USH1049H - Gas generation for a missile post-boost control system - Google Patents

Gas generation for a missile post-boost control system Download PDF

Info

Publication number
USH1049H
USH1049H US07/621,105 US62110590A USH1049H US H1049 H USH1049 H US H1049H US 62110590 A US62110590 A US 62110590A US H1049 H USH1049 H US H1049H
Authority
US
United States
Prior art keywords
propellant
case
insulation
gas generator
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US07/621,105
Inventor
Farid M. Khadduri
Stanley J. Kurzeja
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to US07/621,105 priority Critical patent/USH1049H/en
Application granted granted Critical
Publication of USH1049H publication Critical patent/USH1049H/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C06EXPLOSIVES; MATCHES
    • C06BEXPLOSIVES OR THERMIC COMPOSITIONS; MANUFACTURE THEREOF; USE OF SINGLE SUBSTANCES AS EXPLOSIVES
    • C06B21/00Apparatus or methods for working-up explosives, e.g. forming, cutting, drying
    • C06B21/0083Treatment of solid structures, e.g. for coating or impregnating with a modifier
    • CCHEMISTRY; METALLURGY
    • C06EXPLOSIVES; MATCHES
    • C06BEXPLOSIVES OR THERMIC COMPOSITIONS; MANUFACTURE THEREOF; USE OF SINGLE SUBSTANCES AS EXPLOSIVES
    • C06B21/00Apparatus or methods for working-up explosives, e.g. forming, cutting, drying
    • C06B21/0033Shaping the mixture
    • C06B21/0058Shaping the mixture by casting a curable composition, e.g. of the plastisol type
    • CCHEMISTRY; METALLURGY
    • C06EXPLOSIVES; MATCHES
    • C06BEXPLOSIVES OR THERMIC COMPOSITIONS; MANUFACTURE THEREOF; USE OF SINGLE SUBSTANCES AS EXPLOSIVES
    • C06B45/00Compositions or products which are defined by structure or arrangement of component of product
    • C06B45/12Compositions or products which are defined by structure or arrangement of component of product having contiguous layers or zones
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02KJET-PROPULSION PLANTS
    • F02K9/00Rocket-engine plants, i.e. plants carrying both fuel and oxidant therefor; Control thereof
    • F02K9/08Rocket-engine plants, i.e. plants carrying both fuel and oxidant therefor; Control thereof using solid propellants
    • F02K9/32Constructional parts; Details not otherwise provided for
    • F02K9/34Casings; Combustion chambers; Liners thereof
    • F02K9/346Liners, e.g. inhibitors

