WO2001094859A1 - System for controlling starting of air conditioner and control method thereof - Google Patents

System for controlling starting of air conditioner and control method thereof Download PDF

Info

Publication number
WO2001094859A1
WO2001094859A1 PCT/KR2001/000023 KR0100023W WO0194859A1 WO 2001094859 A1 WO2001094859 A1 WO 2001094859A1 KR 0100023 W KR0100023 W KR 0100023W WO 0194859 A1 WO0194859 A1 WO 0194859A1
Authority
WO
WIPO (PCT)
Prior art keywords
compressor
electronic expansion
starting
control signal
flow rate
Prior art date
Application number
PCT/KR2001/000023
Other languages
French (fr)
Inventor
Joong Ki Moon
Young Man Kim
Jung Min Lee
Jae Myoung Moon
Jong Youb Kim
Il Yong Cho
Original Assignee
Samsung Electronics Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR10-2000-0086779A external-priority patent/KR100395920B1/en
Application filed by Samsung Electronics Co., Ltd. filed Critical Samsung Electronics Co., Ltd.
Priority to EP01900292A priority Critical patent/EP1287296A4/en
Priority to AU24106/01A priority patent/AU2410601A/en
Priority to JP2002502365A priority patent/JP3625816B2/en
Priority to US10/019,533 priority patent/US6637222B2/en
Publication of WO2001094859A1 publication Critical patent/WO2001094859A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C28/00Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids
    • F04C28/24Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids characterised by using valves controlling pressure or flow rate, e.g. discharge valves or unloading valves
    • F04C28/26Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids characterised by using valves controlling pressure or flow rate, e.g. discharge valves or unloading valves using bypass channels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C23/00Combinations of two or more pumps, each being of rotary-piston or oscillating-piston type, specially adapted for elastic fluids; Pumping installations specially adapted for elastic fluids; Multi-stage pumps specially adapted for elastic fluids
    • F04C23/008Hermetic pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C27/00Sealing arrangements in rotary-piston pumps specially adapted for elastic fluids
    • F04C27/005Axial sealings for working fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C28/00Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids
    • F04C28/06Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids specially adapted for stopping, starting, idling or no-load operation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/20Disposition of valves, e.g. of on-off valves or flow control valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/20Disposition of valves, e.g. of on-off valves or flow control valves
    • F25B41/24Arrangement of shut-off valves for disconnecting a part of the refrigerant cycle, e.g. an outdoor part
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • F25B41/34Expansion valves with the valve member being actuated by electric means, e.g. by piezoelectric actuators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • F25B41/34Expansion valves with the valve member being actuated by electric means, e.g. by piezoelectric actuators
    • F25B41/35Expansion valves with the valve member being actuated by electric means, e.g. by piezoelectric actuators by rotary motors, e.g. by stepping motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C18/00Rotary-piston pumps specially adapted for elastic fluids
    • F04C18/02Rotary-piston pumps specially adapted for elastic fluids of arcuate-engagement type, i.e. with circular translatory movement of co-operating members, each member having the same number of teeth or tooth-equivalents
    • F04C18/0207Rotary-piston pumps specially adapted for elastic fluids of arcuate-engagement type, i.e. with circular translatory movement of co-operating members, each member having the same number of teeth or tooth-equivalents both members having co-operating elements in spiral form
    • F04C18/0215Rotary-piston pumps specially adapted for elastic fluids of arcuate-engagement type, i.e. with circular translatory movement of co-operating members, each member having the same number of teeth or tooth-equivalents both members having co-operating elements in spiral form where only one member is moving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • F25B1/04Compression machines, plants or systems with non-reversible cycle with compressor of rotary type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/26Problems to be solved characterised by the startup of the refrigeration cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/026Compressor control by controlling unloaders
    • F25B2600/0261Compressor control by controlling unloaders external to the compressor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2513Expansion valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2521On-off valves controlled by pulse signals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B5/00Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity
    • F25B5/02Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity arranged in parallel
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present invention relates generally to air conditioners, and in particular to a system and method for controlling the starting of an air conditioner that employs a pulse width modulated compressor.
  • each refrigerant conduit connecting each indoor unit to the outdoor unit is long because the outdoor unit is relatively far away from the indoor unit, so the amount of filled refrigerant is large and liquid refrigerant can enter the compressor during the starting of the air conditioner.
  • power supply to any indoor unit is abruptly cut off during the operation of a multi-air conditioner, there is increased a possibility that fluid refrigerant enters the compressor.
  • variable rotation number compressor having a large and variable capacity is employed in the multi-air conditioner.
  • the capacity of the compressor is regulated to be suitable for a variation in required cooling capacity in such a way that the rotation number of a motor is controlled by varying the frequency of current applied to the motor in an inverter control manner.
  • the conventional variable rotation number compressor is problematic in that the rotation number of its motor cannot be controlled with a desirable response and a precision because the motor being rotated has to be controlled directly according to a required cooling capacity.
  • the conventional variable rotation number compressor is less efficient than a general compressor.
  • the conventional variable rotation number compressor are required several power conversions of initially inputted commercial AC power into DC power and this DC power into AC power having a required frequency through converters, so the structure of the circuit device is complicated and noises are frequently generated in the circuit device.
  • variable rotation number compressor In addition, a large-capacity, variable rotation number compressor is problematic in that it is difficult to control the compressor, the efficiency of the compressor is low, the size of the compressor is large and the cost of the compressor is high, so it is difficult to fulfill large-capacity requirements with the variable rotation number compressor. Accordingly, in order to fulfill a large capacity requirement two or more compressors are employed. In this case, a standard compressor in which its motor is rotated at a constant speed is generally utilized together with the variable rotation number compressor. If a plurality of compressors are utilized, the entire size of an outdoor unit is enlarged and, accordingly, the handling of the outdoor unit becomes difficult.
  • Pulse width modulated compressors are disclosed as other variable capacity compressors in U.S. Pat. No. 6,047,557 and Japanese Unexamined Pat. Publication No. Hei 8-334094. These compressors are utilized in refrigerating systems each having a plurality of freezing compartments or refrigerating compartments, and designed to be directly applied to short piping in which the portion of a refrigerant conduit situated between a compressor and an evaporator is short. Consequently, these compressors cannot be applied to air conditioning systems for buildings that indispensably employ long piping and are given control environments different from those for the refrigerating systems. Additionally, in the prior art, there is not disclosed a control system and method for utilizing a pulse width modulated compressor in an multi-air conditioner, and in particular a control system and method for rapidly and safely performing the starting of an air conditioner.
  • an object of the present invention is to provide a system and method for controlling the starting of an air conditioner employing a pulse width modulated compressor, which is capable of rapidly and safely performing the starting of the air conditioner.
  • Another object of the present invention is to provide a system and method for controlling the starting of an air conditioner, which is capable of preventing the inflow of liquid refrigerant in the air conditioner employing a pulse width modulated compressor.
  • a system for controlling the starting of an air conditioner comprises a compressor controlled in a pulse width modulation manner according to a duty control signal; an electronic expansion valve for expanding refrigerant compressed in the compressor; a high pressure conduit connecting the exit side of the compressor and the inlet side of the electronic expansion valve; a low pressure conduit connecting the exit side of the electronic expansion valve and the inlet side of the compressor; a bypass conduit connected at its first end to the high pressure conduit and at its second end to the low pressure conduit; a flow rate regulating valve mounted on the bypass conduit for regulating a flow rate of fluid flowing through the bypass conduit; and a control unit for controlling the compressor during the starting of the compressor in such a way that the electronic expansion valve is opened, the flow rate regulating valve is opened and a duty control signal shorter than a duty control signal for a normal operation is generated.
  • a system for controlling the starting of an air conditioner comprising: a compressor controlled in a pulse width modulation manner according to a duty control signal; an electronic expansion valve for expanding refrigerant compressed in the compressor; a high pressure conduit connecting the exit side of the compressor and the inlet side of the electronic expansion valve; a low pressure conduit connecting the exit side of the electronic expansion valve and the inlet side of the compressor; a bypass conduit connected at its first end to the high pressure conduit and at its second end to the low pressure conduit; a flow rate regulating valve mounted on the bypass conduit for regulating a flow rate of fluid flowing through the bypass conduit; and a control unit for controlling the flow rate regulating valve, the electronic expansion valve and the compressor to prevent liquid refrigerant from entering the compressor during a starting operation of the compressor.
  • a method for controlling the starting of an air conditioner comprises determining whether a starting signal is inputted to a compressor controlled in a pulse width modulation manner according to a duty control signal; and operating the compressor for a predetermined time while closing the electronic expansion valve and opening the flow rate regulating valve mounted on the bypass conduit connecting exit and inlet sides of the compressor, when the starting signal is inputted.
  • Fig. 1 is a diagram showing the cycle of a system for controlling the starting of an air conditioner in accordance with the present invention
  • Fig. 2a is a sectional view showing a pulse width modulated compressor in a loading position
  • Fig. 2b is a sectional view showing the pulse width modulated compressor in an unloading position
  • Fig. 3 is a graph showing a relationship among a loading time, an unloading time and the amount of discharged refrigerant during the operation of the compressor of Figs. 2a and 2b;
  • Fig. 4 is a block diagram showing the system for controlling the starting of an air conditioner in accordance with the present invention.
  • FIG. 5 is a flowchart showing a method for controlling the starting of an air conditioner in accordance with the present invention. * Description of reference characters of principal parts
  • FIG. 1 is a diagram showing an embodiment of the cycle of a system for controlling the starting of an air conditioner in accordance with the principles of the present invention.
  • the air conditioner 1 of the present invention includes a compressor 2, a condenser 3, a plurality of electronic expansion valves 4, and a plurality of evaporators 5, which are connected to each other by refrigerant conduits to form a closed circuit.
  • a refrigerant conduit connecting the outflow side of the compressor 2 to the inflow side of the electronic expansion valves 4 is a high pressure conduit 6 for guiding the flow of high pressure refrigerant discharged from the compressor 2, while a refrigerant conduit connecting the outflow side of the electronic expansion valves 4 to the inflow side of the compressor 2 is a low pressure conduit 7 for guiding the flow of low pressure refrigerant expanded in the electronic expansion valves 4.
  • the condenser 3 is situated on the high pressure conduit 6, while the evaporators 5 are situated on the low pressure conduit 7. While the compressor 2 is operated, refrigerant flows in solid arrow directions.
  • the air conditioner 1 includes an outdoor unit 8 and a plurality of indoor units 9.
  • the outdoor unit 8 includes the above described compressor 2 and condenser 3.
  • the outdoor unit 8 further includes an accumulator 10 situated on the low pressure conduit 7 upstream of the compressor 2 and a receiver 11 situated on the high pressure conduit 6 downstream of the condenser 3.
  • the accumulator 10 serves to collect and evaporate liquid refrigerant having not been evaporated and allow evaporated refrigerant to flow into the compressor 2. If refrigerant is not evaporated completely in the evaporators 5, refrigerant entering the accumulator 10 is a mixture of liquid refrigerant and gaseous refrigerant.
  • the accumulator 10 evaporates liquid refrigerant, and allows only gaseous refrigerant (gas refrigerant) to enter the compressor 2. To this end, it is desirable to situate the entrance and exit ends of the refrigerant conduit in the upper portion of the accumulator 10.
  • refrigerant entering the receiver 11 is a mixture of liquid refrigerant and gaseous refrigerant.
  • the receiver 11 is constructed to separate the liquid refrigerant and the gaseous refrigerant from each other and to allow only the liquid refrigerant to be discharged. To this end, the entrance and exit ends of the refrigerant conduit situated inside of the receiver 11 are extended to the lower portion of the receiver 11.
  • a vent bypass conduit 12 is provided to connect the receiver 11 to the low pressure conduit 7 upstream of the accumulator 10.
  • the entrance end of the vent bypass conduit 12 is situated in the upper portion of the receiver 11 , so only gaseous refrigerant enters the vent bypass conduit 12.
  • a vent valve 13 is provided on the vent bypass conduit 12 and controls the flow rate of gaseous refrigerant bypassed. Double dotted arrows indicate the flow direction of the gaseous refrigerant flowing through the vent bypass conduit 12.
  • the portion of the high pressure conduit 6 extended from the receiver 11 is constructed to pass through the accumulator 10.
  • This construction is to evaporate the liquid refrigerant of low temperature collected in the accumulator 10 by using the refrigerant of relatively high temperature passing through the high pressure conduit 6.
  • the portion of the low pressure conduit 7 situated in the accumulator 10 is formed in the shape of U, while the portion of the high pressure conduit 6 passing through the accumulator 10 is positioned to pass through the interior of the U-shaped portion of the low pressure conduit 7.
  • the outdoor unit 8 further includes a hot gas bypass conduit 14 connecting the portion of the high pressure conduit 6 between the compressor 2 and the condenser 3 to the accumulator 10, and a liquid bypass conduit 15 connecting the downstream side of the receiver 11 and the upstream side of the accumulator 10.
  • a hot gas valve 16 is situated on the hot gas bypass conduit 14 to control the flow rate of hot gas bypassed
  • a liquid valve 17 is situated on the liquid bypass conduit 15 to control the flow rate of liquid refrigerant bypassed. Accordingly, when the hot gas valve 16 is opened, a portion of hot gas discharged from the compressor 2 flows along the hot gas bypass conduit 14 in the direction indicated by the dotted arrow of Fig. 1 ; when the liquid valve 17 is opened, a portion of liquid refrigerant discharged from the receiver 11 flows along the liquid bypass conduit 15 in the directions indicated by the double dotted arrow of Fig. 1.
  • a plurality of indoor units 9 are arranged in parallel.
  • Each of the indoor units 9 includes an electronic expansion valve 4 and an evaporator 5. Consequently, a plurality of indoor units 9 are connected to a single outdoor unit 8.
  • the capacities and shapes of indoor units may be identical with or different from one another.
  • a variable capacity compressor controlled in a pulse width modulation fashion is employed as the compressor 2.
  • the compressor 2 includes a casing 20 provided with an inlet 18 and an outlet 19, a motor 21 situated in the casing 20, a rotating scroll 22 rotated by the rotating force of the motor 21 , and a stationary scroll 24 defining a compressing chamber 23 together with the rotating scroll 22.
  • a bypass conduit 25 is attached to the casing 20 to connect a position over the stationary scroll 24 to the inlet 18, and a PWM valve (Pulse Width Modulated Valve) 26 in the form of a solenoid valve is mounted on the bypass conduit 25.
  • the PWM valve 26 is OFF and closes the bypass conduit 25.
  • the compressor 2 discharges refrigerant.
  • This state is referred to as "a loading state”, and in this state the compressor 2 is operated at 100% capacity.
  • the PWM valve 26 is ON and opens the bypass conduit 25.
