are commonly utilized in subterranean operations, particularly subterranean well completion and remedial operations.
  • hydraulic cement compositions are used in primary cementing operations whereby pipe strings such as casings and liners are cemented in well bores.
  • primary cementing hydraulic cement compositions are pumped into the annular space between the walls of a well bore and the exterior surface of the pipe string disposed therein.
  • the cement composition is permitted to set in the annular space, thereby forming an annular sheath of hardened substantially impermeable cement therein that substantially supports and positions the pipe string in the well bore and bonds the exterior surfaces of the pipe string to the walls of the well bore.
  • Hydraulic cement compositions also are used in remedial cementing operations such as plugging highly permeable zones or fractures in well bores, plugging cracks and holes in pipe strings, and the like.
  • cement compositions have been used in conventional subterranean cementing operations, including, inter alia, cement compositions comprising Portland cement, and cement compositions comprising water, fly ash, and lime.
  • cement compositions comprising Portland cement
  • cement compositions comprising water, fly ash, and lime.
  • the composition and quality of both Portland cement and fly ash vary widely. Accordingly, the set times of conventional cement compositions employing Portland cement and/or fly ash may be unpredictable. This may be problematic because, inter alia, it may cause such conventional cement compositions to set prematurely, before they have been properly placed in a desired location in a subterranean formation.
  • the present invention relates to subterranean operations, and more particularly, to set- delayed cement compositions and methods of using such cement compositions in subterranean applications.
  • An example of a method of the present invention is a method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation.
  • Another example of a method of the present invention is a method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation, within a time period in the range of from about 12 hours to about seven days after the set-delayed cement composition has been provided; and permitting the set-delayed cement composition to set in the subterranean formation.
  • Another example of a method of the present invention is a method, comprising: providing a set-delayed cement composition comprising: water, a set retarder, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set- delayed cement composition into a subterranean formation, within a time period in the range of from about 5 minutes to about 24 hours after the set-delayed cement composition has been provided; and permitting the set-delayed cement composition to set in the subterranean formation.
  • the present invention relates to subterranean operations, and more particularly, to set- delayed cement compositions and methods of using such cement compositions in subterranean applications.
  • the set-delayed cement compositions of the present invention generally comprise water and a cementitious component consisting essentially of: hydrated lime and silica.
  • the set-delayed cement compositions of the present invention may demonstrate better repeatability and reproducibility than conventional cement compositions that may comprise, inter alia, cementitious components comprising Portland cements and/or fly ash.
  • Portland cements and fly ashes often vary significantly in their chemical composition, due in part to the process by which Portland cements and fly ashes are made. Accordingly, conventional cement compositions comprising cementitious components that comprise Portland cements and/or fly ashes often will demonstrate undesirable variability in their performance.
  • the chemical composition of hydrated lime and silica demonstrates far less variability, and in certain embodiments, may approach a degree of repeatability comparable to that of chemical-grade reagents.
  • the set-delayed cement compositions of the present invention comprising a cementitious component that consists essentially of hydrated lime and silica, may demonstrate desirable repeatability and reproducibility, particularly as compared to conventional cement compositions.
  • cementitious components consisting essentially of hydrated lime and silica may be less reactive than cementitious components comprising Portland cements.
  • certain embodiments of the set-delayed cement compositions of the present invention comprising cementitious components consisting essentially of hydrated lime and silica, may be particularly suitable for use, inter alia, in subterranean formations having relatively high bottom-hole-circulating temperatures, e.g., temperatures in the range of from about 400 0 F to about 500°F.
  • the set-delayed cement compositions of the present invention optionally may comprise other additives suitable for use in the set-delayed cement compositions may be added, such as set retarders, fluid loss control agents, dispersants, and the like.
  • the water present in the set-delayed cement compositions of the present invention may be from any source, provided that it does not contain an excess of compounds that adversely affect other compounds in the set-delayed cement compositions.
  • a set-delayed cement composition of the present invention can comprise fresh water, salt water (e.g., water containing one or more salts dissolved therein), brine ⁇ e.g., saturated salt water), or seawater.
  • the water may be present in an amount sufficient to produce a pumpable slurry.
  • the water is present in the set-delayed cement compositions of the present invention in an amount in the range of from about 20% to about 80% by weight of the cementitious component.
  • the water is present in the set- delayed cement compositions in an amount in the range of from about 35% to about 45% by weight of the cementitious component.
  • the set-delayed cement compositions of the present invention comprise hydrated lime.
  • hydrated lime will be understood to mean calcium hydroxide.
  • the hydrated lime may be present in the set-delayed cement compositions in an amount in the range of from about 1% to about 40% by weight of the cementitious component. In certain embodiments, the hydrated lime may be present in the set-delayed cement compositions in an amount in the range of from about 5% to about 20% by weight of the cementitious component.
  • An example of a suitable hydrated lime is commercially available from Continental Lime, Inc., of Salt Lake City, Utah.
  • the silica present in the set-delayed cement compositions of the present invention comprises ground quartz.
  • suitable silicas include those that are commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade names "SSA-I” and "SSA-2.”
  • the silica may be present in the set-delayed cement compositions in an amount in the range of from about 60% to about 99% by weight of the cementitious component. In certain embodiments, the silica is present in the set-delayed cement compositions in an amount in the range of from about 80% to about 95% by weight of the cementitious component.
