WO1992014028A2 - An improved crown block/traveling block system for a well drilling derrick - Google Patents

An improved crown block/traveling block system for a well drilling derrick Download PDF

Info

Publication number
WO1992014028A2
WO1992014028A2 PCT/US1992/000255 US9200255W WO9214028A2 WO 1992014028 A2 WO1992014028 A2 WO 1992014028A2 US 9200255 W US9200255 W US 9200255W WO 9214028 A2 WO9214028 A2 WO 9214028A2
Authority
WO
WIPO (PCT)
Prior art keywords
block
traveling
derrick
crown
crown block
Prior art date
Application number
PCT/US1992/000255
Other languages
French (fr)
Other versions
WO1992014028A3 (en
Inventor
Lowell M. Reed
Original Assignee
Parco Mast And Substructures, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Parco Mast And Substructures, Inc. filed Critical Parco Mast And Substructures, Inc.
Publication of WO1992014028A2 publication Critical patent/WO1992014028A2/en
Publication of WO1992014028A3 publication Critical patent/WO1992014028A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/02Rod or cable suspensions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/043Block and tackle system with variable number of cable parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley

Definitions

  • This disclosure relates to a drilling derrick of the type used to drill oil and g wells and particularly relates to an improved crown block/traveling block system
  • Deep oil and gas wells are drilled utilizing a derrick having a drawworks with line extending therefrom.
  • the typical derrick system has a crown block at the to
  • the line from the drawworks extends up over the crown block and then vertica downwardly within the derrick to a traveling block.
  • the traveling block provides mea for attachment to equipment used in drilling wells, such as a swivel and hook unit.
  • T line extends from the traveling block back over the crown block and then is attach to a tie down or deadline anchor.
  • the crown block and traveling block ha multiple sheaves so that the line loops a number of times between the crown block a the traveling block so as to provide mechanical advantage necessary to lift the hea load encountered in drilling operations.
  • the crown blo and traveling blocks are typically formed of a number of sheaves, each sheave rotatin about a common axis and independently of other sheaves since in the use of multipl cable loops between the crown block and traveling block the sheaves rotate at differe
  • a problem encountered in drilling operations is that extremely heavy weights ar born by the derrick and the drawworks only at a small percent of the portion of th entire drilling operation.
  • the weight encountered by the derrick and the drawworks is not excessive.
  • greater weight is applied to the derrick and the drawworks. Since the derrick and drawworks must be arranged to support the maximum loads but wherein such maximum loads are only encountered a small percent of the time in drilling, inefficiency in the design and operation of derricks and drawworks developes.
  • the improved crown block/traveling block system for a well drilling derrick of this disclosure employs a derrick with a support structure adjacent the derrick top, the derrick having a drawworks with a fast line extending therefrom.
  • An elevationally moveable multi-sheave traveling block is positioned within th derrick below the crown block.
  • the traveling block includes means to support a apparatus for attachment to drilling equipment, such as a swivel and hook unit.
  • a multi-sheave intermediate block is employed and is used in two modes. I the first mode the intermediate block is attached to the derrick support structure belo the lower crown block so that in the first mode the intermediate block forms a portio of a three-block crown block cluster. In the second mode the intermediate block i detached from the support structure and is secured to the upper end of the travelin block. In the second mode the intermediate block and traveling block form a two-bloc traveling block cluster.
  • the fast line extending from the drawworks is looped in a route that extend over a fast line sheave, over the top of the upper crown block, around the bottom o the traveling block, again over the top of the upper crown block, then down around th bottom of the intermediate block, then over the top of the lower crown block and the over a deadline sheave to a deadline anchor.
  • the route being repeated dependin
  • the upper crown block, lower crown block an intermediate block form an elevationally stationary crown block cluster.
  • the intermediate block and the traveling block form a traveling block cluster.
  • the sheaves of the lower crown block are of smaller diameter than the sheave
  • the sheaves of the intermediate block are of smalle diameter than the sheaves of the traveling block.
  • the diameter of the sheaves of the uppe crown block and the lower crown block may be essentially the same, whereas th diameter of the sheaves of the lower crown block and the intermediate block may b substantially the same but smaller in diameter than that of the sheaves of the uppe crown block and the traveling block.
  • the traveling block functions in the normal manner with the mechanical advantage applied to the line extending from the drawworks being determined by the number of sheaves in the traveling block and correspondingly the number of loops in the route of the line.
  • the traveling block functions in the normal manner of the usual oil well drilling application, and efficiency is obtained in that the crown block serves to lift the normal, non-excessive weights encountered in most oil well drilling activities.
  • the intermediate block forms a part of the traveling block cluster
  • multiple mechanical advantage is obtained by the cable routing so that greater weights can be lifted with the same tension applied
  • the unique system of utilizing plural crown blocks and an intermediate block that can function either as a part of the crown block cluster or as a part of a traveling block cluster thereby enables the design of the derrick and drawworks for maximum efficiency of weight lifting capability.
  • the tandem system of block interchange as herein disclosed can be very economically and efficiently changed from
  • Figure 1 is a diagrammatic illustration of the components of a derrick used f drilling oil and gas wells, the derrick not being shown but the horizontal derrick suppo structure which is adjacent the derrick upper end is illustrated and showing an upp crown block, a lower crown block and an intermediate block supported in vertic tandem arrangement to the derrick support structure.
  • the intermediat block is in mode one wherein it is affixed to the derrick support structure and forms part of the crown block cluster.
  • Figure 2 is a diagrammatic view as in Figure 1 but showing the intermediat block affixed to the traveling block to thereby become a part of a traveling bloc cluster.
  • the apparatus is used in Figure 1 during the usual drilling operations and i
  • Figure 3 is a diagrammatic illustration of the first mode as shown in Figure 1 showing diagrammatically the routing of the line over the upper crown block, intermediate block, lower crown block and traveling block as is utilized in normal drilling operations.
  • Figure 4 is a diagrammatic view as in Figure 3 but showing the intermediate block formed as a part of the traveling block cluster in the cable arrangement when extremely heavy weights must be supported.
  • FIG. 1 a crown block/traveling bloc system for a well drilling derrick is shown.
  • a horizontal support structure 10 Adjacent the top of the derrick a horizontal support structure 10 is utilized t provide a base for supporting a crown block assembly, generally indicated by th numeral 12.
  • the crown block assembly includes a upper crown block 14, a lower crown block 16 and an intermediate crown block 18.
  • the upper crown block 14 is formed of a plurality of sheaves 19, three bein shown, it being understood that the illustration of three sheaves is by way of exampl only as the number of sheaves can vary depending upon the design of the derrick an the crown block/traveling block system.
  • the upper crown block 14 is shown affixe to support structure 10 by structural members 22, which is by way of example only a the structural arrangement of the derrick upper portion including support structure 1 and structural members 22 may vary considerably.
  • Lower crown block 16 is positioned in tandem with and directly below uppe crown block 14.
  • the lower crown block is formed of a series of sheaves (three bein shown) that are individually supported about axle 24.
  • intermediate block 18 Positioned in tandem and vertically directly below upper crown block 14 and lower crown block 16 is an intermediate block 18 that includes a plurality of sheaves
  • axle 26 has opposed side plates 30 and 32, the side plates rotatably supporting axle 26.
  • spacer 34 Positioned between side plates 30 and 32 and below sheaves 28 is a spacer 34.
  • a fixed spacer 3 Formed as a part of support structure 10 and extending downwardly therefrom and vertically below the upper and lower crown blocks 14 and 16 is a fixed spacer 3
  • Plates 30 and 32 extend to either side of fixed spacer 36 and when intermediate bloc
  • a pin 38 extends through opening in plates 30 and 32 and through fixed spacer 36 to removably lock intermediate bloc
  • a crown bloc cluster is formed of upper crown block 14, lower crown block 16 and intermediat block 18.
  • the derrick includes, as an integral part of a well drilling system, a drawwork indicated by spool 40 having a fast line 42 wound thereon.
  • Line 42 extends over a fas line sheave 44 rotatably secured to support structure 10 and over a sheave 19 formin
  • Line 42 extends further in a looped route to form crown block/traveling block system to be described subsequently.
  • a traveling block Positioned vertically below the crown block cluster is a traveling block, generally indicated by the numeral 46.
  • the traveling block is formed by opposed parallel plates 48 and 50 that supports an axle 52 about which a plurality of individual sheaves 54 rotate. Plates 48 and 50, below sheaves 54, support a swivel and hook unit 56 that
  • Line 42 provides multiple passes between the upper crown block cluster and lower
  • traveling block 46 is diagrammatically illustrated. Line 42 loops over fast line sheav
  • line 42 is determined by the weight imposed on traveling block 46 divided by the number of lines extending from traveling block 46 to the crown block cluster. In the arrangement illustrated in Figure 1 which shows eight lines between traveling block 46 and the crown block cluster would mean that the total tension load on line 42, ignoring dynamics, would be 1/8 of the load on traveling block 46.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

An improved crown block/traveling block system (12) for a well drilling derrick in which the derrick has a support structure (10) adjacent the derrick top and a drawworks with a fast line (42) extending therefrom, the system being formed of elevationally stationary multi-sheave upper (14) and lower crown blocks (16) arranged in tandem and supported to the derrick support structure, an elevationally moveable multi-sheave traveling block (46) adapted to support drilling equipment which is raised and lowered in the derrick, and a multi-sheave intermediate block (18) which in one mode is attached in tandem arrangement below the upper and lower crown blocks to thereby form a part of a three-block crown block assembly and in the second mode the intermediate block is attached to the traveling block, and the intermediate block and traveling block form a traveling block assembly, the modes being selected according to the weight of equipment to be supported during drilling operations.

Description

AN IMPROVED CROWN BLOCK/TRAVELING BLOCK SYSTEM FOR A WELL DRILLING DERRICK
Summary Of The Disclosure
This disclosure relates to a drilling derrick of the type used to drill oil and g wells and particularly relates to an improved crown block/traveling block system
use with drilling derricks.
Deep oil and gas wells are drilled utilizing a derrick having a drawworks with line extending therefrom. The typical derrick system has a crown block at the to
The line from the drawworks extends up over the crown block and then vertica downwardly within the derrick to a traveling block. The traveling block provides mea for attachment to equipment used in drilling wells, such as a swivel and hook unit. T line extends from the traveling block back over the crown block and then is attach to a tie down or deadline anchor. Usually, the crown block and traveling block ha multiple sheaves so that the line loops a number of times between the crown block a the traveling block so as to provide mechanical advantage necessary to lift the hea load encountered in drilling operations. When it is considered that oil and gas wel are frequently drilled to a depth of 10,000 feet or greater, the weight of drilling tools casing extending down this depth (almost two miles) becomes enormous. Therefor
in order to support such great loads, the crown block system and traveling blo system are very carefully engineered. Further, as above mentioned, in order to li
the diameter of line that must be employed to lift such great loads, the crown blo and traveling blocks are typically formed of a number of sheaves, each sheave rotatin about a common axis and independently of other sheaves since in the use of multipl cable loops between the crown block and traveling block the sheaves rotate at differe
speeds when line is being wound onto a drawworks or when the drawworks is lettin out line so as to lower the traveling block. For background information relating to crown block and traveling bloc assemblies and improved means of using such apparatus in drilling oil and gas well reference may be had to United States Patent Nos. 4,796,863; and 4,836,300. Pate
No. 4,796,863 is entitled "Dual Cluster Crown Block" and Patent No. 4,836,300 i entitled, "Method of Performing Drilling Operations From A Derrick."
A problem encountered in drilling operations is that extremely heavy weights ar born by the derrick and the drawworks only at a small percent of the portion of th entire drilling operation. In normal drilling operations wherein drill pipe is raised an lowered as necessary to change bits and to permit the drill pipe to move verticall downwardly as the hole is drilled, the weight encountered by the derrick and the drawworks is not excessive. When it is necessary to run casing at great depths or when the depth of the well has increased to a point where the length of the drill pipe is great, then greater weight is applied to the derrick and the drawworks. Since the derrick and drawworks must be arranged to support the maximum loads but wherein such maximum loads are only encountered a small percent of the time in drilling, inefficiency in the design and operation of derricks and drawworks developes.
It is an object of this disclosure to provide an improved crown block/traveling
block system for a well drilling derrick that allows the use of a smaller drawworks for
efficient drilling operation over most of the drilling time required for atypical oil and gas well, but which also provides the capacity to run casing at great depth with the heavy loads encountered with the same drawworks and drilling line.
The improved crown block/traveling block system for a well drilling derrick of this disclosure employs a derrick with a support structure adjacent the derrick top, the derrick having a drawworks with a fast line extending therefrom. An elevationally
stationary multi-sheave upper crown block is secured to the derrick support structure vertically over the well borehole. An elevationally stationary multi-sheave lower crow block is secured to the derrick support structure in tandem with and below the upp crown block.
An elevationally moveable multi-sheave traveling block is positioned within th derrick below the crown block. The traveling block includes means to support a apparatus for attachment to drilling equipment, such as a swivel and hook unit.
A multi-sheave intermediate block is employed and is used in two modes. I the first mode the intermediate block is attached to the derrick support structure belo the lower crown block so that in the first mode the intermediate block forms a portio of a three-block crown block cluster. In the second mode the intermediate block i detached from the support structure and is secured to the upper end of the travelin block. In the second mode the intermediate block and traveling block form a two-bloc traveling block cluster.
The fast line extending from the drawworks is looped in a route that extend over a fast line sheave, over the top of the upper crown block, around the bottom o the traveling block, again over the top of the upper crown block, then down around th bottom of the intermediate block, then over the top of the lower crown block and the over a deadline sheave to a deadline anchor. The route being repeated dependin
upon the number of sheaves in the blocks. In such system, in the first mode the upper crown block, lower crown block an intermediate block form an elevationally stationary crown block cluster. In the secon mode the intermediate block and the traveling block form a traveling block cluster.
In the preferred arrangement of the improved crown block/traveling bloc system the sheaves of the lower crown block are of smaller diameter than the sheave
of the upper crown block, and the sheaves of the intermediate block are of smalle diameter than the sheaves of the traveling block. As an illustration of one means practicing the concept of this disclosure, the diameter of the sheaves of the uppe crown block and the lower crown block may be essentially the same, whereas th diameter of the sheaves of the lower crown block and the intermediate block may b substantially the same but smaller in diameter than that of the sheaves of the uppe crown block and the traveling block.
In the first mode, wherein the intermediate block forms a part of a crown bloc cluster, the traveling block functions in the normal manner with the mechanical advantage applied to the line extending from the drawworks being determined by the number of sheaves in the traveling block and correspondingly the number of loops in the route of the line. Thus, in the first mode the traveling block functions in the normal manner of the usual oil well drilling application, and efficiency is obtained in that the crown block serves to lift the normal, non-excessive weights encountered in most oil well drilling activities. However, in the second mode where the intermediate block forms a part of the traveling block cluster, multiple mechanical advantage is obtained by the cable routing so that greater weights can be lifted with the same tension applied
to the line.
The unique system of utilizing plural crown blocks and an intermediate block that can function either as a part of the crown block cluster or as a part of a traveling block cluster thereby enables the design of the derrick and drawworks for maximum efficiency of weight lifting capability. In addition, the tandem system of block interchange as herein disclosed can be very economically and efficiently changed from
mode one to mode two, since no rerouting of the line is required and the intermediate block can be raised and lowered by the drawworks system itself. A better understanding of this disclosure will be had by reference to th following description and claims, taken in conjunction with the attached drawings.
Description of the Drawings
Figure 1 is a diagrammatic illustration of the components of a derrick used f drilling oil and gas wells, the derrick not being shown but the horizontal derrick suppo structure which is adjacent the derrick upper end is illustrated and showing an upp crown block, a lower crown block and an intermediate block supported in vertic tandem arrangement to the derrick support structure. In Figure 1 the intermediat block is in mode one wherein it is affixed to the derrick support structure and forms part of the crown block cluster.
Figure 2 is a diagrammatic view as in Figure 1 but showing the intermediat block affixed to the traveling block to thereby become a part of a traveling bloc cluster. The apparatus is used in Figure 1 during the usual drilling operations and i
Figure 2 during that portion of the drilling operations wherein extremely heavy load are carried by the traveling block cluster.
Figure 3 is a diagrammatic illustration of the first mode as shown in Figure 1 showing diagrammatically the routing of the line over the upper crown block, intermediate block, lower crown block and traveling block as is utilized in normal drilling operations.
Figure 4 is a diagrammatic view as in Figure 3 but showing the intermediate block formed as a part of the traveling block cluster in the cable arrangement when extremely heavy weights must be supported. Description Of The Preferred Embodiment
Referring to the drawings and first to Figure 1 , a crown block/traveling bloc system for a well drilling derrick is shown. A derrick used for drilling oil or gas well
is generally a four-sided vertical upwardly tapered structure and is very well known i
industry. Adjacent the top of the derrick a horizontal support structure 10 is utilized t provide a base for supporting a crown block assembly, generally indicated by th numeral 12. In the embodiment of Figure 1 the crown block assembly includes a upper crown block 14, a lower crown block 16 and an intermediate crown block 18.
The upper crown block 14 is formed of a plurality of sheaves 19, three bein shown, it being understood that the illustration of three sheaves is by way of exampl only as the number of sheaves can vary depending upon the design of the derrick an the crown block/traveling block system. The upper crown block 14 is shown affixe to support structure 10 by structural members 22, which is by way of example only a the structural arrangement of the derrick upper portion including support structure 1 and structural members 22 may vary considerably. Lower crown block 16 is positioned in tandem with and directly below uppe crown block 14. The lower crown block is formed of a series of sheaves (three bein shown) that are individually supported about axle 24.
Positioned in tandem and vertically directly below upper crown block 14 and lower crown block 16 is an intermediate block 18 that includes a plurality of sheaves
28 (three being shown) that independently rotate about an axle 26. Intermediate block
has opposed side plates 30 and 32, the side plates rotatably supporting axle 26.
Positioned between side plates 30 and 32 and below sheaves 28 is a spacer 34.
Formed as a part of support structure 10 and extending downwardly therefrom and vertically below the upper and lower crown blocks 14 and 16 is a fixed spacer 3
Plates 30 and 32 extend to either side of fixed spacer 36 and when intermediate bloc
18 is in the upward position as shown in Figure 1, a pin 38 extends through opening in plates 30 and 32 and through fixed spacer 36 to removably lock intermediate bloc
18 in the upward position. Therefore, in the arrangement as in Figure 1 , a crown bloc cluster is formed of upper crown block 14, lower crown block 16 and intermediat block 18.
The derrick includes, as an integral part of a well drilling system, a drawwork indicated by spool 40 having a fast line 42 wound thereon. Line 42 extends over a fas line sheave 44 rotatably secured to support structure 10 and over a sheave 19 formin
a part of upper crown block 14. Line 42 extends further in a looped route to form crown block/traveling block system to be described subsequently.
Positioned vertically below the crown block cluster is a traveling block, generally indicated by the numeral 46. The traveling block is formed by opposed parallel plates 48 and 50 that supports an axle 52 about which a plurality of individual sheaves 54 rotate. Plates 48 and 50, below sheaves 54, support a swivel and hook unit 56 that
is exemplary of equipment attachment means used in drilling oil and gas wells. The
upper ends of plates 48 and 50 are spaced apart and have an opening 58 therein that can be aligned with an opening 60 in the bottom of intermediate block spacer 34. Line 42 extends over fast line sheave 44 and loops over the top of one of the sheaves 19 of upper crown block 14. Line 42 loops within the upper crown block cluster and below the traveling block sheaves 54 to thereby support the traveling block.
Line 42 provides multiple passes between the upper crown block cluster and lower
crown block 46, and finally the line passes over a deadline sheave 62 affixed to the derrick support structure 10, and line 42 then attaches to a deadline anchor or ti down 64.
Referring to Figure 3, an example of the position of line 42 on the sheave making up upper crown block 14, lower crown block 16, intermediate block 18 an
traveling block 46 is diagrammatically illustrated. Line 42 loops over fast line sheav
44, over the top of upper crown block 14, around the bottom of traveling block 46 again over the top of upper crown block 14, then down around the bottom o intermediate block 18, then over the top of lower crown block 16, and then ove deadline sheave 62 to deadline anchor 64. The route of line 42 is repeated a numbe
of times depending upon the number of sheaves in the blocks to provide the lifting capabilities required according to the derrick design. Generally, the tensile stress in
line 42 is determined by the weight imposed on traveling block 46 divided by the number of lines extending from traveling block 46 to the crown block cluster. In the arrangement illustrated in Figure 1 which shows eight lines between traveling block 46 and the crown block cluster would mean that the total tension load on line 42, ignoring dynamics, would be 1/8 of the load on traveling block 46.
In Figure 3 the portion of line 42 that moves is indicated by 42A and the portion that does not move is indicated by 42B.
The system of Figures 1 and 3, mode one, is used during the majority of drilling operations wherein drill pipe is being run in and out of the hole or where casing is run
at shallower depths. When very heavy loads are required, such as when running casing into a deep oil or gas well, the system of this disclosure is easily varied to
accommodate such increased weights by use of a mode two in which the crown block/traveling block system is arranged as shown in Figure 2. In Figure 2, intermediate block 18 has been moved out of the crown block cluster and is attache to traveling block 46 to form a traveling block cluster. This is easily accomplished b removing pin 38 to allow intermediate block 18 to move downward, which can b accomplished, when there is no load on the traveling block, by releasing line 42 fro the drawworks. A pin 66 is then inserted through openings 58 in the top of plates 4 and 50 and through opening 60 in the bottom of spacer .34. This arrangement the couples intermediate block 18 to the traveling block, providing a traveling block cluster
In mode one as shown in Figures 1 and 3, the intermediate block 18 does no move and therefore does not experience wear and tear. The cable route for mode two is shown diagrammatically in Figure 4. The cabl route is the same, that is, line 42 is not rerouted in any way whatsoever - only the location of intermediate block 18 is changed. However, such change results in a significant difference in the weight supporting capability of the system which, as previously stated, is limited by the tensile strength of line 42. Note that in the arrangement of Figure 4, mode two, and assuming the same number of sheaves as illustrated in Figures 1 and 2, that is, wherein each of the blocks include four independently rotatable sheaves, there is a total of sixteen lengths of line extending from the traveling block cluster to the crown block cluster meaning that, ignoring dynamics, a maximum load sixteen times the tensile strength limit of line 42 can be supported. In other words, by the expedient of moving intermediate block 18 from one location to another, the weight supporting capabilities of the crown block/traveling
block system for a derrick can be doubled without increasing the tensile load on line
42 and without the necessity of rerouting the line or for adding or taking away any piece of equipment. This advantage is accomplished by the movement of the intermediate block 18 from one position to another.
In Figure 4 the portion of line 42 that moves is indicated by 42C and the portio that does not move is indicated by 42D.
The claims and the specification describe the invention presented and the term
that are employed in the claims draw their meaning from the use of such terms in th specification. The same terms employed in the prior art may be broader in meanin than specifically employed herein. Whenever there is a question between the broade definition of such terms used in the prior art and the more specific use of the term herein, the more specific meaning is meant. While the invention has been described with a certain degree of particularity, i is manifest that many changes may be made in the details of construction and the arrangement of components without departing from the spirit and scope of this disclosure. It is understood that the invention is not limited to the embodiments set forth herein for purposes of exemplification, but is to be limited only by the scope of the attached claim or claims, including the full range of equivalency to which each element thereof is entitled.

Claims

WHAT IS CLAIMED IS: 1. An improved crown block/traveling block system for a well drilling derrick
which the derrick has a support structure adjacent the derrick top and drawworks with a fast line extending therefrom, the system comprising: an elevationally stationary multi-sheave upper crown block secured to th derrick support structure; an elevationally stationary multi-sheave lower crown block secured to th derrick support structure in tandem with and below said upper crown block; an elevationally moveable multi-sheave traveling block positioned belo said crown blocks, the traveling block having means to support equipmen attachment means; a multi-sheave intermediate block having means in a first mode fo attachment to the derrick support structure in tandem with and below said lowe crown block and having means in a second mode for attachment in tandem t and above said traveling block; and a fast line looped in a route extending over said upper crown block, under said traveling block, back over said upper crown block, under said intermediate block, and over said lower crown block, the route being repeated depending on the number of sheaves in said blocks, and finally to a tie down.
2. An improved crown block/traveling block system according to claim 1 wherein
in said first mode said upper and lower crown blocks and said intermediate block form an elevationally stationary crown block cluster and in said second mode said intermediate block and said traveling block form a traveling block cluster. An improved crown block/traveling block system according to claim 1 wherei the sheaves of said lower crown block are of smaller diameter than the sheave
of said upper crown block and wherein the sheaves of said intermediate bloc are of smaller diameter than the sheaves of said traveling block.
PCT/US1992/000255 1991-02-06 1992-01-15 An improved crown block/traveling block system for a well drilling derrick WO1992014028A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US65118591A 1991-02-06 1991-02-06
US651,185 1991-02-06

Publications (2)

Publication Number Publication Date
WO1992014028A2 true WO1992014028A2 (en) 1992-08-20
WO1992014028A3 WO1992014028A3 (en) 1992-09-17

Family

ID=24611913

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US1992/000255 WO1992014028A2 (en) 1991-02-06 1992-01-15 An improved crown block/traveling block system for a well drilling derrick

Country Status (1)

Country Link
WO (1) WO1992014028A2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2288582A (en) * 1994-04-21 1995-10-25 Gregory Scace Single line multiple purchase block and tackle system
US7178788B1 (en) * 2004-11-05 2007-02-20 Eagle Rock Manufacturing, Llc Even reeving system for a top drive earth drilling machine
WO2008017093A3 (en) * 2006-08-11 2008-03-27 Eduard Buzetzki Countershaft drive
US7559380B1 (en) 2004-11-05 2009-07-14 Eagle Rock Manufacturing, Llc Traveling swivel frame assembly with fixed brackets
US7584809B1 (en) 2004-11-05 2009-09-08 Eagle Rock Manufacruting, Llc Mobile transport rig with four axels
US7644784B1 (en) 2004-11-05 2010-01-12 Eagle Rock Manufacturing, Llc Transport watercraft
EP2143553A1 (en) * 2008-07-07 2010-01-13 Safan B.V. Driving means and device for working sheet-like material
WO2018150022A1 (en) * 2017-02-17 2018-08-23 Maersk Drilling A/S Drilling rig hoisting system
WO2018187253A1 (en) * 2017-04-05 2018-10-11 Cameron International Corporation Hoisting system and method
EP3715580A1 (en) * 2019-03-18 2020-09-30 Cameron Technologies Limited Compensating system and method
CN111824999A (en) * 2020-07-25 2020-10-27 王奔 Combined pulley block for conversion of movable pulley and fixed pulley
CN115324500A (en) * 2022-06-20 2022-11-11 中国石油天然气集团有限公司 Non-continuous magnetic guide tool tripping operation device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU39266A1 (en) * 1960-10-08 1960-12-08
FR1494259A (en) * 1966-07-25 1967-09-08 Bernard Peingeon Ets Double reeving device for handling equipment
DE2403977A1 (en) * 1974-01-29 1975-08-28 Eduard Prof Dipl Ing Herbert Load lifting with crane - crane has travelling crab with extra pulley system for heavy loads in crab support
DE2701342A1 (en) * 1977-01-14 1978-07-20 Salzgitter Maschinen Ag Drilling rope winding system - with ropes leading from dead=end fixtures over derrick and hook pulleys to winch drums
US4796863A (en) * 1986-10-23 1989-01-10 Parco Mast And Substructures, Inc. Dual cluster crown block
US4836300A (en) * 1986-10-23 1989-06-06 Parco Mast And Substructures, Inc. Method of performing drilling operations from a derrick
DE8909340U1 (en) * 1989-08-02 1990-12-06 Pfeifer Seil- Und Hebetechnik Gmbh & Co, 8940 Memmingen Winch for a mobile crane

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU39266A1 (en) * 1960-10-08 1960-12-08
FR1494259A (en) * 1966-07-25 1967-09-08 Bernard Peingeon Ets Double reeving device for handling equipment
DE2403977A1 (en) * 1974-01-29 1975-08-28 Eduard Prof Dipl Ing Herbert Load lifting with crane - crane has travelling crab with extra pulley system for heavy loads in crab support
DE2701342A1 (en) * 1977-01-14 1978-07-20 Salzgitter Maschinen Ag Drilling rope winding system - with ropes leading from dead=end fixtures over derrick and hook pulleys to winch drums
US4796863A (en) * 1986-10-23 1989-01-10 Parco Mast And Substructures, Inc. Dual cluster crown block
US4836300A (en) * 1986-10-23 1989-06-06 Parco Mast And Substructures, Inc. Method of performing drilling operations from a derrick
DE8909340U1 (en) * 1989-08-02 1990-12-06 Pfeifer Seil- Und Hebetechnik Gmbh & Co, 8940 Memmingen Winch for a mobile crane

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2288582A (en) * 1994-04-21 1995-10-25 Gregory Scace Single line multiple purchase block and tackle system
GB2288582B (en) * 1994-04-21 1997-12-03 Gregory Scace Single line multiple purchase block and tackle system
US7178788B1 (en) * 2004-11-05 2007-02-20 Eagle Rock Manufacturing, Llc Even reeving system for a top drive earth drilling machine
US7559380B1 (en) 2004-11-05 2009-07-14 Eagle Rock Manufacturing, Llc Traveling swivel frame assembly with fixed brackets
US7584809B1 (en) 2004-11-05 2009-09-08 Eagle Rock Manufacruting, Llc Mobile transport rig with four axels
US7644784B1 (en) 2004-11-05 2010-01-12 Eagle Rock Manufacturing, Llc Transport watercraft
WO2008017093A3 (en) * 2006-08-11 2008-03-27 Eduard Buzetzki Countershaft drive
CN102089144B (en) * 2008-07-07 2014-12-03 尼沃拉Ip有限责任公司 Driving means and device for working sheet-like material
WO2010003810A1 (en) * 2008-07-07 2010-01-14 Safan B.V. Driving means and device for working sheet-like material
US8459089B2 (en) 2008-07-07 2013-06-11 Nivora Ip B.V. Driving means and device for working sheet-like material
EP2143553A1 (en) * 2008-07-07 2010-01-13 Safan B.V. Driving means and device for working sheet-like material
EA021926B1 (en) * 2008-07-07 2015-09-30 Нивора Ип Б.В. Driving means of a press brake and a press brake comprising same
WO2018150022A1 (en) * 2017-02-17 2018-08-23 Maersk Drilling A/S Drilling rig hoisting system
US11339615B2 (en) 2017-02-17 2022-05-24 Maersk Drilling A/S Drilling rig hoisting system
US20210179400A1 (en) * 2017-04-05 2021-06-17 Cameron International Corporation Hoisting System And Method
EP3607168A4 (en) * 2017-04-05 2021-01-13 Cameron Technologies Limited Hoisting system and method
WO2018187253A1 (en) * 2017-04-05 2018-10-11 Cameron International Corporation Hoisting system and method
US11897738B2 (en) 2017-04-05 2024-02-13 Schlumberger Technology Corporation Hoisting system and method
EP3715580A1 (en) * 2019-03-18 2020-09-30 Cameron Technologies Limited Compensating system and method
CN111824999A (en) * 2020-07-25 2020-10-27 王奔 Combined pulley block for conversion of movable pulley and fixed pulley
CN115324500A (en) * 2022-06-20 2022-11-11 中国石油天然气集团有限公司 Non-continuous magnetic guide tool tripping operation device and method

Also Published As

Publication number Publication date
WO1992014028A3 (en) 1992-09-17

Similar Documents

Publication Publication Date Title
US6217258B1 (en) Dual hoist derrick system for deep sea drilling
EP1253282B1 (en) Elevator with a bearing
US5174389A (en) Carousel well rig
WO1992014028A2 (en) An improved crown block/traveling block system for a well drilling derrick
US6053255A (en) Blowout preventer lift apparatus and method
CN103669351A (en) Full-stroke hole-leading hydraulic static pile driver
US3936034A (en) Balanced hoist apparatus
US11339615B2 (en) Drilling rig hoisting system
US5368083A (en) Telescopic kelly bar apparatus and method
US9567814B2 (en) Hoisting systems with heave compensation
US4796863A (en) Dual cluster crown block
US4836300A (en) Method of performing drilling operations from a derrick
NO20171016A1 (en) Multi-Path Hoisting Systems
US4585213A (en) Well derrick
US4903443A (en) Derrick having upper and lower crown block positions
US2546683A (en) Crown and traveling blocks and a reeving system therefor
US2685378A (en) Method for handling drill pipe
US2766009A (en) Crown block sheave arrangement
US3042377A (en) Oil well derrick crown block
US3863898A (en) Changing block hoisting system
US4448246A (en) Apparatus for setting casing in an oil well
US2776058A (en) Apparatus for handling pipe in a derrick
CN2520321Y (en) Wellhead apparatus hoisting device and special transport frame
CN216272666U (en) Hoisting point binding device for overturning arch rib segment in air
US1880071A (en) Suspension apparatus for well drilling operations

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): BR JP KR

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): AT BE CH DE DK ES FR GB GR IT LU MC NL SE

AK Designated states

Kind code of ref document: A3

Designated state(s): BR JP KR

AL Designated countries for regional patents

Kind code of ref document: A3

Designated state(s): AT BE CH DE DK ES FR GB GR IT LU MC NL SE

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
122 Ep: pct application non-entry in european phase