US9574357B2 - Scaffold bracket - Google Patents
Scaffold bracket Download PDFInfo
- Publication number
 - US9574357B2 US9574357B2 US14/051,286 US201314051286A US9574357B2 US 9574357 B2 US9574357 B2 US 9574357B2 US 201314051286 A US201314051286 A US 201314051286A US 9574357 B2 US9574357 B2 US 9574357B2
 - Authority
 - US
 - United States
 - Prior art keywords
 - face
 - scaffolding
 - bracket
 - node
 - coupled
 - Prior art date
 - Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
 - Active
 
Links
Images
Classifications
- 
        
- E—FIXED CONSTRUCTIONS
 - E04—BUILDING
 - E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
 - E04G5/00—Component parts or accessories for scaffolds
 - E04G5/06—Consoles; Brackets
 - E04G5/062—Consoles; Brackets specially adapted for attachment to building walls
 
 - 
        
- E—FIXED CONSTRUCTIONS
 - E04—BUILDING
 - E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
 - E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
 - E04G3/20—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
 
 - 
        
- E—FIXED CONSTRUCTIONS
 - E04—BUILDING
 - E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
 - E04G5/00—Component parts or accessories for scaffolds
 - E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
 - E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
 
 - 
        
- E—FIXED CONSTRUCTIONS
 - E04—BUILDING
 - E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
 - E04G5/00—Component parts or accessories for scaffolds
 - E04G5/14—Railings
 
 - 
        
- E—FIXED CONSTRUCTIONS
 - E04—BUILDING
 - E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
 - E04G7/00—Connections between parts of the scaffold
 - E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
 - E04G7/32—Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using wedges
 
 - 
        
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
 - Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
 - Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
 - Y10T29/00—Metal working
 - Y10T29/49—Method of mechanical manufacture
 - Y10T29/49826—Assembling or joining
 
 
Definitions
- Implementations of various technologies described herein generally relate to a scaffold bracket.
 - a scaffolding system may be constructed which allows workers to operate on an elevated portion of the structure.
 - the scaffolding system may be composed of a number of scaffolding components which are based on a ground surface and stacked on top of one another to build up the scaffolding system to a desired height.
 - Components of the scaffolding system may include vertical members, horizontal members such as ledgers and guardrails, footings, decks or platforms, diagonal members, and scaffolding nodes for coupling two or more of the components of the scaffolding system to one another.
 - the scaffold bracket may include a mounting bracket having a first face and a second face opposite of the first face.
 - the scaffold bracket may also include a first scaffolding node attached to the first face and configured to couple to a first member.
 - the scaffold bracket may further include a second scaffolding node attached to the first face and configured to couple to a second member.
 - the scaffold bracket may include a mounting bracket having a first face and a second face opposite the first face.
 - the scaffold bracket may also include a first scaffolding node attached to the first face and a second scaffolding node attached to the first face.
 - the apparatus may also include a horizontal member coupled to the first scaffolding node.
 - the apparatus may further include a diagonal member coupled to the second scaffolding node, where the horizontal member and the diagonal member are connected to one another at a node point.
 - a scaffolding system which may include a plurality of scaffold brackets.
 - Each scaffold bracket in the plurality of scaffold brackets may include a mounting bracket having a first face and a second face opposite the first face.
 - Each scaffold bracket may also include a first scaffolding node attached to the first face and a second scaffolding node attached to the first face.
 - the scaffolding system may also include a plurality of horizontal members, where each horizontal member is coupled to the first scaffolding node.
 - the scaffolding system may further include a plurality of diagonal members, where each diagonal member is coupled to the second scaffolding node and to each horizontal member at a node point.
 - the scaffolding system may additionally include a plurality of upright rails, each coupled to a node point, where the upright rails extend in an upward direction above the plurality of horizontal members and the plurality of diagonal members.
 - the scaffolding system may include one or more horizontal rails coupled between the plurality of upright rails in a substantially horizontal direction.
 - Described herein are implementations of various technologies for a method for constructing a scaffold bracket which may include cutting a portion of a first vertical scaffolding member substantially in half to form a first scaffolding node.
 - the method may also include cutting a portion of a second vertical scaffolding member substantially in half to form a second scaffolding node.
 - the method may further include coupling the first scaffolding node and the second scaffolding node to a first face of a mounting bracket.
 - the method may additionally include coupling a prong and an offset spacer to a second face of the mounting bracket opposite the first face.
 - FIG. 1.1 illustrates a view of a scaffold bracket for use with a scaffolding system in accordance with implementations of various techniques described herein.
 - FIG. 1.2 illustrates a flow diagram of a method for constructing a scaffold bracket in accordance with implementations of various technologies and techniques described herein.
 - FIG. 1.3 illustrates a vertical scaffolding member in connection with implementations of various techniques described herein.
 - FIG. 1.4 illustrates a portion of a vertical scaffolding member in connection with implementations of various techniques described herein.
 - FIG. 1.5 illustrates a portion of a vertical scaffolding member in connection with implementations of various techniques described herein.
 - FIG. 1.6 illustrates a view of a scaffold bracket for use with a scaffolding system in accordance with implementations of various techniques described herein.
 - FIG. 2 illustrates a view of the scaffold bracket used with a scaffolding system in accordance with implementations of various techniques described herein.
 - FIG. 3 illustrates a scaffolding system which uses a plurality of scaffold brackets in accordance with implementations of various techniques described herein.
 - FIG. 4 illustrates a scaffolding system which uses a plurality of scaffold brackets on an above-ground tank, in accordance with implementations of various techniques described herein.
 - first, second, etc. may be used herein to describe various elements, these elements should not be limited by these terms. These terms are used to distinguish one element from another. For example, a first object could be termed a second object, and, similarly, a second object could be termed a first object, without departing from the scope of the claims.
 - the first object and the second object are both objects, respectively, but they are not to be considered the same object.
 - the terms “up” and “down”; “upper” and “lower”; “upwardly” and downwardly”; “below” and “above”; and other similar terms indicating relative positions above or below a given point or element may be used in connection with some implementations of various technologies described herein. However, when applied to equipment and methods for use in wells that are deviated or horizontal, or when applied to equipment and methods that when arranged in a well are in a deviated or horizontal orientation, such terms may refer to a left to right, right to left, or other relationships as appropriate.