  • the set-delayed cement compositions of the present invention further may comprise a set retarder.
  • a set retarder may be used with the set-delayed cement compositions of the present invention. Examples of suitable set retarders include those that are commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade names SCR-100, HR ® -5, and HR ® -25.
  • the optional set retarder may be present in the set-delayed cement compositions in an amount in the range of from about 0.05% to about 2.5% by weight of the cementitious component. In higher-temperature applications, the optional set retarder may be present in the set-delayed cement compositions in an amount in the range of from about 1.5% to about 2.5% by weight of the cementitious component.
  • the set-delayed cement compositions of the present invention may further comprise a weighting agent.
  • any weighting agent may be used with the set- delayed cement compositions of the present invention.
  • the weighting agents used in the present invention comprise hematites.
  • An example of a suitable hematite is commercially available under the trade name "Hi-Dense ® No. 4" from Halliburton Energy Services, Inc., of Duncan, Oklahoma.
  • the weighting agent may be present in an amount in the range of from about 5% to about 45% by weight of the cementitious component.
  • the weighting agent may be present in an amount in the range of from about 35% to about 45% by weight of the cementitious component.
  • Additional additives optionally may be added to the set-delayed cement compositions of the present invention as deemed appropriate by one skilled in the art with the benefit of this disclosure.
  • additives include, among other things, fluid loss control additives, defoamers, microspheres, dispersants, salts, and formation conditioning agents, and the like.
  • a dispersant may be present in the set-delayed cement compositions of the present invention in an amount in the range of from about 0.1% to about 1.0% by weight of the cementitious component.
  • An example of a suitable dispersant is a sulfonated acetone formaldehyde condensate that is commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade name CFR-3.
  • a fluid loss control additive may be present in the set-delayed cement compositions of the present invention in an amount in the range of from about 0.1% to about 1.0% by weight of the cementitious component.
  • suitable fluid loss control additives are commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade names HALAD ® 344 and HALAD ® 413.
  • a set-delayed cement composition of the present invention may be provided that comprises water and a cementitious component consisting essentially of silica and hydrated lime.
  • the set-delayed cement composition may be placed in a subterranean formation and permitted to set therein.
  • a set-delayed cement composition of the present invention may be provided that comprises water and a cementitious component consisting essentially of silica and hydrated lime.
  • the set-delayed cement composition further may comprise a dispersant.
  • the set-delayed cement composition may be permitted to remain in storage for a desired time period (e.g., a time period in the range of from about 12 hours to about seven days after the date on which the set-delayed cement composition was provided), after which a set-retarder may be added to the set- delayed cement composition, and the mixture of the set-delayed cement composition plus retarder may be placed in a subterranean formation and permitted to set therein.
  • a set-delayed cement composition of the present invention may be provided that comprises water, a set retarder, and a cementitious component consisting essentially of silica and hydrated lime.
  • the set-delayed cement composition may be permitted to remain in storage for a time period in the range of from about 5 minutes to about 24 hours, after which the set-delayed cement composition may be placed in a subterranean formation and permitted to set therein.
  • a set-delayed cement composition of the present invention may comprise about 25% by weight water, 12% by weight hydrated lime, 20% by weight micro silica, 20% by weight silica flour, 20% by weight SSA-2, 2% by weight bentonite, 0.7% by weight SCR-100.
  • Sample set-delayed cement compositions of the present invention were prepared comprising 250 grams of water, 120 grams of hydrated lime, 200 grams of micro silica, 200 grams of silica flour, 200 grams of SSA-2, 21.6 grams of bentonite, and 7.2 grams of SCR- 100.
  • the sample compositions (referred to herein as Sample Composition No. 1 and Sample Composition No. 2) were prepared at room temperature and subjected to a thickening time test at 250°F, either immediately after mixing or after standing at room temperature for 24 hours after mixing. The thickening test was performed in accordance with API Spec 10.
  • a conventional cement composition was prepared comprising class H cement blended with 1% SCR-100 and 38% water. After mixing, the conventional cement composition was left standing overnight and then subjected to the same thickening time test described above.
  • Sample Composition No. 1 was tested immediately after mixing and had a thickening time of 2:48.
  • Sample Composition No. 2 was tested after standing for 24 hours, and had a thickening time of 2:32.
  • the conventional cement composition was semi-set and could not be re-blended after 24 hours.
  • Additional sample cement compositions were prepared as follows. About 600 grams of SSA-I were added to 60 grams of lime and 231 grams of water. Varying amounts of set retarder were added, and thickening tests were conducted on the sample cement compositions at varying test temperatures. The thickening tests were conducted according to API Spec 1OB.
  • Sample Composition No. 3 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.5% HR ® -5 by weight of the mixture of lime and silica.
  • Sample Composition No. 4 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.6% HR ® -5 by weight of the mixture of lime and silica.
  • Sample Composition No. 5 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 1.0% HR ® -5 by weight of the mixture of lime and silica.
  • Sample Composition No. 6 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.6% HR ® -5 by weight of the mixture of lime and silica.
  • Sample Composition No. 7 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.7% HR ® -5 by weight of the mixture of lime and silica.
  • Sample Composition No. 8 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, 1.0% HR ® -5 by weight of the mixture of lime and silica, and 0.5% HR ® -25 by weight of the mixture of lime and silica.
  • Sample Composition No. 9 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, 2.0% HR ® -5 by weight of the mixture of lime and silica, and 1.0% HR ® -25 by weight of the mixture of lime and silica.
  • Sample Composition No. 10 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, 2.0% HR ® -5 by weight of the mixture of lime and silica, and 1.0% HR ® -25 by weight of the mixture of lime and silica.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

Methods of cementing in subterranean formations are provided. An example of a method is a method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation.

Description

SET-DELAYED CEMENT COMPOSITIONS COMPRISING HYDRATED LIME AND SILICA AND METHODS OF CEMENTING IN SUBTERRANEAN
FORMATIONS
BACKGROUND
The present invention relates to subterranean operations, and more particularly, to set- delayed cement compositions and methods of using such cement compositions in subterranean applications.
Hydraulic cement compositions are commonly utilized in subterranean operations, particularly subterranean well completion and remedial operations. For example, hydraulic cement compositions are used in primary cementing operations whereby pipe strings such as casings and liners are cemented in well bores. In performing primary cementing, hydraulic cement compositions are pumped into the annular space between the walls of a well bore and the exterior surface of the pipe string disposed therein. The cement composition is permitted to set in the annular space, thereby forming an annular sheath of hardened substantially impermeable cement therein that substantially supports and positions the pipe string in the well bore and bonds the exterior surfaces of the pipe string to the walls of the well bore. Hydraulic cement compositions also are used in remedial cementing operations such as plugging highly permeable zones or fractures in well bores, plugging cracks and holes in pipe strings, and the like.
A broad variety of cement compositions have been used in conventional subterranean cementing operations, including, inter alia, cement compositions comprising Portland cement, and cement compositions comprising water, fly ash, and lime. However, the composition and quality of both Portland cement and fly ash vary widely. Accordingly, the set times of conventional cement compositions employing Portland cement and/or fly ash may be unpredictable. This may be problematic because, inter alia, it may cause such conventional cement compositions to set prematurely, before they have been properly placed in a desired location in a subterranean formation.
SUMMARY
The present invention relates to subterranean operations, and more particularly, to set- delayed cement compositions and methods of using such cement compositions in subterranean applications.
An example of a method of the present invention is a method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation.
Another example of a method of the present invention is a method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation, within a time period in the range of from about 12 hours to about seven days after the set-delayed cement composition has been provided; and permitting the set-delayed cement composition to set in the subterranean formation.
Another example of a method of the present invention is a method, comprising: providing a set-delayed cement composition comprising: water, a set retarder, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set- delayed cement composition into a subterranean formation, within a time period in the range of from about 5 minutes to about 24 hours after the set-delayed cement composition has been provided; and permitting the set-delayed cement composition to set in the subterranean formation.
The features and advantages of the present invention will be readily apparent to those skilled in the art. While numerous changes may be made by those skilled in the art, such changes are within the spirit of the invention.
DESCRIPTION OF PREFERRED EMBODIMENTS
The present invention relates to subterranean operations, and more particularly, to set- delayed cement compositions and methods of using such cement compositions in subterranean applications.
The set-delayed cement compositions of the present invention generally comprise water and a cementitious component consisting essentially of: hydrated lime and silica. Among other things, the set-delayed cement compositions of the present invention may demonstrate better repeatability and reproducibility than conventional cement compositions that may comprise, inter alia, cementitious components comprising Portland cements and/or fly ash. Portland cements and fly ashes often vary significantly in their chemical composition, due in part to the process by which Portland cements and fly ashes are made. Accordingly, conventional cement compositions comprising cementitious components that comprise Portland cements and/or fly ashes often will demonstrate undesirable variability in their performance. In contrast, the chemical composition of hydrated lime and silica demonstrates far less variability, and in certain embodiments, may approach a degree of repeatability comparable to that of chemical-grade reagents. Accordingly, the set-delayed cement compositions of the present invention, comprising a cementitious component that consists essentially of hydrated lime and silica, may demonstrate desirable repeatability and reproducibility, particularly as compared to conventional cement compositions. Moreover, cementitious components consisting essentially of hydrated lime and silica may be less reactive than cementitious components comprising Portland cements. Accordingly, certain embodiments of the set-delayed cement compositions of the present invention, comprising cementitious components consisting essentially of hydrated lime and silica, may be particularly suitable for use, inter alia, in subterranean formations having relatively high bottom-hole-circulating temperatures, e.g., temperatures in the range of from about 4000F to about 500°F. In certain optional embodiments, the set-delayed cement compositions of the present invention optionally may comprise other additives suitable for use in the set-delayed cement compositions may be added, such as set retarders, fluid loss control agents, dispersants, and the like.
The water present in the set-delayed cement compositions of the present invention may be from any source, provided that it does not contain an excess of compounds that adversely affect other compounds in the set-delayed cement compositions. For example, a set-delayed cement composition of the present invention can comprise fresh water, salt water (e.g., water containing one or more salts dissolved therein), brine {e.g., saturated salt water), or seawater. The water may be present in an amount sufficient to produce a pumpable slurry. Generally, the water is present in the set-delayed cement compositions of the present invention in an amount in the range of from about 20% to about 80% by weight of the cementitious component. In certain exemplary embodiments, the water is present in the set- delayed cement compositions in an amount in the range of from about 35% to about 45% by weight of the cementitious component.
The set-delayed cement compositions of the present invention comprise hydrated lime. As referred to herein, hydrated lime will be understood to mean calcium hydroxide. The hydrated lime may be present in the set-delayed cement compositions in an amount in the range of from about 1% to about 40% by weight of the cementitious component. In certain embodiments, the hydrated lime may be present in the set-delayed cement compositions in an amount in the range of from about 5% to about 20% by weight of the cementitious component. An example of a suitable hydrated lime is commercially available from Continental Lime, Inc., of Salt Lake City, Utah.
The silica present in the set-delayed cement compositions of the present invention comprises ground quartz. Examples of suitable silicas include those that are commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade names "SSA-I" and "SSA-2." The silica may be present in the set-delayed cement compositions in an amount in the range of from about 60% to about 99% by weight of the cementitious component. In certain embodiments, the silica is present in the set-delayed cement compositions in an amount in the range of from about 80% to about 95% by weight of the cementitious component.
Optionally, the set-delayed cement compositions of the present invention further may comprise a set retarder. Whether a particular application will require the inclusion of a set retarder in a particular set-delayed cement composition may depend upon factors including, but not limited to, the bottom hole circulating temperature of the application. One of ordinary skill in the art, with the benefit of this disclosure, will be able to determine whether a set retarder is appropriate for a particular application. Generally, any set retarder may be used with the set-delayed cement compositions of the present invention. Examples of suitable set retarders include those that are commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade names SCR-100, HR®-5, and HR®-25. Where included, the optional set retarder may be present in the set-delayed cement compositions in an amount in the range of from about 0.05% to about 2.5% by weight of the cementitious component. In higher-temperature applications, the optional set retarder may be present in the set-delayed cement compositions in an amount in the range of from about 1.5% to about 2.5% by weight of the cementitious component.
Optionally, the set-delayed cement compositions of the present invention may further comprise a weighting agent. Generally, any weighting agent may be used with the set- delayed cement compositions of the present invention. In certain embodiments, the weighting agents used in the present invention comprise hematites. An example of a suitable hematite is commercially available under the trade name "Hi-Dense® No. 4" from Halliburton Energy Services, Inc., of Duncan, Oklahoma. In certain embodiments of the present invention where a weighting agent may be present in a set-delayed cement composition, the weighting agent may be present in an amount in the range of from about 5% to about 45% by weight of the cementitious component. In certain embodiments, the weighting agent may be present in an amount in the range of from about 35% to about 45% by weight of the cementitious component.
Additional additives optionally may be added to the set-delayed cement compositions of the present invention as deemed appropriate by one skilled in the art with the benefit of this disclosure. Examples of such additives include, among other things, fluid loss control additives, defoamers, microspheres, dispersants, salts, and formation conditioning agents, and the like. Where included, a dispersant may be present in the set-delayed cement compositions of the present invention in an amount in the range of from about 0.1% to about 1.0% by weight of the cementitious component. An example of a suitable dispersant is a sulfonated acetone formaldehyde condensate that is commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade name CFR-3. Where included, a fluid loss control additive may be present in the set-delayed cement compositions of the present invention in an amount in the range of from about 0.1% to about 1.0% by weight of the cementitious component. Examples of suitable fluid loss control additives are commercially available from Halliburton Energy Services, Inc., of Duncan, Oklahoma, under the trade names HALAD® 344 and HALAD® 413.
In one embodiment of the present invention, a set-delayed cement composition of the present invention may be provided that comprises water and a cementitious component consisting essentially of silica and hydrated lime. The set-delayed cement composition may be placed in a subterranean formation and permitted to set therein.
In another embodiment of the present invention, a set-delayed cement composition of the present invention may be provided that comprises water and a cementitious component consisting essentially of silica and hydrated lime. In certain embodiments, the set-delayed cement composition further may comprise a dispersant. The set-delayed cement composition may be permitted to remain in storage for a desired time period (e.g., a time period in the range of from about 12 hours to about seven days after the date on which the set-delayed cement composition was provided), after which a set-retarder may be added to the set- delayed cement composition, and the mixture of the set-delayed cement composition plus retarder may be placed in a subterranean formation and permitted to set therein. In another embodiment of the present invention, a set-delayed cement composition of the present invention may be provided that comprises water, a set retarder, and a cementitious component consisting essentially of silica and hydrated lime. The set-delayed cement composition may be permitted to remain in storage for a time period in the range of from about 5 minutes to about 24 hours, after which the set-delayed cement composition may be placed in a subterranean formation and permitted to set therein.
In one embodiment, a set-delayed cement composition of the present invention may comprise about 25% by weight water, 12% by weight hydrated lime, 20% by weight micro silica, 20% by weight silica flour, 20% by weight SSA-2, 2% by weight bentonite, 0.7% by weight SCR-100.
To facilitate a better understanding of the present invention, the following examples of certain aspects of some embodiments are given. In no way should the following examples be read to limit, or define, the entire scope of the invention.
EXAMPLE 1
Sample set-delayed cement compositions of the present invention were prepared comprising 250 grams of water, 120 grams of hydrated lime, 200 grams of micro silica, 200 grams of silica flour, 200 grams of SSA-2, 21.6 grams of bentonite, and 7.2 grams of SCR- 100. The sample compositions (referred to herein as Sample Composition No. 1 and Sample Composition No. 2) were prepared at room temperature and subjected to a thickening time test at 250°F, either immediately after mixing or after standing at room temperature for 24 hours after mixing. The thickening test was performed in accordance with API Spec 10. As a comparison, a conventional cement composition was prepared comprising class H cement blended with 1% SCR-100 and 38% water. After mixing, the conventional cement composition was left standing overnight and then subjected to the same thickening time test described above.
Sample Composition No. 1 was tested immediately after mixing and had a thickening time of 2:48. Sample Composition No. 2 was tested after standing for 24 hours, and had a thickening time of 2:32. The conventional cement composition was semi-set and could not be re-blended after 24 hours.
The above example demonstrates, among other things, that the set-delayed cement compositions of the present invention are suitable for use in subterranean applications. EXAMPLE 2
Additional sample cement compositions were prepared as follows. About 600 grams of SSA-I were added to 60 grams of lime and 231 grams of water. Varying amounts of set retarder were added, and thickening tests were conducted on the sample cement compositions at varying test temperatures. The thickening tests were conducted according to API Spec 1OB.
Sample Composition No. 3 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.5% HR®-5 by weight of the mixture of lime and silica.
Sample Composition No. 4 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.6% HR®-5 by weight of the mixture of lime and silica.
Sample Composition No. 5 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 1.0% HR®-5 by weight of the mixture of lime and silica.
Sample Composition No. 6 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.6% HR®-5 by weight of the mixture of lime and silica.
Sample Composition No. 7 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, and 0.7% HR®-5 by weight of the mixture of lime and silica.
Sample Composition No. 8 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, 1.0% HR®-5 by weight of the mixture of lime and silica, and 0.5% HR®-25 by weight of the mixture of lime and silica.
Sample Composition No. 9 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, 2.0% HR®-5 by weight of the mixture of lime and silica, and 1.0% HR®-25 by weight of the mixture of lime and silica.
Sample Composition No. 10 comprised 600 grams SSA-I, 60 grams lime, 231 grams of water, 2.0% HR®-5 by weight of the mixture of lime and silica, and 1.0% HR®-25 by weight of the mixture of lime and silica.
The results of the thickening time are set forth in Table 1 below. TABLE 1
Figure imgf000009_0001
The above example demonstrates, among other things, that the set-delayed cement compositions of the present invention are suitable for use in subterranean applications.
Therefore, the present invention is well adapted to attain the ends and advantages mentioned as well as those that are inherent therein. While numerous changes may be made by those skilled in the art, such changes are encompassed within the spirit of this invention as defined by the appended claims. The terms in the claims have their plain, ordinary meaning unless otherwise explicitly and clearly defined by the patentee.

Claims

What is claimed is:
1. A method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation.
2. The method of claim 1 wherein the subterranean formation has a bottom-hole- circulating temperature in the range of from about 4000F to about 5000F.
3. The method of claim 1 wherein the hydrated lime is present in the set-delayed cement composition in an amount in the range of from about 1% to about 40% by weight of the cementitious component.
4. The method of claim 1 wherein the silica is present in the set-delayed cement composition in an amount in the range of from about 60% to about 99% by weight of the cementitious component.
5. The method of claim 1 wherein the water is present in the set-delayed cement composition in an amount in the range of from about 20% to about 80% by weight of the cementitious component.
6. A method comprising: providing a set-delayed cement composition comprising: water, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation, within a time period in the range of from about 12 hours to about seven days after the set- delayed cement composition has been provided; and permitting the set-delayed cement composition to set in the subterranean formation.
7. The method of claim 6 wherein the set-delayed cement composition comprises a dispersant.
8. The method of claim 6 further comprising adding a set retarder to the set-delayed composition before placing the set-delayed cement composition into a subterranean formation.
9. The method of claim 6 wherein the subterranean formation has a bottom-hole- circulating temperature in the range of from about 400°F to about 500°F.
10. The method of claim 6 wherein the hydrated lime is present in the set-delayed cement composition in an amount in the range of from about 1% to about 40% by weight of the cementitious component.
11. The method of claim 6 wherein the silica is present in the set-delayed cement composition in an amount in the range of from about 60% to about 99% by weight of the cementitious component.
12. The method of claim 6 wherein the water is present in the set-delayed cement composition in an amount in the range of from about 20% to about 80% by weight of the cementitious component.
13. A method comprising: providing a set-delayed cement composition comprising: water, a set retarder, and a cementitious component consisting essentially of: hydrated lime, and silica; placing the set-delayed cement composition into a subterranean formation, within a time period in the range of from about 5 minutes to about 24 hours after the set- delayed cement composition has been provided; and permitting the set-delayed cement composition to set in the subterranean formation.
14. The method of claim 13 wherein the subterranean formation has a bottom-hole- circulating temperature in the range of from about 400°F to about 5000F.
15. The method of claim 13 wherein the hydrated lime is present in the set-delayed cement composition in an amount in the range of from about 1% to about 40% by weight of the cementitious component.
16. The method of claim 13 wherein the silica is present in the set-delayed cement composition in an amount in the range of from about 60% to about 99% by weight of the cementitious component.
17. The method of claim 13 wherein the water is present in the set-delayed cement composition in an amount in the range of from about 20% to about 80% by weight of the cementitious component.
PCT/GB2006/001561 2005-05-05 2006-04-27 Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations WO2006117522A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/122,436 US20060249289A1 (en) 2005-05-05 2005-05-05 Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations
US11/122,436 2005-05-05

Publications (1)

Publication Number Publication Date
WO2006117522A1 true WO2006117522A1 (en) 2006-11-09

Family

ID=36579935

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2006/001561 WO2006117522A1 (en) 2005-05-05 2006-04-27 Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations

Country Status (2)

Country Link
US (1) US20060249289A1 (en)
WO (1) WO2006117522A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8138347B2 (en) 2007-05-18 2012-03-20 Glaxosmithkline Llc Quinoline derivatives as PI3 kinase inhibitors

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9328281B2 (en) 2012-03-09 2016-05-03 Halliburton Energy Services, Inc. Foaming of set-delayed cement compositions comprising pumice and hydrated lime
US10195764B2 (en) 2012-03-09 2019-02-05 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising pumice and associated methods
US9371712B2 (en) 2012-03-09 2016-06-21 Halliburton Energy Services, Inc. Cement set activators for set-delayed cement compositions and associated methods
US9255454B2 (en) 2012-03-09 2016-02-09 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising pumice and associated methods
US9580638B2 (en) 2012-03-09 2017-02-28 Halliburton Energy Services, Inc. Use of synthetic smectite in set-delayed cement compositions
US9790132B2 (en) 2012-03-09 2017-10-17 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising pumice and associated methods
US9212534B2 (en) 2012-03-09 2015-12-15 Halliburton Energy Services, Inc. Plugging and abandoning a well using a set-delayed cement composition comprising pumice
US9534165B2 (en) 2012-03-09 2017-01-03 Halliburton Energy Services, Inc. Settable compositions and methods of use
US9255031B2 (en) 2012-03-09 2016-02-09 Halliburton Energy Services, Inc. Two-part set-delayed cement compositions
US10202751B2 (en) 2012-03-09 2019-02-12 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising pumice and associated methods
US9227872B2 (en) 2012-03-09 2016-01-05 Halliburton Energy Services, Inc. Cement set activators for set-delayed cement compositions and associated methods
US9328583B2 (en) 2012-03-09 2016-05-03 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising pumice and associated methods
US9856167B2 (en) 2012-03-09 2018-01-02 Halliburton Energy Services, Inc. Mitigation of contamination effects in set-delayed cement compositions comprising pumice and hydrated lime
US10082001B2 (en) 2012-03-09 2018-09-25 Halliburton Energy Services, Inc. Cement set activators for cement compositions and associated methods
US8851173B2 (en) 2012-03-09 2014-10-07 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising pumice and associated methods
US9505972B2 (en) 2012-03-09 2016-11-29 Halliburton Energy Services, Inc. Lost circulation treatment fluids comprising pumice and associated methods
GB2532383B (en) * 2013-09-06 2020-09-02 Halliburton Energy Services Inc Set-delayed cement compositions comprising pumice and associated methods
MX2016002867A (en) * 2013-09-09 2016-08-17 Halliburton Energy Services Inc Two-part set-delayed cement compositions.
AU2015223141B2 (en) * 2014-02-28 2017-03-16 Halliburton Energy Services, Inc. Settable compositions and methods of use

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0177308A2 (en) * 1984-09-27 1986-04-09 Halliburton Company Well cementing methods and compositions
EP0605257A1 (en) * 1992-12-30 1994-07-06 Halliburton Company Method of cementing subterranean zone
EP0704410A2 (en) * 1994-09-28 1996-04-03 Halliburton Company Cementitious compositions for downhole use

Family Cites Families (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2698256A (en) * 1950-01-12 1954-12-28 Great Lakes Carbon Corp Siliceous composition and method for manufacturing the same
US2805719A (en) * 1955-09-15 1957-09-10 Halliburton Oil Well Cementing High temperature well cementing
NO117964B (en) * 1965-07-09 1969-10-13 Rheinische Kalksteinwerke
US3679446A (en) * 1968-06-04 1972-07-25 Osaka Packing Molding materials of calcium silicate hydrate and shaped products thereof
US4238536A (en) * 1978-09-14 1980-12-09 Halliburton Company Preventing water incursion into commodity piles
US4234344A (en) * 1979-05-18 1980-11-18 Halliburton Company Lightweight cement and method of cementing therewith
DE3344291A1 (en) * 1983-12-07 1985-06-13 Skw Trostberg Ag, 8223 Trostberg DISPERSING AGENT FOR SALTY SYSTEMS
US4465805A (en) * 1983-12-23 1984-08-14 Dow Corning Corporation Curable masses producing fluorosilicone elastomers and coatings
US4555269A (en) * 1984-03-23 1985-11-26 Halliburton Company Hydrolytically stable polymers for use in oil field cementing methods and compositions
US4515635A (en) * 1984-03-23 1985-05-07 Halliburton Company Hydrolytically stable polymers for use in oil field cementing methods and compositions
US4676317A (en) * 1986-05-13 1987-06-30 Halliburton Company Method of reducing fluid loss in cement compositions which may contain substantial salt concentrations
NO165673C (en) * 1987-11-16 1991-03-20 Elkem As HYDRAULIC CEMENT SUSPENSION.
FR2630930B1 (en) * 1988-05-03 1990-11-02 Sames Sa PNEUMATIC LIQUID SPRAYING DEVICE
US4880468A (en) * 1988-09-29 1989-11-14 Halliburton Services Waste solidification composition and methods
US5049288A (en) * 1989-06-27 1991-09-17 Halliburton Company Set retarded cement compositions and methods for well cementing
US5336022A (en) * 1991-11-27 1994-08-09 Chemical Lime Company Method for producing enhanced soil stabilization reactions between lime and clay soils due to the effect of silica addition
US5346550A (en) * 1992-02-05 1994-09-13 Halliburton Company Low temperature well cementing compositions and methods
US5327968A (en) * 1992-12-30 1994-07-12 Halliburton Company Utilizing drilling fluid in well cementing operations
US5472051A (en) * 1994-11-18 1995-12-05 Halliburton Company Low temperature set retarded well cement compositions and methods
US5577865A (en) * 1995-07-28 1996-11-26 Halliburton Company Placement of a substantially non-flowable cementitious material in an underground space
US5711383A (en) * 1996-04-19 1998-01-27 Halliburton Company Cementitious well drilling fluids and methods
AUPO612097A0 (en) * 1997-04-10 1997-05-08 James Hardie Research Pty Limited Building products
AU738096B2 (en) * 1997-08-15 2001-09-06 Halliburton Energy Services, Inc. Light weight high temperature well cement compositions and methods
US6796378B2 (en) * 1997-08-15 2004-09-28 Halliburton Energy Services, Inc. Methods of cementing high temperature wells and cement compositions therefor
US5900053A (en) * 1997-08-15 1999-05-04 Halliburton Energy Services, Inc. Light weight high temperature well cement compositions and methods
US6068055A (en) * 1998-06-30 2000-05-30 Halliburton Energy Services, Inc. Well sealing compositions and methods
US6258160B1 (en) * 1999-09-07 2001-07-10 Halliburton Energy Services, Inc. Methods and compositions for grouting heat exchange pipe
US6138759A (en) * 1999-12-16 2000-10-31 Halliburton Energy Services, Inc. Settable spotting fluid compositions and methods
US6668929B2 (en) * 2000-07-26 2003-12-30 Halliburton Energy Services, Inc. Methods and oil-based settable spotting fluid compositions for cementing wells
US6716282B2 (en) * 2000-07-26 2004-04-06 Halliburton Energy Services, Inc. Methods and oil-based settable spotting fluid compositions for cementing wells
US6666268B2 (en) * 2000-07-26 2003-12-23 Halliburton Energy Services, Inc. Methods and oil-based settable drilling fluid compositions for drilling and cementing wells
US6315042B1 (en) * 2000-07-26 2001-11-13 Halliburton Energy Services, Inc. Oil-based settable spotting fluid
US6562122B2 (en) * 2000-09-18 2003-05-13 Halliburton Energy Services, Inc. Lightweight well cement compositions and methods
US6749679B2 (en) * 2002-01-23 2004-06-15 Advanced Materials Technologies, Llc Composition of materials for production of acid resistant cement and concrete and methods thereof
US6989057B2 (en) * 2002-12-10 2006-01-24 Halliburton Energy Services, Inc. Zeolite-containing cement composition
US6908508B2 (en) * 2003-06-04 2005-06-21 Halliburton Energy Services, Inc. Settable fluids and methods for use in subterranean formations
US6689208B1 (en) * 2003-06-04 2004-02-10 Halliburton Energy Services, Inc. Lightweight cement compositions and methods of cementing in subterranean formations
US7201798B2 (en) * 2005-05-05 2007-04-10 Halliburton Energy Services, Inc. Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0177308A2 (en) * 1984-09-27 1986-04-09 Halliburton Company Well cementing methods and compositions
EP0605257A1 (en) * 1992-12-30 1994-07-06 Halliburton Company Method of cementing subterranean zone
EP0704410A2 (en) * 1994-09-28 1996-04-03 Halliburton Company Cementitious compositions for downhole use

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8138347B2 (en) 2007-05-18 2012-03-20 Glaxosmithkline Llc Quinoline derivatives as PI3 kinase inhibitors
US8404837B2 (en) 2007-05-18 2013-03-26 Glaxosmithkline Llc Quinoline derivatives as P13 kinase inhibitors
US8633187B2 (en) 2007-05-18 2014-01-21 Glaxosmithkline Llc Quinoline derivatives as PI3 kinase inhibitors
US8785433B2 (en) 2007-05-18 2014-07-22 Glaxosmithkline Llc Quinoline derivatives as PI3 kinase inhibitors

Also Published As

Publication number Publication date
US20060249289A1 (en) 2006-11-09

Similar Documents

Publication Publication Date Title
US7201798B2 (en) Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations
US20060249289A1 (en) Set-delayed cement compositions comprising hydrated lime and silica and methods of cementing in subterranean formations
US7073585B2 (en) Cement compositions with improved fluid loss characteristics and methods of cementing in surface and subterranean applications
US7021380B2 (en) Compositions comprising set retarder compositions and associated methods
US6689208B1 (en) Lightweight cement compositions and methods of cementing in subterranean formations
US7055603B2 (en) Cement compositions comprising strength-enhancing lost circulation materials and methods of cementing in subterranean formations
EP2585552B1 (en) Methods for using acid-soluble cement compositions comprising cement kiln dust and/or a natural pozzolan
US6516884B1 (en) Stable well cementing methods and compositions
US20050034864A1 (en) Cement compositions with improved fluid loss characteristics and methods of cementing in surface and subterranean applications
US20080196628A1 (en) Cement Compositions Comprising Rock-Forming Minerals and Associated Methods
US20050109507A1 (en) Methods of using cement compositions having long-term slurry-state stability
US7303625B2 (en) Treatment fluids comprising chlorinated carbohydrates
US7422062B2 (en) Methods of treating subterranean formations using treatment fluids comprising chlorinated carbohydrates
EP1769133A1 (en) Methods of reducing the impact of a formate-based drilling fluid comprising an alkaline buffering agent on a cement slurry
US7547664B2 (en) Additives comprising chlorinated carbohydrates
AU2013309038B2 (en) Acid-soluble cement compositions comprising cement kiln dust and methods of use
EP1960492B1 (en) Additives and treatment fluids comprising chlorinated carbohydrates and methods of using them
EP1616073A1 (en) Biodegradable cement retarder compositions and methods of cementing in a subterranean formation

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Country of ref document: DE

NENP Non-entry into the national phase

Ref country code: RU

WWW Wipo information: withdrawn in national office

Country of ref document: RU

122 Ep: pct application non-entry in european phase

Ref document number: 06726941

Country of ref document: EP

Kind code of ref document: A1