WO1999014093A1 - Method of optimizing train operation and training - Google Patents

Method of optimizing train operation and training Download PDF

Info

Publication number
WO1999014093A1
WO1999014093A1 PCT/US1998/018823 US9818823W WO9914093A1 WO 1999014093 A1 WO1999014093 A1 WO 1999014093A1 US 9818823 W US9818823 W US 9818823W WO 9914093 A1 WO9914093 A1 WO 9914093A1
Authority
WO
WIPO (PCT)
Prior art keywords
train
determining
operating parameters
locomotive
engineer
Prior art date
Application number
PCT/US1998/018823
Other languages
French (fr)
Inventor
Stephen K. Nickles
Michael J. Hawthorne
John E. Haley
Bryan M. Mclaughlin
Marshall G. Beck
Original Assignee
New York Air Brake Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New York Air Brake Corporation filed Critical New York Air Brake Corporation
Priority to CA002303281A priority Critical patent/CA2303281C/en
Priority to AU95674/98A priority patent/AU753354B2/en
Priority to BR9814278-0A priority patent/BR9814278A/en
Priority to EP98949330A priority patent/EP1017578A1/en
Publication of WO1999014093A1 publication Critical patent/WO1999014093A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T17/00Component parts, details, or accessories of power brake systems not covered by groups B60T8/00, B60T13/00 or B60T15/00, or presenting other characteristic features
    • B60T17/18Safety devices; Monitoring
    • B60T17/22Devices for monitoring or checking brake systems; Signal devices
    • B60T17/228Devices for monitoring or checking brake systems; Signal devices for railway vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T13/00Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems
    • B60T13/10Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems with fluid assistance, drive, or release
    • B60T13/66Electrical control in fluid-pressure brake systems
    • B60T13/665Electrical control in fluid-pressure brake systems the systems being specially adapted for transferring two or more command signals, e.g. railway systems
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/024Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system in which a parameter or coefficient is automatically adjusted to optimise the performance

Definitions

  • the present invention relates generally to locomotive display and more specifically to a method of optimizing train operations and training and its use with, for example, a Locomotive Engineers Assist Display and Event Recorder (LEADER) .
  • LEADER Locomotive Engineers Assist Display and Event Recorder
  • the LEADER System is a real-time, enhanced version of the Train Dynamics Analyzer (TDA) , a long standing Locomotive Engineer training tool offered by the Train Dynamics Services Group of New York Air Brake.
  • LEADER has the ability to display a real-time or "live" representation of a train on the current track, the trackage ahead, the dynamic interaction of the cars and locomotives (both head end and remote) , and the current state of the pneumatic brake system.
  • TDA Train Dynamics Analyzer
  • LEADER has the ability to display a real-time or "live" representation of a train on the current track, the trackage ahead, the dynamic interaction of the cars and locomotives (both head end and remote) , and the current state of the pneumatic brake system.
  • LEADER will allow insight into the effect of throttle changes and brake applications throughout the train providing feedback and information to the Locomotive Engineer not currently available.
  • the information LEADER offers provides an opportunity for both safer and more efficient train handling leading to enormous potential economic benefits.
  • the LEADER System has all the necessary information to predict the future state of the train given a range of future command changes (what if scenarios) . With this ability, LEADER can assist the railroads in identifying and implementing a desired operating goal; minimize time to destination, maximize fuel efficiency, minimize in train forces, (etc.) or a weighted combination thereof. LEADER will perform calculations based on the operational goal and the current state of the train to make recommendations to the Locomotive Crew on what operating changes will best achieve these goals.
  • the TDA functionality was enhanced to assist in training Locomotive Engineer how to better handle their trains. Designs of simulators with math models are shown in U.S. Patents 4,041,283; 4,827,438 and 4,853,883. Further capability was added to investigate accidents by playing the event recorder data through the TDA, monitoring critical physical parameters. Through the years data was collected from instrumented trains and laboratory experiments, allowing the models used by the TDA to be refined. On board data collection for off-loading is shown in U.S. Patents 4,561,057 and 4,794,548. As more Locomotive Engineers became familiar with the TDA display through training sessions, it became apparent that a real time version of the TDA in the cab of a locomotive would offer substantial benefits in improved train handling. Improved train handling would in turn foster safety and economic benefits. Earlier designs for on board computer controllers is shown in U.S. Patent 4,042,810 with a description of math models.
  • the LEADER system provides safe and effective control of a train through display or control of the dynamically changing parameters. It accurately provides train speed within designated speed limits. It maintains in-train coupling forces with safe limits to prevent train break-in-twos . It maintains safe levels of lateral forces between the wheels and the rails of all cars to prevent cars from departing from the track and derailing. It provides control of slack action for both draft and buff between cars to reduce damage to valuable lading and to prevent potential train separation or break-in-twos. It maintains train stop and slow downs to prevent the train from entering unauthorized territories that could cause accidents with other train traffic. It determines the optimum locomotive throttle setting and train brake application to minimize fuel consumption and wear of brake shoes and wheels.
  • a method of optimizing train operation includes determining conditions of location, track profile and train forces of the train. Next, a set of preliminary train restraint operating parameters are determined from the determined conditions. Also, at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination is determined. The determined set of preliminary train operating parameters are weighted and combined. Optimized train operating parameters are determined from the weighted and combined preliminary train operating parameters. The determination of whether optimization should be performed is made from train location track and profile. This includes determining the location of train with respect to one or more of hill, valley, curve, signal and siding.
  • Determining optimized operating parameters includes determining dynamic and fluid braking.
  • the fluid braking is determined individually for each locomotive and car in the train which can be individually controlled.
  • the dynamic and fluid braking for each locomotive will be determined for each locomotive individually.
  • Dynamic and fluid braking may be one of the sets of the preliminary train optimizable operating parameters and will be weighed and combined with the other preliminary train operating parameters.
  • the weighing of the dynamic and fluid braking is a function of location on the track profile.
  • the train operating parameters include one or more of train fluid braking, locomotive fluid braking, locomotive dynamic braking and locomotive propulsion.
  • One of the train optimized operating parameters is shutting down or restarting the propulsion of individual locomotives.
  • the optimized operating parameters may be displayed and/or the train controlled to the determined optimizing parameters.
  • Determining the preliminary train restraint operating parameters includes one or more of speed limits, slow orders, speed restriction zones, meets and passes, track occupancy permits, general operating bulletins, drawbar limits and slack action limits.
  • the preliminary train optimizable parameters are determined using the operational restraints.
  • the method also includes determining train characteristics.
  • the train characteristics for each car includes one or more of length, weight, position of the train, braking equipment description, types of bearings and wind drag areas.
  • the characteristics for each locomotive includes one or more of length, weight, position of the train, traction performance, dynamic braking performance, fuel consumption as it relates to power control settings and locomotive speeds .
  • the determination of train forces includes determining forces experienced by and throughout the train for the ensuing track. This includes determining coupler forces and slack action throughout the train.
  • the determination of preliminary train restraint operating parameters includes determining preliminary train operating parameters to maintain coupler forces below a set limit. If slack action has been determined, the optimized train operating parameters are determined to achieve zero acceleration within the train. If slack action and coupler forces exceed predetermined limits, the operator is notified. If the operator does not take appropriate action, the train is controlled to the determined operating parameters.
  • the determining of forces includes determining at least one of steady state draft and buff, transit draft and buff, slack action and lateral over vertical force ratio.
  • the determining forces also includes determining forces exerted by the grade and rolling resistance over the ensuing track.
  • the preliminary train optimizable operating parameters are determined to maintain grade from the determined rolling resistance and force exerted by a grade.
  • a preliminary train optimizable parameters are determined to stop at a minimum distance from the determined rolling resistance force and force exerted by the grade. The method of determining the optimizable operating parameters to stop at minimum distance is repeated until the train has stopped.
  • the preliminary train restraint and optimizable operating parameters are determined to adhere to posted speed restrictions.
  • the method of training a locomotive engineer in a moving train includes displaying on the train a condition to which the engineer responds.
  • the engineer's response is determined and the display is changed in response to the engineer's response.
  • the display may also be changed to reflect the actual condition resulting from the engineer's response.
  • the display may also suggest a response to the initial displayed condition and the display can be changed to reflect the condition resulting from the suggested response.
  • the engineer's response is recorded as it relates to the displayed condition.
  • the engineer's response is compared to the suggested condition.
  • the engineer is qualified from the comparison of the engineer's response to the suggested response to the condition.
  • the response of the train to the engineer's response as it relates to the displayed condition is also recorded.
  • the method of training would also include determining the qualification level of the engineer prior to training from the engineer's inputs.
  • the qualification level of the engineer and an engineer identification may be inputted by using an encoded device.
  • the engineer is qualified based on the determined response and the qualification level is updated based on the determined qualification.
  • Access to the locomotive controls may also be controlled using a user identification and determining the qualification level of the user.
  • the system is enabled if the qualification level of the user meets the locomotive requirements.
  • the user identification and qualification levels may be inputted by the previously discussed encoded device.
  • the control system for example, the display, may be customized using the user's identification and/or qualification level .
  • FIG. 1 is a diagrammatic view of the energy balance system according to the principles of the present invention.
  • FIG. 2 is a block diagram of the system components of a locomotive assist display and event recorder according to the principles of the present invention.
  • Figure 3 is a flow chart for the control of braking and propulsion system car by car according to the principles of the present invention.
  • Figure 4 is a flow chart for the control of the braking and propulsion system according to the principles of the present invention.
  • Figure 5 is a LEADER display incorporating the principles of the present invention.
  • Figure 6 is a block diagram with flow of information from the train to the display incorporating the principles of the present invention.
  • Figure 7 is a flow chart for location and determination according to the principles of the present invention.
  • Figure 8 is a flow chart for fuel optimization using throttle setting according to the principles of the present invention.
  • Figure 9 is a flow chart for fuel savings using shutdown/restart of locomotives.
  • Figure 10 is a flow chart for balancing grade according to the principles of the present invention.
  • Figure 11 is a flow chart for excessive force warning according to the principles of the present invention.
  • Figure 12 is a flow chart for slack related force correction according to the principles of the present invention.
  • Figure 13 is a flow chart for stop distance calculation according to the principles of the present invention.
  • Figure 14 is a flow chart for on job training/qualification according to the principles of the present invention according to the principles of the present invention.
  • FIG 15 is a flow chart for controlling access to the locomotive controls according to the present invention.
  • DETAILED DESCRIPTION OF THE PRE ERRE EMBODIMENT LEADER operates on the principle of conservation of energy, kinetic and potential as illustrated in Figure 1. Some events increase the amount of kinetic or potential energy in the system, while others reduce it. Burning fuel converts matter to energy (motion via horsepower and heat) , while braking converts kinetic energy into heat, slowing the train. Energy changes state but, the total sum of energy in the system must be a constant. A train in motion is constantly converting fuel to energy, converting kinetic energy into potential energy traveling uphill against gravity, converting potential energy into kinetic energy traveling downhill, and removing kinetic energy in the form of heat from the friction and dynamic brake systems .
  • Math models of the LEADER System monitors parameters and performs calculations based on the current energy state of the train to create a real- time display of train dynamics.
  • the power of LEADER resides in its ability to provide information allowing the crew to better control the train, minimizing loss of energy. Loss of energy via over-braking represents fuel unnecessarily consumed. Energy imparted to the cargo of the train represents potential damage to lading, equipment and rail. Both phenomena are undesirable and addressable with LEADER.
  • the LEADER system is comprised of a number of subsystems each with specific duties.
  • Figure 2 shows a generic LEADER architecture.
  • the user interface of the LEADER System is the real-time display which shows a graphical and numerical representation of the current state of the train as shown in Figure 5.
  • Radio communication is established between the lead locomotive, the trailing locomotives in the lead consist, and locomotives in the remote consist to report the necessary parameters from each of these locomotives necessary to perform LEADER Calculations.
  • Consist information is entered via the key pad on the real-time display, a wired communication source (laptop PC or removable storage device) or via wayside radio communication.
  • Position is determined from wheel movement sensors and a Global Positioning System (GPS) .
  • GPS Global Positioning System
  • the Input/Output (I/O) Concentrator gathers all of the various locomotive parameters necessary for LEADER algorithm calculations and reports the information to the LEADER Computer.
  • the LEADER Processor a high throughput capacity computer platform using a Real Time Operating System (RTOS) , then performs the calculations required by the LEADER algorithms and the real-time display is updated. All of these sub-systems combine to form the LEADER System.
  • RTOS Real Time Operating System
  • Each locomotive in a LEADER train will require at a minimum, the I/O Concentrator with communication capability to the head end.
  • a LEADER Processor and Display are only required for the lead locomotive.
  • the decision to equip all locomotives with a full LEADER installation should be based on the Rails ability to permanently designate a locomotive as lead or trail in its duties.
  • the development of LEADER began over 20 years ago with early efforts to create the Train Dynamics Analyzer (TDA) , a computer math model used to predict in-train forces.
  • TDA Train Dynamics Analyzer
  • LEADER provides a number of unique features that are available due to LEADER'S comprehensive knowledge of the state of the train. Many of these features allow the Rail to convey and enforce operating policies by programming limits into the LEADER System such that when the limits are exceeded, LEADER will audibly and/or visibly alert the crew to the situation.
  • FIG. 5 shows a "frozen" LEADER Display.
  • Each LEADER feature is identified by a block which points to the appropriate screen location.
  • the sections following use the same paragraph number as the identification block detail the operation of each feature.
  • the LEADER Display shown in Figure 5 represents one particular configuration for the display of LEADER information.
  • the display format can be customized on customer request by adding information, removing information, changing the color scheme, rearranging the position of the sections of information, and/or varying the size of any particular graphic.
  • the top portion of the LEADER Display shows the track profile in three views.
  • the train consist is represented with different colored blocks for the locomotive units and for the cars.
  • the length of the displayed train is proportional to the length of the actual train.
  • Milepost marks are represented by lines running vertically through the track profile portion of the display.
  • the horizontal view of the track profile shows the grade on which the train is currently positioned and the grade of the track profile for a number of miles ahead .
  • the Horizontal View of the track profile will show the position of the entire train on the track, both current location and geographic shape
  • the top graphic of the track profile section is made up of blocks that represent track curvature.
  • a block above the dividing line represents a curve to the right, a block below the dividing line represents a curve to the left .
  • the overhead view incorporates symbols to represent track structures such as crossings, signals, overpasses, underpasses, and sidings.
  • the draft/buff force graphic represents draft forces as a function above the 0 kilo-pound line and buff forces as a function below the 0 kilo-pound line.
  • Draft and buff forces can be divided into two categories, steady state and transient. Steady state forces are shown, in general, by a smooth, relatively slow changing function. Transient draft and buff forces (run-in/run-out or slack induced forces) are shown by "spikes" of force that travel through the train. LEADER accurately calculates and displays both. Slack induced forces represent momentum transfers between the cars resulting in potential lading and car damage.
  • L/V Lateral over Vertical
  • the lower right and lower center sections of the screen have real time trajectory and status information displayed in both digital and analog bar graph format.
  • the following list contains the parameters currently shown on the LEADER Display: Sections are numbered to match the identification blocks of Figure 5. 5.7.1 Head End Information
  • Location is a digital representation of mile market location of the head end locomotive.
  • Slope is the grade of the track at the location of the head end locomotive.
  • Curvature is the degree of curvature of the track at the location of the head end locomotive.
  • Speed is shown as a digital read out followed by an analog bar graph representing the speed of the head end locomotive at each instant in time. The bar graph will turn from a normal color of green to red if the speed limit is exceeded.
  • Acceleration is shown as a digital read out followed by an analog bar graph representing the acceleration of the head end locomotive at each instant in time.
  • Feed Valve Setting is the pressure at which the feed valve is set, displayed in pounds per square inch (psi) .
  • Fuel is the amount of fuel consumed since the counter was last reset.
  • Consist Length is a digital read out of the length of consist shown in feet .
  • This graphic takes on two roles; one for conventional pneumatic brake equipped trains and one for EP Brake equipped trains.
  • the graphic is a digital read out followed by an analog bar graph representing the brake pipe pressure reduction at the head end locomotive at each instant in time.
  • the LEADER system has the capability to support trains equipped with EP Brake Systems rather than conventional displacement valves.
  • the graphic is a digital read out followed by an analog bar graph representing the percent of brake commanded to the EP System.
  • Fuel Consumption Rate is a digital read out followed by an analog bar graph representing the instantaneous fuel consumption rate of the entire train shown in Gallons Per Hour (GPH) .
  • Excessive Speed Warning is an audio and/or visual warning that will appear on the LEADER Display when the speed of the locomotive exceeds the speed limit for the current track location.
  • the speed restriction for the track can be modified to reflect slow orders for a section of trackage. A mark is shown on the speed indication graphic that represents the current speed limit.
  • Minimum Safe Pneumatic Brake Reduction is of interest for safe train operation. As brake applications are applied and released the charge state of the pneumatic brake system can become such that an undesired release of brakes will occur if the next brake application requested is not deep enough. LEADER will calculate the safe brake application level and visually display a target on the Brake Reduction bar graph. If the brake application requested is not deep enough, a visual warning will be posted by the LEADER display.
  • Gluttony is a measure of how the train is being moved with regards to fuel efficiency. Gluttony is calculated and displayed in gallons/thousand-ton-miles.
  • the LEADER display is equipped with eight function keys at the bottom of the display. The definition of each function key is shown in the representation of the key on the LCD panel directly above it.
  • the function keys allow user input to the system, accessing various setup and configuration menus and querying information from the LEADER system.
  • LEADER is capable of three operating modes, each building on the previous mode. The three modes advance LEADER from a real time display passively providing information to the locomotive engineer (information only mode) to a LEADER system that will suggestions to the locomotive engineer on how to better handle the train (driver assist mode) and finally to a control system that is capable of issuing commands to optimally control the locomotive (cruse control mode) .
  • the locomotive engineer makes all of the decisions and solely activates the various control systems in a manual mode.
  • the LEADER provides information to the engineer that is not currently available to him to use to manage various locomotive control systems.
  • driver assist mode LEADER determines and displays the optimum locomotive power dynamic brake throttle setting and the locomotive and car brake control settings. These settings are determined for the head end locomotives and the remotely controlled locomotives. These recommendations are desired settings displayed to the locomotive engineer who can then elect to manually move the various controls to achieve these settings.
  • leader derived settings are used to automatically control the locomotive power and braking systems, the train brake system of each car and ancillary systems which effect train movement.
  • the locomotive engineer services an operational supervisor with the ability to manually override the cruise control .
  • Cruise control can also be effectuated by communication links between the leader and the railroad central traffic control center.
  • LEADER would receive and activate a variety of commands received from the central traffic control center. This received information would include impeding slow orders, speed limit changes, aspects of approaching signals, etc. LEADER would provide status updates to the control center, including current train speed, current track location, detected faults or equipment malfunctions, estimated time of arrival, etc. The traffic control can use this information to manage the complete safe and effective movement of train traffic under its control .
  • the display of Figure 5 is produced by the flow chart of Figure 6.
  • the track profile data bases include track profile or topology including grades, curves, mile posts, town names, absolute latitude and longitude coordinates, signal locations and other various track structures. Besides the physical characteristics of the track profile, also the condition of upcoming signals, slow orders, speed limits and location of speed restricting zones are taken into account .
  • the LEADER system includes communication capability between the locomotive and central dispatcher such that new orders can be loaded into the system in real time.
  • THE LEADER system also include multiple distance counters to aid the locomotive engineer with navigating various speed restrictions zones.
  • the LEADER has the capability to start, stop, reset and alert the crew upon arbitrary condition of multiple counters shown on the LEADER display. Thus, depending upon the length of the train, the train may be in multiple zones at a time.
  • the consist information or train characteristics includes car length, car weight, car position in the consist, braking equipment description, types of bearings, wind drag areas. It also includes information on the locomotive including locomotive length, weight and position of the consist, traction performance, dynamic braking performance, fuel consumption as related to power control settings and locomotive speeds.
  • the track profile data base and the consist information can be loaded externally by the engineer or communication links with the railroad central traffic control center.
  • the information on the consist may be derived automatically from individual controllers on the locomotives on the cars during power up as described in U.S. Patent applications 08/837,113 filed April 14, 1997 and 08/689,813 filed August 14, 1996.
  • Other information that may be loaded would include operational constraints for exceptional speed limits and special slow orders, speed restriction zones, meets and passes, track occupancy permits, general operating bulletins, upcoming signal designations, desired time of arrival and final destination location and limit of authority or track locations the train move to without the possibility of interference with the movement of the trains in the area.
  • the track profile data base, location and consist information are used to draw the track profile in the horizontal view, curvature view and overhead view and provided to the leader display.
  • the leader train dynamic's calculations uses a combination of instrumented measurements at the locomotive and if available from the cars and a computer calculation based on the fundamental laws of physics, engineering mechanics along with various empirical derivations. These measurements and calculations are used to facilitate the estimated required feedbacks.
  • the measurements include throttle and/or dynamic brake settings at the locomotive, control pressures of various locomotive air brake control systems, and locomotive speed and increment wheel rotation. It also includes end of train brake control pressures and brake pressures to the individual cars available. Power produced and/or anticipated within the locomotives traction system and locomotive wheel slip. Activation of the locomotive sanders and whistle and or bells.
  • the absolute track location and time of day are also inputs. This is in addition to the consist information and track profile previously described. From this information, Leader calculates the steady state and transient draft/buff force magnitude and its position of the consist, lateral over vertical force ratio magnitude and position in the consist, brake pressure magnitude and position in the consist and brake cylinder pressure magnitude and positions in the consist. These four parameters are then mapped to the train symbols and current track profile locations and provided to the leader display.
  • a flow chart for determining the location is illustrated in Figure 7.
  • Three different sources of information are derived, weighted and combined as an estimation of location.
  • a first source for information is transmitted to the train. This is available from geographical positions system (GPS) which is used to detect the precise latitude and longitude of the head of the train.
  • GPS geographical positions system
  • Another commercially available system uses transponders buried at spaced intervals under the rail. The locomotive equipped with a transceiver activates transponders as they pass over them. The transponder then transmits an encoded message that, when deciphered, provides track location.
  • the train engineer can enter mile post signs which would then be compared against the track data base to determine location.
  • the flow chart of Figure 7 also indicates two incremental methods of estimating location.
  • a turn rate indicator provides a signal which is used to index against the track data base to produce an estimate of the location.
  • Another is an end of axle pulse counter which detects incremental distance travel by the locomotive and is used to index the track data base to an estimate location. The turn rate indicator and the end of axle pulse counter will operate to an increment from the previously measured position. All three of the estimated locations are then weighted and combined to produce the ultimate estimate of location to be used in the display and various calculations based on track profile .
  • the LEADER also has the capability of determining whether its calculations are inaccurate. For example, if there is error in actual distance traveled versus the calculated distance traveled, this may be brought to the attention of the operator. This allows the operator to change the weighting functions if desired in the algorithm. These errors in the algorithms may be to faulty measurements, wrong consist information, failures in the car brake systems and/or failures in the propulsion system. Even without the ability to identify the specific source of the error, at least notification that the error does exist will allow the operator and the system to make more intelligent decisions .
  • the LEADER integrates with electropneumatic (EP) brake systems to provide braking on a car by car basis. This can be used to maximize fuel efficiency, minimizes in-train forces, and/or minimize the time of the destination.
  • EP brake controllers on each car can be commanded to apply brakes on the cars forward of a certain point as the train crests the hill and not apply the brakes on the cars which are below the crest of the hill. This eliminates the cars on the uphill side from being dragged with their brakes on until they crest the hill .
  • the control of the individual cars is illustrated in the flow chart of Figure 3. The process begins with LEADER monitoring the track profile.
  • Geographic features of interest may include hills, valleys, curves, signals or siding. These are examples of features of interest which would benefit from individual car braking.
  • the identity of which cars are at the geographic feature of interest is determined. This is determined using car serialization data to order and identify the cars. Serialization of the car may be determined using the process described in copending U.S. Patent Application No. 08/837,113 filed April 14, 1997. After identifying the location of the car relative to the geographic feature of interest, there is a decision made of whether optimization is possible. If not, it cycles back to the LEADER monitoring track profile.
  • the operating parameters for operational constraints are determined. As previously discussed, they may include limits on forces or speed.
  • optimized weighted parameters from the user are derived taking into account the operational constraints. Examples of method of optimization may be to maximize fuel efficiency, minimize in-train forces or minimize time to destination. Also, dynamic brake affinity and pneumatic brake affinity can be weighted also. These are determined by the user. These weighted factors are combined and provided to the optimized weighted parameter from user step. If less than all is desired, the weight for the undesired parameter may be given zero.
  • the optimized weighted parameters are then used to calculate optimized operating parameters, for example, which car to brake and what level of braking is necessary.
  • the appropriate commands are issued to the electropneumatic system brakes of each car. This would include the car ID and level of braking transmitted over the communication link throughout the train. For the locomotives, this would include pneumatic and dynamic braking as well as propulsion.
  • the flow charts of Figures 3 and 4 would also be operable to identify the train location and the location of the individual cars and determine whether the constraint limits have been or are going to be reached. If there is an anticipation that they are going to be reached, then the calculation of restraint operating parameters are performed. The calculation of which cars to brake and what level of brake is necessary as well as calculation of locomotive commands is performed. These commands are then issued to the individual cars and locomotives. Alternatively, the braking and propulsion control is performed on the system level .
  • Proportional controls of the locomotive traction power and dynamic braking include subsystems for managing a locomotive pulling effect and electric braking efforts.
  • Proportional control of locomotive air brake subsystems including both the application and release the independent locomotive brakes and the train or individual car brakes.
  • the activation/deactivation of ancillary locomotive control systems include control of sanding, the horn and the bells.
  • Locomotives operate at maximum efficiency at certain throttles. While multiple locomotives are necessary to pull the train over certain areas, other areas in the same territory may not require all of the locomotives for operation.
  • LEADER has the knowledge of the state of the train currently, the locomotive capacity, the train consist and the track profile ahead. Using this knowledge, LEADER can determine the optimal combination of throttle settings on the locomotive to maximize efficiency. The setting can be from idle to notch 1-8.
  • a portion of the train's operating time is spent moving totally empty.
  • the amount of power required during a loaded move will generally determine the number and horse power of the locomotives in the train. All trains are generally operated during both the loaded and empty move in such a train, even though the empty train movement may not require all of the locomotives from propulsion.
  • the LEADER'S capability to look ahead and calculate required horse power for a certain section of a move it is possible to shutdown an unneeded locomotive and save sufficient fuel.
  • the LEADER can continue to look ahead and determine whether and when additional power will be necessary. They command the engines to restart with proper warm up time to be available when required.
  • the flow chart for such an operation is illustrated in Figure 9.
  • User defined operating parameters are inputted to the LEADER system.
  • the LEADER looks ahead to calculate or the determined required horse power to navigate through the next section of trackage. Then a determination is made whether sufficient power is available. If not, then there is a determination whether there are any available locomotives to start up. If not, the system cycles back to the beginning. If there is, then one or more of the available locomotives are started up to provide the appropriate horsepower. If sufficient horsepower is available, then a determination is made of whether one or more of the locomotives can be shutdown for the power requirement. If not, then the system cycles back. If one or more locomotives can be shutdown, then one or more locomotives are appropriately shutdown. This system is reiterated continuously monitoring the ensuing trackage and adjusting the number of locomotives which are shutdown or restarted.
  • the LEADER system measures train speed, time, track location and profile, locomotive throttle and brake control settings, and the train makeup determines the optimum brake application required to maintain a safe speed.
  • the safe speed may be optimized in combination with a longitudinal and lateral force level, minimum slack action and fuel usage.
  • the LEADER predicts that brake control settings will be required to maintain the speed or to optimize the speed with other forces and fuel usage.
  • the predicted brake settings can be conveyed to the LEADER display for implementation by the engineer or for control by the LEADER system directly.
  • a flow chart for optimizing the braking of the train to maintain grade is illustrated in Figure 10.
  • LEADER monitors current train speed (V) and track location (XLOC) .
  • LEADER determines the average grade (G) over the ensuing distance to be traveled, X.
  • LEADER determines the average train rolling resistance forces (FR) over the ensuing distance to be traveled, X.
  • W train weight
  • LEADER Based on the calculated brake force (FB) required, LEADER determines the brake control settings to achieve this brake force. If the average grade is not downhill, LEADER computes the propulsion force required to maintain the speed (V) . Based on the propulsion force required to maintain speed, the LEADER calculates train throttle settings to achieve this force.
  • the control settings or the throttle settings required to achieve the force will then be used with a determination of whether there is automatic control. If automatic control is not selected, the settings are displayed. The determination is made of whether the crew responded to the displayed settings. If they do, then the system cycles back to the beginning. If not, an enforcement is produced. This enforcement could include a warning or automatic control. If automatic control is selected, then the appropriate settings are actuated.
  • the balancing grade may also be part of the optimization routine of Figures 3, 4, 8 and/or 9.
  • the determination of unsafe forces is described in the flow chart of Figure 11.
  • the LEADER determines the forces using its standard algorithms. The current force levels include steady state draft and buff, transient draft and buff and lateral over vertical force ratio. These are compared with the limits set by the railroad. If these calculated forces are outside the limits, the determination is then made whether the system is an automatic control or not. If it is an automatic control, then the commands to actuate forces are actuated. If it is not an automatic control, then an alert is provided to the user.
  • the crew response is then determined. If the crew affectuates the required setting, then the system cycles back. If the crew does not actuate the required setting, then an enforcement is actuated. This enforcement again can be some visual alarm or indication or automatic control. If they are not outside the limits, the LEADER force calculation is continued.
  • this information can be used as in the flow chart of Figures 3 and 4 as a weighted value or by itself to achieve optimum braking. It can be used to control the braking as well as to control the propulsion. By adjusting the propulsion system, pulling the force exerted can be controlled.
  • slack action In addition to the coupling forces produced by the pulling between the cars, there is slack action which may brake the coupler or damage the coupling system. There is typically 4 - 6 inches of free unrestrained movement in the coupling and even at its relative speed of 1 - 2 miles an hour, can create large forces.
  • the prediction and control of slack action is illustrated in the flow chart of Figure 12.
  • the LEADER measures train speed, time, track location and track profiles, locomotive throttle and brake settings and train make-up to minimize slack related forces. Using standard freight train dynamic modeling techniques, LEADER calculates coupler forces and slack conditions throughout the train. Next, it determines if slack action is occurring. If not, the existing throttle and brake settings are used in the display or for control of the train.
  • the LEADER predicts the train and brake control settings that will minimize momentum changes between the freight cars. Through experimentation it has been discovered that the magnitude of slack related forces can be effectively minimized by maintaining near zero acceleration of the train as the slack action is occurring. The LEADER determines the magnitude of locomotive power application or brake system application that is required to maintain near zero train acceleration.
  • the LEADER system uses the measurement of train speed, time, track location and characteristics, locomotive throttle and brake control settings and car consist information to determine what is required to stop the train from its current track location.
  • the LEADER uses standard freight train dynamic modeling techniques, coupled with the measurements in data base to accurately predict the distance required to stop the train from its present track location. The predicted stop distance can be conveyed to the locomotive engineer and the LEADER display and to ancillary control equipment of systems internal or external to the locomotive.
  • FIG. 13 shows a flow chart for stop distance calculations.
  • LEADER displays stop distance XSTOP. If not, it loops back to begin the calculation cycle.
  • the ability of the LEADER to provide information and to record information allows the training or qualifying of the locomotive engineer. As illustrated in Figure 14, training can be performed by providing railroad training parameters to the LEADER system. The LEADER system can provide feedback display information to the LEADER display screen for guidelines of operation. The response of the engineer would then be recorded by the LEADER system. The LEADER display would then provide the result of the input with suggested corrections or modifications. The LEADER system also has the ability to store the history of the trip and the operator's responses. This information can be downloaded and used on a simulator, desktop or portable PC system. This information can be compared against desired responses to qualify the engineer. Although such qualifications have historically been performed on training systems, the real life data provides a better setting for qualification. This information may also be used for train handling, performance analysis, accident investigation and general operational studies.
  • Access to the control of the locomotives may be determined by reading a user I.D. and determining whether the user is qualified to use the particular piece of equipment. This information may be on an encoded device which the user of the locomotive must insert into the system before the system will be actuated.
  • a flow chart of the system is illustrated in Figure 15. The user's I.D. is read. A determination is then made whether the user, through his I.D. or through his qualification level is approved for the particular equipment or locomotive. If the engineer is not, the system is disabled. An alarm may be set if desired. If the engineer is qualified or approved for the equipment, the user I.D. is recorded. The display and/or systems could be customized for that user if desired. If not, this step can be deleted.
  • the final step for an improved user is to enable the systems for its use.
  • the encoded device which includes the user's I.D. and their qualification may also be used with the trainer of Figure 14. This training session would determine, from the user I.D., their level prior to the training session. Depending upon the results and the qualification, this user's level would be updated. Thus, the encoded device would always carry the latest qualification level of the user.

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

A method of optimizing train operation includes determining conditions of location, track profile and train forces of the train. Next, a set of preliminary train restraint operating parameters are determined from the determined conditions. Also, at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination is determined. The determined set of preliminary train operating parameters are weighted and combined. Optimized train operating parameters are determined from the weighted and combined preliminary train operating parameters. Engineering train and access is also performed.

Description

METHOD OF OPTIMIZING TRAIN OPERATION AND TRAINING
The present invention relates generally to locomotive display and more specifically to a method of optimizing train operations and training and its use with, for example, a Locomotive Engineers Assist Display and Event Recorder (LEADER) .
The LEADER System is a real-time, enhanced version of the Train Dynamics Analyzer (TDA) , a long standing Locomotive Engineer training tool offered by the Train Dynamics Services Group of New York Air Brake. LEADER has the ability to display a real-time or "live" representation of a train on the current track, the trackage ahead, the dynamic interaction of the cars and locomotives (both head end and remote) , and the current state of the pneumatic brake system. As a tool for the Locomotive Engineer, LEADER will allow insight into the effect of throttle changes and brake applications throughout the train providing feedback and information to the Locomotive Engineer not currently available. The information LEADER offers provides an opportunity for both safer and more efficient train handling leading to enormous potential economic benefits.
The LEADER System has all the necessary information to predict the future state of the train given a range of future command changes (what if scenarios) . With this ability, LEADER can assist the railroads in identifying and implementing a desired operating goal; minimize time to destination, maximize fuel efficiency, minimize in train forces, (etc.) or a weighted combination thereof. LEADER will perform calculations based on the operational goal and the current state of the train to make recommendations to the Locomotive Crew on what operating changes will best achieve these goals.
The TDA functionality was enhanced to assist in training Locomotive Engineer how to better handle their trains. Designs of simulators with math models are shown in U.S. Patents 4,041,283; 4,827,438 and 4,853,883. Further capability was added to investigate accidents by playing the event recorder data through the TDA, monitoring critical physical parameters. Through the years data was collected from instrumented trains and laboratory experiments, allowing the models used by the TDA to be refined. On board data collection for off-loading is shown in U.S. Patents 4,561,057 and 4,794,548. As more Locomotive Engineers became familiar with the TDA display through training sessions, it became apparent that a real time version of the TDA in the cab of a locomotive would offer substantial benefits in improved train handling. Improved train handling would in turn foster safety and economic benefits. Earlier designs for on board computer controllers is shown in U.S. Patent 4,042,810 with a description of math models.
The LEADER system provides safe and effective control of a train through display or control of the dynamically changing parameters. It accurately provides train speed within designated speed limits. It maintains in-train coupling forces with safe limits to prevent train break-in-twos . It maintains safe levels of lateral forces between the wheels and the rails of all cars to prevent cars from departing from the track and derailing. It provides control of slack action for both draft and buff between cars to reduce damage to valuable lading and to prevent potential train separation or break-in-twos. It maintains train stop and slow downs to prevent the train from entering unauthorized territories that could cause accidents with other train traffic. It determines the optimum locomotive throttle setting and train brake application to minimize fuel consumption and wear of brake shoes and wheels. It monitors total locomotive performance, train brake performance and it provides advisement if performance is faulty. It forecasts the estimate time of arrival of train to various switch points, signals locations or final destinations to advise the engineer and rail traffic control centers. It records various key data for later downloaded analysis for operational studies and accident investigations as well as engineer qualifications.
A method of optimizing train operation includes determining conditions of location, track profile and train forces of the train. Next, a set of preliminary train restraint operating parameters are determined from the determined conditions. Also, at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination is determined. The determined set of preliminary train operating parameters are weighted and combined. Optimized train operating parameters are determined from the weighted and combined preliminary train operating parameters. The determination of whether optimization should be performed is made from train location track and profile. This includes determining the location of train with respect to one or more of hill, valley, curve, signal and siding.
Determining optimized operating parameters includes determining dynamic and fluid braking. The fluid braking is determined individually for each locomotive and car in the train which can be individually controlled. The dynamic and fluid braking for each locomotive will be determined for each locomotive individually. Dynamic and fluid braking may be one of the sets of the preliminary train optimizable operating parameters and will be weighed and combined with the other preliminary train operating parameters. The weighing of the dynamic and fluid braking is a function of location on the track profile. The train operating parameters include one or more of train fluid braking, locomotive fluid braking, locomotive dynamic braking and locomotive propulsion. One of the train optimized operating parameters is shutting down or restarting the propulsion of individual locomotives. The optimized operating parameters may be displayed and/or the train controlled to the determined optimizing parameters.
Determining the preliminary train restraint operating parameters includes one or more of speed limits, slow orders, speed restriction zones, meets and passes, track occupancy permits, general operating bulletins, drawbar limits and slack action limits. The preliminary train optimizable parameters are determined using the operational restraints. The method also includes determining train characteristics. The train characteristics for each car includes one or more of length, weight, position of the train, braking equipment description, types of bearings and wind drag areas. The characteristics for each locomotive includes one or more of length, weight, position of the train, traction performance, dynamic braking performance, fuel consumption as it relates to power control settings and locomotive speeds .
The determination of train forces includes determining forces experienced by and throughout the train for the ensuing track. This includes determining coupler forces and slack action throughout the train. The determination of preliminary train restraint operating parameters includes determining preliminary train operating parameters to maintain coupler forces below a set limit. If slack action has been determined, the optimized train operating parameters are determined to achieve zero acceleration within the train. If slack action and coupler forces exceed predetermined limits, the operator is notified. If the operator does not take appropriate action, the train is controlled to the determined operating parameters. The determining of forces includes determining at least one of steady state draft and buff, transit draft and buff, slack action and lateral over vertical force ratio. The determining forces also includes determining forces exerted by the grade and rolling resistance over the ensuing track. The preliminary train optimizable operating parameters are determined to maintain grade from the determined rolling resistance and force exerted by a grade. A preliminary train optimizable parameters are determined to stop at a minimum distance from the determined rolling resistance force and force exerted by the grade. The method of determining the optimizable operating parameters to stop at minimum distance is repeated until the train has stopped. The preliminary train restraint and optimizable operating parameters are determined to adhere to posted speed restrictions.
The method of training a locomotive engineer in a moving train includes displaying on the train a condition to which the engineer responds. The engineer's response is determined and the display is changed in response to the engineer's response. The display may also be changed to reflect the actual condition resulting from the engineer's response. The display may also suggest a response to the initial displayed condition and the display can be changed to reflect the condition resulting from the suggested response. The engineer's response is recorded as it relates to the displayed condition. The engineer's response is compared to the suggested condition. The engineer is qualified from the comparison of the engineer's response to the suggested response to the condition. The response of the train to the engineer's response as it relates to the displayed condition is also recorded.
The method of training would also include determining the qualification level of the engineer prior to training from the engineer's inputs. The qualification level of the engineer and an engineer identification may be inputted by using an encoded device. The engineer is qualified based on the determined response and the qualification level is updated based on the determined qualification. Access to the locomotive controls may also be controlled using a user identification and determining the qualification level of the user. The system is enabled if the qualification level of the user meets the locomotive requirements. The user identification and qualification levels may be inputted by the previously discussed encoded device. The control system, for example, the display, may be customized using the user's identification and/or qualification level .
Other objects, advantages and novel features of the present invention will become apparent from the following detailed description of the invention when considered in conjunction with the accompanying drawings .
T3PTFF DESCRIPTION OF THF, DRA INGS
Figure 1 is a diagrammatic view of the energy balance system according to the principles of the present invention.
Figure 2 is a block diagram of the system components of a locomotive assist display and event recorder according to the principles of the present invention.
Figure 3 is a flow chart for the control of braking and propulsion system car by car according to the principles of the present invention.
Figure 4 is a flow chart for the control of the braking and propulsion system according to the principles of the present invention.
Figure 5 is a LEADER display incorporating the principles of the present invention.
Figure 6 is a block diagram with flow of information from the train to the display incorporating the principles of the present invention. Figure 7 is a flow chart for location and determination according to the principles of the present invention.
Figure 8 is a flow chart for fuel optimization using throttle setting according to the principles of the present invention.
Figure 9 is a flow chart for fuel savings using shutdown/restart of locomotives.
Figure 10 is a flow chart for balancing grade according to the principles of the present invention.
Figure 11 is a flow chart for excessive force warning according to the principles of the present invention.
Figure 12 is a flow chart for slack related force correction according to the principles of the present invention.
Figure 13 is a flow chart for stop distance calculation according to the principles of the present invention. Figure 14 is a flow chart for on job training/qualification according to the principles of the present invention according to the principles of the present invention.
Figure 15 is a flow chart for controlling access to the locomotive controls according to the present invention. DETAILED DESCRIPTION OF THE PRE ERRE EMBODIMENT LEADER operates on the principle of conservation of energy, kinetic and potential as illustrated in Figure 1. Some events increase the amount of kinetic or potential energy in the system, while others reduce it. Burning fuel converts matter to energy (motion via horsepower and heat) , while braking converts kinetic energy into heat, slowing the train. Energy changes state but, the total sum of energy in the system must be a constant. A train in motion is constantly converting fuel to energy, converting kinetic energy into potential energy traveling uphill against gravity, converting potential energy into kinetic energy traveling downhill, and removing kinetic energy in the form of heat from the friction and dynamic brake systems .
Math models of the LEADER System, monitors parameters and performs calculations based on the current energy state of the train to create a real- time display of train dynamics. The power of LEADER resides in its ability to provide information allowing the crew to better control the train, minimizing loss of energy. Loss of energy via over-braking represents fuel unnecessarily consumed. Energy imparted to the cargo of the train represents potential damage to lading, equipment and rail. Both phenomena are undesirable and addressable with LEADER.
The LEADER system is comprised of a number of subsystems each with specific duties. Figure 2 shows a generic LEADER architecture. The user interface of the LEADER System is the real-time display which shows a graphical and numerical representation of the current state of the train as shown in Figure 5. Radio communication is established between the lead locomotive, the trailing locomotives in the lead consist, and locomotives in the remote consist to report the necessary parameters from each of these locomotives necessary to perform LEADER Calculations. Consist information is entered via the key pad on the real-time display, a wired communication source (laptop PC or removable storage device) or via wayside radio communication. Position is determined from wheel movement sensors and a Global Positioning System (GPS) . The Input/Output (I/O) Concentrator gathers all of the various locomotive parameters necessary for LEADER algorithm calculations and reports the information to the LEADER Computer. The LEADER Processor, a high throughput capacity computer platform using a Real Time Operating System (RTOS) , then performs the calculations required by the LEADER algorithms and the real-time display is updated. All of these sub-systems combine to form the LEADER System.
Each locomotive in a LEADER train will require at a minimum, the I/O Concentrator with communication capability to the head end. A LEADER Processor and Display are only required for the lead locomotive. The decision to equip all locomotives with a full LEADER installation (Processor, Display in addition to the I/O Concentrator) should be based on the Railroads ability to permanently designate a locomotive as lead or trail in its duties. The development of LEADER began over 20 years ago with early efforts to create the Train Dynamics Analyzer (TDA) , a computer math model used to predict in-train forces. The train dynamic modeling techniques and algorithms embodied in the TDA are described in U.S. Patent 4,041,283.
LEADER provides a number of unique features that are available due to LEADER'S comprehensive knowledge of the state of the train. Many of these features allow the Railroad to convey and enforce operating policies by programming limits into the LEADER System such that when the limits are exceeded, LEADER will audibly and/or visibly alert the crew to the situation.
Figure 5 shows a "frozen" LEADER Display. Each LEADER feature is identified by a block which points to the appropriate screen location. The sections following use the same paragraph number as the identification block detail the operation of each feature.
The LEADER Display shown in Figure 5 represents one particular configuration for the display of LEADER information. The display format can be customized on customer request by adding information, removing information, changing the color scheme, rearranging the position of the sections of information, and/or varying the size of any particular graphic.
In the following descriptions of features on the LEADER Display the term function will be used to describe the plot of the magnitude of a particular parameter across the length of the train varying with time .
5.1 Track Profile
The top portion of the LEADER Display shows the track profile in three views. The train consist is represented with different colored blocks for the locomotive units and for the cars. The length of the displayed train is proportional to the length of the actual train. Milepost marks are represented by lines running vertically through the track profile portion of the display.
5.2 Horizontal View of Track
The horizontal view of the track profile shows the grade on which the train is currently positioned and the grade of the track profile for a number of miles ahead . The Horizontal View of the track profile will show the position of the entire train on the track, both current location and geographic shape
(uphill or downhill) as a vertical slice of the track profile in real-time.
5.3 Track Curvature Representation
The top graphic of the track profile section is made up of blocks that represent track curvature. A block above the dividing line represents a curve to the right, a block below the dividing line represents a curve to the left . The longer the block the longer the curve . The higher the block the more severe the curve .
5.4 Overhead View/Supplemental Information
Just above the horizontal view is the overhead view. This view incorporates symbols to represent track structures such as crossings, signals, overpasses, underpasses, and sidings. 5.5 In-Train Forces
Directly below the train represented on the LEADER display is the portion of the screen dedicated to showing in-train forces. All in-train forces are displayed as a graphic that maps to each car in the train. Follow any point on any of the force functions straight up the display and it will intersect with a point on the train where that particular level of force is currently present. Three types of forces are represented on two different graphics. The two graphics can be identified as the draft/buff magnitude force functions and the Lateral divided by Vertical (L/V) force ratio function.
The draft/buff force graphic represents draft forces as a function above the 0 kilo-pound line and buff forces as a function below the 0 kilo-pound line. Draft and buff forces can be divided into two categories, steady state and transient. Steady state forces are shown, in general, by a smooth, relatively slow changing function. Transient draft and buff forces (run-in/run-out or slack induced forces) are shown by "spikes" of force that travel through the train. LEADER accurately calculates and displays both. Slack induced forces represent momentum transfers between the cars resulting in potential lading and car damage.
The Lateral over Vertical (L/V) force ratio graphic is shown above the draft/buff force graphic. L/V forces appear in cars as they traverse curves in the track. 5.6 Brake Pipe Pressure/Brake Cylinder Pressures
Directly below the force graphics are two functions that represent brake pipe pressure throughout the train and brake cylinder pressure throughout the train. Again, these functions map to a location in the train representation directly above. Because the functions are real-time representations of the brake system, it is possible to monitor a brake application or release as it travels through the entire train.
5.7 Trajectory/Telemetry Information
The lower right and lower center sections of the screen have real time trajectory and status information displayed in both digital and analog bar graph format. The following list contains the parameters currently shown on the LEADER Display: Sections are numbered to match the identification blocks of Figure 5. 5.7.1 Head End Information
Location is a digital representation of mile market location of the head end locomotive. Slope is the grade of the track at the location of the head end locomotive. Curvature is the degree of curvature of the track at the location of the head end locomotive.
5.7.2 Speed is shown as a digital read out followed by an analog bar graph representing the speed of the head end locomotive at each instant in time. The bar graph will turn from a normal color of green to red if the speed limit is exceeded.
5.7.3 Acceleration is shown as a digital read out followed by an analog bar graph representing the acceleration of the head end locomotive at each instant in time.
5.7.4 Current Speed Limit is shown as a digital read out of the speed limit for the current position of the head end locomotive.
5.7.5 Feed Valve Setting is the pressure at which the feed valve is set, displayed in pounds per square inch (psi) .
5.7.6 Fuel is the amount of fuel consumed since the counter was last reset.
5.7.7 Consist Length is a digital read out of the length of consist shown in feet .
5.7.8 Time is the digital read out of the current time. 5.7.9 Brake Pipe Reduction (or EP Brake
Command) This graphic takes on two roles; one for conventional pneumatic brake equipped trains and one for EP Brake equipped trains. In Conventional, the graphic is a digital read out followed by an analog bar graph representing the brake pipe pressure reduction at the head end locomotive at each instant in time. The LEADER system has the capability to support trains equipped with EP Brake Systems rather than conventional displacement valves. In an EP equipped train the graphic is a digital read out followed by an analog bar graph representing the percent of brake commanded to the EP System.
5.7.10 Draw Bar Forces is a digital read out followed by an analog bar graph representing the instantaneous locomotive draw bar force.
5.7.11 Fuel Consumption Rate is a digital read out followed by an analog bar graph representing the instantaneous fuel consumption rate of the entire train shown in Gallons Per Hour (GPH) .
5.8.1 Excessive Speed Warning is an audio and/or visual warning that will appear on the LEADER Display when the speed of the locomotive exceeds the speed limit for the current track location. The speed restriction for the track can be modified to reflect slow orders for a section of trackage. A mark is shown on the speed indication graphic that represents the current speed limit.
5.8.2 Minimum Safe Pneumatic Brake Reduction is of interest for safe train operation. As brake applications are applied and released the charge state of the pneumatic brake system can become such that an undesired release of brakes will occur if the next brake application requested is not deep enough. LEADER will calculate the safe brake application level and visually display a target on the Brake Reduction bar graph. If the brake application requested is not deep enough, a visual warning will be posted by the LEADER display.
5.8.3 Gluttony is a measure of how the train is being moved with regards to fuel efficiency. Gluttony is calculated and displayed in gallons/thousand-ton-miles.
The LEADER display is equipped with eight function keys at the bottom of the display. The definition of each function key is shown in the representation of the key on the LCD panel directly above it. The function keys allow user input to the system, accessing various setup and configuration menus and querying information from the LEADER system. LEADER is capable of three operating modes, each building on the previous mode. The three modes advance LEADER from a real time display passively providing information to the locomotive engineer (information only mode) to a LEADER system that will suggestions to the locomotive engineer on how to better handle the train (driver assist mode) and finally to a control system that is capable of issuing commands to optimally control the locomotive (cruse control mode) .
In the information only mode, the locomotive engineer makes all of the decisions and solely activates the various control systems in a manual mode. The LEADER provides information to the engineer that is not currently available to him to use to manage various locomotive control systems. In driver assist mode, LEADER determines and displays the optimum locomotive power dynamic brake throttle setting and the locomotive and car brake control settings. These settings are determined for the head end locomotives and the remotely controlled locomotives. These recommendations are desired settings displayed to the locomotive engineer who can then elect to manually move the various controls to achieve these settings. In the cruise control mode, leader derived settings are used to automatically control the locomotive power and braking systems, the train brake system of each car and ancillary systems which effect train movement. The locomotive engineer services an operational supervisor with the ability to manually override the cruise control . Cruise control can also be effectuated by communication links between the leader and the railroad central traffic control center.
LEADER would receive and activate a variety of commands received from the central traffic control center. This received information would include impeding slow orders, speed limit changes, aspects of approaching signals, etc. LEADER would provide status updates to the control center, including current train speed, current track location, detected faults or equipment malfunctions, estimated time of arrival, etc. The traffic control can use this information to manage the complete safe and effective movement of train traffic under its control . The display of Figure 5 is produced by the flow chart of Figure 6. The track profile data bases include track profile or topology including grades, curves, mile posts, town names, absolute latitude and longitude coordinates, signal locations and other various track structures. Besides the physical characteristics of the track profile, also the condition of upcoming signals, slow orders, speed limits and location of speed restricting zones are taken into account . The LEADER system includes communication capability between the locomotive and central dispatcher such that new orders can be loaded into the system in real time. THE LEADER system also include multiple distance counters to aid the locomotive engineer with navigating various speed restrictions zones. The LEADER has the capability to start, stop, reset and alert the crew upon arbitrary condition of multiple counters shown on the LEADER display. Thus, depending upon the length of the train, the train may be in multiple zones at a time.
Various physical conditions and train characteristics are need for the methods to be discussed below. The consist information or train characteristics includes car length, car weight, car position in the consist, braking equipment description, types of bearings, wind drag areas. It also includes information on the locomotive including locomotive length, weight and position of the consist, traction performance, dynamic braking performance, fuel consumption as related to power control settings and locomotive speeds.
The track profile data base and the consist information can be loaded externally by the engineer or communication links with the railroad central traffic control center. Similarly, the information on the consist may be derived automatically from individual controllers on the locomotives on the cars during power up as described in U.S. Patent applications 08/837,113 filed April 14, 1997 and 08/689,813 filed August 14, 1996. Other information that may be loaded would include operational constraints for exceptional speed limits and special slow orders, speed restriction zones, meets and passes, track occupancy permits, general operating bulletins, upcoming signal designations, desired time of arrival and final destination location and limit of authority or track locations the train move to without the possibility of interference with the movement of the trains in the area. The track profile data base, location and consist information are used to draw the track profile in the horizontal view, curvature view and overhead view and provided to the leader display. The leader train dynamic's calculations uses a combination of instrumented measurements at the locomotive and if available from the cars and a computer calculation based on the fundamental laws of physics, engineering mechanics along with various empirical derivations. These measurements and calculations are used to facilitate the estimated required feedbacks. The measurements include throttle and/or dynamic brake settings at the locomotive, control pressures of various locomotive air brake control systems, and locomotive speed and increment wheel rotation. It also includes end of train brake control pressures and brake pressures to the individual cars available. Power produced and/or anticipated within the locomotives traction system and locomotive wheel slip. Activation of the locomotive sanders and whistle and or bells. The absolute track location and time of day are also inputs. This is in addition to the consist information and track profile previously described. From this information, Leader calculates the steady state and transient draft/buff force magnitude and its position of the consist, lateral over vertical force ratio magnitude and position in the consist, brake pressure magnitude and position in the consist and brake cylinder pressure magnitude and positions in the consist. These four parameters are then mapped to the train symbols and current track profile locations and provided to the leader display.
A flow chart for determining the location is illustrated in Figure 7. Three different sources of information are derived, weighted and combined as an estimation of location. A first source for information is transmitted to the train. This is available from geographical positions system (GPS) which is used to detect the precise latitude and longitude of the head of the train. Another commercially available system uses transponders buried at spaced intervals under the rail. The locomotive equipped with a transceiver activates transponders as they pass over them. The transponder then transmits an encoded message that, when deciphered, provides track location. As another alternative, the train engineer can enter mile post signs which would then be compared against the track data base to determine location. The flow chart of Figure 7 also indicates two incremental methods of estimating location. A turn rate indicator provides a signal which is used to index against the track data base to produce an estimate of the location. Another is an end of axle pulse counter which detects incremental distance travel by the locomotive and is used to index the track data base to an estimate location. The turn rate indicator and the end of axle pulse counter will operate to an increment from the previously measured position. All three of the estimated locations are then weighted and combined to produce the ultimate estimate of location to be used in the display and various calculations based on track profile .
The LEADER also has the capability of determining whether its calculations are inaccurate. For example, if there is error in actual distance traveled versus the calculated distance traveled, this may be brought to the attention of the operator. This allows the operator to change the weighting functions if desired in the algorithm. These errors in the algorithms may be to faulty measurements, wrong consist information, failures in the car brake systems and/or failures in the propulsion system. Even without the ability to identify the specific source of the error, at least notification that the error does exist will allow the operator and the system to make more intelligent decisions .
The LEADER integrates with electropneumatic (EP) brake systems to provide braking on a car by car basis. This can be used to maximize fuel efficiency, minimizes in-train forces, and/or minimize the time of the destination. By combining knowledge of the position and state of the train, the control of the individual brakes further improves braking performance. For example, the EP brake controllers on each car can be commanded to apply brakes on the cars forward of a certain point as the train crests the hill and not apply the brakes on the cars which are below the crest of the hill. This eliminates the cars on the uphill side from being dragged with their brakes on until they crest the hill . The control of the individual cars is illustrated in the flow chart of Figure 3. The process begins with LEADER monitoring the track profile. If there is a geographic feature of interest, it proceeds to identify train location relative to geographic feature of interest. If not, it cycles back to monitoring the track profile. Geographic features of interest may include hills, valleys, curves, signals or siding. These are examples of features of interest which would benefit from individual car braking. After identifying the location of the train relative the geographic feature, the identity of which cars are at the geographic feature of interest is determined. This is determined using car serialization data to order and identify the cars. Serialization of the car may be determined using the process described in copending U.S. Patent Application No. 08/837,113 filed April 14, 1997. After identifying the location of the car relative to the geographic feature of interest, there is a decision made of whether optimization is possible. If not, it cycles back to the LEADER monitoring track profile. If optimization is possible, the operating parameters for operational constraints are determined. As previously discussed, they may include limits on forces or speed. Next, optimized weighted parameters from the user are derived taking into account the operational constraints. Examples of method of optimization may be to maximize fuel efficiency, minimize in-train forces or minimize time to destination. Also, dynamic brake affinity and pneumatic brake affinity can be weighted also. These are determined by the user. These weighted factors are combined and provided to the optimized weighted parameter from user step. If less than all is desired, the weight for the undesired parameter may be given zero.
The optimized weighted parameters are then used to calculate optimized operating parameters, for example, which car to brake and what level of braking is necessary. The appropriate commands are issued to the electropneumatic system brakes of each car. This would include the car ID and level of braking transmitted over the communication link throughout the train. For the locomotives, this would include pneumatic and dynamic braking as well as propulsion.
If all of the cars are not equipped with EP system brakes, the only control of the train is through the brake pipe to the individual cars as well as the brakes and the throttle on the locomotive. Thus, maximization of fuel efficiency, minimizing the in-train forces and minimizes time to destination would have to be controlled through the throttle and brake pipe. If the cars do not have individually controlled brakes, the optimized operating parameters are determined on the system level as illustrated in Figure 4.
It should be noted that even if optimization may not be possible, the flow charts of Figures 3 and 4 would also be operable to identify the train location and the location of the individual cars and determine whether the constraint limits have been or are going to be reached. If there is an anticipation that they are going to be reached, then the calculation of restraint operating parameters are performed. The calculation of which cars to brake and what level of brake is necessary as well as calculation of locomotive commands is performed. These commands are then issued to the individual cars and locomotives. Alternatively, the braking and propulsion control is performed on the system level .
The calculations and the optimization of Figures 3 and 4 are conducted not only for the present location of the train but looking ahead at the ensuing track profile. This is used to determine what change in the train conditions will result from the change in the track profile and location. Without such look ahead capability, complete optimization is not fully achieved. Also, anticipation of a diminishing or increasing condition in track profile and train location will affect keeping the train within the constraint boundaries.
Proportional controls of the locomotive traction power and dynamic braking include subsystems for managing a locomotive pulling effect and electric braking efforts. Proportional control of locomotive air brake subsystems including both the application and release the independent locomotive brakes and the train or individual car brakes. The activation/deactivation of ancillary locomotive control systems include control of sanding, the horn and the bells.
As a subset of the optimization of Figures 3 and 4 or as an independent system, fuel optimization through the throttle setting including idle is described in Figure 8.
Locomotives operate at maximum efficiency at certain throttles. While multiple locomotives are necessary to pull the train over certain areas, other areas in the same territory may not require all of the locomotives for operation. LEADER has the knowledge of the state of the train currently, the locomotive capacity, the train consist and the track profile ahead. Using this knowledge, LEADER can determine the optimal combination of throttle settings on the locomotive to maximize efficiency. The setting can be from idle to notch 1-8.
Information on the train consist, locomotive information, track profile and current throttle commands are used by the LEADER processing algorithms to determine the train status. The determination is then made of whether the throttle settings are optimal for fuel efficiency. If they are, no further processing is required. If they are not, then a recommended optimal throttle setting is determined. This setting is then displayed to the crew. In a semiautomatic mode, the crew response is determined and if the crew selects the optimal setting, no further processing is performed. If the crew does not select the optimal setting, then the system will automatically select the optimal setting. Thus, fuel optimization through throttle setting is achieved. As a further extension of optimization using throttle settings is the ability to save fuel through shutdown and restart of the locomotives. Over the course of operation of a freight train, for example, a coal train operating in a loop, a portion of the train's operating time is spent moving totally empty. The amount of power required during a loaded move will generally determine the number and horse power of the locomotives in the train. All trains are generally operated during both the loaded and empty move in such a train, even though the empty train movement may not require all of the locomotives from propulsion. The LEADER'S capability to look ahead and calculate required horse power for a certain section of a move, it is possible to shutdown an unneeded locomotive and save sufficient fuel. The LEADER can continue to look ahead and determine whether and when additional power will be necessary. They command the engines to restart with proper warm up time to be available when required.
The flow chart for such an operation is illustrated in Figure 9. User defined operating parameters are inputted to the LEADER system. The LEADER looks ahead to calculate or the determined required horse power to navigate through the next section of trackage. Then a determination is made whether sufficient power is available. If not, then there is a determination whether there are any available locomotives to start up. If not, the system cycles back to the beginning. If there is, then one or more of the available locomotives are started up to provide the appropriate horsepower. If sufficient horsepower is available, then a determination is made of whether one or more of the locomotives can be shutdown for the power requirement. If not, then the system cycles back. If one or more locomotives can be shutdown, then one or more locomotives are appropriately shutdown. This system is reiterated continuously monitoring the ensuing trackage and adjusting the number of locomotives which are shutdown or restarted.
Another limitation on the abilities to control the in-train forces and fuel efficiency is that on most trains, that although the freight brakes can be gradually applied, they cannot be gradually released. Once a brake is released by the locomotive engineers, the brake will completely release. After a brake application is initiated, it may take up to one minute or longer to fully apply the brakes throughout a train having, for example, 100 cars. A full release of a brake system will also take a minute or longer. The time required is depended upon the length of the train and the specific type of brake valves on the cars. Thus, a common problem faced by the locomotive engineers to determine the extent of brake to apply.
If an engineer is moving down a grade that requires a brake application to maintain a safe speed, a sufficient application must be made to prevent the train from gaining too much speed. If too much brake is applied, the train may slow down and eventually stop or stall. Ideally, sufficient brake is applied to balance the effect of the grade. If too much brake is applied, there are two choices. The brakes can be released and re-applied, which will take two or more minutes. This may result in the train gaining too much speed before the brakes are reapplied and therefore being a "runaway" . The other alternative is to apply the locomotive power propulsion to compensate for the excessive brake application. This is known as "power braking" . Although resulting in a reasonable control of train speed, it increased the cost of energy, fuel consumption and wear on the brake system.
The LEADER system measures train speed, time, track location and profile, locomotive throttle and brake control settings, and the train makeup determines the optimum brake application required to maintain a safe speed. The safe speed may be optimized in combination with a longitudinal and lateral force level, minimum slack action and fuel usage. Using standard freight train dynamic modeling coupled with the measurements and data bases, the LEADER predicts that brake control settings will be required to maintain the speed or to optimize the speed with other forces and fuel usage. Depending upon the mode of operation, the predicted brake settings can be conveyed to the LEADER display for implementation by the engineer or for control by the LEADER system directly.
A flow chart for optimizing the braking of the train to maintain grade is illustrated in Figure 10. LEADER monitors current train speed (V) and track location (XLOC) . LEADER determines the average grade (G) over the ensuing distance to be traveled, X. LEADER determines the average train rolling resistance forces (FR) over the ensuing distance to be traveled, X. Based on train weight (W) , LEADER calculates the force exerted on the train by the grade (FG) , FG=WG. If the average grade (G) is downhill, LEADER computes the braking force (FB) required to balance the grade (G) , FB= (FG+FR) . Based on the calculated brake force (FB) required, LEADER determines the brake control settings to achieve this brake force. If the average grade is not downhill, LEADER computes the propulsion force required to maintain the speed (V) . Based on the propulsion force required to maintain speed, the LEADER calculates train throttle settings to achieve this force.
The control settings or the throttle settings required to achieve the force will then be used with a determination of whether there is automatic control. If automatic control is not selected, the settings are displayed. The determination is made of whether the crew responded to the displayed settings. If they do, then the system cycles back to the beginning. If not, an enforcement is produced. This enforcement could include a warning or automatic control. If automatic control is selected, then the appropriate settings are actuated. The balancing grade may also be part of the optimization routine of Figures 3, 4, 8 and/or 9.
The longitudinal forces which, if they exceed the limit of the coupling system, will result in a train braking in-two. Pulling a long train up a grade against gravity and overcome the friction at the car axles, may produce an acceleration or force in the couplings which is unsafe. The determination of unsafe forces is described in the flow chart of Figure 11. The LEADER determines the forces using its standard algorithms. The current force levels include steady state draft and buff, transient draft and buff and lateral over vertical force ratio. These are compared with the limits set by the railroad. If these calculated forces are outside the limits, the determination is then made whether the system is an automatic control or not. If it is an automatic control, then the commands to actuate forces are actuated. If it is not an automatic control, then an alert is provided to the user. The crew response is then determined. If the crew affectuates the required setting, then the system cycles back. If the crew does not actuate the required setting, then an enforcement is actuated. This enforcement again can be some visual alarm or indication or automatic control. If they are not outside the limits, the LEADER force calculation is continued.
Also, this information can be used as in the flow chart of Figures 3 and 4 as a weighted value or by itself to achieve optimum braking. It can be used to control the braking as well as to control the propulsion. By adjusting the propulsion system, pulling the force exerted can be controlled.
In addition to the coupling forces produced by the pulling between the cars, there is slack action which may brake the coupler or damage the coupling system. There is typically 4 - 6 inches of free unrestrained movement in the coupling and even at its relative speed of 1 - 2 miles an hour, can create large forces. The prediction and control of slack action is illustrated in the flow chart of Figure 12. The LEADER measures train speed, time, track location and track profiles, locomotive throttle and brake settings and train make-up to minimize slack related forces. Using standard freight train dynamic modeling techniques, LEADER calculates coupler forces and slack conditions throughout the train. Next, it determines if slack action is occurring. If not, the existing throttle and brake settings are used in the display or for control of the train.
If slack action is occurring, coupled with the measurements and the stored data base information, the LEADER predicts the train and brake control settings that will minimize momentum changes between the freight cars. Through experimentation it has been discovered that the magnitude of slack related forces can be effectively minimized by maintaining near zero acceleration of the train as the slack action is occurring. The LEADER determines the magnitude of locomotive power application or brake system application that is required to maintain near zero train acceleration.
Next to determination is whether automatic control is actuated. If it is, then the throttle end are actuated to the calculated settings to minimize slack action. If not, the LEADER displays a throttle and/or brake settings to minimize slack action. Next, the crew's response is measured. If the crew sets the throttle and/or brakes to the desired setting, then the system cycles back to the beginning. If not, an enforcement is initiated. Again, this may be an alarm or indicator that they have not responded or it may automatic control. Calculation control settings can either be conveyed to the locomotive engineer by the LEADER display for implementation or complete control settings can be set. Trains having some or all EP brake cars, slack action will be controlled either at the locomotive only with propulsion and brake pipe braking or in combination with EP braking on the individual cars by sending additional electrical signals to the individual cars to even out the slack within the consist.
In addition to providing information or controlling the train to be within speed limits, or to optimize the performance of the train, it is also important to provide information with respect to the ability to come to a safe stop. The LEADER system uses the measurement of train speed, time, track location and characteristics, locomotive throttle and brake control settings and car consist information to determine what is required to stop the train from its current track location. The LEADER uses standard freight train dynamic modeling techniques, coupled with the measurements in data base to accurately predict the distance required to stop the train from its present track location. The predicted stop distance can be conveyed to the locomotive engineer and the LEADER display and to ancillary control equipment of systems internal or external to the locomotive. If the predicted stop distance indicates that the locomotive will enter a restricted zone unless a stop is initiated, the ancillary control equipment can automatically induce the required brake application to bring the train to a safe stop. Figure 13 shows a flow chart for stop distance calculations. LEADER monitors current train speed (V) and track location (XLOC) . It sets integration time period, DT=1 sec, initialize stop distance, XSTOP=0 and initialize stop time, TSTOP=0. Based on track location (XLOC) , speed (V) and train makeup, LEADER calculates retardation forces imparted to the train (FR) due to grades, curves, and rolling resistance effects, at Time = TSTOP . Based on full service brake application, LEADER calculates brake cylinder pressures on train, at Time = TSTOP. LEADER calculation train brake retardation (FB) forces from brake cylinder pressures, and car brake rigging, at Time = TSTOP. Based on Newton's laws of motion and train weight (W) , LEADER calculates train deceleration at time = TSTOP, A=K* (FB+FR)/W. LEADER integrates calculated acceleration to determine speed at time = TSTOP, V=V+A*DT. LEADER integrates speed to determine stopping distance and track location at time = TSTOP, XSTOP = XSTOP + V*DT. XLOC = XLOC + V*DT. TSTOP = TSTOP + DT . Next, it is determined if velocity V = O. If yes, LEADER displays stop distance XSTOP. If not, it loops back to begin the calculation cycle. The ability of the LEADER to provide information and to record information allows the training or qualifying of the locomotive engineer. As illustrated in Figure 14, training can be performed by providing railroad training parameters to the LEADER system. The LEADER system can provide feedback display information to the LEADER display screen for guidelines of operation. The response of the engineer would then be recorded by the LEADER system. The LEADER display would then provide the result of the input with suggested corrections or modifications. The LEADER system also has the ability to store the history of the trip and the operator's responses. This information can be downloaded and used on a simulator, desktop or portable PC system. This information can be compared against desired responses to qualify the engineer. Although such qualifications have historically been performed on training systems, the real life data provides a better setting for qualification. This information may also be used for train handling, performance analysis, accident investigation and general operational studies.
Access to the control of the locomotives may be determined by reading a user I.D. and determining whether the user is qualified to use the particular piece of equipment. This information may be on an encoded device which the user of the locomotive must insert into the system before the system will be actuated. A flow chart of the system is illustrated in Figure 15. The user's I.D. is read. A determination is then made whether the user, through his I.D. or through his qualification level is approved for the particular equipment or locomotive. If the engineer is not, the system is disabled. An alarm may be set if desired. If the engineer is qualified or approved for the equipment, the user I.D. is recorded. The display and/or systems could be customized for that user if desired. If not, this step can be deleted. The final step for an improved user is to enable the systems for its use. The encoded device which includes the user's I.D. and their qualification may also be used with the trainer of Figure 14. This training session would determine, from the user I.D., their level prior to the training session. Depending upon the results and the qualification, this user's level would be updated. Thus, the encoded device would always carry the latest qualification level of the user. Although the present invention has been described and illustrated in detail, it is to be clearly understood that the same is by way of illustration and example only, and is not to be taken by way of limitation. The spirit and scope of the present invention are to be limited only by the terms of the appended claims.

Claims

WHAT IS CLATMED:
1. A method of optimizing train operation comprising: determining conditions of location, track profile and train forces; determining, from the determined conditions, a set of preliminary train restraint operating parameters to be within operational restraints and at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination; weighting and combining the determined set of preliminary train operating parameters; and determining optimized train operating parameters from the weighted and combined preliminary train operating parameters.
2. The method according to Claim 1, including determining from train location and track profile if optimization should be performed.
3. The method according to Claim 2, wherein determining if optimization should be performed includes determining location of the train with respect to one or more of hill, valley, curve, signal and siding.
4. The method according to Claim 1, wherein determining optimized operating parameters includes determining dynamic and fluid braking.
5. The method according to Claim 4, wherein determining fluid braking includes determining fluid braking individually for each locomotive and car in the train which can be individually controlled.
6. The method according to Claim 4, wherein determining dynamic and fluid braking includes determining dynamic and fluid braking individually for each locomotive.
7. The method according to Claim 1, including determining dynamic and fluid braking as preliminary train optimizable operating parameters, weighting and combining each the dynamic and fluid braking with the determined sets of preliminary train operating parameters.
8. The method according to Claim 7, wherein weighing the dynamic and fluid braking as a function of location and track profile.
9. The method according to Claim 1, wherein the train operating parameters include one or more of train fluid braking, locomotive fluid braking, locomotive dynamic braking and locomotive propulsion.
10. The method according to Claim 1, including displaying the optimized operating parameters.
11. The method according to Claim 1, including controlling the train to the determined optimized operating parameters.
12. The method according to Claim 1, wherein the train includes more than one locomotive and one of the train optimized operating parameters includes shutting down or restarting the propulsion system of individual locomotives.
13. The method according to Claim 1, wherein determining the preliminary train restraint operating parameters in one or more of speed limits, slow orders, speed restriction zones, meets and passes, track occupancy permits, general operating bulletins, drawbar limits and slack action limits.
14. The method according to Claim 1, wherein the preliminary train optimizable operating parameters are determined using the operational restraints .
15. The method according to Claim 1, including determining train characteristics which includes, for each car, one or more of length, weight, position in the train, braking equipment, description, types of bearings and wind drag areas.
16. The method according to Claim 1, including train characteristics which includes, for each locomotive, one or more of length, weight, position in the train, traction performance, dynamic braking performance, fuel consumption as related to power control settings and locomotive speeds.
17. The method according to Claim 1, wherein determining train forces includes determining forces experienced by and through out the train for ensuing track profile.
18. The method according to Claim 1, wherein determining preliminary train restraint operating parameters includes determining preliminary train operating parameters to maintain coupler forces below a set limit.
19. The method according to Claim 1, wherein determining forces includes determining coupler forces and slack action through out the train.
20. The method according to Claim 19, wherein determining optimized train operating parameters if slack action has been determined includes determining train operating parameters which achieve zero acceleration within the train.
21. The method according to Claim 1, wherein determining forces includes determining at least one of steady state draft and buff, transient draft and buff, slack action and lateral over vertical force ratio.
22. The method according to Claim 1, wherein determining forces includes determining forces exerted by grade and rolling resistance over the ensuring track.
23. The method according to Claim 22, including determining preliminary train optimizable operating parameters to maintain grade from the determined rolling resistance force and force exerted by grade.
24. The method according to Claim 22, including determining preliminary train optimizable operating parameters to stop in a minimum distance from the determined rolling resistance force and force exerted by grade .
25. The method according to Claim 1, including determining preliminary train optimizable operating parameters to a stop in a minimum distance.
26. The method according to Claim 25, wherein the method is repeated until the train is stopped.
27. The method according to Claim 1, including determining train restraint and optimizable operating parameters to adhere to posted speed restriction.
28. A method of training a locomotive engineer in a moving train comprising: displaying on the train a condition to which the engineer is to respond; determining the engineer's response; and changing the display in response to the engineer's response.
29. The method according to Claim 28, wherein the display is changed to reflect the actual condition resulting from the engineer's response.
30. The method according to Claim 28, including displaying a suggested response to the initially displayed condition.
31. The method according to Claim 30, wherein the display is changed to reflect the condition resulting from the suggested response.
32. The method according to Claim 28, including recording the engineer' s response as it relates to the displayed condition.
33. The method according to Claim 32, including comparing the engineer' s response to a suggested response to the condition.
34. The method according to Claim 33, including qualifying the engineer from the comparison of the engineer's response to a suggested response to the condition.
35. The method according to Claim 32, including recording the response of the train to the engineer's response as it relates to the displayed condition.
36. The method according to Claim 28 including determining the qualification level of the engineer prior to training from the engineer's inputs.
37. The method according to Claim 36, qualifying the engineer based on the determined response and updating the qualification level .
38. The method of controlling access to locomotive controls comprising: inputting user identification; determining qualification levels of user, and enabling systems if determined qualification levels of user meets locomotive requirements .
39. The method according to Claim 38 including customizing control systems based on user identification .
40. The method according to Claim 38, wherein user identification and qualification level are inputted by the user using an encoded device.
PCT/US1998/018823 1997-09-12 1998-09-11 Method of optimizing train operation and training WO1999014093A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CA002303281A CA2303281C (en) 1997-09-12 1998-09-11 Method of optimizing train operation
AU95674/98A AU753354B2 (en) 1997-09-12 1998-09-11 Method of optimizing train operation and training
BR9814278-0A BR9814278A (en) 1997-09-12 1998-09-11 Train operation and training optimization method
EP98949330A EP1017578A1 (en) 1997-09-12 1998-09-11 Method of optimizing train operation and training

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US5897097P 1997-09-12 1997-09-12
US60/058,970 1997-09-12

Publications (1)

Publication Number Publication Date
WO1999014093A1 true WO1999014093A1 (en) 1999-03-25

Family

ID=22020025

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US1998/018823 WO1999014093A1 (en) 1997-09-12 1998-09-11 Method of optimizing train operation and training

Country Status (7)

Country Link
US (2) US6144901A (en)
EP (1) EP1017578A1 (en)
AU (1) AU753354B2 (en)
BR (1) BR9814278A (en)
CA (3) CA2635895C (en)
WO (1) WO1999014093A1 (en)
ZA (1) ZA988358B (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1253059A1 (en) * 2001-04-25 2002-10-30 Hitachi, Ltd. Railway vehicle operation-control system and a railway vehicle using the operation control system
EP1264754A1 (en) * 2001-06-07 2002-12-11 Siemens Aktiengesellschaft Traffic data evaluation device
WO2003097424A1 (en) * 2002-05-20 2003-11-27 Tmg International Holdings Pty Limited System for improving timekeeping and saving energy on long-haul trains
US6763291B1 (en) 2003-09-24 2004-07-13 General Electric Company Method and apparatus for controlling a plurality of locomotives
GB2371121B (en) * 2001-01-13 2005-06-01 Dawe John A control system for a railway train and method therefor
FR2877885A1 (en) * 2004-11-17 2006-05-19 Alstom Transport Sa Rail transit car e.g. train, speed controlling device, has speed limitation unit to find control signal so that speed limit for train having two pairs of mechanically independent front and rear wheels, does not exceed determined speed limit
US7127336B2 (en) 2003-09-24 2006-10-24 General Electric Company Method and apparatus for controlling a railway consist
WO2007111768A3 (en) * 2006-03-20 2008-04-17 Gen Electric Trip optimization system and method for a train
WO2008073546A2 (en) * 2006-12-07 2008-06-19 General Electric Company Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
WO2009090278A1 (en) * 2008-01-16 2009-07-23 Sociedad Pública Eusko Trenbideak-Ferrocarriles Vascos, S.A. Radio-based railway blocking management system
AU2008201906B2 (en) * 2002-05-20 2009-12-03 TTG (Holdings) Pty Ltd Method for improving timekeeping and saving energy on long-haul trains
US8398405B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller
EP2428425A3 (en) * 2006-02-13 2013-03-27 New York Air Brake Distributed train intelligence sytem and method
RU2482990C2 (en) * 2006-12-07 2013-05-27 Дженерал Электрик Компани Method for optimising operation of train with multiple locomotives with distributed power feed
US8538608B2 (en) 2009-09-09 2013-09-17 General Electric Company Control system and method for remotely isolating powered units in a rail vehicle system
US8565946B2 (en) 2011-07-01 2013-10-22 General Electric Company System and method for vehicle control
US8903573B2 (en) 2006-03-20 2014-12-02 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US8998617B2 (en) 2006-03-20 2015-04-07 General Electric Company System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller
US9079589B2 (en) 2009-09-09 2015-07-14 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US9201409B2 (en) 2006-03-20 2015-12-01 General Electric Company Fuel management system and method
US9233696B2 (en) 2006-03-20 2016-01-12 General Electric Company Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear
US9266542B2 (en) 2006-03-20 2016-02-23 General Electric Company System and method for optimized fuel efficiency and emission output of a diesel powered system
US9527518B2 (en) 2006-03-20 2016-12-27 General Electric Company System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
CN112896122A (en) * 2021-03-05 2021-06-04 南京经纬达汽车科技有限公司 Pedal feel simulation device and control method thereof

Families Citing this family (162)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040172175A1 (en) * 2003-02-27 2004-09-02 Julich Paul M. System and method for dispatching by exception
US7539624B2 (en) * 1994-09-01 2009-05-26 Harris Corporation Automatic train control system and method
US7092894B1 (en) * 1994-09-01 2006-08-15 Harris Corporation Cost reactive scheduler and method
US6334654B1 (en) 1996-09-13 2002-01-01 New York Air Brake Corporation Integrated train electrical and pneumatic brakes
US6343236B1 (en) * 1999-04-02 2002-01-29 General Electric Company Method and system for analyzing fault log data for diagnostics
US6622264B1 (en) 1999-10-28 2003-09-16 General Electric Company Process and system for analyzing fault log data from a machine so as to identify faults predictive of machine failures
US6947797B2 (en) * 1999-04-02 2005-09-20 General Electric Company Method and system for diagnosing machine malfunctions
US6980894B1 (en) * 1999-04-14 2005-12-27 San Francisco Bay Area Rapid Transit Method of managing interference during delay recovery on a train system
US7164975B2 (en) * 1999-06-15 2007-01-16 Andian Technologies Ltd. Geometric track and track/vehicle analyzers and methods for controlling railroad systems
US20110208567A9 (en) * 1999-08-23 2011-08-25 Roddy Nicholas E System and method for managing a fleet of remote assets
US7219067B1 (en) * 1999-09-10 2007-05-15 Ge Harris Railway Electronics Llc Total transportation management system
US7188341B1 (en) 1999-09-24 2007-03-06 New York Air Brake Corporation Method of transferring files and analysis of train operational data
US7117137B1 (en) 1999-12-29 2006-10-03 Ge Harris Railway Electronics, Llc Adaptive train model
US6505103B1 (en) * 2000-09-29 2003-01-07 Ge Harris Harmon Railway Technology, Llc Method and apparatus for controlling remote locomotive operation
US20060005736A1 (en) * 2001-03-27 2006-01-12 General Electric Company Hybrid energy off highway vehicle electric power management system and method
US6612245B2 (en) 2001-03-27 2003-09-02 General Electric Company Locomotive energy tender
US9193268B2 (en) 2001-03-27 2015-11-24 General Electric Company Hybrid energy power management system and method
US7430967B2 (en) * 2001-03-27 2008-10-07 General Electric Company Multimode hybrid energy railway vehicle system and method
US6922619B2 (en) * 2002-02-28 2005-07-26 General Electric Company System and method for selectively limiting tractive effort to facilitate train control
US6973880B2 (en) 2001-03-27 2005-12-13 General Electric Company Hybrid energy off highway vehicle electric power storage system and method
US7882789B2 (en) * 2001-03-27 2011-02-08 General Electric Company System and method for managing emissions from diesel powered systems
US6615118B2 (en) * 2001-03-27 2003-09-02 General Electric Company Hybrid energy power management system and method
US7302895B2 (en) * 2002-02-28 2007-12-04 General Electric Company Configurable locomotive
US6612246B2 (en) 2001-03-27 2003-09-02 General Electric Company Hybrid energy locomotive system and method
US7231877B2 (en) * 2001-03-27 2007-06-19 General Electric Company Multimode hybrid energy railway vehicle system and method
US9151232B2 (en) 2001-03-27 2015-10-06 General Electric Company Control system and method
US7500436B2 (en) * 2003-05-22 2009-03-10 General Electric Company System and method for managing emissions from mobile vehicles
US6591758B2 (en) 2001-03-27 2003-07-15 General Electric Company Hybrid energy locomotive electrical power storage system
US7448328B2 (en) * 2001-03-27 2008-11-11 General Electric Company Hybrid energy off highway vehicle electric power storage system and method
US6629034B1 (en) * 2001-06-06 2003-09-30 Navigation Technologies Corp. Driving profile method and system
US6487488B1 (en) 2001-06-11 2002-11-26 New York Air Brake Corporation Method of determining maximum service brake reduction
US6691957B2 (en) * 2001-06-21 2004-02-17 General Electric Company Control and method for optimizing the operation of two or more locomotives of a consist
US7021588B2 (en) * 2001-06-21 2006-04-04 General Electric Company System and method for managing two or more locomotives of a consist
JP3723766B2 (en) * 2001-12-04 2005-12-07 株式会社日立製作所 Train control method and apparatus
JP3932098B2 (en) * 2002-01-31 2007-06-20 株式会社デンソー Auxiliary terminal for vehicle power distribution device and user retrofit load connection
US10569792B2 (en) 2006-03-20 2020-02-25 General Electric Company Vehicle control system and method
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US7143017B2 (en) * 2002-06-25 2006-11-28 New York Air Brake Corporation Remote control locomotive simulator
US6865454B2 (en) * 2002-07-02 2005-03-08 Quantum Engineering Inc. Train control system and method of controlling a train or trains
US20040015275A1 (en) * 2002-07-18 2004-01-22 Herzog Stanley M. Automatic control system for trains
US6993675B2 (en) * 2002-07-31 2006-01-31 General Electric Company Method and system for monitoring problem resolution of a machine
US7096171B2 (en) * 2002-08-07 2006-08-22 New York Air Brake Corporation Train simulator and playback station
US7647141B2 (en) * 2002-08-07 2010-01-12 New York Air Brake Corporation Advanced simulation capture and reporting tools
US6789005B2 (en) 2002-11-22 2004-09-07 New York Air Brake Corporation Method and apparatus of monitoring a railroad hump yard
US6694231B1 (en) 2002-08-08 2004-02-17 Bombardier Transportation Gmbh Train registry overlay system
US6810312B2 (en) * 2002-09-30 2004-10-26 General Electric Company Method for identifying a loss of utilization of mobile assets
US8538611B2 (en) * 2003-01-06 2013-09-17 General Electric Company Multi-level railway operations optimization system and method
US20060212188A1 (en) * 2003-02-27 2006-09-21 Joel Kickbusch Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
US7725249B2 (en) * 2003-02-27 2010-05-25 General Electric Company Method and apparatus for congestion management
US20060212186A1 (en) * 2003-02-27 2006-09-21 Philp Joseph W Method and apparatus for scheduling maintenance of way
US20060212187A1 (en) * 2003-02-27 2006-09-21 Wills Mitchell S Scheduler and method for managing unpredictable local trains
US7937193B2 (en) * 2003-02-27 2011-05-03 General Electric Company Method and apparatus for coordinating railway line of road and yard planners
US7797087B2 (en) * 2003-02-27 2010-09-14 General Electric Company Method and apparatus for selectively disabling train location reports
AU2003902168A0 (en) * 2003-05-07 2003-05-22 Central Queensland University A control system for operating long vehicles
AU2004201920B2 (en) * 2003-05-07 2009-03-12 Central Queensland University A Control System for Operating Long Vehicles
US20090132113A1 (en) * 2003-05-22 2009-05-21 General Electric Company System and method for managing mobile asset
US8292172B2 (en) * 2003-07-29 2012-10-23 General Electric Company Enhanced recordation device for rail car inspections
US6972670B2 (en) * 2003-12-04 2005-12-06 New York Air Brake Corporation WDP setup determination method
US20050228620A1 (en) * 2004-04-08 2005-10-13 Corys Training & Engineering Support Systems Method and apparatus for simulating a train and track
US7908047B2 (en) * 2004-06-29 2011-03-15 General Electric Company Method and apparatus for run-time incorporation of domain data configuration changes
US7340329B2 (en) * 2004-11-24 2008-03-04 New York Air Brake Corporation System and method for controlling an electrified vehicle
US20060195327A1 (en) * 2005-02-14 2006-08-31 Kumar Ajith K Method and system for reporting and processing information relating to railroad assets
CA2599780A1 (en) * 2005-03-14 2006-09-21 General Electric Company A system and method for railyard planning
MX2007012297A (en) * 2005-04-07 2008-03-11 New York Air Brake Corp Multimedia train simulator.
US7522990B2 (en) * 2005-06-08 2009-04-21 General Electric Company System and method for improved train handling and fuel consumption
US7575201B2 (en) * 2005-08-18 2009-08-18 General Electric Company System and method for detecting a change or an obstruction to a railway track
US8311689B2 (en) * 2005-12-21 2012-11-13 General Electric Company Protection against exceeding the braking capability of remote controlled locomotives
US7751952B2 (en) * 2005-12-30 2010-07-06 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for arrival rate
US7657348B2 (en) * 2005-12-30 2010-02-02 Canadian National Railway Company System and method for computing rail car switching solutions using dynamic classification track allocation
US20070156298A1 (en) * 2005-12-30 2007-07-05 Canadian National Railway Company System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of arrival profile
US7742848B2 (en) * 2005-12-30 2010-06-22 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block pull time
US8055397B2 (en) 2005-12-30 2011-11-08 Canadian National Railway Company System and method for computing rail car switching sequence in a switchyard
US7747362B2 (en) * 2005-12-30 2010-06-29 Canadian National Railway Company System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of block pull time
US20070179688A1 (en) * 2005-12-30 2007-08-02 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard
US8060263B2 (en) * 2005-12-30 2011-11-15 Canadian National Railway Company System and method for forecasting the composition of an outbound train in a switchyard
US7742849B2 (en) 2005-12-30 2010-06-22 Canadian National Railway Company System and method for computing car switching solutions in a switchyard using car ETA as a factor
US7818101B2 (en) * 2005-12-30 2010-10-19 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard using an iterative method
US7792616B2 (en) * 2005-12-30 2010-09-07 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block size
US9129233B2 (en) * 2006-02-15 2015-09-08 Catepillar Inc. System and method for training a machine operator
US20080154692A1 (en) * 2006-03-14 2008-06-26 Prescott Logan System and method for rail yard process monitoring
US9689681B2 (en) 2014-08-12 2017-06-27 General Electric Company System and method for vehicle operation
US20080183490A1 (en) * 2006-03-20 2008-07-31 Martin William P Method and computer software code for implementing a revised mission plan for a powered system
US20080201019A1 (en) * 2006-03-20 2008-08-21 Ajith Kuttannair Kumar Method and computer software code for optimized fuel efficiency emission output and mission performance of a powered system
US8630757B2 (en) * 2006-03-20 2014-01-14 General Electric Company System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks
US8768543B2 (en) * 2006-03-20 2014-07-01 General Electric Company Method, system and computer software code for trip optimization with train/track database augmentation
US8788135B2 (en) * 2006-03-20 2014-07-22 General Electric Company System, method, and computer software code for providing real time optimization of a mission plan for a powered system
US7974774B2 (en) * 2006-03-20 2011-07-05 General Electric Company Trip optimization system and method for a vehicle
US8401720B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for detecting a physical defect along a mission route
US8249763B2 (en) 2006-03-20 2012-08-21 General Electric Company Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings
US20080167766A1 (en) * 2006-03-20 2008-07-10 Saravanan Thiyagarajan Method and Computer Software Code for Optimizing a Range When an Operating Mode of a Powered System is Encountered During a Mission
US8126601B2 (en) * 2006-03-20 2012-02-28 General Electric Company System and method for predicting a vehicle route using a route network database
US8473127B2 (en) * 2006-03-20 2013-06-25 General Electric Company System, method and computer software code for optimizing train operations considering rail car parameters
US8295993B2 (en) * 2006-03-20 2012-10-23 General Electric Company System, method, and computer software code for optimizing speed regulation of a remotely controlled powered system
US20080208401A1 (en) * 2006-03-20 2008-08-28 Ajith Kuttannair Kumar System, method, and computer software code for insuring continuous flow of information to an operator of a powered system
US8370007B2 (en) * 2006-03-20 2013-02-05 General Electric Company Method and computer software code for determining when to permit a speed control system to control a powered system
US7447571B2 (en) 2006-04-24 2008-11-04 New York Air Brake Corporation Method of forecasting train speed
US7797088B2 (en) * 2006-05-02 2010-09-14 General Electric Company Method and apparatus for planning linked train movements
US7734383B2 (en) * 2006-05-02 2010-06-08 General Electric Company Method and apparatus for planning the movement of trains using dynamic analysis
US20070260497A1 (en) * 2006-05-02 2007-11-08 Wolfgang Daum Method of planning train movement using a front end cost function
US8498762B2 (en) * 2006-05-02 2013-07-30 General Electric Company Method of planning the movement of trains using route protection
US7680750B2 (en) * 2006-06-29 2010-03-16 General Electric Company Method of planning train movement using a three step optimization engine
US9037323B2 (en) 2006-12-01 2015-05-19 General Electric Company Method and apparatus for limiting in-train forces of a railroad train
US8082071B2 (en) * 2006-09-11 2011-12-20 General Electric Company System and method of multi-generation positive train control system
CA2665485C (en) * 2006-10-06 2012-02-21 New York Air Brake Corporation Human machine interface for speed and location control with braking distance display
US8433461B2 (en) * 2006-11-02 2013-04-30 General Electric Company Method of planning the movement of trains using pre-allocation of resources
US8229607B2 (en) * 2006-12-01 2012-07-24 General Electric Company System and method for determining a mismatch between a model for a powered system and the actual behavior of the powered system
US9580090B2 (en) 2006-12-01 2017-02-28 General Electric Company System, method, and computer readable medium for improving the handling of a powered system traveling along a route
CA2622865A1 (en) * 2006-12-07 2008-06-07 General Electric Company Trip optimization system and method for a train
US20080148993A1 (en) * 2006-12-08 2008-06-26 Tom Mack Hybrid propulsion system and method
US20080195351A1 (en) * 2007-02-12 2008-08-14 Tom Otsubo Method and system for operating a locomotive
US8180544B2 (en) * 2007-04-25 2012-05-15 General Electric Company System and method for optimizing a braking schedule of a powered system traveling along a route
US9120493B2 (en) * 2007-04-30 2015-09-01 General Electric Company Method and apparatus for determining track features and controlling a railroad train responsive thereto
US8145799B2 (en) * 2007-05-18 2012-03-27 General Electric Company Systems and methods for changing parameters of a controller
US20090043435A1 (en) * 2007-08-07 2009-02-12 Quantum Engineering, Inc. Methods and systems for making a gps signal vital
US8190312B2 (en) * 2008-03-13 2012-05-29 General Electric Company System and method for determining a quality of a location estimation of a powered system
US8965604B2 (en) 2008-03-13 2015-02-24 General Electric Company System and method for determining a quality value of a location estimation of a powered system
US7765859B2 (en) * 2008-04-14 2010-08-03 Wabtec Holding Corp. Method and system for determining brake shoe effectiveness
FR2932447B1 (en) * 2008-06-12 2016-09-30 Alstom Transport Sa TRAIN MANAGEMENT INTEGRATED SYSTEM OF A TRAIN
DE102008028264B3 (en) * 2008-06-13 2009-12-17 Knorr-Bremse Systeme für Schienenfahrzeuge GmbH Method for monitoring at least one system parameter influencing the operating behavior of vehicles or vehicle trains
US8463469B2 (en) * 2008-12-17 2013-06-11 General Electric Company Digital railroad system
US8155811B2 (en) * 2008-12-29 2012-04-10 General Electric Company System and method for optimizing a path for a marine vessel through a waterway
US8239078B2 (en) * 2009-03-14 2012-08-07 General Electric Company Control of throttle and braking actions at individual distributed power locomotives in a railroad train
US8346414B2 (en) * 2009-03-16 2013-01-01 Ztr Control Systems System and method for determining whether a locomotive in a consist is in leading mode or trailing mode
US9834237B2 (en) 2012-11-21 2017-12-05 General Electric Company Route examining system and method
US8069367B2 (en) * 2009-05-05 2011-11-29 Lockheed Martin Corporation Virtual lock stepping in a vital processing environment for safety assurance
US8234023B2 (en) * 2009-06-12 2012-07-31 General Electric Company System and method for regulating speed, power or position of a powered vehicle
DE102010024800B4 (en) * 2009-06-25 2014-07-03 Knorr-Bremse Systeme für Schienenfahrzeuge GmbH Display device and method for operating a display device
US8509970B2 (en) 2009-06-30 2013-08-13 Invensys Rail Corporation Vital speed profile to control a train moving along a track
US20110017693A1 (en) * 2009-07-21 2011-01-27 Aps Technology Group, Inc. Container tracking and locating systems, methods, and computer program products
AU2011305691A1 (en) 2010-09-21 2013-04-11 Ansaldo Sts Usa, Inc. Method for adjusting braking parameters of a train to account for train characteristic parameter variations
US20120075122A1 (en) * 2010-09-24 2012-03-29 Honeywell International Inc. Alert generation and related aircraft operating methods
JP5558317B2 (en) * 2010-11-09 2014-07-23 株式会社東芝 Train control device
US8738202B2 (en) * 2010-11-18 2014-05-27 Ztr Control Systems Method and apparatus for controlling sanding on locomotives
CN103415425B (en) * 2010-12-31 2017-02-15 通用电气公司 System and method for controlling a vehicle
US8751071B2 (en) * 2011-05-09 2014-06-10 General Electric Company System and method for controlling a vehicle
US9235991B2 (en) * 2011-12-06 2016-01-12 General Electric Company Transportation network scheduling system and method
US9493143B2 (en) 2012-06-01 2016-11-15 General Electric Company System and method for controlling velocity of a vehicle
WO2014073412A1 (en) * 2012-11-08 2014-05-15 三菱電機株式会社 Operation schedule evaluation device and operation schedule processing system
US9682716B2 (en) 2012-11-21 2017-06-20 General Electric Company Route examining system and method
US9669811B2 (en) 2012-12-28 2017-06-06 General Electric Company System and method for asynchronously controlling brakes of vehicles in a vehicle system
US9171345B2 (en) * 2013-02-15 2015-10-27 Norfolk Southern Corporation System and method for terminal capacity management
US9233669B2 (en) * 2013-06-10 2016-01-12 General Electric Company Methods and systems for speed management within a transportation network
US10399584B2 (en) 2014-03-27 2019-09-03 Ge Global Sourcing Llc System and method integrating an energy management system and yard planner system
US10532755B2 (en) 2014-03-27 2020-01-14 Ge Global Sourcing Llc Control system and method for a transportation network
US9561811B2 (en) 2014-12-19 2017-02-07 Progress Rail Locomotive Inc. Railroad control system having onboard management
GB2536002B (en) * 2015-03-02 2017-08-02 Hitachi Ltd Railway Vehicle Operation
US9522687B2 (en) 2015-04-17 2016-12-20 Electro-Motive Diesel, Inc. System and method for remotely operating locomotives
US9908544B2 (en) 2015-04-17 2018-03-06 Electro-Motive Diesel, Inc. System and method for remotely configuring locomotives
US9676403B2 (en) * 2015-04-29 2017-06-13 General Electric Company System and method for determining operational restrictions for vehicle control
US9682717B2 (en) 2015-10-13 2017-06-20 Electro-Motive Diesel, Inc. Ride through control system having user interface
US9937936B2 (en) 2015-11-30 2018-04-10 General Electric Company System and method for monitoring coupler fatigue
US10705519B2 (en) 2016-04-25 2020-07-07 Transportation Ip Holdings, Llc Distributed vehicle system control system and method
US10279823B2 (en) * 2016-08-08 2019-05-07 General Electric Company System for controlling or monitoring a vehicle system along a route
US10730536B2 (en) 2016-08-10 2020-08-04 Ge Global Sourcing Llc Systems and methods for route mapping
US10532754B2 (en) 2016-10-31 2020-01-14 Ge Global Sourcing Llc System for controlling or monitoring a vehicle system along a route
US20190168728A1 (en) * 2017-12-01 2019-06-06 Westinghouse Air Brake Technologies Corporation System and Method for Adaptive Braking
US11485393B2 (en) 2018-08-08 2022-11-01 Transportation Ip Holdings, Llc Vehicle control system
AU2020230855A1 (en) 2019-03-04 2021-08-12 Central Queensland University Control system for operating long vehicles
CN111539374B (en) * 2020-05-07 2022-05-20 上海工程技术大学 Rail train bearing fault diagnosis method based on multidimensional data space
CN113919250B (en) * 2021-11-22 2022-06-07 华设设计集团股份有限公司 Method for optimizing and selecting installation position of wind resistance braking device of high-speed train
US20240199096A1 (en) * 2022-12-14 2024-06-20 Progress Rail Locomotive Inc. System and method for modeling in-train forces with multiple locomotives interspersed evenly along train
CN116339190B (en) * 2023-02-16 2024-09-03 株洲中车时代电气股份有限公司 Train operation control method based on non-reference track model predictive control

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4041283A (en) 1975-07-25 1977-08-09 Halliburton Company Railway train control simulator and method
US4042810A (en) 1975-01-25 1977-08-16 Halliburton Company Method and apparatus for facilitating control of a railway train
US4181943A (en) * 1978-05-22 1980-01-01 Hugg Steven B Speed control device for trains
EP0114633A1 (en) * 1983-01-17 1984-08-01 Hitachi, Ltd. Method for automatic operation of a vehicle
US4561057A (en) 1983-04-14 1985-12-24 Halliburton Company Apparatus and method for monitoring motion of a railroad train
US4602335A (en) * 1983-08-10 1986-07-22 K.C. Southern Railway Company Fuel efficient control of multiple unit locomotive consists
GB2188464A (en) * 1986-03-28 1987-09-30 Magyar Allamvasutak Vezerigazg Data-processing and on-board information system for railway operation
US4794548A (en) 1986-08-28 1988-12-27 Halliburton Company Data collection apparatus and train monitoring system
US4827438A (en) 1987-03-30 1989-05-02 Halliburton Company Method and apparatus related to simulating train responses to actual train operating data
US4853883A (en) 1987-11-09 1989-08-01 Nickles Stephen K Apparatus and method for use in simulating operation and control of a railway train
WO1990003622A1 (en) * 1988-09-28 1990-04-05 Teknis Systems (Australia) Pty. Ltd. A system for energy conservation on rail vehicles
EP0539885A2 (en) * 1991-10-25 1993-05-05 Kabushiki Kaisha Toshiba Optimal train running-pattern calculating apparatus and system including the same
EP0755840A1 (en) * 1995-07-28 1997-01-29 N.S. Railbedrijven B.V. Method and system for optimizing the travel performance of a vehicle,preferably a rail vehicle
DE19645426A1 (en) * 1995-11-03 1997-05-07 Caterpillar Inc Method of generating efficiency estimates for vehicle operator
CA2192151A1 (en) * 1996-02-15 1997-08-16 Robert C. Kull Train Brake Performance Monitor
US8689813B2 (en) 2009-05-25 2014-04-08 Korea Institute Of Industrial Technology Valve for prevention of frozen break using phase change material
US8837113B2 (en) 2010-03-17 2014-09-16 Keihin Corporation Capacitor module with simplified wiring arrangement and structure

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3519805A (en) * 1967-11-29 1970-07-07 Westinghouse Electric Corp Vehicle stopping control apparatus
CH509899A (en) 1969-04-09 1971-07-15 Japan National Railway Brake control system
US3937430A (en) 1973-03-05 1976-02-10 General Signal Corporation Method and apparatus for controlling the speed of a vehicle
US3887239A (en) 1973-03-05 1975-06-03 Gen Signal Corp Method and apparatus for controlling the speed of a vehicle
JPS51132514A (en) 1975-04-02 1976-11-17 Hitachi Ltd Automatic control device for train
US4005838A (en) * 1975-05-27 1977-02-01 Westinghouse Air Brake Company Station stop and speed regulation system for trains
US4162107A (en) 1978-01-30 1979-07-24 Vsesojuzny Nauchno-Issledovatelsky Proektno-Tekhnologichesky Institut Vagonostroenia Braking system for a railway car
IT1192338B (en) * 1978-12-21 1988-03-31 Wabco Westinghouse Spa SPEED CONTROL DEVICE FOR RAILWAY TRUCKS
JPS5612801A (en) 1979-07-13 1981-02-07 Hitachi Ltd Method of stopping vehicle in fixed position
US4344364A (en) * 1980-05-09 1982-08-17 Halliburton Company Apparatus and method for conserving fuel in the operation of a train consist
US4401035A (en) * 1980-07-03 1983-08-30 Kansas City Southern Railway Company Control device for multiple unit locomotive systems
KR910008882B1 (en) 1982-04-27 1991-10-24 가부시기가이샤 히다찌세이사꾸쇼 Method and device for stopping vehicle at prodetemined position
CN85103302B (en) * 1985-05-04 1986-07-16 哈尔滨铁路局减速顶调速系统研究中心 Inverse slope speed-regulation on railway hump marshalling yard
US4735385A (en) * 1987-06-24 1988-04-05 Halliburton Company Apparatus and method for conserving fuel during dynamic braking of locomotives
US5109343A (en) * 1990-06-06 1992-04-28 Union Switch & Signal Inc. Method and apparatus for verification of rail braking distances
US5387030A (en) 1993-09-10 1995-02-07 Knorr Brake Holding Plural service rate sensitivity control valve
US5393129A (en) 1994-03-14 1995-02-28 Westinghouse Air Brake Company Electro-pneumatic freight brake control system
US5828979A (en) * 1994-09-01 1998-10-27 Harris Corporation Automatic train control system and method
US5785392A (en) * 1996-02-06 1998-07-28 Westinghouse Air Brake Company Selectable grade and uniform net shoe force braking for railway freight vehicle
US5833325A (en) 1996-02-06 1998-11-10 Westinghouse Air Brake Company Freight brake control using train net braking ratio
US5746486A (en) 1996-10-16 1998-05-05 General Motors Corporation Brake control system
US5984426A (en) 1997-07-31 1999-11-16 Westinghouse Air Brake Company Apparatus and method for a railway freight car brake control
US5950967A (en) * 1997-08-15 1999-09-14 Westinghouse Air Brake Company Enhanced distributed power

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4042810A (en) 1975-01-25 1977-08-16 Halliburton Company Method and apparatus for facilitating control of a railway train
US4041283A (en) 1975-07-25 1977-08-09 Halliburton Company Railway train control simulator and method
US4181943A (en) * 1978-05-22 1980-01-01 Hugg Steven B Speed control device for trains
EP0114633A1 (en) * 1983-01-17 1984-08-01 Hitachi, Ltd. Method for automatic operation of a vehicle
EP0257662A2 (en) * 1983-01-17 1988-03-02 Hitachi, Ltd. Method for automatically controlling a vehicle
US4561057A (en) 1983-04-14 1985-12-24 Halliburton Company Apparatus and method for monitoring motion of a railroad train
US4602335A (en) * 1983-08-10 1986-07-22 K.C. Southern Railway Company Fuel efficient control of multiple unit locomotive consists
GB2188464A (en) * 1986-03-28 1987-09-30 Magyar Allamvasutak Vezerigazg Data-processing and on-board information system for railway operation
US4794548A (en) 1986-08-28 1988-12-27 Halliburton Company Data collection apparatus and train monitoring system
US4827438A (en) 1987-03-30 1989-05-02 Halliburton Company Method and apparatus related to simulating train responses to actual train operating data
US4853883A (en) 1987-11-09 1989-08-01 Nickles Stephen K Apparatus and method for use in simulating operation and control of a railway train
WO1990003622A1 (en) * 1988-09-28 1990-04-05 Teknis Systems (Australia) Pty. Ltd. A system for energy conservation on rail vehicles
EP0539885A2 (en) * 1991-10-25 1993-05-05 Kabushiki Kaisha Toshiba Optimal train running-pattern calculating apparatus and system including the same
EP0755840A1 (en) * 1995-07-28 1997-01-29 N.S. Railbedrijven B.V. Method and system for optimizing the travel performance of a vehicle,preferably a rail vehicle
DE19645426A1 (en) * 1995-11-03 1997-05-07 Caterpillar Inc Method of generating efficiency estimates for vehicle operator
CA2192151A1 (en) * 1996-02-15 1997-08-16 Robert C. Kull Train Brake Performance Monitor
US5744707A (en) * 1996-02-15 1998-04-28 Westinghouse Air Brake Company Train brake performance monitor
US8689813B2 (en) 2009-05-25 2014-04-08 Korea Institute Of Industrial Technology Valve for prevention of frozen break using phase change material
US8837113B2 (en) 2010-03-17 2014-09-16 Keihin Corporation Capacitor module with simplified wiring arrangement and structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DATABASE WPI Section PQ Week 9751, Derwent World Patents Index; Class Q18, AN 97-550428, XP002093698 *

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2371121B (en) * 2001-01-13 2005-06-01 Dawe John A control system for a railway train and method therefor
US6600978B2 (en) 2001-04-24 2003-07-29 Hitachi, Ltd. Railway vehicle operation-control system and a railway vehicle using the operation control system
EP1253059A1 (en) * 2001-04-25 2002-10-30 Hitachi, Ltd. Railway vehicle operation-control system and a railway vehicle using the operation control system
EP1264754A1 (en) * 2001-06-07 2002-12-11 Siemens Aktiengesellschaft Traffic data evaluation device
AU2008201906B2 (en) * 2002-05-20 2009-12-03 TTG (Holdings) Pty Ltd Method for improving timekeeping and saving energy on long-haul trains
WO2003097424A1 (en) * 2002-05-20 2003-11-27 Tmg International Holdings Pty Limited System for improving timekeeping and saving energy on long-haul trains
GB2405016A (en) * 2002-05-20 2005-02-16 Tmg Internat Holdings Pty Ltd System for improving timekeeping and saving energy on long-haul trains
AU2008201906B9 (en) * 2002-05-20 2011-06-23 TTG (Holdings) Pty Ltd Method for improving timekeeping and saving energy on long-haul trains
US7822491B2 (en) 2002-05-20 2010-10-26 Ausrail Technologies Pty Limited System for improving timekeeping and saving energy on long-haul trains
GB2405016B (en) * 2002-05-20 2006-07-26 Tmg Internat Holdings Pty Ltd System for improving timekeeping and saving energy on long-haul trains
AU2008201906C1 (en) * 2002-05-20 2010-05-13 TTG (Holdings) Pty Ltd Method for improving timekeeping and saving energy on long-haul trains
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US6763291B1 (en) 2003-09-24 2004-07-13 General Electric Company Method and apparatus for controlling a plurality of locomotives
AU2004203591B2 (en) * 2003-09-24 2010-03-04 Ge Global Sourcing Llc Method and apparatus for controlling a railway consist
US7127336B2 (en) 2003-09-24 2006-10-24 General Electric Company Method and apparatus for controlling a railway consist
EP1659018A1 (en) * 2004-11-17 2006-05-24 Alstom Transport S.A. Device and method for controlling the speed of a railway vehicle and system comprising such devices
AU2005234619B2 (en) * 2004-11-17 2012-01-19 Alstom Transport Technologies Device and method for controlling the speed of a rail vehicle and system comprising devices of this type
FR2877885A1 (en) * 2004-11-17 2006-05-19 Alstom Transport Sa Rail transit car e.g. train, speed controlling device, has speed limitation unit to find control signal so that speed limit for train having two pairs of mechanically independent front and rear wheels, does not exceed determined speed limit
EP2428424A3 (en) * 2006-02-13 2013-04-03 New York Air Brake Corporation Distributed train intelligence system and method
EP2428425A3 (en) * 2006-02-13 2013-03-27 New York Air Brake Distributed train intelligence sytem and method
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US9266542B2 (en) 2006-03-20 2016-02-23 General Electric Company System and method for optimized fuel efficiency and emission output of a diesel powered system
JP2009530183A (en) * 2006-03-20 2009-08-27 ゼネラル・エレクトリック・カンパニイ Train travel optimization system and method
US8398405B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US9527518B2 (en) 2006-03-20 2016-12-27 General Electric Company System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system
WO2007111768A3 (en) * 2006-03-20 2008-04-17 Gen Electric Trip optimization system and method for a train
US9233696B2 (en) 2006-03-20 2016-01-12 General Electric Company Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear
US9201409B2 (en) 2006-03-20 2015-12-01 General Electric Company Fuel management system and method
US8903573B2 (en) 2006-03-20 2014-12-02 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US8998617B2 (en) 2006-03-20 2015-04-07 General Electric Company System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller
WO2008073546A3 (en) * 2006-12-07 2008-08-07 Gen Electric Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
WO2008073546A2 (en) * 2006-12-07 2008-06-19 General Electric Company Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
RU2482990C2 (en) * 2006-12-07 2013-05-27 Дженерал Электрик Компани Method for optimising operation of train with multiple locomotives with distributed power feed
WO2009090278A1 (en) * 2008-01-16 2009-07-23 Sociedad Pública Eusko Trenbideak-Ferrocarriles Vascos, S.A. Radio-based railway blocking management system
ES2324086A1 (en) * 2008-01-16 2009-07-29 Sociedad Publica Eusko Trenbideak-Ferrocarriles Vascos, S.A. Radio-based railway blocking management system
US9079589B2 (en) 2009-09-09 2015-07-14 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US8538608B2 (en) 2009-09-09 2013-09-17 General Electric Company Control system and method for remotely isolating powered units in a rail vehicle system
US8565946B2 (en) 2011-07-01 2013-10-22 General Electric Company System and method for vehicle control
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
CN112896122A (en) * 2021-03-05 2021-06-04 南京经纬达汽车科技有限公司 Pedal feel simulation device and control method thereof

Also Published As

Publication number Publication date
AU9567498A (en) 1999-04-05
US6587764B2 (en) 2003-07-01
CA2635895C (en) 2009-11-17
BR9814278A (en) 2005-08-16
CA2303281A1 (en) 1999-03-25
ZA988358B (en) 2000-08-30
US6144901A (en) 2000-11-07
CA2652065C (en) 2010-03-23
CA2652065A1 (en) 1999-03-25
CA2303281C (en) 2009-11-17
EP1017578A1 (en) 2000-07-12
CA2635895A1 (en) 1999-03-25
US20030105561A1 (en) 2003-06-05
AU753354B2 (en) 2002-10-17

Similar Documents

Publication Publication Date Title
US6144901A (en) Method of optimizing train operation and training
US6622068B2 (en) Method of optimizing train operation and training
US6219595B1 (en) Method of minimizing undesirable brake release
US6487488B1 (en) Method of determining maximum service brake reduction
AU769318B2 (en) Train handling techniques and analysis
US9002548B2 (en) System and method for determining a mismatch between a model for a powered system and the actual behavior of the powered system
US9162690B2 (en) System and method for controlling movement of vehicles
US9037323B2 (en) Method and apparatus for limiting in-train forces of a railroad train
US20070233335A1 (en) Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
EP1012019B1 (en) Method of minimizing undesirable brake release
CA2531842C (en) Method of optimizing train operation
AU2002301645C1 (en) Method of optimizing train operation and training
AU758845B2 (en) Method of optimizing train operation and training
MXPA00002535A (en) Method of optimizing train operation and training
CA2562595C (en) Train handling techniques and analysis
MXPA00002468A (en) Method of minimizing undesirable brake release

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AU BR CA MX

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
ENP Entry into the national phase

Ref document number: 2303281

Country of ref document: CA

Ref country code: CA

Ref document number: 2303281

Kind code of ref document: A

Format of ref document f/p: F

WWE Wipo information: entry into national phase

Ref document number: PA/a/2000/002535

Country of ref document: MX

WWE Wipo information: entry into national phase

Ref document number: 95674/98

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 1998949330

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1998949330

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 95674/98

Country of ref document: AU

WWR Wipo information: refused in national office

Ref document number: 1998949330

Country of ref document: EP

WWW Wipo information: withdrawn in national office

Ref document number: 1998949330

Country of ref document: EP