WO2004067856A1 - Dragline bucket - Google Patents

Dragline bucket Download PDF

Info

Publication number
WO2004067856A1
WO2004067856A1 PCT/AU2004/000105 AU2004000105W WO2004067856A1 WO 2004067856 A1 WO2004067856 A1 WO 2004067856A1 AU 2004000105 W AU2004000105 W AU 2004000105W WO 2004067856 A1 WO2004067856 A1 WO 2004067856A1
Authority
WO
WIPO (PCT)
Prior art keywords
bucket
dragline
assembly
hoist
rope
Prior art date
Application number
PCT/AU2004/000105
Other languages
French (fr)
Inventor
Jeffrey Rowlands
Original Assignee
Cmte Development Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cmte Development Limited filed Critical Cmte Development Limited
Priority to AU2004207143A priority Critical patent/AU2004207143B2/en
Priority to CA002514727A priority patent/CA2514727A1/en
Priority to US10/543,555 priority patent/US20060107556A1/en
Priority to BR0406708-8A priority patent/BRPI0406708A/en
Publication of WO2004067856A1 publication Critical patent/WO2004067856A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/48Drag-lines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/58Component parts
    • E02F3/60Buckets, scrapers, or other digging elements

Definitions

  • This invention relates to a new type of bucket for a rigged dragline assembly.
  • Draglines are large excavating machines designed to fill, carry and dump loads of material, typically earth. Draglines are often used in open cut coal mines to remove waste overburden covering a shallow coal seam. Background of the Invention
  • FIG 1 illustrates a typical large electric dragline in accordance with the prior art.
  • a conventional dragline includes a rotatable support 1 mounted on a stationary base 2.
  • An outwardly projecting boom assembly 3 is mounted pivo tally to the rotatable support.
  • Winches 6,9 are mounted on the support for retrieving or releasing cables or ropes.
  • hoist ropes Normally there are two main sets of ropes or cables, hereinafter referred to as hoist ropes
  • Hoist ropes 4 extend from the hoist winch 6 mounted on the support, up and outwardly along the boom, over pulleys or sheaves 7 mounted at the most distant point of the boom, down to a bucket and rigging assembly 8.
  • Drag ropes 5 extend from a drag winch 9 mounted on the support 1, outwardly to the bucket and rigging assembly 8.
  • the bucket and rigging assembly consists of the bucket itself, and the "Rigging" which refers to the total collection of chains, ropes, cables and other components used to suspend the bucket.
  • a conventional dragline is equipped with a mechanism for locomotion, typically being reciprocating support feet or crawler tracks.
  • FIG 2 shows the typical components of the bucket and rigging assembly in accordance with the prior art. While it is acknowledged that there are variations on the arrangements and names of components, the following definitions, familiar to any person skilled in the art, will be used: Drag ropes 5 which are used to pull the bucket while filling (normally two).
  • Drag chains 10 which connect the drag ropes to the bucket.
  • Hoist ropes 4 which are used to lift and carry the bucket (normally two).
  • Hoist chains 11 (upper and lower) which connect the bucket to the hoist ropes.
  • Spreader bar 12 which separates the left and right hoist chains to allow the bucket to sit there between. It is situated at the junction of the upper and lower hoist chains.
  • Dump rope 13 that allows the bucket to be picked up or dumped by applying or releasing tension to the drag ropes.
  • Dump block 14 which is a pulley around which the dump rope is free to move.
  • Dump chains 15 which are intermediate chains connecting the dump rope to the leading end of the drag chains.
  • Miracle hitch 16 which is a three way link connecting the hoist ropes, chains and dump block. Drag three way link 17 that joins the drag ropes, drag chains and dump chains.
  • Equaliser links 18 that equalise the loads between various components and allow interconnection, e. g., from the two hoist ropes to the single miracle hitch.
  • Rope sockets 19 that are used to terminate ropes and allow their connection to other components.
  • Teeth and lip assembly 20 which is the leading (cutting) edge of the bucket.
  • Basket 21 which is the main body of the bucket used to carry payload.
  • Dump hitch 23 which is the point on the arch to which the dump rope is attached.
  • Drag hitches 24 which are the points on the front of the bucket to which the drag chains are connected.
  • Hoist trunnions 25 which are the points to which the lower hoist chains are attached to the bucket.
  • Top rails 26 which are structural thickeners along the top edges of the bucket.
  • Rear rail 27 which is a structural thickener along the top edge of the rear of the bucket.
  • Rated Suspended Load which is the maximum recommended load that can be suspended from the hoist ropes.
  • the drag and hoist ropes may be retrieved or released from their respective winches to move the bucket freely in space.
  • the rotatable support can "Swing" the upper dragline assembly and thus bucket and rigging through a horizontal arc.
  • the normal operation of a dragline begins with the bucket freely suspended in space above the ground.
  • the bucket is then lowered to the ground and positioned by releasing rope from the hoist winch and/or drag winch.
  • the bucket is then filled with material by retrieving drag ropes onto the drag winch.
  • the bucket may be lifted or "Disengaged” from the ground by retrieving the hoist ropes. In this operation, tension is developed in the dump rope 13 which causes the front of the bucket to lift via the arch 22.
  • Payload A certain volume of excavated material known as "Payload” is retained in the bucket after disengaging.
  • the bucket may then be moved to its dump point by retrieving and releasing the hoist and drag ropes and/or swinging the support 1.
  • the payload is dumped by releasing drag rope until the dump rope loses tension and allows the bucket to tip forward. This operation can only occur under, or nearly under the boom point sheaves.
  • the bucket capacity is approximately 47 cubic metres.
  • the bucket weight is typically 40 tonnes.
  • the combined rigging weight is typically 20 tomies.
  • the RSL for these machines is approximately 150 tonnes. Therefore, the manufacturers recommend payloads of approximately 90 tonnes.
  • FIG. 5 shows the multiple hoist rope dragline assembly described in WOO 1/32994.
  • a bucket 30 is suspended from two hoist ropes 31 and 32.
  • the first hoist rope 31 is connected to a forward part of the bucket.
  • the second hoist rope 32 is comiected to a rear part of the bucket.
  • Two sheaves 33 and 34 are spaced one behind the other at the distal end of boom 35.
  • the first hoist rope 31 is entrained over the first sheave 33, while the second hoist rope is entrained over the second sheave 34.
  • the two hoist ropes 31 and 32 in combination with drag ropes 36 control movement of the bucket 30.
  • the payload is distributed between the two hoist ropes.
  • the payload is inevitably not distributed evenly between the two hoist ropes.
  • One hoist rope will usually bear more load than the other.