  • the compressor 2 does not discharge refrigerant.
  • This state is referred to as "a unloading state”, and in this state the compressor 2 is operated at 0% capacity.
  • Power is supplied to the compressor 2 regardless of the loading and unloading states, and the motor 21 is rotated at a constant speed. When power is not supplied to the compressor 2, the motor 21 is not rotated and the compressor 2 is not operated.
  • the compressor 2 periodically undergoes the loading and unloading states during its operation.
  • Loading time and unloading time vary according to required cooling capacity. During the loading time the temperature of the evaporator 5 is decreased because the compressor 2 discharges refrigerant, while during the unloading time the temperature of the evaporator 5 is increased because the compressor 2 does not discharge refrigerant. In Fig. 3, the hatched portions indicate the amount of discharged refrigerant.
  • a signal for controlling loading and unloading times is referred to as a duty control signal.
  • the capacity of the compressor 2 is varied in such a way that the loading and unloading times are varied according to the required total cooling capacity of the compressor 2 while each period is kept constant, for example, 20 seconds.
  • Fig. 4 is a block diagram showing the system for controlling the starting of an air conditioner in accordance with the present invention.
  • the outdoor unit 8 includes an outdoor control unit 27 that is connected to the compressor 2 and the PWM valve 26 to transmit and receive a signal.
  • the outdoor control unit 27 is connected to an outdoor communication circuit unit 28 to transmit and receive data, and connected to the vent valve 13, the hot gas valve 16 and the liquid valve 17 to control the operation of these valves if necessary.
  • Each of indoor units 9 includes an indoor control unit 29.
  • a temperature detecting unit 30 and a temperature setting unit 31 are connected to the input port of the indoor control unit 29, and the electronic expansion valve 4 is connected to the output port of the indoor control unit 29.
  • the temperature detecting unit 30 is a temperature sensor for sensing the temperature of a room to be air- conditioned.
  • Each indoor unit 9 includes an indoor communication circuit unit 32 connected to an indoor control unit 29 to transmit and receive data.
  • the outdoor communication circuit unit 28 and the indoor communication circuit unit 32 are constructed to transmit and receive data in a wire or wireless fashion.
  • the operations of the compressor 2 are divided into a normal operation and a starting operation.
  • the normal operation designates the operation of the compressor that will be performed according to information on a required cooling capacity transmitted from the indoor unit after power is applied to the compressor and the starting of the compressor has been completed, while the starting operating designates the operation of the compressor that will be performed to start the compressor when a starting signal is transmitted to the compressor.
  • the indoor control unit 29 receives signals from the temperature detecting unit 30 and the temperature setting unit 31 , and calculates the required cooling capacity of the indoor unit 9 on the basis of the difference between an indoor temperature and a set temperature. Additionally, the indoor control unit 29 has information on the cooling capacity of the indoor unit itself, and can calculate a required cooling capacity on the basis of the difference between an indoor temperature and a set temperature and the cooling capacity of the indoor unit itself.
  • the required cooling capacity of each indoor unit calculated as described above is transmitted through the communication circuit units 28 and 32 to the outdoor control unit 27.
  • the outdoor control unit 27 calculates a total required cooling capacity to which the required cooling capacities of all the indoor units 9 add up.
  • the compressor 2 is operated with its loading time and unloading time alternating with each other, which are preset depending on the total required cooling capacity.
  • the outdoor control unit 27 determines whether the compressor 2 is stopped (S101). If the compressor 2 is stopped, the electronic expansion valve 4 and the vent valve 13 are completely opened (S102 and S103). It is determined whether thirty seconds have passed (S104). If thirty seconds have passed, the hot gas valve 16 is opened. Thereafter, it is determined whether two minutes and thirty seconds, have passed after the hot gas valve 16 is opened (S105, three minutes after the electronic valve 4 and the vent valve 13 are opened). If two minutes and thirty seconds have passed, the electronic expansion valve 4, the vent valve 13 and the hot gas valve 16 are closed (S106).
  • the reason why the pressure balancing process of three minutes is performed is to reduce starting load at the early stage of starting by balancing high and low pressure in a cycle.
  • three minutes is a time required to balance high and low pressure in the cycle, but the time may be changed depending on particular systems.
  • the starting operation is performed under the control of the outdoor control unit 27. First of all, it is determined whether a starting signal for the compressor 2 is inputted (S108). If the starting signal is inputted, the compressor 2 is operated, the electronic expansion valve 4 is closed and the hot gas valve 16 and the vent valve 13 are opened (S109). In this case, the period of a duty control signal for controlling the compressor 2 is set to be shorter than the period of a duty control signal for the normal operation.
  • the reason why the period of the starting operation is set to be shorter than the period of the normal operation is that if the compressor 2 is operated by the periods of the normal operation, pressure fluctuation becomes great, thereby deteriorating the reliability of the compressor 2 and causing the safe starting of the compressor 2 to be difficult. Additionally, when the unloading time is relatively long during a normal operation, the starting of the compressor 2 takes a long time; while when the loading time is relatively long, a pressure drop becomes great and liquid refrigerant may flow from the accumulator 10 to the compressor 2. Accordingly, if the loading time is determined as being relatively short and a loading operation is frequently performed, the starting of the compressor can be accomplished rapidly and safely.
  • the period of the starting operation is 20 to 80% of the period of the normal operation, preferably 50%.
  • the reason why the lowermost limit of the period of the starting operation is determined as 20% is that the loading time and the unloading time are set by the second and there is a restriction in the reduction of the lowermost limit.
  • the reason why the uppermost limit is determined as 80% is that if the uppermost limit is determined as more than 80%, there is nearly no effect of the reduction of the period. Therefore, when the period of the normal operation is twenty seconds, the period of the starting operation is four to sixteen seconds, preferably, ten seconds.
  • the compressor is operated at 20 to 50% modulation.
  • 20% modulation means that the compressor is operated while a two-second loading time and an eight-second unloading time are alternated
  • 50% modulation means that the compressor is operated while a five-second loading time and a five-second unloading time are alternated.
  • 30% modulation is preferable.
  • a loading and unloading time ratio is 3:7.
  • the liquid valve 17 is opened when the degree of overheating of refrigerant sucked into the compressor 2 is high and a liquid ingredient is required to be supplemented.
  • STEP 108 is performed for about one to five minutes, preferably, one minute. Accordingly, it is determined whether STEP 108 has been performed for one minute (S109). If so, the starting operation is stopped; while if not, STEP 108 is continued to be performed.
  • the time of starting operation is determined not only to achieve the goal of starting operation but also to rapidly start a cooling operation. When safe starting is primarily considered, it is desirable to perform the starting operation for a sufficient time. If so, the normal operation or the cooling operation is delayed. Although in this embodiment the time of the starting operation is one minute, five minutes may be selected if a safe starting operation is pursued though a cooling operation is somewhat delayed.
  • the present invention provides a system and method for controlling the starting of an air conditioner, in which a pulse width modulated compressor is employed and the electronic expansion valve, the hot gas valve and the vent valve are suitably controlled, thereby allowing the starting of the air conditioner to be performed rapidly and safely. Additionally, the system and method for controlling the starting of an air conditioner is capable of preventing the inflow of liquid refrigerant in the air conditioner while the compressor is operated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Fluid Mechanics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

A system for controlling the starting of an air conditioner includes a compressor controlled in a pulse width modulation according to a duty cycle control signal, an electronic expansion valve for expanding refrigerant compressed in the compressor, a high pressure conduit connecting the exit side of the compressor and the inlet side of the electronic expansion valve, a low pressure conduit connecting the exit side of the electronic expansion valve and the inlet side of the compressor, a bypass conduit connected at its first end to the high pressure conduit and at its second end to the low pressure conduit, and a flow rate regulating valve mounted on the bypass conduit for regulating a flow rate of fluid flowing through the bypass conduit. A control unit controls the compressor during the starting of the compressor in such a way that the electronic expansion valve is open, the flow rate regulating valve is open and a duty control signal shorter than a duty control signal during a normal operation is generated.

Description

SYSTEM FOR CONTROLLING STARTING OF AIR CONDITIONER AND
CONTROL METHOD THEREOF
Technical Field
The present invention relates generally to air conditioners, and in particular to a system and method for controlling the starting of an air conditioner that employs a pulse width modulated compressor.
Background Art
With the enlargement of buildings, there is an increasing consumer demand for a multi-air conditioner in which a plurality of indoor units are connected to a single outdoor unit. In such a multi-air conditioner, the length of each refrigerant conduit connecting each indoor unit to the outdoor unit is long because the outdoor unit is relatively far away from the indoor unit, so the amount of filled refrigerant is large and liquid refrigerant can enter the compressor during the starting of the air conditioner. In particular, if power supply to any indoor unit is abruptly cut off during the operation of a multi-air conditioner, there is increased a possibility that fluid refrigerant enters the compressor. When the power of an operated indoor unit is abruptly cut off during operation, an electronic expansion valve is not closed because power supply to the electronic expansion valve constituting an element of the indoor unit is cut off. Accordingly, high pressure liquid refrigerant situated in a refrigerant conduit between the condenser and the electronic expansion valve enters the compressor or an accumulator upstream of the compressor through the electronic expansion valve and the evaporator in a non-evaporated state. This phenomenon is continued until the pressures of high and low pressure sides are balanced. The liquid refrigerant having entered the compressor is mixed with oil contained in the compressor to dilute the oil, so the lubrication of the friction portions of the compressor is deteriorated, thereby damaging the compressor.
Meanwhile, for the multi-air conditioner, a great cooling capacity is required and each indoor unit is frequently turn on/off, so the required cooling capacity is changed. In order to meet such a demand, a variable rotation number compressor having a large and variable capacity is employed in the multi-air conditioner. In such a variable rotation number compressor, the capacity of the compressor is regulated to be suitable for a variation in required cooling capacity in such a way that the rotation number of a motor is controlled by varying the frequency of current applied to the motor in an inverter control manner. However, the conventional variable rotation number compressor is problematic in that the rotation number of its motor cannot be controlled with a desirable response and a precision because the motor being rotated has to be controlled directly according to a required cooling capacity. Additionally, since the rotation number of the motor is frequently varied, vibrations and noises occur, thereby causing problems that the life spans of the motor and the compressor are shortened and the mechanical reliability of an entire system is deteriorated. In addition, since an expensive and complicated circuit device is required and power consumption is great in order to vary the frequency of current applied to the motor, the conventional variable rotation number compressor is less efficient than a general compressor. Particularly, in the conventional variable rotation number compressor are required several power conversions of initially inputted commercial AC power into DC power and this DC power into AC power having a required frequency through converters, so the structure of the circuit device is complicated and noises are frequently generated in the circuit device.
In addition, a large-capacity, variable rotation number compressor is problematic in that it is difficult to control the compressor, the efficiency of the compressor is low, the size of the compressor is large and the cost of the compressor is high, so it is difficult to fulfill large-capacity requirements with the variable rotation number compressor. Accordingly, in order to fulfill a large capacity requirement two or more compressors are employed. In this case, a standard compressor in which its motor is rotated at a constant speed is generally utilized together with the variable rotation number compressor. If a plurality of compressors are utilized, the entire size of an outdoor unit is enlarged and, accordingly, the handling of the outdoor unit becomes difficult.
Pulse width modulated compressors are disclosed as other variable capacity compressors in U.S. Pat. No. 6,047,557 and Japanese Unexamined Pat. Publication No. Hei 8-334094. These compressors are utilized in refrigerating systems each having a plurality of freezing compartments or refrigerating compartments, and designed to be directly applied to short piping in which the portion of a refrigerant conduit situated between a compressor and an evaporator is short. Consequently, these compressors cannot be applied to air conditioning systems for buildings that indispensably employ long piping and are given control environments different from those for the refrigerating systems. Additionally, in the prior art, there is not disclosed a control system and method for utilizing a pulse width modulated compressor in an multi-air conditioner, and in particular a control system and method for rapidly and safely performing the starting of an air conditioner.
Disclosure of the Invention
Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and an object of the present invention is to provide a system and method for controlling the starting of an air conditioner employing a pulse width modulated compressor, which is capable of rapidly and safely performing the starting of the air conditioner.
Another object of the present invention is to provide a system and method for controlling the starting of an air conditioner, which is capable of preventing the inflow of liquid refrigerant in the air conditioner employing a pulse width modulated compressor.
In order to accomplish the above objects, in accordance with the principles of the present invention, a system for controlling the starting of an air conditioner comprises a compressor controlled in a pulse width modulation manner according to a duty control signal; an electronic expansion valve for expanding refrigerant compressed in the compressor; a high pressure conduit connecting the exit side of the compressor and the inlet side of the electronic expansion valve; a low pressure conduit connecting the exit side of the electronic expansion valve and the inlet side of the compressor; a bypass conduit connected at its first end to the high pressure conduit and at its second end to the low pressure conduit; a flow rate regulating valve mounted on the bypass conduit for regulating a flow rate of fluid flowing through the bypass conduit; and a control unit for controlling the compressor during the starting of the compressor in such a way that the electronic expansion valve is opened, the flow rate regulating valve is opened and a duty control signal shorter than a duty control signal for a normal operation is generated. Additionally, in accordance with another aspect of the principles of the present invention, a system for controlling the starting of an air conditioner, comprising: a compressor controlled in a pulse width modulation manner according to a duty control signal; an electronic expansion valve for expanding refrigerant compressed in the compressor; a high pressure conduit connecting the exit side of the compressor and the inlet side of the electronic expansion valve; a low pressure conduit connecting the exit side of the electronic expansion valve and the inlet side of the compressor; a bypass conduit connected at its first end to the high pressure conduit and at its second end to the low pressure conduit; a flow rate regulating valve mounted on the bypass conduit for regulating a flow rate of fluid flowing through the bypass conduit; and a control unit for controlling the flow rate regulating valve, the electronic expansion valve and the compressor to prevent liquid refrigerant from entering the compressor during a starting operation of the compressor.
Additionally, in accordance with yet another aspect of the principles the present invention, a method for controlling the starting of an air conditioner comprises determining whether a starting signal is inputted to a compressor controlled in a pulse width modulation manner according to a duty control signal; and operating the compressor for a predetermined time while closing the electronic expansion valve and opening the flow rate regulating valve mounted on the bypass conduit connecting exit and inlet sides of the compressor, when the starting signal is inputted.
Brief Description of the Drawings
Fig. 1 is a diagram showing the cycle of a system for controlling the starting of an air conditioner in accordance with the present invention; Fig. 2a is a sectional view showing a pulse width modulated compressor in a loading position, and Fig. 2b is a sectional view showing the pulse width modulated compressor in an unloading position;
Fig. 3 is a graph showing a relationship among a loading time, an unloading time and the amount of discharged refrigerant during the operation of the compressor of Figs. 2a and 2b;
Fig. 4 is a block diagram showing the system for controlling the starting of an air conditioner in accordance with the present invention; and
Fig. 5 is a flowchart showing a method for controlling the starting of an air conditioner in accordance with the present invention. *Description of reference characters of principal parts
2: compressor 4: electronic expansion valve
5: evaporator 8: outdoor unit
9: indoor unit 13: vent valve 16: hot gas valve 17: liquid valve
26: pulse width modulated valve 27: outdoor control unit
Best Mode for Carrying Out the Invention
Hereinafter, embodiments of the present invention are described in detail with reference to accompanying drawings. Fig. 1 is a diagram showing an embodiment of the cycle of a system for controlling the starting of an air conditioner in accordance with the principles of the present invention. The air conditioner 1 of the present invention includes a compressor 2, a condenser 3, a plurality of electronic expansion valves 4, and a plurality of evaporators 5, which are connected to each other by refrigerant conduits to form a closed circuit. Of the refrigerant conduits, a refrigerant conduit connecting the outflow side of the compressor 2 to the inflow side of the electronic expansion valves 4 is a high pressure conduit 6 for guiding the flow of high pressure refrigerant discharged from the compressor 2, while a refrigerant conduit connecting the outflow side of the electronic expansion valves 4 to the inflow side of the compressor 2 is a low pressure conduit 7 for guiding the flow of low pressure refrigerant expanded in the electronic expansion valves 4. The condenser 3 is situated on the high pressure conduit 6, while the evaporators 5 are situated on the low pressure conduit 7. While the compressor 2 is operated, refrigerant flows in solid arrow directions.
The air conditioner 1 includes an outdoor unit 8 and a plurality of indoor units 9. The outdoor unit 8 includes the above described compressor 2 and condenser 3. The outdoor unit 8 further includes an accumulator 10 situated on the low pressure conduit 7 upstream of the compressor 2 and a receiver 11 situated on the high pressure conduit 6 downstream of the condenser 3. The accumulator 10 serves to collect and evaporate liquid refrigerant having not been evaporated and allow evaporated refrigerant to flow into the compressor 2. If refrigerant is not evaporated completely in the evaporators 5, refrigerant entering the accumulator 10 is a mixture of liquid refrigerant and gaseous refrigerant. The accumulator 10 evaporates liquid refrigerant, and allows only gaseous refrigerant (gas refrigerant) to enter the compressor 2. To this end, it is desirable to situate the entrance and exit ends of the refrigerant conduit in the upper portion of the accumulator 10.
If refrigerant is not condensed completely in the condenser 3, refrigerant entering the receiver 11 is a mixture of liquid refrigerant and gaseous refrigerant. The receiver 11 is constructed to separate the liquid refrigerant and the gaseous refrigerant from each other and to allow only the liquid refrigerant to be discharged. To this end, the entrance and exit ends of the refrigerant conduit situated inside of the receiver 11 are extended to the lower portion of the receiver 11.
In order to bypass gaseous refrigerant situated in the receiver 11 , a vent bypass conduit 12 is provided to connect the receiver 11 to the low pressure conduit 7 upstream of the accumulator 10. The entrance end of the vent bypass conduit 12 is situated in the upper portion of the receiver 11 , so only gaseous refrigerant enters the vent bypass conduit 12. A vent valve 13 is provided on the vent bypass conduit 12 and controls the flow rate of gaseous refrigerant bypassed. Double dotted arrows indicate the flow direction of the gaseous refrigerant flowing through the vent bypass conduit 12.
The portion of the high pressure conduit 6 extended from the receiver 11 is constructed to pass through the accumulator 10. This construction is to evaporate the liquid refrigerant of low temperature collected in the accumulator 10 by using the refrigerant of relatively high temperature passing through the high pressure conduit 6. In order to effectively evaporate the refrigerant, the portion of the low pressure conduit 7 situated in the accumulator 10 is formed in the shape of U, while the portion of the high pressure conduit 6 passing through the accumulator 10 is positioned to pass through the interior of the U-shaped portion of the low pressure conduit 7.
The outdoor unit 8 further includes a hot gas bypass conduit 14 connecting the portion of the high pressure conduit 6 between the compressor 2 and the condenser 3 to the accumulator 10, and a liquid bypass conduit 15 connecting the downstream side of the receiver 11 and the upstream side of the accumulator 10. A hot gas valve 16 is situated on the hot gas bypass conduit 14 to control the flow rate of hot gas bypassed, and a liquid valve 17 is situated on the liquid bypass conduit 15 to control the flow rate of liquid refrigerant bypassed. Accordingly, when the hot gas valve 16 is opened, a portion of hot gas discharged from the compressor 2 flows along the hot gas bypass conduit 14 in the direction indicated by the dotted arrow of Fig. 1 ; when the liquid valve 17 is opened, a portion of liquid refrigerant discharged from the receiver 11 flows along the liquid bypass conduit 15 in the directions indicated by the double dotted arrow of Fig. 1.
A plurality of indoor units 9 are arranged in parallel. Each of the indoor units 9 includes an electronic expansion valve 4 and an evaporator 5. Consequently, a plurality of indoor units 9 are connected to a single outdoor unit 8. The capacities and shapes of indoor units may be identical with or different from one another.
As depicted in Figs. 2a and 2b, a variable capacity compressor controlled in a pulse width modulation fashion is employed as the compressor 2. The compressor 2 includes a casing 20 provided with an inlet 18 and an outlet 19, a motor 21 situated in the casing 20, a rotating scroll 22 rotated by the rotating force of the motor 21 , and a stationary scroll 24 defining a compressing chamber 23 together with the rotating scroll 22. A bypass conduit 25 is attached to the casing 20 to connect a position over the stationary scroll 24 to the inlet 18, and a PWM valve (Pulse Width Modulated Valve) 26 in the form of a solenoid valve is mounted on the bypass conduit 25. In Fig. 2a, the PWM valve 26 is OFF and closes the bypass conduit 25. In this state, the compressor 2 discharges refrigerant. This state is referred to as "a loading state", and in this state the compressor 2 is operated at 100% capacity. In Fig. 2a, the PWM valve 26 is ON and opens the bypass conduit 25. In this state, the compressor 2 does not discharge refrigerant. This state is referred to as "a unloading state", and in this state the compressor 2 is operated at 0% capacity. Power is supplied to the compressor 2 regardless of the loading and unloading states, and the motor 21 is rotated at a constant speed. When power is not supplied to the compressor 2, the motor 21 is not rotated and the compressor 2 is not operated. As shown in Fig. 3, the compressor 2 periodically undergoes the loading and unloading states during its operation. Loading time and unloading time vary according to required cooling capacity. During the loading time the temperature of the evaporator 5 is decreased because the compressor 2 discharges refrigerant, while during the unloading time the temperature of the evaporator 5 is increased because the compressor 2 does not discharge refrigerant. In Fig. 3, the hatched portions indicate the amount of discharged refrigerant. A signal for controlling loading and unloading times is referred to as a duty control signal. In the embodiments of the present invention, the capacity of the compressor 2 is varied in such a way that the loading and unloading times are varied according to the required total cooling capacity of the compressor 2 while each period is kept constant, for example, 20 seconds.
Fig. 4 is a block diagram showing the system for controlling the starting of an air conditioner in accordance with the present invention. As illustrated in Fig. 4, the outdoor unit 8 includes an outdoor control unit 27 that is connected to the compressor 2 and the PWM valve 26 to transmit and receive a signal. The outdoor control unit 27 is connected to an outdoor communication circuit unit 28 to transmit and receive data, and connected to the vent valve 13, the hot gas valve 16 and the liquid valve 17 to control the operation of these valves if necessary. Each of indoor units 9 includes an indoor control unit 29. A temperature detecting unit 30 and a temperature setting unit 31 are connected to the input port of the indoor control unit 29, and the electronic expansion valve 4 is connected to the output port of the indoor control unit 29. The temperature detecting unit 30 is a temperature sensor for sensing the temperature of a room to be air- conditioned. Each indoor unit 9 includes an indoor communication circuit unit 32 connected to an indoor control unit 29 to transmit and receive data. The outdoor communication circuit unit 28 and the indoor communication circuit unit 32 are constructed to transmit and receive data in a wire or wireless fashion. In the present invention, the operations of the compressor 2 are divided into a normal operation and a starting operation. The normal operation designates the operation of the compressor that will be performed according to information on a required cooling capacity transmitted from the indoor unit after power is applied to the compressor and the starting of the compressor has been completed, while the starting operating designates the operation of the compressor that will be performed to start the compressor when a starting signal is transmitted to the compressor.
In a normal operation mode, the indoor control unit 29 receives signals from the temperature detecting unit 30 and the temperature setting unit 31 , and calculates the required cooling capacity of the indoor unit 9 on the basis of the difference between an indoor temperature and a set temperature. Additionally, the indoor control unit 29 has information on the cooling capacity of the indoor unit itself, and can calculate a required cooling capacity on the basis of the difference between an indoor temperature and a set temperature and the cooling capacity of the indoor unit itself. The required cooling capacity of each indoor unit calculated as described above is transmitted through the communication circuit units 28 and 32 to the outdoor control unit 27. The outdoor control unit 27 calculates a total required cooling capacity to which the required cooling capacities of all the indoor units 9 add up. The compressor 2 is operated with its loading time and unloading time alternating with each other, which are preset depending on the total required cooling capacity.
With reference to Fig. 5, a pressure balancing process prior to a starting operation and the starting operation are described. First, the outdoor control unit 27 determines whether the compressor 2 is stopped (S101). If the compressor 2 is stopped, the electronic expansion valve 4 and the vent valve 13 are completely opened (S102 and S103). It is determined whether thirty seconds have passed (S104). If thirty seconds have passed, the hot gas valve 16 is opened. Thereafter, it is determined whether two minutes and thirty seconds, have passed after the hot gas valve 16 is opened (S105, three minutes after the electronic valve 4 and the vent valve 13 are opened). If two minutes and thirty seconds have passed, the electronic expansion valve 4, the vent valve 13 and the hot gas valve 16 are closed (S106). The reason why the pressure balancing process of three minutes is performed is to reduce starting load at the early stage of starting by balancing high and low pressure in a cycle. In such a case, three minutes is a time required to balance high and low pressure in the cycle, but the time may be changed depending on particular systems.
Subsequently, the starting operation will be described. The starting operation is performed under the control of the outdoor control unit 27. First of all, it is determined whether a starting signal for the compressor 2 is inputted (S108). If the starting signal is inputted, the compressor 2 is operated, the electronic expansion valve 4 is closed and the hot gas valve 16 and the vent valve 13 are opened (S109). In this case, the period of a duty control signal for controlling the compressor 2 is set to be shorter than the period of a duty control signal for the normal operation. The reason why the period of the starting operation is set to be shorter than the period of the normal operation is that if the compressor 2 is operated by the periods of the normal operation, pressure fluctuation becomes great, thereby deteriorating the reliability of the compressor 2 and causing the safe starting of the compressor 2 to be difficult. Additionally, when the unloading time is relatively long during a normal operation, the starting of the compressor 2 takes a long time; while when the loading time is relatively long, a pressure drop becomes great and liquid refrigerant may flow from the accumulator 10 to the compressor 2. Accordingly, if the loading time is determined as being relatively short and a loading operation is frequently performed, the starting of the compressor can be accomplished rapidly and safely.
In this embodiment, the period of the starting operation is 20 to 80% of the period of the normal operation, preferably 50%. The reason why the lowermost limit of the period of the starting operation is determined as 20% is that the loading time and the unloading time are set by the second and there is a restriction in the reduction of the lowermost limit. The reason why the uppermost limit is determined as 80% is that if the uppermost limit is determined as more than 80%, there is nearly no effect of the reduction of the period. Therefore, when the period of the normal operation is twenty seconds, the period of the starting operation is four to sixteen seconds, preferably, ten seconds.
During the starting operation, the compressor is operated at 20 to 50% modulation. 20% modulation means that the compressor is operated while a two-second loading time and an eight-second unloading time are alternated, and 50% modulation means that the compressor is operated while a five-second loading time and a five-second unloading time are alternated. However, 30% modulation is preferable. In this case, a loading and unloading time ratio is 3:7. The reasons why the starting operation is performed at 50% or less modulation are that a limitation is imposed on an increase in modulation because the starting operation is not a normal operation and the reliability of the compressor may be deteriorated because a great pressure drop occurs due to an increase in modulation in a low temperature starting operation. The reason why all the electronic expansion valves 4 are closed while the starting operation is performed is to prevent liquid refrigerant, which is contained in the receiver 11 and the evaporator 5 and has passed through the condenser 3, from entering the accumulator all at once and, thereafter, the compressor 2. Additionally, the electronic expansion valves 4 are closed, so the portion of the refrigerant conduit between each evaporator 5 and the compressor 2 and the inlet of the compressor 2 are rapidly depressurized, thereby allowing rapid starting to be accomplished.
In the meantime, when the compressor 2 is operated while all the electronic expansion valves 4 are closed, the pressure of refrigerant between each electronic expansion valve and the compressor 2 greatly drops and refrigerant is not circulated normally, resulting in the overheating of the compressor 2. Thus the hot gas valve 16 is opened to connect the exit side of the compressor 2 with upstream of the accumulator 10. Accordingly, a portion of hot gas enters the accumulator 10, so the pressure of refrigerant situated in the accumulator 10 is prevented from greatly dropping and the compressor 2 is normally operated.
In addition, since refrigerant is not circulated normally while all the electronic expansion valves 4 are closed, refrigerant condensed in the condenser 3 cannot enter the receiver 11 rapidly. Accordingly, liquid refrigerant is allowed to flow into the receiver 11 in such a way that gaseous refrigerant contained in the receiver 11 is discharged to the low pressure side by opening the vent valve 13.
The liquid valve 17 is opened when the degree of overheating of refrigerant sucked into the compressor 2 is high and a liquid ingredient is required to be supplemented. In the meantime, STEP 108 is performed for about one to five minutes, preferably, one minute. Accordingly, it is determined whether STEP 108 has been performed for one minute (S109). If so, the starting operation is stopped; while if not, STEP 108 is continued to be performed. The time of starting operation is determined not only to achieve the goal of starting operation but also to rapidly start a cooling operation. When safe starting is primarily considered, it is desirable to perform the starting operation for a sufficient time. If so, the normal operation or the cooling operation is delayed. Although in this embodiment the time of the starting operation is one minute, five minutes may be selected if a safe starting operation is pursued though a cooling operation is somewhat delayed.
Industrial Applicability
As described above, the present invention provides a system and method for controlling the starting of an air conditioner, in which a pulse width modulated compressor is employed and the electronic expansion valve, the hot gas valve and the vent valve are suitably controlled, thereby allowing the starting of the air conditioner to be performed rapidly and safely. Additionally, the system and method for controlling the starting of an air conditioner is capable of preventing the inflow of liquid refrigerant in the air conditioner while the compressor is operated.

Claims

Claims
1. A system for controlling starting operation of an air conditioner, comprising: a compressor controlled in a pulse width modulation manner according to a duty control signal; an electronic expansion valve for expanding refrigerant compressed in said compressor; a high pressure conduit connecting the exit side of said compressor and the inlet side of said electronic expansion valve; a low pressure conduit connecting the exit side of said electronic expansion valve and the inlet side of said compressor; a bypass conduit connected at its first end to said high pressure conduit and at its second end to said low pressure conduit; a flow rate regulating valve mounted on said bypass conduit for regulating a flow rate of fluid flowing through said bypass conduit; and a control unit for controlling said electronic valve, said flow rate regulating valve and said compressor during a starting operation of said compressor in such a way that said electronic expansion valve is closed, said flow rate regulating valve is opened and said compressor being controlled by a duty control signal having a period shorter than a period of a duty control signal for a normal operation.
2. The system according to claim 1 , further comprising : an accumulator mounted on said low pressure conduit, wherein said bypass conduit is a hot gas bypass conduit connecting a high pressure conduit between said compressor and said condenser and said accumulator, and said flow rate regulating valve is a hot gas valve mounted on said hot gas bypass conduit.
3. The system according to claim 1 , further comprising an accumulator mounted on said low pressure conduit, and a receiver mounted on a high pressure conduit downstream of said condenser, wherein said bypass conduit is a vent bypass conduit connecting said receiver and a upstream side of said accumulator, and said flow rate regulating valve is a vent valve mounted on said vent bypass conduit.
4. The system according to claim 1, wherein said period of said duty control signal of said compressor for said starting operation is 20 to 80% of said period of said duty control signal of said compressor for said normal operation.
5. The system according to claim 1 , wherein said compressor is operated at a loading and unloading time ratio of 2:8 to 5:5 during said starting operation of the compressor.
6. The system according to claim 1 , said starting operation of the compressor is performed for one to five minutes.
7. The system according to claim 1 , wherein said duty signal has a period of four to sixteen seconds during said starting operation of the compressor.
8. A system for controlling the starting of an air conditioner, comprising: a compressor controlled in a pulse width modulation manner according to a duty control signal; an electronic expansion valve for expanding refrigerant compressed in said compressor; a high pressure conduit connecting the exit side of said compressor and the inlet side of said electronic expansion valve; a low pressure conduit connecting the exit side of said electronic expansion valve and the inlet side of said compressor; a bypass conduit connected at its first end to said high pressure conduit and at its second end to said low pressure conduit; a flow rate regulating valve mounted on said bypass conduit for regulating a flow rate of fluid flowing through said bypass conduit; and a control unit for controlling said flow rate regulating valve, said electronic expansion valve and said compressor to prevent liquid refrigerant from entering said compressor during a starting operation of said compressor.
9. A method for controlling the starting of an air conditioner, comprising : determining whether a starting signal is inputted to a compressor controlled in a pulse width modulation according to a duty control signal; and operating said compressor for a predetermined time while closing an electronic expansion valve and opening a flow rate regulating valve mounted on a bypass conduit connecting exit and inlet sides of said compressor, when said starting signal is inputted.
10. The method according to claim 9, wherein in said compressor operating is performed in such a way that said compressor is operated by a duty control signal having a period shorter than a period of a duty control signal for a normal operation.
11. The method according to claim 9, wherein said compressor operating is performed in such a way that said compressor is operated by a duty control signal having a period corresponding to 20 to 80% of a period of a duty control signal for a normal operation.
12. The method according to claim 9, wherein said compressor operating is performed at a loading and unloading time ratio of 2:8 to 5:5.
13. The method according to claim 9, wherein said compressor operating is performed for one to five minutes.
PCT/KR2001/000023 2000-06-07 2001-01-05 System for controlling starting of air conditioner and control method thereof WO2001094859A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP01900292A EP1287296A4 (en) 2000-06-07 2001-01-05 System for controlling starting of air conditioner and control method thereof
AU24106/01A AU2410601A (en) 2000-06-07 2001-01-05 System for controlling starting of air conditioner and control method thereof
JP2002502365A JP3625816B2 (en) 2000-06-07 2001-01-05 Air conditioner start-up control system and control method thereof
US10/019,533 US6637222B2 (en) 2000-06-07 2001-01-05 System for controlling starting of air conditioner and control method thereof

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR20000031142 2000-06-07
KR2000/31142 2000-06-07
KR10-2000-0086779A KR100395920B1 (en) 2000-06-07 2000-12-30 Control system for starting of air conditioner and control method thereof
KR2000/86779 2000-12-30

Publications (1)

Publication Number Publication Date
WO2001094859A1 true WO2001094859A1 (en) 2001-12-13

Family

ID=26638074

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2001/000023 WO2001094859A1 (en) 2000-06-07 2001-01-05 System for controlling starting of air conditioner and control method thereof

Country Status (6)

Country Link
US (1) US6637222B2 (en)
EP (1) EP1287296A4 (en)
JP (1) JP3625816B2 (en)
CN (1) CN1120335C (en)
AU (1) AU2410601A (en)
WO (1) WO2001094859A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1628107A2 (en) * 2004-08-20 2006-02-22 Lg Electronics Inc. Method for controlling solenoid valve of air-conditioner
EP2146419A1 (en) * 2008-07-16 2010-01-20 Lg Electronics Inc. Motor, compressor and air conditioning system having the same
EP2146420A1 (en) * 2008-07-16 2010-01-20 Lg Electronics Inc. Capacity modulation compressor and air conditioning system having the same
CN101949570A (en) * 2010-09-09 2011-01-19 宁波奥克斯电气有限公司 Direct-current set-free air conditioner starting control method
EP2304338A1 (en) * 2008-05-14 2011-04-06 Carrier Corporation Transport refrigeration system and method of operation
WO2013006172A1 (en) * 2011-07-07 2013-01-10 Carrier Corporation Method and system for transport container refrigeration control
WO2013050055A1 (en) * 2011-10-03 2013-04-11 Electrolux Home Products Corporation N.V. Refrigerator and method of operating refrigeration system
CN107101411A (en) * 2017-04-28 2017-08-29 麦克维尔空调制冷(武汉)有限公司 A kind of centrifugal refrigerating machines and power-off quick start method
US11137170B2 (en) 2016-11-11 2021-10-05 Carrier Corporation Heat pump system and start up control method thereof

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7918655B2 (en) * 2004-04-30 2011-04-05 Computer Process Controls, Inc. Fixed and variable compressor system capacity control
US7621141B2 (en) * 2004-09-22 2009-11-24 York International Corporation Two-zone fuzzy logic liquid level control
JP4225357B2 (en) * 2007-04-13 2009-02-18 ダイキン工業株式会社 Refrigerant filling apparatus, refrigeration apparatus and refrigerant filling method
JP5198337B2 (en) * 2009-03-25 2013-05-15 ホシザキ電機株式会社 Automatic ice machine
WO2011037012A1 (en) * 2009-09-28 2011-03-31 東芝キヤリア株式会社 Air conditioner
US8011191B2 (en) 2009-09-30 2011-09-06 Thermo Fisher Scientific (Asheville) Llc Refrigeration system having a variable speed compressor
US9097448B2 (en) * 2009-10-12 2015-08-04 Lg Electronics Inc. Air conditioning system and method for controlling operation thereof
KR101585943B1 (en) * 2010-02-08 2016-01-18 삼성전자 주식회사 Air conditioner and control method thereof
JP5877331B2 (en) * 2011-05-26 2016-03-08 パナソニックIpマネジメント株式会社 Refrigeration system with scroll compressor
US9970698B2 (en) 2011-10-24 2018-05-15 Whirlpool Corporation Multiple evaporator control using PWM valve/compressor
US9605884B2 (en) 2011-10-24 2017-03-28 Whirlpool Corporation Multiple evaporator control using PWM valve/compressor
WO2013081132A1 (en) * 2011-11-30 2013-06-06 株式会社サムスン横浜研究所 Air conditioner
CN103352838B (en) * 2013-07-30 2016-06-01 广东西屋康达空调有限公司 Frequency conversion digital compressor
SG10201903371VA (en) * 2014-10-14 2019-05-30 Cass Khoo Efficiency enhancing apparatus and methods for a heat exchange system
CN106500254B (en) * 2016-11-02 2019-04-19 广东志高暖通设备股份有限公司 Module water dispenser system, air-conditioning device and module water dispenser control method
WO2018180985A1 (en) * 2017-03-29 2018-10-04 三菱電機株式会社 Air-conditioning device, railway vehicle air-conditioning device, and method for controlling air-conditioning device
CN112443947B (en) * 2019-08-30 2021-11-26 青岛海尔空调电子有限公司 Control method of simultaneous cooling and heating multi-split air conditioning system
CN112161374B (en) * 2020-09-29 2021-09-14 珠海格力电器股份有限公司 Variable frequency air conditioner, control method thereof and computer readable storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR870005221A (en) * 1985-11-28 1987-06-05 와다리 스기이찌로오 Air conditioning apparatus and control method thereof
KR890005469A (en) * 1987-09-10 1989-05-15 아오이 죠이찌 Multi-type air conditioner system with starting control for parallel operated compressors therein
KR940018623A (en) * 1993-01-26 1994-08-18 김광호 Refrigerant cycle control device and method of air conditioner
JPH08334094A (en) 1995-06-07 1996-12-17 Copeland Corp Scroll type machine with volume control mechanism
KR970022002A (en) * 1995-10-09 1997-05-28 구자홍 Stable presser method of multi-airconditioner
KR970066360A (en) * 1996-03-23 1997-10-13 김광호 A control device for driving of airconditioner
WO1998057104A1 (en) 1997-06-11 1998-12-17 American Standard Inc. Start-up method and apparatus in refrigeration chillers
US6047557A (en) 1995-06-07 2000-04-11 Copeland Corporation Adaptive control for a refrigeration system using pulse width modulated duty cycle scroll compressor

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05106922A (en) * 1991-10-18 1993-04-27 Hitachi Ltd Control system for refrigerating equipment
US5303562A (en) * 1993-01-25 1994-04-19 Copeland Corporation Control system for heat pump/air-conditioning system for improved cyclic performance
US6202431B1 (en) * 1999-01-15 2001-03-20 York International Corporation Adaptive hot gas bypass control for centrifugal chillers

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR870005221A (en) * 1985-11-28 1987-06-05 와다리 스기이찌로오 Air conditioning apparatus and control method thereof
KR890005469A (en) * 1987-09-10 1989-05-15 아오이 죠이찌 Multi-type air conditioner system with starting control for parallel operated compressors therein
KR940018623A (en) * 1993-01-26 1994-08-18 김광호 Refrigerant cycle control device and method of air conditioner
JPH08334094A (en) 1995-06-07 1996-12-17 Copeland Corp Scroll type machine with volume control mechanism
US6047557A (en) 1995-06-07 2000-04-11 Copeland Corporation Adaptive control for a refrigeration system using pulse width modulated duty cycle scroll compressor
KR970022002A (en) * 1995-10-09 1997-05-28 구자홍 Stable presser method of multi-airconditioner
KR970066360A (en) * 1996-03-23 1997-10-13 김광호 A control device for driving of airconditioner
WO1998057104A1 (en) 1997-06-11 1998-12-17 American Standard Inc. Start-up method and apparatus in refrigeration chillers

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1287296A4

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1628107A3 (en) * 2004-08-20 2007-08-08 Lg Electronics Inc. Method for controlling solenoid valve of air-conditioner
EP1628107A2 (en) * 2004-08-20 2006-02-22 Lg Electronics Inc. Method for controlling solenoid valve of air-conditioner
EP2304338A1 (en) * 2008-05-14 2011-04-06 Carrier Corporation Transport refrigeration system and method of operation
EP2304338A4 (en) * 2008-05-14 2014-09-03 Carrier Corp Transport refrigeration system and method of operation
EP2146420A1 (en) * 2008-07-16 2010-01-20 Lg Electronics Inc. Capacity modulation compressor and air conditioning system having the same
EP2146419A1 (en) * 2008-07-16 2010-01-20 Lg Electronics Inc. Motor, compressor and air conditioning system having the same
CN101949570A (en) * 2010-09-09 2011-01-19 宁波奥克斯电气有限公司 Direct-current set-free air conditioner starting control method
CN101949570B (en) * 2010-09-09 2012-10-10 宁波奥克斯电气有限公司 Starting control method for direct-current variable frequency air conditioner operating any units
WO2013006172A1 (en) * 2011-07-07 2013-01-10 Carrier Corporation Method and system for transport container refrigeration control
US9766009B2 (en) 2011-07-07 2017-09-19 Carrier Corporation Method and system for transport container refrigeration control
WO2013050055A1 (en) * 2011-10-03 2013-04-11 Electrolux Home Products Corporation N.V. Refrigerator and method of operating refrigeration system
US11137170B2 (en) 2016-11-11 2021-10-05 Carrier Corporation Heat pump system and start up control method thereof
CN107101411A (en) * 2017-04-28 2017-08-29 麦克维尔空调制冷(武汉)有限公司 A kind of centrifugal refrigerating machines and power-off quick start method
CN107101411B (en) * 2017-04-28 2020-01-17 麦克维尔空调制冷(武汉)有限公司 Centrifugal water chilling unit and power-off quick starting method

Also Published As

Publication number Publication date
CN1380959A (en) 2002-11-20
US20030074910A1 (en) 2003-04-24
JP2003536044A (en) 2003-12-02
CN1120335C (en) 2003-09-03
AU2410601A (en) 2001-12-17
JP3625816B2 (en) 2005-03-02
EP1287296A1 (en) 2003-03-05
US6637222B2 (en) 2003-10-28
EP1287296A4 (en) 2007-08-22

Similar Documents

Publication Publication Date Title
US6637222B2 (en) System for controlling starting of air conditioner and control method thereof
US6519958B1 (en) Control system for starting of air conditioner and control method thereof
EP1287298B1 (en) Control system of degree of superheat of air conditioner and control method thereof
JP3798374B2 (en) Air conditioner control system and control method thereof
US4989414A (en) Capacity-controllable air conditioner
EP1984680B1 (en) Air-conditioning system and controlling method for the same
US6868685B2 (en) Air conditioner and method of controlling the same
US6711909B2 (en) Outdoor fan control system of air conditioner and control method thereof
KR20070082501A (en) Air-conditioning system and controlling method for the same
EP2093508B1 (en) Air Conditioner and Method of Controlling the Same
KR100395918B1 (en) Air conditioner control system and control method thereof
KR100395920B1 (en) Control system for starting of air conditioner and control method thereof
EP1475575B1 (en) Air conditioner
KR100373075B1 (en) Control system for starting of air conditioner and control method thereof
JPH0217358A (en) Degree of overheat control device for freezing device
KR100710311B1 (en) Air-conditioning system and controlling method for the same
JP3059886B2 (en) Refrigeration equipment
KR100710312B1 (en) Air-conditioning system and controlling method for the same
JPH01203849A (en) Air conditioner

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

WWE Wipo information: entry into national phase

Ref document number: 10019533

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 018012647

Country of ref document: CN

REEP Request for entry into the european phase

Ref document number: 2001900292

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2001900292

Country of ref document: EP

121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWP Wipo information: published in national office

Ref document number: 2001900292

Country of ref document: EP