US9973032B2 - Two-tier battery solution for data center backup - Google Patents

Two-tier battery solution for data center backup Download PDF

Info

Publication number
US9973032B2
US9973032B2 US14/959,231 US201514959231A US9973032B2 US 9973032 B2 US9973032 B2 US 9973032B2 US 201514959231 A US201514959231 A US 201514959231A US 9973032 B2 US9973032 B2 US 9973032B2
Authority
US
United States
Prior art keywords
power
battery device
determining
duration
anomaly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US14/959,231
Other languages
English (en)
Other versions
US20170163084A1 (en
Inventor
Christopher G. Malone
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Google LLC
Original Assignee
Google LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Assigned to GOOGLE INC. reassignment GOOGLE INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MALONE, CHRISTOPHER G.
Priority to US14/959,231 priority Critical patent/US9973032B2/en
Application filed by Google LLC filed Critical Google LLC
Priority to EP16199381.1A priority patent/EP3176906B1/en
Priority to DK16199381.1T priority patent/DK3176906T3/da
Priority to DE202016107457.6U priority patent/DE202016107457U1/de
Priority to CN201910405287.9A priority patent/CN110165733B/zh
Priority to CN201611100191.4A priority patent/CN106898826B/zh
Publication of US20170163084A1 publication Critical patent/US20170163084A1/en
Assigned to GOOGLE LLC reassignment GOOGLE LLC CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: GOOGLE INC.
Priority to US15/950,852 priority patent/US10559972B2/en
Publication of US9973032B2 publication Critical patent/US9973032B2/en
Application granted granted Critical
Priority to US16/719,950 priority patent/US11146099B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/263Arrangements for using multiple switchable power supplies, e.g. battery and AC
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0063Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with circuits adapted for supplying loads from the battery
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/062Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/14Mounting supporting structure in casing or on frame or rack
    • H05K7/1485Servers; Data center rooms, e.g. 19-inch computer racks
    • H02J2007/0067
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0025Sequential battery discharge in systems with a plurality of batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/00712Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters

Definitions

  • This specification relates to backup power sources.
  • a data center such as a server farm
  • a data center typically contains thousands of server processing devices. Within the data centers the processing devices are arranged in racks, and each rack may contain dozens of servers. Assuming the power required for a single rack may be in the order of 50 kW, and that there may be hundreds of racks in a data center, it is not uncommon for a data center to have a power requirement on the order of megawatts.
  • Data center facilities range in critical levels according to the cost of down time to a business that utilizes the particular data center, the cost of ownership for the data center, and other factors.
  • a data center facility includes redundant power systems to provide power to the server in the event of a power anomaly (e.g., blackout from utility provider, unstable utility power, etc.).
  • Data center facilities utilize in-rack batteries and diesel generators to provide back-up power during a power anomaly.
  • In-rack batteries are sized as small as possible to cover short-durations and minimize cost and size of the battery.
  • the diesel generators are designed to provide power for longer—duration power anomalies. The determination of which source provides power during the power anomaly is dependent upon the duration of the power anomaly.
  • one innovative aspect of the subject matter described in this specification can be embodied in methods that include the actions of a providing a plurality of first battery devices, each first battery device respectively electrically coupled to a respective server rack in a plurality of server racks and having a respective capacity to provide power to the respective rack for a power anomaly for up to a first duration.
  • a power anomaly is a deviation of mains power from one or more of a nominal supply voltage and frequency.
  • Other embodiments of this aspect include corresponding systems, apparatus, and computer programs, configured to perform the actions of the methods, encoded on computer storage devices.
  • a utility grade second tier battery powers a data center with clean energy.
  • the capacity of a second tier battery can be determined according to historical power anomaly data. Sizing the capacity of the second tier battery according to the historical power anomaly data enables the battery to be sufficiently sized to minimize costs and unused resources.
  • the second tier battery does not require a start-up time. Thus, the second tier battery will be able to provide power near instantaneously, and thus the capacity of the rack batteries can be reduced relative to the capacity required for a diesel generator back up. Utilizing the second tier battery can also provide a zero emissions solution for providing long-term back up power.
  • Running diesel generators to provide a supplemental load includes emitting pollutants into the air during the diesel generator's operation.
  • the utility grade battery system can provide power back to the grid to realize additional cost savings.
  • the utility grade battery system can provide power back to the grid for grid frequency regulation by supplying supplemental power to correct a gird frequency imbalance.
  • a diesel generator system must be sized for peak capacity of the data center without regard to likely outage duration, a diesel generator system is often overdesigned in that it may provide power as long as it has fuel available.
  • the sizing of a utility grade battery based on historical outages and durations enables the capacity of the utility grade battery to be tailored to the data center's specific and likely needs, which reduces costs associated with a system that would otherwise have wasted capacity that is unlikely to ever be used for a particular data center.
  • FIG. 1 is a block diagram illustration data center facility with an incorporated two tier battery system.
  • FIG. 2 is a flow diagram describing a process for operating the two tier battery system.
  • FIG. 3 is a flow diagram describing a process for determining a second duration and a capacity for a battery device.
  • FIG. 4 is a flow diagram describing a process for shedding load from the utility and providing supplemental power from the two tier battery system.
  • a system provides a back-up power system that includes a two-tier battery system that powers a load (e.g., industrial loads, data centers, server racks, etc.) for various time durations in response to a power anomaly.
  • a load e.g., industrial loads, data centers, server racks, etc.
  • the first tier battery is capable of providing power for shorter duration (e.g., 1 minute, 5 minutes, 10 minutes, etc.) power anomalies.
  • the second tier battery device which can be a utility grade battery with a multiple mega-watt capacity, provides power to the load for power anomaly durations (e.g., 1 hour, 3 hours, 1 day, etc.) that are longer than durations that can be supported by the first battery.
  • the system enables the second battery to provide power to the load before the power capacity of the first battery expires.
  • the system is configured to provide back-up power to the load without interrupting the power supplied to the load.
  • a power anomaly profile can be generated by maintaining an anomaly historical database.
  • the anomaly historical database can include information regarding the duration of each historical power anomaly experienced by the system.
  • the capacity of the second battery device can be determined utilizing the power anomaly profile and based on the durations of the power anomalies.
  • the capacity of the second battery device is designed such that the duration of power provided by the second battery device is longer than all of the durations within the power anomaly profile.
  • FIG. 1 is a block diagram of a data center facility 100 with two-tier battery system.
  • the facility 100 can occupy one or more rooms within a building or essentially an entire building.
  • the facility 100 is sufficiently large for installation of numerous (e.g., dozens or hundreds or thousands) alternating current devices, such as racks 120 of computer equipment, and other loads that collectively constitute a load. Examples of the latter include motors, chillers, AC lighting, etc.
  • the racks 120 of mounted computers are arranged in rows and are separated by aisles.
  • Each rack 120 includes multiple processing devices.
  • each processing device includes a motherboard, on which a variety of computer-related components are mounted.
  • the facility 100 includes other computer and routing devices (not shown) to connect the facility to a network, such as the Internet.
  • the facility 100 is also connected to an AC power feed 114 that provides power from a utility provider 50 to power the racks 120 .
  • an AC power feed 114 that provides power from a utility provider 50 to power the racks 120 .
  • the AC power feed 114 couples to each isle of racks utilizing an AC power feed branch 112 - 1 , 112 - 2 , etc.
  • Each rack includes an AC to DC converter (not shown) that converts AC power to DC power for use by the racks 120 .
  • each rack 120 may house, for example, up to 100 processing devices, each rack 120 may individually consume on the order of 50 kW of power.
  • the facility 100 can also include an AC load 103 that utilizes AC power received from the AC feed 114 .
  • the AC load 103 includes various AC loads that are integrated into the facility 100 .
  • the AC load 103 can include lighting, security systems, other computer and routing devices (not shown), motors, chillers and other loads that are part of the facility infrastructure.
  • a two tier battery system provides a back-up power source for the facility in the event of a power anomaly.
  • a power anomaly is a deviation of mains power from one or more of a nominal supply voltage and frequency.
  • a power anomaly can include a power outage, a voltage sag in excess of a threshold on the power line, a reduction in the amount of power delivered to the facility 100 , and any other power disturbance of the like.
  • the two tier battery system includes first battery devices 202 , each in a respective rack 120 , a second battery device 204 , an inverter 206 , switches 207 and a power control system 208 .
  • Each first battery device is respectively electrically coupled to a respective server rack 120 in a plurality of server racks 120 and has a respective capacity to provide power to the respective rack 120 for a power anomaly for up to a first duration.
  • each first battery 202 provides power to its respective server rack 120 for up to a first duration.
  • the first duration is a short duration (e.g., 1 minute, 5 minutes, 10 minutes, etc.), that is selected to handle transient power anomalies in which power is not lost for period of time in excess of the first duration.
  • the power control system 208 monitors the power anomaly by a monitor line input 115 . Should the duration begin to approach the first duration, the power control system 208 , before the first duration expires, will utilize the switches 207 by means of a control line 118 to isolate the data center 100 from the power feed 114 and provided power from the second battery device 204 and the inverter 206 .
  • the second battery device 204 has a capacity to provide power to the plurality of respective server racks 120 and the AC load 103 for a power anomaly for up to a second duration (e.g., 1 hour, 3 hours, 1 day, etc.).
  • the second duration which of course is longer than the first duration, is selected so that it is long enough to provide power to the data center facility 100 for long-term power anomalies that are likely to be experienced. This typically requires the second battery device 204 to have a battery capacity of at least one mega-watt hours. How the second duration is selected is described with reference to FIGS. 3 and 4 below.
  • the second battery device 204 can be a lithium ion battery system with a capacity of at least one mega-watt hour. Other types of batteries can also be used.
  • the inverter 206 converts the DC power provided by the battery 204 to AC power to provide the necessary power to the data center 100 .
  • the other AC loads 103 are also powered by the second battery device 204 .
  • the power control system 208 includes a battery charger to charge the second battery device.
  • the second battery 204 is charged by the power feed 114 and the charging system that is integrated into the power control system.
  • Other charging sources and topologies can also be used, however.
  • the power control system 208 again by means of the control line 118 , utilizes the switches 207 to restore power from the power feed 114 .
  • FIG. 2 is a flow diagram describing a process 300 for operating the two tier battery system 200 .
  • the process determines an occurrence of a power anomaly ( 302 ).
  • a power anomaly can be determined by the power control system 208 using various instruments (e.g., voltage monitoring sensor, current monitoring sensor, and other mechanisms of the like). The power anomaly is determined to occur when the input power provided by the utility is not within acceptable operational rages, e.g., +/ ⁇ 5% of a specified voltage, etc.
  • the power control system 208 Upon determining the occurrence of the power anomaly, the power control system 208 will monitor the duration of the power anomaly and determines that the anomaly is still occurring before the expiration of the first time period. For example, if the first duration is 1 minute, then after 30 seconds the power control system 208 may determine whether the anomaly is still present.
  • the power control system 2208 enables, within the first duration, the second battery device 204 to provide power to the plurality of respective server racks 120 ( 306 ).
  • the power control system 208 can activate the switches 207 that isolate the data center 100 from the power feed 114 and enables the first battery 202 to provide power to the racks 120 and AC load 103 .
  • the first battery 202 may be integrated into the circuit such that the first battery 202 automatically provides power to the facility 100 without activating a switch when the power control system 208 has determined that a power anomaly has occurred.
  • the power control system 208 may automatically switch the data center 100 to the second battery device 204 .
  • Selecting the first duration is based, in part, on a determined response time to cause the second battery device 204 to provide power to the plurality of respective server racks 120 .
  • the first duration for the first batteries 202 may be selected to be at least 30 seconds, e.g., 45 seconds or some other time that is in excess of 30 seconds to ensure that the first batteries 202 will not be depleted before the second battery device 204 is providing power to the data center 100 .
  • the first duration of the first battery device 202 is selected to be at least sufficiently long enough to enable coupling to power by the second battery device 204 , which ensures that back-up power is delivered to the facility without interruption.
  • Selecting the second duration may be done based, in part, on a historical analysis of anomalies. Based on the historical analysis, the second duration is selected according to a likelihood threshold that quantifies the likelihood of a power anomaly exceeding the second duration. For example, if the data center 100 is to be designed such that the likelihood the capacity of the second battery device 204 being depleted is 0.1%, then the second duration is a duration that, according to a historical model, is likely to occur only at a rate of 0.1%. From this second duration, the capacity of the second battery device 204 can then be determined.
  • the power control system 208 tracks and records power anomalies to create and maintain a power anomaly profile that includes historical statistics.
  • a power anomaly profile may be provided by the utility provider, if available.
  • the capacity of the second battery device 204 can be determined based on the historical statistics provided by power anomaly profile.
  • FIG. 3 is a flow diagram describing a process 350 for determining a second duration and a corresponding capacity for a battery device.
  • the process 350 can be done in the power control system, or in any appropriate data processing apparatus.
  • the process 350 determines a power consumption statistic for the plurality of server racks ( 352 ).
  • the power consumption of the server racks for a data center can be determined (or, alternatively, the power consumption of the entire data center itself).
  • the statistic can be provided by the utility provider, or measured at the data center 100 .
  • the amount of power consumed for a predetermined amount of time can be used to determine an energy rating, e.g., X kW/H, or Y MW/H, etc.
  • a first likelihood threshold is selected ( 354 ), and the process determines, based on the historical statistics, a second duration have a likelihood of occurring equal to the first likelihood threshold ( 356 ).
  • the first likelihood threshold is thus 0.1%, which, in turn, corresponds to a duration of approximately 7.82 hours.
  • a designer of the second battery system would select a second duration of at least 7.82 hours or greater when the first likelihood threshold is 0.1%.
  • the process 350 determines, based on the modeled second duration and power consumption statistics, a modeled capacity ( 358 ). For example, assume the power consumption for the data center is 500 KWH, and the designer selected 8 hours as the second duration. The capacity of the second battery device 204 is thus 4 MWH. The capacity of the second battery device 204 is chosen to provide sufficient power to the data center 100 for the duration of forecasted power anomalies.
  • the power grid may become stressed (e.g., experience a voltage drop, a lack of current being provided by the power from the power grid, etc.) because the demand for power approaches the maximum amount of power generated by the power utility 50 .
  • the data center 100 can, in some situations, provide demand response power back into the grid from the second battery device 204 .
  • the power grid frequency may incur a frequency imbalance due to fluctuating load demands.
  • the data center's second battery device 204 can provide requisite power to the power grid to balance the power grid frequency.
  • FIG. 4 is a flow diagram describing a process 400 for shedding load from the utility and providing supplemental power from the two tier battery system.
  • the power control system 208 can determine that a demand response condition for a power grid providing power to the mains power is met ( 402 ).
  • the demand response condition for the power grid can be an over demand condition for the power grid or the power grid reaching a critical power delivery state where the demand for power is close to or has met the amount of power that is available for consumption on the power grid.
  • the control system 208 can be notified by the utility of the demand condition being met.
  • the power control system 208 In response to determining that the demand response condition is met, the power control system 208 causes the second battery device 204 to provide at least a portion of power to the plurality of server racks 120 to shed a load from the power grid that is at least equal to the portion of power provided by the second battery device 204 ( 404 ). For example, the power control system 208 allows the second battery device 204 to provide power to approximately 50% percent of the load of the data center 100 . This reduces the overall load of the data center as seen from the grid by 50%.
  • the demand response may be condition on likelihood that a power anomaly will not be observed during the demand response time. This is to ensure that the battery device 204 does not deplete its charge during by providing demand response relief when the likelihood of experiencing a power anomaly during this time is unacceptably high.
  • Embodiments of the subject matter and the operations described in this specification can be implemented in digital electronic circuitry, or in computer software, firmware, or hardware, including the structures disclosed in this specification and their structural equivalents, or in combinations of one or more of them.
  • Embodiments of the subject matter described in this specification can be implemented as one or more computer programs, i.e., one or more modules of computer program instructions, encoded on computer storage medium for execution by, or to control the operation of, data processing apparatus.
  • the operations described in this specification can be implemented as operations performed by a data processing apparatus on data stored on one or more computer-readable storage devices or received from other sources.
  • a computer program (also known as a program, software, software application, script, or code) can be written in any form of programming language, including compiled or interpreted languages, declarative or procedural languages, and it can be deployed in any form, including as a stand-alone program or as a module, component, subroutine, object, or other unit suitable for use in a computing environment.
  • a computer program may, but need not, correspond to a file in a file system.
  • a program can be stored in a portion of a file that holds other programs or data (e.g., one or more scripts stored in a markup language document), in a single file dedicated to the program in question, or in multiple coordinated files (e.g., files that store one or more modules, sub-programs, or portions of code).
  • a computer program can be deployed to be executed on one computer or on multiple computers that are located at one site or distributed across multiple sites and interconnected by a communication network.
  • the processes and logic flows described in this specification can be performed by one or more programmable processors executing one or more computer programs to perform actions by operating on input data and generating output.
  • the processes and logic flows can also be performed by, and apparatus can also be implemented as, special purpose logic circuitry, e.g., a FPGA (field programmable gate array) or an ASIC (application-specific integrated circuit).
  • special purpose logic circuitry e.g., a FPGA (field programmable gate array) or an ASIC (application-specific integrated circuit).
  • processors suitable for the execution of a computer program include, by way of example, both general and special purpose microprocessors, and any one or more processors of any kind of digital computer.
  • a processor will receive instructions and data from a read-only memory or a random access memory or both.
  • the essential elements of a computer are a processor for performing actions in accordance with instructions and one or more memory devices for storing instructions and data.
  • a computer will also include, or be operatively coupled to receive data from or transfer data to, or both, one or more mass storage devices for storing data, e.g., magnetic, magneto-optical disks, or optical disks.
  • mass storage devices for storing data, e.g., magnetic, magneto-optical disks, or optical disks.
  • a computer need not have such devices.
  • Devices suitable for storing computer program instructions and data include all forms of non-volatile memory, media and memory devices, including by way of example semiconductor memory devices, e.g., EPROM, EEPROM, and flash memory devices; magnetic disks, e.g., internal hard disks or removable disks; magneto-optical disks; and CD-ROM and DVD-ROM disks.
  • semiconductor memory devices e.g., EPROM, EEPROM, and flash memory devices
  • magnetic disks e.g., internal hard disks or removable disks
  • magneto-optical disks e.g., CD-ROM and DVD-ROM disks.
  • the processor and the memory can be supplemented by, or incorporated in, special purpose logic circuitry.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Management (AREA)
  • Automation & Control Theory (AREA)
  • Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
US14/959,231 2015-12-04 2015-12-04 Two-tier battery solution for data center backup Active 2036-06-15 US9973032B2 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
US14/959,231 US9973032B2 (en) 2015-12-04 2015-12-04 Two-tier battery solution for data center backup
EP16199381.1A EP3176906B1 (en) 2015-12-04 2016-11-17 Two-tier battery solution for data center backup
DK16199381.1T DK3176906T3 (da) 2015-12-04 2016-11-17 Tostrenget batteriløsning til backcup af datacenter
DE202016107457.6U DE202016107457U1 (de) 2015-12-04 2016-11-17 Zweistufige Akkulösung für Rechenzentrumsbackup
CN201910405287.9A CN110165733B (zh) 2015-12-04 2016-12-02 用于数据中心备用的二级电池解决方案
CN201611100191.4A CN106898826B (zh) 2015-12-04 2016-12-02 用于数据中心备用的二级电池解决方案
US15/950,852 US10559972B2 (en) 2015-12-04 2018-04-11 Two-tier battery solution for data center backup
US16/719,950 US11146099B2 (en) 2015-12-04 2019-12-18 Two-tier battery solution for data center backup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US14/959,231 US9973032B2 (en) 2015-12-04 2015-12-04 Two-tier battery solution for data center backup

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/950,852 Continuation US10559972B2 (en) 2015-12-04 2018-04-11 Two-tier battery solution for data center backup

Publications (2)

Publication Number Publication Date
US20170163084A1 US20170163084A1 (en) 2017-06-08
US9973032B2 true US9973032B2 (en) 2018-05-15

Family

ID=57354172

Family Applications (3)

Application Number Title Priority Date Filing Date
US14/959,231 Active 2036-06-15 US9973032B2 (en) 2015-12-04 2015-12-04 Two-tier battery solution for data center backup
US15/950,852 Active US10559972B2 (en) 2015-12-04 2018-04-11 Two-tier battery solution for data center backup
US16/719,950 Active 2036-02-16 US11146099B2 (en) 2015-12-04 2019-12-18 Two-tier battery solution for data center backup

Family Applications After (2)

Application Number Title Priority Date Filing Date
US15/950,852 Active US10559972B2 (en) 2015-12-04 2018-04-11 Two-tier battery solution for data center backup
US16/719,950 Active 2036-02-16 US11146099B2 (en) 2015-12-04 2019-12-18 Two-tier battery solution for data center backup

Country Status (5)

Country Link
US (3) US9973032B2 (zh)
EP (1) EP3176906B1 (zh)
CN (2) CN110165733B (zh)
DE (1) DE202016107457U1 (zh)
DK (1) DK3176906T3 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11271259B2 (en) * 2019-09-04 2022-03-08 Baidu Usa Llc Airflow management for battery module cooling
US11489356B2 (en) 2019-07-02 2022-11-01 Abb Schweiz Ag MVDC link-powered battery chargers and operation thereof

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170063127A1 (en) * 2015-08-26 2017-03-02 The Aes Corporation Battery Backup Capacity Method and System
US9973032B2 (en) 2015-12-04 2018-05-15 Google Llc Two-tier battery solution for data center backup
US11061458B2 (en) * 2019-03-15 2021-07-13 Microsoft Technology Licensing, Llc Variable redundancy data center power topology
EP3726685A1 (en) 2019-04-16 2020-10-21 Carrier Corporation Method for responding to electrical power source request
EP3726307A1 (en) 2019-04-17 2020-10-21 Carrier Corporation Method for controlling building power consumption
EP3966455A1 (en) 2019-05-10 2022-03-16 Carrier Corporation Compressor with vibration sensor
WO2020243711A1 (en) 2019-05-31 2020-12-03 Carrier Corporation Method for supervisory control of building power consumption
CN112086954A (zh) * 2020-09-29 2020-12-15 东莞铭普光磁股份有限公司 一种智能直流配电装置、配电方法及电子设备

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5549984A (en) 1994-07-25 1996-08-27 Globe-Union Inc. Control and indicator circuit for a dual battery system
US6329792B1 (en) 1997-07-04 2001-12-11 Estco Energy Inc. Device and system for management of battery back up power source
US20050134239A1 (en) 2003-12-22 2005-06-23 Harris Shaun L. Multiple input redundant power system
US20060133181A1 (en) 2004-12-20 2006-06-22 Fujitsu Limited Power controller, apparatus provided with backup power supply, program for controlling power, and method for controlling power
US7141894B2 (en) 2002-11-01 2006-11-28 Rudy Kraus Apparatus for providing high quality power
US7196495B1 (en) 2004-04-27 2007-03-27 Concord Technologies, Lp Dual battery and monitor arrangement
US7589436B2 (en) 2004-09-10 2009-09-15 Hitachi Computer Peripherals Co., Ltd. Data processing unit and DC backup power supply
US7980905B2 (en) * 2007-11-25 2011-07-19 C-Mar Holdings, Ltd. Method and apparatus for providing power to a marine vessel
US20110223450A1 (en) 2008-07-07 2011-09-15 Enervault Corporation Cascade Redox Flow Battery Systems
US20110316338A1 (en) * 2010-06-24 2011-12-29 Microsoft Corporation Hierarchical Power Smoothing
US20120134090A1 (en) * 2010-11-30 2012-05-31 Inventec Corporation Server computer set
US20120313437A1 (en) 2011-06-08 2012-12-13 Latham Andrew V Data center battery enhancement method and system
US20130080793A1 (en) * 2011-09-24 2013-03-28 Eaton Corporation Data processing system power distribution using reserve bus
US20130120929A1 (en) 2011-03-09 2013-05-16 Yahoo! Inc. Flexible Tier Data Center
WO2013126800A1 (en) 2012-02-22 2013-08-29 Viridity Energy, Inc. Facilitating revenue generation from data shifting by data centers
US20150032301A1 (en) 2013-07-29 2015-01-29 Electro-Motive Diesel, Inc. Two tiered energy storage for a mobile vehicle
US20150097663A1 (en) * 2013-10-07 2015-04-09 Google Inc. Smart-home multi-functional hazard detector providing location-specific feature configuration
US20150180233A1 (en) 2013-03-15 2015-06-25 Fuji Electric Co., Ltd. Uninterruptible power supply apparatus
WO2015110566A1 (de) 2014-01-27 2015-07-30 Robert Bosch Gmbh Bordnetz und verfahren zum betrieb eines bordnetzes
CN204696782U (zh) 2015-05-18 2015-10-07 刘粤荣 一种ups的双电源系统和ups设备

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI449301B (zh) * 2006-06-01 2014-08-11 Exaflop Llc 用於資料中心之配電系統,包含其之模組處理系統、以及其操作方法、架構和電腦程式產品,以及便於資料處理之方法
US9614374B2 (en) * 2009-11-02 2017-04-04 General Electric Company Method for controlling energy storage system
JP5427762B2 (ja) * 2010-12-16 2014-02-26 株式会社日立製作所 電力変換装置、電力変換装置の制御装置及び電力変換装置の制御方法
US10063092B2 (en) * 2015-10-02 2018-08-28 Facebook, Inc. Data center power network with multiple redundancies
US9973032B2 (en) 2015-12-04 2018-05-15 Google Llc Two-tier battery solution for data center backup

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5549984A (en) 1994-07-25 1996-08-27 Globe-Union Inc. Control and indicator circuit for a dual battery system
US6329792B1 (en) 1997-07-04 2001-12-11 Estco Energy Inc. Device and system for management of battery back up power source
US7141894B2 (en) 2002-11-01 2006-11-28 Rudy Kraus Apparatus for providing high quality power
US20050134239A1 (en) 2003-12-22 2005-06-23 Harris Shaun L. Multiple input redundant power system
US7196495B1 (en) 2004-04-27 2007-03-27 Concord Technologies, Lp Dual battery and monitor arrangement
US7589436B2 (en) 2004-09-10 2009-09-15 Hitachi Computer Peripherals Co., Ltd. Data processing unit and DC backup power supply
US20060133181A1 (en) 2004-12-20 2006-06-22 Fujitsu Limited Power controller, apparatus provided with backup power supply, program for controlling power, and method for controlling power
US7980905B2 (en) * 2007-11-25 2011-07-19 C-Mar Holdings, Ltd. Method and apparatus for providing power to a marine vessel
US20110223450A1 (en) 2008-07-07 2011-09-15 Enervault Corporation Cascade Redox Flow Battery Systems
US20110316338A1 (en) * 2010-06-24 2011-12-29 Microsoft Corporation Hierarchical Power Smoothing
US20120134090A1 (en) * 2010-11-30 2012-05-31 Inventec Corporation Server computer set
US20130120929A1 (en) 2011-03-09 2013-05-16 Yahoo! Inc. Flexible Tier Data Center
US20120313437A1 (en) 2011-06-08 2012-12-13 Latham Andrew V Data center battery enhancement method and system
US20130080793A1 (en) * 2011-09-24 2013-03-28 Eaton Corporation Data processing system power distribution using reserve bus
WO2013126800A1 (en) 2012-02-22 2013-08-29 Viridity Energy, Inc. Facilitating revenue generation from data shifting by data centers
US20150180233A1 (en) 2013-03-15 2015-06-25 Fuji Electric Co., Ltd. Uninterruptible power supply apparatus
US20150032301A1 (en) 2013-07-29 2015-01-29 Electro-Motive Diesel, Inc. Two tiered energy storage for a mobile vehicle
US20150097663A1 (en) * 2013-10-07 2015-04-09 Google Inc. Smart-home multi-functional hazard detector providing location-specific feature configuration
WO2015110566A1 (de) 2014-01-27 2015-07-30 Robert Bosch Gmbh Bordnetz und verfahren zum betrieb eines bordnetzes
CN204696782U (zh) 2015-05-18 2015-10-07 刘粤荣 一种ups的双电源系统和ups设备

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Extended European Search Report issued in European Application No. 16199381.1, dated Apr. 5, 2017, 9 pages.
Mary Mazzoni, "3p Weekend: 7 Things You Need to Know About Tesla's New Home Battery", Triple Pundit, retrieved from <http://www.triplepundit.com/2015/05/3p-weekend-7-things-you-need-to-know-about-teslas-home-battery/>, May 1, 2015, 10 pages.
Rich Miller, "Microsoft: We're Eliminating Backup Generators", Data Center Knowledge, retrieved from <http://www.datacenterknowledge.com/archives/2012/09/17/microsoft-were-eliminating-backup-generatorsi>, Sep. 17, 2012, 8 pages.
Robert McFarlane, "TechWatch: Why your data center might need a fuel cell generator", TechTarget, retrieved from <http://searchdatacenter.techtarget.com/feature/TechWatch-Why-your-data-center-needs-a-fuel-cell-generator>, Jan. 2014, 7 pages.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11489356B2 (en) 2019-07-02 2022-11-01 Abb Schweiz Ag MVDC link-powered battery chargers and operation thereof
US11271259B2 (en) * 2019-09-04 2022-03-08 Baidu Usa Llc Airflow management for battery module cooling

Also Published As

Publication number Publication date
US20200127488A1 (en) 2020-04-23
CN106898826B (zh) 2019-06-21
EP3176906B1 (en) 2019-09-18
CN110165733A (zh) 2019-08-23
US20180233946A1 (en) 2018-08-16
CN110165733B (zh) 2023-01-03
US10559972B2 (en) 2020-02-11
US20170163084A1 (en) 2017-06-08
CN106898826A (zh) 2017-06-27
EP3176906A1 (en) 2017-06-07
DK3176906T3 (da) 2019-12-16
DE202016107457U1 (de) 2017-03-07
US11146099B2 (en) 2021-10-12

Similar Documents

Publication Publication Date Title
US11146099B2 (en) Two-tier battery solution for data center backup
US11455021B2 (en) Datacenter power management using AC and DC power sources
JP5600836B2 (ja) ラックサーバシステム及びそれに適用可能な動作方法
EP2036189B1 (en) Data center uninterruptible power distribution architecture
US9671807B2 (en) Power grid stabilization system and power grid stabilization method
US10432017B1 (en) Uninterruptable power supply (UPS) management
US11216059B2 (en) Dynamic tiering of datacenter power for workloads
US10211667B2 (en) Uninterrupted power supply systems and methods
EP3427360B1 (en) Rack power system and method
US20210344217A1 (en) Datacenter current injection for power management
US20210294406A1 (en) Datacenter power management using current injection
US11461513B2 (en) Data center power scenario simulation
US20170310126A1 (en) Voltage regulation for battery strings
CN105429280A (zh) 不断电系统及其供应方法
CN106785145A (zh) 一种基于Rack机柜的蓄电池BBU充放电检测方法
TW201351846A (zh) 在低電壓事件期間用於供電給儀器的系統、方法與設備
JP6402924B2 (ja) 電力管理システム及びこれと連携する蓄電池搭載機器並びに電力管理システムの制御方法
US9032250B1 (en) Online testing of secondary power unit
US20210296900A1 (en) Datacenter power management through phase balancing
US20190146565A1 (en) Data center fuel cells
WO2019213466A1 (en) Time varying power management within datacenters
KR20150013072A (ko) 배터리 히터 시스템 및 방법
TW201546605A (zh) 整合型不斷電供電系統與方法
US20200371574A1 (en) Datacenter power manipulation using power caches
KR20170013780A (ko) 에너지 저장 시스템을 포함하는 전력 공급 시스템

Legal Events

Date Code Title Description
AS Assignment

Owner name: GOOGLE INC., CALIFORNIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MALONE, CHRISTOPHER G.;REEL/FRAME:037212/0469

Effective date: 20151201

AS Assignment

Owner name: GOOGLE LLC, CALIFORNIA

Free format text: CHANGE OF NAME;ASSIGNOR:GOOGLE INC.;REEL/FRAME:044129/0001

Effective date: 20170929

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

CC Certificate of correction