Definitions

  • This invention relates to gas generators and more particularly, but without limitation thereto, to solid propellant gas generators for use in post-boost control systems of guided missiles.
  • An object of the present invention is to provide a solid propellant gas generator to withstand the severe operating conditions of a missile system.
  • Still another object of the present invention is to provide the high energy gas requirements of missile systems.
  • a further object of the present invention is to provide an efficient, reliable and cost effective gas generator design for a missile system.
  • a still further object of the present invention is to provide a solid propellant gas generator that has high gas flow, high operating pressure, high operating temperatures, long burn time duration, and which operates efficiently, reliably and with optimum safety.
  • a gas generator includes a propellant grain, inhibitor, internal insulation, case forward and aft closures, external insulation, igniters and a gas outlet assembly.
  • the general steps for manufacturing the gas generator are to fabricate the components and assemble the case including the external and internal insulation.
  • the cylindrical inhibitor is then attached to the forward closure to form a cavity into which the propellant is cast forming a sleeve around it when assembled.
  • This propellant grain assembly is then inserted into the face, and the forward closure, igniter and gas outlet assembly are then attached to the case to form a complete gas generator.
  • the propellant When the gas generator is ignited, the propellant is consumed by burning the solid material into hot gases which escape through the gas outlet assembly.
  • the propellant contains its own fuel and oxidizers to provide the necessary energy. As the propellant burns, the length and weight of the propellant grain, of course, decreases.
  • An important advantage of the present invention is to provide a lightweight, high pressure, long duration, efficient gas generator that has a removable propellant grain assembly. Moreover, all of the adverse structural and thermal environments are resolved by the gas generator design of the present invention.
  • FIG. 1 is a side elevation of the gas generator assembly of the present invention.
  • FIG. 1A is a cross-sectional view taken of the forward section along section line 1A--1A of FIG. 2.
  • FIG. 1B is a cross-sectional view taken of the aft section along section line 1B--1B of FIG. 3.
  • FIG. 2 is the forward view taken at view line 2--2 of FIG. 1.
  • FIG. 3 is the aft view taken at view line 3--3 FIG. 1.
  • FIG. 4 is a cross-sectional view taken at section line 4--4 of FIG. 1A.
  • FIG. 5 is a partial cross sectional view taken along section line 5--5 of FIG. 3.
  • FIG. 1 a side elevation view of the gas generator assembly of the present invention as indicated by reference numeral 11.
  • FIG. 2 is the forward view as taken as 2--2 of FIG. 1 and
  • FIG. 3 is the aft view taken at 3--3 of FIG. 1.
  • Generator 11 includes propellant grain 13, inhibitor 15, internal insulation 17, case 19, all of which are cylindrical in configuration. The latter three are in a concentric sleeve arrangement with the external insulation 21.
  • the forward insulation comprises three major segments.
  • the forward section is domed shaped and includes internal insulation 23, forward closure 25, and external insulation 27.
  • the aft section shown in FIGS. 1B and 3 is domed shaped and has gas outlet assembly 29 and igniter assembly 31 attached to the exterior thereof.
  • the propellant grain is made from a hydroxyl terminated polybutadriene polymer propellant with HMX solid particles used as oxidizer (HTPB/HMX) composite propellant with flame temperature of nearly 3,000° F.
  • the propellant weight is approximately 232 pounds and is cast into a cylindrical inhibitor 15 to form a cylindrical propellant grain having a length of about 29 inches and a diameter of about 13 inches.
  • the grain is an end burning design with a configured start up surface for added initial burn area and uniform flame front propagation.
  • Case 19 is made from 6Al-4V titanium alloy and is of cylindrical configuration with an integral half dome section 33, an enlarged forward section 34 and attachment lugs 35, 37, 39, and 41.
  • Forward closure 25 is made from 6Al-4V titanium alloy, has a domed configuration, thickened section 43, o-ring groove 45, retaining key groove 47 and four handling holes 49. The forward closure is removably attached to the case with a retaining key 51 and is sealed by means of a o-ring 53.
  • FIG. 4 shows the forward retention assembly including an opening 54 formed in attachment lug 37 wherein a flexible retaining key 51 is inserted therethrough and into annular retaining groove 47 to lock forward titanium closure 25 to the forward section 34 of titanium case 19. See FIG. 1A.
  • the radial interface between the exterior surface of the inhibitor 15 and the interior surface of the insulator 17 is an interference fit having no clearance. This is done to maximize propellant weight, assure mechanical integrity, and eliminate separation of the inhibitor and the propellant grain during gas generator operation. Elimination of this separation is critical to prevent propellant burn-back in the interference region between the grain surface and the inhibitor.
  • the propellant grain assembly is loaded and unloaded by cooling the grain assembly to provide necessary clearance between the inhibitor and insulator and then subjecting the assembly to normal temperature conditions where the interface achieves an interference fit.
  • gas outlet assembly 29 includes internal silica phenolic insulation sections 55, 57, 59, 61 and 63, molybdenum liners 65, 67, 69, and 71, external outlet insulation 73, titanium elbow casting 75 and columbium reducer 77.
  • This particular design allows assembly of thick insulation sections 55-63 which permits a long burn time of hot high pressure gases.
  • FIG. 5 shows igniter assembly 31 which is attached to the aft dome section 33 of the case.
  • the igniter assembly contains a propellant which generates hot gases that are emitted through gas diffuser 83 that extends into air gap 85 between the aft end of the propellant and the insulator 17. These hot gases ignite the propellant which discharges its gases through gas outlet assembly 29.
  • the constituents and process of the propellant to inhibitor bonding system of the present invention are as follows:
  • the above described inhibitor and forward closure assembly (which contains insulation 23) are assembled and placed into casting tooling.
  • the inhibitor 15 and interior insulation 23 are made of the same material and generally comprise an ethylene propylene, diene monomer (EPDM/neoprene rubber binders containing silica powder and aramid fibers.)
  • EPDM/neoprene rubber binders containing silica powder and aramid fibers The specific chemical composition is set forth in Tables I and II as follows:
  • the initial batch includes mixing the binders, antioxidants, processing aids and catalyst.
  • a Banbury mixer is used for approximately 8 to 10 minutes (10 minutes optimum).
  • the fiber filler is then mixed with the step (1) constituents.
  • a Banbury mixer is used for three submixes each for approximately one minute.
  • step (b) The curative is then mixed with the step (a) constituents.
  • a Banbury mixer is used for approximately one minute to form a slab about 4 inches thick, one foot wide and from one to two feet long.
  • step (c) The mixed slab of step (b) is then calendered to about 0.1 inch thick.
  • step (d) The calendered material of step (c) is then remixed in a Banbury mixer for about one minute to form a mixed slabs as defined in step (b).
  • step (e) The mixed slab of step (d) is then calendered to about an 0.1 inch thick sleet having an approximate 4 foot width.
  • a thin plastic cover sheet is applied to one surface of the step (6) uncured insulation sheet and rolled for subsequent use.
  • step (h) The uncured insulation of step (g) is then cured by subjecting it to elevated temperatures wherein the time and temperature is dependent upon the total thickness of uncured insulation.
  • the inhibitor sleeve has a nominal thickness of about 150 mils, a length of about 30 inches and a diameter of about 13 inches.
  • barrier coat is then brush applied to the interior surface of the cleaned cavity.
  • the barrier coat is an epoxy resin with amine curing agent, such as Scotchcast-8TM (made by The Minnesota Mining and Manufacturing Co.).
  • the barrier coat is brush applied to a nominal weight of about 0.35 pounds or about 3-4 mils thickness.
  • the barrier coat is then cured wherein the cure time and temperature is 24 hours minimum at 60° to 90° F. plus 1 hour minimum at 170° ⁇ 5° F.
  • a liner is then brush coated onto the cured interior surface of the barrier coat.
  • the inhibitor sleeve and forward closure are preheated to 170° F. for 2 to 6 hours prior to liner application.
  • the liner is applied in two brush coats and has a final nominal weight of about 0.25 pounds or 2-3 mils. thickness.
  • the chemical composition of the liner is carbon black, isophorone diisocyanate liquid, polybutadiene liquid hydroxyl terminated (type II), and ferric acetylacetonate.
  • the mixing process of the uncured liner material is as follows:
  • the liner is then cured for a total time of 72 to 96 hours at a temperature of 170° F. ⁇ 5° F. If propellant casting operations are not to begin immediately purge with nitrogen and seal.
  • the lined assembly may be stored up to 2 weeks maximum before casting at 60° to 90° F.
  • the propellant is manufactured and then cast into the lined cavity.
  • the propellant materials are HMX Class I, carbon black, isophorone diisocyanate, and polybutadiene liquid hydroxyl terminated (type II).
  • the mixing process of the uncured propellant begins by adding the polybutadiene liquid hydroxyl terminated (type II) and the carbon black to mixer.
  • the carbon black shall be added within 4 hours maximum of removal from "in use” storage. Blend the ingredients for 5 minutes at atmospheric pressure and then under vacuum for 15 minutes at a minimum vacuum of 28 inches of mercury. The vacuum shall be broken with nitrogen.
  • While mixing add ground Class 1 HMX utilizing a vibrating feeder. This mixing shall be for a minimum of 40 minutes at atmospheric pressure.
  • Add the unground Class 1 HMX utilizing a vibrating feeder This mixing shall be for a minimum of 45 minutes at atmospheric pressure followed by blending for a minimum of 1 hour at a minimum vacuum of 28 inches mercury. Vacuum shall be broken with nitrogen.
  • the casting process of the uncured propellant begins by preheating the casting hardware assembly 2 to 6 hours at 170° ⁇ 100° F. prior to casting if not already hot from the liner cure.
  • the hopper is loaded with propellant and replenished as necessary during casting.
  • the hopper water jacket temperature is maintained at 140° ⁇ 10° F. and relative humidity is maintained at 30 to 60% during casting.
  • the inhibitor sleeve/closure assembly is evacuated to a pressure of not less than 5 mm of mercury. Close off vacuum line to inside of inhibitor sleeve, but maintain vacuum on outside of inhibitor sleeve to prevent sleeve from collapsing during casting. Open hopper valve to allow propellant to flow into inhibitor sleeve, allowing pressure in the sleeve to be not more than 20 mm of mercury until the propellant level is approximately 1 inch from bottom of casting tooling "clamp" ring, discontinue breaking vacuum and add propellant to obtain correct height of maximum of 2 inches from bottom of "clamp” ring. Close hopper valve and break vacuum. Remove casting hopper and measure propellant level. If insufficient propellant, replace casting hopper, evacuate the sleeve to a pressure of not more than 120 mm of mercury and cast additional propellant. Release vacuum on inside of sleeve first, then release vacuum on outside of sleeve.
  • the propellant is then cured, thereby bonding the propellant to liner inhibitor 15, by sealing the end of the casting cylinder and applying nitrogen gas at a pressure of 40 ⁇ 5 psig for the first 60 hours minimum of cure.
  • the propellant shall be cured for a total time of 140 to 164 hours at 170° F. ⁇ 5° F. Total deviations from propellant cure temperature totaling one hour are permitted provided that the excursion temperatures are greater then 40° F. and less than 200° F. Total deviations in excess of one hour and less than 12 hours are permitted provided the excursion temperatures are less than 130° F. and greater than 90° F.
  • the total propellant cure time is to be extended by the total time of propellant cure temperature excursion below 165° F.
  • the titanium case (6AL-4V) is sandblasted with a 180 grit aluminum oxide abrasive to a surface roughness not to exceed 125 microinches.
  • Chemlok 205TM rubber to metal adhesive primer made by Lord Chemical Products
  • brush application and having a nominal thickness of 1-2 mils.
  • Chemlok 205TM is a chlorinated resin and phenolic blend in 79% solvent with 5% titanium oxide and 1% zinc oxide.
  • the corrosion resistant coating is then air dried at ambient temperature and atmosphere for at least 60 minutes.
  • Chemlok 252TM is a chlorinated resin with EPDM rubber curing agent.
  • Chemlok 252TM adhesive coating is then air dried at ambient temperature and atmosphere for at least 60 minutes.
  • Uncured insulation material is then laid up against the interior surface of the air dried adhesive coating. Several layers are used until the desired insulation characteristics (defined by thickness or weight) are achieved. Each layer adheres to the next since the uncured material is tacky. Between each layer a vacuum bag is inserted and a vacuum is pulled between the bag and the insulation material to attach adjacent layers of material.
  • the insulation material preferable has plastic backing for storage and handling purposes.
  • Pattern sizes are nominal in inches as follows:
  • the grain direction of the insulation material shall run axially with the motor case.
  • step 18 After the completion of step 18 the interior surface is machined to final dimensions for receiving the propellant grain assembly.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Insulating Bodies (AREA)

Abstract

A gas generator for a missile includes a propellant grain, inhibitor, internal insulation, case forward and aft closures, external insulation, igniters and a gas outlet assembly. The general steps for manufacturing the gas generator are to fabricate the components and assemble the case including the external and internal insulation. The cylindrical inhibitor is then attached to the forward closure to form a cavity into which the propellant is cast forming a sleeve around it when assembled. This propellant grain assembly is then inserted into the case, and the forward closure, igniter and gas outlet assembly are then attached to the case to form a complete gas generator. When the gas generator is ignited, the propellant is consumed by burning the solid material into hot gases which escape through the gas outlet assembly. The propellant contains its own fuel and oxidizers to provide the necessary energy.

Description

FIELD OF THE INVENTION
This invention relates to gas generators and more particularly, but without limitation thereto, to solid propellant gas generators for use in post-boost control systems of guided missiles.
BACKGROUND OF THE INVENTION
Because of increased performance requirements relating to missile systems and the gas generators used for propulsion energy requirements there is a continuing search for new techniques for generating large masses of gas at high pressure. These gas generators are used in missile post-boost control systems, for example, to provide gas energy to the control system thrust nozzles for forward, reverse, pitch, yaw and roll control. Prior techniques have not provided the high performance required for advanced weapon systems that must undergo severe operating environments and have requirements for longer periods of high pressure gases and at minimum weight. These and other requirements have been accomplished by the gas generator design of the present invention.
OBJECTIVES OF THE INVENTION
An object of the present invention is to provide a solid propellant gas generator to withstand the severe operating conditions of a missile system.
Still another object of the present invention is to provide the high energy gas requirements of missile systems.
A further object of the present invention is to provide an efficient, reliable and cost effective gas generator design for a missile system.
A still further object of the present invention is to provide a solid propellant gas generator that has high gas flow, high operating pressure, high operating temperatures, long burn time duration, and which operates efficiently, reliably and with optimum safety.
SUMMARY OF THE INVENTION
These objects of the invention and other objects, features and advantages to become apparent as the specification progresses are accomplished by the invention according to which, briefly stated, a gas generator includes a propellant grain, inhibitor, internal insulation, case forward and aft closures, external insulation, igniters and a gas outlet assembly. The general steps for manufacturing the gas generator are to fabricate the components and assemble the case including the external and internal insulation. The cylindrical inhibitor is then attached to the forward closure to form a cavity into which the propellant is cast forming a sleeve around it when assembled. This propellant grain assembly is then inserted into the face, and the forward closure, igniter and gas outlet assembly are then attached to the case to form a complete gas generator. When the gas generator is ignited, the propellant is consumed by burning the solid material into hot gases which escape through the gas outlet assembly. The propellant contains its own fuel and oxidizers to provide the necessary energy. As the propellant burns, the length and weight of the propellant grain, of course, decreases.
LIST OF ADVANTAGES OF THE INVENTION
An important advantage of the present invention is to provide a lightweight, high pressure, long duration, efficient gas generator that has a removable propellant grain assembly. Moreover, all of the adverse structural and thermal environments are resolved by the gas generator design of the present invention.
These and further objectives, constructional and operational characteristics, and advantages of the invention will no doubt be more evident to those skilled in the art from the detailed description given hereinafter with reference to the figures of the accompanying drawings which illustrate a preferred embodiment by way of non-limiting example.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a side elevation of the gas generator assembly of the present invention.
FIG. 1A is a cross-sectional view taken of the forward section along section line 1A--1A of FIG. 2.
FIG. 1B is a cross-sectional view taken of the aft section along section line 1B--1B of FIG. 3.
FIG. 2 is the forward view taken at view line 2--2 of FIG. 1.
FIG. 3 is the aft view taken at view line 3--3 FIG. 1.
FIG. 4 is a cross-sectional view taken at section line 4--4 of FIG. 1A.
FIG. 5 is a partial cross sectional view taken along section line 5--5 of FIG. 3.
GLOSSARY
The following is a glossary of elements and structural members as referenced and employed in the present invention.
______________________________________                                    
11          gas generator                                                 
13          propellant grain                                              
15          inhibitor                                                     
17          internal insulation                                           
19          case                                                          
21          external insulation                                           
23          internal insulation                                           
25          forward closure                                               
27          external insulation                                           
29          gas outlet assembly                                           
31          igniter assembly                                              
33          aft dome section                                              
34          thickened forward section of case 19                          
35, 37, 39, 41                                                            
            attachment lugs                                               
43          thickened section of forward enclosure 25                     
45          o-ring groove                                                 
47          annular retaining key groove                                  
49          handling holes                                                
51          retaining key                                                 
53          o-    ring                                                            
55, 57, 59, 61, 63                                                        
            silica    phenolic insulation section                               
65, 67, 69, 71                                                            
            molybdenum liners                                             
73          external outlet insulation                                    
75          titanium elbow casting                                        
77          columbium reducer                                             
83          gas diffuser for igniter 31                                   
85          air gap                                                       
______________________________________                                    
DESCRIPTION OF THE PREFERRED EMBODIMENTS
Referring now to the drawings wherein like reference numerals are used to designate like or corresponding parts throughout the various figures thereof, there is shown in FIG. 1 a side elevation view of the gas generator assembly of the present invention as indicated by reference numeral 11. FIG. 2 is the forward view as taken as 2--2 of FIG. 1 and FIG. 3 is the aft view taken at 3--3 of FIG. 1.
Generator 11 includes propellant grain 13, inhibitor 15, internal insulation 17, case 19, all of which are cylindrical in configuration. The latter three are in a concentric sleeve arrangement with the external insulation 21. The forward insulation comprises three major segments. The forward section is domed shaped and includes internal insulation 23, forward closure 25, and external insulation 27. The aft section shown in FIGS. 1B and 3 is domed shaped and has gas outlet assembly 29 and igniter assembly 31 attached to the exterior thereof.
The propellant grain is made from a hydroxyl terminated polybutadriene polymer propellant with HMX solid particles used as oxidizer (HTPB/HMX) composite propellant with flame temperature of nearly 3,000° F. The propellant weight is approximately 232 pounds and is cast into a cylindrical inhibitor 15 to form a cylindrical propellant grain having a length of about 29 inches and a diameter of about 13 inches. The grain is an end burning design with a configured start up surface for added initial burn area and uniform flame front propagation.
Case 19 is made from 6Al-4V titanium alloy and is of cylindrical configuration with an integral half dome section 33, an enlarged forward section 34 and attachment lugs 35, 37, 39, and 41. Forward closure 25 is made from 6Al-4V titanium alloy, has a domed configuration, thickened section 43, o-ring groove 45, retaining key groove 47 and four handling holes 49. The forward closure is removably attached to the case with a retaining key 51 and is sealed by means of a o-ring 53. FIG. 4 shows the forward retention assembly including an opening 54 formed in attachment lug 37 wherein a flexible retaining key 51 is inserted therethrough and into annular retaining groove 47 to lock forward titanium closure 25 to the forward section 34 of titanium case 19. See FIG. 1A.
The radial interface between the exterior surface of the inhibitor 15 and the interior surface of the insulator 17 is an interference fit having no clearance. This is done to maximize propellant weight, assure mechanical integrity, and eliminate separation of the inhibitor and the propellant grain during gas generator operation. Elimination of this separation is critical to prevent propellant burn-back in the interference region between the grain surface and the inhibitor. The propellant grain assembly is loaded and unloaded by cooling the grain assembly to provide necessary clearance between the inhibitor and insulator and then subjecting the assembly to normal temperature conditions where the interface achieves an interference fit.
As shown in FIG. 1B, gas outlet assembly 29 includes internal silica phenolic insulation sections 55, 57, 59, 61 and 63, molybdenum liners 65, 67, 69, and 71, external outlet insulation 73, titanium elbow casting 75 and columbium reducer 77. This particular design allows assembly of thick insulation sections 55-63 which permits a long burn time of hot high pressure gases.
FIG. 5 shows igniter assembly 31 which is attached to the aft dome section 33 of the case. The igniter assembly contains a propellant which generates hot gases that are emitted through gas diffuser 83 that extends into air gap 85 between the aft end of the propellant and the insulator 17. These hot gases ignite the propellant which discharges its gases through gas outlet assembly 29.
The constituents and process of the propellant to inhibitor bonding system of the present invention are as follows:
(1) The above described inhibitor and forward closure assembly (which contains insulation 23) are assembled and placed into casting tooling. The inhibitor 15 and interior insulation 23 are made of the same material and generally comprise an ethylene propylene, diene monomer (EPDM/neoprene rubber binders containing silica powder and aramid fibers.) The specific chemical composition is set forth in Tables I and II as follows:
                                  TABLE I                                 
__________________________________________________________________________
(Chemical Composition)                                                    
                        By Weight                                         
                        Composition in Parts per 100                      
                        Parts of Rubber Binder (PHR)                      
Function                                                                  
        Ingredient      Minimum                                           
                             Maximum                                      
                                   Nominal                                
__________________________________________________________________________
Binder  EPDM Elastomer  79.0 81.0  80.0                                   
        2 Chlorobutadiene                                                 
                        19.0 21.0  20.0                                   
        1,3 Elastomer                                                     
Filler  Silica Hydrate  29.0 31.0  30.0                                   
Antioxidants                                                              
        Polymerized Trimethyl                                             
                        1.9  2.1   2.0                                    
        Dihydroquinoline                                                  
        Alkylated Diphenylamines and                                      
                        0.9  1.1   1.0                                    
        Diphenyl-P-Phenylendiamene                                        
Curing Agent                                                              
        40% a,a' Bis (Tert-Butylperoxy)                                   
                        5.5  5.7   5.6                                    
        Diisopropylbenzene                                                
Processing Aids                                                           
        Napthenic Process Oil                                             
                        4.9  5.1   5.0                                    
        Synthetic Polyterpene Resin                                       
                        4.9  5.1   5.0                                    
Fiber   Aramid Fiber (.25 inch)                                           
                        27.0 29.0  28.0                                   
Activator                                                                 
        Zinc Oxide, Technical                                             
                        4.9  5.1   5.0                                    
__________________________________________________________________________
                                  TABLE II                                
__________________________________________________________________________
(Functional Description of Ingredients)                                   
Ingredient      Description                                               
__________________________________________________________________________
EPDM Elastomer  EPDM elastomer; binder also adds chemical                 
                bond sites                                                
2  Chlorobutadiene  1,3 Elastomer                                           
                Choroprene elastomer added to improve                     
                processing and bonding                                    
Silica Hydrate  Mineral filler to improve thermal                         
                properties (mixing and packing)                           
Polymerized Trimethylquinoline                                            
                Polymerized trimethylquinoline antioxidant                
                prevents aging degradation of the polymer                 
                chain                                                     
Alkylated Diphenylamines and                                              
                Diphenylamine; antioxidant used in combination            
Diphenyl-p-Phenylendiamine                                                
                with above for high temperature storage                   
                conditions                                                
40% a,a' Bis (Tert-Butylperoxy),                                          
                40% active peroxide supported on Burgess                  
Diisopropylbenzene (curative)                                             
                KE clay; curative for both polymers also                  
                provides aging stability as compared to                   
                Sulfur, for example.                                      
Napthenic Process Oil                                                     
                Lubricating oil; improve mixing                           
Synthetic Polyterpene Resin                                               
                Tackifier added to improve green tack                     
                (adhesion between uncured layers)                         
Aramid Fiber (.25 inch)                                                   
                Aramid fiber reinforcement; improved char                 
                retention and thermal properties                          
Zinc Oxide      Activator for curing agent                                
__________________________________________________________________________
The following are the process steps used to prepare the uncured thermal insulation and inhibitor composition.
(1) The initial batch includes mixing the binders, antioxidants, processing aids and catalyst. A Banbury mixer is used for approximately 8 to 10 minutes (10 minutes optimum).
(a) The fiber filler is then mixed with the step (1) constituents. A Banbury mixer is used for three submixes each for approximately one minute.
(b) The curative is then mixed with the step (a) constituents. A Banbury mixer is used for approximately one minute to form a slab about 4 inches thick, one foot wide and from one to two feet long.
(c) The mixed slab of step (b) is then calendered to about 0.1 inch thick.
(d) The calendered material of step (c) is then remixed in a Banbury mixer for about one minute to form a mixed slabs as defined in step (b).
(e) The mixed slab of step (d) is then calendered to about an 0.1 inch thick sleet having an approximate 4 foot width.
(f) A thin plastic cover sheet is applied to one surface of the step (6) uncured insulation sheet and rolled for subsequent use.
(g) When used; the uncured insulation is cut to proper configuration; the configured insulation is laid up and the plastic sheet is removed. If additional insulation thickness is required another piece of uncured insulation is cut to proper configuration and laid up against the first uncured insulation sheet and the plastic sheet is removed. The first and second sheets are tacky and are pressed together to form contiguous insulation sheets. The process is repeated until the total desired uncured insulation thickness is achieved.
(h) The uncured insulation of step (g) is then cured by subjecting it to elevated temperatures wherein the time and temperature is dependent upon the total thickness of uncured insulation. The inhibitor sleeve has a nominal thickness of about 150 mils, a length of about 30 inches and a diameter of about 13 inches.
(2) The inner surface of the cavity formed by inhibitor sleeve 15 and insulator 23 is cleaned with a methyl ethyl ketone (MEK) dampened lint free cloth and is then dried for at least 60 minutes.
(3) A barrier coat is then brush applied to the interior surface of the cleaned cavity. The barrier coat is an epoxy resin with amine curing agent, such as Scotchcast-8™ (made by The Minnesota Mining and Manufacturing Co.). The barrier coat is brush applied to a nominal weight of about 0.35 pounds or about 3-4 mils thickness.
(4) The barrier coat is then cured wherein the cure time and temperature is 24 hours minimum at 60° to 90° F. plus 1 hour minimum at 170°±5° F.
(5) A liner is then brush coated onto the cured interior surface of the barrier coat. The inhibitor sleeve and forward closure are preheated to 170° F. for 2 to 6 hours prior to liner application. The liner is applied in two brush coats and has a final nominal weight of about 0.25 pounds or 2-3 mils. thickness. The chemical composition of the liner is carbon black, isophorone diisocyanate liquid, polybutadiene liquid hydroxyl terminated (type II), and ferric acetylacetonate. The mixing process of the uncured liner material is as follows:
(a) Add polybutadiene liquid hydroxyl terminated (type II) and ferric acetylacetonate to mixer and blend 1 hour minimum at low speed with mix temperature 160°±10° F. Cool to 90°±10° F. before further processing.
(b) Add isophorone diisocyanate and blend 10 minutes minimum at low speed.
(c) Screen carbon black through a 100 mesh screen using Ro-Tap with approximately 5 mm diameter glass beads. Add approximately 1/3 of the carbon black to mix and blend for 10 minutes minimum at low mixer speed. Repeat mixing step for each of the two remaining portions of carbon black.
(d) When all ingredients have been added and mixed, run mixer at low speed for 60 minutes minimum under vacuum of 25 inches of mercury minimum. Mix temperature shall not exceed 90° F. Break vacuum with nitrogen or argon.
(e) Clean storage cans and lids with solvent and allow to air dry. Transfer mix to 1 quart cans, or 1 pint cans. Purge cans with nitrogen or argon before filling. After filling, flush with nitrogen or argon before installing lids.
(f) Store in deep freeze at 0°±10° F.
(6) The liner is then cured for a total time of 72 to 96 hours at a temperature of 170° F.±5° F. If propellant casting operations are not to begin immediately purge with nitrogen and seal. The lined assembly may be stored up to 2 weeks maximum before casting at 60° to 90° F.
(7) The propellant is manufactured and then cast into the lined cavity. The propellant materials are HMX Class I, carbon black, isophorone diisocyanate, and polybutadiene liquid hydroxyl terminated (type II).
(a) The mixing process of the uncured propellant begins by adding the polybutadiene liquid hydroxyl terminated (type II) and the carbon black to mixer. The carbon black shall be added within 4 hours maximum of removal from "in use" storage. Blend the ingredients for 5 minutes at atmospheric pressure and then under vacuum for 15 minutes at a minimum vacuum of 28 inches of mercury. The vacuum shall be broken with nitrogen. While mixing, add ground Class 1 HMX utilizing a vibrating feeder. This mixing shall be for a minimum of 40 minutes at atmospheric pressure. While mixing, add the unground Class 1 HMX utilizing a vibrating feeder. This mixing shall be for a minimum of 45 minutes at atmospheric pressure followed by blending for a minimum of 1 hour at a minimum vacuum of 28 inches mercury. Vacuum shall be broken with nitrogen.
(b) Removed sample for moisture analysis and total solids test.
(c) Add IPDI, mix 10 to 12 minutes, at atmospheric pressure. Blend under vacuum at a minimum vacuum of 28 inches of mercury for 90 minutes. During the final mixing, the mixer shall be run at its slowest speed and the water jacket temperature adjusted to yield a final mix temperature of 140°±5° F. Break vacuum with nitrogen. The propellant shall be cast within 10 hours maximum upon completion of mixing.
(d) The casting process of the uncured propellant begins by preheating the casting hardware assembly 2 to 6 hours at 170°±100° F. prior to casting if not already hot from the liner cure.
(e) The hopper is loaded with propellant and replenished as necessary during casting. The hopper water jacket temperature is maintained at 140°±10° F. and relative humidity is maintained at 30 to 60% during casting.
(f) The inhibitor sleeve/closure assembly is evacuated to a pressure of not less than 5 mm of mercury. Close off vacuum line to inside of inhibitor sleeve, but maintain vacuum on outside of inhibitor sleeve to prevent sleeve from collapsing during casting. Open hopper valve to allow propellant to flow into inhibitor sleeve, allowing pressure in the sleeve to be not more than 20 mm of mercury until the propellant level is approximately 1 inch from bottom of casting tooling "clamp" ring, discontinue breaking vacuum and add propellant to obtain correct height of maximum of 2 inches from bottom of "clamp" ring. Close hopper valve and break vacuum. Remove casting hopper and measure propellant level. If insufficient propellant, replace casting hopper, evacuate the sleeve to a pressure of not more than 120 mm of mercury and cast additional propellant. Release vacuum on inside of sleeve first, then release vacuum on outside of sleeve.
(g) The propellant is then cured, thereby bonding the propellant to liner inhibitor 15, by sealing the end of the casting cylinder and applying nitrogen gas at a pressure of 40±5 psig for the first 60 hours minimum of cure. The propellant shall be cured for a total time of 140 to 164 hours at 170° F.±5° F. Total deviations from propellant cure temperature totaling one hour are permitted provided that the excursion temperatures are greater then 40° F. and less than 200° F. Total deviations in excess of one hour and less than 12 hours are permitted provided the excursion temperatures are less than 130° F. and greater than 90° F. The total propellant cure time is to be extended by the total time of propellant cure temperature excursion below 165° F.
(h) The nitrogen gas is released and the grain assembly allowed to cool 1 hour minimum after cure.
After the above described manufacturing and curing process the assembly is then machined as previously described and as shown in the FIG. 4.
Because of the severe temperature, time, pressure and load conditions put on a gas generator of the type described it is critical that the metal case to non-metal bonding system be effective under adverse conditions. The present invention provides such a bonding system the details of which are as follows:
(1) The titanium case (6AL-4V) is sandblasted with a 180 grit aluminum oxide abrasive to a surface roughness not to exceed 125 microinches.
(2) The interior sandblasted surface is then cleaned by using a lint free cloth dampened in methyl ethyl ketone (MEK) solvent.
(3) A corrosion resistant coating is then applied such as Chemlok 205™ (rubber to metal adhesive primer made by Lord Chemical Products) by brush application and having a nominal thickness of 1-2 mils. Chemlok 205™, for example, is a chlorinated resin and phenolic blend in 79% solvent with 5% titanium oxide and 1% zinc oxide.
(4) The corrosion resistant coating is then air dried at ambient temperature and atmosphere for at least 60 minutes.
(5) A metal to rubber adhesive coating is then applied using an adhesive such as Chemlok 252™ by brush application and leaving a nominal thickness of 1-2 mils. Chemlok 252™, for example, is a chlorinated resin with EPDM rubber curing agent.
(6) The Chemlok 252™ adhesive coating is then air dried at ambient temperature and atmosphere for at least 60 minutes.
(7) Uncured insulation material is then laid up against the interior surface of the air dried adhesive coating. Several layers are used until the desired insulation characteristics (defined by thickness or weight) are achieved. Each layer adheres to the next since the uncured material is tacky. Between each layer a vacuum bag is inserted and a vacuum is pulled between the bag and the insulation material to attach adjacent layers of material. The insulation material preferable has plastic backing for storage and handling purposes.
A specific example of the lay-up process for the sheets of uncured insulation is as follows:
1. For the metal aft dome insulation cut five patterns, four patterns of approximately 0.100 inch thick and 1 additional pattern (thickness as required of insulating material). Pattern sizes are nominal in inches as follows:
              TABLE III                                                   
______________________________________                                    
Pattern OD (in.)     ID (in.) Thickness (in.)                             
______________________________________                                    
1       14.60        2.670    .100                                        
2       14.60        2.425    .100                                        
3       14.70        2.290    .100                                        
4       14.75        2.155    .100                                        
5       14.80        2.030    As required                                 
______________________________________                                    
2. For the metal case insulation cut five patterns of approximately 0.100 inch thick insulating material. Pattern sizes are nominal in inches as follows:
              TABLE IV                                                    
______________________________________                                    
                 Length (in.)                                             
Pattern    Width (in.) Bottom    Top                                      
______________________________________                                    
1          26 13/16    451/4     451/2                                    
2          26          45        44 11/16                                 
4          251/2       431/4     433/4                                    
5           61/2       421/4     421/2                                    
______________________________________                                    
The grain direction of the insulation material shall run axially with the motor case.
3. Lay dome patterns on table and clean top side with MEK and allow to air dry 10 minutes minimum.
4. Place patterns 1 and 2 clean sides mating into a dome preform fixture. Leave plastic backing on the outsides.
5. Place patterns 3 and 4 in similar condition. Remove plastic backing from outside of pattern 4 and clean with MEK. Allow to air dry 10 minutes minimum. Place pattern 5, clean, unprotected side on pattern 4. Leave plastic backing on outsides of patterns 3 and 5. Place patterns into a dome preform fixture.
6. Place mold assembly into a press and pressurize to 5-8 tons for 5-8 minutes minimum. Allow insulating material to stay in mold until needed.
7. Remove dome insulation from fixture. Remove the plastic backing and clean with MEK. Allow to air dry 10 minutes minimum.
8. Place pattern into the case first, locating the edge the distance from case retaining key groove. Smooth the pattern against the inside of case. Wipe the pattern surface with MEK and allow to air dry 10 minutes minimum. Filter circulating air is to be used for approximately 2 minutes.
9. Install conventional cure ring in case. Install an oven film bag and fasten to cure ring with vacuum sealer or equivalent. Attach vacuum lines to fittings on cure ring and elbow connector and pull vacuum (24 inch Hg) for 10 minutes minimum.
10. Remove cure ring, oven film bag and vacuum lines. Cure ring may be left in place.
11. Install two ply dome insulation piece into case. Align insulation hole with entrance to outlet.
12. Pull vacuum per Steps 9 and 10.
13. Install remaining dome insulation piece into case per steps 11 and 12.
14. Install remaining patterns individually per steps 9 and 10.
15. Using new O-rings, install case cure ring into end of case and install conventional retaining key cure plug. Place teflon glass fabric on dome and side wall full length. Install cure bag into gas generator case. Secure cure bag to cure ring with rubber strip and hose clamp. Remove gas generator case assembly from handling fixture and place on cart and secure. Install ortman key plug and apply vacuum sealer or equivalent to all sealing areas of case.
16. Pull vacuum of 24 inches Hg for 30 minutes minimum. Ensure that cure bag has all the wrinkles out, is seated correctly and there are no leaks. This step may be performed after installation into an autoclave but prior to the start of the heating of the autoclave.
17. Move case to the autoclave. Place gas generator case on cure cart and install in autoclave.
18. The insulation, adhesive and casing are now cured which results in a bonding between the case and insulation. A specific example of the autoclave curing process is as follows:
(a) Attach vacuum line from pump to vacuum fitting on case outlet.
(b) With assembly under a vacuum of 24 inches of mercury minimum, start heating autoclave to 160° F.±10° F. and maintain for 2.0-3.0 hours at temperature.
(c) Start air compressor and pressurize assembly to 125-145 psig and increase the temperature to 195° F.±10° F. Maintain temperature and pressure for 1.5-2.0 hours.
(d) Increase autoclave temperature to 325° F.±10° F. and maintain for 3.5-4.0 hours. NOTE: Any deviation from the required temperature tolerance of 10° F. or less for a total of 15 minutes or less will be acceptable as long as the actual cure time to the required temperature is within the required cure time tolerance except when the temperature deviates above the temperature requirement.
(e) Maintain 125-145 psig until autoclave temperature reaches 150° F. This cool down period shall not be less than 30 minutes.
(f) Release pressure, remove assembly from autoclave and allow to cool to ambient.
(g) Remove all fittings, cure bag, and glass fabric from gas generator case. Clean case as necessary using MEK.
19. After the completion of step 18 the interior surface is machined to final dimensions for receiving the propellant grain assembly.
This invention has been described in detail with particular reference to a certain preferred embodiment, but it will be understood that variations and modifications can be effected within the spirit and scope of the invention. This invention is not limited to the preferred embodiment and alternatives heretofore described, to which variations and improvements may be made, without departing from the scope of protection of the present patent and true spirit of the invention, the characteristics of which are summarized in the following claims.

Claims (2)

What is claimed is:
1. A gas generator comprising:
a cylindrical chamber, said chamber having a domed forward section, a domed aft section, said aft section having a centrally located aft round oriface;
a cylindrical propellant grain having one end abutting said forward section and the opposite end spaced from said aft section;
an outlet assembly connected to said aft section and communicating with said aft opening; and
said cylindrical chamber including a cylindrical case, said aft section being integral with said case, said case and aft section being formed of titanium.
2. The gas generator of claim 1 wherein said outlet assembly includes a plurality of thick insulation sections that are inserted into the outlet assembly to permit long burn time of hot, high pressure gases.
US07/621,105 1990-11-30 1990-11-30 Gas generation for a missile post-boost control system Abandoned USH1049H (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US07/621,105 USH1049H (en) 1990-11-30 1990-11-30 Gas generation for a missile post-boost control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US07/621,105 USH1049H (en) 1990-11-30 1990-11-30 Gas generation for a missile post-boost control system

Publications (1)

Publication Number Publication Date
USH1049H true USH1049H (en) 1992-05-05

Family

ID=24488743

Family Applications (1)

Application Number Title Priority Date Filing Date
US07/621,105 Abandoned USH1049H (en) 1990-11-30 1990-11-30 Gas generation for a missile post-boost control system

Country Status (1)

Country Link
US (1) USH1049H (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5872325A (en) * 1996-01-24 1999-02-16 Buck Werke Gmbh & Co. Ammunition casing of composite fiber material
US20050115439A1 (en) * 2003-12-02 2005-06-02 Abel Stephen G. Multiple pulse segmented gas generator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2998704A (en) 1956-08-13 1961-09-05 Phillips Petroleum Co Ignition of solid rocket propellants
US3001498A (en) 1960-05-17 1961-09-26 Raymond E Karp Torpedo intermediate section
US3054258A (en) 1957-10-28 1962-09-18 Standard Oil Co Temperature rise retardation of surfaces exposed to heat
US3291397A (en) 1963-02-11 1966-12-13 Gen Motors Corp Rocket nozzle liner ring mounting
US4116131A (en) 1970-05-13 1978-09-26 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Solid propellant motor
US4137289A (en) 1977-06-21 1979-01-30 General Binding Corporation Method of making a spiral binder
US4766726A (en) 1985-12-27 1988-08-30 Morton Thiokol, Inc. Segmented case rocket motor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2998704A (en) 1956-08-13 1961-09-05 Phillips Petroleum Co Ignition of solid rocket propellants
US3054258A (en) 1957-10-28 1962-09-18 Standard Oil Co Temperature rise retardation of surfaces exposed to heat
US3001498A (en) 1960-05-17 1961-09-26 Raymond E Karp Torpedo intermediate section
US3291397A (en) 1963-02-11 1966-12-13 Gen Motors Corp Rocket nozzle liner ring mounting
US4116131A (en) 1970-05-13 1978-09-26 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Solid propellant motor
US4137289A (en) 1977-06-21 1979-01-30 General Binding Corporation Method of making a spiral binder
US4766726A (en) 1985-12-27 1988-08-30 Morton Thiokol, Inc. Segmented case rocket motor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5872325A (en) * 1996-01-24 1999-02-16 Buck Werke Gmbh & Co. Ammunition casing of composite fiber material
US20050115439A1 (en) * 2003-12-02 2005-06-02 Abel Stephen G. Multiple pulse segmented gas generator

Similar Documents

Publication Publication Date Title
US10724478B2 (en) Insulation materials comprising fibers having a partially cured polymer coating thereon, structures including such insulation materials, and methods of insulating such structures
US6554936B1 (en) Method of constructing insulated metal dome structure for a rocket motor
US4738202A (en) Cartridge case and cartridge arrangement and method
US2988877A (en) Solid propellant rocket motor
US6904755B2 (en) Rocket motor nozzle assemblies having vacuum plasma-sprayed refractory metal shell throat inserts, methods of making, and rocket motors including same
US3009385A (en) Method of loading a rocket motor with solid propellant
EP3643603B1 (en) Fireproof pressure relief assembly
US4501841A (en) Elastomeric insulating materials for rocket motors
US3010355A (en) Method for making a rocket motor
US5101731A (en) Propellant grain assembly for a gas generator
USH1049H (en) Gas generation for a missile post-boost control system
GB2244782A (en) Fireproof sealing system for bolted flanges
US5762746A (en) Method of internally insulating a propellant combustion chamber
US5056405A (en) Propellant-to-inhibitor bonding system
US5784877A (en) Rocket-ramjet engine casing port closure
US4223606A (en) Dual thrust rocket motor
US4004523A (en) Solid propellant charges
USH1087H (en) Case to insulation bonding system
US5113650A (en) Reorienting grain direction of calendered insulation sheet stock perpendicular to gas flow in solid propellant rocket motors
US3991565A (en) Solid propellant with inhibitor layer in rocket motor
US6711890B2 (en) Pressure-actuated joint system
KR950007640B1 (en) Assembling method for propelling part of rocket
US5755401A (en) Missile diverter integration method and system
RU2266422C1 (en) Method to form heat protective coating of rocket engine combustion chamber
US5209876A (en) Cloth-lined interceptor motor insulation for strong insulation-to-propellant interlock

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE