WO2005047620A1 - Decking tool - Google Patents
Decking tool Download PDFInfo
- Publication number
- WO2005047620A1 WO2005047620A1 PCT/AU2004/001528 AU2004001528W WO2005047620A1 WO 2005047620 A1 WO2005047620 A1 WO 2005047620A1 AU 2004001528 W AU2004001528 W AU 2004001528W WO 2005047620 A1 WO2005047620 A1 WO 2005047620A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- tool
- boards
- spacer elements
- decking
- tool body
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/0092—Separate provisional spacers used between adjacent floor or wall tiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
- E04F21/1883—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by simultaneously applying several elements, e.g. templates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
- E04F21/22—Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs
Definitions
- This invention relates to a decking tool for assisting in the building of a decking such as a verandah or like structure in which spaced apart decking boards are provided.
- a decking tool for assisting in the building of a decking such as a verandah or like structure in which spaced apart decking boards are provided.
- the reference to decking in this specification also includes vertical walls formed from spaced apart boards, as well as horizontal deckings such as verandahs.
- deckings generally comprise a building structure formed from a number of support posts on which bearers are laid. Joists are then attached to the bearers and decking boards are nailed or otherwise fastened to the joists in order to complete the decking.
- the most time consuming part of building a decking is the laying of the decking boards because this requires the boards to be laid out, spaced and then nailed in place.
- decking boards are laid directly on bearers without joists, particularly if space is minimal.
- joist is used to refer to the frame members upon which the decking boards are laid and connected.
- the decking is formed by fixing a first decking board on the joists, which is positioned by use of a string line or other datum.
- the decking board is fixed in place by nails or screws.
- a number of boards laid end to end in a row are fixed to form a first row of the decking boards.
- a second row is then laid in position and is spaced from the first row by a handheld spacer, which can typically comprise a piece of wood which is sawn off as an off-cut, and which has the desired thickness to space the decking boards apart by the desired spacing which, in most applications, is a distance of about 5 mm. After the boards have been spaced by means of the spacer elements, the boards are then individually nailed in place.
- a handheld spacer which can typically comprise a piece of wood which is sawn off as an off-cut, and which has the desired thickness to space the decking boards apart by the desired spacing which, in most applications, is a distance of about 5 mm.
- the object of the present invention is to provide a decking tool which assists in the formation of a decking to reduce the time required to form the decking.
- the invention in a first aspect may be said to reside in a decking tool comprising: a tool body for location on a plurality of laid decking boards; a plurality of spacer elements extending from the body for location between adjacent decking boards of the laid decking boards, the spacer elements having a predetermined size to space the boards apart from one another by a distance corresponding to said predetermined size, and adjacent spacer elements being spaced from one another by a distance corresponding to the width of the decking boards; and the tool body having a front edge and an abutment member spaced from the front edge for abutting the joist to thereby locate the front edge over the decking boards and the joist to form a guide for the location of fasteners to secure the decking boards to the joist.
- a plurality of the boards can be laid in place and are then automatically spaced by the tool by locating the spacer elements between adjacent boards and pushing the boards hard up against the respective spacer elements .
- the boards can be secured in place much quicker than according to conventional techniques, thereby reducing the time taken to form the decking.
- this aspect of the invention provides a guide for the location of the fasteners, the fasteners can be secured through the boards and into the joists in a straight line much quicker than in the past, and therefore the time taken to form the decking is further reduced.
- the abutment member comprises a leading edge of at least one of the spacer elements .
- the abutment member comprises a leading edge of a plurality of the spacer elements .
- the leading edge of all of the spacer elements are in alignment and spaced from the front edge of the tool body by the second predetermined distance so that the leading edge of all of the spacer elements forms the abutment member.
- the tool includes a removal spacer plate which is selectively connected to the tool body so as to form a front edge of the tool body which is spaced from the abutment member by a first distance when the removable plate is attached to the tool body, and the tool body having a front edge which is spaced from the abutment member by a second distance when the removable plate is removed from the tool body.
- the tool body comprises a substantially rectangular body, or U-shaped body in cross-section, having a generally flat lower surface from which the spacer elements project.
- the tool body has an upper surface to which is connected a handle for facilitating movement and positioning of the decking tool.
- the tool body has a longitudinal centre line and the handle is offset relative to the centre line so that two like decking tools can be stacked in back to back relationship to reduce the size of a package of two such tools for shipment from one place to another.
- the spacer elements comprise plates having a first section adjacent the tool body which is of a predetermined size to thereby define the space between adjacent decking boards, the plate tapering to a free edge remote from the tool body, and the free edge being curved or flat in shape.
- the spacer elements have side surfaces and at least part of the side surfaces are substantially parallel so that the decking boards can abut the side surfaces which are substantially parallel to thereby space the boards without the tendency of the boards forcing the tool away from the boards.
- the spacer elements include end spacer elements which locate adjacent outer surfaces of outermost boards of the plurality of laid boards, the end spacer elements being of greater length in a direction away from the tool body than the remainder of spacer elements .
- the invention also provides a method of laying a decking comprising the steps of: laying a plurality of decking boards on joists; positioning a decking tool of the type described above so that spacer elements of the decking tool locate between decking boards of the plurality of decking boards, and front edges of the spacer elements abut a joist to thereby space the decking boards apart by the predetermined distance; and using a front edge of the tool to form a guide to locate fasteners through the decking boards and into the joist to thereby secure the decking boards to the joist.
- the tool is used in the above-mentioned manner to nail the decking boards to a first of the joists, and then the tool is moved to a second of the joists to nail the boards to a second of the joists, and then is moved to a third of the joists to nail the boards to a third of the joists, and so on until all of the plurality of boards are nailed to the joists.
- a further plurality of boards are then laid, and the tool is used in the same manner to secure those boards to the joists.
- the invention in a second aspect may be said to reside in a decking tool comprising: a tool body for location on a plurality of laid decking boards; a plurality of spacer elements extending from the body for location between adjacent decking boards of the laid decking boards, the spacer elements having a predetermined size to space the boards apart from one another by a distance corresponding to the said predetermined size, and adjacent spacer elements being spaced from one another by a distance corresponding to the width of the decking boards; and the spacer elements having side surfaces and at least part of the side surfaces being substantially parallel so that the decking boards can abut the parts of the side surfaces which are substantially parallel to thereby space the boards without the tendency of the boards forcing the tool away from the boards.
- the parts of the spacer elements which are substantially parallel are adjacent the tool body, the elements having free ends and the side surfaces adjacent the free ends tapering towards one another to facilitate entry of the spacer elements between adjacent decking boards .
- the tool body has a front edge and an abutment member spaced from the front edge for abutting the joist to thereby locate the front edge over the decking boards and the joist to form a guide for the location of fasteners to secure the decking boards to the joist.
- the abutment member comprises a leading edge of at least one of the spacer elements.
- the abutment member comprises a leading edge of a plurality of the spacer elements.
- the leading edge of all of the spacer elements are in alignment and spaced from the front edge of the tool body by the second predetermined distance so that the leading edge of all of the spacer elements forms the abutment member.
- the tool body comprises a substantially rectangular body, or U-shaped body in cross-section, having a generally flat lower surface from which the spacer elements project.
- the tool body has an upper surface to which is connected a handle for facilitating movement and positioning of the decking tool .
- the tool body has a longitudinal centre line and the handle is offset relative to the centre line so that two like decking tools can be stacked in back to back relationship to reduce the size of a package of two such tools for shipment from one place to another.
- the spacer elements include end spacer elements which locate adjacent outer surfaces of outermost boards of the plurality of laid boards, the end spacer elements being of greater length in a direction away from the tool body than the remainder of spacer elements .
- the invention in a still further aspect may be said to reside in a decking tool comprising: a tool body for location on a plurality of laid decking boards; a detachable spacer member for connection to the tool body, the spacer member having a plurality of spacer elements for location between adjacent decking boards of the laid decking boards, the spacer elements having a predetermined size to space the boards apart from one another by a distance corresponding to said predetermined size, and adjacent spacer elements being spaced from one another by a predetermined distance corresponding to a width of the decking boards; and a first coupling element on the tool body and a corresponding second coupling element on the spacer member for releasably connecting the spacer member to the tool body to enable spacer members to be interchanged to thereby provide different predetermined sizes and/or different distances depending on the desired spacing between decking boards and the width of the decking boards which are being laid.
- the tool body includes at least one opening and the spacer member comprises a rod from which the spacing elements extend, the bar being for location on the tool body so the spacer elements can project through the at least one opening.
- the first coupling element comprises at least one screw threaded stem and a nut for screw-threaded engagement with the stem
- the second coupling element comprises at least one hole through the bar so that the bar can be located on the tool body by engaging the stem with the hole and secured in place by the nut.
- the first coupling element comprises two said stems and nuts, and the second coupling element comprises two said openings.
- the said stems are positioned on the tool body and the holes are positioned on the bar so that when the holes engage with the stems, the spacer elements are spaced from an edge of the tool body by a predetermined distance to form a guide for fasteners to secure the decking boards to the joists.
- the tool body has a front edge and an abutment member spaced from the front edge for abutting the joists to thereby locate the front edge over the decking boards and the joists to form a guide for the location of fasteners to secure the decking boards to the joists when the spacer member is attached to the tool body.
- the abutment member comprises a leading edge of at least one of the spacer elements.
- the abutment member comprises a leading edge of a plurality of the spacer elements.
- the leading edge of all of the spacer elements are in alignment and spaced from the front edge of the tool body by the second predetermined distance so that the leading edge of all of the spacer elements forms the abutment member.
- the tool body comprises a substantially rectangular body, or U-shaped body in cross-section, having a generally flat lower surface from which the spacer elements project.
- the tool body has an upper surface to which is connected a handle for facilitating movement and positioning of the decking tool.
- the tool body has a longitudinal centre line and the handle is offset relative to the centre line so that two like decking tools can be stacked in back to back relationship to reduce the size of a package of two such tools for shipment from one place to another.
- the spacer elements include end spacer elements which locate adjacent outer surfaces of outermost boards of the plurality of laid boards, the end spacer elements being of greater length in a direction away from the tool body than the remainder of spacer elements .
- Figure 1 is a perspective view of a decking tool according to the preferred embodiment of the invention
- Figure 2 is a front view of the tool of Figure 1
- Figure 3 is a detailed view of part of the tool of Figure 2
- Figure 4 is an end view of the tool of Figure 1
- Figure 5 is an underneath view of the tool of Figure 1
- Figure 6 is a view showing the manner in which a decking is laid using the tool of Figures 1 to 5
- Figure 7 is a perspective view of a further embodiment of the invention
- Figure 8 is a plan view of a tool body used in the embodiment of Figure 7
- Figure 9 is a cross-sectional view along the line IX- IX of Figure 7, but with the spacer member connected to the tool body
- Figure 10 is a cross-sectional view along the line X- X of Figure 9.
- a decking tool 10 which comprises a tool body 12.
- the tool body 12 is preferably rectangular in configuration and has a width W of about 90 mm, a thickness T of about 10 mm, and a length L of about 650 mm.
- W width of about 90 mm
- T thickness of about 10 mm
- L length of about 650 mm.
- these dimensions are merely exemplary and the width, thickness and length of the tool could be other than that described above.
- the tool body 10 may be formed as a slight U-shape in cross-section. This enables the thickness of the tool body to be reduced while maintaining structural integrity and strength.
- the tool body 12 has an upper surface 14 and a lower surface 16.
- the surfaces 14 and 16 are generally flat and parallel with respect to one another.
- a handle 18 is connected to the surface 14 and is offset from longitudinal centre line C of the tool body 10 so that two identical tools can be stacked back to back with their handles 18 beside one another to minimise the amount of space occupied by two such tools when packaged together for shipment from one place to another.
- the location of the handle 18 on one side of the centre line C also ensures that there is sufficient room for a nail gun to be used with the tool, as will be described in more detail hereinafter, and that if a workman is holding the tool by the handle, the workman's hand is well away from the nail gun and there is clear space for the nail gun to move along the tool .
- the tool body 10 has a front edge 20.
- the tool 10 may also include a removable plate 22 which can be connected to the front edge 20 by screws 24.
- the removable plate 22 can be connected to the tool body 10 by clamps (not shown) or any other suitable releasable fastener. The purpose of the removable plate 22 will be described hereinafter.
- the lower surface 16 of the tool body 12 has a plurality of spacer elements 25 extending away from the surface 16.
- the spacer elements 25 are best shown in Figures 2 to 5.
- seven spacer elements 25 are provided and which are spaced apart by a predetermined, preferably equal distance, which matches the width of a decking board with which the tool is to be used. For example, if the tool is to be used with decking boards of width 90 mm, the spacer elements 25 are spaced apart by a distance corresponding to that distance, plus a slight extra distance to compensate for any expansion or slight bowing of the decking boards which may occur when the boards are subjected to weather prior to use to form a decking. Typically, if the tool is to be used with decking boards of width 90 mm, the spacer elements 25 are spaced apart by a distance D of 90.5 mm.
- decking boards will all have the same thickness, and therefore the spacer elements 25 will be spaced apart by the same distance, it is not inconceivable that deckings may be formed from boards which have regular patterns of different thicknesses and therefore, in some embodiments, the spacer elements 25 may be spaced apart by different distances depending on the thickness of boards and the pattern which is to be produced.
- the spacer elements 25 have a first section 25a adjacent the surface 16 which defines the thickness of the spacer elements 25, and therefore the spacing between adjacent decking boards which are laid using the tool of the preferred embodiment.
- the spacer elements 25 then have a second portion 25b which tapers towards a flattened or generally curved end 25c which is remote from the surface 16.
- the spacer elements 25 are preferably configured in this shape to prevent injury if the spacer elements come into contact with a person because they are generally blunt, and also to prevent the likelihood of scratching of a newly laid decking by the spacer elements 25 during use of the tool 10.
- each of the spaces 25 is defined by side walls 25b which are substantially parallel with respect to one another.
- the remainder of the walls 25c of the spacers taper towards one another.
- the tapered walls 25c enable easy insertion between boards whereas the parallel sides or surfaces 25b ensure that the spacers properly locate between the boards to define the required space.
- the boards can abut the surfaces 25b and the abutment will not tend to push the tool away from the boards ensuring that the spacers 25 properly locate between the boards and properly space the boards .
- the spacer elements 25 are preferably in the form of plates, as is best shown in the side view of Figure 4, which are generally rectangular in side view as shown in Figure 4.
- the spacer elements 25 are formed integral with the body 10 so as to have maximum strength.
- the spacer elements 25 could be fixed to the body 10 by any suitable method.
- the spacer elements could be in the form of pins or the like which may make it easier for the pins to locate between decking boards when the tool is used.
- the pins will preferably have a flattened or gently curved free end similar to that shown in Figure 3.
- the tool body 10 can be provided with releasable spacer elements 25 and locator points for locating the spacer elements 25 at separation distances of 90.5 mm or 70.5 mm so that a single tool can be modified for use with decking boards of thickness 90 mm or 70 mm as the case may be.
- the end spacer elements which are marked 25' in Figures 2 and 4 are of greater length in a distance away from the surface 16 than the intermediate spacer elements 25.
- the reason for this is that the greater length of the spacer elements 25 provides a more secure location against a joist, and also against end decking boards during use of the tool, to reduce the likelihood of twisting or pivotal movement of the tool relative to the boards when the tool is in use.
- the length of the end teeth 25' are approximately 30 mm and the length of the other teeth are about 15 mm.
- these dimensions could be varied depending on the application to which the tool is to be put.
- the spacer elements 25 each have a leading edge 35 which are aligned along line B in Figure 5.
- the aligned edges 35 are spaced a predetermined distance Di from front edge 20 of the tool body 12, which relates to the thickness of a joist on which the decking boards are to be laid.
- the spacer elements 25 are positioned such that the edges 35 are the distance Di of 10 mm from the front edge 20 of the tool body 12.
- the removable plate 22 is removed from the tool body so the front edge 20 forms a guide for a nail gun to nail the boards to the joists, as will be described hereinafter.
- the spacer elements 25 contact the joist, and thereby locate the front edge 20 of the tool body over the joist to form the guide for the nail gun.
- only the longer spacer elements 25' extend down beneath the decking boards and abut the side of the joist.
- additional ones, or all of the spacer elements 25, could contact the side of the joist to position the tool and therefore the front edge 20 at the desired place over the joist.
- the front edge 20 is located slightly towards the side of the joist from the midpoint of the joist by a distance of about 5 mm.
- This distance accommodates the thickness of the nail gun, so that if the nail gun is placed adjacent the edge 22, the nails are located at the midpoint of the joist so that when the nails are punched into the boards and the joist, the nails form a straight line at the midpoint of the joist.
- the removable plate 22 is secured in position.
- the plate 22 has a thickness of about 5 mm and therefore the edge of the tool body which, in this arrangement, is formed by the edge 22 ' of the plate 22 is spaced a distance of 15 mm from the leading edges 35 of the spacer elements 25.
- this provides spacing for the nail gun so a straight line of nails is formed at the midpoint of the joist.
- a removable plate 20 having a thickness of 12.5 mm can be provided. This will locate the edge 22 at the midpoint of a 35 mm joist so that the nails can be located against the edge 22 and hammered through the boards and into the joist to thereby form a straight line of nails at the centre line of the joist.
- the tool can be supplied with a number of different sized removable plates so that an appropriate removable plate can be attached to suit the size of the joist, and also whether the fasteners are being attached by way of a nail gun, hammer or other suitable tool.
- the tool of the preferred embodiment has seven spacer elements 25 defining six spaces for receiving decking boards, the number of elements, and therefore the number of decking boards which can be accommodated by the tool is arbitrary and could be more or less than six. For example, in some applications, the tool could accommodate two or three boards and in others, 10 to 15 or even more boards .
- Figure 6 is a diagram illustrating how the tool of the preferred embodiment is used to form a decking.
- the decking is formed by laying decking boards 100 on joists 200.
- the joists 200 are supported by bearers (not shown) which in turn are supported along posts (not shown) .
- the decking boards 100 are cut to length as usual, so that rows of decking boards are formed, and with the joins between decking boards of the same row being staggered with respect to the joins of decking boards in an adjacent row.
- the first decking board 100 ' is aligned using a string line or other datum and is nailed in place in the conventional way so as to provide a starting reference point.
- the remaining decking boards 100 are then laid out as shown in Figure 6, and the tool 10 is positioned over the decking boards.
- the end spacer elements 25 abut outer edges of the outermost decking boards 100, and the intermediate spacer elements 25 locate between the adjacent decking boards 100.
- the decking boards 100 are then pushed tightly together so that they sandwich the spacer elements therebetween to properly set the spacing between the boards 100 in accordance with the size or, in other words, the thickness of the spacer elements 25.
- the tool 10 may need to be slightly forced into place by a hammer or the like to take out bows in the boards 100 and ensure that the boards properly locate between the spacer elements 25.
- the tool 10 is then positioned so that the leading edges 35 of the spacer elements 25' abut side edge 200a of the respective joists 200.
- the edge 20 of the tool 10 over the joist 200 just short of the midpoint of the joist 200.
- the removable plate 22 is used.
- a straight edge defined by the front edge 20 or 22' is therefore formed along the joist 200 for guiding a nail gun so that a row of nails can be easily punched through the boards 100 to secure the boards 100 to the joist 200.
- This is simply done by running the nail gun along the edge 20 and activating the nail as the nail gun passes over the appropriate place of each of the decking boards 100.
- the decking boards 100 are all automatically spaced apart by the required distance, and a guide is used to form a guideline so that a straight line of nails can be located through the boards and into the joist to secure the decking boards 100 in place.
- the tool 10 is then removed and replaced adjacent the next joist 200', as shown by reference 10' in Figure 6, and the same sequences of operations occurs.
- the boards at the joist 200' are properly spaced and a guide is formed for the nail gun to attach the boards to the joist 200'.
- a new set of boards 100 (not shown) are then laid on the joists 200 and the same operation is repeated to secure those boards to the joists 200. This continues until the decking has been finished.
- the tool automatically spaces the boards, thereby avoiding the need for individual spacing by hand, and also forms a datum guide for the nail gun, a considerable amount of time is saved in securing the decking boards 100 to the joists 200. Thus, the time taken to complete the decking is greatly reduced.
- the tool can be released, thereby enabling the workman to have two free hands for operating the nail gun or a hammer and nail in order to attach the decking boards 100 to the joists 200.
- a large extension handle can be used so that the tool 10 can be manipulated into place from a standing position, rather than having to kneel or bend over.
- FIGS. 7 to 10 show a still further embodiment of the invention.
- Like reference numerals indicate like parts to those previously described.
- Tool body 12 is formed from metal having a generally square U-shaped cross-section so that it includes a base 12a and upstanding side edges 12b.
- a handle 18 is provided as in the earlier embodiments.
- the base 12a of the tool body 12 includes an elongate opening 300 which is comprised of a first slot 301, a second slot 302, and a third slot 303. As best shown in Figures 7 and 8, the slots 301, 302 and 303 extend all the way through the base 12a. Screw threaded stems 305 are provided between the slots 301 and 302, and 302 and 303. The stems 305 are provided with wing nuts 306.
- a spacer member 310 is provided for releasable connection to the tool body 12.
- the spacer member 310 shown in Figure 7 is inverted with respect to the tool body 12 so that the relevant detail can be more easily seen.
- the member 310 comprises a bar 312 having the spacers 25 and is provided with holes 311 which correspond in position with the stems 305.
- the elements 25, as in the earlier embodiments, are spaced apart by a predetermined distance corresponding to the width of the decking board which is to be laid. Furthermore, the spacer elements 25 have a width or thickness which corresponds to the desired spacing between boards, such as for example, 5 mm.
- spacer members 310 are intended to be provided, each having spacer elements 25 which are spaced apart by different distances to correspond with different width decking boards which may be used, and also may also have spacer elements 25 of different thicknesses to provide different spacings between the laid decking boards.
- the wing nuts 306 are removed from the screw threaded stems 305 and the spacer member 310 is located in place by inverting it with respect to the position shown in Figure 7, and locating the stems 305 through the holes 311 so that the spacer elements 25 then project through the openings 301, 302 and 303, as is best shown in the cross-sectional view of Figure 9.
- the stem 305 is connected to the tool body 12 by locating the stem 305 through a hole 316 in the tool body 12 and then welding the stem 305 in place in the hole 316.
- the spacer elements may be connected to the bar body 312 by providing holes 317 in the bar body 12, and locating the spacer elements 25 through the holes and welding them in place.
- the spacer elements 25 have side surfaces 320 which are substantially parallel, and which are adjacent the bar 312. This therefore provides flat and parallel surfaces which abut the decking boards 100 when the tool is located between the decking boards 100 so that the tool can easily sit in place and when the decking boards 100 are pushed together, will not tend to be forced away from the decking boards, as would likely be the case if the side surfaces 320 are inclined or V-shaped.
- the spacer elements 25 are completed by side surfaces 321 which are at the free end of the spacer elements 25 which taper together towards a blunt point 323.
- the tapering surfaces 321 facilitate insertion of the spacer elements between spacer boards 100 until the side edges 320 locate between the boards to properly space the boards by the distance between the side surfaces 320 (which may, for example, be 5 mm) .
- the blunt point 323 is provided so that sharp points are not provided which may have the potential to cause injury.
- the spacer elements are also provided with front and rear surfaces 324 which extend all the way from the bar body
- edges 312 to the blunt point 323 and which are parallel.
- One of the edges 324 will abut the joist 200 so that one of the edges 12b (the right hand edge in Figure 9) will provide the front edge 20 which forms the guide for a nail gun so that fasteners can be laid in a straight line along the centre of the joist 200.
- the stems 305 and wing nuts 306, together with the holes 311, form first and second coupling elements to releasably connect the spacer bar 310 to the tool body 12.
- different forms of cooperating fasteners could be used.
- the bar 310, rather than resting on the upper surface of the tool body 12, could be located in a recess portion in the bottom surface of the tool body 12.
- the tools of the preferred embodiments therefore have the advantage that they enable decking boards to be laid more quickly because a number of decking boards can be laid and spaced at the one time rather than to have to individually move a spacer element between adjacent decking boards each time a decking board is secured.
- the tool spaces a number of the decking boards, once a tool is in place, it can be released and the workman has two free hands with which to work. This therefore adds to the safety of the operation and prevents the likelihood of a user having to locate one hand in close proximity to a nail gun. Furthermore, the handle being spaced away from where the nail gun would locate also improves safety.
- the edge 20 of the tools provides a guide to enable a straight line of nails or other fasteners to be located in place to secure the decking boards 100 to the joists 200.
- the spacing provided by the elements 25 is always the same, the boards will always be laid in a square fashion. This therefore ensures that the last board laid is in fact square with the first board laid, and reduces the need to continuously measure and square the decking during the formation of the decking. This further decreases the time taken to build the decking.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2004289702A AU2004289702A1 (en) | 2003-11-13 | 2004-11-04 | Decking tool |
EP04796977A EP1687498A4 (en) | 2003-11-13 | 2004-11-04 | Decking tool |
CA002544571A CA2544571A1 (en) | 2003-11-13 | 2004-11-04 | Decking tool |
US10/579,204 US20080022629A1 (en) | 2003-11-13 | 2004-11-04 | Decking tool |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2003906239A AU2003906239A0 (en) | 2003-11-13 | Decking tool | |
AU2003906239 | 2003-11-13 | ||
US52780503P | 2003-12-08 | 2003-12-08 | |
US60/527,805 | 2003-12-08 | ||
AU2004904030A AU2004904030A0 (en) | 2004-07-21 | Decking tool | |
AU2004904030 | 2004-07-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2005047620A1 true WO2005047620A1 (en) | 2005-05-26 |
Family
ID=34595481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU2004/001528 WO2005047620A1 (en) | 2003-11-13 | 2004-11-04 | Decking tool |
Country Status (5)
Country | Link |
---|---|
US (1) | US20080022629A1 (en) |
EP (1) | EP1687498A4 (en) |
AU (1) | AU2004289702A1 (en) |
CA (1) | CA2544571A1 (en) |
WO (1) | WO2005047620A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011067582A1 (en) * | 2009-12-03 | 2011-06-09 | Mark Sykes | Tiling tool and method of use thereof |
WO2018158307A1 (en) * | 2017-02-28 | 2018-09-07 | Sheppard Stuart | A deck construction device |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20135129L (en) * | 2013-02-13 | 2014-08-14 | Peltitarvike Oy | Method for fixing structural parts, fixing part and system |
US9340986B2 (en) * | 2014-01-14 | 2016-05-17 | John Hamilton | Decking gauge |
CN104975706A (en) * | 2015-05-20 | 2015-10-14 | 岳池县丽城环保科技有限公司 | Fixed attaching formwork (position adjusting board) |
US11802413B2 (en) | 2019-08-19 | 2023-10-31 | Omg, Inc. | Deck construction spotter and container combination |
US11819122B2 (en) * | 2019-12-13 | 2023-11-21 | James Tarpey | Load distributing deck insert |
US20230235578A1 (en) * | 2022-01-26 | 2023-07-27 | Mike Mathess | Drywall Positioning Device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1549671A (en) * | 1923-06-28 | 1925-08-11 | Shingle Lock Company | Spacing instrument or gauge |
US6510621B2 (en) * | 2001-01-03 | 2003-01-28 | C. J. Higgins Engineering Co. | Deck board spacing strap |
AU8555701A (en) * | 2001-11-01 | 2003-05-08 | John Hamilton | Decking gauge |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2466919A (en) * | 1947-01-30 | 1949-04-12 | Sykes Clint | Tile setting template |
US4850114A (en) * | 1988-05-19 | 1989-07-25 | Vockins David H | Decking spacer |
US4858399A (en) * | 1988-08-22 | 1989-08-22 | Salato Jr Peter A | Protective covering and spacer strip for a deck |
US5161345A (en) * | 1990-12-03 | 1992-11-10 | Sobjack Sr Ernest J | Method and apparatus for supporting and erecting trusses and other building frame assemblies |
US5560117A (en) * | 1994-08-29 | 1996-10-01 | Tallman; Brett | Deck board or like spacer |
US6385859B1 (en) * | 1999-02-27 | 2002-05-14 | T&S Products, Inc. | Tool for simultaneously spacing, positioning, and aligning construction materials, and method of using same |
US6508010B2 (en) * | 2001-04-09 | 2003-01-21 | John C. Hanson | Deck board spacer |
US6874242B2 (en) * | 2002-09-27 | 2005-04-05 | Erez Shilo | Dual spacing width tile spacer |
-
2004
- 2004-11-04 US US10/579,204 patent/US20080022629A1/en not_active Abandoned
- 2004-11-04 CA CA002544571A patent/CA2544571A1/en not_active Abandoned
- 2004-11-04 WO PCT/AU2004/001528 patent/WO2005047620A1/en active Application Filing
- 2004-11-04 AU AU2004289702A patent/AU2004289702A1/en not_active Abandoned
- 2004-11-04 EP EP04796977A patent/EP1687498A4/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1549671A (en) * | 1923-06-28 | 1925-08-11 | Shingle Lock Company | Spacing instrument or gauge |
US6510621B2 (en) * | 2001-01-03 | 2003-01-28 | C. J. Higgins Engineering Co. | Deck board spacing strap |
AU8555701A (en) * | 2001-11-01 | 2003-05-08 | John Hamilton | Decking gauge |
Non-Patent Citations (1)
Title |
---|
See also references of EP1687498A4 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011067582A1 (en) * | 2009-12-03 | 2011-06-09 | Mark Sykes | Tiling tool and method of use thereof |
GB2488066A (en) * | 2009-12-03 | 2012-08-15 | Mark Sykes | Tiling tool and method of use thereof |
GB2488066B (en) * | 2009-12-03 | 2016-02-24 | Surtile Ltd | Tiling tool and method of use thereof |
WO2018158307A1 (en) * | 2017-02-28 | 2018-09-07 | Sheppard Stuart | A deck construction device |
GB2560166B (en) * | 2017-02-28 | 2020-07-15 | The Decking Tool Ltd | A deck construction device |
US10988947B2 (en) | 2017-02-28 | 2021-04-27 | The Decking Tool Ltd | Deck construction device |
Also Published As
Publication number | Publication date |
---|---|
AU2004289702A1 (en) | 2005-05-26 |
EP1687498A1 (en) | 2006-08-09 |
EP1687498A4 (en) | 2008-01-23 |
US20080022629A1 (en) | 2008-01-31 |
CA2544571A1 (en) | 2005-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10480177B2 (en) | Wall panel blocking bracket and method of using same | |
US7681324B2 (en) | Prefabricated jig to position and align roof trusses | |
US8434739B1 (en) | Adjustable demolition leveraging tool and method | |
US4850114A (en) | Decking spacer | |
US8555570B2 (en) | Hidden fastener formed in situ during attachment of sheathing onto a support member | |
US5419649A (en) | Intermediate rail to post connection | |
US8256614B1 (en) | Interconnected and on-site severable deck clips with cooperating installation tool for joining two adjacent decking planks to an underlying support structure | |
US20170045069A1 (en) | Hidden Deck Fastener | |
US20110108601A1 (en) | Stapling tool for hardwood plank staples | |
US3126928A (en) | Figure | |
US20130174498A1 (en) | Deck board placement tool | |
US7571551B1 (en) | Apparatus and method for raising and spacing roof trusses | |
US20060260219A1 (en) | Stud framing brace | |
US20080022629A1 (en) | Decking tool | |
US4709460A (en) | Panel installation tool and method | |
CA2947769A1 (en) | Integral truss plate connector | |
US20020144421A1 (en) | Deck board spacer | |
WO2005097426A1 (en) | Tool for extracting an embedded elongated object | |
US6578279B1 (en) | Paver alignment and scribing guide tool and method of use | |
ZA200603548B (en) | Decking tool | |
US12084872B2 (en) | Deck installation device and a method of using said device | |
US20020056832A1 (en) | Tool for extracting nails, tacks or staples | |
US4493477A (en) | Carpenters tool | |
US9435129B1 (en) | Cement lap siding handling and installation tools and method of using | |
US20170350143A1 (en) | Method and apparatus for supporting sheeting materials |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2004289702 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 546848 Country of ref document: NZ |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2544571 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2004796977 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10579204 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 2004289702 Country of ref document: AU Date of ref document: 20041104 Kind code of ref document: A |
|
WWP | Wipo information: published in national office |
Ref document number: 2004289702 Country of ref document: AU |
|
WWP | Wipo information: published in national office |
Ref document number: 2004796977 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 10579204 Country of ref document: US |