WO2005012651A1 - Fondations en beton arme - Google Patents

Fondations en beton arme Download PDF

Info

Publication number
WO2005012651A1
WO2005012651A1 PCT/AU2004/001010 AU2004001010W WO2005012651A1 WO 2005012651 A1 WO2005012651 A1 WO 2005012651A1 AU 2004001010 W AU2004001010 W AU 2004001010W WO 2005012651 A1 WO2005012651 A1 WO 2005012651A1
Authority
WO
WIPO (PCT)
Prior art keywords
tendons
foundation
reinforced concrete
reinforcement structure
concrete slab
Prior art date
Application number
PCT/AU2004/001010
Other languages
English (en)
Inventor
Nick Canto
Tim Peters
Original Assignee
Strongforce Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Strongforce Pty Ltd filed Critical Strongforce Pty Ltd
Publication of WO2005012651A1 publication Critical patent/WO2005012651A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/22Foundations specially adapted for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • the present invention relates broadly to a reinforced concrete foundation and its method of construction.
  • the invention relates particularly, though not exclusively, to a tower foundation for a wind turbine generator.
  • This passive foundation is a relatively large concrete mass and may be set in the ground at a depth of up to 10 metres.
  • the general steps involved in construction of this passive foundation are as follows: i) a hole is excavated and inner and outer cylindrical casings of different diameters are placed in the hole; ii) the casings are coaxially aligned in a vertical disposition and a bottom and top ring, interconnected by circumferentially spaced foundation bolts, positioned in an annulus space between the inner and outer casings; iii) the annulus space is filled with concrete to partially embed the foundation bolts, and the inner casing is backfilled.
  • a reinforced concrete foundation comprising: a concrete slab being reinforced with a plurality of reinforcing bars; one or more tensioned tendons being operatively coupled to the concrete slab; and one or more ground anchors each being operatively coupled to the concrete slab and adapted to engage the ground adjacent the concrete slab so that it is effectively anchored.
  • the tensioned tendons are post-tensioned tendons. More preferably the post-tensioned tendons each include an elongate duct housing multiple tension strands to be tensioned. Even more preferably the ducts each extend through the concrete slab and the tension strands protrude from the corresponding duct to permit tensioning and grouting of the duct.
  • the ground anchors are each in the form of a permanent rock anchor located within an anchor hole formed in the ground and underlying the concrete slab.
  • the permanent rock anchor includes an elongate sheath housing one or more stress strands to be stressed, and an internal grout tube located within the sheath for grouting of the sheath.
  • the rock anchor also includes an external grout tube located about the sheath for grouting of an annulus between the sheath and the anchor hole.
  • the foundation also comprises a mounting element being partly embedded in the concrete slab, an exposed portion of the mounting element being adapted for connection to a structural member such as a tower of a wind turbine generator. More preferably the mounting element is shaped cylindrical or oval and complementary to a corresponding bottom portion of the tower.
  • the cylindrical mounting element together with the associated reinforcing structure is of a "can design".
  • a method of constructing a reinforced concrete foundation comprising the steps of: assembling a reinforcement structure of reinforcing bars, the reinforcement structure being in the general configuration of the concrete foundation; positioning one or more tendons within the reinforcement structure; erecting formwork about the reinforcement structure, the formwork defining a formwork space; pouring concrete in the formwork space to form a concrete slab; drilling one or more anchor holes in the ground in the vicinity of the reinforcement structure; locating one or more ground anchors in respective of said one or more anchor holes and extending into the reinforcement structure; tensioning the tendons within the concrete slab so that it is stressed.
  • the step of tensioning the tendons involves post-tensioning of the tendons after the concrete is cured.
  • the tendons each include an elongate duct which houses multiple tension strands and wherein the step of post-tensioning of the tendons also involves grouting of the duct to embed the tensioned strands.
  • the method also comprises the step of stressing the ground anchors.
  • the ground anchors are each in the form of a permanent rock anchor including an elongate sheath housing one or more stress strands and an internal grout tube, and wherein the step of stressing the ground anchors involves grouting of the sheath via the internal grout tube and thereafter stressing the respective strands.
  • the rock anchor also includes an external grout tube located about the sheath, and wherein the step of stressing the ground anchors also involves grouting via the external grout tube an annulus space between the sheath and the anchor hole.
  • the method further comprises the step of, prior to pouring of the concrete, positioning a mounting element within the reinforcement structure. More preferably the mounting element is partly embedded in concrete poured into the formwork space.
  • the concrete slab is in the form of a concrete anchor cap. More preferably the structural member is a tower or column such as a wind turbine tower mounted to the concrete anchor cap.
  • Figure 1 is a perspective view of a reinforced concrete foundation according to an embodiment of the invention.
  • Figure 2 is a perspective view of the foundation of figure 1 excluding the tensioned tendons and ground anchors;
  • Figure 3 shows in plan and sectional views the reinforcement structure of the foundation of figures 1 and 2;
  • Figure 4 shows in plan and sectional views the post-tensioning details of the tendons of the foundation of figure 1;
  • Figure 5 shows in plan and sectional views the ground anchor detail of the foundation of figure 1.
  • a reinforced concrete foundation 10 which in this embodiment is a tower foundation for a wind turbine generator (not shown).
  • the wind turbine generator (WTG) foundation broadly comprises a concrete slab 12, and a plurality of tensioned tendons and ground anchors such as 14A and 16A, respectively.
  • the concrete slab 12 (of which the base only is shown for clarity) includes a reinforcement structure designated generally as 18 of interconnected reinforcing bars (not individually designated).
  • the WTG foundation 10 is in plan view shaped octagonal.
  • the WTG foundation 10 includes a mounting element in the form of a cylindrical "can" 20 which is partly embedded within the concrete slab 12.
  • the can 20 is coaxially aligned with the concrete slab 12 and is shaped complementary to a corresponding bottom portion of the WTG tower (not illustrated).
  • the WTG tower is in a traditional manner welded to the can 20.
  • the WTG foundation of this particular construction includes ten (10) of the tensioned tendons 14A to 14J and eight (8) of the ground anchors 16A to 16H.
  • the tendons 14A to 14H are straight and each extend in a horizontal plane between opposing perimeter faces of the concrete slab 12.
  • the other tensioned tendons 141 and 14J are each arcuate or semi-circular in shape and together extend circumferentially about the ground anchors 16A to 16H within the concrete slab 12.
  • the ground anchors 16A to 16H are vertically disposed and equally spaced circumferentially about the concrete slab 12.
  • the reinforcement structure 18 primarily includes reinforcement in four (4) layers, namely: i) an "under can" reinforcement structure 30 including a multiplicity of radially extending reinforcing bars such as 32 interconnected by a plurality of circumferentially extending and radially spaced lacers such as 34; ii) a "bottom reinforcement” structure 36 including a multiplicity of radially extending reinforcing bars such as 38 interconnected by a plurality of circumferentially extending and radially spaced lacers such as 40, and a central mesh reinforcement 42; iii) a "top reinforcement” structure 44 including a multiplicity of radially extending reinforcing bars such as 46 interconnected by a plurality of circumferentially extending and radially spaced lacers such as 48 and a central mesh reinforcement 50; and iv) an "above can foot” reinforcement structure 51 including a multiplicity of radially extending pairs of reinforcing bars such as 52 and 54 located inside and outside, respectively, the
  • the radial reinforcing bars such as 32, 38, 46, 52 and 54 are typically fabricated as U-bars which interconnect and separate adjacent layers of the reinforcement structure 18.
  • the can 20 includes a lower flange 60 which is in a horizontal plane and protrudes radially inward and outward of a peripheral wall 62 of the can 20.
