WO2001053655A1 - Improved method for the drilling of oil wells - Google Patents

Improved method for the drilling of oil wells Download PDF

Info

Publication number
WO2001053655A1
WO2001053655A1 PCT/EP2000/013370 EP0013370W WO0153655A1 WO 2001053655 A1 WO2001053655 A1 WO 2001053655A1 EP 0013370 W EP0013370 W EP 0013370W WO 0153655 A1 WO0153655 A1 WO 0153655A1
Authority
WO
WIPO (PCT)
Prior art keywords
drilling
well
oil wells
positioning
curvature
Prior art date
Application number
PCT/EP2000/013370
Other languages
English (en)
French (fr)
Inventor
Angelo Calderoni
Gualtiero Ferrario
Original Assignee
Eni S.P.A.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eni S.P.A. filed Critical Eni S.P.A.
Priority to BR0016888-2A priority Critical patent/BR0016888A/pt
Priority to CA002396282A priority patent/CA2396282A1/en
Priority to MXPA02006734A priority patent/MXPA02006734A/es
Priority to EP00991655A priority patent/EP1244866A1/en
Priority to AU33676/01A priority patent/AU3367601A/en
Priority to EA200200605A priority patent/EA200200605A1/ru
Publication of WO2001053655A1 publication Critical patent/WO2001053655A1/en
Priority to NO20023169A priority patent/NO20023169L/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions

Definitions

  • the present invention relates to an improved method for the drilling of oil wells which allows the positioning of lining columns, operating with an almost constant clearance for the whole of the desired well depth and which substantially consists in effecting the drilling, guaranteeing the elimi- nation of any geometrical curvature and irregularities of the hole, whether it be vertical or deviated.
  • lining operations of the hole are effected which comprise the positioning of appropriate casings at pre-established intervals in relation to the depth reached and characteristics of the formations penetrated.
  • the clearance between casing and hole can vary from values of about 6-7 inches (15-16 cm) for the surface and/or intermediate phases, to values of almost an inch for the deeper phases (for example: 26" hole for 20" conductor pipe, 17 1/2" hole for 13 3/8", 12 1/4" hole for 9 5/8" casing, 8 1/2" hole for 7" casing) .
  • the drilling method according to the present invention allows, with the same diameter of the production column, the dimensions of the upper well part (surface and intermediate columns) to be re- symbolized. This enables a significant reduction in the consumption of materials (mud, cement and steel) and consequently the production of waste products.
  • This technique also avoids the necessity of producing holes with a diameter which is too large with respect to the diameter of the columns to be lowered, which generally implies the possibility of effecting holes with a smaller diameter compared to the conventional technique. All of this positively influences the advancement rate of the bit there- fore allowing the production times of the holes to be reduced, with a consequent decrease in the costs.
  • the technique according to the present invention also enables a significant reduction in the operating costs, as the verticality and/or regular curvature of the well facilitates all workover and well intervention operations.
  • This method comprises a drilling and pipe- laying technique which allows the positioning of the lining columns operating with an almost con- stant clearance with values of more or less 1.5 inches (3-4 cm) for the whole well depth (from the top to the bottom) , or in any case for the whole of the desired well depth.
  • a reduced clearance allows, with the same number of columns and final diameter of the production casing, the dimensions of the upper part of the well to be greatly reduced.
  • An object of the present invention therefore relates to an improved method for the drilling of oil wells and for the contemporaneous positioning of appropriate casings, characterized in that the clearance is kept almost constant for the whole of the desired well depth, consisting in drilling the well section of interest, maintaining a high degree of hole regularity by the use of automatic verti- cality and/or curvature control equipment.
  • the method according to the following invention comprises effecting the drilling phase according to the following procedures: automatic control of the verticality and/or curvature of the well; use of bits equipped with adequate distribu- tors and roller reamers, in order to guarantee hole regularity and calibration; use of drilling mud with chemical and rheological characteristics which are such as to minimize any possible problems of hole in- stability; constant control of all the drilling parameters in order to maintain a curvature (BUR/DO) of 0.7 degrees every 30 , with a maximum slope of 1.5 degrees in the vertical sections.
  • SDD Straight Hole Drilling Device
  • This device contrary to the conventional systems, automatically effects a continuous correction of the verticality and is based on a retro-activated control which ensures the absolute verticality of holes, even in formations which have a strong ten- dency to cause the bit trajectory to deviate from the vertical.
  • the pipe-laying procedure is effected as follows. After producing a perfectly vertical and well calibrated hole the lining columns can be lowered into the well. In order to facilitate the passage of the casing into the hole calibrated with a re-zad clearance, the following precautions should be observed:
  • curvature should be planned in relation to the flexibility of the casings to be used.
  • Figure 1 compares the conventional pipe-laying program with the "Lean” program.
  • the data in said figure were obtained in the Monte Enoc 9 well ef- fected in the Field of Val D'Agri in Basilicata. It is evident how with the "Lean” solution, starting from a lower diameter of the surface and intermediate columns, a production column is obtained with the same diameter as that produced with the conven- tional solution.
  • Figure 2 describes a further two examples of Lean pipe-laying, which can provide a valid alternative to the previous scheme, above all in contingency situations.
  • Figure 3 schematically represents a comparison between the hole sections.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Steroid Compounds (AREA)
PCT/EP2000/013370 2000-01-05 2000-12-28 Improved method for the drilling of oil wells WO2001053655A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
BR0016888-2A BR0016888A (pt) 2000-01-05 2000-12-28 Processo de perfuração de poços petrolìferos e posicionamento dos tubos de revestimento apropriados.
CA002396282A CA2396282A1 (en) 2000-01-05 2000-12-28 Improved method for the drilling of oil wells
MXPA02006734A MXPA02006734A (es) 2000-01-05 2000-12-28 Metodo mejorado para la perforacion de pozos petroleros.
EP00991655A EP1244866A1 (en) 2000-01-05 2000-12-28 Improved method for the drilling of oil wells
AU33676/01A AU3367601A (en) 2000-01-05 2000-12-28 Improved method for the drilling of oil wells
EA200200605A EA200200605A1 (ru) 2000-01-05 2000-12-28 Усовершенствованный способ бурения нефтяных скважин
NO20023169A NO20023169L (no) 2000-01-05 2002-06-28 Forbedret fremgangsmåte for boring av oljebrönner

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT2000MI000007A IT1316157B1 (it) 2000-01-05 2000-01-05 Metodo migliorato per la perforazione di pozzi petroliferi
ITMI2000A000007 2000-01-05

Publications (1)

Publication Number Publication Date
WO2001053655A1 true WO2001053655A1 (en) 2001-07-26

Family

ID=11443623

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2000/013370 WO2001053655A1 (en) 2000-01-05 2000-12-28 Improved method for the drilling of oil wells

Country Status (13)

Country Link
US (1) US20020189864A1 (no)
EP (1) EP1244866A1 (no)
CN (1) CN1420958A (no)
AU (1) AU3367601A (no)
BR (1) BR0016888A (no)
CA (1) CA2396282A1 (no)
EA (1) EA200200605A1 (no)
IT (1) IT1316157B1 (no)
MA (1) MA25880A1 (no)
MX (1) MXPA02006734A (no)
NO (1) NO20023169L (no)
OA (1) OA12135A (no)
WO (1) WO2001053655A1 (no)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015056218A2 (en) 2013-10-17 2015-04-23 Eni S.P.A. Process for constructing a well for exploiting a reservoir under a sea-bed or ocean-bed
CN111852336A (zh) * 2020-08-27 2020-10-30 安徽建筑大学 一种水平定向钻扩孔用钻具

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7661476B2 (en) * 2006-11-15 2010-02-16 Exxonmobil Upstream Research Company Gravel packing methods
US7857078B2 (en) * 2007-05-29 2010-12-28 Baker Hughes Incorporated Cutting tools and methods of making the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5603386A (en) * 1992-03-05 1997-02-18 Ledge 101 Limited Downhole tool for controlling the drilling course of a borehole
US5918674A (en) * 1996-03-20 1999-07-06 Head; Philip Casing and method of installing the casing in a well
WO1999035368A1 (en) * 1997-12-31 1999-07-15 Shell Internationale Research Maatschappij B.V. Method for drilling and completing a hydrocarbon production well
WO2000028188A1 (en) * 1998-11-10 2000-05-18 Baker Hughes Incorporated Self-controlled directional drilling systems and methods

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4077657A (en) * 1976-03-22 1978-03-07 Smith, International, Inc. Adjustable bent sub
US6290001B1 (en) * 2000-05-18 2001-09-18 Halliburton Energy Services, Inc. Method and composition for sweep of cuttings beds in a deviated borehole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5603386A (en) * 1992-03-05 1997-02-18 Ledge 101 Limited Downhole tool for controlling the drilling course of a borehole
US5918674A (en) * 1996-03-20 1999-07-06 Head; Philip Casing and method of installing the casing in a well
WO1999035368A1 (en) * 1997-12-31 1999-07-15 Shell Internationale Research Maatschappij B.V. Method for drilling and completing a hydrocarbon production well
WO2000028188A1 (en) * 1998-11-10 2000-05-18 Baker Hughes Incorporated Self-controlled directional drilling systems and methods

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
A. CALDERONI, A. LIGRONE, C. MOLASCHI: "The lean profile: a step change in drilling performance", SOCIETY OF PETROLEUM ENGINEERS, no. 52788, 9 March 1999 (1999-03-09) - 11 March 1999 (1999-03-11), Amsterdam, XP002166760 *
A. CALDERONI, A. SAVANI, J. TREVIRANUS, J. OPPELT: "Outstanding economic advantages based on new straight-hole drilling device proven in various oilfield locations", SOCIETY OF PETROLEUM ENGINEERS, no. 56444, 3 October 1999 (1999-10-03) - 6 October 1999 (1999-10-06), Houston, XP002166759 *
J.W. BARKER: "Wellbore design with reduced clearance between casing strings", SOCIETY OF PETROLEUM ENGINEERS, no. 37615, 4 March 1997 (1997-03-04) - 6 March 1997 (1997-03-06), The Hague, XP002166761 *
P. HEAD, D. TURNER, T. HANSON, S. AL RAWAHI, G. CAMERON: "Slimwells without the pain", SOCIETY OF PETROLEUM ENGINEERS, no. 52795, 9 March 1999 (1999-03-09) - 11 March 1999 (1999-03-11), Amsterdam, XP002166762 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015056218A2 (en) 2013-10-17 2015-04-23 Eni S.P.A. Process for constructing a well for exploiting a reservoir under a sea-bed or ocean-bed
CN105899750A (zh) * 2013-10-17 2016-08-24 艾尼股份公司 构造用于开采海底或洋底下储层的井的工艺
CN111852336A (zh) * 2020-08-27 2020-10-30 安徽建筑大学 一种水平定向钻扩孔用钻具

Also Published As

Publication number Publication date
MXPA02006734A (es) 2002-10-23
ITMI20000007A0 (it) 2000-01-05
BR0016888A (pt) 2002-10-08
MA25880A1 (fr) 2003-10-01
US20020189864A1 (en) 2002-12-19
OA12135A (en) 2006-05-05
EP1244866A1 (en) 2002-10-02
CA2396282A1 (en) 2001-07-26
NO20023169D0 (no) 2002-06-28
NO20023169L (no) 2002-07-02
CN1420958A (zh) 2003-05-28
EA200200605A1 (ru) 2003-02-27
IT1316157B1 (it) 2003-04-03
ITMI20000007A1 (it) 2001-07-05
AU3367601A (en) 2001-07-31

Similar Documents

Publication Publication Date Title
AU606777B2 (en) Method of constructing a well
US4573540A (en) Method for drilling deviated wellbores
US11959365B2 (en) Metal seal for liner drilling
US7891423B2 (en) System and method for optimizing gravel deposition in subterranean wells
WO2002048501A1 (en) Method for centralising a tight fitting casing in a borehole
US7475726B2 (en) Continuous monobore liquid lining system
CN110043229A (zh) 一种海域天然气水合物多井组连通汇聚开采方法
CN109184693A (zh) 岩盐老矿区老井挖潜工艺
WO2001053655A1 (en) Improved method for the drilling of oil wells
US8230947B2 (en) Method of selecting a drilling motor for a casing drill string
GB2481293A (en) Expandable casing joint
US8256535B2 (en) Mill-through tailpipe liner exit and method of use thereof
US2854214A (en) Well drilling
US20180223607A1 (en) Toe casing
US20180155988A1 (en) Method of drilling a borehole in an earth formation
Qiao et al. Discussion on long open-hole sidetracking technology based on an ultra-deep well in the Northern Tarim Basin
Vrielink et al. The optimization of slant-well drilling in the Lindbergh field
CN112780248B (zh) 煤层气水平井及其施工方法
RU2100569C1 (ru) Способ цементирования скважин с аномально-высокими пластовыми давлениями
Alsyed et al. Well Integrity During Operating the First Offshore Gas Wells in Saudi Arabia; Experiences and Lessons Learned
RU98464U1 (ru) Конструкция глубокой скважины
CN117662000A (zh) 一种超深短半径裸眼侧钻施工方法和钻具
AU2006201101A1 (en) Method for accessing and producing from an underground coal seam
CN112177563A (zh) 一种完井方法
Bybee Optimization of Big-Bore Wells in a Giant Offshore Field

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
ENP Entry into the national phase

Ref document number: 20020436

Country of ref document: UZ

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2000991655

Country of ref document: EP

Ref document number: 200200605

Country of ref document: EA

WWE Wipo information: entry into national phase

Ref document number: 33676/01

Country of ref document: AU

Ref document number: 10168526

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: IN/PCT/2002/1020/CHE

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: P20020569A

Country of ref document: HR

WWE Wipo information: entry into national phase

Ref document number: 2396282

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: PA/a/2002/006734

Country of ref document: MX

Ref document number: 00818206X

Country of ref document: CN

WWP Wipo information: published in national office

Ref document number: 2000991655

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWW Wipo information: withdrawn in national office

Ref document number: 2000991655

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: JP