  • the lifetime of a dragline hoist rope is proportional to the peak cyclic stress experienced by it (stress being the load per unit cross-sectional area of the rope, and peak cyclic stress being the span between consecutive maximum and minimum stress states). This relationship is defined by the "fatigue" lifetime as defined in equation 1 :
  • Rope Fatigue Lifetime is proportional to 1 /(Maximum Cyclic Stress)* - eqn. 1
  • rope life is reduced by approximately a half.
  • rope life is reduced by approximately 90 %..
  • an object of the present invention to provide a means for equalising, as far as possible, the loads carried by each dragline in a multiple hoist rope dragline assembly. It is a further object of the present invention to provide a means for equalising, as far as possible, the hoist rope lifetimes in a multiple hoist rope dragline assembly.
  • the present invention provides a method of designing a bucket for a dragline assembly of the type wherein the attitude of the bucket is controllable by differential movement of front and rear hoist ropes attached to front and rear portions of the bucket respectively, said method including the steps of: analysing the loads in both the front and rear hoist ropes during digging, hoisting and dumping phases of the dragline operating cycle; and optimising bucket parameters such that the respective loads are equalized as far as possible over as much of the cycle as possible.
  • the parameters include, but are not limited to:
  • the method of designing a bucket is performed on a dragline assembly having two spaced apart boom point sheaves located at or adjacent the distal end of a boom assembly, one sheave being positioned closer to the distal end of the boom assembly than the other
  • the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 30% of their mean value during a major part of the hoisting phase of the operating cycle, being the time between the point of disengagement of the bucket from the ground, and dumping of the payload.
  • the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 20% of their mean value during a major part of the hoisting phase of the operating cycle.
  • the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 10%o of their mean value during a major part of the hoisting phase of the operating cycle.
  • the invention provides a bucket for a dragline assembly when designed in accordance with the method above.
  • the bucket includes a base and side walls extending upwardly therefrom, wherein the bucket has a height dimension shorter than a length dimension, and wherein the height dimension at a front part of the bucket is less than or equal to the height dimension at a rear part of the bucket.
  • the bucket has a substantially flat base with two tapering side walls along its length dimension.
  • the overall length dimension of the bucket is at least twice the overall height dimension.
  • the length dimension is at least three times the height dimension.
  • the bucket does not include an arch between the upper front portions of the bucket side walls.
  • the bucket of the present invention has generally shallow sides which may be tapered from rear to front. This means that when the bucket carries a payload, the centre of gravity of the combined payload and bucket is shifted further towards the rear of the bucket than in a conventional bucket design. This advantageously tends to equalise the load carried by the front and rear hoist ropes. This effect is illustrated in more detail below in the Example and Comparative Example.
  • the bucket has a substantially flat base with two tapering side walls along its length dimension.
  • a further advantage of the bucket of the present invention is that it has a short height dimension relative to its length dimension and, preferably, its width dimension.
  • the length dimension is at least twice the height dimension, more preferably at least, or about, three times the height dimension.
  • the bucket includes attachment means at the front and rear parts of the bucket for attachment to front and rear hoist ropes respectively.
  • the bucket includes attachment means at the front part of the bucket for attachment to a drag rope/s.
  • the attachment means may be, for example, hooks or openings in the bucket.
  • the attachment means for the rear hoist rope comprise a single rope and/or chain attached to a central point at the rear of the bucket, or a dual attachment to multiple rear points via an intermediate "bridal” or “yoke” chain or rope.
  • the dual arrangement minimises the chance of the bucket twisting or uncontrollably rotating in situations where the bucket is hanging almost exclusively by the rear hoist rope, e.g. during dumping or "chopping".
  • the attachment means for the front hoist rope comprises a pair of flanges having a plurality of openings therein, each flange extending upwards from respective side walls forming the length of the bucket.
  • the attachment means for the drag rope comprises a pair of flanges having a plurality of openings therein, each flange extending in a forward direction from respective side walls forming the length of the bucket.
  • the bucket does not include an arch.
  • traditional dragline buckets include an arch 22.
  • the incorporation of the arch 22 has the effect of shifting the centre of gravity of the bucket towards the front part.
  • the absence of an arch in this preferred embodiment of the present invention, contributes to shifting the centre of gravity more towards the rear of the bucket, h addition, the elimination of the arch reduces the total bucket weight and thus increases the total payload that may be carried without exceeding the machine's RSL.
  • the bucket of the present invention is substantially cuboid- or trapezoid-shaped, having an open top and an open front section.
  • the side walls forming the length of the bucket are flared outwards from the base, which increases the volume of the bucket and helps to retain material in the bucket.
  • the bucket includes a scooping means for scooping material into the bucket.
  • the scooping means comprises a downwardly angled flange extending from a front part of the base.
  • the flange includes a plurality of tapered fingers which define the flange's front leading edge. The tapered fingers facilitate scooping of material (e.g. earth) into the bucket.
  • the bucket is used with a dragline assembly including differential control means for adjusting the length of one hoist rope relative to the other, thereby allowing control of the angle of inclination of the bucket in a vertical plane.
  • the first hoist rope is wound onto a first drum located on the base, and the second hoist rope is wound onto a second drum located on the base, the first and second drums being independently rotatable to achieve differential control.
  • first and second boom sheaves are spaced apart from each other by a fixed distance such that the first sheave is located closer to the support than the second sheave.
  • This type of rigged dragline assembly (excluding the bucket of the present invention) is described in more detail in WO01/32994.
  • the present invention provides a method of moving a payload, including the steps of providing a rigged dragline assembly as described above; depositing a payload into the bucket; and adjusting the front and rear hoist ropes and/or the drag rope(s) to move the payload in a desired manner.
  • the front and rear hoist ropes are adjusted independently to control the carry angle of the bucket, thereby controlling the combined centre of gravity of the payload and bucket.
  • the carry angle may also be used to facilitate even weight distribution. A large carry angle will tend to shift the centre of gravity towards the front hoist rope due to the extra payload being carried on the front payload face , whereas a small carry angle will tend to shift the centre of gravity towards the rear hoist rope due to the loss of payload from the front payload face.
  • the present invention recognises the problem of unequal loads between front and rear hoist ropes in the known dragline assembly described in WO01/32994. Moreover, the present invention recognises that this problem may be addressed by optimising bucket design.
  • the present invention allows the payload to be varied to ensure that the total hoist rope load is matched to the Rated Suspended Load (RSL) of the Dragline by virtue of altering the bucket's carry angle to control the bucket payload, yet still maintaining an even load distribution between the two hoist ropes during the parts of the dragline cycle in which maximum hoist rope loads are experienced.
  • RSS Rated Suspended Load
  • the analysis is performed on a dragline assembly having two spaced apart boom point sheaves located at or adjacent the distal end of a boom assembly, one sheave being positioned closer to the distal end of the boom assembly than the other.
  • This type of boom arrangement is described in WO01/32994.
  • the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 30% of their mean value during a major part of the hoisting phase of the cycle, more preferably within 20%, and more preferably within 10%).
  • the hoisting phase is defined as the time between the point of disengagement and dumping of the payload in a typical dragline assembly cycle.
  • the major part of the hoisting phase comprises at least 50% of the hoisting phase, more preferably at least 60%>, more preferably at least 70%, and more preferably at least 80%.
  • FIG. 1 illustrates a conventional dragline
  • FIG. 2 illustrates conventional components of a bucket and rigging assembly
  • FIG. 3 illustrates a disadvantage with a conventional dragline
  • FIG. 4 illustrates a conventional dragline dumping at the boom point radius
  • FIG. 5 illustrates a prior art dragline having front and a rear hoist rope
  • FIG. 6A is a front view of a bucket according to the present invention.
  • FIG. 6B is a side elevation of FIG. 6 A;
  • FIG. 6C is a perspective view of FIG. 6 A;
  • FIG. 7 is a graph of hoist rope load over time for both conventional and separate front and rear end hoist ropes.
  • FIG. 8 is a similar graph to FIG. 7 showing the loads from a bucket designed in accordance with the invention.
  • rope load distribution may be uneven during other parts of the dragline cycle such as dumping or when the bucket is disengaged out of the ground.
  • the inventor of the present invention has realised that this can be achieved by providing a bucket design that allows the total hoist rope load to be matched to the Rated Suspended Load (RSL) of the Dragline by virtue of altering the bucket's carry angle to control the bucket payload, yet still approximate an even load distribution between the hoist ropes during the parts of the dragline cycle in which maximum hoist rope loads are experienced.
  • the present invention recognises that in a typical multiple hoist rope dragline assembly, having a front and a rear hoist rope, the maximum load carried by the front hoist rope is often greater than the maximum load carried by the rear hoist rope.
  • the present invention recognises the importance of bucket design in equalising the loads carried by front and rear hoist ropes during the parts of the dragline cycle in which maximum hoist rope loads are experienced.
  • FIGS. 6A-6C there is shown a bucket 100, having a base 102 and side walls 103, 104 and 105 extending upwardly therefrom. Two side walls 103 and 104 define a length of the bucket, and one side wall 105 defines a width of the bucket. From FIG. 6B, it can be seen that the bucket 1 has a length dimension which is approximately three times the height dimension.
  • the bucket 100 has a rear part 106 and a front part 107. From FIG. 6B, it, can be seen that the height of the bucket at the rear part 106 is greater than the height of the bucket at the front part 107.
  • the effect of this tapering is that more payload is carried in the rear part than the front part, meaning that when the bucket is filled with a payload, the centre of gravity is located towards the rear part of the bucket.
  • 109 may be left open, braced by welded rods across the top of the opening. These rods may also be used to mount a bridle (not shown) for attachment to the rear hoist rope, although the rear hoist rope may be attached to a single central point on the rear wall 105 of the bucket.
  • a pair of flanges 110 and 111 extend upwards from respective side walls 103 and 104.
  • Each flange 110 and 111 has respective openings 112 and 113 for attachment of a front hoist rope via an intermediate bridal or yoke.
  • a pair of flanges 114 and 115 extend frontwards from respective side walls 103 and 104.
  • Each flange 114 and 115 has respective openings 116 and 117 for attachment of a drag rope.
  • the bucket 100 is substantially trazpezoid-shaped, having an open top and an open front end.
  • the bucket 100 includes a downwardly angled flange 118 extending from a front part of the base 102.
  • the flange 118 is comprised of a plurality of fingers 119.
  • the fingers 119 are tapered to define a front leading edge 120 of the flange 118.
  • material may be scooped into the bucket 100 using the flange 118 by dragging it along the ground.
  • FIGS. 6A-6B The efficacy of the bucket shown in FIGS. 6A-6B was compared with a conventional bucket, as illustrated in FIGS. 1-5.
  • FIGS 1-5) The hoist rope loads were measured for a typical prior art bucket design (as shown in FIGS 1-5) for two cases. The first where the bucket was rigged with conventional hoist ropes, i.e. side by side, and the second in the front/rear configuration using a conventional bucket as described in WO01/32994.
  • FIG. 7 shows the hoist rope loads over time during the various stages of digging, hoisting, dumping and return for the two cases.
  • the trace corresponding to the conventional hoist rope load represents exactly half the total hoist load because there are actually two identical ropes working together, joined by an "equalising bar" at or near the bucket hitching point. This trace is used as a reference for comparison for the individual front and rear hoist ropes in the new invention.
  • the loads on a front hoist rope and a rear hoist rope were measured on a rigged dragline bucket assembly of the type shown in FIGS 6A, B and C.
  • the total suspended load was matched to the example of the conventionally designed bucket of prior art.
  • FIG. 8 shows the hoist rope loads over time during the various stages of digging, hoisting, dumping and return.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

The invention provides for the design of a dragline bucket of the type where there are separate front and rear hoist ropes attached to front mounting points (110, 111) and rear mounting points (109) respectively. The front and rear hoist ropes can be independently operated to vary the horizontal attitude of the bucket. The bucket design methodology seeks to equalize the loads in the front and rear hoist ropes during the major phases of the operating cycle such as digging, hoisting and dumping, and this is typically achieved by providing a bucket with comparatively shallow side walls (103, 104) compared with the overall length of the bucket and the positions at which the front and rear hoist ropes ultimately join onto the bucket. The bucket typically has a flat floor (102) and relatively shallow side walls which may in some embodiments taper downwardly from the rear section (106) to the front section (107).

Description

DRAGLINE BUCKET
Field of the Invention
This invention relates to a new type of bucket for a rigged dragline assembly.
Draglines are large excavating machines designed to fill, carry and dump loads of material, typically earth. Draglines are often used in open cut coal mines to remove waste overburden covering a shallow coal seam. Background of the Invention
FIG 1 illustrates a typical large electric dragline in accordance with the prior art. A conventional dragline includes a rotatable support 1 mounted on a stationary base 2. An outwardly projecting boom assembly 3 is mounted pivo tally to the rotatable support.
Winches 6,9 are mounted on the support for retrieving or releasing cables or ropes.
Normally there are two main sets of ropes or cables, hereinafter referred to as hoist ropes
4 and drag ropes 5. Hoist ropes 4 extend from the hoist winch 6 mounted on the support, up and outwardly along the boom, over pulleys or sheaves 7 mounted at the most distant point of the boom, down to a bucket and rigging assembly 8. Drag ropes 5 extend from a drag winch 9 mounted on the support 1, outwardly to the bucket and rigging assembly 8.
The bucket and rigging assembly consists of the bucket itself, and the "Rigging" which refers to the total collection of chains, ropes, cables and other components used to suspend the bucket. A conventional dragline is equipped with a mechanism for locomotion, typically being reciprocating support feet or crawler tracks. FIG 2 shows the typical components of the bucket and rigging assembly in accordance with the prior art. While it is acknowledged that there are variations on the arrangements and names of components, the following definitions, familiar to any person skilled in the art, will be used: Drag ropes 5 which are used to pull the bucket while filling (normally two).
Drag chains 10 which connect the drag ropes to the bucket.
Hoist ropes 4 which are used to lift and carry the bucket (normally two).
Hoist chains 11 (upper and lower) which connect the bucket to the hoist ropes.
Spreader bar 12 which separates the left and right hoist chains to allow the bucket to sit there between. It is situated at the junction of the upper and lower hoist chains.
Dump rope 13 that allows the bucket to be picked up or dumped by applying or releasing tension to the drag ropes.
Dump block 14 which is a pulley around which the dump rope is free to move. Dump chains 15 which are intermediate chains connecting the dump rope to the leading end of the drag chains.
Miracle hitch 16 which is a three way link connecting the hoist ropes, chains and dump block. Drag three way link 17 that joins the drag ropes, drag chains and dump chains.
Equaliser links 18 that equalise the loads between various components and allow interconnection, e. g., from the two hoist ropes to the single miracle hitch.
Rope sockets 19 that are used to terminate ropes and allow their connection to other components. Teeth and lip assembly 20 which is the leading (cutting) edge of the bucket.
Basket 21 which is the main body of the bucket used to carry payload.
Arch 22 which provides structural integrity to the bucket and supplies a point to attach the dump rope.
Dump hitch 23 which is the point on the arch to which the dump rope is attached. Drag hitches 24 which are the points on the front of the bucket to which the drag chains are connected.
Hoist trunnions 25 which are the points to which the lower hoist chains are attached to the bucket.
Top rails 26 which are structural thickeners along the top edges of the bucket. Rear rail 27 which is a structural thickener along the top edge of the rear of the bucket.
Other relevant definitions are:
"Carry Angle" which is the acute angle between the floor of the bucket and the horizontal. "Rated Suspended Load" (RSL) which is the maximum recommended load that can be suspended from the hoist ropes.
"Boom Poinf'which is the most distant extreme of the boom 3 from the support 1. This point corresponds to the location of the Boom Point Sheaves 7.
"Boom Point Radius" which is the horizontal radius measured outwardly from the centre of rotation of the support 1 to a point directly under the boom point sheaves 7.
The drag and hoist ropes may be retrieved or released from their respective winches to move the bucket freely in space. The rotatable support can "Swing" the upper dragline assembly and thus bucket and rigging through a horizontal arc. The normal operation of a dragline begins with the bucket freely suspended in space above the ground. The bucket is then lowered to the ground and positioned by releasing rope from the hoist winch and/or drag winch. The bucket is then filled with material by retrieving drag ropes onto the drag winch. At some point, the bucket may be lifted or "Disengaged" from the ground by retrieving the hoist ropes. In this operation, tension is developed in the dump rope 13 which causes the front of the bucket to lift via the arch 22. A certain volume of excavated material known as "Payload" is retained in the bucket after disengaging. The bucket may then be moved to its dump point by retrieving and releasing the hoist and drag ropes and/or swinging the support 1. The payload is dumped by releasing drag rope until the dump rope loses tension and allows the bucket to tip forward. This operation can only occur under, or nearly under the boom point sheaves. For a typical large electric dragline (e. g. BE 1370W or Marion 8050), the bucket capacity is approximately 47 cubic metres. The bucket weight is typically 40 tonnes. The combined rigging weight is typically 20 tomies. The RSL for these machines is approximately 150 tonnes. Therefore, the manufacturers recommend payloads of approximately 90 tonnes.
There are a number of limitations that conventional rigging designs place on operating a dragline: a) After filling the bucket, it cannot be disengaged from the ground until the bucket is sufficiently close to the support 1 to allow enough tension to be developed in the dump rope to lift the bucket arch. FIG 3 shows that if the bucket is lifted too early, the forward section of the payload is lost. This means that the bucket must be "Over dragged" after it is full, to a point where it can be lifted and retain a satisfactory payload. This adds to cycle time, increases wear and reduces hoisting efficiency. b) A dragline bucket can only dump at the perimeter defined by the boom point radius. This is because the dump rope will only become slack enough to drop the front of the bucket when the drag rope tension is low, i.e., the drag ropes have been sufficiently released. FIG 4 shows this effect.
There are dynamic methods for dumping just inside and outside of boom point radius, however these methods are not recommended by the manufacturers.
Various proposals have been made to improve the control of the orientation of the dragline bucket in a vertical plane i.e. "carry angle" control by utilising differential control of the two hoist ropes, one of which is operatively connected to the front of the bucket, and the other operatively connected to the rear of the bucket. By adjusting the position of one hoist rope relative to the other, the vertical orientation of the bucket can be adjusted in order to provide a dumping movement without relying on the dump rope becoming slack with all of the disadvantages set out above. A construction of this type is described in International Patent Application
WOO 1/32994, where the carry angle of the bucket is controlled by differential hoist rope movement with the hoist rope entrained over two boom point sheaves. FIG. 5 shows the multiple hoist rope dragline assembly described in WOO 1/32994. A bucket 30 is suspended from two hoist ropes 31 and 32. The first hoist rope 31 is connected to a forward part of the bucket. The second hoist rope 32 is comiected to a rear part of the bucket. Two sheaves 33 and 34 are spaced one behind the other at the distal end of boom 35. The first hoist rope 31 is entrained over the first sheave 33, while the second hoist rope is entrained over the second sheave 34. The two hoist ropes 31 and 32 in combination with drag ropes 36 control movement of the bucket 30. In a dragline assembly having front and rear hoist ropes, as shown in FIG. 5, the payload is distributed between the two hoist ropes. However, the payload is inevitably not distributed evenly between the two hoist ropes. One hoist rope will usually bear more load than the other.
The lifetime of a dragline hoist rope is proportional to the peak cyclic stress experienced by it (stress being the load per unit cross-sectional area of the rope, and peak cyclic stress being the span between consecutive maximum and minimum stress states). This relationship is defined by the "fatigue" lifetime as defined in equation 1 :
Rope Fatigue Lifetime is proportional to 1 /(Maximum Cyclic Stress)* - eqn. 1
where x lies between 5 and 6.
i.e. for a 10% increase in maximum cyclic stress, rope life is reduced by approximately a half. For a 50% increase in maximum cyclic stress, rope life is reduced by approximately 90 %..
Hence, in a dragline assembly having separate front and rear hoist ropes, there is typically a large difference in lifetime between the front and rear hoist ropes, since each rope has differing maximum cyclic stress. Hoist ropes having unequal lifetimes are highly undesirable from a maintenance point of view. Replacement of a hoist rope is a costly exercise, because it involves lengthy downtime of the dragline assembly. Moreover, because of the expense of this downtime, it is desirable to change both hoist ropes together. However, if one hoist rope fatigues quicker than the other, replacement of both ropes at the same time is inefficient since one rope, having useful remaining lifetime, is unnecessarily replaced.
It is, therefore, an object of the present invention to provide a means for equalising, as far as possible, the loads carried by each dragline in a multiple hoist rope dragline assembly. It is a further object of the present invention to provide a means for equalising, as far as possible, the hoist rope lifetimes in a multiple hoist rope dragline assembly. Summary of the Invention
Accordingly, the present invention provides a method of designing a bucket for a dragline assembly of the type wherein the attitude of the bucket is controllable by differential movement of front and rear hoist ropes attached to front and rear portions of the bucket respectively, said method including the steps of: analysing the loads in both the front and rear hoist ropes during digging, hoisting and dumping phases of the dragline operating cycle; and optimising bucket parameters such that the respective loads are equalized as far as possible over as much of the cycle as possible.
Preferably the parameters include, but are not limited to:
(a) the positions of the points at which the front and rear hoist ropes ultimately join the bucket;
(b) the position of the centre of gravity of the payload; (c) the position of the centre of gravity of the bucket itself; and (d) the carry angle of the bucket with respect to the horizontal.
Preferably, the method of designing a bucket is performed on a dragline assembly having two spaced apart boom point sheaves located at or adjacent the distal end of a boom assembly, one sheave being positioned closer to the distal end of the boom assembly than the other
Preferably, the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 30% of their mean value during a major part of the hoisting phase of the operating cycle, being the time between the point of disengagement of the bucket from the ground, and dumping of the payload.
Preferably, the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 20% of their mean value during a major part of the hoisting phase of the operating cycle.
Preferably, the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 10%o of their mean value during a major part of the hoisting phase of the operating cycle.
In a further aspect the invention provides a bucket for a dragline assembly when designed in accordance with the method above.
Preferably, the bucket includes a base and side walls extending upwardly therefrom, wherein the bucket has a height dimension shorter than a length dimension, and wherein the height dimension at a front part of the bucket is less than or equal to the height dimension at a rear part of the bucket. Preferably, the bucket has a substantially flat base with two tapering side walls along its length dimension.
Preferably, the overall length dimension of the bucket is at least twice the overall height dimension.
Preferably, the length dimension is at least three times the height dimension. Preferably, the bucket does not include an arch between the upper front portions of the bucket side walls.
The bucket of the present invention has generally shallow sides which may be tapered from rear to front. This means that when the bucket carries a payload, the centre of gravity of the combined payload and bucket is shifted further towards the rear of the bucket than in a conventional bucket design. This advantageously tends to equalise the load carried by the front and rear hoist ropes. This effect is illustrated in more detail below in the Example and Comparative Example.
Preferably, the bucket has a substantially flat base with two tapering side walls along its length dimension. A further advantage of the bucket of the present invention is that it has a short height dimension relative to its length dimension and, preferably, its width dimension. Preferably, the length dimension is at least twice the height dimension, more preferably at least, or about, three times the height dimension. This flat bucket geometry minimises the amount of bucket steel required to constrain the payload and thus increases the efficiency of the carrying operation, i.e. maximum payload for minimum steel.
Preferably, the bucket includes attachment means at the front and rear parts of the bucket for attachment to front and rear hoist ropes respectively. Preferably, the bucket includes attachment means at the front part of the bucket for attachment to a drag rope/s.
The attachment means may be, for example, hooks or openings in the bucket. Preferably, the attachment means for the rear hoist rope comprise a single rope and/or chain attached to a central point at the rear of the bucket, or a dual attachment to multiple rear points via an intermediate "bridal" or "yoke" chain or rope. The dual arrangement minimises the chance of the bucket twisting or uncontrollably rotating in situations where the bucket is hanging almost exclusively by the rear hoist rope, e.g. during dumping or "chopping". Preferably, the attachment means for the front hoist rope comprises a pair of flanges having a plurality of openings therein, each flange extending upwards from respective side walls forming the length of the bucket. Preferably, the attachment means for the drag rope comprises a pair of flanges having a plurality of openings therein, each flange extending in a forward direction from respective side walls forming the length of the bucket.
Preferably, the bucket does not include an arch. As shown in FIG. 2, traditional dragline buckets include an arch 22. The incorporation of the arch 22 has the effect of shifting the centre of gravity of the bucket towards the front part. The absence of an arch, in this preferred embodiment of the present invention, contributes to shifting the centre of gravity more towards the rear of the bucket, h addition, the elimination of the arch reduces the total bucket weight and thus increases the total payload that may be carried without exceeding the machine's RSL.
Preferably, the bucket of the present invention is substantially cuboid- or trapezoid-shaped, having an open top and an open front section. Preferably, the side walls forming the length of the bucket are flared outwards from the base, which increases the volume of the bucket and helps to retain material in the bucket. Preferably, the bucket includes a scooping means for scooping material into the bucket. Preferably, the scooping means comprises a downwardly angled flange extending from a front part of the base. These types of scooping flanges are known in dragline bucket design. Preferably, the flange includes a plurality of tapered fingers which define the flange's front leading edge. The tapered fingers facilitate scooping of material (e.g. earth) into the bucket.
Preferably, the bucket is used with a dragline assembly including differential control means for adjusting the length of one hoist rope relative to the other, thereby allowing control of the angle of inclination of the bucket in a vertical plane.
Preferably, the first hoist rope is wound onto a first drum located on the base, and the second hoist rope is wound onto a second drum located on the base, the first and second drums being independently rotatable to achieve differential control.
Preferably, the first and second boom sheaves are spaced apart from each other by a fixed distance such that the first sheave is located closer to the support than the second sheave. This type of rigged dragline assembly (excluding the bucket of the present invention) is described in more detail in WO01/32994.
In a further aspect, the present invention provides a method of moving a payload, including the steps of providing a rigged dragline assembly as described above; depositing a payload into the bucket; and adjusting the front and rear hoist ropes and/or the drag rope(s) to move the payload in a desired manner.
Preferably, the front and rear hoist ropes are adjusted independently to control the carry angle of the bucket, thereby controlling the combined centre of gravity of the payload and bucket. Thus, in addition to the bucket design being used to distribute evenly the load between the front and rear hoist ropes, the carry angle may also be used to facilitate even weight distribution. A large carry angle will tend to shift the centre of gravity towards the front hoist rope due to the extra payload being carried on the front payload face , whereas a small carry angle will tend to shift the centre of gravity towards the rear hoist rope due to the loss of payload from the front payload face.
Hence, the present invention recognises the problem of unequal loads between front and rear hoist ropes in the known dragline assembly described in WO01/32994. Moreover, the present invention recognises that this problem may be addressed by optimising bucket design. In addition, the present invention allows the payload to be varied to ensure that the total hoist rope load is matched to the Rated Suspended Load (RSL) of the Dragline by virtue of altering the bucket's carry angle to control the bucket payload, yet still maintaining an even load distribution between the two hoist ropes during the parts of the dragline cycle in which maximum hoist rope loads are experienced.
Preferably, the analysis is performed on a dragline assembly having two spaced apart boom point sheaves located at or adjacent the distal end of a boom assembly, one sheave being positioned closer to the distal end of the boom assembly than the other. This type of boom arrangement is described in WO01/32994.
Preferably, the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 30% of their mean value during a major part of the hoisting phase of the cycle, more preferably within 20%, and more preferably within 10%). The hoisting phase is defined as the time between the point of disengagement and dumping of the payload in a typical dragline assembly cycle.
Preferably, the major part of the hoisting phase comprises at least 50% of the hoisting phase, more preferably at least 60%>, more preferably at least 70%, and more preferably at least 80%. Brief Description of the Drawings
The present invention will now be described in more detail with reference to the following Figures in which:-
FIG. 1 illustrates a conventional dragline;
FIG. 2 illustrates conventional components of a bucket and rigging assembly; FIG. 3 illustrates a disadvantage with a conventional dragline;
FIG. 4 illustrates a conventional dragline dumping at the boom point radius;
FIG. 5 illustrates a prior art dragline having front and a rear hoist rope;
FIG. 6A is a front view of a bucket according to the present invention;
FIG. 6B is a side elevation of FIG. 6 A; FIG. 6C is a perspective view of FIG. 6 A;
FIG. 7 is a graph of hoist rope load over time for both conventional and separate front and rear end hoist ropes; and
FIG. 8 is a similar graph to FIG. 7 showing the loads from a bucket designed in accordance with the invention. Detailed Description of Preferred Embodiments of the Invention
In a dragline assembly having front and rear hoist ropes as shown in FIG. 5, the payload is distributed between the two hoist ropes. The payload is inevitably not distributed evenly between the two hoist ropes and the inventor of the present invention has realised that this uneven distribution can be minimized by careful bucket design. This uneven distribution of rope load during hoisting is a direct result of:
(a) the positions of the points at which the various ropes and chains ultimately join the bucket;
(b) the position of the centre of gravity of the payload;
(c) the position of the centre of gravity of the bucket itself; and
(d) the carry angle of the bucket with respect to the horizontal.
In addition the rope load distribution may be uneven during other parts of the dragline cycle such as dumping or when the bucket is disengaged out of the ground.
This uneven distribution of rope load can be overcome by providing a means for equalizing, as far as possible, the hoist rope lifetimes in a multiple hoist rope dragline assembly.
The inventor of the present invention has realised that this can be achieved by providing a bucket design that allows the total hoist rope load to be matched to the Rated Suspended Load (RSL) of the Dragline by virtue of altering the bucket's carry angle to control the bucket payload, yet still approximate an even load distribution between the hoist ropes during the parts of the dragline cycle in which maximum hoist rope loads are experienced. The present invention recognises that in a typical multiple hoist rope dragline assembly, having a front and a rear hoist rope, the maximum load carried by the front hoist rope is often greater than the maximum load carried by the rear hoist rope. Furthermore, the present invention recognises the importance of bucket design in equalising the loads carried by front and rear hoist ropes during the parts of the dragline cycle in which maximum hoist rope loads are experienced.
Typically, this can be achieved by carefully considering the bucket parameters including those listed in items (a) to (d) above when designing the bucket to be used with the dragline.
Referring to FIGS. 6A-6C, there is shown a bucket 100, having a base 102 and side walls 103, 104 and 105 extending upwardly therefrom. Two side walls 103 and 104 define a length of the bucket, and one side wall 105 defines a width of the bucket. From FIG. 6B, it can be seen that the bucket 1 has a length dimension which is approximately three times the height dimension. The bucket 100 has a rear part 106 and a front part 107. From FIG. 6B, it, can be seen that the height of the bucket at the rear part 106 is greater than the height of the bucket at the front part 107. The effect of this tapering is that more payload is carried in the rear part than the front part, meaning that when the bucket is filled with a payload, the centre of gravity is located towards the rear part of the bucket.
To facilitate construction and reduce weight in the bucket, the rear corners 108 and
109 may be left open, braced by welded rods across the top of the opening. These rods may also be used to mount a bridle (not shown) for attachment to the rear hoist rope, although the rear hoist rope may be attached to a single central point on the rear wall 105 of the bucket.
At the front part of the bucket 1, a pair of flanges 110 and 111 extend upwards from respective side walls 103 and 104. Each flange 110 and 111 has respective openings 112 and 113 for attachment of a front hoist rope via an intermediate bridal or yoke. Also at the front part of the bucket 1, a pair of flanges 114 and 115 extend frontwards from respective side walls 103 and 104. Each flange 114 and 115 has respective openings 116 and 117 for attachment of a drag rope.
From FIG. 6 A, it can been seen that side walls 103 and 104 are flared outwards from the base, facilitating retention of material in the bucket. Hence, the bucket 100 is substantially trazpezoid-shaped, having an open top and an open front end.
The bucket 100 includes a downwardly angled flange 118 extending from a front part of the base 102. The flange 118 is comprised of a plurality of fingers 119. The fingers 119 are tapered to define a front leading edge 120 of the flange 118. As with conventional dragline buckets, material may be scooped into the bucket 100 using the flange 118 by dragging it along the ground.
The efficacy of the bucket shown in FIGS. 6A-6B was compared with a conventional bucket, as illustrated in FIGS. 1-5.
Comparative Example The hoist rope loads were measured for a typical prior art bucket design (as shown in FIGS 1-5) for two cases. The first where the bucket was rigged with conventional hoist ropes, i.e. side by side, and the second in the front/rear configuration using a conventional bucket as described in WO01/32994. FIG. 7 shows the hoist rope loads over time during the various stages of digging, hoisting, dumping and return for the two cases. The trace corresponding to the conventional hoist rope load represents exactly half the total hoist load because there are actually two identical ropes working together, joined by an "equalising bar" at or near the bucket hitching point. This trace is used as a reference for comparison for the individual front and rear hoist ropes in the new invention.
It can be seen that during the hoist part of the dragline cycle, the hoist rope loads for the front/rear configuration system diverge significantly from the conventional trace. Since the peak load for the front hoist rope during hoisting is greater than that of the rear hoist rope, its lifetime is significantly shorter.
Example
The loads on a front hoist rope and a rear hoist rope were measured on a rigged dragline bucket assembly of the type shown in FIGS 6A, B and C. The total suspended load was matched to the example of the conventionally designed bucket of prior art.
FIG. 8 shows the hoist rope loads over time during the various stages of digging, hoisting, dumping and return.
It can be seen that the peak front and rear hoist rope loads are nearly equal during the hoisting part of the cycle, meaning that they will have similar lifetimes.

Claims

CLAIMS:-
1. A method of designing a bucket for a dragline assembly of the type wherein the attitude of the bucket is controllable by differential movement of front and rear hoist ropes attached to front and rear portions of the bucket respectively, said method including the steps of: analysing the loads in both the front and rear hoist ropes during digging, hoisting and dumping phases of the dragline operating cycle; and optimising bucket parameters such that the respective loads are equalized as far as possible over as much of the cycle as possible.
2. A method as claimed in claim 1, when performed on a dragline assembly having two spaced apart boom point sheaves located at or adjacent the distal end of a boom assembly, one sheave being positioned closer to the distal end of the boom assembly than the other.
3. A method as claimed in either claim 1 or claim 2, wherein the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 30% of their mean value during a major part of the hoisting phase of the operating cycle, being the time between the point of disengagement of the bucket from the ground, and dumping of the payload.
4. A method as claimed in claim 3, wherein the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 20% of their mean value during a major part of the hoisting phase of the operating cycle.
5. A method as claimed in claim 4, wherein the bucket parameters are optimised such that the respective front and rear hoist rope loads are within 10% of their mean value during a major part of the hoisting phase of the operating cycle.
6. A method as claimed in any one of claims 1 to 5 whereby the bucket parameters include the positions at which the front and rear hoist ropes ultimately join onto the bucket.
7. A bucket for a dragline assembly when designed in accordance with the method as claimed in any one of claims 1 to 6.
8. A bucket for a dragline assembly as claimed in claim 7, including a base and side walls extending upwardly therefrom, wherein the bucket has a height dimension shorter than a length dimension, and wherein the height dimension at a front part of the bucket is less than or equal to the height dimension at a rear part of the bucket.
9. A bucket for a dragline assembly as claimed in either claim 7 or claim 8, wherein the bucket has a substantially flat base with two tapering side walls along its length dimension.
10. A bucket for a dragline assembly as claimed in any one of claims 7 to 9, wherein the overall length dimension of the bucket is at least twice the overall height dimension.
11. A bucket for a dragline assembly as claimed in claim 10, wherein the length dimension is at least three times the height dimension.
12. A bucket for a dragline assembly as claimed in any one of claims 7 to 11, wherein the bucket does not include an arch between the upper front portions of the bucket side walls.
PCT/AU2004/000105 2003-01-31 2004-01-29 Dragline bucket WO2004067856A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2004207143A AU2004207143B2 (en) 2003-01-31 2004-01-29 Dragline bucket
CA002514727A CA2514727A1 (en) 2003-01-31 2004-01-29 Dragline bucket
US10/543,555 US20060107556A1 (en) 2003-01-31 2004-01-29 Dragline bucket
BR0406708-8A BRPI0406708A (en) 2003-01-31 2004-01-29 Dredger bucket

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2003900403A AU2003900403A0 (en) 2003-01-31 2003-01-31 Dragline bucket
AU2003900403 2003-01-31

Publications (1)

Publication Number Publication Date
WO2004067856A1 true WO2004067856A1 (en) 2004-08-12

Family

ID=30005104

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2004/000105 WO2004067856A1 (en) 2003-01-31 2004-01-29 Dragline bucket

Country Status (9)

Country Link
US (1) US20060107556A1 (en)
CN (1) CN100564708C (en)
AU (1) AU2003900403A0 (en)
BR (1) BRPI0406708A (en)
CA (1) CA2514727A1 (en)
RU (1) RU2005127320A (en)
TR (1) TR200502947T2 (en)
WO (1) WO2004067856A1 (en)
ZA (1) ZA200505967B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8250785B2 (en) 2008-01-23 2012-08-28 Esco Corporation Dragline bucket, rigging and system

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070240340A1 (en) * 2006-04-12 2007-10-18 Esco Corporation UDD dragline bucket
US20070240341A1 (en) * 2006-04-12 2007-10-18 Esco Corporation UDD dragline bucket machine and control system
AU2013202800B2 (en) * 2008-01-23 2014-07-03 Esco Group Llc Dragline bucket, rigging and system
US8950091B2 (en) 2012-03-26 2015-02-10 Caterpillar Global Mining Llc Dragline bucket with remote dumping and positioning capabilities
KR101455373B1 (en) * 2014-07-04 2014-11-04 (주)대우건설 Plough for flattening dredged sea-bed
RU2597895C1 (en) * 2015-08-13 2016-09-20 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Dragline excavator working tool
US11091896B2 (en) * 2017-09-26 2021-08-17 Bright Technologies, Llc Cable armoring system
US11352764B2 (en) * 2018-03-08 2022-06-07 Bright Technologies, Llc Advanced fiber rope boom pendant technologies for heavy equipment
US11649606B2 (en) 2020-06-19 2023-05-16 Caterpillar Inc. Dragline bucket
CN115341602A (en) * 2022-08-30 2022-11-15 徐少钢 Flexible control soil feeding excavation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4791738A (en) * 1987-06-22 1988-12-20 Esco Corporation Dragline bucket
AU7023298A (en) * 1997-04-23 1998-11-13 Jerry Fijalkowski Portable ski rest
WO2001032994A1 (en) * 1999-11-03 2001-05-10 Jeffrey Craig Rowlands Dragline bucket rigging and control apparatus

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US860103A (en) * 1906-10-26 1907-07-16 William J Newman Power transmission for excavating apparatus.
US1095335A (en) * 1910-11-17 1914-05-05 James E Little Digging and excavating machine.
US1248600A (en) * 1912-01-20 1917-12-04 Frederick C Austin Hoisting and dumping apparatus.
US1691100A (en) * 1926-04-16 1928-11-13 Thew Shovel Co Dragline arrangement
US2120444A (en) * 1936-02-24 1938-06-14 Charles T Smith Apparatus for dredging
US2200315A (en) * 1937-06-05 1940-05-14 Raymond S Weimer Excavator
US2249070A (en) * 1938-02-16 1941-07-15 Raymond S Weimer Excavating apparatus
US2267614A (en) * 1939-03-30 1941-12-23 Bucyrus Monighan Company Dragline excavator
US2334460A (en) * 1941-09-23 1943-11-16 Weimer Mabel Excavating apparatus
US3247606A (en) * 1964-03-16 1966-04-26 Page Engineering Company Dragline excavating bucket and hitch
US4689904A (en) * 1986-09-29 1987-09-01 Esco Corporation Rub link assembly for dragline bucket
US5084990A (en) * 1990-08-06 1992-02-04 Esco Corporation Dragline bucket and method of operating the same
US5657559A (en) * 1995-11-24 1997-08-19 Harnischfeger Corporation Rigging assembly for an excavating bucket
US5832638A (en) * 1996-07-01 1998-11-10 Cleal Watts Low draft high yield bucket system for draglines
US6588126B2 (en) * 2000-04-13 2003-07-08 Ground Breaking Innovations Pty Ltd Drag link bucket controls

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4791738A (en) * 1987-06-22 1988-12-20 Esco Corporation Dragline bucket
AU7023298A (en) * 1997-04-23 1998-11-13 Jerry Fijalkowski Portable ski rest
WO2001032994A1 (en) * 1999-11-03 2001-05-10 Jeffrey Craig Rowlands Dragline bucket rigging and control apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8250785B2 (en) 2008-01-23 2012-08-28 Esco Corporation Dragline bucket, rigging and system
US8572870B2 (en) 2008-01-23 2013-11-05 Esco Corporation Dragline bucket, rigging and system

Also Published As

Publication number Publication date
CN1745220A (en) 2006-03-08
RU2005127320A (en) 2006-02-27
ZA200505967B (en) 2006-04-26
US20060107556A1 (en) 2006-05-25
TR200502947T2 (en) 2007-11-21
CA2514727A1 (en) 2004-08-12
BRPI0406708A (en) 2005-12-20
CN100564708C (en) 2009-12-02
AU2003900403A0 (en) 2003-02-13

Similar Documents

Publication Publication Date Title
ZA200505967B (en) Dragline bucket
AU2006202566B2 (en) Dragline bucket rigging and control apparatus
US5400530A (en) Dragline excavator bucket and rigging
AU779774B2 (en) Dragline apparatus and bucket
US7721473B2 (en) Dragline excavator bucket
US20070240341A1 (en) UDD dragline bucket machine and control system
US20050193598A1 (en) Bucket and rigging assembly for an excavating bucket
AU2004207143B2 (en) Dragline bucket
US5752334A (en) Dumping system for a dragline bucket
US20180274203A1 (en) Dragline Bucket with Adjustable Placement of Chain Connections
US20230099091A1 (en) Trunnion for a rear taper dragline bucket
US20180274202A1 (en) Dragline bucket rigging with active tilt device
US10981759B2 (en) Dump block for dragline rigging
CA2617476C (en) Dragline bucket rigging and control apparatus
US20070240340A1 (en) UDD dragline bucket
WO2008124888A1 (en) Differential hoist dragline rigging

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

DPEN Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed from 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2004207143

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2005/05967

Country of ref document: ZA

Ref document number: 200505967

Country of ref document: ZA

WWE Wipo information: entry into national phase

Ref document number: 3317/DELNP/2005

Country of ref document: IN

Ref document number: 2005/02947

Country of ref document: TR

ENP Entry into the national phase

Ref document number: 2006107556

Country of ref document: US

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 10543555

Country of ref document: US

Ref document number: 2514727

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 20048031485

Country of ref document: CN

WWP Wipo information: published in national office

Ref document number: 2004207143

Country of ref document: AU

ENP Entry into the national phase

Ref document number: 2005127320

Country of ref document: RU

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: PI0406708

Country of ref document: BR

122 Ep: pct application non-entry in european phase
WWP Wipo information: published in national office

Ref document number: 10543555

Country of ref document: US