  • the can 20 is supported within the reinforcement structure 18 via a plurality of circumferentially spaced adjustable feet 64A to 64C which locate under the flange 60.
  • the reinforcement mesh 42 of the bottom reinforcement structure 36 is octagonal in shape and roughly of the same size as the can 20.
  • the reinforcement mesh 50 of the top reinforcement structure 44 is square-shaped and sized so as to locate within the can 20.
  • the WTG foundation 10 includes the ten (10) tensioned tendons 14A to 14J. Although not illustrated each of the tendons such as
  • the straight tendons 14A to 14H extend through the concrete slab 12 in two (2) sets each extending between opposing faces of the octagonal concrete slab 12.
  • Each of the tendons such as 14F is at a "dead end” anchored at a perimeter face of the concrete slab 12 whereas an opposite "live end” of the tendon 14F is connected to an anchorage mounted within an opposing face of the concrete slab 12.
  • the "live end” anchorage can in a conventional manner be connected to a tensioning device such as a multistrand jack for tensioning of the multiple tension strands.
  • the tendons such as 14F are post-tensioned following curing of the concrete slab 12.
  • the arcuate tendons 141 and 14J are each semi-circular being fixed at a dead end and at an opposite live end being connected to a live end anchorage.
  • the semi-circular tendons 141 and 14J together surround the ground anchors 16A to 16H in a circular shape.
  • the can 20 includes opposing pairs of openings such as 66F for the passage of the corresponding tensioned tendon 14F.
  • the duct of the tendons such as 14F are each wrapped with a protective sheeting, such as a HDPE material, in order to isolate the tendon 14F from the can 20.
  • "antiburst" reinforcement designated generally as 68E and 68F is provided at each end of the respective tendon 14E and 14F. This additional reinforcement increases the strength of the concrete slabl2 in the vicinity of the dead and live ends of the tendons such as 14F.
  • This additional reinforcement is interconnected via reinforcing bars such as 70 and connected via additional reinforcing bars such as 72 to the bottom reinforcement structured 36 of figure 3.
  • the WTG foundation 10 includes the eight (8) ground anchors 16A to 16H.
  • Each of the ground anchors is in the form of a permanent rock anchor such as 16A located within a corresponding anchor hole such as 74A drilled in the ground and underlying the concrete slab 12.
  • the permanent rock anchors such 16A each include an elongate sheath 76A housing one or more stress stands 78A.
  • the rock anchor 16A also includes an internal grout tube 80A and an external grout tube 82A.
  • the internal grout tube 80A is wrapped about the stress strands 78A within the sheath 76A whereas the external grout tube 82A is wound about the sheath 76A in an annulus between the sheath 76A and the anchor hole 74A.
  • the rock anchors such as 16A each include a bearing plate 84A connected to an upper end of the sheath 74A, and an anchor head 86A bearing against the bearing plate 84A and within which end portions of the strands 78A are retained after tensioning.
  • the permanent rock anchors 16A to 16H of this embodiment are circumferentially spaced about the concrete slabl2 approximately midway between the can 20 and a perimeter of the slab 12.
  • the rock anchors 16A to 16H are located adjacent respective of the perimeter edges of the slab 12 formed at the intersection of the adjacent faces.
  • the rock anchors such as 16 A are vertically oriented within the concrete slab 12 and the reinforcement structure 18 includes additional reinforcement such as 88 about an upper perimeter portion of the rock anchors such as 16A.
  • the general steps involved in construction of this WTG foundation 10 are as follows: i) the ground is excavated at the site of the WTG, and a concrete base or blinding slab is poured; ii) foundation markings are setout on the blinding slab and the "under can" reinforcement structure 30 is layed out and tied; iii) the mounting element in the form of the can 20 is located on the adjustable feet 64A to 64C which are positioned on the blinding slab; iv) the remaining reinforcement structure 18 is assembled around the can 20 and its associated service ducting; v) the duct of the tendons 14A to 14J and the sheath of the ground anchors 16A to 16H are positioned within the reinforcement structure 18; vi) formwork is erected about the reinforcement structure 18; vii) the tendons such as 14A are positioned within their respective ducts; viii) concrete is poured within the formwork so as to form a concrete slab in which the reinforcement structure 18 and part of the can 20 are embedded; ix) the required number of ground holes such
  • the concrete slab is in the form of a concrete anchor cap 12.
  • the tower of a WTG is positioned on top of and butt welded to the can 20.
  • the concrete anchor cap 12 with the associated reinforcement structure is of a significantly reduced volume compared to traditional passive foundations.
  • the foundation mass is around 70 percent lighter than that of the traditional passive foundation and minimal excavation is required with the WTG foundation 10 being at a depth of around 1.4 metres and a diameter of approximately 7.0 metres.
  • Fabrication of the reinforcement structure 18 is configured to strengthen the concrete slab or anchor cap 12 in the vicinity of the can 20.
  • the reinforcement structure 18 is concentrated about those regions of the concrete anchor cap 12 which according to structural design criterion and finite element analysis experience the maximum stress. This area of maximum stress is located about the mounting element or can 20 of this example.
  • the fabrication of the reinforcement structure 18 is otherwise performed using traditional techniques in the field of reinforcing steel tying.
  • ground anchor holes such as 74A are drilled to a predetermined depth as disclosed in the following example of an "anchor schedule". Each of the ground anchor holes such as 74A is water pressure tested.
  • the formwork includes a series of steel panels which interlink and lock-up about the perimeter of the reinforcement structure 18.
  • the concrete is poured and vibrated within the formwork space and about the reinforcement structure 18 and can 20. This pouring and vibration of the concrete is otherwise a known construction technique.
  • the tendons 14A to 14J and the ground anchors 16A to 16H are post-tensioned.
  • the tendons 14A to 14J are stressed or tensioned according to the sequence of the following "post-tensioning schedule".
  • the jacking force per tension strand is
  • the tendons 14A to 14H are grouted once they have been post-tensioned.
  • the ground anchors are on the other hand internally and externally grouted via grout tubes such as 80 A and 82 A, respectively, and then post-tensioned. These grouting processes are performed in accordance with known techniques in the art.
  • the reinforced concrete foundation and its method of construction have the following advantages: i) the reinforced concrete foundation provides a significant reduction in the foundation "footprint" as compared to a traditional passive foundation; ii) the reinforced concrete foundation including tensioned tendons and ground anchors has a significantly reduced volume compared to the traditional passive foundation and thus requires reduced excavation; iii) materials and transportation costs are reduced with the reduction in foundation mass; iv) adverse environmental impact is minimised as a result of the reduced footprint imposed by this foundation compared to the traditional passive foundation; v) the construction methodology reduces the time involved in construction of the reinforced concrete foundation due to the reduced volume of excavation and the particular construction technique adopted; and vi) the reinforced concrete foundation including the post-tensioned tendons and the associated reinforcement structure reduces the number of penetrations to the mounting element or can.
  • the invention described herein is susceptible to variations and modifications other than those specifically described.
  • the configuration of the reinforcement structure and the number of tensioned tendons and ground anchors may vary from that described but still remain within the ambit of the present invention.
  • the specific method of constructing the reinforced concrete foundation may vary provided it includes incorporation of ground anchors and tendons as broadly defined in this specification.
  • the reinforced concrete slab may be prefabricated at a workshop /factory and then transported to site for ground anchoring and post-stressing. This may in particular for remote locations be an attractive alternative to the in-situ construction technique described.
  • the reinforced concrete foundation need not be limited to WTG towers but may extend to other structural columns or towers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Sustainable Energy (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Sustainable Development (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Foundations (AREA)

Abstract

Fondations en béton armé (10) qui, dans cet exemple, sont des fondations de mât pour une éolienne. Lesdites fondations d'éolienne comportent une dalle de béton (12) et une pluralité d'armatures de précontrainte tendues et d'éléments d'ancrage dans le sol, respectivement tels que (14A) et (16A). Ces fondations (10) d'éolienne comportent également un élément de montage sous forme de « fût » cylindrique (20) qui est partiellement encastré dans la dalle de béton (12). Le fût (20) qui possède une forme complémentaire à une partie inférieure correspondante du mât d'éolienne (non représenté) est adapté pour être soudé ou raccordé d'une autre manière à ladite partie inférieure.
PCT/AU2004/001010 2003-07-29 2004-07-29 Fondations en beton arme WO2005012651A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2003227292A AU2003227292A1 (en) 2003-07-29 2003-07-29 Reinforced concrete foundations
AU2003227292 2003-07-29

Publications (1)

Publication Number Publication Date
WO2005012651A1 true WO2005012651A1 (fr) 2005-02-10

Family

ID=34109526

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2004/001010 WO2005012651A1 (fr) 2003-07-29 2004-07-29 Fondations en beton arme

Country Status (2)

Country Link
AU (2) AU2003227292A1 (fr)
WO (1) WO2005012651A1 (fr)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008036934A2 (fr) 2006-09-21 2008-03-27 Ahmed Phuly Système de fondation modulaire partiellement préfabriqué
KR100925964B1 (ko) 2008-09-11 2009-11-09 미쯔이 죠센 가부시키가이샤 탑형상 구조물의 기초 구조
EP2182201A1 (fr) 2008-11-03 2010-05-05 Siemens Aktiengesellschaft Fondation particulièrement pour une éolienne et éolienne
EP2192238A1 (fr) 2008-11-26 2010-06-02 Vestas Wind Systems A/S Fondation et procédé de formation de fondation pour tour d'éolienne
ITMI20091559A1 (it) * 2009-09-11 2011-03-12 Stefano Knisel Fondazione migliorata per torre eolica
US20110061321A1 (en) * 2006-09-21 2011-03-17 Ahmed Phuly Fatigue reistant foundation system
US20120047830A1 (en) * 2006-09-21 2012-03-01 Ahmed Phuly Fatigue resistant foundation
CN102966115A (zh) * 2012-12-18 2013-03-13 湘电风能有限公司 一种风力发电机组基础
CN103967046A (zh) * 2014-05-12 2014-08-06 中国水电顾问集团西北勘测设计研究院有限公司 一种陆上四叶型的风机扩展基础中部钢筋结构
US9096985B1 (en) * 2006-09-21 2015-08-04 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
US9347197B2 (en) * 2006-09-21 2016-05-24 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
AU2011205043B2 (en) * 2010-09-17 2017-03-02 Civil And Allied Technical Construction Pty Ltd Wind turbine foundation
US20190063029A1 (en) * 2016-02-18 2019-02-28 Holcim Technology Ltd Foundation for a wind mill
WO2021123489A1 (fr) 2019-12-19 2021-06-24 Structural Design Engineering, Slu Fondation en béton pour tour éolienne et procédé pour son installation
WO2023006955A1 (fr) 2021-07-30 2023-02-02 Lak Mohammad Amin Fondation basée sur la gravité

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4092811A (en) * 1977-02-14 1978-06-06 T. Y. Lin International Cooling tower, construction method therefor and precast prestressed concrete building units
US5826387A (en) * 1994-11-23 1998-10-27 Henderson; Allan P. Pier foundation under high unit compression
WO2001040585A1 (fr) * 1999-11-30 2001-06-07 Brosnihan, Gail, Anne Structure de fondations et erection de tours
US6665990B1 (en) * 2000-03-06 2003-12-23 Barr Engineering Co. High-tension high-compression foundation for tower structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4092811A (en) * 1977-02-14 1978-06-06 T. Y. Lin International Cooling tower, construction method therefor and precast prestressed concrete building units
US5826387A (en) * 1994-11-23 1998-10-27 Henderson; Allan P. Pier foundation under high unit compression
WO2001040585A1 (fr) * 1999-11-30 2001-06-07 Brosnihan, Gail, Anne Structure de fondations et erection de tours
US6665990B1 (en) * 2000-03-06 2003-12-23 Barr Engineering Co. High-tension high-compression foundation for tower structures

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"Holberg wind energy project, project description", STOTHERT POWER CORP. & GLOBAL RENEWABLE ENERGY PARTNERS INC, July 2004 (2004-07-01), Retrieved from the Internet <URL:http://www-eao.gov.bc.ca/epic/output/documents/p288/d19059/1090860876600_8ffcf4a91d454939a85fec36ea75af21.pdf> [retrieved on 20040819] *
"Wha is post-tensioning?", POST-TENSIONING INSTITUTE, December 2000 (2000-12-01), Retrieved from the Internet <URL:http://www.vsl.net/downloads/what-pt.pdf> [retrieved on 20040819] *
SHAFER ET AL.: "WindPACT turbine design scaling studies: technical area 4-balance-of-station cost", NATIONAL RENEWABLE ENERGY LABORATORY, July 2001 (2001-07-01), Retrieved from the Internet <URL:http://www.nrel.gov/docs/fy01osti/29950.pdf> [retrieved on 20040819] *

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200071944A1 (en) * 2006-09-21 2020-03-05 Ahmed Phuly Foundation with pedestal and ribs for towers
US10947747B2 (en) * 2006-09-21 2021-03-16 Ahmed Phuly Foundation with pedestal and ribs for towers
EP2064393A2 (fr) * 2006-09-21 2009-06-03 Ahmed M. Phuly Système de fondation modulaire partiellement préfabriqué
US11939736B2 (en) * 2006-09-21 2024-03-26 Ahmed M. Phuly Foundation with pedestal and ribs for towers
EP2064393A4 (fr) * 2006-09-21 2009-12-30 Ahmed Phuly Engineering & Cons Système de fondation modulaire partiellement préfabriqué
US9534405B1 (en) * 2006-09-21 2017-01-03 Ahmed Phuly Method of constructing a wind tower foundation
US20210310262A1 (en) * 2006-09-21 2021-10-07 Ahmed M. Phuly Foundation with pedestal and ribs for towers
US9347197B2 (en) * 2006-09-21 2016-05-24 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
US11072934B2 (en) * 2006-09-21 2021-07-27 Ahmed M. Phuly Foundation with pedestal and ribs for towers
US10975586B2 (en) * 2006-09-21 2021-04-13 Ahmed M. Phuly Foundation with pedestal and ribs for towers
US20110061321A1 (en) * 2006-09-21 2011-03-17 Ahmed Phuly Fatigue reistant foundation system
US20170306583A1 (en) * 2006-09-21 2017-10-26 Ahmed Phuly Wind tower foundation
US20120047830A1 (en) * 2006-09-21 2012-03-01 Ahmed Phuly Fatigue resistant foundation
US10648187B2 (en) * 2006-09-21 2020-05-12 Ahmed Phuly Foundation with pedestal and ribs for towers
WO2008036934A2 (fr) 2006-09-21 2008-03-27 Ahmed Phuly Système de fondation modulaire partiellement préfabriqué
US8661752B2 (en) * 2006-09-21 2014-03-04 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
US10513833B2 (en) * 2006-09-21 2019-12-24 Ahmed Phuly Foundation with pedestal and ribs for towers
US20190084183A1 (en) * 2006-09-21 2019-03-21 Ahmed M. Phuly Foundation with pedestal and ribs for towers
US9096985B1 (en) * 2006-09-21 2015-08-04 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
US20150225918A1 (en) * 2006-09-21 2015-08-13 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
US9937635B2 (en) * 2006-09-21 2018-04-10 Ahmed Phuly Method of constructing a wind tower foundation
WO2008036934A3 (fr) * 2006-09-21 2008-06-26 Ahmed Phuly Système de fondation modulaire partiellement préfabriqué
US20180264680A1 (en) * 2006-09-21 2018-09-20 Ahmed Phuly Foundation with pedestal and ribs for towers
KR100925964B1 (ko) 2008-09-11 2009-11-09 미쯔이 죠센 가부시키가이샤 탑형상 구조물의 기초 구조
EP2256338A1 (fr) * 2008-11-03 2010-12-01 Siemens Aktiengesellschaft Fondation particulièrement pour une éolienne et éolienne
US8359798B2 (en) 2008-11-03 2013-01-29 Siemens Aktiengesellschaft Foundation particularly for a wind turbine and wind turbine
EP2182201A1 (fr) 2008-11-03 2010-05-05 Siemens Aktiengesellschaft Fondation particulièrement pour une éolienne et éolienne
EP2192238A1 (fr) 2008-11-26 2010-06-02 Vestas Wind Systems A/S Fondation et procédé de formation de fondation pour tour d'éolienne
US8695297B2 (en) 2009-09-11 2014-04-15 Stefano Kniesel Foundation for a wind turbine tower
WO2011030199A3 (fr) * 2009-09-11 2011-11-03 Stefano Knisel Fondation perfectionnée pour tour d'éolienne
WO2011030199A2 (fr) 2009-09-11 2011-03-17 Stefano Knisel Fondation perfectionnée pour tour d'éolienne
ITMI20091559A1 (it) * 2009-09-11 2011-03-12 Stefano Knisel Fondazione migliorata per torre eolica
AU2011205043B2 (en) * 2010-09-17 2017-03-02 Civil And Allied Technical Construction Pty Ltd Wind turbine foundation
CN102966115A (zh) * 2012-12-18 2013-03-13 湘电风能有限公司 一种风力发电机组基础
CN103967046A (zh) * 2014-05-12 2014-08-06 中国水电顾问集团西北勘测设计研究院有限公司 一种陆上四叶型的风机扩展基础中部钢筋结构
CN103967046B (zh) * 2014-05-12 2016-02-03 中国电建集团西北勘测设计研究院有限公司 一种陆上四叶型的风机扩展基础中部钢筋结构
US10968592B2 (en) * 2016-02-18 2021-04-06 Holcim Technology Ltd Foundation for a wind mill
US20190063029A1 (en) * 2016-02-18 2019-02-28 Holcim Technology Ltd Foundation for a wind mill
US11795653B2 (en) 2016-02-18 2023-10-24 Holcim Technology Ltd Foundation for a wind mill
WO2021123489A1 (fr) 2019-12-19 2021-06-24 Structural Design Engineering, Slu Fondation en béton pour tour éolienne et procédé pour son installation
WO2023006955A1 (fr) 2021-07-30 2023-02-02 Lak Mohammad Amin Fondation basée sur la gravité

Also Published As

Publication number Publication date
AU2006228556B2 (en) 2009-03-26
AU2006228556A1 (en) 2006-11-02
AU2003227292A1 (en) 2005-02-17

Similar Documents

Publication Publication Date Title
AU2006228556B2 (en) Reinforced concrete foundations
US7618217B2 (en) Post-tension pile anchor foundation and method therefor
US9739027B2 (en) Perimeter pile anchor foundation
EP2310576B1 (fr) Support de base pour generateurs d&#39;energie eoliens
JP6452137B2 (ja) タワー用基礎システムおよびタワー用基礎システムを設置する方法
EP0793754B1 (fr) Fondations sans tension pour piliers
US6672023B2 (en) Perimeter weighted foundation for wind turbines and the like
CA2651259C (fr) Fondation d&#39;ancrage a pieux en post-tension et procede associe
EP2981654B1 (fr) Ensemble tour pour une structure de tour
KR20210094617A (ko) 풍력 터빈 타워용 기초
US10738436B1 (en) Tubular foundation for onshore wind turbine generators
WO2001040585A1 (fr) Structure de fondations et erection de tours
US20200208612A1 (en) Bionic Root Foundation for Onshore Wind Turbine Generators
AU2024202789A1 (en) Post-tension tube foundation and method of assembling same
KR20120058362A (ko) 지지기둥용 지반 보강장치
ZA200204229B (en) Foundation structure and erection of towers.

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase