USRE30846E - Submarine pipeline laying vessel - Google Patents

Submarine pipeline laying vessel Download PDF

Info

Publication number
USRE30846E
USRE30846E US05/944,979 US94497978A USRE30846E US RE30846 E USRE30846 E US RE30846E US 94497978 A US94497978 A US 94497978A US RE30846 E USRE30846 E US RE30846E
Authority
US
United States
Prior art keywords
pipe
vessel
reel
water
diverter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US05/944,979
Inventor
Alexander C. Lang
Peter A. Lunde
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technip UK Ltd
Original Assignee
Santa Fe International Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US05/574,433 external-priority patent/US3982402A/en
Application filed by Santa Fe International Corp filed Critical Santa Fe International Corp
Priority to US05/944,979 priority Critical patent/USRE30846E/en
Application granted granted Critical
Publication of USRE30846E publication Critical patent/USRE30846E/en
Assigned to STENA OFFSHORE LIMITED reassignment STENA OFFSHORE LIMITED ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: SANTA FE INTERNATIONAL CORPORATION, A CORP. OF DE
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/03Pipe-laying vessels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/202Accessories therefor, e.g. floats, weights fixed on or to vessels
    • F16L1/203Accessories therefor, e.g. floats, weights fixed on or to vessels the pipes being wound spirally prior to laying

Definitions

  • a pipeline is fabricated on the deck of a lay barge by welding together individual lengths of pipe. Each length of pipe is about 40 feet long.
  • the reel pipe-laying technique for laying relatively smaller diameter pipe
  • a pipeline is wound on the hub of a large reel which is rotatably mounted on the deck of the lay barge.
  • the lay barge is then moved to an offshore pipe-laying location and the pipeline is unwound from the reel.
  • the unwinding portion of the pipeline is straightened prior to being lowered into the body of water.
  • the departure angle of the pipe relative to the barge is limited primarily due to the fixed location of the pipe handling machinery mounted on the deck of the barge.
  • the lay barge is required to have a long equipment ramp in a position fixed relative to the barge.
  • a plurality of longitudinally-spaced pipe supports commonly known as stanchions.
  • the position of each stanchion is adjustable within a small range to provide a desired pipe-descent trajectory which gradually slopes downwardly.
  • a particular trajectory is selected for each diameter size of pipe, weight of pipe, pipe tension, and depth of water.
  • the means of supporting the pipe is what is commonly known as a "stinger", which is attached to the aft end of the lay barge at the end of the long ramp.
  • the stinger supports the descending pipe span from the aft end of the barge to a lift-off point on the stinger. From this lift-off point the pipe span can safely sag to the seabed.
  • the primary purpose of the stinger is to avoid excessive concentrations of curvature stress in the descending pipe span. These concentrations could buckle or permanently bend the pipeline.
  • Various types of pipe stingers are known; some are straight and others have articulated joints.
  • a straight stinger is usually a long, stiff structure. It comprises two buoyant pontoons interconnected by numerous crossovers on which are mounted horizontally and vertically disposed rollers. The rollers support the pipe span as it moves from the barge's aft end to the lift-off point.
  • straight stingers have several disadvantages, for example, significantly different water depths require stingers of different lengths. The changing of stingers is time-consuming. The length of a straight stinger is generally from four to six times the water depth in which the pipeline is laid. In practice, however, stingers have an upper length limit of about 600 feet. Such long stingers must be capable of withstanding high loads caused by water currents and relative movement between the stinger and the lay-barge. Stingers are therefore generally constructed from high-strength materials, for example high-strength steel.
  • a straight stinger consisting of several segments connected in series by hinge joints. While a freely-articulated stinger is designed to follow the curvature of the descending pipe span, destructive concentrations of pipe curvature stress can occur along the stinger, if the buoyancy of the segments is not correctly distributed. Wave motions and pitching motions of the lay barge tend to cause the stinger to rise and fall in high seas, thereby making a pipe which extends between any two stinger segments very vulnerable to buckling.
  • a semi-articulated stinger has been proposed as a compromise between a freely-articulated stinger and a straight stinger.
  • the segments are connected with hinge joints which permit a limited degree of vertical, lateral, and torsional intersegment movement.
  • Stingers usually require a significant amount of time to install, operate, and remove, especially during an impending storm or other adverse operating conditions. If a stinger fails during pipe-laying, the barge's down time can be great and the ensuing financial loss considerable.
  • a reel pipe-laying method for continuously laying a pipeline without a stinger by aligning a pipe section as it is being paid out from the reel, straightening the aligned pipe, tensioning the pipe, discharging the straightened pipe under tension into the body of water, and changing the lift off angle of the pipe relative to the horizontal by pivoting a diverter structure operably supporting at least the straightener and tensioner, but preferably the aligner as well.
  • the diverter extends from a horizontal pivot, near the aft end of the vessel, upwardly and inwardly toward the reel.
  • the lift-off angle of the straightened pipe relative to the horizontal, i.e., the deck of the ship, and the tension applied thereon are adjusted according to the depth of the body water into which the pipeline is discharged, and to the size, strength and weight of the pipe.
  • the present invention has the unique advantage for both small and large diameter pipe in that lift off angles of up to 90° can be easily achieved under continuous pipe-laying operation.
  • the pipe-laying vessel has a pipe supply reel which is rotatably mounted about a horizontal axis oriented athwartships.
  • the reel is comprised of a hollow hub, mounted on the ship for rotation about its horizontal axis, and of vertically disposed side flanges secured respectively about the opposite ends of the hub.
  • Bearing means are provided for rotatably supporting and centering the hub.
  • Drive means are circumferentially mounted about the bottom portions of a flange for rotating the reel clockwise or counterclockwise.
  • a diverter is provided for guiding a pipe section from its orientation as it unwinds from the reel toward a downwardly extending orientation, as the pipe is being guided between the reel and the body of water.
  • the diverter is pivotably mounted on and preferably near the aft end of the vessel about a horizontal pivot whereupon it extends over the vessel's deck in an upward direction inclined toward the reel.
  • the diverter preferably comprises near its upper end a curved aligner for changing the orientation of the pipe from its orientation as it unwinds from the reel into a downwardly-extending, vertical trajectory toward the body of water.
  • the aligner is followed by bending means for plastically reverse-bending the pipe to a desired, preferably linear, configuration after the pipe leaves the bending means.
  • the bending means may include or be followed by tension means for applying tension to the pipe.
  • the aligner, the straightener, and the tensioner are mounted on the diverter structure for pivotal movement therewith.
  • the straightener and tensioner can employ common elements, all of which are preferably arranged to permit adjustable angular and reciprocating movements therebetween.
  • a reel with the largest pipe storage capacity is ordinarily employed. This requires a reel having a hub with a minimum outer diameter determined so as not to adversely affect the largest diameter pipe which will be coiled on the reel.
  • the pipe is bent around the reel's hub so that the maximum stress in at least a portion of the pipe's metal wall exceeds the yield stress.
  • the pipe When a straight metal pipe is bent to a bending radius known as the critical radius, the pipe is said to be at the limit between its elastic or linear range and its plastic or non-linear range.
  • a straight pipe is bent elastically, that is, so as not to exceed its elastic range, no residual deformation or curvature remains in the pipe after the applied bending moment is removed.
  • a straight pipe therefore is a pipe with zero curvature, or a pipe bent to an infinite radius.
  • a critical bending radius whose value marks the boundary between the pipe's elastic and plastic ranges.
  • the critical elastic bending radius is about 308 feet. That is, if the pipe is bent to a radius larger than 308 feet, there will remain no appreciable residual curvature in the pipe upon the release of the bending moment. If it is necessary to bend the same pipe to a radius considerably shorter than 308 feet, the pipe's steel can be bent plastically, without exceeding its ultimate bending moment, down to a radius of about 12 feet. If now the plastic bending moment is released, the pipe will remain with a permanent residual curvature.
  • the values of the critical bending radius and of the ultimate plastic bending radius can be experimentally and theoretically determined. Accordingly, from a knowledge of such values, the necessary elements which are to be mounted on the pivotable diverter structure can be designed and controlled.
  • FIG. 1 is a schematic view in elevation of a preferred embodiment of an apparatus in accordance with the present invention.
  • FIG. 2 is a plan view of the apparatus shown in FIG. 1.
  • a pipe-laying ship 10 which supports a reel, generally designated as 12, on its deck 13.
  • the hub 15 of reel 12 is shown disposed for rotation about its horizontal axis 11.
  • Reel 12 stores a very long pipeline 14 which is wound into a multi-layer coil 28.
  • Each layer of pipe 30 in the multilayer coil 28 has many windings.
  • the reel is driven clockwise or counterclockwise by a series of drive motors 19 operatively coupled for applying a driving force to one of the flanges 21 of the reel.
  • drive motors 19 When reel 12 is rotated clockwise, as viewed in FIG. 1, there is obtained an unwound pipe section 16.
  • the pipe section 16 when emerging from the outermost layer 32, has a relatively large radius of curvature and, conversely, when emerging from the innermost layer 34 has a smaller radius of curvature.
  • reel 12 It is desired for reel 12 to have a maximum pipe storage capacity.
  • the diameter of hub 15 is selected so that even the largest diameter, say 24 inch, pipe wound thereon will not be bent to a radius shorter than its ultimate plastic bending radius, as previously defined.
  • the unwound pipe section 16 therefore contains a permanent residual curvature whose magnitude varies with the diameter of the layer in the multi-layer coil 28 from which pipe section 16 emerges; with the diameter, size, weight and strength of the pipe; with pipe tension; and with the angle to which a pipe diverter structure 24 has been elevated.
  • An aligner bends pipe 16 from a generally horizontal direction to the desired downwardly extending orientation.
  • Aligner 18 has a sufficiently small uniform or uniformly varying curvature to avoid buckling or damaging the pipe and is mounted near the top end of the diverter structure 24 whose bottom end is pivotably mounted for rotation about an athwartships horizontal pivot 26.
  • the diverter can be rotated in a clockwise or counterclockwise direction and is supported at any selected angle by conventional extensible means 27 in order to set the lift-off angle A which is the angle between the descend trajectory of the pipe and the horizontal.
  • the diverter 24 also includes a pipe straightener which is generally designated as 20.
  • Pipe section 16 enters the straightener at a variable angle with respect to the horizontal and with a variable residual curvature depending on the diameter of the layer in the multilayer coil 28 from which pipe section 16 emerges. The variable residual curvature also depends on the diameter, size, weight and strength of the pipe, upon pipe tension, and upon the angle A which the diverter has been elevated.
  • Pipe straightener 20 plastically bends the pipe to a bending radius whose value is selected so as to straighten the pipe.
  • the required diverter elevation is determined by the depth of the body of water, the diameter and size of the pipe, the weight of the pipe, and the tension in the pipe at the water surface.
  • straightener 20 is provided, for example, with a bending shoe 42 and a reaction shoe 44.
  • Aligner 18 may serve as the other reaction shoe.
  • the bending shoe 42, the reaction shoe 44, and the aligner 18 form a "three-wheeled straightener" whose operation is well known to those skilled in the art.
  • the three-wheeled straightener plastically reverse bends the pipe by an amount sufficient to allow pipe section 16 to leave reaction shoe 44 at a point 54 with a very large radius of curvature which approaches infinity. A straight pipe is thus obtained.
  • Pipe section 16 is discharged downwardly along a descent trajectory 50 and at the selected lift-off angle A with respect to the horizontal.
  • Angle A may have a value from a few degrees up to 90°, which is an important advantage of this invention.
  • a level winding mechanism 35 is employed to guide pipe section 16 from the reel 12 as it uncoils across a pipe layer 30 to the center line of the diverter 24.
  • the level winding force may be reacted against the reel's flanges 21.
  • the pipe should be held straight in a vertical plane passing through the longitudinal axis of the diverter prior to its entering, and while passing across, the bending shoe 42. This is accomplished by a horizontal bending means 36 which can be adjusted to apply the necessary forces to the pipe normal to the vertical plane.
  • a pipe tensioner 51 To assist in maintaining the descending pipe span under proper tension and to establish the proper catenary for the pipe in the body of water, there is additionally provided a pipe tensioner 51. While the tensioner can have independent elements 52, 53, the desired tension may be conveniently obtained by mounting only one tensioning shoe 52 (shown in dotted lines), face-to-face with the reaction shoe 44, with pipe 16 passing between the pipe-engaging peripheries of the opposite shoes 52 and 44. The tensioner shoes 52 and 44 or 52 53 firmly grip the pipe by the friction force between the shoe pads and pipe surface. Pipe tension is controlled by driving the shoes in the forward or reverse direction.
  • the various shoes are mounted at spaced locations on the diverter structure 24 and may be mounted for reciprocating and rotational movements relative to each other.
  • the pipe-engaging periphery of each shoe preferably has a movable chain (not shown) made up of pipe-engaging pads that may be arcuately shaped to receive and closely engage against the wall of the moving pipe.
  • the chains in the straightening and tensioning shoes move in directions indicated by the arrows.
  • the tensioner may be assisted by the ship's propulsion during the pipe-laying operation and/or by the reel's driving means 19.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

This invention relates to a method and to an apparatus for use in laying a submarine pipeline from a pipe-laying vessel. According to one aspect of the present invention, there is provided a reel pipe-laying method for continuously laying a pipeline of up to 24-inch diameter without a stinger by (1) aligning a pipe portion as it is being paid out from the reel, (2) straightening the aligned pipe portion, (3) tensioning the pipe, (4) discharging the straightened pipe under tension into the body of water, and (5) changing for different water depths and pipe conditions the lift off angle of the pipe relative to the horizontal by pivoting a diverter about a horizontal pivot, the diverter supporting at least the straightener and the tensioner and extending from the horizontal pivot mounted near the aft end of the vessel, upwardly toward the reel.

Description

BACKGROUND OF THE INVENTION
The laying of long lines of metal pipe on the floor of deep waters from a lay barge is gaining increasing commercial importance for the transport of fluids, particularly petroleum and petroleum products.
In one conventional, pipe-laying method, known as "stove-piping", a pipeline is fabricated on the deck of a lay barge by welding together individual lengths of pipe. Each length of pipe is about 40 feet long. In another conventional method, known as "the reel pipe-laying technique" for laying relatively smaller diameter pipe, a pipeline is wound on the hub of a large reel which is rotatably mounted on the deck of the lay barge. The lay barge is then moved to an offshore pipe-laying location and the pipeline is unwound from the reel. The unwinding portion of the pipeline is straightened prior to being lowered into the body of water. In both of these techniques the departure angle of the pipe relative to the barge is limited primarily due to the fixed location of the pipe handling machinery mounted on the deck of the barge.
In either of these known pipe-laying methods, the lay barge is required to have a long equipment ramp in a position fixed relative to the barge. In one procedure there are mounted on the ramp a plurality of longitudinally-spaced pipe supports, commonly known as stanchions. The position of each stanchion is adjustable within a small range to provide a desired pipe-descent trajectory which gradually slopes downwardly. A particular trajectory is selected for each diameter size of pipe, weight of pipe, pipe tension, and depth of water. In another procedure the means of supporting the pipe is what is commonly known as a "stinger", which is attached to the aft end of the lay barge at the end of the long ramp. The stinger supports the descending pipe span from the aft end of the barge to a lift-off point on the stinger. From this lift-off point the pipe span can safely sag to the seabed. The primary purpose of the stinger is to avoid excessive concentrations of curvature stress in the descending pipe span. These concentrations could buckle or permanently bend the pipeline. Various types of pipe stingers are known; some are straight and others have articulated joints.
A straight stinger is usually a long, stiff structure. It comprises two buoyant pontoons interconnected by numerous crossovers on which are mounted horizontally and vertically disposed rollers. The rollers support the pipe span as it moves from the barge's aft end to the lift-off point. However, straight stingers have several disadvantages, for example, significantly different water depths require stingers of different lengths. The changing of stingers is time-consuming. The length of a straight stinger is generally from four to six times the water depth in which the pipeline is laid. In practice, however, stingers have an upper length limit of about 600 feet. Such long stingers must be capable of withstanding high loads caused by water currents and relative movement between the stinger and the lay-barge. Stingers are therefore generally constructed from high-strength materials, for example high-strength steel.
Some of the disadvantages of a straight stinger are avoided by using a freely-articulated stinger consisting of several segments connected in series by hinge joints. While a freely-articulated stinger is designed to follow the curvature of the descending pipe span, destructive concentrations of pipe curvature stress can occur along the stinger, if the buoyancy of the segments is not correctly distributed. Wave motions and pitching motions of the lay barge tend to cause the stinger to rise and fall in high seas, thereby making a pipe which extends between any two stinger segments very vulnerable to buckling.
A semi-articulated stinger has been proposed as a compromise between a freely-articulated stinger and a straight stinger. In the semi-articulated stinger, the segments are connected with hinge joints which permit a limited degree of vertical, lateral, and torsional intersegment movement.
Stingers usually require a significant amount of time to install, operate, and remove, especially during an impending storm or other adverse operating conditions. If a stinger fails during pipe-laying, the barge's down time can be great and the ensuing financial loss considerable.
In practicing the conventional pipe-laying methods hereinbefore described the pipeline moves over the deck of the lay barge in a substantially horizontal plane. Long ramps are required on the lay barges and frequently these ramps do not provide adequate space for inspecting, testing and, if necessary, repairing the descending pipeline. Also, workers find it difficult to maintain their equilibrium on the ramp, especially in rough sea.
Proposals have been made to solve the "stinger problem" by eliminating the stinger. But these proposals, as far as is known, have been limited to the reel pipe-laying technique for up to 12 inch pipe, as described in U.S. Pat. No. 3,641,778, assigned to the same assignee.
SUMMARY OF THE INVENTION
According to one aspect of the present invention, there is provided a reel pipe-laying method for continuously laying a pipeline without a stinger by aligning a pipe section as it is being paid out from the reel, straightening the aligned pipe, tensioning the pipe, discharging the straightened pipe under tension into the body of water, and changing the lift off angle of the pipe relative to the horizontal by pivoting a diverter structure operably supporting at least the straightener and tensioner, but preferably the aligner as well. The diverter extends from a horizontal pivot, near the aft end of the vessel, upwardly and inwardly toward the reel.
Generally, the lift-off angle of the straightened pipe relative to the horizontal, i.e., the deck of the ship, and the tension applied thereon are adjusted according to the depth of the body water into which the pipeline is discharged, and to the size, strength and weight of the pipe.
The present invention has the unique advantage for both small and large diameter pipe in that lift off angles of up to 90° can be easily achieved under continuous pipe-laying operation.
The pipe-laying vessel has a pipe supply reel which is rotatably mounted about a horizontal axis oriented athwartships. The reel is comprised of a hollow hub, mounted on the ship for rotation about its horizontal axis, and of vertically disposed side flanges secured respectively about the opposite ends of the hub. Bearing means are provided for rotatably supporting and centering the hub. Drive means are circumferentially mounted about the bottom portions of a flange for rotating the reel clockwise or counterclockwise.
A diverter is provided for guiding a pipe section from its orientation as it unwinds from the reel toward a downwardly extending orientation, as the pipe is being guided between the reel and the body of water. The diverter is pivotably mounted on and preferably near the aft end of the vessel about a horizontal pivot whereupon it extends over the vessel's deck in an upward direction inclined toward the reel.
The diverter preferably comprises near its upper end a curved aligner for changing the orientation of the pipe from its orientation as it unwinds from the reel into a downwardly-extending, vertical trajectory toward the body of water. The aligner is followed by bending means for plastically reverse-bending the pipe to a desired, preferably linear, configuration after the pipe leaves the bending means. The bending means may include or be followed by tension means for applying tension to the pipe.
Advantageously, the aligner, the straightener, and the tensioner are mounted on the diverter structure for pivotal movement therewith. The straightener and tensioner can employ common elements, all of which are preferably arranged to permit adjustable angular and reciprocating movements therebetween.
A reel with the largest pipe storage capacity is ordinarily employed. This requires a reel having a hub with a minimum outer diameter determined so as not to adversely affect the largest diameter pipe which will be coiled on the reel. The pipe is bent around the reel's hub so that the maximum stress in at least a portion of the pipe's metal wall exceeds the yield stress.
When a straight metal pipe is bent to a bending radius known as the critical radius, the pipe is said to be at the limit between its elastic or linear range and its plastic or non-linear range.
If a straight pipe is bent elastically, that is, so as not to exceed its elastic range, no residual deformation or curvature remains in the pipe after the applied bending moment is removed. A straight pipe therefore is a pipe with zero curvature, or a pipe bent to an infinite radius. For each steel grade and diameter size pipe, there corresponds a critical bending radius whose value marks the boundary between the pipe's elastic and plastic ranges.
In the pipe's plastic range, the stress-strain relationship is non-linear. For a relatively small increase in bending moment applied to the pipe, there is now obtained a relatively large increase in curvature. A permanent residual curvature will now remain after the release of an applied bending moment. If such a permanent deformation is not objectionable, the pipe can be bent plastically to a limit of the ultimate bending radius. If now the bending radius is made smaller than the pipe's ultimate bending radius, the pipe is likely to buckle and collapse.
For example, for a typical 8-inch diameter steel pipe whose steel has a yield strength of 35,000 psi, the critical elastic bending radius is about 308 feet. That is, if the pipe is bent to a radius larger than 308 feet, there will remain no appreciable residual curvature in the pipe upon the release of the bending moment. If it is necessary to bend the same pipe to a radius considerably shorter than 308 feet, the pipe's steel can be bent plastically, without exceeding its ultimate bending moment, down to a radius of about 12 feet. If now the plastic bending moment is released, the pipe will remain with a permanent residual curvature.
For each grade of steel and diameter size, the values of the critical bending radius and of the ultimate plastic bending radius can be experimentally and theoretically determined. Accordingly, from a knowledge of such values, the necessary elements which are to be mounted on the pivotable diverter structure can be designed and controlled.
For a better understanding of the present invention and to show how the same may be carried into effect, reference will now be made, by way of example, to the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a schematic view in elevation of a preferred embodiment of an apparatus in accordance with the present invention; and
FIG. 2 is a plan view of the apparatus shown in FIG. 1.
Referring to the drawings, there is shown a pipe-laying ship 10 which supports a reel, generally designated as 12, on its deck 13. The hub 15 of reel 12 is shown disposed for rotation about its horizontal axis 11. Reel 12 stores a very long pipeline 14 which is wound into a multi-layer coil 28. Each layer of pipe 30 in the multilayer coil 28 has many windings. The reel is driven clockwise or counterclockwise by a series of drive motors 19 operatively coupled for applying a driving force to one of the flanges 21 of the reel. When reel 12 is rotated clockwise, as viewed in FIG. 1, there is obtained an unwound pipe section 16.
The pipe section 16, when emerging from the outermost layer 32, has a relatively large radius of curvature and, conversely, when emerging from the innermost layer 34 has a smaller radius of curvature.
It has been found, contrary to what might be expected, that neither the pipe nor its plastic coating, if any, generally become damaged by the consecutive bending and reverse bending operations contemplated by the method of this invention.
It is desired for reel 12 to have a maximum pipe storage capacity. Hence, the diameter of hub 15 is selected so that even the largest diameter, say 24 inch, pipe wound thereon will not be bent to a radius shorter than its ultimate plastic bending radius, as previously defined.
The unwound pipe section 16 therefore contains a permanent residual curvature whose magnitude varies with the diameter of the layer in the multi-layer coil 28 from which pipe section 16 emerges; with the diameter, size, weight and strength of the pipe; with pipe tension; and with the angle to which a pipe diverter structure 24 has been elevated.
An aligner, generally designated as 18, bends pipe 16 from a generally horizontal direction to the desired downwardly extending orientation. Aligner 18 has a sufficiently small uniform or uniformly varying curvature to avoid buckling or damaging the pipe and is mounted near the top end of the diverter structure 24 whose bottom end is pivotably mounted for rotation about an athwartships horizontal pivot 26. The diverter can be rotated in a clockwise or counterclockwise direction and is supported at any selected angle by conventional extensible means 27 in order to set the lift-off angle A which is the angle between the descend trajectory of the pipe and the horizontal.
The diverter 24 also includes a pipe straightener which is generally designated as 20. Pipe section 16 enters the straightener at a variable angle with respect to the horizontal and with a variable residual curvature depending on the diameter of the layer in the multilayer coil 28 from which pipe section 16 emerges. The variable residual curvature also depends on the diameter, size, weight and strength of the pipe, upon pipe tension, and upon the angle A which the diverter has been elevated. Pipe straightener 20 plastically bends the pipe to a bending radius whose value is selected so as to straighten the pipe.
The required diverter elevation is determined by the depth of the body of water, the diameter and size of the pipe, the weight of the pipe, and the tension in the pipe at the water surface.
Pipe 16 after it leaves aligner 18 at a point 48, has a non-uniform residual stress distribution pattern relative to its longitudinal axis and, hence, a variable residual curvature.
To remove this variable residual curvature from pipe 16, straightener 20 is provided, for example, with a bending shoe 42 and a reaction shoe 44. Aligner 18 may serve as the other reaction shoe. The bending shoe 42, the reaction shoe 44, and the aligner 18 form a "three-wheeled straightener" whose operation is well known to those skilled in the art. The three-wheeled straightener plastically reverse bends the pipe by an amount sufficient to allow pipe section 16 to leave reaction shoe 44 at a point 54 with a very large radius of curvature which approaches infinity. A straight pipe is thus obtained.
From reaction shoe 44 pipe section 16 is discharged downwardly along a descent trajectory 50 and at the selected lift-off angle A with respect to the horizontal. Angle A may have a value from a few degrees up to 90°, which is an important advantage of this invention.
A level winding mechanism 35 is employed to guide pipe section 16 from the reel 12 as it uncoils across a pipe layer 30 to the center line of the diverter 24. The level winding force may be reacted against the reel's flanges 21. The pipe should be held straight in a vertical plane passing through the longitudinal axis of the diverter prior to its entering, and while passing across, the bending shoe 42. This is accomplished by a horizontal bending means 36 which can be adjusted to apply the necessary forces to the pipe normal to the vertical plane.
To assist in maintaining the descending pipe span under proper tension and to establish the proper catenary for the pipe in the body of water, there is additionally provided a pipe tensioner 51. While the tensioner can have independent elements 52, 53, the desired tension may be conveniently obtained by mounting only one tensioning shoe 52 (shown in dotted lines), face-to-face with the reaction shoe 44, with pipe 16 passing between the pipe-engaging peripheries of the opposite shoes 52 and 44. The tensioner shoes 52 and 44 or 52 53 firmly grip the pipe by the friction force between the shoe pads and pipe surface. Pipe tension is controlled by driving the shoes in the forward or reverse direction.
The various shoes are mounted at spaced locations on the diverter structure 24 and may be mounted for reciprocating and rotational movements relative to each other. The pipe-engaging periphery of each shoe preferably has a movable chain (not shown) made up of pipe-engaging pads that may be arcuately shaped to receive and closely engage against the wall of the moving pipe. The chains in the straightening and tensioning shoes move in directions indicated by the arrows.
The tensioner may be assisted by the ship's propulsion during the pipe-laying operation and/or by the reel's driving means 19.

Claims (8)

What is claimed is:
1. A vessel for continuously laying a pipeline on the bed underlying a body of water, comprising:
a pipe supply reel mounted for rotation on said vessel about .[.its horizontal.]. .Iadd.a predetermined .Iaddend.axis;
drive means for rotating said reel .[.thereby unwinding a pipe section.].;
a diverter structure having one end coupled to one end of said vessel and having the other end extending upwardly in the direction of said reel and at an acute angle relative to the deck of said vessel; and pipe-conditioning means mounted on said diverter structure for conditioning said pipe section and discharging the conditioned pipe section into said body of water.
2. The vessel of claim 1 and further including:
pivot means mounted near said one end of said vessel for pivotably mounting said one end of said diverter structure, and extensible means mounted on said vessel and being operably coupled to said diverter structure for pivoting said diverter structure about said pivot means, whereby said pipe is discharged directly from said one end of said vessel into said body of water.
3. The vessel of claim 2 and further including:
force-producing means positioned between said reel and said diverter structure for maintaining the unwound pipe section in a fixed vertical plane prior to and during the pipe conditioning.
4. The vessel of claim 3 wherein,
said reel comprises a hollow hub and a pair of vertically-disposed side flanges secured to the opposite ends of said hub; and
drive means angularly disposed under at least one of said flanges for rotating said reel.
5. A vessel for continuously laying a pipeline on the seabed underlying a body of water, comprising:
a pipe supply reel mounted for rotation on said vessel about its horizontal axis;
drive means for rotating the reel;
level winding means for level winding a pipe section as it is being pulled from the reel;
aligning means for aligning the pipe into a desired single vertical center plane;
straightening means for straightening the aligned pipe section;
diverter means;
said aligning means and said straightening means being mounted on said diverter means, and said diverter means being pivotably mounted on said vessel for changing the lift-off angle of the pipe relative to the horizontal, whereby said aligning and straightening means are positioned on and over the deck of said vessel; and
means for discharging the straightened pipe under tension into said body of water at a desired lift-off angle.
6. The vessel of claim 5 wherein said aligning means are mounted on said diverter means between said straightening means and said reel.
7. The vessel of claim 6 and further including level-winding means mounted near the reel to guide the pipe laterally across the reel as the pipe is wound on and unwound from the reel.
8. The vessel of claim 7 and further including adjustable, horizontal-force-producing means positioned near the aligning means for maintaining the pipe in said vertical center plane prior to and during the straightening of the pipe by said straightening means. .Iadd. 9. A vessel for laying a pipeline on the bed underlying a body of water, comprising:
a reel for carrying a continuous length of pipe spooled thereon mounted on said vessel for rotation about a predetermined rotational axis;
a diverter structure having one end portion mounted to said vessel and its other end portion extending upwardly at an acute angle relative to the deck of the vessel;
pipe conditioning means mounted on said diverter structure for conditioning pipe after it is unspooled from said reel and for discharging the conditioned pipe into said body of water; and
drive means for adjusting said diverter structure about its pivot axis to thereby selectively control the angle of discharge of said conditioned pipe into said body of water. .Iaddend..Iadd. 10. A vessel according to claim 9, wherein said pipe conditioning means comprises straightening means for bending the unspooled pipe to a bending radius whose value is selected to substantially straighten the pipe prior to its being discharged into the body of water. .Iaddend..Iadd. 11. A vessel according to claim 10, further including:
level winding means for guiding the pipe laterally across the reel as the pipe is unwound from the reel to said pipe conditioning means. .Iaddend. .Iadd. 12. A vessel according to claim 11, wherein said level winding means is movable in a plane substantially normal to the rotational axis of the reel as pipe is unwound from the reel. .Iaddend..Iadd. 13. A vessel according to claim 9, wherein said diverter structure is pivotably mounted adjacent one end portion of said vessel; and said drive means comprises extensible means mounted on said vessel and operably coupled to said diverter structure for pivoting said diverter structure about said pivot means to a desired elevation as determined by the depth of the body of water and the diameter and size of the pipe. .Iaddend..Iadd. 14. A vessel according to claim 13, wherein:
said reel comprises a hollow hub and a pair of vertically-disposed side flanges secured to the opposite ends of said hub; and
further drive means are provided to cooperate with at least one of said flanges for rotating said reel. .Iaddend..Iadd. 15. A vessel according to claim 9, wherein said pipe conditioning means comprises:
aligning means for aligning the pipe in a desired substantially vertical plane; and
straightening means for straightening the aligned pipe section. .Iaddend..Iadd. 16. A vessel according to claim 15, wherein said diverter structure is pivotably mounted adjacent one end portion of said vessel; and said drive means comprises extensible means mounted on said vessel and operably coupled to said diverter structure for pivoting said diverter structure about said pivot means to a desired elevation as determined by the depth of the body of water and the diameter and size of the pipe. .Iaddend..Iadd. 17. A vessel according to claim 16, wherein said aligning means are mounted on said diverter means between said straightening means and said reel. .Iaddend..Iadd. 18. A vessel according to claim 17, further including:
level-winding means for guiding the pipe laterally across the reel as the pipe is wound on and unwound from the reel through said pipe conditioning means. .Iaddend..Iadd. 19. A vessel for laying a pipeline on the bed underlying a body of water, comprising:
a reel for carrying a continuous length of pipe spooled thereon mounted on said vessel for rotating about a predetermined rotational axis;
a diverter structure pivotably mounted to said vessel;
pipe conditioning means mounted on said diverter structure for conditioning pipe after it is unspooled from said reel and for discharging the conditioned pipe into said body of water, said pipe conditioning means including aligning means for aligning the unspooled pipe in desired plane, and straightening means for plastically bending the unspooled pipe to a bending radius whose value is selected to substantially straighten the pipe prior to its being discharged into the body of water;
level-winding means for guiding the pipe laterally across the reel as the pipe is unwound from the reel; and
drive means for pivoting said diverter structure about its pivot axis to thereby selectively control the angle of discharge of said conditioned pipe into said body of water. .Iaddend..Iadd. 20. A vessel according to claim 19, wherein said level-winding means is movable in a plane substantially normal to the rotational axis of the reel as pipe is unwound from the reel. .Iaddend..Iadd. 21. A vessel according to claim 19, wherein said diverter structure is pivotably mounted adjacent one end portion of said vessel; and said drive means comprises extensible means mounted on said vessel and operably coupled to said diverter structure for pivoting said diverter structure about said pivot means to a desired elevation as determined by the depth of the body of water and the diameter and size of the pipe. .Iaddend..Iadd. 22. A vessel according to claim 19, wherein said aligning means are mounted on said diverter means between said straightening means and said reel. .Iaddend. .Iadd. 23. A vessel for laying a pipeline on the bed underlying a body of water, comprising:
a reel for carrying a continuous length of pipe spooled thereon mounted on said vessel for rotation about a predetermined rotational axis;
a diverter structure pivotably mounted to said vessel;
pipe conditioning means mounted on said diverter structure for conditioning pipe after it is unspooled from said reel and for discharging the conditioned pipe into said body of water, said pipe conditioning means including aligning means for aligning the unspooled pipe in a desired plane, and straightening means for plastically bending the unspooled pipe to a bending radius whose value is selected to substantially straighten the pipe prior to its being discharged into the body of water; and
drive means for pivoting said diverter structure about its pivot axis to thereby selectively control the angle of discharge of said conditioned pipe into said body of water. .Iaddend..Iadd. 24. A vessel according to claim 23, wherein said diverter structure is pivotably mounted adjacent one end portion of said vessel; and said drive means comprises extensible means mounted on said vessel and operably coupled to said diverter structure for pivoting said diverter structure about said pivot means to a desired elevation as determined by the depth of the body of water and the diameter and size of the pipe. .Iaddend..Iadd. 25. A vessel according to claim 23, wherein said aligning means are mounted on said diverter means between said straightening means and said reel. .Iaddend.
US05/944,979 1975-05-05 1978-09-22 Submarine pipeline laying vessel Expired - Lifetime USRE30846E (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US05/944,979 USRE30846E (en) 1975-05-05 1978-09-22 Submarine pipeline laying vessel

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US05/574,433 US3982402A (en) 1975-05-05 1975-05-05 Submarine pipeline laying vessel
US05/944,979 USRE30846E (en) 1975-05-05 1978-09-22 Submarine pipeline laying vessel

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US05/574,433 Reissue US3982402A (en) 1975-05-05 1975-05-05 Submarine pipeline laying vessel

Publications (1)

Publication Number Publication Date
USRE30846E true USRE30846E (en) 1982-01-12

Family

ID=27076386

Family Applications (1)

Application Number Title Priority Date Filing Date
US05/944,979 Expired - Lifetime USRE30846E (en) 1975-05-05 1978-09-22 Submarine pipeline laying vessel

Country Status (1)

Country Link
US (1) USRE30846E (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4961671A (en) * 1984-08-31 1990-10-09 Santa Fe International Corporation Method of converting a pipeline laying vessel from a pivotal ramp type to an arcuate type
EP0507572A1 (en) * 1991-04-03 1992-10-07 ADVANCED MECHANICS & ENGINEERING LTD. Reeling systems for undersea pipe
US5836719A (en) * 1994-03-16 1998-11-17 Coflexip Stena Offshore Limited Pipe laying vessel and method
US6554538B2 (en) 2001-07-03 2003-04-29 Torch Offshore, Inc. Reel type pipeline laying ship and method
US20030118409A1 (en) * 1999-11-29 2003-06-26 Lang Peter Eric De Pipe lay system with tension compensator
US6685393B1 (en) * 1999-09-08 2004-02-03 Petroleo Brasileiro S.A. Method for installing an undersea catenary riser
US6702519B2 (en) 2001-07-03 2004-03-09 Torch Offshore, Inc. Reel type pipeline laying ship and method
US20040062611A1 (en) * 2001-01-19 2004-04-01 Geir Endal Method for pipelaying from a coil to the sea bed, controlling thermal expansion
US6733208B2 (en) 2001-07-03 2004-05-11 Torch Offshore, Inc. Reel type pipeline laying ship and method
US6761505B2 (en) 2002-01-15 2004-07-13 Torch Offshore, Inc. Reel type pipeline laying ship and method
US20090129868A1 (en) * 2007-11-20 2009-05-21 Millheim Keith K Offshore Coiled Tubing Deployment Vessel
US20120061504A1 (en) * 2009-05-22 2012-03-15 Michael Powell Transporting and installing flexible pipe
US20130034389A1 (en) * 2010-01-13 2013-02-07 Saipem S.P.A. Undersea pipe-laying
US20130216315A1 (en) * 2010-10-25 2013-08-22 François-Régis Pionetti Modular device for the storage and handling of a plurality of flexible pipes
US8821069B2 (en) 2012-01-24 2014-09-02 Control Flow, Inc. Linear pipe recovery/lay tensioners and methods of using same
US20140374546A1 (en) * 2012-02-02 2014-12-25 Siemens Aktiengesellschaft Cable assembly holding apparatus
US20190226177A1 (en) * 2015-09-11 2019-07-25 Saipem S.P.A. Method and system for burying a pipeline in a bed of a body of water

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1537942A (en) * 1925-02-14 1925-05-19 Reading Chain And Block Corp Rope guide
US3405878A (en) * 1966-06-27 1968-10-15 Frank L. Lawrence Infinite ratio driving interlock for spooling drums of a yarder
US3581506A (en) * 1968-12-31 1971-06-01 Pan American Petroleum Corp Laying pipeline in deep water
US3641778A (en) * 1970-01-26 1972-02-15 Fluor Ocean Services Apparatus for diverting a pipeline
US3685306A (en) * 1970-10-29 1972-08-22 Texaco Inc Subsea pipe laying apparatus and method
US3775985A (en) * 1972-04-20 1973-12-04 Mc Dermott J & Co Inc Apparatus for laying submarine pipelines
US3822559A (en) * 1973-01-29 1974-07-09 Exxon Production Research Co Controlled yield stinger
US3872680A (en) * 1973-08-31 1975-03-25 Brown & Root Method and apparatus for laying pipelines

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1537942A (en) * 1925-02-14 1925-05-19 Reading Chain And Block Corp Rope guide
US3405878A (en) * 1966-06-27 1968-10-15 Frank L. Lawrence Infinite ratio driving interlock for spooling drums of a yarder
US3581506A (en) * 1968-12-31 1971-06-01 Pan American Petroleum Corp Laying pipeline in deep water
US3641778A (en) * 1970-01-26 1972-02-15 Fluor Ocean Services Apparatus for diverting a pipeline
US3685306A (en) * 1970-10-29 1972-08-22 Texaco Inc Subsea pipe laying apparatus and method
US3775985A (en) * 1972-04-20 1973-12-04 Mc Dermott J & Co Inc Apparatus for laying submarine pipelines
US3822559A (en) * 1973-01-29 1974-07-09 Exxon Production Research Co Controlled yield stinger
US3872680A (en) * 1973-08-31 1975-03-25 Brown & Root Method and apparatus for laying pipelines

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4961671A (en) * 1984-08-31 1990-10-09 Santa Fe International Corporation Method of converting a pipeline laying vessel from a pivotal ramp type to an arcuate type
EP0507572A1 (en) * 1991-04-03 1992-10-07 ADVANCED MECHANICS & ENGINEERING LTD. Reeling systems for undersea pipe
US5836719A (en) * 1994-03-16 1998-11-17 Coflexip Stena Offshore Limited Pipe laying vessel and method
US6685393B1 (en) * 1999-09-08 2004-02-03 Petroleo Brasileiro S.A. Method for installing an undersea catenary riser
US6761506B2 (en) * 1999-11-29 2004-07-13 Ihc Gusto Engineering B.V. Pipe lay system with tension compensator
US20030118409A1 (en) * 1999-11-29 2003-06-26 Lang Peter Eric De Pipe lay system with tension compensator
US6910830B2 (en) * 2001-01-19 2005-06-28 Statoil Asa Method for pipelaying from a coil to the sea bed, controlling thermal expansion
US20040062611A1 (en) * 2001-01-19 2004-04-01 Geir Endal Method for pipelaying from a coil to the sea bed, controlling thermal expansion
US20060188341A1 (en) * 2001-07-03 2006-08-24 Lyle Stockstill Reel type pipeline laying ship and method
US20050036842A1 (en) * 2001-07-03 2005-02-17 Lyle Stockstill Reel type pipeline laying ship and method
US6702519B2 (en) 2001-07-03 2004-03-09 Torch Offshore, Inc. Reel type pipeline laying ship and method
US7029206B2 (en) 2001-07-03 2006-04-18 Lyle Stockstill Reel type pipeline laying ship and method
US6554538B2 (en) 2001-07-03 2003-04-29 Torch Offshore, Inc. Reel type pipeline laying ship and method
US6733208B2 (en) 2001-07-03 2004-05-11 Torch Offshore, Inc. Reel type pipeline laying ship and method
US6761505B2 (en) 2002-01-15 2004-07-13 Torch Offshore, Inc. Reel type pipeline laying ship and method
US20140241809A1 (en) * 2007-11-20 2014-08-28 Keith K. Millheim Offshore Coiled Tubing Deployment Vessel
US20090129868A1 (en) * 2007-11-20 2009-05-21 Millheim Keith K Offshore Coiled Tubing Deployment Vessel
US20110188942A1 (en) * 2007-11-20 2011-08-04 Millheim Keith K Offshore Coiled Tubing Deployment Vessel
US20120301225A1 (en) * 2007-11-20 2012-11-29 Millheim Keith K Offshore Coiled Tubing Deployment Vessel
US20120061504A1 (en) * 2009-05-22 2012-03-15 Michael Powell Transporting and installing flexible pipe
US20130034389A1 (en) * 2010-01-13 2013-02-07 Saipem S.P.A. Undersea pipe-laying
US9409633B2 (en) * 2010-01-13 2016-08-09 Saipem S.P.A. Undersea pipe-laying
US9862465B2 (en) 2010-01-13 2018-01-09 Saipem S.P.A. Undersea pipe-laying
US20130216315A1 (en) * 2010-10-25 2013-08-22 François-Régis Pionetti Modular device for the storage and handling of a plurality of flexible pipes
US9556971B2 (en) * 2010-10-25 2017-01-31 Saipem S.A. Modular device for the storage and handling of a plurality of flexible pipes
US8821069B2 (en) 2012-01-24 2014-09-02 Control Flow, Inc. Linear pipe recovery/lay tensioners and methods of using same
US20140374546A1 (en) * 2012-02-02 2014-12-25 Siemens Aktiengesellschaft Cable assembly holding apparatus
US9515466B2 (en) * 2012-02-02 2016-12-06 Siemens Aktiengesellschaft Cable assembly holding apparatus
US20190226177A1 (en) * 2015-09-11 2019-07-25 Saipem S.P.A. Method and system for burying a pipeline in a bed of a body of water
US10597849B2 (en) * 2015-09-11 2020-03-24 Saipem S.P.A. Method and system for burying a pipeline in a bed of a body of water

Similar Documents

Publication Publication Date Title
US3982402A (en) Submarine pipeline laying vessel
USRE30846E (en) Submarine pipeline laying vessel
US5836719A (en) Pipe laying vessel and method
US5573353A (en) Vertical reel pipe laying vessel
US6554538B2 (en) Reel type pipeline laying ship and method
US6371694B1 (en) Vessel for laying rigid pipes at great depth
US5011333A (en) Underwater pipe laying apparatus
US4594871A (en) Reel type continuous marine pipe laying system
US5533834A (en) Pipelay stinger
US3641778A (en) Apparatus for diverting a pipeline
US5527134A (en) Pipelaying vessel
US4157023A (en) Apparatus and method for laying pipelines
US6702519B2 (en) Reel type pipeline laying ship and method
US4243345A (en) Pipe handling apparatus for reel pipe laying system
GB2287518A (en) Pipe laying vessel
US3472035A (en) Method of abandoning and recovering a pipeline during an underwater pipe laying operation
AU697153B2 (en) Improvements in or relating to marine pipelaying
AU701870B2 (en) Apparatus for handling elongate members
GB2283554A (en) Marine pipelaying
WO1998005894A1 (en) Vessel and method for laying pipes
WO2023019334A1 (en) Guiding flexible pipelines aboard installation vessels
AU2002354783A1 (en) Reel type pipeline laying ship and method
MXPA97010449A (en) Improvements regarding the placement of underwater tubing

Legal Events

Date Code Title Description
AS Assignment

Owner name: STENA OFFSHORE LIMITED, UNITED KINGDOM

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:SANTA FE INTERNATIONAL CORPORATION, A CORP. OF DE;REEL/FRAME:005748/0251

Effective date: 19891107