WO1996021797A1 - Method and apparatus for production of subsea hydrocarbon formations - Google Patents

Method and apparatus for production of subsea hydrocarbon formations Download PDF

Info

Publication number
WO1996021797A1
WO1996021797A1 PCT/US1995/000460 US9500460W WO9621797A1 WO 1996021797 A1 WO1996021797 A1 WO 1996021797A1 US 9500460 W US9500460 W US 9500460W WO 9621797 A1 WO9621797 A1 WO 9621797A1
Authority
WO
WIPO (PCT)
Prior art keywords
tendons
buoy
flotation
column
tanks
Prior art date
Application number
PCT/US1995/000460
Other languages
French (fr)
Inventor
Joseph W. Blandford
Original Assignee
Seahorse Equipment Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seahorse Equipment Corporation filed Critical Seahorse Equipment Corporation
Priority to EP95910084A priority Critical patent/EP0750717A1/en
Priority to BR9508462A priority patent/BR9508462A/en
Priority to PCT/US1995/000460 priority patent/WO1996021797A1/en
Priority to AU18310/95A priority patent/AU1831095A/en
Publication of WO1996021797A1 publication Critical patent/WO1996021797A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/017Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/502Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of tension legs

Abstract

A system for controlling, separating, processing and exporting well fluids produced from subsea hydrocarbon formations is disclosed. The subsea well tender system includes a surface buoy (12) supporting one or more decks (14) above the water surface for accommodating equipment to process oil, gas and water recovered from the subsea hydrocarbon formation. The surface buoy includes a surface-piercing central flotation column connected to one or more external flotation tanks (16) located below the water surface. The surface buoy is secured to the seabed by one or more tendons (34) which are anchored to a foundation (36) with piles imbedded in the seabed. The system accommodates multiple versions on the surface buoy configuration.

Description

METHOD AND APPARATUS FOR PRODUCTION OF SUBSEA HYDROCARBON FORMATIONS
BACKGROUND OF THE DISCLOSURE
The present invention is directed to a method and apparatus for testing and producing hydrocarbon formations found in deep (over 300 feet) offshore waters, particularly to a method and deep water system for economically producing relatively small deep water hydrocarbon reserves which currently are not economical to produce utilizing conventional technology. This invention was made with Government support under contract No. DE-FG02-90ER80888 awarded by the Department of Energy. The Government has certain rights in this invention.
Commercial exploration for oil and gas deposits in U.S. domestic waters, principally the Gulf of Mexico, is moving to significantly deeper waters (over 300 feet) as shallow water reserves are being depleted. Deep water exploration is usually undertaken only by major oil companies, due to its very high cost. The major oil companies must discover very large oil and gas fields with large reserves to justify the large capital expenditure needed to establish commercial production. The value of these reserves is further discounted by the long time required to begin production using current technology. As a result, many smaller or "lower tier" offshore fields are deemed to be uneconomical to produce. The economics of these deep water small fields can be significantly enhanced by improving and lowering the cost of methods and apparatus to produce hydrocarbons from them.
In water depths up to about 300 feet, in regions where other oil and gas production operations have been established, successful exploration wells drilled by jack-up drilling units are routinely completed and produced. Such completion is often economically attractive because bottom founded structures can be installed to support the surface-piercing conductor pipe left by the jack-up drilling unit. Moreover, in a region where production operations have already been established, available pipeline capacities are relatively close, making pipeline hook-ups economically viable.
Significant hydrocarbon discoveries in water depths over about
300 feet are typically exploited by means of centralized drilling and production operations that achieve economies of scale. These central facilities are costly and typically require one to five years to plan and construct. To economically justify such central facilities, sufficient producible reserves must be proven prior to committing to construction of a central facility. Depending on geological complexity, the presence of commercially exploitable reserves in water depths of 300 feet or more is verified by a program of drilling and testing a number of expendable exploration and delineation wells, typically 4 to 12 wells. The total period of time from drilling a successful exploration well to first production from a central drilling and producing platform typically ranges from two to ten years.
A complete definition of the reservoir and its producing characteristics is not available until the reservoir is produced for an extended period of time, typically one or more years. However, it is necessary to design and construct the producing facility several years before the producing characteristics of the reservoir are precisely defined. This often results in facilities with either excess or insufficient allowance for the number of wells required to efficiently produce the reservoir and excess or insufficient plant capacity at an offshore location where modifications are costly.
Early production and testing systems have been used in the past by converting Mobil Offshore Drilling Units ("MODU's"). A drilling unit is overkill for early production of less prolific wells and when the market tightens, such conversions may not be economical. Similarly, converted tanker early production systems, heretofore used because they were plentiful and cheap, can also be uneconomic for less prolific wells. The system of the present disclosure efficiently and economically supports a production operation, whereas a MODU is intended for drilling and a tanker system for transportation of hydrocarbons. As noted in U.S. Patent No. 4,556,340 (Morton), floating hydrocarbon production facilities have been utilized for development of marginally economic discoveries, early production and extended reservoir testing. Floating hydrocarbon production facilities also offer the advantage of being easily moved to another field for additional production work and may be used to obtain early production prior to construction of permanent, bottom founded structures. Floating production facilities have heretofore been used to produce marginal subsea reservoirs which could not otherwise be economically produced. In the aforementioned U.S. Patent No. 4,556,340, production form a subsea wellhead to a floating production facility is realized by the use of a substantially neutrally buoyant flexible production riser which includes biasing means for shaping the riser in an oriented broad arc. The broad arc configuration permits the use of wire line well service tools through the riser system.
In U.S. Patent No. 4,784,529 (Hunter) a mooring apparatus and method for securely mooring a floating tension leg platform to an anchoring base template is disclosed. The method includes locating a plurality of anchoring means on the seabed, the anchoring means being adapted for receipt of a mooring through a side entry opening in the anchoring means. A semi-submersible floating structure is stationed above the anchoring means for connection thereto by the mooring tendons.
An FPS (Floating Production System) consists of semi- submersible floater, riser, catenary mooring system, subsea system, export pipelines, and production facilities. Significant system elements of an FPS do not materially reduce in size and cost with a reduction in number of wells or throughput. Consequently, there are limitations on how well an FPS can adapt to the economic constraints imposed by marginal fields or reservoir testing situations. The cost of the semi-submersible vessel (conversion or newbuild) and deepwater mooring system alone would be prohibitive for many of these applications. Note that the semi-submersible configuration was developed for drilling applications. Here a large amount of payload must be supported with low free-floating motions. In marginal field applications neither requirement is important. In the present invention, only small payloads are required and these can be supported on a small deck which can be supported by a centrally located single surface-piercing column, rather than four corner located surface-piercing columns. Low freefloating motions are not required because a permanent vertical tension mooring will restrain vertical motions. As the need for large waterplane area is reduced, the structure in the wave zone can become more transparent, reducing environmental load and cost.
A TLP (Tension Leg Platform) consists of a four column semi- submersible floater, multiple vertical tendons on each corner, tendon anchors, and well risers. A single leg TLP has four columns and a single tendon/well. The TLP deck is supported by four columns that pierce the water plane. TLP's typically bring well(s) to the surface for completion.
As the TLP size is reduced, and the distance between corners diminishes, yaw motions increase and lead to interference between well risers. They twist around each other thereby creating a potential safety hazard with well risers. In the case of a single leg TLP, a catenary mooring is required to prevent large twisting displacements.
The deepwater catenary mooring is a substantial additional cost element.
There are limitations on the extent to which a TLP can be reduced in size and cost. No matter how small the TLP's payload, it must contain enough buoyancy to keep sufficient pre-tension on tendons so that tendons never go slack as a wave trough passes. A slack tendon can snap to very high tension loads that cause high fatigue damage or overstress.
A further restriction in shrinking a TLP is the fact that during tow and installation, the TLP's stability depends on water plane area. This limits how close together the columns can be spaced. After the TLP's tendons are in place, the tendon tension stabilizes the TLP and it need not be stable in the free floating condition. A conventional TLP has at least three columns that pass through the water surface and attract environmental load. This is three times as much column wind area and load as the system configuration of the present disclosure.
SUMMARY OF THE INVENTION
The present invention provides a system for controlling and processing well fluids produced from subsea hydrocarbon formations. The subsea well tender system includes a surface buoy supporting one or more decks above the water surface for accommodating equipment to process oil, gas and water recovered from the subsea hydrocarbon formation. The surface buoy includes a surface-piercing central flotation column connected to one or more external floatation tanks located below the water surface. The surface buoy is secured to the seabed by one or more tendons which are anchored to foundation piles imbedded in the seabed.
BRIEF DESCRIPTION OF THE DRAWINGS
So that the manner in which the above recited features, advantages and objects of the present invention are attained and can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to the embodiments thereof which are illustrated in the appended drawings.
It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
Fig. 1 is an elevational environmental view showing the well tender system of the present invention;
Fig. 2 is an elevational side view of the surface-piercing buoy of the well tender system of the invention; Fig. 3 is an elevational environmental view showing an alternate embodiment of the well tender system of the invention;
Fig. 4 is an elevational side view of the surface-piercing buoy of the alternate embodiment of the invention depicting the installation of the surface buoy on the tendons;
Fig. 5 is an elevational environmental view showing installation of the deck on the surface buoy of the invention;
Figs. 6-19 are elevational side views of various configurations of the surface buoy of the invention; and Fig. 20 is a side view showing stacking of tendon segments to form a single tendon string.
DETAILED DESCRIPTION OF THE INVENTION
The well tender system of the present disclosure may be adapted for various configurations. Depending on the conditions and facilities at the well site, the system may or may not require oil storage. The system may also be installed, temporarily or permanently, directly above a well.
Referring first to Fig. 1, the well tender system of the invention is generally identified by the reference numeral 10. The well tender system 10 includes a surface-piercing buoy 12 which provides positive buoyancy and vertical support to the entire tender system 10 of the invention and supports the production deck 14 which is large enough to accommodate the equipment necessary to control and process the oil, gas and water produced from the subsea reservoir.
The surface-piercing buoy 12 includes one or more submerged tanks 16 fabricated of steel or other material. The size, number, and composition of the tanks 16 depends on the application. The tank cross-section can be circular, rectangular or any other suitable shape as required. The tanks 16 are incorporated into a framework of steel braces 18 that are themselves buoyant, and as a unit the braces 18 comprise the substructure portion of the surface-piercing buoy 12. At the center of the buoy 12 is a central flotation column 20 extending from the bottom of the buoy 12, up through the water surface and up to the production decks 14. The tanks 16, steel braces 18, and flotation column 20 form the hull 21 component of the surface-piercing buoy 12.
The large diameter central flotation column 20 supports the production decks 14, which may include one or more decks, and the equipment. A boat landing 22 is attached to the column 20 at the waterline, and it may extend partially or completely around the central column 20. The superstructure of the surface-piercing buoy 12 comprises one or more decks, and is constructed of steel or other materials, as applicable, to accommodate the equipment required to control, process, compress, and inject the fluids, gas or liquid, produced by any particular reservoir. For example, the surface- piercing buoy 12 may include a helideck and one or more decks which may accommodate simple test equipment, and/or full processing equipment.
The central flotation column 20 is compartmentalized for damage control. It includes a ballast manifold with a submersible electric pump (not shown in the drawings) to deballast the hull during installation. The electric pump may be a type commercially available, for example, a submersible pump manufactured by Reda. The central column 20 may range in size from three feet to fifty feet in diameter depending upon the application, and the diameter of the column 20 may vary. The bottom of the central column 20 may extend as deep as 250 ft. below the water surface, and it will extend up to the lower deck elevation. Likewise, the flotation tanks 16 are compartmentalized for damage control. The ballast compartments of the tanks 16 are piped to be drained by the submersible pump in the central column 20.
Well fluids are conducted from the remote wells 24, up one or more flowline risers 26 to the production deck 14, where the well fluids are injected into equipment for processing. Multiple flowline risers 26 may be bundled or may extend up to the surface individually, as desired by the operator. Each riser 26 is in the form of a catenary line and may be comprised of flexible or rigid material. The catenary risers 26 may also provide a restoring torque that aids to stabilize the vertical mooring system of the invention. Depending on water depth and corresponding water temperature, the flowline risers 26 may be insulated to maintain flowline temperature to inhibit hydrate formation.
The risers 26 extend from each remote well 24 to the surface- piercing buoy 12 and are equally sized permitting pigging of the flowlines from the production deck 14. It is operationally desirable for each well 24 to have an individual flowpath from the subsea well 24 to a flow control choke at the production deck 14. For gas wells it is operationally desirable to have a means to carry hydrate control chemicals to the well 24.
A separate service riser bundle 28 extends from the surface buoy boat landing 22 through a catenary or floating hose to a pick-up buoy 30 that allows the production system to be serviced and off¬ loaded. In the absence of a liquid pipeline, produced oil can be off¬ loaded by one or more vessels keeping station in a watch circle around the surface buoy 12. Oil may also be stored and off-loaded from the tanks 16 or oversized tendon buoys 32 equipped with double hull or storage compartment tanks. It is also possible to off¬ load well fluids directly to the shuttle vessel.
The surface buoy 12 shown in Figs. 1 and 2 is installed at the offshore well site by controlled flooding of the central flotation column 20 and the tanks 16, causing the surface-piercing buoy 12 to be lowered in a vertical position for attachment to the top of the vertically positioned tendons 34 as shown in Fig. 5. Due to the light weight of the hull 21 and the absence of the production deck 14 at this stage of the installation, it is possible to lift the hull 21 from a transport barge with a small derrick barge. The ability of the derrick barge to apply upward force during lowering can stabilize the system if necessary. With the hull 21 in a ballasted condition, the upper ends of the tendons 34, which are anchored at the opposite ends thereof to the foundation 36, are connected to the hull 21 by a remote manually operated submerged vehicle and/or by divers. All ballast is then removed from the tanks 16 and the central flotation column 20. With the hull 21 securely in place, the deck section is then lifted from the cargo barge and set on the hull 21 , thereby completing the installation of the well tender system 10 of the present disclosure.
The tendons 34 are connected either to the braces 12 or the tanks 16. Up to five connecting tendons 34 may extend from each brace 18 or tank 16 to the seabed 38. The tendons 34 may comprise single-piece tendons or multiple-piece tendons designed to be either neutrally buoyant or negatively buoyant. The tendons 34 are secured to the surface buoy 12 and the foundation 36 at the seabed 38 by means of a vertical stab connection or side-entry connection.
Referring now to Fig. 3, an alternate embodiment of the well tender system of the invention generally identified by the reference numeral 100 is shown. The well tender system 100 is substantially identical to the well tender system 10 previously described and therefore like reference numerals are employed to identify like components. It will be observed, however, that the surface buoy 12 shown in Fig. 3 is provided with tanks 16 which are smaller in external dimensions than the tendon buoys 32. The tendon buoys 32 are oversized to provide greater tensioning force to the tendons 34 and to reduce buoyancy requirements of the surface piercing buoy 12. Additionally, the oversized tendon buoys 32 may be equipped with storage compartments for storing recovered well fluids.
Referring still to Fig. 3, a near surface completion riser assembly generally identified by the reference numeral 110 is also shown. In this installation, risers 35 are connected to the wells 37 at the lower ends thereof. The riser buoys 39 provide sufficient upward tensioning force to maintain the risers 35 in a substantially vertical orientation. A manifold 40 may be supported by the riser buoys 39.
Alternatively, the manifold 40 may be supported on the production deck 14. One or more flow line risers 42 extend from the manifold 40 to the surface buoy 12. In the installation shown in Fig. 3, well fluids are produced up the risers 35 and directed through the flow line risers 42 to the production deck 14 for processing.
Referring now to Figs. 4 and 5, the installation sequence of the surface buoy 12 and production deck 14 is shown. The installation of the surface buoy 12 has been previously described herein, however, with some installations it may be desirable to utilize guide lines to facilitate installation of the surface buoy 12 on top of the tendons 32. With this installation technique, guidelines 44 are attached to the top of the preinstalled tendon and reeved through sheaves on the hull 21 to winches located on the boat landing 22.
In the prior art, conventional semi submersible and TLP designs disclose a deck structure which is either integral with the hull or is mated with the hull. In either case, the dimensions of the deck are dictated by the dimensions of the hull, which in turn are influenced by floating and motion characteristics. The net effect is that the deck design is impacted not only by facilities but also by marine considerations.
In the well tender system of the present invention, the dimensions of the deck 14 are independent of the dimensions of the surface buoy hull. This not only simplifies the engineering of the deck 14 and the hull 21 by making them more independent, but also enables installation of different deck configurations and facilities on a single surface buoy hull configuration, thereby enhancing versatility and increasing reuse applications for a given surface buoy configuration. This versatility increases the salvage value of a surface buoy hull because not only may it be installed in different water depths, but it may be fitted with various deck configurations and facilities, provided only that the pay load carrying capacity of the surface buoy is not exceeded. In the well tender system of the present invention, the deck section can be installed on the hull 21 after the hull 21 is secured to the pre-installed tendons 34. This componentization simplifies the installation of the hull 21. Several ways are available to design the interface between the deck 14 and hull 21. For example, a single surface buoy hull 21 of the invention may accommodate a deck 14 which is prismatic in shape and connected at four corners to a small spider deck fabricated on the column 20 of the hull 21. Likewise, the same surface buoy hull 21 may accommodate a deck 14 which includes a section projecting therefrom which stabs into the surface piercing column 20 of the hull 21. In addition, the hull 21 may accommodate a prismatic shaped deck 14 which connects directly to the top of the surface piercing column 20 of the hull 21.
Referring now to Fig. 20, installation of a composite tendon generally identified by the reference 50 is shown. The composite tendon 50 is formed by a plurality of tendons 52 for installation in very deep water. However, few manufacturing yards have sufficient waterfront length to accommodate the fabrication of extremely long tendons. Also, the longer the tendons, the more difficult they are to upend to a vertical orientation. For example, Auger type tendons, approximately 240 feet long, typically are assembled on the side of a specially equipped derrick barge since the tendons do not have sufficient buoyancy to stand up by themselves. With the addition of buoyancy to the tendons, tendon lengths much longer than available cargo barges (240 feet) can be towed to the location, upended and lowered. By removing the ballast water from the tendon upper buoyancy tanks 32, the entire tendon string can be made self standing and can be released while the next tendon segment 52 is prepared for connection to the free floating tendon segments 32 which have been connected end to end by connectors 54. The connection 56 between the foundation pile 36 and the lower tendon segment 52 or between tendon segments may be of the Auger-style vertical stab, Joliet-style side entry, or the bottom entry type connection.
Referring now collectively to Figs. 6-19, various configurations of the surface buoy 12 are shown. As noted above, the surface buoy 12 may include one or more submerged tanks 16 which may be configured to form multiple variations of the surface buoy 12 design. The variations include changing from solely "vertically oriented" to
"horizontally oriented" flotation tanks 16. The number of horizontally or diagonally oriented flotation tanks 16 may vary from three to six. As the number of horizontal tanks 16 increases, the discrete tanks 16 evolve into a circular flotation ring 62, as more clearly shown in Fig. 8. In some instances it may be desirable to incorporate spaced and parallel central columns 20 as shown in Figs. 9 and 10. This configuration is particularly useful for supporting increased payloads which may result from a design criteria requiring a complex production facilities. In addition, varying the number of plan levels, as shown in Figs. 10-13, increases the buoyancy force and the payload capacity of the surface buoy 12 and can also add storage capacity. In addition, the flotation tanks 16 may be replaced by a solid buoyancy slab or tank 60 as shown in Figs. 14-19. The shape of the solid buoyancy slab may also be varied, as well as the number of surface-piercing columns. In the variations of the surface buoy 12 shown in Figs. 6 through 19, each corner of the particular configuration is anchored to the seabed 38 by one or more tendons 34.
While the foregoing is directed to the preferred embodiment of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims which follow.

Claims

WHAT IS CLAIMED IS:
1. A subsea well tender system comprising a surface- piercing central flotation column, wherein said surface-piercing column supports one or more decks above the water surface for accommodating equipment to process oil, gas, and water, and further including anchoring means securing said surface buoy to the seabed.
2. The system of claim 1 wherein said surface buoy includes at least one flotation tank mounted to said surface-piercing flotation column.
3. The system of claim 2 wherein said anchor means comprises at least two tendons having one end anchored to the seabed and the other end connected to said surface buoy.
4. The system of claim 3 wherein said tendons include a tendon flotation buoy adjacent to each end of said tendons, and wherein said uppermost tendon buoy is dimensionally larger than said flotation tanks.
5. The system of claim 1 wherein said surface buoy includes at least two vertically oriented flotation tanks.
6. The system of claim 1 wherein said surface buoy includes at least two horizontally oriented flotation tanks.
7. The system of claim 1 wherein said surface buoy includes at least two diagonally oriented flotation tanks.
8. The system of claim 1 wherein said surface buoy includes flotation tanks forming a circular flotation ring.
9. The system of claim 1 wherein said surface buoy includes at least two levels of flotation tanks spaced one above the other.
10. The system of claim 1 wherein said surface buoy includes at least two substantially centrally located surface-piercing columns.
1 1 . The system of claim 1 wherein said surface buoy includes a solid buoyancy slab mounted at the lower end of the surface piercing column.
12. The system of claim 1 including a deck structure mounted on the surface-piercing column above the water surface.
13. The system of claim 12 wherein the deck structure defines a prismatic shape connected at four corners to a spider deck mounted on said surface-piercing column of said surface buoy.
14. The system of claim 12 wherein said deck structure includes a downwardly extending section for stabbing into the uppermost end of said surface-piercing column.
15. The system of claim 12 wherein said deck structure defines a prismatic shape adapted for connection onto the top of said surface-piercing column.
16. The system of claim 1 wherein said anchoring means comprises a plurality of tendon segments connected end to end to form a single tendon string extending from the seabed to said surface buoy.
17. A method for recovering well fluids from a subsea well, whic comprises:
(a) attaching means to the seabed offshore for anchorin tendons to the seabed; (b) connecting at least three vertically oriented tendons t the anchor means;
(c) towing to a location above the vertically oriente tendons a surface buoy which has a surface-piercing central flotatio column for supporting one or more decks above the water surface, an submerged flotation tanks connected to the central flotation column b braces below the water surface; (d) ballasting the surface buoy to lower it for connection with the tendons while maintaining the upper end of the central flotation column above the water surface;
(e) securing the tendons to the surface buoy;
(f) deballasting the surface buoy to place the tendons in tension while supporting one or more decks above the water surface;
(g) establishing fluid communication between a subsea well and the surface buoy; and
(h) offloading well fluids to a cargo barge or pipeline.
18. The method of claim 17 wherein said subsea well is located in over 300 feet of water.
19. The method of claim 17 wherein the tendons are each vertically oriented by a tendon flotation buoy attached near the upper end of each tendon.
20. The method of claim 17 wherein the anchor means is attached to the seabed by installing an individual anchoring pile in the seabed for each tendon.
21. A production platform for deepwater oil or gas wells comprising:
(a) a surface buoy having a surface piercing central flotation column, submerged flotation tanks outwardly of the central flotation column and braces between the central flotation column and the tanks;
(b) a production platform supported by the central flotation column of the surface buoy;
(c) at least three spaced tendons secured to the seabed and attached to the submerged flotation tanks or braces outwardly from the central column; and
(d) said surface buoy supporting said production platform while maintaining the tendons in tension.
22. The platform of claim 21 wherein the tendons can be release from attachment to the tanks or braces and the platform can be remove and located over other wells.
23. A method of providing a stable platform above offshor water, which comprises the steps of:
(a) attaching means to the seabed offshore for anchorin tendons to the seabed; (b) connecting at least three vertically oriented tendons t the anchor means;
(c) towing to a location near the upper ends of th vertically oriented tendons surface buoy which has a surface-piercin central flotation column for supporting one or more decks above th water surface, and submerged flotation tanks connected to the column b braces below the water surface to provide connections for the tendons outward of the perimeter of the central flotation column;
(d) ballasting the surface buoy to lower it for connection with the tendons while maintaining the upper end of the central flotation column above the water surface;
(e) securing the tendons to the tanks or braces outwardly from the central flotation column; and
(f) deballasting the surface buoy to place the tendons in tension while supporting one or more decks above the water surface.
PCT/US1995/000460 1994-07-29 1995-01-13 Method and apparatus for production of subsea hydrocarbon formations WO1996021797A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP95910084A EP0750717A1 (en) 1995-01-13 1995-01-13 Method and apparatus for production of subsea hydrocarbon formations
BR9508462A BR9508462A (en) 1994-07-29 1995-01-13 Process separation apparatus for substantially separating a mixture and separation process or apparatus
PCT/US1995/000460 WO1996021797A1 (en) 1995-01-13 1995-01-13 Method and apparatus for production of subsea hydrocarbon formations
AU18310/95A AU1831095A (en) 1995-01-13 1995-01-13 Method and apparatus for production of subsea hydrocarbon formations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US1995/000460 WO1996021797A1 (en) 1995-01-13 1995-01-13 Method and apparatus for production of subsea hydrocarbon formations

Publications (1)

Publication Number Publication Date
WO1996021797A1 true WO1996021797A1 (en) 1996-07-18

Family

ID=22248500

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US1995/000460 WO1996021797A1 (en) 1994-07-29 1995-01-13 Method and apparatus for production of subsea hydrocarbon formations

Country Status (3)

Country Link
EP (1) EP0750717A1 (en)
AU (1) AU1831095A (en)
WO (1) WO1996021797A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020161211A1 (en) * 2019-02-06 2020-08-13 Sllp 134 Limited Gas storage system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3472032A (en) * 1967-12-01 1969-10-14 Pan American Petroleum Corp Production and storage system for offshore oil wells
FR2278563A1 (en) * 1975-06-24 1976-02-13 Mo Olav Concrete floating construction with operating platform - with heavy submerged structure and light superstructure
GB1467238A (en) * 1973-03-21 1977-03-16 British Petroleum Co Oil storage tank
FR2418145A1 (en) * 1978-02-24 1979-09-21 Emh Floating support associated with articulated column for sea-bed mining - incorporates emergent platform articulated on column head and symmetrically placed floats to eliminate bending stresses
US4674918A (en) * 1985-09-06 1987-06-23 Kalpins Alexandrs K Anchoring floating structural body in deep water
US4723875A (en) * 1987-02-13 1988-02-09 Sutton John R Deep water support assembly for a jack-up type platform
EP0494497A1 (en) * 1990-12-13 1992-07-15 Joseph W. Blandford Method and apparatus for production of subsea hydrocarbon formations
US5381865A (en) * 1990-12-13 1995-01-17 Blandford; Joseph W. Method and apparatus for production of subsea hydrocarbon formations

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3472032A (en) * 1967-12-01 1969-10-14 Pan American Petroleum Corp Production and storage system for offshore oil wells
GB1467238A (en) * 1973-03-21 1977-03-16 British Petroleum Co Oil storage tank
FR2278563A1 (en) * 1975-06-24 1976-02-13 Mo Olav Concrete floating construction with operating platform - with heavy submerged structure and light superstructure
FR2418145A1 (en) * 1978-02-24 1979-09-21 Emh Floating support associated with articulated column for sea-bed mining - incorporates emergent platform articulated on column head and symmetrically placed floats to eliminate bending stresses
US4674918A (en) * 1985-09-06 1987-06-23 Kalpins Alexandrs K Anchoring floating structural body in deep water
US4723875A (en) * 1987-02-13 1988-02-09 Sutton John R Deep water support assembly for a jack-up type platform
EP0494497A1 (en) * 1990-12-13 1992-07-15 Joseph W. Blandford Method and apparatus for production of subsea hydrocarbon formations
US5381865A (en) * 1990-12-13 1995-01-17 Blandford; Joseph W. Method and apparatus for production of subsea hydrocarbon formations

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"Monopod TLP improves deepwater economics", PETROLEUM ENGINEER INTERNATIONAL, vol. 65, no. 1, January 1993 (1993-01-01), CLEVELAND, OHIO,USA, pages 48 - 51 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020161211A1 (en) * 2019-02-06 2020-08-13 Sllp 134 Limited Gas storage system

Also Published As

Publication number Publication date
EP0750717A1 (en) 1997-01-02
AU1831095A (en) 1996-07-31

Similar Documents

Publication Publication Date Title
EP0494497B1 (en) Method and apparatus for production of subsea hydrocarbon formations
US5964550A (en) Minimal production platform for small deep water reserves
CN100402371C (en) Riser installation vessel and method of using the same
US8616806B2 (en) Riser support system for use with an offshore platform
US5381865A (en) Method and apparatus for production of subsea hydrocarbon formations
US6666624B2 (en) Floating, modular deepwater platform and method of deployment
US6170424B1 (en) Production/platform mooring configuration
WO1995020074A1 (en) Tension leg platform and method of installation therefor
EP1097287B1 (en) Floating spar for supporting production risers
AU8816698A (en) Buoyant substructure for offshore platform
US6106198A (en) Method for installation of tension-leg platforms and flexible tendon
US6688250B2 (en) Method and apparatus for reducing tension variations in mono-column TLP systems
US7278801B2 (en) Method for deploying floating platform
US6007275A (en) Method and apparatus for employing stopper chain locking mechanism for tension-leg platform tendons
WO1997029948A1 (en) Tension-leg platform buoyancy ring
GB2253813A (en) Production buoy
EP0750717A1 (en) Method and apparatus for production of subsea hydrocarbon formations
WO2000001894A1 (en) Well riser lateral restraint and installation system for offshore platform
US7104730B2 (en) Achieving hydrostatic stability of a floating structure
MXPA06013864A (en) Method for deploying floating platform
GB2346842A (en) Floating substructure with ballasting system

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AM AT AU BB BG BR BY CA CH CN CZ DE DK EE ES FI GB GE HU JP KE KG KP KR KZ LK LR LT LU LV MD MG MN MW MX NL NO NZ PL PT RO RU SD SE SI SK TJ TT UA US UZ VN

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): KE MW SD SZ AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG

WWE Wipo information: entry into national phase

Ref document number: 1995910084

Country of ref document: EP

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWP Wipo information: published in national office

Ref document number: 1995910084

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

NENP Non-entry into the national phase

Ref country code: CA

WWW Wipo information: withdrawn in national office

Ref document number: 1995910084

Country of ref document: EP