WO2001017092A1 - Surveillance d'installations electriques - Google Patents

Surveillance d'installations electriques Download PDF

Info

Publication number
WO2001017092A1
WO2001017092A1 PCT/SE2000/001606 SE0001606W WO0117092A1 WO 2001017092 A1 WO2001017092 A1 WO 2001017092A1 SE 0001606 W SE0001606 W SE 0001606W WO 0117092 A1 WO0117092 A1 WO 0117092A1
Authority
WO
WIPO (PCT)
Prior art keywords
electric power
data
power system
unit
amount
Prior art date
Application number
PCT/SE2000/001606
Other languages
English (en)
Inventor
Lars Gertmar
Arne Nysveen
Jan Ove Gjerde
Per-Anders LÖF
Original Assignee
Abb Ab
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from SE9903026A external-priority patent/SE9903026L/
Priority claimed from SE9903037A external-priority patent/SE9903037L/xx
Application filed by Abb Ab filed Critical Abb Ab
Priority to AU68845/00A priority Critical patent/AU6884500A/en
Publication of WO2001017092A1 publication Critical patent/WO2001017092A1/fr

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/10Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
    • H02P9/107Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load for limiting effects of overloads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • H02J13/00017Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus using optical fiber
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00036Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
    • H02J13/0004Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • H02J3/1892Arrangements for adjusting, eliminating or compensating reactive power in networks the arrangements being an integral part of the load, e.g. a motor, or of its control circuit
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K19/00Synchronous motors or generators
    • H02K19/16Synchronous generators
    • H02K19/36Structural association of synchronous generators with auxiliary electric devices influencing the characteristic of the generator or controlling the generator, e.g. with impedances or switches
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K19/00Synchronous motors or generators
    • H02K19/16Synchronous generators
    • H02K19/36Structural association of synchronous generators with auxiliary electric devices influencing the characteristic of the generator or controlling the generator, e.g. with impedances or switches
    • H02K19/365Structural association of synchronous generators with auxiliary electric devices influencing the characteristic of the generator or controlling the generator, e.g. with impedances or switches with a voltage regulator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/10Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0061Details of emergency protective circuit arrangements concerning transmission of signals
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/05Details with means for increasing reliability, e.g. redundancy arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/22Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Definitions

  • the present invention generally relates to supervision and control of electric power plants and electric power networks.
  • the invention relates in particular to determination of actual operational margins for electric power objects or electric power units that are included in the electric power plant or electric power network.
  • the overall aim of the control and supervision systems is that the power system is utilised in an economically optimum way and that operation safety goals are fulfilled.
  • the power system may be in a number of different states depending on outer circumstances, for instance caused by disturbances, such as production and line tripping.
  • the economical optimisation of the operation constitutes the main task, while aspects regarding delivery security has to become prioritised at alert or emergency operation.
  • Important questions for the reliability in the electric power systems of the future are the origin of new actors and the reduced organisational connection between production and transmission resources.
  • An additional area that draws more and more attention among the power companies is questions around risk handling.
  • SCADA Supervisory Control And Data Acquisition
  • SCADA comprises data collection, supervision, control and presentation of different functions in the electric power system.
  • SCADA is closely connected to the calculation functions that are parts of
  • EMS Electronic Management System
  • DMS Distribution Management System
  • EMS comprises analysis and optimisation of the production and transmission systems via functions for production planning, production control and power system analysis, while DMS constitutes corresponding functions for distribution network applications.
  • DSM Demand-Side Management
  • BMS Business Management System
  • the technical base for the hardware that is included in the SCADA and EMS systems can be divided into three part systems: local systems, communication systems and operational centre systems.
  • RTUs Remote Terminal Units
  • Operation centre systems may be said to constitute the actual brain in the systems for control and supervision of electric power networks, which leads to that the activity at different operational centres has to be co-ordinated in that the computers of the operational centres communicate and co-operate in hierarchically formed structures.
  • the hierarchic demand is a natural result of the operational organisation of the power companies and the geographically spread-out process.
  • SCADA The main tasks for SCADA can be divided into data collection, supervision, control, accounting, planning and follow-up.
  • the part function of the SCADA system that handles supervision, the treatment of measurement values and indications, the supervision of limit values and indications and event and alarm handling are included.
  • Operational limits are supervised and passing of an operational limit result in an alarm in the operational centre. Different methods are used in order to indicate alarms and fault signals, depending on their nature and significance for the operation of the electric power network.
  • the part function of controlling comprises manoeuvring, set point control, blocking and sending of control orders and limit values to local regulation equipment.
  • the nominal limits concern in most cases pure electrical quantities, such as voltages, currents, powers and phase conditions, and are typically set after recommendations from the manufacturer of the units, based on the present design. These recommendations are based on tests of the apparatuses and/or " theoretical calculations of its properties, and margins that should assure a safe operation also at somewhat different operational conditions.
  • measurement values that has not been fetched directly from the system can still be calculated more or less reliably with help of measurement values from the network by applying theoretical models for the processes.
  • the basic functions that are included in EMS are constituted by the functions for production planning, production control, topology determination, state estimation, network calculation functions, safety analysis and possible practising simulators.
  • a good model of the electric power system is required, which is achieved via the functions for topology determination and state estimation.
  • the module for topology determination builds up an electrical model that describes how the nodes and components of the electric power network are electrically connected to each other. All measurement values suffer from larger or smaller errors, and certain measurement values are missing due to faults in equipment or lack of remote terminals for data collection.
  • FACTS components Flexible AC Transmission System
  • FACTS components Flexible AC Transmission System
  • Sekiguchi and Masui have in the European patent application EP 0 853 367 with the title "Electric Power Control System” described a system for remote supervision and regulation, including protection functions in the form of relay protections, of an electric power network.
  • the described embodiment comprises besides collection means for measurement values also processing and memory units, which are connected by a communication network.
  • Data in the described system is handled in digital form and the regulation system for information collection contains a main area (so-called core-area) and a communication area (so-called web-area), and program modules with possibilities to communication in order to control the relay protections.
  • Data and status concerning different relay protections can be graphically shown at a screen, and new programs can be downloaded into the relay protections via the user interface and a communication network.
  • the two patent applications describe in the first place a method to connect and coordinate protection and control equipment in an electric power network.
  • the control units for protection devices and processing units which are connected via a communication network, constitute important parts.
  • the described procedure is based on the use of conventionally available and thereby often utilised information in the operational data network.
  • a device which is designed for to be placed at an electric transmission line and for measurement of parameters associated with a power flow over the line.
  • the device contains besides sensors, which for instance can measure temperature, current and voltage, also a radio transmitter for communication with a receiver.
  • the device can be placed at a transmission line without having to make this voltage free. Data collected via the device on the transmission line is transmitted via radio to the receiver placed at earth potential, for instance in the lower part of the power-line pylon.
  • the patent describes further a method for supervision of the power flow at a number of transmission lines in a switching station by using a number of the above described devices placed at different transmission lines in the station.
  • the receiving station at the ground can beside receiver and antenna also include a processing unit, a memory and a communication device for sending collected, and possibly processed, measurement data on to other units in the electric power system.
  • the described device measures only parameters directly available on or at an electrical conductor surrounded by air.
  • the measurements are performed on a passive component in the electric power network, a line, without intending to measure on an in advance determined critical point, so-called "hot spot".
  • the system contains a one-way information flow from the receiving station of the measurement device to a supervision unit and is utilised as a pure overload protection.
  • the receiving station can control several lines in the same way in the same time, by measurements of identical type. Examples on control of the power flow can be by reconnections in the network or changes of the tap-changer position for transformers with on-load tap-changers.
  • the control of the power flow through supervised transmission lines is based on data collected locally within the switching station.
  • a general problem with supervision of electric power networks according to prior art is that the measurement data that is used does not have any close and safe connection to the actually critical points in the electric power processes in an electric power network. Control is today to a large extent performed by means of limits based on more or less static models and calculations of differing accuracy.
  • a problem with supervision systems according to prior art is that the control of and/or limits for controllable parameters are dependent on calculations and/or models of differing accuracy and reliability. This in turn leads to that, in order to get a safe operation, one has to apply relatively large security margins in the operation of electric power objects and electric power plants, whereby the utilisation does not become absolutely optimum.
  • Another problem with supervision systems according to prior art is that measurements from different types of electric power object rarely are used together to utilise the margins in each electric power object.
  • a general object with the present invention is thus to provide a supervision method and devices therefore, to utilise already existent resources in electric power plants and electric power networks more efficiently.
  • a further object with the present invention is to provide a method and devices that with time enables building-up an experience that further can improve the understanding of complex electric power systems and the operation thereof.
  • Another object is to provide methods and devices to be able, in an earlier stage and/or with higher security, to detect operational disturbances in an electric power system.
  • a further object is to optimise the operation of the electric power system to minimise the impact on the environment that electric power systems have.
  • the present invention can be said to utilise direct measurement of marginal critical quantities in direct connection to interesting point in electric power processes in the different electric power objects. These points are generally located at places difficult to access, such as at high potential in limited spaces, at high potential inside encapsulations with solid or liquid insulation, or at rotating parts.
  • the marginal critical quantities have thereby to be measured at these places difficult to access.
  • the measurements give direct information about actual, now valid operational margins concerning marginal critical quantities and in particular quantities that are both marginal critical and material critical. Information about available margins is transferred to other units within the network or the plant.
  • the electric power plant or electric power network can then be controlled emanating from such actual operational margins from several different units in the plant, which enables a more efficient operation of the electric power plant or the electric power network, and can give decision support for extension of networks by identifying bottlenecks.
  • a fast feedback is achieved if accomplished operational changes do not bring about intended result.
  • the measurements give furthermore new paths for detecting faults in the systems.
  • databases of operational conditions can be built, which then can be used both as support of the operation of the system and for future maintenance, model designing etc.
  • Fig. 1 is an embodiment of an electric power plant according to the present invention
  • Fig. 2 is an embodiment of an electric power network according to the present invention
  • Fig. 3 is an embodiment of an electric power network according to the present invention with different types of electric power units
  • Fig. 4 is an embodiment of an electric power network in several levels according to the present invention
  • Fig.5a and 5b are schematic drawings and diagram showing how temperature margins in electric power objects can be utilised by the present invention
  • Fig.6a to 6d are schematic diagrams showing how time variations in the utilisation of electric power objects can be utilised by the present invention
  • Fig. 7a to 7e are schematic drawings and diagrams showing how operational margins in electric power plants can vary and be utilised by the present invention
  • Fig. 8a to 8e are schematic drawings and diagrams showing how operational margins in electric power objects can vary and be utilised in electric power plants by the present invention
  • Fig. 9 illustrates a communication network and associated information flows according to the present invention
  • Fig. 10 shows a flow diagram for a method according to a first aspect of the present invention.
  • Fig. 11 illustrates an electric power network presenting a so-called bottleneck.
  • An electric power object is a device in an electric power system, which comprises a process or a course of events of electric/electromagnetic type.
  • the electric power object is most often controllable, either internally or by external switching devices, and has via its controllability an influence on electrical parameters in the electric power system, in which the object is present.
  • the group of electric power objects comprises e.g.: electrical machines (motors and generators), transformers, reactors, capacitors and power electronics.
  • An electric power plant is defined in the present description as a group of interconnected electric power objects, which are located within a relatively limited area and are operated in a co-ordinated manner and which preferably belong to the same operator.
  • the operation of the electric power plant can be influenced by the inherent behaviour of the objects as well as an active control by a supervision unit.
  • electric power network is in the present description intended a group of electric power plants and single electric power objects, if any, interconnected by electrical lines, typically distributed over a somewhat wider geographical area than an electric power plant.
  • the operation of the included components are supervised and controlled in a co-ordinated manner, possible also in co-operation with superior, side- existing and/or subordinated electric power networks, by a supervision unit.
  • An electric power network can e.g. be included as a part in a superior electric power network.
  • Electric power unit is used in the following as a composed concept for electric power object, electric power plant and electric power network.
  • the concept electric power system is used in the wide sense of a general system of different electric power units.
  • Measurements at high electrical potential e.g. over 1 kV, or very close to such a high electrical potential, have also to a large extent been avoided earlier.
  • High voltages are present in many electric power objects and space limitations is a common reason to why one does not perform measurements close to these. Encapsulations are often used to screen high potentials and constitute also sometimes an obstacle for a simple supervision of different parameters, in particular in cases where solid or liquid insulation is present.
  • the parameters that are of interest are parameters that have a direct or indirect connection to the operational state of the electric power objects.
  • the parameters are of very differing character. Some of the parameters can be denoted as marginal critical quantities and some of the parameters can be denoted as material critical quantities, and some can be denoted as both margin and material critical quantities.
  • marginal critical quantities are intended quantities that are associated with some kind of limit. If this limit is exceeded, it will have a direct influence on the operation of the electric power object, relatively independent of other quantities. Thus, for these, direct limits can be set-up. If the limit is exceeded, a well-defined damage or influence on the operation is achieved more or less directly. Examples of marginal critical quantities are: temperature, load angle, phase angle, slip, current, voltage, frequency and torque. In current and voltage are also phase quantities associated thereby included. A too high temperature can over a certain limit cause a direct material damage. A phase angle in a synchronous machine has for instance an absolute limit, when the stability of the synchronous machine ceases. Practical limits for such quantities have of course to be set with a certain margin. Voltage can be denoted as a marginal critical quantity, since it has a limit associated with a maximum transmission capacity. If one falls below this limit, the voltage stability in the network is lost.
  • material critical quantities are intended quantities, which in principle also have a limit. This limit can be difficult to determine, since it is dependent of so many surrounding parameters. These limits do often not constitute any really critical limits but can normally at least during a shorter period of time be exceeded without for sure causing a damage or operational disturbance. At longer exceedings are normally a gradually degradation of the material obtained, a shortening of life. Examples of material critical quantities are: temperature, current, partial discharges (PD), vibrations, overtones, minus sequence, zero sequence, rotational speed, air-gap flux and speed. These quantities have often rated values or nominal values for a certain electric power object. It is, however, mostly possible to exceed these nominal values, at least for a shorter time, without causing any immediate damages on the electric power object.
  • a current through a winding in a transformer that exceeds the rated current does not always case a damage. If the winding is cold from the beginning, either as a result of that the transformer earlier has been utilised sparsely, or because of that the temperature of the surroundings is very low, the transformer can withstand a temporary overcurrent without being damaged. If on the contrary the overcurrent is present for a certain time, the winding is probably heated up by time and can at a later occasion reach temperatures that are harmful for the material.
  • the material critical quantities are often related to limits for the marginal critical quantities by more or less complex models and relations. Existing static limits for material critical quantities are normally set with certain, mostly relative large, safety margins.
  • Vibrations constitute a rather typical material critical quantity, for which it is difficult to define any type of exact limit, but instead it has a degrading effect on the material with time. If vibrations are on during a time period, damages will eventually arise, if the level is sufficiently high, i.e. over a limit. It is not the level itself, but more a combination of level and time that gives rise to problems and damages in the case of material critical quantities.
  • a quantity such as temperature can according to the reasoning above be characterised as both marginal critical and material critical. There are values for e.g. polymers, which can not be exceeded without having the material going through a non-reversible process. At the same time, a gradual degradation of the material, i.e. an ageing phenomenon, can occur if the temperature is over another lower level, and the consequence depends in this context both on the time and the level itself. Current can also be placed in this double assignment, as a result of its close connection to the temperature.
  • the temperature is the incomparably most important, since all electric power objects have some sort of temperature dependent margins.
  • FIG. 1 a typical example of an electric power plant 1 is illustrated.
  • the electrical machine 10 comprises a rotating part 17 and a stationary part 19, normally denoted as rotor and stator, respectively.
  • a sensor device 18 At the rotor, there is a sensor device 18 arranged, which measures the temperature of the rotor winding, the rotor current, the vibrations of the rotor and the shaft torque.
  • the sensor device 18 sends measurement data concerning these parameters to a machine control unit 20 via a transfer channel 21 , preferably wireless, e.g. via radio waves.
  • the machine control unit 20 is also responsible for the normal operation and the control of the electrical machine 10.
  • the electrical machines are via connection lines 36 connected to a power electronics unit 12 for e.g. voltage regulation, reactive power control or charging of batteries.
  • the power electronics unit 12 can have one or several terminals and can be connected in series as well as in shunt to the power network.
  • the power electronics unit 12 is provided with a temperature sensor 22, which measure the temperature at certain critical high voltage parts in the unit. Temperature data is transferred to a control unit 24 for power electronics, which otherwise is arranged to control the operation of the power electronics unit 12. The transfer is in this example performed via an IR link or fibre optics 23.
  • Both the power electronics units are furthermore connected to the primary side of a transformer 14 via connection lines 36.
  • a sensor device 26 is arranged in direct connection to the high voltage parts and measures temperatures and current (including phase quantities) on the windings. These measurement values may for instance be transmitted via a combination of radio wave connections and fibre optical communication links 27 to a transformer control unit 28. The secondary winding of the transformer is then connected to an external electric power network via an external plant line 16.
  • the sensor devices 18, 22, 26 are arranged in order to measure marginal critical parameters at places difficult to access. Besides these measurements, also other quantities can be measured at these places, such as material related quantities, e.g. the vibration measurements at the rotors 17. Furthermore, the control devices 20, 24, 28 can obtain results of measurements of parameters from other more conventional places, e.g. stator temperatures or currents and voltages at relatively low potential.
  • the machine control unit 20 processes the measurement data obtained from the sensor device 18. Emanating from this processed data, the machine control unit 20 can control the unit according to predefined action plans. These action plans may e.g. comprise protection and defence functions.
  • the machine control unit 20 extracts also certain information from achieved measurement data, summarises the information in a suitable manner and sends the information further over an information link 30 to a plant supervision unit 32.
  • control units for power electronics 24 control the power electronics units 12 based on the temperature data that has been received from the temperature sensor 22.
  • the control units 24 for power electronics can either, without processing, forward the unprocessed data directly via an information link 30 to the plant supervision unit 32, or directly in the control unit 24 process collected measurement data. If for instance the information link 30 to the plant supervision unit 32 does not work, it is preferable to be able to directly in the control units 24 process measurement data and compare with set-up levels or levels stored in databases in order to take emergency measures, such as bypass switching or disconnection of the power electronics in the unit when needed, if temperature limits are exceeded.
  • measurement data concerning the actual temperature on the power semiconductor from the temperature sensor 22 can, however, in the normal case be sent directly forward to the plant supervision unit 32, where possible decisions about actions can be co-ordinated with other information before decision about measures is taken.
  • the transformer control unit 28 processes, in a similar way as in the machine control unit, the measurement data that is received from the sensor device 26. Emanating from this processed data, the transformer control unit 28 can control the transformer according to predefined action plans. These action plans may e.g. comprise protection and defence functions.
  • the transformer control unit 28 extracts also certain information from achieved measurement data, summarises the information in a suitable manner and sends the information further over an information link 30 to a plant supervision unit 32.
  • the plant supervision unit 32 receives information from the control units 20, 24, 28 of the different electric power objects. In certain cases, the information is processed and adapted, in order to reduce the amount of data that is transmitted, such as the case is e.g. in this example for the machine control units 20 and the transformer control unit 28. In other cases, such as e.g. for the power electronics, the information to the plant supervision unit 32 comprises more or less raw data from the temperature sensor. The plant supervision unit 32 collects the information from the control units 20, 24, 28 and processes this information in order to estimate the present operational margins for the different electric power objects 10, 12, 14. This estimation is performed currently, either continuously or intermittently.
  • the present operational margin for each electric power object 10, 12, 14 is therefore currently updated and can in each moment give a picture of the state of the object and which margins there are to utilise.
  • the plant supervision unit 32 can, emanating from these present operational margins, control the different parts of the electric power plant 1 in an optimum way. Also certain external information can be used. Control information is then sent back to the control units 20, 24, 28 for the different electric power objects, so that the operation of each object 10, 12, 14 is changed according to the overall plan prepared by the plant supervision unit 32.
  • the plant supervision unit 32 is preferably also provided with a communication link 34 to external units, via which external control signals can be received.
  • all included electric power objects comprise measurement sensors.
  • the power electronics 12 should not be temperature supervised, one should in any case want to control these based on the information received from the electrical machines 10 and the transformer 14.
  • the marginal critical quantities are thus utilised to control and regulate the overall operation of the entire electric power plant 1.
  • the large advantages of using precisely present operational margins based on marginal critical quantities measured at places difficult to access will be discussed in more detail below.
  • At least two of the electric power objects are provided with sensors for measurements of marginal critical parameters at places difficult to access, which gives co-ordination advantages, which are discussed in more detail below.
  • FIG. 2 illustrates an electric power network 2 comprising three electric power plants 1.
  • Each electric power plant 1 comprises a plant supervision unit 32.
  • the electric power plants 1 within an electric power network 2 are connected to each other either directly by plant lines 16 or by an electric power object 40 and plant lines 16, which electric power object 40 in turn can be connected to other electric power networks by a network line 52.
  • the electric power object 40 comprises an object control unit 44, which is arranged for information transmission to and from a network supervision unit 46.
  • the network supervision unit 46 is also connected to the plant supervision units 32 of the electric power plants 1 for transmission of information.
  • the network supervision unit 46 is furthermore preferably provided with a communication link 54 to external units.
  • Each electric power plant 1 has an inner structure, similar to the one described in connection with Fig. 1. This inner structure is, for the sake of clarity, only shown for one of the electric power plants.
  • the electric power plant 1 comprises in the illustrated example three electric power objects 40 comprising one object control unit 44 each.
  • the electric power objects 40 are electrically connected to each other by connection lines 36 and outwards through a plant line 16.
  • the electric power objects 40 comprise preferably also sensors 42 for measurement of marginal critical quantities at places difficult to access, which communicates with the object control units 44.
  • the object control units 44 forward the information associated with the measured parameters to the plant supervision unit 32.
  • the information that is transmitted from the plant supervision units 32 to the network supervision unit 46 is based, at least to a part, on the measured marginal critical parameters.
  • the information may consist of operational margins for the plant 1 , other operational information as well as other information.
  • the operational margins can also be gives together with other information, e.g. price information, conditions for the validity of the operational margins etc.
  • the information can thus also include certain external parameters that can be used as external control signals.
  • Other operational information may e.g. consist of reporting of abnormal operational conditions, which e.g. may indicate a closely imminent fault. Normally, no direct information about e.g.
  • the network supervision unit 46 can, emanating from the operational information that is received from the plant supervision units 32, control the operation of the electric power network 2 in an optimum manner. It should also be noted here that the information about operational margins etc. that is used for the network operation is operational margins based on the critical margins that presently has been measured. This means that the decision basis that is offered to the network supervision unit 46 is currently updated, which is why the prerequisites for the operation of the electric power network are changed with time.
  • an electric power network 2 which comprises three electric power units. These electric power units are in this example an electric power object 40, an electric power plant 1 and a subordinated electric power network 2' interconnected by a plant line 36 and a subordinated plant line 16'.
  • the electric power object 40 has a control unit 44 with access to operational margin information concerning the electric power object 40, which control unit 44 communicates with the network supervision unit 46 via a link 30.
  • the electric power plant 1 has a plant supervision unit 32 with access to operational margin information concerning the electric power plant 1 , which plant supervision unit 32 communicates with the network supervision unit 46 via a link 34.
  • the subordinated electric power network 2' has a subordinated network supervision unit 46' with access to operational margin information concerning the electric power network 2', which subordinated network supervision unit 46' communicates with the network supervision unit 46 via a communication link 54'.
  • FIG. 4 shows one more example of how a hierarchical electric power network structure can be formed.
  • An electric power network 2 comprises in this example three primary subordinated electric power networks 2', with associated network supervision units 46'. These primary subordinated electric power networks 2' comprise in turn secondary subordinated electric power networks 2", with associated network supervision units 46".
  • an hierarchical structure can be formed, at the same time as cross connections between different electric power units can give rise to masked systems.
  • Information exchange can also be performed directly between different electric power units, as illustrated by the information links
  • distribution networks are from an hierarchically point of view with respect to its electrical connection formed in a radial manner, while transmission networks mostly have a masked electrical formation.
  • An electric power network with this organisation is possible to apply in all different parts of an electric power system.
  • Generation (production) and use (load) of electric power are obvious application areas for these networks.
  • transmission and distribution networks are interesting for this type of control.
  • Fig. 5a an electric power object in the form of a transformer 60 is schematically illustrated.
  • the transformer manages to transmit a maximum power Pc.
  • This critical power Pc is calculated emanating from constructional considerations concerning the insulation material around the windings and e.g. the temperature of the surroundings. It is stated to withstand a temperature of Tc, over which the material is damaged.
  • a nominal power PN for the transformer is set, which corresponds to a nominal temperature TN for the winding (at continuous operation).
  • a transformer 60' of a type that can be included in an electric power plant according to the present invention is illustrated.
  • the transformer 60' is provided with a temperature sensor 62, which is connected to a control unit 64, which in turn is in communication 68 with e.g. a plant supervision unit (not shown).
  • a plant supervision unit not shown.
  • the transformer 60' is exposed for a lower surrounding temperature than expected, or that a cooling air-flow 66 exposes the transformer for a cooling that is larger than the one the calculations of the critical power Pc is based on. This cooling results in that if the transformer 60' is used at the nominal power PN, the temperature in the winding will only amount to TN'.
  • FIG. 6a the generated power from an alternating current generator during constant operation is shown.
  • a nominal power of PN has been stated, which at continuous operation should correspond to a certain critical temperature in the rotor winding Tc.
  • Fig. 6b the rotor temperature is shown, during the corresponding time period. If the machine now only is required to be in operation during limited time periods, there will be no temperature equilibrium established in the rotor.
  • PN can still not be exceeded without releasing different overloading protections.
  • other control courses may be used.
  • FIG 6c an operational course is shown, where the generator is operated in order to generate a power Po, exceeding the nominal one during limited time intervals.
  • FIG 6d a corresponding diagram over the temperature course in the rotor is shown.
  • An efficient operation of electric power objects and electric power plants can be achieved by utilising the possibilities to measurement of marginal critical quantities at places difficult to access in an electric power system.
  • a well thought-out use of such measurement data can result in reduced loads and improved life times for electric power objects. This can for instance be accomplished by an efficient utilisation of margins existing in the object or by a redistribution of power in plants or networks.
  • a balanced planning between operational safety and operational economy should also include environmental aspects.
  • Today, optimisation algorithms are used at the operation of an electric power system mainly in order to minimise costs, or losses in the network. Optimisation algorithms can also be used in order to make balances between operation safety aspects and economical considerations, and also environmental considerations can be included in this balance.
  • an electric power network 2 comprising three electric power plants 1 , in the figure denoted by A, B and C, each one of which having a plant supervision unit 32.
  • the electric power network 2 further comprises an electric power object 40 and a network supervision unit 46.
  • Fig. 7b illustrates extracted power (broken columns) and power margin (unfilled columns), respectively, for the plants included in the electric power network at a first moment.
  • extracted power from plant B is very close to maximum available power.
  • the plant C has in contrary a good margin. At a possible lack of power in the network, one may therefore advantageously utilise plant C to remedy this.
  • Fig. 7b illustrates the same quantities in the same network, but at another moment.
  • the conditions have now changed.
  • the plant B has now announced that its margin has been increased considerably, e.g. due to that additional electric power objects now have been introduced.
  • the plant C has been affected by operational difficulties in that the surrounding temperature has been strongly raised.
  • the available power margin has therefore decreased considerably.
  • the planning of the measures at an operational disturbance in the entire electric power network should now be changed, so that an efficient utilisation of the margins can be made.
  • Figs. 7b and 7c it might appear as if plant A is the most stable one and very probable has the highest potential for helping managing operational disturbances.
  • available power a short limited time period is, however, illustrated. It here shows that the plant B has a large inertia concerning heating-up at overpower extraction, and thus during a short time can deliver a very large power. The same reasoning is valid also for plant B. Plant A is in contrary very sensitive to overpower extraction and can only increase its available power very marginally, even for shorter periods of time.
  • Figure 11 shows an example of an electric power network with two input points H, J and one load area L, to which there are two main paths for the power to flow.
  • bottlenecks K can appear at the transmission side in that electric power objects have different load capability.
  • the electric power object K is assumed to have a lower load capability and thereby constitute a bottleneck limiting the transmission capacity between the input points (production areas) and the load.
  • different electric power objects can constitute bottlenecks at different moments.
  • FIG. 8a A closely related example concerning optimum capacity utilisation is illustrated by Fig. 8a.
  • an electric power plant 1 is shown, with four electric power objects 40, denoted D, E, F and G.
  • the electric power object D can be connected to external units either through electric power object E or G.
  • electric power object F can be connected to external units either through electric power object E or G.
  • Fig. 8b an operational situation for the plant is shown.
  • Electric power object D produces a power that corresponds to the broken column. This power is brought through electric power object E.
  • the empty columns illustrate as earlier presently available power utilisation.
  • Electric power object F also produces a power, which is brought through electric power object G out to an external network.
  • Fig. 8c the plant is shown at a later occasion. Available power transmission through electric power object E has by some reason been reduced, but is enough for the power produced by F. In the same way, the power from D can be transmitted by utilising the capacity of G by its maximum. A reconnection can in this way protect the total power generation of the plant.
  • Fig. 8d one has tried to optimise the total power generation. By utilising the margins for D and G by its maximum, a smaller increase can be achieved.
  • Fig. 8e shows the situation at a later occasion, where the margins for electric power object F has increased. Now, it is instead advantageous to let the power of F pass E and instead reduce the power of D to the maximum level of G, in order, in a total view, to have a larger power from the plant.
  • the measurements can also be used for operational planning of e.g. programs of measures to be taken at fault situations or temporary load peaks etc.
  • the measurements can also be used for prognosing purposes, which can be used for long term production or network expansion planning.
  • the measurements of marginal critical quantities at places difficult to access constitute as described above the basis of the new way to supervise electric power systems.
  • other types of measurements are in a certain degree necessary in order to refine the decision foundation.
  • Such measurements can e.g. be conventional measurements at places easy to access, or measurements of e.g. material related quantities, topology, position, velocity etc. These measurements can refine the decision foundation that is the basis for the control.
  • Electrical machines comprise motors and generators of different types. Most of the machines are rotating electrical machines comprising rotor, stator and windings belonging thereto.
  • the electromagnetic process in an electrical rotating machine takes in principle place in the gap between the rotating and the stationary parts. Since the conditions in the rotor are more isolated and difficult to estimate, the rotor margins constitute normally the most critical ones in a rotating electrical machine. Quantities measured directly at the rotor, such as current, voltage, phase quantities, temperatures, constitute therefore the most interesting quantities. Also quantities such as shaft torque and partial discharges (PD) can be of interest. Additional quantities that can be of interest to measure are e.g. the mechanical vibrations in the rotor. A changed appearance of the vibration spectrum may indicate incipient mechanical problems, and may also bring about changed operational control, in order to avoid unsuitable breakdowns.
  • a synchronous machine which comprises a current converter device and a rotor provided with windings, can be provided with a co-rotating processing unit, and a likewise co-rotating communication unit for wireless information transmission to a stationary unit.
  • the transmission can appropriately be performed via radio.
  • To the rotor is also at least one co-rotating sensor for measurement of marginal and/or material critical quantities associated with the rotor, for example temperature.
  • a stationary processing unit is connected to a stationary communication means.
  • the stationary communication means is arranged to send and receive data by the wireless information transfer with the co-rotating communication means.
  • a processing unit By placing a processing unit co-rotating with the rotor, one achieves a possibility to local treatment of locally achieved data. Thereby, the amount of data that has to be transferred between stationary and movable parts is minimised.
  • the co-rotating positioning of the processing unit also provides a possibility for autonomous operation of the rotor, in the case of possible interruptions of the communication with stationary parts.
  • the electromagnetic process takes place between the primary and secondary windings.
  • the windings are normally insulated, either by solid or liquid insulation material, which normally sets many of the limits in a transformer.
  • High-power electronics are today used among other things in power transmission systems for high-voltage direct current (HVDC, High Voltage Direct Current) or compensators for reactive power regulation, the most occurring are SVC-devices (Static Var Compensators).
  • Current converter connections for large powers are today mostly made with silicon based thyristors. These connections often demand large reactive powers as a result of that the currents of the alternating current network obtain large phase shift relative to its voltages. This means that the dimensioning of machines for current converter based systems and of current converters has to take reactive power flows into consideration, i.e. reactive losses in machines and reactances of the alternating current network and needs for phase compensation, thus not only to the pure active power flows with more or less negligible active losses.
  • the power electronics components are characterised by small dimensions and fast response, in particular concerning temperature and its derivative.
  • the rated value concerning current depends e.g. of the temperature level in the semiconductor plate itself.
  • Power capacitors as well as the high-voltage lead-throughs that are included in rotating electrical machines, power transformers, reactors and switching means, are both built by dielectric systems, in which the temperature, in particular at so-called "hot-spots", is essential in order to supervise and fully utilise the margins in the electric power objects.
  • the level regarding the temperature limits for semiconductors in power-electronic applications can be different depending on the temperature of the surrounding.
  • the possibility to position a temperature sensor directly at or in connection with the semiconductor can in this context further improve the possibility to utilise its full temperature range, by continuously measuring the temperature directly at the electric power object.
  • the present invention is based on that the control units and the supervision units at the different levels comprise "intelligent" means, which on one hand have certain processing or treatment capacity and on the other hand manage to communicate with each other.
  • the communication between different parts in the systems can be performed in different ways according to prior art and is preferably adjusted to the present needs. For communication, where among other things protection and defence compose an important part, a fast communication is appropriately selected, while communication of data of a more time neutral character can take place over slower media.
  • the communication can thus be different in different parts of an electric power system. Suitable techniques for communication are radio, radio link, the telephony network, signal cables, fibre optical connections, Internet, intranet, satellite connections and communication via carrier frequency connections over the power lines.
  • a control unit 42 thus has a communication link 72A, 72B to a plant supervision unit 32.
  • This communication link 72A, 72B comprises an upward directed channel 74 and a downward directed channel 76. Even these channels can be of different type, since the type of data that is transported is different in the different directions.
  • a communication link 72A between a specific control unit and a plant supervision unit can also be different from another communication link 72B from another control unit to the same or another plant supervision unit.
  • a control unit can also have communication possibilities 75 with more than one plant supervision unit, or communication 77 directly with other control units. The present invention is best utilised if every control unit 42 that provides marginal critical quantities from places difficult to access has a possibility to a double directed communication in some way.
  • Communication links can exist between supervision unit at different levels 80, 82 as well as between supervision units on the same level 78. In order for the system to operate satisfactory, also here a possibility for two-way information exchange between the different included supervision units is required. External data can also advantageously be added to the system via an external link 81 at one or several levels.
  • the advantages concerning the operational management by the present invention arise mainly due to the availability of better input data, direct measured marginal critical quantities from places difficult to access in the electric power system.
  • the access to real measured data in contrast to calculated or estimated, creates a refined resolution. This in its turn influence functions such as optimum operation via for instance OPF (Optimal Power Flow), and functions for loss minimising, static operational security analysis and dynamic operational security analysis.
  • OPF Optimal Power Flow
  • the operational point can be controlled for creating suitable safe margins to technical limitations, e.g. thermal limits, voltage stability limits or transient stability limits.
  • one can create an economical optimum operation of the network either by a centralised production planning or by a deregulated electric market where the price governs.
  • the present invention provides also a new dynamic dimension.
  • resources with dynamically varying capacity are now provided. Co-ordinated supervision of loads, where the access to internally measured data creates new possibilities concerning intelligent load control, from occasion to occasion.
  • Loss minimising based on actual data gives also environmental advantages by lower total losses in the electric power system.
  • the present invention offers possibilities to a better dimensioning of components, i.e. a smaller size measured in MVA, by enabling an operational managing closer to the real present margins or limits. This as a result of the access to real measured data, in contrary to estimated ones. If one e.g. to a generator of 1 ,0 power units earlier has connected a transformer of 1.2 power units, one may now reduce the size by being able to supervise the condition in the transformer in a better way. The condition relates above all to the temperature of the active parts within the encapsulation and insulation.
  • the transformer can instead for instance be dimensioned for 1.1 power units. The smaller amount of material that is needed for this transformer thereby gives environmental advantages.
  • the invention facilitates the introduction of adaptive relay protections, which can include changes of the settings of the relay protections with regard to locally measured quantities from places difficult to access as well as based on input signals (from outside). Control signals that arrives from outside can be based on technical as well as economical judgements (or combinations of technical and economical). Resetting of relay protections enables an utilisation of available resources based on present margins, and not in advance set values. This should in most cases enable an increased transmission capability, but above all create a safer operation with regard to the present operational situation - and an improved protection of sensitive components in the network (direct measured values, not estimated).
  • Adaptive relay protection in this application relates (in the first case) protections for individual electrical components such as for example electrical machines and transformers.
  • the present invention comprises preferably also a database creation.
  • databases have mainly estimated operational data been used, estimated according to different models. Directly measured operational data from places difficult to access gives a considerably better decision foundation since the data is richer and more consistent.
  • Databases should be present at different levels in the electric power system.
  • databases are indicated by the reference number 70, and databases of different kinds are thus preferably present in control units 42, plant supervision units 32 as well as network supervision units 46. The content in these databases may, however, differ considerably.
  • the databases comprise preferably data associated to different operational situations for the electric power object.
  • the control units 42 may e.g. comprise historical databases that enable local control of the electric power object if an interruption occurs in the communication system.
  • control for instance regarding co-ordinated voltage regulation within an electric power plant is suitably performed via plant supervision units 32.
  • Corresponding control can be performed at different hierarchic levels in an electric power system.
  • the need of local historical databases can be used in order to improve the control of parts of the electric power network if an interruption arises in the communication system.
  • Interruptions in the transmission of information concerning the operation of the electric power system can arise at different levels in the electric power supervision system. These interruptions can depend on interruptions in the communication systems between different parts or in that certain parts of an electric power network electrically collapses, a so-called blackout.
  • Two interesting cases can be exemplified by communication interruptions between individual electric power objects and its superior units or between one electric power plant and the rest of the electric power network.
  • the possibilities to control the production of load in a subarea via the historical database of the network supervision unit in the isolated electric power plant or in the isolated part network can be mentioned.
  • the subarea is from a communication point of view isolated from hierarchically superior network supervision units.
  • a too conservative operation of machines and plant parts can be avoided until the point when the communications with superior network supervision unit can be guaranteed again.
  • Another related example of a situation when historical databases can be utilised is so-called island operation, when individual areas in the power system, often as a result of a large disturbance, operates autonomously during a time until the different island again can be synchronised.
  • a problem with conventional machine protections and machine limiters according to prior art is that they in many cases are based on rough static models about loss generation and loss conduction and temperature rise. In order for a protection to be obtained also for rather extreme conditions, large safety margins have to be used, and furthermore, the actual conditions such as variation in the temperature of the surroundings are considered very little.
  • a rotating machine is according to the invention appropriately equipped with both a rotating and a stationary processing unit in order to collect measurement data from the stator as well as the rotor, which in this context is a place difficult to access. The new possibilities for collection and processing of measurement data creates clearly improved conditions concerning autonomous operation of the machine at disturbances in the electric power system as well as the communication system.
  • an autonomous operating generator can be utilised for scheduled (co-ordinated) voltage regulation, at least during limited periods of time, and until the communication system is reinstated. This can be achieved e.g. by combining information about present time and day of the week with information about earlier control during similar conditions stored in the database and extrapolated data from the operation of the electric power object before the disturbance. This may also include a locally controlled overload of an autonomously operating generator, which also may help in maintaining the voltage stability in the electric power network.
  • a further example of autonomous control can be constituted by a co-ordinated utilisation of reactive resources in an isolated electric power network. Assume that an area has become electrically isolated after a disturbance and that there is a lack of reactive power. Generally, power electronics can be overloaded during a relatively short time in relation to electric machines. There might, however, be an interesting potential to immediately after the disturbance utilise the power electronics as much as it is possible by measuring the temperature directly at the semiconductor circuit and utilise the presently available temperature margin in order to so to say "buy time" in order to manage to carry through other measures, and in such a way reduce the risk for a more extensive disturbance.
  • the measures that are taken in the isolated electric power network is based on collection of present data from different electric power objects and the information is suitably co-ordinated in a network supervision unit present in the part network.
  • the main tasks of the network supervision unit is to guarantee a reliable and economically optimum operation of the network, while it during disturbances of the described type changes over to prioritise operation safety aspects.
  • additional space for reactive power production in connected synchronous generators can be created, which may help to maintain the voltage regulation and supply the most important loads until the part network once more can be synchronised with the rest of the electric power system. This may, however, lead to increased costs, for instance by delivery reliability agreements with customers.
  • the created databases can also be used for technical supplementary services, for instance in the form of support at planning and pricing of production resources, voltage regulation, reactive reserves, frequency regulation and immediate and fast active reserves.
  • Information about access to and pricing of support services is a relatively new request as a result of the creation of deregulated electrical markets. Access to information about how generators and other electric power objects have been loaded and how close to the limits they have been run and how much overload they may handle, respectively, is very interesting information in connection with the creation of such databases. Different interested parties will in this context have different, and sometimes competing, interests. As example can be mentioned differences in interests and requests concerning responsibility distribution between owners of production plants, owners of transmission resources and independent system operators. By collecting measurement data and building up this type of operational databases, a better overview of for instance the costs associated with reactive power production can be obtained. The access to directly measured operational data from places difficult to access constitutes a very important information source concerning the estimation of the real cost picture.
  • This information is in large parts lacking today, in particular for waterpower units.
  • the specific costs, increased wear etc., that this brings about are, however, often unclear for the owner of the unit.
  • Temperature data and levels of partial discharges measured primarily at places difficult to access, create an improved basis for planning of maintenance and reinvestments in existing plants, and improved estimations of the life of the components.
  • knowledge about e.g. which temperatures that windings in a rotor and transformer windings really have been exposed for is provided. Earlier have only estimations of these temperatures been made by different more or less well-made thermal models of the components. Also the temperature in the stator is of interest. These real values may thereby be collected in a database and be utilised as a log of the thermal history. This creates possibilities to e.g.
  • bath tub curves for respective supervised component, which describes how the probability for faults is changed with the ageing of the component.
  • Such bath tub curves state the fault frequency as a function of operation time and the access to reliable " bath tub curves " creates hereby improved possibilities to a good maintenance planning.
  • the maintenance plans are then based on the real need and the knowledge about this can give a feedback to owners as well as component manufacturers. Ageing phenomena and life can thus be continuously supervised, which reduces the need of maintenance.
  • the lifetime supervision can also be used in order to be able to predict necessary reinvestments in a reliable way in advance. All told, this leads to a better capital administration, since very large amounts are invested in components in the electric power systems.
  • the input signal from somewhere to ask for or demand access to overload capacity for any electric component can be based on the need of improved operational safety or motivated by economical terms, for instance increased transmission capacity.
  • the basis for and the balancing between different types of needs, technical, economical or environmental, is in this context of subordinated importance, but can be seen forming a control signal.
  • This control signal can be a request for access against compensation as well as a demand for access at risk for serious and more extensive consequences if the operational reliability can not be maintained.
  • the state estimator constitutes an important part in the remote control system and is a basis for different decision foundation by describing the present state in the electric power system. The state estimation is thus a basic function for the more calculation- oriented functions that are included in the EMS/DMS systems.
  • the purpose with using estimation is to extract the best estimation about the present
  • the estimation can therefore be said to constitute a filtering of collected raw data from the electric power system.
  • the systematic process concerning the filtering of raw data results in "losses" in information, which leads to that there is needed extra input data to the estimation process in order to completely determine the present state in the electric power network.
  • unknown state variables are intended non-measured as well as measured but non- filtered (estimated) measurement values.
  • the estimation can simplified be described as the solution of the overestimated equation system that arises when the number of measurement values exceeds the number of unknown state variables that has to be determined.
  • Static methods are primarily for determination of the power load. This in its turn is primarily intended to be used for studying static or slowly varying courses of events in the electric power system.
  • Power flow data is continuously provided by state estimation based on real time data, which are sent to the network supervision units and constitute the basis for most calculations that are performed in the control centres.
  • Dynamic state estimation is, as the name states, related to transient or dynamic courses of events in the electric power network. This is used in cases where considerations should be taken to the dynamics of the components that are included in the electric power system. As example can be mentioned studies of co-operation between the turbine regulation and the frequency and voltage regulation belonging to generators.
  • the present invention gives also possibilities for an improved topology handling, in particular together with time labelling of data.
  • measurement data can for instance be sorted in respect of data measured before and after a topology change, respectively.
  • Such a topology change can for example be a fault that has led to that a switch has disconnected a line. This improves the possibilities to good estimation since the estimation is performed on only one topology and not by a mixture of measurement data belonging to different topologies.
  • the time labelling can for instance be based on the time signal from the GPS system (Global Positioning Satellite).
  • the system consists of 24 satellites and can provide equipment with a time signal that is synchronised within 0.2 microseconds ( ⁇ s) against a world standard time (UTC, Coordinated Universal Time).
  • UTC Coordinated Universal Time
  • the utilisation of time labelling by utilising the time signal from GPS satellites is described at several places in the literature (se e.g. "Power system relaying" by S.H. Horowitz and A.G. Phadke, Research Studies Press Ltd & John Wiley & Sons Inc., pp. 287-289).
  • collected measurement data can be sorted in time order, careful comparisons can be performed and phase quantities calculated.
  • the time signal of the GPS satellites has an accuracy of better than one microsecond, which if it is connected to the collection of measurement data creates possibilities to determine if a certain measurement value is collected before or after that an event has occurred.
  • One of the reasons for that time synchronised measurements data has become so interesting is the possibility to obtain corresponding phasor quantities from collected measurement data concerning alternating current quantities.
  • phasor quantities which represent the measurement value for alternating current quantities to both amount and phase angle and to be able to compare measurement values from different localisations in the electric power network, a very good time synchronisation is required.
  • a refined model building can also be obtained via the basis of the topology handling and data collection.
  • the access to new operational data measured at places difficult to access and an improved topology handling gives possibilities to a dynamic updating of models included in the power system model.
  • the access to new types of measurement data is particularly interesting, e.g. currents in damping windings in electrical machines, and improved topology handling by e.g. exact time labelling
  • GPS Global System
  • a reliable and good model building is particularly important since this model of the electric power system constitutes the basis for many other functions within the EMS/DMS group (operational reliability and operational safety).
  • the collection of data to a network supervision unit creates possibilities to create a dynamically updated model of the electric power system. This is, however, nothing principally new against earlier used methods for data collection and topology determination.
  • the unique for the present invention comes from the improved possibilities for collection of new operational data measured at places difficult to access.
  • collection of currents and voltages from direct measurement on the rotor in electrical machines.
  • These new data can be utilised for dynamically updating parameters in models of the electric machine, which earlier in the best case were based on indirect measurements, for instance from the starting- up of the machine.
  • a further interesting application is the possibilities to change parameters in the model based on the present, directly in the machine, measured temperature, which creates more exact models. If one furthermore uses the lifetime information that also is available by the historical database, ageing phenomena can also be included in the models.
  • the present invention also involves improvements concerning fault indications and the handling of faults. Improved possibilities for remote control can be based on combinations of locally measured quantities and global control signals.
  • the access to measurement data from places difficult to access can furthermore discover fault states in the electric power network earlier, safer and more reliable than before. It is the immediate nearness to the electric/electromagnetic courses of events by the access to measurement data from places difficult to access that gives an improved picture concerning fault indications for the supervised electric power objects. Detection of e.g. damages on components or erroneous operational conditions in the electric power network can thereby be improved.
  • a drop-out of a slot in a rotor is an example of a fault case that now relatively easily should be detectable, which earlier would have been very complicated.
  • Detection of fault states can now be made by direct measurement of operational data at places difficult to access. Examples on this are currents in damping windings and levels of partial discharges (PD) in electric machines, which also can be used to detect fault states in the network.
  • Other new operational data that can be used for detection of fault states are vibrations, including resonance phenomena such as for instance ferro-resonance and SSR (sub-synchronous resonance), and measurement of overtones and asymmetric components (minus sequence and zero sequence) in electrical equipment.
  • Possibilities for remote manoeuvring based on information collected from now available measurement data, collected at places difficult to access in the electric power system can be seen as an improvement of the fault handling system.
  • the possibilities to take correct measures at faults are improved.
  • Remote manoeuvring can for instance be used for sectioning the network at operation changes, disturbances etc., which by means of the now available measurement data from so-called places difficult to access can lead to improved possibilities to overload components during (determined) time periods in a controlled way.
  • the possibilities for overloading certain components in a co-ordinated and supervised manner leads to improved possibilities and may thereby create more time to carry out necessary reconnections after the occurrence of the disturbance, which leads to an improved operational reliability in the electric power system.
  • the communication between the different units comprises normally transferring of data and/or control information.
  • the available communication capacity has to be dimensioned so that there during normal conditions is free capacity.
  • Such free capacity can e.g. be utilised for downloading of software and/or retrieving of locally stored historical database information.
  • Such information can be transferred in the time slots not utilised for data collection and communication of these data and control information between different units.
  • Downloading of software may preferably occur in erasable PROM (Programmable
  • Read-Only Memory i.e. programmable ROM or "flash"-memories. Erasable
  • EPROM Programmable Read-Only Memory
  • EPROM Electrically Erasable PROM
  • EEPROM Electrically Erasable PROM
  • the utilised protocol for information transfer between the different units should include some type of blocking of the downloading of software and the updating of databases when the capacity is needed in order to guarantee a reliable and economically optimum network operation. Blocks with data for the downloading of software and the updating of databases can then preferably be given a lower priority and will thus not always be sent immediately. Also in this context, it is important to guarantee that the updating of databases takes place with a lower priority than other more important information transfers.
  • the updating should also be associated with a similar secrecy procedure as earlier discussed, in order to guarantee that only authorised units can have access to these data.
  • the need of information transferring can be limited by only transferring changes in measurement data or operational margins. This leads to a reduced need for transferring capacity, i.e. a lower need of performance of the communication system, which may result in that cheaper solutions can be used. If stationary conditions prevail, ideally no communication has to take place.
  • the principles for how these changes should be communicated are stated in the protocols that are valid for the communication network. This is above all true for measurement values, which rarely are changed, or operational margins for larger units, where small changes do not come through within a short time.
  • the reduced transfer-need can of course also be utilised for the downloading of software and the updating of databases mentioned above.
  • An important feature in a system according to the present invention is that information concerning the operation is spread all around in the system, in order to keep all information as updated as possible.
  • the different nodes in the communication system i.e. the supervision units and the control units also act as information filters.
  • a control unit it can e.g. be interesting to have data concerning separate parts of an electric power object, e.g. the present shaft torque of a rotor, the level of partial discharges in the rotor or the present winding temperature of a transformer.
  • this type of information can still be of interest, in particular if the processing capacity in the control unit is low.
  • control unit may very well supply the plant supervision unit by more summary information, but that still is based on the directly measured information.
  • the control unit acts as an information filter that only lets information that is of importance to the receiver through. If one continues upwards in the hierarchic chain to a network supervision unit, too detailed information can often constitute an encumbrance. Here are probably only different types of summary operational margins for a whole plant of greatest interest.
  • the plant supervision unit here acts to process the information received from the control units to margins that are valid for the plant as a whole.
  • a flow diagram which represents a method according to one aspect of the present invention.
  • the process begins in step 100.
  • step 101 a direct measurement is performed of at least a first marginal critical quantity at a first place difficult to access at a first electric power object.
  • step 102 in parallel with step 101 , a direct measurement is performed of at least a second marginal critical quantity at a second place difficult to access at a second electric power object.
  • the first and the second electric power object belong preferably to different object types.
  • step 103 and 104 respectively, the respective marginal critical quantities are processed to a first amount of data and a second amount of data, respectively.
  • the first and/or the second amount of data may consist of the measurement values directly, whereby step 103 and/or 104 is totally excluded.
  • step 105 and 106 respectively, the amounts of data are transferred to a supervision unit.
  • the supervision unit uses in step 108 the transferred amounts of data in order to estimate different present actual operational margins for the plant or network, in which the electric power objects are included.
  • step 110 the electric power plant or network is controlled based on at least one of the estimated present actual operational margins.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

La présente invention porte sur la mesure directe de quantités critiques marginales en connexion directe avec des points étudiés dans des processus d'alimentation électrique de différents objets (10, 12, 14) électriques. Ces points se trouvent généralement à des endroits difficiles (haute tension, pièces (17) rotatives. Les mesures donnent des informations directes sur les marges opérationnelles en cours de validité, concernant des quantités critiques marginales et notamment des quantités marginalement et matériellement critiques. Les données concernant les marges disponibles sont transférées vers d'autres unités (32) du réseau ou de l'installation (1). L'installation (1) électrique ou réseau électrique peut être ensuite commandé sur la base de ces marges opérationnelles réelles à partir de différentes unités (10, 12, 14) de l'installation (1), ce qui permet un fonctionnement plus efficace. Les mesures permettent également de détecter des défaillances dans les systèmes, et des bases de données des états opérationnels peuvent être établies, lesquelles peuvent être ensuite utilisées comme support pour le fonctionnement du système et pour la maintenance future, la modélisation, etc.
PCT/SE2000/001606 1999-08-27 2000-08-23 Surveillance d'installations electriques WO2001017092A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU68845/00A AU6884500A (en) 1999-08-27 2000-08-23 Electric power supervision

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
SE9903026A SE9903026L (sv) 1999-08-27 1999-08-27 Intelligent synkronmaskin
SE9903037A SE9903037L (sv) 1999-08-27 1999-08-27 Materialutnyttjande växelströmsmaskiner
SE9903026-4 1999-08-27
SE9903037-1 1999-08-27
SE9904476A SE516801C2 (sv) 1999-08-27 1999-12-08 Förfarande för fjärrkontroll av elkraftsystem, samt elkraftsystem
SE9904476-0 1999-12-08

Publications (1)

Publication Number Publication Date
WO2001017092A1 true WO2001017092A1 (fr) 2001-03-08

Family

ID=27355989

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE2000/001606 WO2001017092A1 (fr) 1999-08-27 2000-08-23 Surveillance d'installations electriques

Country Status (3)

Country Link
AU (1) AU6884500A (fr)
SE (1) SE516801C2 (fr)
WO (1) WO2001017092A1 (fr)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004012327A1 (fr) * 2002-07-31 2004-02-05 Sydkraft Ab Machine electrique
WO2007084037A1 (fr) * 2006-01-23 2007-07-26 Abb Technology Ltd. Station de conversion et procédé pour la commander
WO2008144860A1 (fr) * 2007-05-29 2008-12-04 Siemens Ltda Système de surveillance et de commande à distance de régulateurs de tension
WO2009019080A2 (fr) * 2007-08-08 2009-02-12 Robert Bosch Gmbh Réseau de bord pour un véhicule à moteur
US8803363B2 (en) 2012-04-16 2014-08-12 Temporal Power Ltd. Method and system for regulating power of an electricity grid system
US9083207B1 (en) 2014-01-10 2015-07-14 Temporal Power Ltd. High-voltage flywheel energy storage system
US9325217B2 (en) 2010-06-08 2016-04-26 Temporal Power Ltd. Flywheel energy system
EP3125452A1 (fr) * 2015-07-28 2017-02-01 LSIS Co., Ltd. Système de commande de données
US9847641B2 (en) 2003-08-15 2017-12-19 Beacon Power, Llc. Methods, systems and apparatus for regulating frequency of generated power using flywheel energy storage systems with varying load and/or power generation
CN108899796A (zh) * 2018-09-05 2018-11-27 长园共创电力安全技术股份有限公司 一种开关柜智能操控装置
US10508710B2 (en) 2012-11-05 2019-12-17 Bc New Energy (Tianjin) Co., Ltd. Cooled flywheel apparatus having a stationary cooling member to cool a flywheel annular drive shaft

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3824857A (en) * 1972-08-07 1974-07-23 Electric Machinery Mfg Co Temperature measuring system for rotating machines
GB1470692A (en) * 1973-06-18 1977-04-21 Skoda Np Electric probe for wireless measuring of the temperature of a transformer winding
US4140999A (en) * 1976-05-03 1979-02-20 Robertshaw Controls Company Transformer hot spot detection system
US5257863A (en) * 1992-07-30 1993-11-02 Electric Power Research Institute, Inc Electronic rotor temperature sensor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3824857A (en) * 1972-08-07 1974-07-23 Electric Machinery Mfg Co Temperature measuring system for rotating machines
GB1470692A (en) * 1973-06-18 1977-04-21 Skoda Np Electric probe for wireless measuring of the temperature of a transformer winding
US4140999A (en) * 1976-05-03 1979-02-20 Robertshaw Controls Company Transformer hot spot detection system
US5257863A (en) * 1992-07-30 1993-11-02 Electric Power Research Institute, Inc Electronic rotor temperature sensor

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"AUTOMATISERING OCH FJARRSTYRNING", AUTOMATISERING OCH FJAERRSTYRNING, XX, XX, 1 January 1900 (1900-01-01), XX, pages 305 - 324, XP002932743 *
"KRAFTSYSTEMET I IT-AALDERN", KRAFTSYSTEMET I IT-AALDERN, XX, XX, 1 January 1900 (1900-01-01), XX, pages 391 - 406, XP002932742 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7242166B2 (en) 2002-07-31 2007-07-10 Sydkraft Ab Electric machine
AU2003245234B2 (en) * 2002-07-31 2008-02-21 E. ON Sverige AB Electric machine
WO2004012327A1 (fr) * 2002-07-31 2004-02-05 Sydkraft Ab Machine electrique
US7498775B2 (en) 2002-07-31 2009-03-03 E.On Sverige Ab Electric machine
US9847641B2 (en) 2003-08-15 2017-12-19 Beacon Power, Llc. Methods, systems and apparatus for regulating frequency of generated power using flywheel energy storage systems with varying load and/or power generation
EP1977496A4 (fr) * 2006-01-23 2011-01-05 Abb Technology Ltd Station de conversion et procede pour la commander
WO2007084037A1 (fr) * 2006-01-23 2007-07-26 Abb Technology Ltd. Station de conversion et procédé pour la commander
EP1977496A1 (fr) * 2006-01-23 2008-10-08 ABB Technology Ltd Station de conversion et procede pour la commander
US8228694B2 (en) 2006-01-23 2012-07-24 Abb Technology Ltd. Converter station and a method for control thereof
WO2008144860A1 (fr) * 2007-05-29 2008-12-04 Siemens Ltda Système de surveillance et de commande à distance de régulateurs de tension
WO2009019080A2 (fr) * 2007-08-08 2009-02-12 Robert Bosch Gmbh Réseau de bord pour un véhicule à moteur
WO2009019080A3 (fr) * 2007-08-08 2009-04-02 Bosch Gmbh Robert Réseau de bord pour un véhicule à moteur
US9325217B2 (en) 2010-06-08 2016-04-26 Temporal Power Ltd. Flywheel energy system
US8803363B2 (en) 2012-04-16 2014-08-12 Temporal Power Ltd. Method and system for regulating power of an electricity grid system
US10508710B2 (en) 2012-11-05 2019-12-17 Bc New Energy (Tianjin) Co., Ltd. Cooled flywheel apparatus having a stationary cooling member to cool a flywheel annular drive shaft
US9083207B1 (en) 2014-01-10 2015-07-14 Temporal Power Ltd. High-voltage flywheel energy storage system
US9362801B2 (en) 2014-01-10 2016-06-07 Temporal Power Ltd. High-voltage flywheel energy storage system
CN106411147A (zh) * 2015-07-28 2017-02-15 Ls产电株式会社 数据控制系统
US9948105B2 (en) 2015-07-28 2018-04-17 Lsis Co., Ltd. Data control system
CN106411147B (zh) * 2015-07-28 2019-04-30 Ls 产电株式会社 数据控制系统
EP3125452A1 (fr) * 2015-07-28 2017-02-01 LSIS Co., Ltd. Système de commande de données
CN108899796A (zh) * 2018-09-05 2018-11-27 长园共创电力安全技术股份有限公司 一种开关柜智能操控装置
CN108899796B (zh) * 2018-09-05 2020-09-18 长园共创电力安全技术股份有限公司 一种开关柜智能操控装置

Also Published As

Publication number Publication date
SE9904476D0 (sv) 1999-12-08
SE9904476L (sv) 2001-02-28
SE516801C2 (sv) 2002-03-05
AU6884500A (en) 2001-03-26

Similar Documents

Publication Publication Date Title
US11652365B2 (en) Highly flexible electrical distribution grid edge energy manager and router
Sayed et al. SCADA and smart energy grid control automation
US20230291230A1 (en) Highly flexible, electrical distribution grid edge energy manager and router
Zidan et al. Fault detection, isolation, and service restoration in distribution systems: State-of-the-art and future trends
US9112381B2 (en) Method and apparatus for managing the distribution of electrical energy in a power distribution grid
Jiang et al. A vision of smart transmission grids
WO2001017092A1 (fr) Surveillance d'installations electriques
Roberts Network management systems for active distribution networks. A feasibility study
Collinson et al. Solutions for the connection and operation of distributed generation
Jose et al. Substation automation system for energy monitoring and control using SCADA
Dolezilek et al. Practical applications of smart grid technologies
Leelaruji et al. State-of-the-art in the industrial implementation of protective relay functions, communication mechanism and synchronized phasor capabilities for electric power systems protection
WO2001017085A1 (fr) Machine a courant alternatif dans laquelle la temperature des materiaux est utilisee
WO2001017084A1 (fr) Machine synchrone intelligente pourvue d'un capteur rotatif et d'une unite de traitement
Skok et al. System integrity protection schems for future power transmission system using synchrophasors
Venkatanagaraju et al. Mitigation of power system blackout with microgrid system
Ruppert et al. Inverter-Based Radial Distribution System and Associated Protective Relaying
Glinkowski et al. 10 Microgrids
US20230098127A1 (en) Method for controlling an energy network, agent device, network control arrangement and system
Pacheco et al. Power management system in an industrial plant
Preston et al. Utilizing IEC 61850 for a Power Management System of an Offshore Platform: Copyright Material IEEE, Paper No. PCIC-2017-34
Ha et al. Loss minimization and load balancing in a distribution network
Misak et al. Hybrid Off-Grid Systems Using Renewable Energy Sources
Kuzle Review of various technologies of smart grid management for increasing the flexibility of the power system and enabling mass integration of renewable energy sources
Bertsch et al. Enhanced reliability and other benefits with online security assessment

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP