WO1996029640A1 - Method of automatically operating distributed system - Google Patents

Method of automatically operating distributed system Download PDF

Info

Publication number
WO1996029640A1
WO1996029640A1 PCT/JP1995/000505 JP9500505W WO9629640A1 WO 1996029640 A1 WO1996029640 A1 WO 1996029640A1 JP 9500505 W JP9500505 W JP 9500505W WO 9629640 A1 WO9629640 A1 WO 9629640A1
Authority
WO
WIPO (PCT)
Prior art keywords
computer
control
power
power supply
computers
Prior art date
Application number
PCT/JP1995/000505
Other languages
French (fr)
Japanese (ja)
Inventor
Hitoshi Ueno
Kenichi Soejima
Narishige Morimoto
Masaaki Ohya
Shigeo Nakamura
Original Assignee
Hitachi, Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi, Ltd. filed Critical Hitachi, Ltd.
Priority to PCT/JP1995/000505 priority Critical patent/WO1996029640A1/en
Priority to JP52826496A priority patent/JP3658410B2/en
Publication of WO1996029640A1 publication Critical patent/WO1996029640A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/16Combinations of two or more digital computers each having at least an arithmetic unit, a program unit and a register, e.g. for a simultaneous processing of several programs
    • G06F15/177Initialisation or configuration control
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof

Definitions

  • a method for achieving power control of a large number of computers connected by a communication line using a single power control unit is described below.
  • the power control unit is connected to all of the computers targeted by the power control unit. 2 ⁇ ⁇ I I I I would like to establish a monthly communication line; It is described on pages 7 to S6.
  • the automatic operation e-control program is connected to a power source control device.
  • two settings must be made beforehand: For this setting, Is a system administrator's wiring and counting
  • the development of the autonomous driving system is not required to collect the configuration information of the autonomous driving control program manually even in an environment where the configuration of the computer system is frequently interrupted.
  • the driving method is if tr; Disclosure of the month
  • Originating ⁇ manner is of, for controlling ⁇ the request mediation pro-grams to your elephant and Do that a total of S machine, request te Mubu G g is that controls the control your elephant meter cigarettes machine, control ⁇ total kee What is the best way to find a machine ?: 0, search from the relation information man--and send a control request to that computer :: Realize: ⁇ ⁇ . , ⁇ ⁇ «s is the power supply s ⁇ ;
  • K 3 ⁇ 4 S can be obtained.
  • the power control target S record ⁇ program should check the startup message received immediately after the power of the sky registration power supply control line is turned on, and identify the issuer; It is possible to specify the power line and the connected computer.
  • FIG. 1 is an overall configuration diagram showing one example of the invention
  • FIG. 2 is a configuration of an automatic driving control unit! ! H! 3 is the configuration Hi of the power supply control device
  • FIG. 4 is the configuration of request mediation! 1
  • FIG. 5 is a configuration diagram of a schedule file
  • FIG. 6 is a configuration diagram HI of a request target
  • FIG. 6 is a configuration diagram of an S connection configuration automatic detection function. 8 shows the operation of the schedule analysis unit.
  • is a G—figure.
  • FIG. 9 is a flow diagram showing the start time setting I: operation [ ⁇ , and g!
  • Figure I shows the overall structure of the example: 3.
  • the S-computer system is composed of computers 101, 102, and 103. Communication lines are connected to control the power of each computer.
  • a power supply line 1: T,: 5, :: 9 is wired from the power supply control device 120, and is connected to the computer 103 and the iO 102, respectively.
  • Control information for controlling the power control unit ⁇ The word line 116 is connected to the computer I 03.
  • Each tr military aircraft has a request mediation gr c'4,: 09, :: 1, and the request section has a request target ⁇ «: 05, :: 0, :: 2
  • Automatic operation control ⁇ -: ⁇ 6 is a schedule mail:
  • the communication line 125 is inserted from C'T, and the schedule information is inserted. Make and receive requests.
  • Schedule 21 107 Communication line Can be set from beta console 123 via 24.
  • the control request issued by the automatic operation e-control K 106 reaches the request relay ffi i from the request relay unit 104 via the communication line 1, and is received by the power source control device control 4 via the communication line 113.
  • the power control device S control unit I i 4 interprets the received request and issues a power control device S120 control command via the signal line 116.
  • the automatic operation control unit 106 reads the schedule information from the schedule file 107 and analyzes the start / stop schedule.
  • the schedule analysis unit 203 issues a start request K fixed request based on the analysis result.
  • the power control collision device i 20 has a power supply line T, US.::9, and I computers are connected to the power supply line i to supply power to the power supply line. To start and stop; 2) Control the power of the computer.
  • the command for turning on and off the power is received via a signal line 116 and analyzed by the second interface nice part 313. If a stop request is made, the command is sent via a communication line 314. Power supply control is passed to 81309, and if there is a start request, power supply start control via communication line 315 Passed to 2. The stop request is passed in the form of “Specify after the specified time has passed and the power supply line is cut off?”, So the power stop control ffi 309 describes these contents * Stop A request section 310 is provided.
  • the power start control unit 3 is provided with a start request record «part 3: 2: t E ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ or start At time j, the power is shut off when the power reaches two times.
  • G & 30S or power source town: request via control line 30S-,: r. to power Degatanasu I Tsu latch circuit; this gives Ru c
  • the request mediation unit 104 receives a power control request from the automatic operation control unit 106 via the communication line: OS, obtains an identification name of the transmission destination computer, and requests the request mediation unit 104 of the transmission destination computer for the request method. Give the sage.
  • the request mediation 104 can also be used from an external control unit in the automatic operation control. Also, in the case of a broadcast message request for a large number of computers, the message is transmitted without obtaining the identification name of the communication destination computer. Further, upon receiving the broadcast message, the request mediation unit 104 starts processing corresponding to the request for the own computer.
  • the request mediation unit 104 first performs a request message reception process by the request message reception unit 401, and passes the request message to the request target search unit 403.
  • the request target search unit 403 reads the information of the request target section via the communication line 423, analyzes the information, obtains the identification name of the request message transmission destination total S machine, and requests the information.
  • the packet is passed to the transmission S05, from which it is sent to a request relay of the other computer via the communication line 12i.
  • the request mediation 104 When the request mediation 104 receives a request message from another computer, the request message is first received; 4 is a machine that receives request message reception. Message to 412 ⁇ ? -The request target search unit 4 in the machine inquires s of the request target description If 35424 and accepts it. If the request is a competent request, it sends a request arrow Z to the specified bus process. Sage Delivery Department 4: 0
  • the contents of the request target storage ⁇ 424 are changed according to the request target description 51 of the control request message received by the control unit 420.
  • the configuration of the schedule file 107 is as shown in FIG.
  • request K information K 4 2 4 is 6 6:
  • the contents stored in the request object description 3 ⁇ 4 3 ⁇ 4C 24 are the required elephant identification name field 601, the man identification name field 602, and the mum G ses identification name field.
  • 604 is defined as 1; Need, and consists of a number of codes;
  • the identification name recorded in the request alias 601 is controlled so as to have a common meaning among all the computers having the request mediation ffi 104.
  • the machine identifier S03 and the machine identifier 604 specify what the service registered as a name actually performs, and the designated machine is used.
  • the specified process on the server cannot execute the service indicated by the request target ⁇ alias 601.
  • Computers 70:, 702, 703, and 04 are connected to each other by a communication line 1, and the automatic power control of these computers is executed by a power control device 120.
  • the power of each computer is supplied and controlled by the power supply lines 7 1, 7 18, 7 19, and 7 15 c
  • Each of the S machines has a request mediation section 70: Start-up method and a start list # 3 705, and a power supply S street device control T: 4
  • a power supply control record 10 is provided.
  • Power control ele- ment S recording unit end 10 is operated by the operator from the console control end: 2
  • the communication line end is operated by the timing instructed via :: : 7, T i S, end: 9 S, then first supply line T: Power supply for T ?” It is.
  • the rule definition information is included (802). If the specified value is 503, the specified start time is valid (303; Man's S'J name 50 :,: j ® ® with 502 to start the pass-shi start time setting unit 205 as a para-meta to Okoshisuke time 503 (S04) e in addition, stop time designated 504 valid specification for al (S05) Ma Thin
  • the identification name 501, the control unit '' dimension 502, and the stop time 504 are passed as parameters, and the stop time setting unit 201 is started (806).
  • step S02 If you haven't finished reading all the records yet, skip to step S02 to read the next code '(807), and if you have finished reading, Close the file 10 (808).
  • the machine IS alias, control date, and start time are received from the schedule file 10T as parameters (9 (H), followed by the machine identification name).
  • a power supply service name that specifies the individual power supply service is added to the “machine-specified power supply service name” (902 .; and the message passed to the request target).
  • the message is generated (903; the generated message is passed to the request 104 (904) c
  • the man identifier, control assignment, and stop time are received from the schedule file: 07 as the parameters (; 001, and finally the machine S name).
  • the source service instruction name is ⁇ : input the [machine specified power supply service name] to generate 002).
  • the timer is set by specifying that the stop control unit 205 is to be activated when the stop time on the day specified by the control date has been reached. At this time, as a parameter, 'Machine specified power supply service name. Pass it to the genius analysis 203; 1003) c
  • the request-target name and the contents of the message are obtained from the request message receiving unit 401 as parameters (120 :), and the request target memory ⁇ 424 is checked to determine the parameter.
  • the target name and the request target 18 Search for a match in which the alias 601 matches 202), and if there is no matching 'record (1203), perform error processing (1206).
  • the machine IS alias 603 of the other record and the machine [7: Ask for the process identifier 604 (1204) c]
  • the request message is given by giving the parameter.
  • the transmitting unit 405 is activated (1205).
  • the process identifier and request name are obtained from the request message receiving unit 414 as parameters (1301), and the request target description is obtained.
  • Te shows the e ⁇ Me Tsu "to be sampled T 0 ⁇ G 'dynamic ⁇ procedure; 1:; 5 C" over-di-co-over ⁇ e to ⁇ Ming Ri in two-3
  • This process is started as a process after the power is turned on, and a harasser that specifies a broadcast message as a request ele- ment is used.
  • Require request g: _ c start ⁇ 3 ⁇ 4 ⁇ ⁇ ⁇ :: 50:; 0
  • the peripheral device management unit S 1602 has a printer 16607, a fax 1608, and a television system such as ⁇ . Equipment 1609 The difference is that other devices are connected.
  • Each electronic device receives the power control from the management device control 03 ;: 160 L via the peripheral device management device S 1602 on the computer 103.
  • the operation for setting the key knives is executed from the automatic operation control unit 106.
  • the message indicating the request issued from the self-help tillage control 06 is sent to the request mediation unit i04 with the content of the operation of the device represented by the identification name unique to each electronic device. Then, the subject of the request, part I! Based on the record information of 05, the computer determines which message should be delivered to the management device control existing on the computer, and delivers the message to the computer.

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • Power Sources (AREA)

Abstract

In a distributed computer system in which one power control unit controls a plurality of computers, all the computers are provided with request repeaters, and the conversion of the name of a computer to be controlled and the name of a control computer is carried out. The conversion information is collected automatically by the control computer at the system setting time. In order to carry out the automatic collection of conversion information, the computers connected to the power control unit are started one by one, and broadcast messages are received from the individual computers, thereby analyzing the relation between the power source and the computers. An automatic operation control program can be set easily since it is not necessary to know the name of control computer.

Description

¾  ¾
分散 i ス テム 自勛運転万法 ^; ¾ ^ 計篡機シ ス ÷ ムの 自動運 ¾万 Sに :— , 二 一で 二 リ , 7、 つ ー ク ;ニ多数の計算機が ¾続さ て い る場台に 、 こ Γ. ら の計算機の電源投 人切断を 自動制 IS丁 る 自動運 ブ G グラ ム O設定の手間 を ^減する 方 に! ¾す る 。 Distributed i-Stem Automated driving method ^; ¾ ^ Automatic operation of the measuring system: 10,000, S:-, two, seven, seven; Automatically turn off the power of these computers on the platform where the power is turned off. Automatic operation G Gram O To reduce the trouble of setting O! ¾
背景 5術 Background 5 art
通信線に よ り 接続さ Γ て いる多数の計算機の電源制御を 1 台の電源制御装置に よ リ 実 する方法につ いて 、 電源制御装置と そ が対象 と し て い る全て の計算機 の間 に ^ 月 の通信線を 設け る方;ョが、 - ≡ 立評論」 . ; N o . 2 99 1 1 第? 7頁か ら第 S6頁に記載さ て いる 。  A method for achieving power control of a large number of computers connected by a communication line using a single power control unit is described below. The power control unit is connected to all of the computers targeted by the power control unit. 2 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^ I I I I would like to establish a monthly communication line; It is described on pages 7 to S6.
し か し 、 上記従来技術では、 電源制御装置が制御対象計算機全て に は接続さ れ て いない場合の制御方法については触れ られて い ない = すな ち 、 電源制御装置が制御対象 と し て いる計算機の の一^の計算機だけ に制御情報を渡すため の制御用信号線を接続する 自動運転装置では、 自勛運 e制 御プ G グラ ムがどの計算機に鬈源制御装置が接続さ れて い るか、 さ ら に鼋源制御 装置の の電源供給線に どの計算機が接続さ れて いる かを予め人手;二 リ 設定 し な け : nばな らす'、 こ の設定の ため には シス テ ム管理者が吻理的な電源の配線と 計However, in the above prior art, the control method when the power supply control device is not connected to all the control target computers is not mentioned = that is, the power supply control device is a control target. In an automatic operation device that connects a control signal line for passing control information to only one of the computers, the automatic operation e-control program is connected to a power source control device. In advance, and also manually determine which computer is connected to the power supply line of the power control device in advance; two settings must be made beforehand: For this setting, Is a system administrator's wiring and counting
S機の ^係 を常 に? Ξ gする必要があ る 。 し か し 、 ¾ 算機の E置替え は比? Z K 頻繁に ''亍 、 電源制 装置の電源供給線の配線は ^ に配線さ r二 ま ま に し て ¾'いて I* S機だ を置 き換え る こ こ ち 多 'いの 、 電 の接続関係な ど を常に?≡ S て る 二 :: は s易て' な い : Always in charge of the S plane? Ξ You need to g. But is the E substitution of a computer a ratio? ZK Frequently, the power supply wiring of the power control device is wired to ^, and the power supply line is left in place and the I * S machine is frequently replaced. What kind of connection is always required? ≡ て 二 : : : : ::
発 ¾の 巨 的は 、 計算機シ ス テム の槔成が頻繁に Sわる よ う な環境下で も 自動 運転制街プ c "'ラ ムの構成情報 を人手に り 収集す る必要が無い 自動運転方法を ife tr; T 一と ·— ¾ョ月の開示 The development of the autonomous driving system is not required to collect the configuration information of the autonomous driving control program manually even in an environment where the configuration of the computer system is frequently interrupted. The driving method is if tr; Disclosure of the month
発 の § 的は, 制御お象 と な る計 S機に要求仲介プロ グラ ム を搭裁 し 、 要求 teムブ G グラ ムが制御お象計莨機を 制御す る ため に 、 制御 ^計箕機と し て ど を い ば良 ; 0、 を 係情報マ マ ノ ら検索 - 、 そ の計算機に対 し て制御要求を 'ϊてる こ :: 実現さ る : Ξ に . 係情報 " マ イ ,ν Ε « sは電源 s τ;象 a録フ ニ ゲラ を 設 る 二 と ,こ ; ■: 自動玍成さ れる : Originating § manner is of, for controlling搭裁the request mediation pro-grams to your elephant and Do that a total of S machine, request te Mubu G g is that controls the control your elephant meter cigarettes machine, control ^ total kee What is the best way to find a machine ?: 0, search from the relation information man--and send a control request to that computer :: Realize: Ξ 係. , ν Ε «s is the power supply s τ;
き.: 算機への制 © デー タ j送信は要求 to介ブ G グラ ム に よ っ て行われる て- 、 自勛運 制 isブ : ブラ 二は 御お象計算機と 制御情報だけ を指定 し て電源 G : Control to the computer © Data j transmission is performed by the request-to- G -gram, and the automatic operation is: The branier specifies only the target computer and control information. Then power
K ¾S を う, こ と がで き る 。 さ ら に 、 電源制御対象 S録ブ π; グラ ムは、 天登録電源 制御線の電源を 投入 し た直後に受け取る起勛メ ッ セージ を調べ、 発行元 を特定す る こ ;二 よ り 、 そ の電源線と 接続さ れて いる計算機と を特定 τる こ と がで き る 。 K ¾ S can be obtained. In addition, the power control target S record π; program should check the startup message received immediately after the power of the sky registration power supply control line is turned on, and identify the issuer; It is possible to specify the power line and the connected computer.
ϋ Εの ¾虽な説明 Detailed explanation of ϋ Ε
1 は、 ; 発明の一実旌例 を示す全体構成図であ り 、 図 2 は、 自動運転制御部 の構成!!て ' あ り 、 H! 3 は 、 電源制御装置の構成 Hiで あ り 、 図 4 は、 要求仲介 の 構成!1であ り 、 図 5 は、 スケ ジ ュールフ マ イ ルの構成図であ り 、 図 6 は、 要求対 象 « の構成 HIであ り 、 了 は、 S続構成自動検出機能の構成図で あ り 、 8 、 ス ケ ジ ュール解析部の動作 を示 τフ G—図であ り 、 図 9 は、 起動時刻設定 I: 作を示すフ ロ ー [ϋで あ り 、 g! i 0 は、 停止時刻設定 の動作を示すフ ロ ー;! て- 'J 、 Ξ 1 1 は 、 停止制御部の動作 を示すフ d—図であ り 、 H 1 2 は、 要求お 象 ^索 ^の動作 を示すフ ::一 ¾であ り 、 I 3 は、 マ シ ^要求対象検索 ^動 ' 示てフ c:一 Sで , ;! I 4 は 、 電源制御 象 g録 g:の 作 を示て コ 一: I て り 、 I 5 は、 動メ ッ て一ジ ブ匚 一 ド ャ ス ト の動作 を示すフ G—;!で ' . :1 1 6 は、 一 ¾:の鼋子機器を て る構成 示丁構成 ^で あ る c 1 is an overall configuration diagram showing one example of the invention; FIG. 2 is a configuration of an automatic driving control unit! ! H! 3 is the configuration Hi of the power supply control device, and FIG. 4 is the configuration of request mediation! 1, FIG. 5 is a configuration diagram of a schedule file, FIG. 6 is a configuration diagram HI of a request target, and FIG. 6 is a configuration diagram of an S connection configuration automatic detection function. 8 shows the operation of the schedule analysis unit. Τ is a G—figure. FIG. 9 is a flow diagram showing the start time setting I: operation [ϋ, and g! , Flow showing the operation of stop time setting; 'J, Ξ11 is a d-diagram showing the operation of the stop control unit, and H12 is a フ: を ¾ which shows the operation of the requested object ^: 3 is the machine ^ requested object search ^ action ' I 4 indicates the operation of the power supply control element g: g: I, and I 5 indicates the operation of the mobile device. In ':. 1 1 6, one ¾: of鼋子equipment Ru hand configuration示丁configuration ^ a Oh Ru c
¾ を実施する ための最良の形態 Best mode for implementing ¾
I に 実施例の全体構造 : 3 を示す。  Figure I shows the overall structure of the example: 3.
2 1 に おいて分敗計 S機シ ス テムは計算機 1 0 1、 計算機 102、 計算機 1 03か ら楊 成 さ れて お り 通信線 :に つ ' 接続さ 、 各々 の計算機の電源 ¾御は電源制 ©装 S 120に ; に'実施さ ている。 電源制御裝置 120からは電源供給線 1: T、 ::5, ::9 が配線さ てお り 各々計算機 103、 iO 102に接続されている。 電源制御装 を制御する ための制御情報 ί言号線 116は計算機 I 03だ に接統さ ている。 In 21, the S-computer system is composed of computers 101, 102, and 103. Communication lines are connected to control the power of each computer. Is power control © In S120; A power supply line 1: T,: 5, :: 9 is wired from the power supply control device 120, and is connected to the computer 103 and the iO 102, respectively. Control information for controlling the power control unit ίThe word line 116 is connected to the computer I 03.
各 tr軍機には要求仲介 gr c'4、 : 09、 :: 1が設け ら てお 、 要求 部內には 要求対象 Ξ« : 05 , : :0、 ::2を っている 自動運 制御 §-:ΰ6はス ジュール マ イ ル: C'Tから通信線 125を z、 - てス ジ ュ ール情報を ^み込み, ϋ ί言線 10 Sを 介して要求件介 i 04に対する制街要求の 行と受信を行う 。 スケジ二 一ルフ マ ィ ル 107 通信線: 24を介 し て ベ ータ コ ソ ール 123から設定でき る。  Each tr military aircraft has a request mediation gr c'4,: 09, :: 1, and the request section has a request target Ξ «: 05, :: 0, :: 2 Automatic operation control § -: ΰ6 is a schedule mail: The communication line 125 is inserted from C'T, and the schedule information is inserted. Make and receive requests. Schedule 21 107 Communication line: Can be set from beta console 123 via 24.
自動運 e制御 K 106が発行 し た制御要求は要求仲介部 104から通信線 1を介し て要求仲介 ffi i に達し、 通信線 113を介して ¾源制御装 制御 ©に 4が受け取る。 鼋源制街装 S制御部 I i 4は受け取っ た要求を解釈し信号線 116を介 して電源制御装 S120制御二マン ドを発行する。  The control request issued by the automatic operation e-control K 106 reaches the request relay ffi i from the request relay unit 104 via the communication line 1, and is received by the power source control device control 4 via the communication line 113. The power control device S control unit I i 4 interprets the received request and issues a power control device S120 control command via the signal line 116.
次に、 §! 2 を, いて 自動運 G制御部の構成を説明する。  Next, the configuration of the automatic operation G control unit will be described with reference to §!
自動運転制御部 106は、 スケジュールフ マ イ ル 107からスケジュール情報を読み 込んで起 K停止スケジュールの解析を行う スケジュール解析部 203、 解析結果に 基づいて起動時刻の K定要求を発行する起勳時刻設定部 206、 停 i 時刻に起動さ れるタ イ マの設定などを処理する停止時刻設定 20:、 およひ'停 時刻設定 2: 201 に よ リ 設定されたタ イマの起勛によ り勳作する停止制御部 205からなる。 起動時 刻設定 35206によ り作成された起勳要求メ ッセージと停止制御部 205によ リ /(E成さ れた停 I 要求メ ッセージは共に通信線 108を介して送信される。 The automatic operation control unit 106 reads the schedule information from the schedule file 107 and analyzes the start / stop schedule. The schedule analysis unit 203 issues a start request K fixed request based on the analysis result. The setting unit 206, the stop time setting 20: processing the setting of the timer started at the stop i time, etc., and the “stop time setting 2: 201”, according to the start of the timer set in 201 It consists of a stop control unit 205 that performs a prize. Startup time set 35206 by Ri created Okoshi勳request message and I request message stops I was made Li / (E stop control unit 205 is transmitted via the communication line 108 together.
次に、 3 を用いて電源制御装置の構成を説明する。  Next, the configuration of the power supply control device will be described using FIG.
電源制牴裝 i 20は 源供給線 T、 US. :: 9を持ち、 こ Πら ¾源^袷線 i に 対 して I 台の計算機を接続し 、 電源供給線への鼋カ供給を開始し た リ停止する こ と ;二 り 計算機の電源制御を行う 。 電源出 スィ ツ チ 路 30:、 202. 303は鼋源 供給の開 ^と停 を ^^する ための回路であ り スィ ツチ叵路退? =、 ^ 30了と制 ffi線 3 04. 305 , 306を介 して送られる制御情報に よ り制御さ る。  The power control collision device i 20 has a power supply line T, US.::9, and I computers are connected to the power supply line i to supply power to the power supply line. To start and stop; 2) Control the power of the computer. Power supply switch circuit 30 :, 202.303 is a circuit for opening and stopping power supply ^^ Switch connection? =, ^ 30 and controlled by control information sent via ffi lines 3 04. 305 and 306.
電源の 入と切断のためのコマン ドは信号線 116を介して受け取 '.: 、 二 マ ン ド ィ ンタ フ ニース部 313によ リ解析さ れ、 停止要求であれば通信線 314を介 して電源 停二制御 81309に渡され、 開始要求て 'あれば通信線 315を介して電源開始制御 0: 31 2に渡さ れる 。 停止要求は 「指定 し た時間轾過後に指定 し電源供給線を切断状?!! にせよ 」 と い う 形で渡さ れる ので電源停止制御 ffi 309には これ らの内容を 記 *す る停止要求記 部 310が設け られて いる 。 同様に 、 電源開始要求を記憶す る ため に電源開始制御部 3 には開始要求記 «部 3: 2が設け られて い る t E愫 さ Γ—て いる 停二要求時 ¾ ま た は開始時 j ;二達する と電源停二制铤 g& 30Sま たは鼋源関始 :街 :は制御線 30Sを介 て要求に - ,: rする 指示を ス ス. ツ チ 路遏^ 305を 介 し て 電源出刀ス ィ ツ チ回路;こ与え る c The command for turning on and off the power is received via a signal line 116 and analyzed by the second interface nice part 313. If a stop request is made, the command is sent via a communication line 314. Power supply control is passed to 81309, and if there is a start request, power supply start control via communication line 315 Passed to 2. The stop request is passed in the form of “Specify after the specified time has passed and the power supply line is cut off?”, So the power stop control ffi 309 describes these contents * Stop A request section 310 is provided. Similarly, in order to store the power start request, the power start control unit 3 is provided with a start request record «part 3: 2: t E 愫 時 時 時 時 開始 or start At time j, the power is shut off when the power reaches two times. G & 30S or power source: town: request via control line 30S-,: r. to power Degatanasu I Tsu latch circuit; this gives Ru c
次 、' 4 を用いて 要求仲介部の楫成を ^す る 。  Next, we use '4 to perform the request mediation department.
要求仲介部 104は通信線: OSを介 し て 自勛運転制御部 106か ら の電源制御要求を 受け取 り 、 送信先計算機の識別名 を求め、 送信先計算機の要求仲介部 104に要求 メ ソ セー ジ を渡す。 要求仲介 104は 自動運転制御 ^外の制御部か ら も使 て- き る 。 ま た、 多数の計算機に対する ブ C ド キ ャ ス トメ ッ セー ジ要求の場合には 通信先計算機の識別名 を求め る こ と な く メ ッ セー ジ を送信する 。 ま た、 要求仲介 部 104はブ ドキ ャ ス ト メ ッ セ ー ジ を受け取る と 自計算機向 けの要求と し て対 応する処理を開始する。  The request mediation unit 104 receives a power control request from the automatic operation control unit 106 via the communication line: OS, obtains an identification name of the transmission destination computer, and requests the request mediation unit 104 of the transmission destination computer for the request method. Give the sage. The request mediation 104 can also be used from an external control unit in the automatic operation control. Also, in the case of a broadcast message request for a large number of computers, the message is transmitted without obtaining the identification name of the communication destination computer. Further, upon receiving the broadcast message, the request mediation unit 104 starts processing corresponding to the request for the own computer.
要求仲介部 104は ま ず要求メ ッ セージ受付部 401に よ リ 要求メ ッ セー ジの受け付 け処理を行い、 要求対象検索部 403に渡す。 要求対象検索部 403は通信線 423を介 し て要求対象記 «部の情報を 読み込んで解析 して要求メ ッセー ジ送信先計 S機の 識別名 を求め、 そ の情報を要求メ ッ セー ジ送信 S 05に渡 し 、 そ こ か ら通信線 12i を介 し て相手先計算機の要求仲介 に送 if さ れる 。  The request mediation unit 104 first performs a request message reception process by the request message reception unit 401, and passes the request message to the request target search unit 403. The request target search unit 403 reads the information of the request target section via the communication line 423, analyzes the information, obtains the identification name of the request message transmission destination total S machine, and requests the information. The packet is passed to the transmission S05, from which it is sent to a request relay of the other computer via the communication line 12i.
要求仲介 104が他の計算機か ら の要求メ ッ セー ジ を受け取る と き 、 ま ず要求 メ ソ てー ジ受信 ; 4が要求メ ソ セー ジ受け取 り 理を いマ シ ン ^要求対象 ^ 索 412にメ ッ セー ジ ^? を渡す - マ シ ン 内要求対象検索部 4 では要求対象記 If 35424の s と 照会 して受 け付け ^能な要求な ら指定 さ たブ□ セ ス への通矢 Zを 要求メ 'ノ セー ジ配達部 4: 0を ^ いて行う  When the request mediation 104 receives a request message from another computer, the request message is first received; 4 is a machine that receives request message reception. Message to 412 ^? -The request target search unit 4 in the machine inquires s of the request target description If 35424 and accepts it. If the request is a competent request, it sends a request arrow Z to the specified bus process. Sage Delivery Department 4: 0
要求対象記憶 ^ 424の 内容の変更は要求対象記 «制御部 420が受 け付け る 制 御要求メ ソ セー ジの 51理に よ り 行う 。  The contents of the request target storage ^ 424 are changed according to the request target description 51 of the control request message received by the control unit 420.
スケ ジ ュ ールフ ァ ィ ル 107の構成は図 5 の よ う にな っ て いる 。  The configuration of the schedule file 107 is as shown in FIG.
ス ケ ジ ュ ールフ ァ イ ル: 0":に記 «さ れて いる 内 §は、 マ シ ン ¾別名フ ィ ール ド 5 0 1 と 制御 E付指定フ ール ド 502と 起動時刻指定 一ル ド 503お よ ひ'停止時刻指 定フ ール ド 504を 1 レ ニ ー ド と し 、 多数の レ コ ー ドで構成さ て い る £ 制御日 付指定 502と 動時刻指定 503ま たは停止時刻指定 504;二 よ り 起動や停二の時刻指 定を 行い 、 マ ン 識別名 50 二 よ り その制御を どの "算機に対 し て実 する かを する The schedule file: 0 ":« indicates that the machine ¾ aka field 5 0 1 and control E designated field 502 and start time designated field 503 and 'stop time designated field 504 are defined as 1 reed and consist of a large number of records. to have that £ is designated 502 and the dynamic time specified 503 or with a control day stop time specified 504; performs a start-up and stop second time specified two good Ri, which between emissions distinguished name 50 two good Ri its control " Ask the computer to do it
ま た , 要求. 象 K情 K 4 24の構成 6 〇 に な っ てい る : In addition, the structure of request K information K 4 2 4 is 6 6:
要求対象記 « ¾C 24に 憶 さ て いる 内容は、 要求お象識別名 フ メ —ル ド 60 1 と マ ン識別名フ ル ド 6 02お びマ ン ブ G セ ス識別名 フ ール ド 604を 1 ; ニ ー ド と し 、 多数の コ ー ド ;二 よ り 構成さ て いる 。 要求^象箝別名 60 1に 録 さ て いる識別名称は要求仲介 ffi 1 04を有する全ての計算機の間で共通の意呋を 持つ よ う に制御さ れて いる 。  The contents stored in the request object description ¾ ¾C 24 are the required elephant identification name field 601, the man identification name field 602, and the mum G ses identification name field. 604 is defined as 1; Need, and consists of a number of codes; The identification name recorded in the request alias 601 is controlled so as to have a common meaning among all the computers having the request mediation ffi 104.
要求对象識別名 6 0 1と し て 1 台の計算機用の電源制御サー ビス名 を 1 個登録す る 。 マ シ 識別名 S 03と マ シ ^ブ セ ス識別名 604は、 名称と し て登録 し たサ一 ビス が実際には何を行う かを規定する も ので あ り 、 指定さ れたマ シ ン 上の指定さ れたプ C セ スが要求対象 ¾別名 60 1に示 さ れる サービス を実行可能て'ある こ と を 不 して いる 。  Register one power control service name for one computer as the request target identifier 6001. The machine identifier S03 and the machine identifier 604 specify what the service registered as a name actually performs, and the designated machine is used. The specified process on the server cannot execute the service indicated by the request target 要求 alias 601.
次;こ 、 接続構成自動検出機能の構成を ; 3 了 に示 。  Next, this shows the configuration of the connection configuration automatic detection function.
計算機 70 :、 702 , 703、 了 04は通信線 1に よ リ 接統さ れて お り 、 二 れ ら の計算 機の 自動電源制御は電源制御装置 1 20に よ り 実行 さ れている 。 各計算機の電源は 電源供給線 7 1了、 7 1 8、 7 1 9 , 7 1 5に よ リ 供給さ 制御さ れて いる c Computers 70:, 702, 703, and 04 are connected to each other by a communication line 1, and the automatic power control of these computers is executed by a power control device 120. The power of each computer is supplied and controlled by the power supply lines 7 1, 7 18, 7 19, and 7 15 c
各計 S機には要求仲介部 7 0 :お よ び起動メ ッ でー ジ ブ匚 一 ド ^ ー ス ト ¾3 705を 設 け、 電源 S街装置制御 T: 4を設け た計算機 704二に さ ら に電源制御お象 録 了 1 0を 設けて いる 。 鼋源制御お象 S録部了 1 0はオペ —タ コ ン ソ ール了: 2か ら通信 線了:: を介 し て指示さ れたタ イ ミ グで 動さ 、 電源供給棕 7: 7、 T i S、 了: 9を S た 、 か ら ま ず罨源供給線 T: Tを電源 ¾入状??!に て る 。 電源が 入 さ れ e動 さ れ た計算機 70 1では起勛メ ッ セー ジブロ ー ド キ ス ト部 705が 勛さ れメ ッ セー ジが通信線 1 2 1上;こ送出 さ れ る e こ のメ ッセージ を受け取っ た計算機 7 04の要求件 介 了 07はそ の内 Sを電源制御対象登録部了 1 0に渡 し 、 登録部了 1 0は電源供給線 7 :了 を 入 し た こ と に よ っ て計算機 70 iが立ち上がつ たも のであ る と 判断 し 、 そ の結 果を 要求対象記 «部 70Sに追加 g録する 。 そ し て 、 次の電源供給線 7iSの電源 を投 入 し 、 同様に g録追加処理を 実 す る 。 こ れ をすベて の電源供給線が投入さ れる ま で継続 し て実行する 。 Each of the S machines has a request mediation section 70: Start-up method and a start list # 3 705, and a power supply S street device control T: 4 In addition, a power supply control record 10 is provided. Power control ele- ment S recording unit end 10 is operated by the operator from the console control end: 2 The communication line end is operated by the timing instructed via :: : 7, T i S, end: 9 S, then first supply line T: Power supply for T ?! It is. E This that will be this delivery; power ON by e dynamic computational unit 70 1, Okoshi勛Me Tsu Se diblock over civil be sampled portion 705 is勛main Tsu saver di communication line 1 2 1 above The request completion of the computer 704, which received the message of 704, passes the S to the power control object registration section 10 and the registration section 10 has received the power supply line 7: As a result, it is determined that the computer 70i has just started up, and the The result is added to the target description «Part 70S. Then, the power supply of the next power supply line 7iS is turned on, and the g record addition processing is performed similarly. This is continuously executed until all power supply lines are turned on.
次に 、 Z 2 に示 し たス ケ ジ ュ ール解析 Si 203の動作手順を ! 3 8 の : 一!! に よ Ά Βξ - c Next, the operation procedure of the schedule analysis Si 203 shown in Z 2! 3 of 8: One! ! Yo yo Βξ Βξ- c
ニ ニ で 、 ま ずス 1 r ニ ー ル "1 マ イ 107を : r— ブ し て ( 801 ': ス ケ ジ ニ ー ル フ ァ イ : 07か ら 1 コ ー ド分の ス ジ ュ ール定義情報 を ^み込み ( 802 ) . そ の レ ニ 一 ド ;二定義 さ て いる起勳時刻指定 503が有効な指定な ら ( 303; マ ン 識 S'J 名 50:、 : j ® ョ 付 502、 起助時刻 503をパラ メ タ と して渡 し起動時刻設定部 205を起 動する ( S04 ) e ま た、 停止時刻指定 504が有効な指定な ら ( S05 ) マ シ ン 識別名 5 01、 制御 ョ ''寸 502、 停止時刻 504をパラ メ タ と して渡 して停止時刻設定部 201 を起 動する ( 806 ) 。 At first, the 1st rail " 1 mi": r-bubble (801 ': schedule file: 07-code schedule from 07 The rule definition information is included (802). If the specified value is 503, the specified start time is valid (303; Man's S'J name 50 :,: j ® ® with 502 to start the pass-shi start time setting unit 205 as a para-meta to Okoshisuke time 503 (S04) e in addition, stop time designated 504 valid specification for al (S05) Ma Thin The identification name 501, the control unit '' dimension 502, and the stop time 504 are passed as parameters, and the stop time setting unit 201 is started (806).
つ ぎに 、 ま だ全ての レ コ ー ド を S み終わっ て いないな ら次の コ ー ド を読む た め に ス テ ッ プ S02に飛ひ' ( 807 ) 、 読み終わ っ たな ら スケ ジ ュールフ ァ イ ル 10了を ク ロ ーズする ( 808 ) 。  If you haven't finished reading all the records yet, skip to step S02 to read the next code '(807), and if you have finished reading, Close the file 10 (808).
次に図 2 に示 し た起勛時刻設定部 206の動作手順を 囟 9 のフ コ ー図に よ り 説明 する 。  Next, the operation procedure of the start time setting unit 206 shown in FIG. 2 will be described with reference to a flowchart of FIG.
最初にパラ メ タ と し てマ シ ン IS別名 、 制御日付、 起動時刻を ス ケ ジ ュ ール フ マ ィ ル 10 Tか ら受け取 り ( 9(H ) 、 つ ぎにマ シ ン識別名 に個々 の 源サ— ビス を特定 す る ため の電源サー ビス指示名 を付加 し た 「マ シ ン指定電源サー ビス名 」 を生成 する ( 902.; 。 さ ら に要求対象に渡すメ ッ セー ジ を生成 し ( 903 ; 、 生成 し た メ ッ セー ジ を 要求 介 104に渡す ( 904 ) c First, the machine IS alias, control date, and start time are received from the schedule file 10T as parameters (9 (H), followed by the machine identification name). A power supply service name that specifies the individual power supply service is added to the “machine-specified power supply service name” (902 .; and the message passed to the request target). The message is generated (903; the generated message is passed to the request 104 (904) c
次に、 ¾ 2 ;二示 し た停止時刻設定部 201の動作手順を ϋΜ 0 のフ ロ ー図 に ; '.; 説明する  Next, the operation procedure of the stop time setting unit 201 shown in ¾ 2; 2 is described in the flow diagram of 図 0; '.
最 ¾に バラ メ タ と し て マ ン 識別名 、 制御 Ξ付、 停二時刻 を ス ケ ジ ニ ー フ マ ィ ル: 07か ら受け取 り ( ; 001 、 つ ぎにマ シ ン ¾ S 名 に 源サー ビス指示名 を ^: 力 [ し た ' マ シ ン 指定電源サー ビス名 」 を生成する に 002 ) 。 さ ら に制御 日付で指 定 さ れた 日 の停止時刻に達 し た と き停止制御部 205を起動す る こ と を指定 し て タ イ マ を 設定する 。 こ の と き ノくラ メ タ と し て 'マ シ ン 指定電源サー ビス名 . を ス ケ ジ ニ — ル解析 203へ渡す ; 1003 ) c Finally, the man identifier, control assignment, and stop time are received from the schedule file: 07 as the parameters (; 001, and finally the machine S name). The source service instruction name is ^: input the [machine specified power supply service name] to generate 002). Further, the timer is set by specifying that the stop control unit 205 is to be activated when the stop time on the day specified by the control date has been reached. At this time, as a parameter, 'Machine specified power supply service name. Pass it to the genius analysis 203; 1003) c
次 に、 図 2 に示 し た停 IT制御 ffi 205の動作手順 を図 1 1 の フ ロ ー [3に よ り 説明 す る e Next, the operation procedure of the stop IT control ffi 205 shown in Fig. 2 will be described with reference to the flow [3] of Fig. 11 e
最初にパラ メ タ と し て マ '二 ; 指定電源サー ビス名 を ス ジ ュ ー ル解析 g!203か ら受 け取 り ; ::0 、 要求 7:象 ;:渡すメ ッ セー ジ を生成 し に:02 : 、 兰成 し た メ ッ セ一 ジ を要求仲 :ΰ4に igて ; ::02· ; = First, receive the specified power supply service name as a parameter from schedule analysis g! 203; :: 0, request 7: elephant ;: message to be passed. generated in: 02:,兰成the main Tsu cell one di request relationship: ΰ4 to Te ig; :: 02 ·; =
次に、 図 4 に示 し た要求-象検索 403の動作手順 を 1 2 のフ 匚 ー図 に り 説明する 。  Next, the operation procedure of the request-elevation search 403 shown in FIG. 4 will be described with reference to a flowchart of FIG.
最初にパラ メ タ と し て 要求-象名 と メ ッ セー ジ 内容を 要求メ ッ セ ー ジ受け付け 部401か ら得 ( 120: ) 、 要求対象記憶 ^424を検^ し てバラ メ タ の要求対象名 と 要 求対象 18別名 601が一致する レ ニ ー ド を探 し に 202 ) 、 一致する 'レ コ ー ドが存在 し ないな ら ( 1203 ) エラー処理を行い ( 1206 ) 存在する な らそ の レ コ ー ドのマ シ ン IS別名 603と マ シ · [7:プ匚 セ ス識別名 604を求める ( 1204 ) c そ し て ノく ラ メ タ を 与えて要求メ ッ セー ジ送信部 405を起動す る ( 1205 ) 。 First, the request-target name and the contents of the message are obtained from the request message receiving unit 401 as parameters (120 :), and the request target memory ^ 424 is checked to determine the parameter. The target name and the request target 18 Search for a match in which the alias 601 matches 202), and if there is no matching 'record (1203), perform error processing (1206). The machine IS alias 603 of the other record and the machine [7: Ask for the process identifier 604 (1204) c] Then, the request message is given by giving the parameter. The transmitting unit 405 is activated (1205).
次;こ、 図 4 に示 し たマ シ ン 内要求対象検索部 4 の勛作手順を図 1 3 のフ ロ ー 図に よ リ 説明する 。  Next, the operation procedure of the in-machine request target search unit 4 shown in FIG. 4 will be described with reference to the flow chart of FIG.
ま ず、 パラ メ タ と して ブ C セス識別名 と 要求対象名お よ ひ'メ ッ セー ジ内容を要 求メ ッセ ー ジ受信部 414か ら取得 し ( 1301 ) 、 要求対象記'!!部 424を検索 しパラ メ タ の要求対象名 と 要求対象 IS別名 601が一致する レ コ ー ド を探す ( 1302 ) c も し 一致 レ ニ ー ドが無いな ら < 1303 ) 二ラ一 ¾4理を行い '、 1307 '; あ る な ら そ の レ ニ 一 ドのマ シ ン 識別名 603と マ シ ン 内ブ G セ ス識別名 604を求める に304 '; c さ ら に 、 求め た値と ノくラ メ タ の間に予 暂があれば に 305; 二ラー 理を い ': : 307 ; ' 予 盾が無ければバラ メ タ を渡 し て要求メ ッ セー ジ配達 4:0を起助する ( : 306 ) 。 First, the process identifier and request name are obtained from the request message receiving unit 414 as parameters (1301), and the request target description is obtained. !!!! Search part 424 for a record in which the request target name of the parameter and the request target IS alias 601 match (1302) c if there is no match target <1303) Perform ', 1307'; if any, 304 'to obtain the machine identifier 603 of the unit and G bus identifier 604 in the machine; c If there is a reservation between と and ラ ラ 305 305 : : : : : : : :: ; : '' : : : : Help me (: 306).
次に 、 図 了 に示 し た鼋源制 象登錄部了: 0の動作手順を; 1 1 4 のフ r: — ;二 リ IP,明する 。  Next, the operation procedure of the resource control registration unit shown in the figure: 0 is described;
ま ず、 電源制御装 g 120の電源供給線の内、 停止状態にな っ て ;、 る線を 1 選 ひ' ( 140: ; 、 そ の電源供給線を動作状態に し ( 1402 ) 、 要求件介 ^了 0?か ら ブ G — ド キ ャ ス ト メ ッ セ一 ジ を受信する ま で一定時間待つ ( 1403 ) c ブ G— ド キ ャ ス ト メ ッ セー ジが到着 し たな ら に 404 ) ブロ ー ド キ ャ ス ト メ ッセー ジの送信元マ シ ン のマ 識別名 を求め に4 05 、 要求仲介 70 の要求対象記 « 了 O Sに 7: ^す る ニ ー ド を追加する ( : 406 ) 。 さ ら にすベての電源供給線を動作状態に し た力、 否か を検査 し 、 ま だ停止状態の電源供給線が残っ て いる な ら ス テ ツ : 40 iへ飛ひ'、 そ う で な け ば終 了する ί. 1 4 0丁 ) , First, when one of the power supply lines of the power control unit g120 is stopped; one of the power supply lines is selected (140 :;), the power supply line is activated (1402), and a request is made. Wait for a certain period of time from receiving the message 0 to receive the broadcast message (1403). C The broadcast message has arrived. 404) Broadcast message source machine In order to obtain the machine identification name of the application, 405 is added, and 7: ^ is added to the request completion OS of the request mediation 70 (: 406). Inspect all the power supply lines to determine whether they have been activated or not. If there are still power supply lines in the stopped state, go to Step 40i. If not, it will end.
次に 、 2 に示 し た e勳メ ッ てー ジ コ ー ^ " ス ト T 0 Ξ G'動 ^手順 を ; 1: ; 5 C " ニ ー 3 に り Ιί明する e Then, in 2 Te shows the e勳Me Tsu "to be sampled T 0 Ξ G 'dynamic ^ procedure; 1:; 5 C" over-di-co-over ^ e to Ιί Ming Ri in two-3
こ の ¾1理は電源投 人後の 勛 ¾L理のー ¾と し て起動さ 、 要求お象 と し て ブ c 一 ヤ ス 卜 メ ッ てー ジ を指定 たハラ メ ータ を ¾ し て要求 介 g: _ c了を起動 τ る ¾L理を行 う に 50 : ; 0 This process is started as a process after the power is turned on, and a harasser that specifies a broadcast message as a request ele- ment is used. Require request g: _ c start τ ¾ 理 理 理:: 50:; 0
次に、 計算機^外の一般の電子機器の電源制御を行う 構成につ いて 、 1 6 の 構成囟;こ よ り IX明する 。  Next, a configuration for controlling the power supply of general electronic equipment outside the computer will be described in 16 of Configuration I;
二 の構成て'は図 1 の構成に ¾ ¾ し て いる が、 周辺機器管理裝 S 1 602に プ リ ン タ 1 6 07や F A X 1 608、 テ 'ン ビゃラ ジ: τな どの視聴覚機器 1 6 09お よ ひ'その他の ¾子機 器が接統 さ れて いる点が異な る 。 各電子機器は計算機 1 03上の管理装置制御 ¾;: 1 60 Lか ら周辺機器管理装 S 1 602を介 して電源制御を受ける 力、'、 そ の際、 自動運 βの ためのス ケ ジ ニ ール設定操作は 自勛運転制御部 106か ら実行 さ る 。  Although the second configuration is similar to the configuration of FIG. 1, the peripheral device management unit S 1602 has a printer 16607, a fax 1608, and a television system such as τ. Equipment 1609 The difference is that other devices are connected. Each electronic device receives the power control from the management device control 03 ;: 160 L via the peripheral device management device S 1602 on the computer 103. The operation for setting the key knives is executed from the automatic operation control unit 106.
自助運耘制御 06か ら発行さ れ た要求を表わすメ ッ セー ジは、 各電子機器固 有の識別名称で表わさ れた機器の操作と い う 内容で要求仲介部 i 04に Sさ れる。 そ 二 で要求対象記 ¾部! 05の記録情報を元に、 どの計算機上に存在する管理装 制御 に対 し て配送するべ き メ ッセー ジか を割 り 出 し て 、 その計算機に メ ソ セ ー ジ を配送する。  The message indicating the request issued from the self-help tillage control 06 is sent to the request mediation unit i04 with the content of the operation of the device represented by the identification name unique to each electronic device. Then, the subject of the request, part I! Based on the record information of 05, the computer determines which message should be delivered to the management device control existing on the computer, and delivers the message to the computer.
二 れに よ り 、 電源制御対象の機器 を制御 -る際に、 そ の ためのメ つ て ー ジ を ど の! ^算機;二配送すべ き か を 自動運転制御 06が気に し な く て も済む と い う ¾!旲 力、'ぁ る。  According to this, when controlling a device to be power controlled, what message is there for it? ^ Automatic operation control 06 does not need to worry about whether to deliver two computers!旲 Power.
g業二の利用可能性 Availability of g industry
発明 に よれば、 分散計算機 シス テ ムの 自動運転の際に問題と なる 、 電源制御 裝 S と各計算機間の接続構成を ': E握す る ため の情報収集が自動 に な る の で、 シ ス テム管理者の管理負荷 を軽減する効果がある  According to the invention, information collection for grasping the connection configuration between the power supply control device S and each computer, which is a problem in the automatic operation of the distributed computer system, becomes automatic. Effective in reducing the administrative load on system administrators

Claims

t% ϊ ^ α IS t% ϊ ^ α IS
1 . 2台 ^上の計算機が通信路で接統され、 前記計算機の «源投入と電源切断を 行う電源制御裝 Eを、 前記計算機の少な く とも 1 台に設けた電源制御装 制御手 段で制御 し 、 予め定めた時刻に前記計算機の電源投久又は切 を指示する 自動運 転制御手段を設けた分敗計軍機シ ステムにおいて、  1.2 Two computers are connected by a communication path, and a power control device E is provided in at least one of the computers, and a power control device E for turning on and off the power of the computers is provided in at least one of the computers. And the automatic power control means for instructing the computer to be turned on or off at a predetermined time.
前記各計箄機二に任意の計算機の電源制御を実 てる電源制御装置制御手段を 保持する計算機がどの計算機であるかを記《手段に記憶し、  The computer which holds the power supply control device control means for controlling the power supply of an arbitrary computer in each of the above-mentioned computers 2 is stored in <the means,
自動速転制御手段が特定の計算機の指定と該計算機に ¾する制御内容を指示す ると き前 Ξ指示を の計算機に配送するかを前記記憶手段を検索する こ と によ り 決定する こ と を特徴とする分散システム自勛運転方法。  When the automatic speed change control means designates a specific computer and instructs the control contents to be applied to the computer, it is determined by searching the storage means whether to deliver the instruction to the computer. A distributed system automatic operation method characterized by:
2 . 前記計算機と ¾源制御装 a制御手段を保持する計算機との対応情報を前記記 愧手段に格納する こ と を特徴とする請求の範囲第 1 項記裁の分散計算機システム 自勛 a転万法。  2. The distributed computer system according to claim 1, wherein the correspondence information between the computer and the computer holding the resource control unit a control unit is stored in the storage unit. Manpo.
3 . 予め前記電源制御装 S制御手段を保持する計算機が前記電源制御装置の電源 供給線に接続されている 1 台以上の計算機を電源切断状^にし、 電源線に対して 時間間 ^を sいて順番に 1 本ずつ電源投入を行い、 電源線の電源投入によ り起勳 された計算機は他の多数の計算機に対してメ ッセージを発兰し、 前記鼇源制御裝 置制御手段を有する計算機は前記電源を投入した罨源線にその後に到着 した前記 メ ッセージの発生 の計算機が接続されていると判断する こ と を特徴とする請求 の範匪第 〗 項および第 2項記載の分散システム自勳運転方法。  3. The computer that holds the power control device S control means in advance turns off one or more computers connected to the power supply line of the power control device and disconnects the power source line for a period of time s. The power is turned on one by one in turn, and the computer that is started by turning on the power supply line issues a message to many other computers, and has the above-mentioned source control device control means. 3. The distribution according to claim 2, wherein the computer determines that the computer for generating the message arriving after that is connected to the power source line which is turned on. How to drive the system.
4 . 前記自勳運転制御手段は、 電源制御対象となる計算機の識別名とその制御内 Sを?!定する こ と によ リ制 ¾£対象計算機の電源制 ¾S)を う こ と を特徴とする請求 の範囲第 1 項記敕の分散システム自動運 e方法。  4. The self-run operation control means finds the identification name of the computer to be controlled and the S in the control. ! Claim 1. The distributed system automatic operation method according to claim 1, wherein a power supply control (S) of the target computer is performed by setting.
5 . 前 §Ξ制御対象計算機登録手段に g録された情報を ^索する こ と に よ り 、 前 Ξ 自動運 e :j御手段に指定さ た電源制御対象と なる 箄機の IS 名称から前 E 算機を制御する電源制御裝!!制御手段を有する計算機を抽出する こと を特擞とす る IS求の K IS第 1 項、 第 2項および第 4項記載の分散シス テム自動運転方法。  5. By searching the information registered in the control target computer registration means in the previous § か ら, the automatic operation e: j from the IS name of the power supply control target specified in the control means Previous E Power control device to control the calculator! 5. The distributed system automatic operation method according to the first, second, and fourth KIS of IS request, which is characterized by extracting a computer having a control means.
6 . 少な く とも電源制御対象となる計算機の ¾別名称と前記計算機の電源操作を 行う電源制御装置の制御を行う電源制御装 S制御手段を有する ^算機の識別名称 との対応閣係情報を保持する こ と を特徴とする謂求の範囲第 1 項記載の分敗シ ス テ ム自動運転方法。 6. At least the specific name of the computer to be controlled by the power supply and the power supply control unit that controls the power supply control unit that controls the power supply of the computer. A method for automatic operation of a defeat and loss system according to claim 1, wherein information on a cabinet clerk is retained.
7 . 2 上の電源供給線を持つ電源制御裝 Eを制御する電源制御装置制御手段 を有する前記計算機は、 切断状態にある I の電源供給線を電源投人状態に し た 後で他の I· »機からのメ ッセージを受 ί言 し 、 計算機が起動さ たこ と を示 メ ソ セ一ジが到着 し たらそのメ ッセ一ジの発信元を求め、 前記メ ッセージ発信元の計 算機識 3リ名称を前記髦源制御お象と なる計算機の識別名称と し、 自計算機の琉別 名称を前 Ξ計算機の電源操作を行う電源制御装! 1の制御を行う電源制御装 S制御 手段を有する計算機の 16別名称と して 録する こ と を特徴とする ϋ求の範囲第 1 項および第 6 項記载の分 システム自勛運転方法。  The computer having the power control device control means for controlling the power supply control device E having the power supply line above 7.2, after the power supply line of the disconnected I is turned on and the other I · Receives a message from the machine and indicates that the computer has been started. When a message arrives, the source of the message is determined, and the source of the message is calculated. The name of the computer is the identification name of the computer that is the target of the above-mentioned power source control, and the name of the computer itself is Ryubetsu. A power supply control device for performing the control of (1), which is recorded as 16 different names of a computer having S control means.
8 . 前記計算機は、 電源が投入された後一定時間内ま たは一定処理手順数以内に、 予め定めた範囲内の不特定多数の! ^算機に対して起動されたこ と を示すメ ッセ一 ジを送出する こと を特徴とする請求の範困第 1 項、 第 3 項および第 7 項記載の分 散シ ステム自動運転方法。  8. Within a certain period of time or within a certain number of processing procedures after the power is turned on, the above-mentioned computer will generate an unspecified number of! The method according to any one of claims 1, 3 and 7, wherein a message indicating that the computer has been started is transmitted to the computer.
9 . 前 Ε電源制御装置の制御対象に少な く とも一台の電子機器を含み、 前記各計 算機上に設ける要求仲介手段が検索する前記記 «手段の中に任意の電子機器の電 源制御を実行する 源制御裝 S制御手段を保持する計算機がどの計算機であるか を示す情報を記 *する こ と を特撖とする請求の範囲第 1 項記載の分散シ ステム自 勛運耘万法。  9. The power control device includes at least one electronic device as a control target, and the request mediating means provided on each of the computers searches for the power source of any electronic device in the above-mentioned means. The distributed control system according to claim 1, characterized in that information indicating which computer is a computer holding the S control means is provided. Law.
PCT/JP1995/000505 1995-03-20 1995-03-20 Method of automatically operating distributed system WO1996029640A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP1995/000505 WO1996029640A1 (en) 1995-03-20 1995-03-20 Method of automatically operating distributed system
JP52826496A JP3658410B2 (en) 1995-03-20 1995-03-20 Distributed system automatic operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP1995/000505 WO1996029640A1 (en) 1995-03-20 1995-03-20 Method of automatically operating distributed system

Publications (1)

Publication Number Publication Date
WO1996029640A1 true WO1996029640A1 (en) 1996-09-26

Family

ID=14125788

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP1995/000505 WO1996029640A1 (en) 1995-03-20 1995-03-20 Method of automatically operating distributed system

Country Status (2)

Country Link
JP (1) JP3658410B2 (en)
WO (1) WO1996029640A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013200690A (en) * 2012-03-23 2013-10-03 Fujitsu Ltd Processing system, equipment management apparatus and program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63182726A (en) * 1987-01-26 1988-07-28 Nec Corp Automatic power supply control system
JPH034309A (en) * 1989-05-31 1991-01-10 Nec Corp Computer system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63182726A (en) * 1987-01-26 1988-07-28 Nec Corp Automatic power supply control system
JPH034309A (en) * 1989-05-31 1991-01-10 Nec Corp Computer system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013200690A (en) * 2012-03-23 2013-10-03 Fujitsu Ltd Processing system, equipment management apparatus and program

Also Published As

Publication number Publication date
JP3658410B2 (en) 2005-06-08

Similar Documents

Publication Publication Date Title
US6760753B1 (en) Electronic mail communication apparatus and recording medium
US5978807A (en) Apparatus for and method of automatically downloading and storing internet web pages
EP2035976B1 (en) System and method for managing images over a network
CA1266129A (en) Method and system for program loading
US6947182B1 (en) Network system and control method of the same
US7693994B2 (en) Intermediary apparatus, distributed processing system, data-transfer method, program and recording medium
EP1372072B1 (en) Data processing apparatus, data processing method, and program
CN102238227A (en) Server apparatus, and terminal apparatus
EP0290924A2 (en) Method for loading data or program to a plurality of terminal stations
CN101686299A (en) Data processing device
CN108549542A (en) A kind of file dispositions method, device and equipment
US20060020661A1 (en) Apparatus and method for displaying content
JPH0981473A (en) Spontaneous service providing method and system
WO1996029640A1 (en) Method of automatically operating distributed system
JP2937643B2 (en) Data collection method
JPH0965034A (en) Image communication equipment
CN116011213B (en) Data simulation system
CN116319853A (en) Conference information display method, device, equipment and medium
KR0151903B1 (en) The performance management of centralized access node system in remote network management
JPH10320339A (en) Cleint/server system
JPH11338757A (en) File managing device
JP2574380B2 (en) Image communication device
JP2003087482A (en) Digital copying machine system
JP2747248B2 (en) Communication data division transmission method and apparatus
US7478137B1 (en) Lightweight messaging with and without hardware guarantees

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): DE JP US

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642