 - compositions or structures may be described herein as having certain materials, it should be understood that the composition could optionally include two or more different materials. In addition, the composition or structure may also include some components other than the ones already cited. It should also be understood that throughout this specification, when a range is described as being useful, or suitable, or the like, it is intended that any value within the range, including the end points, is to be considered as having been stated. Furthermore, respective numerical values should be read once as modified by the term “about” (unless already expressly so modified) and then read again as not to be so modified unless otherwise stated in context.
 - a range of from 1 to 10 is to be read as indicating a respective possible number along the continuum between about 1 and about 10.
 - a certain range is expressed, even if a few specific data points are explicitly identified or referred to within the range, or even when no data points are referred to within the range, it is to be understood that the inventors appreciate and understand that any data points within the range are to be considered to have been specified, and that the inventors have possession of the entire range and points within the range.
 - the scaffold bracket may be configured to couple to a sheer wall of a structure, such as a storage tank, above ground storage tank, vessel, or any other steel, metal, or weld-capable structure known to those skilled in the art.
 - the scaffold bracket may include a mounting bracket, a first scaffolding node, a second scaffolding node, a prong, and an offset spacer.
 - the first scaffolding node and the second scaffolding node may be attached to a first face of the mounting bracket, and the prong and the offset spacer may be attached to a second face of the mounting bracket.
 - the scaffold bracket may couple to a wall bracket of the sheer wall via the prong.
 - the offset spacer may contact the sheer wall, and may be used in conjunction with the prong to space the mounting bracket substantially equidistantly from the sheer wall.
 - the first scaffolding node may be configured to couple to a first member of the scaffolding system, and the second scaffolding node may be configured to couple to a second member of the scaffolding system.
 - the first scaffolding node and the second scaffolding node may each be a portion of a pin lock or any other coupling means known to those skilled in the art, where the portion may include a substantially semicircular rosette portion coupled to a substantially semicircular, cylindrical tubing portion.
 - the scaffold bracket may be formed by cutting a portion of a vertical scaffolding member substantially in halves in a lengthwise direction to form the first scaffolding node and the second scaffolding node.
 - the first scaffolding node and the second scaffolding node may then be coupled to the mounting bracket.
 - a prong and an offset spacer may then be coupled to the mounting bracket.
 - the scaffold bracket may be used to form a knee-braced cantilevered support.
 - a horizontal member may be coupled to the first scaffolding node via the rosette portion
 - a diagonal member may be coupled to the second scaffolding node via the rosette portion.
 - the horizontal member and/or the diagonal member may be engineered scaffolding members. In this manner, the scaffold bracket, the horizontal member, and the diagonal member may together form a knee-braced cantilevered support.
 - the horizontal member and the diagonal member may be connected to one another at a node point.
 - the node point may include a coupling means for coupling to other scaffolding components.
 - a scaffolding system may be formed using the scaffold bracket.
 - the scaffolding system may include a plurality of scaffold brackets, where each scaffold bracket may be coupled to a horizontal member and a diagonal member, thereby forming a knee-braced cantilevered support.
 - Each horizontal member may connect to a diagonal member at a node point, where the node point may include a means for coupling to an upright rail.
 - the upright rail may be a vertical post having one or more coupling means positioned along the upright rail.
 - Each combination of the scaffold bracket, the horizontal member, diagonal member, and the upright rail may be connected to at least one other such combination in the scaffolding system to allow workers to traverse along the wall.
 - a handrail and/or a midrail may be connected between at least two upright rails.
 - a deck may be placed on top of a plurality of horizontal members.
 - the upright rail, the handrail, and/or the midrail may be engineered scaffolding members.
 - FIGS. 1.1-4 Various implementations described above will now be described in more detail with reference to FIGS. 1.1-4 .
 - FIG. 1.1 illustrates a view of a scaffold bracket 100 for use with a scaffolding system in accordance with implementations of various techniques described herein.
 - the scaffold bracket 100 may be configured to couple to a sheer wall (shown in FIGS. 2-3 ) of a structure, such as a storage tank, above ground storage tank, vessel, or any other steel, metal, or weld-capable structure known to those skilled in the art.
 - the scaffold bracket 100 may include a mounting bracket 110 , a first scaffolding node 120 , a second scaffolding node 130 , a prong 140 , and an offset spacer 150 .
 - the mounting bracket 110 , the first scaffolding node 120 , the second scaffolding node 130 , the prong 140 , and/or the offset spacer 150 may be composed of carbon steel, stainless steel, hot-dip galvanized steel, aluminum, or any other material known to those skilled in the art.
 - the mounting bracket 110 may be a metallic plate which includes a first face 111 and a second face 112 .
 - the first face 111 and/or the second face 112 may be substantially flat.
 - the first scaffolding node 120 and the second scaffolding node 130 may be attached to the first face 111
 - the prong 140 and the offset spacer 150 may be attached to the second face 112 , as described below.
 - the first scaffolding node 120 and the second scaffolding node 130 may extend laterally from the first face 111
 - the prong 140 and the offset spacer 150 may extend laterally from the second face 112 .
 - the prong 140 may extend laterally from the second face 112 at a top end 102 of the mounting bracket 110 .
 - the scaffold bracket 100 may couple to the sheer wall (shown in FIGS. 2-3 ) via a wall bracket 50 .
 - the wall bracket 50 may extend laterally from the sheer wall, where the wall bracket 50 may be attached to the sheer wall via welding or any other means known to those skilled in the art.
 - the scaffold bracket 100 may couple to the wall bracket 50 via the prong 140 .
 - the prong 140 may be a male connector and the wall bracket 50 may be a female connector designed to couple to one another via hooking, latching, attachment, or any other implementation known to those skilled in the art.
 - the scaffold bracket 100 has been described as being coupled to the sheer wall via a wall bracket 50 and the prong 140 , it should be understood however that the scaffold bracket 100 may be coupled to the sheer wall via any other coupling means commonly known by persons of ordinary skill in the art.
 - the wall bracket 50 may be a metallic plate formed into a U-shape and welded to the sheer wall, where the U-shape of the wall bracket 50 may form an opening for use in coupling to the prong 140 .
 - the prong 140 may take the form of a hook and may be inserted into the wall bracket 50 through the opening formed by the U-shape of the wall bracket 50 , thereby coupling the prong 140 to the wall bracket 50 .
 - the scaffold bracket 100 may be disposed in a substantially vertical direction 101 , with the first face 111 facing outwardly and away from the sheer wall.
 - the offset spacer 150 may contact the sheer wall, and may be used in conjunction with the prong 140 to space the mounting bracket 110 substantially equidistantly from the sheer wall.
 - the prong 140 and the offset spacer 150 together may position the mounting bracket 110 to be substantially perpendicular to a ground surface.
 - the prong 140 and the offset spacer 150 may extend laterally from mounting bracket 110 at a substantially identical length.
 - the offset spacer 150 may take any shape or size needed to space the mounting bracket 110 in conjunction with the prong 140 .
 - the prong 140 and the offset spacer 150 may be substantially identical in size and shape, and may be arranged to mirror one another.
 - the first scaffolding node 120 may be configured to couple to a first member (not pictured) of the scaffolding system
 - the second scaffolding node 130 may be configured to couple to a second member (not pictured) of the scaffolding system.
 - the first scaffolding node 120 and/or the second scaffolding node 130 may be coupled to the first face 111 via welding or any other implementation known to those skilled in the art, as further described below.
 - the first scaffolding node 120 and the second scaffolding node 130 may be substantially identical.
 - the first scaffolding node 120 and the second scaffolding node 130 may each be a portion of a pin lock or any other coupling means known to those skilled in the art.
 - the first scaffolding node 120 may be a portion of a pin lock that includes a substantially semicircular rosette portion 122 coupled to a substantially semicircular, cylindrical tubing portion 124 .
 - the rosette portion 122 may be concentrically coupled to the cylindrical tubing portion 124 , such that the cylindrical tubing portion 124 may be encircled by the rosette portion 122 .
 - the second scaffolding node 130 may be a portion of a pin lock that includes a substantially semicircular rosette portion 132 coupled to a substantially semicircular, cylindrical tubing portion 134 .
 - the rosette portion 132 may be concentrically coupled to the cylindrical tubing portion 134 , such that the cylindrical tubing portion 134 may be encircled by the rosette portion 132 .
 - the rosette portions 122 , 132 may be coupled to their respective cylindrical tubing portions 124 , 134 via welding or any other implementation known to those skilled in the art, as further described below.
 - the rosette portions 122 , 132 may include a plurality of radially-arranged cut-outs used for coupling to the first member and the second member respectively.
 - the cut-outs may be of one or more shapes and/or of one or more sizes.
 - the cut-outs may be arranged along the rosette portions 122 , 132 , such that components, e.g., the first member and the second member, coupled to the rosette portions can be placed at varying angles with respect to the mounting bracket 110 , as described below.
 - FIG. 1.2 illustrates a flow diagram of a method 160 for constructing a scaffold bracket in accordance with implementations of various technologies and techniques described herein. It should be understood that while method 160 indicates a particular order of execution of operations, in some implementations, certain portions of the operations might be executed in a different order. The following description of method 160 is provided with reference to the scaffold bracket 100 of FIG. 1.1 .
 - the first scaffolding node 120 may be formed by cutting a portion of a vertical scaffolding member substantially in half in a lengthwise direction.
 - the vertical scaffolding member may be a vertical post or any other implementation known to those skilled in the art.
 - An example of a vertical scaffolding member 170 is shown in FIG. 1.3 .
 - the vertical scaffolding member 170 may be a cylindrical tube 172 having one or more rosettes 174 , i.e., pin locks, positioned along the cylindrical tube 172 .
 - the rosettes 174 may encircle the cylindrical tube 172 , and may be coupled to the cylindrical tube 172 via welding or any other means known to those skilled in the art.
 - the portion of the vertical scaffolding member 170 to be cut substantially in half may include one rosette 174 and a portion of the cylindrical tube 172 extending from both a top and a bottom of the rosette 174 , as shown in FIG. 1.4 .
 - the first scaffolding node 120 may be formed, where the first scaffolding node 120 includes the substantially semicircular rosette portion 122 coupled to the substantially semicircular, cylindrical tubing portion 124 , as shown in FIG. 1.1 .
 - the second scaffolding node 130 may be formed by cutting a portion of a vertical scaffolding member substantially in half in a lengthwise direction.
 - the vertical scaffolding member of block 164 may be similar or identical to the vertical scaffolding member of block 162 , such as the member 170 shown in FIG. 1.3 .
 - the portion of the vertical scaffolding member to be cut substantially in half may include one rosette and a portion of the cylindrical tube extending from both a top and a bottom of the rosette, as similarly shown in FIG. 1.4 .
 - the second scaffolding node 130 may be formed, where the second scaffolding node 130 includes the substantially semicircular rosette portion 132 coupled to the substantially semicircular, cylindrical tubing portion 134 , as shown in FIG. 1.1 .
 - the same vertical scaffolding member may be used to form the first scaffolding node 120 and the second scaffolding node 130 of blocks 162 and 164 .
 - a portion of a single vertical scaffolding member may be cut substantially in half, producing a first half and a second half.
 - the first half may be used to form the first scaffolding node 120
 - the second half may be used to form the second scaffolding node 130 .
 - a portion of the vertical scaffolding member 180 cut substantially in half may include a substantially semicircular first rosette portion 182 , a substantially semicircular second rosette portion 184 , and a substantially semicircular cylindrical tubing portion 186 extending between the two rosette portions, as shown in FIG.
 - the first scaffolding node 120 may be formed at the first rosette portion 182 and the second scaffolding node 130 may be formed at the second rosette portion 184 , with the cylindrical tubing portion 186 coupled between the two nodes.
 - the first scaffolding node 120 and the second scaffolding node 130 may be coupled to the mounting bracket 110 .
 - the scaffolding nodes 120 , 130 may be coupled to the first face 111 via welding or any other implementation known to those skilled in the art.
 - the first scaffolding node 120 and the second scaffolding node 130 may be positioned on the first face 111 , such that the first scaffolding node 120 may be closer to the top end 102 of the mounting bracket 110 .
 - the second scaffolding node 130 may be placed proximately below the first scaffolding node in a substantially identical configuration.
 - the first scaffolding node 120 and the second scaffolding node 130 may be substantially vertically aligned to one another along the mounting bracket 110 .
 - first scaffolding node 120 formed at the first rosette portion 182 and the second scaffolding node 130 formed at the second rosette portion 184 may be coupled to the mounting bracket 100 with the cylindrical tubing portion 186 coupled between the two nodes, as shown in FIG. 1.6 .
 - the prong 140 and the offset spacer 150 may be coupled to the mounting bracket 110 .
 - the prong 140 and the offset spacer 150 may extend laterally from the second face 112 .
 - the prong 140 and/or the offset spacer 150 may be coupled to the second face 112 via welding or any other implementation known to those skilled in the art.
 - the prong 140 and/or the offset spacer 150 may be part of the metallic plate which forms the mounting bracket 110 , as described above.
 - scaffolding components may be coupled to the scaffold bracket 100 to create a scaffolding system.
 - the scaffolding components may include engineered scaffolding members, as they are known to those skilled in the art.
 - Engineered scaffolding members may be designed to withstand a particular stress and/or weight, i.e., they may have undergone destructive testing for quality control purposes.
 - engineered scaffolding members may be designed to conform to standards set forth by the Occupational Safety & Health Administration (OSHA).
 - the engineered scaffolding members may be cylindrical tubes composed of carbon steel, stainless steel, hot-dip galvanized steel, aluminum, or any other material known to those skilled in the art.
 - FIG. 2 illustrates a view of the scaffold bracket 100 used with a scaffolding system in accordance with implementations of various techniques described herein.
 - the scaffold bracket 100 may be coupled to a wall 40 via the wall bracket 50 and the prong 140 , as described above.
 - the scaffold bracket 100 may be spaced substantially equidistantly from the wall 40 due to the positioning of the prong 140 and the offset spacer 150 on the second face 112 .
 - horizontal member 205 may be coupled to the first scaffolding node 120 via the rosette portion 122 .
 - the diagonal member 210 may be coupled to the second scaffolding node 130 via the rosette portion 132 .
 - the horizontal member 205 and/or the diagonal member 210 may be engineered scaffolding members as described above.
 - the horizontal member 205 may be a horizontal brace or any other implementation known to those skilled in the art.
 - the diagonal member 210 may be a diagonal brace or any other implementation known to those skilled in the art.
 - the horizontal member 205 may have an end with a slot used for coupling to the rosette portion 122 .
 - the slot of the horizontal member 205 may align with a cut-out of the rosette portion 122 , allowing a wedge 220 to be disposed through the cut-out and the slot. Consequently, the horizontal member 205 and the rosette portion 122 may be coupled via frictional force.
 - the wedge 220 may be hammered through the cut-out and the slot.
 - the end having the slot may be pinched down relative to the rest of the horizontal member 205 in order to facilitate the use of the wedge 205 with the slot.
 - the diagonal member 210 may have an end with a slot used for coupling to the rosette portion 132 .
 - a wedge 230 may be similarly used to couple the diagonal member 210 and the rosette portion 132 via frictional force.
 - the end of the diagonal member 210 having the slot may also be similarly pinched down.
 - the cut-outs may be arranged along the rosette portions 122 , 132 such that horizontal member 205 and/or the diagonal member 210 can be placed at varying angles with respect to the mounting bracket 110 .
 - other coupling means known to those skilled in the art may be used in place of the wedge 220 and/or the wedge 230 .
 - the scaffold bracket 100 , the horizontal member 205 , and the diagonal member 210 may together form a knee-braced cantilevered support.
 - the horizontal member 205 and the diagonal member 210 may be coupled to each other via welding or any other coupling means known to those skilled in the art.
 - the horizontal member 205 and the diagonal member 210 may be connected to one another at a node point (not shown).
 - the node point may include a coupling means for coupling to other scaffolding components, as described below.
 - a plurality of scaffold brackets 100 , horizontal members 205 , and diagonal members 210 may be used with other scaffolding components to create a scaffolding system.
 - Other scaffolding components may include engineered scaffolding members such as an upright rail 330 , a handrail 310 , and/or a midrail 320 , as described with respect to FIG. 3 .
 - FIG. 3 illustrates a scaffolding system 300 which uses a plurality of scaffold brackets 100 in accordance with implementations of various techniques described herein.
 - each scaffold bracket 100 may be coupled to the wall 40 via a wall bracket 50 (not shown) and a prong 140 (not shown), as described above.
 - each scaffold bracket 100 may be coupled to a horizontal member 205 and a diagonal member 210 , thereby forming a knee-braced cantilevered support.
 - Each horizontal member 205 may connect to a diagonal member 210 at a node point 302 , where the node point 302 may include a means for coupling to an upright rail 330 .
 - the upright rail 330 may be inserted into the node point 302 and fastened using bolts or other implementations known to those skilled in the art.
 - the upright rail 330 may vertically extend from the node point 302 in an upward direction.
 - the upright rail 330 may be a vertical post having one or more coupling means positioned along the upright rail 330 .
 - the coupling means may include a rosette, i.e., a pin lock, or other coupling implementations known to those skilled in the art.
 - a handrail 310 and/or a midrail 320 may be connected between at least two upright rails 330 .
 - Each end of the handrail 310 may be coupled to the upright rails 330 via the coupling means positioned along the upright rails 330 .
 - the ends of the handrail 310 may be coupled at or proximate to top portions of the upright rails 330 .
 - the midrail 320 may be similarly connected between two upright rails 330 .
 - ends of the midrail 320 may be coupled at or proximate to middle portions of the upright rails 330 .
 - the handrail 310 and/or the midrail 320 may be a horizontal ledger or any other implementation known to those skilled in the art.
 - a deck 340 may be placed on top of a plurality of horizontal members 205 .
 - the deck 340 may be composed of steel, aluminum, wood, plywood, or any other material known to those skilled in the art.
 - the deck 340 may be any walking surface known to those in the art that may be installed on top of the horizontal members 205 .
 - the handrail 310 and/or the midrail 320 may be designed to allow for a tie-off point for workers traversing along the deck 340 .
 - each combination of the scaffold bracket 100 , the horizontal member 205 , diagonal member 210 , and the upright rail 330 may be connected to at least one other such combination in the scaffolding system 300 along with the deck 340 to allow workers to traverse along the wall 40 .
 - FIG. 4 illustrates a scaffolding system 400 which uses a plurality of scaffold brackets 100 on an above-ground tank in accordance with implementations of various techniques described herein.
 - a plurality of scaffold brackets 100 , horizontal members 205 , diagonal members 210 , upright rails 330 , handrails 310 , midrails 320 , and decks 340 may be used along the above-ground tank.
 - the scaffolding system 400 may be used along an interior wall of the above-ground tank.
 - the scaffold bracket 100 may be attached near a top of an above-ground storage tank, allowing workers to perform duties needed near the top of the tank via the deck 340 , without the need of additional scaffold brackets, horizontal members, and diagonal members below the scaffold bracket 100 to provide support.
 - the scaffold brackets 100 may be coupled to the welded brackets in a non-permanent manner, thus allowing easier installation or removal.
 - the top handrail and the midrail may be used to provide a stable, solid support for workers traversing along the deck.
 - components of the scaffold bracket and the scaffolding system may be composed of engineered scaffolding members.
 
Landscapes
- Engineering & Computer Science (AREA)
 - Architecture (AREA)
 - Mechanical Engineering (AREA)
 - Civil Engineering (AREA)
 - Structural Engineering (AREA)
 - Mutual Connection Of Rods And Tubes (AREA)
 
Abstract
Description
Claims (9)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| US14/051,286 US9574357B2 (en) | 2013-05-20 | 2013-10-10 | Scaffold bracket | 
| US15/406,478 US10358834B2 (en) | 2013-05-20 | 2017-01-13 | Scaffold bracket | 
| US16/518,770 US20190338542A1 (en) | 2013-05-20 | 2019-07-22 | Scaffold Bracket | 
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| US201361825323P | 2013-05-20 | 2013-05-20 | |
| US14/051,286 US9574357B2 (en) | 2013-05-20 | 2013-10-10 | Scaffold bracket | 
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date | 
|---|---|---|---|
| US15/406,478 Division US10358834B2 (en) | 2013-05-20 | 2017-01-13 | Scaffold bracket | 
Publications (2)
| Publication Number | Publication Date | 
|---|---|
| US20140339019A1 US20140339019A1 (en) | 2014-11-20 | 
| US9574357B2 true US9574357B2 (en) | 2017-02-21 | 
Family
ID=51894898
Family Applications (3)
| Application Number | Title | Priority Date | Filing Date | 
|---|---|---|---|
| US14/051,286 Active US9574357B2 (en) | 2013-05-20 | 2013-10-10 | Scaffold bracket | 
| US15/406,478 Active 2033-12-19 US10358834B2 (en) | 2013-05-20 | 2017-01-13 | Scaffold bracket | 
| US16/518,770 Abandoned US20190338542A1 (en) | 2013-05-20 | 2019-07-22 | Scaffold Bracket | 
Family Applications After (2)
| Application Number | Title | Priority Date | Filing Date | 
|---|---|---|---|
| US15/406,478 Active 2033-12-19 US10358834B2 (en) | 2013-05-20 | 2017-01-13 | Scaffold bracket | 
| US16/518,770 Abandoned US20190338542A1 (en) | 2013-05-20 | 2019-07-22 | Scaffold Bracket | 
Country Status (1)
| Country | Link | 
|---|---|
| US (3) | US9574357B2 (en) | 
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US20190330862A1 (en) * | 2017-01-25 | 2019-10-31 | Bechtel Oil, Gas And Chemicals, Inc. | Scaffolding system for use with curvilinear walls and method of use | 
| US20210095484A1 (en) * | 2019-09-26 | 2021-04-01 | Howard R. Moeggenborg | Elevated walkway system and method | 
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| ES2926290T3 (en) * | 2014-12-15 | 2022-10-25 | Nordex Energy Spain S A | Wind turbine with concrete tower and procedure for its assembly | 
| US10070723B1 (en) * | 2015-09-25 | 2018-09-11 | Troy Greenberg | Attachment bracket | 
| AU2016332986B2 (en) * | 2015-09-29 | 2019-06-13 | Katrina LANGBEIN | Safety device | 
| US12195961B2 (en) | 2016-06-24 | 2025-01-14 | Apache Industrial Services, Inc. | Formwork system | 
| US11306492B2 (en) | 2016-06-24 | 2022-04-19 | Apache Industrial Services, Inc | Load bearing components and safety deck of an integrated construction system | 
| US11624196B2 (en) | 2016-06-24 | 2023-04-11 | Apache Industrial Services, Inc | Connector end fitting for an integrated construction system | 
| US10472823B2 (en) | 2016-06-24 | 2019-11-12 | Apache Industrial Services, Inc. | Formwork system | 
| US11976483B2 (en) | 2016-06-24 | 2024-05-07 | Apache Industrial Services, Inc | Modular posts of an integrated construction system | 
| US11293194B2 (en) | 2016-06-24 | 2022-04-05 | Apache Industrial Services, Inc | Modular ledgers of an integrated construction system | 
| DE102019106067A1 (en) * | 2019-03-11 | 2020-09-17 | Peri Gmbh | Fastening device for a frame element and fastening arrangement | 
| CN110700560A (en) * | 2019-11-11 | 2020-01-17 | 浙江宇之航科技工程有限公司 | Wall-attached hanging piece applied to attached lifting scaffold | 
| CN112854715B (en) * | 2021-03-10 | 2024-11-22 | 中建八局科技建设有限公司 | External scaffolding structure for construction of above-ground structures near foundation pits | 
| CN114960447B (en) * | 2022-06-15 | 2023-07-14 | 中铁上海工程局集团第五工程有限公司 | Cast-in-situ beam support bracket convenient to install fast | 
| US20250295267A1 (en) * | 2024-03-25 | 2025-09-25 | Larry Bagby | Grill mounting apparatus | 
Citations (21)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US3403751A (en) * | 1967-05-11 | 1968-10-01 | David V. Yoder | Scaffold | 
| US3510097A (en) * | 1968-12-03 | 1970-05-05 | William O Mccaleb | Metal scaffold mountable on building wall | 
| US3515244A (en) * | 1968-08-26 | 1970-06-02 | John E Weible | Scaffolding device | 
| US3992118A (en) | 1973-10-10 | 1976-11-16 | Sgb Group Limited | Scaffolding joint | 
| US4039264A (en) * | 1975-04-26 | 1977-08-02 | C. Bryant & Son Limited | Scaffolding | 
| US4396092A (en) * | 1980-04-25 | 1983-08-02 | Thompson H Truett | Roof supported scaffold | 
| US4493578A (en) | 1982-09-30 | 1985-01-15 | Harsco Corporation | Scaffolding connector and system | 
| US5024037A (en) | 1988-12-28 | 1991-06-18 | Tatsuo Ono | Process for connection of supports, and support system | 
| US5535974A (en) | 1994-03-07 | 1996-07-16 | Savitski; Richard H. | Scaffold bracket | 
| US5865410A (en) | 1996-03-18 | 1999-02-02 | Metal Products Specialists, Inc. | Universal staging bracket | 
| US5961240A (en) | 1997-04-02 | 1999-10-05 | Aluma Enterprises Inc. | Scaffolding connector | 
| US6027276A (en) | 1996-01-26 | 2000-02-22 | Peri Gmbh | Scaffolding node | 
| US6026932A (en) | 1997-11-13 | 2000-02-22 | Comp; Bradley L. | Flush mounting scaffolding brace | 
| US20020027043A1 (en) * | 2000-09-07 | 2002-03-07 | Richard Wisler | Wall jack | 
| US6722471B2 (en) | 2000-12-22 | 2004-04-20 | Albert A. Wolfe | Scaffolding system having improved safety structures and connecting members | 
| US20060163001A1 (en) * | 2005-01-24 | 2006-07-27 | Pozell Charles A | Wall hanging scaffold | 
| US20060243524A1 (en) * | 2005-04-29 | 2006-11-02 | Raymond Jarrell | Collapsible hanging scaffold bracket | 
| US20070056799A1 (en) * | 2005-09-12 | 2007-03-15 | Charles Leidner | Scaffold device | 
| US7258197B1 (en) | 2005-05-12 | 2007-08-21 | Frederic Wicks | Scaffold bracket | 
| USD567964S1 (en) | 2006-12-22 | 2008-04-29 | Wah Lai | Scaffolding modular node | 
| US8393439B2 (en) | 2010-01-26 | 2013-03-12 | Steve Howard Thacker | Scaffold system and method | 
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| JPS5796173A (en) * | 1980-09-29 | 1982-06-15 | Aruuma Shisutemusu Inc | Vertical load supporting frame | 
| FR2513290A1 (en) * | 1981-09-24 | 1983-03-25 | Ciotat Chantiers Navals | TUBULAR TYPE SCAFFOLDS, METHOD OF MOUNTING AND HORIZONTAL CROSSINGS OF THESE SCAFFOLDS | 
| IT1167691B (en) * | 1983-12-19 | 1987-05-13 | F A P Praticus Spa | DEVICE FOR THE CONNECTION OF A MAST AND A CURRENT IN A METAL TUBULAR SCAFFOLD FOR THE BUILDING INDUSTRY | 
| US5259477A (en) * | 1992-02-12 | 1993-11-09 | Clois D. Fears | Collapsible scaffold bracket | 
| CA2111724A1 (en) * | 1993-12-17 | 1995-06-18 | Raymond Wayne Gillard | Scaffold system | 
| CA2436339A1 (en) * | 2003-07-30 | 2005-01-30 | Aluma Enterprises Inc. | Shoring leg with node connectors | 
| US9482020B2 (en) * | 2009-07-21 | 2016-11-01 | Deltak Manufacturing, Inc. | Method of assembling an offset working platform on a scaffold structure using a foldable knee-out scaffold frame member | 
| AU2013101084B4 (en) * | 2013-02-11 | 2015-02-05 | 4 Ken Pty Ltd | Method and system for oblique scaffold connection | 
- 
        2013
        
- 2013-10-10 US US14/051,286 patent/US9574357B2/en active Active
 
 - 
        2017
        
- 2017-01-13 US US15/406,478 patent/US10358834B2/en active Active
 
 - 
        2019
        
- 2019-07-22 US US16/518,770 patent/US20190338542A1/en not_active Abandoned
 
 
Patent Citations (21)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US3403751A (en) * | 1967-05-11 | 1968-10-01 | David V. Yoder | Scaffold | 
| US3515244A (en) * | 1968-08-26 | 1970-06-02 | John E Weible | Scaffolding device | 
| US3510097A (en) * | 1968-12-03 | 1970-05-05 | William O Mccaleb | Metal scaffold mountable on building wall | 
| US3992118A (en) | 1973-10-10 | 1976-11-16 | Sgb Group Limited | Scaffolding joint | 
| US4039264A (en) * | 1975-04-26 | 1977-08-02 | C. Bryant & Son Limited | Scaffolding | 
| US4396092A (en) * | 1980-04-25 | 1983-08-02 | Thompson H Truett | Roof supported scaffold | 
| US4493578A (en) | 1982-09-30 | 1985-01-15 | Harsco Corporation | Scaffolding connector and system | 
| US5024037A (en) | 1988-12-28 | 1991-06-18 | Tatsuo Ono | Process for connection of supports, and support system | 
| US5535974A (en) | 1994-03-07 | 1996-07-16 | Savitski; Richard H. | Scaffold bracket | 
| US6027276A (en) | 1996-01-26 | 2000-02-22 | Peri Gmbh | Scaffolding node | 
| US5865410A (en) | 1996-03-18 | 1999-02-02 | Metal Products Specialists, Inc. | Universal staging bracket | 
| US5961240A (en) | 1997-04-02 | 1999-10-05 | Aluma Enterprises Inc. | Scaffolding connector | 
| US6026932A (en) | 1997-11-13 | 2000-02-22 | Comp; Bradley L. | Flush mounting scaffolding brace | 
| US20020027043A1 (en) * | 2000-09-07 | 2002-03-07 | Richard Wisler | Wall jack | 
| US6722471B2 (en) | 2000-12-22 | 2004-04-20 | Albert A. Wolfe | Scaffolding system having improved safety structures and connecting members | 
| US20060163001A1 (en) * | 2005-01-24 | 2006-07-27 | Pozell Charles A | Wall hanging scaffold | 
| US20060243524A1 (en) * | 2005-04-29 | 2006-11-02 | Raymond Jarrell | Collapsible hanging scaffold bracket | 
| US7258197B1 (en) | 2005-05-12 | 2007-08-21 | Frederic Wicks | Scaffold bracket | 
| US20070056799A1 (en) * | 2005-09-12 | 2007-03-15 | Charles Leidner | Scaffold device | 
| USD567964S1 (en) | 2006-12-22 | 2008-04-29 | Wah Lai | Scaffolding modular node | 
| US8393439B2 (en) | 2010-01-26 | 2013-03-12 | Steve Howard Thacker | Scaffold system and method | 
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US20190330862A1 (en) * | 2017-01-25 | 2019-10-31 | Bechtel Oil, Gas And Chemicals, Inc. | Scaffolding system for use with curvilinear walls and method of use | 
| US20210095484A1 (en) * | 2019-09-26 | 2021-04-01 | Howard R. Moeggenborg | Elevated walkway system and method | 
Also Published As
| Publication number | Publication date | 
|---|---|
| US20190338542A1 (en) | 2019-11-07 | 
| US20170130469A1 (en) | 2017-05-11 | 
| US20140339019A1 (en) | 2014-11-20 | 
| US10358834B2 (en) | 2019-07-23 | 
Similar Documents
| Publication | Publication Date | Title | 
|---|---|---|
| US10358834B2 (en) | Scaffold bracket | |
| US20210270048A1 (en) | Method of Erecting An Offset Scaffold Platform | |
| US11970873B2 (en) | Bearing plate of an integrated construction system | |
| US10415262B2 (en) | Modular ledgers of an integrated construction system | |
| US7735606B1 (en) | Scaffold support platform | |
| US11761217B2 (en) | Scaffold gate toeboard assembly for use on a scaffold gate | |
| US20130043095A1 (en) | Masonry scaffold system with truss level rosettes | |
| AU2012332760A1 (en) | Pivoting horizontal and vertical scaffold members and a method of erecting an offset scaffold platform | |
| US20080202064A1 (en) | Bracket and method for supoprting a platform from concrete form tabs | |
| US20240287823A1 (en) | Modular Posts of an Integrated Construction System | |
| US11293194B2 (en) | Modular ledgers of an integrated construction system | |
| US10570630B2 (en) | Suspended scaffolding structure and connector therefor | |
| US20170028232A1 (en) | Lifeline device for temporary scaffold and lifeline support device | |
| CN103334580B (en) | Section steel tripod in a kind of overhanging scaffold and connection system for guide rail | |
| US9765537B2 (en) | Vertical support member for a suspended scaffold assembly, kit for mounting a suspended scaffold assembly, suspended scaffold assembly and method for mounting the same | |
| WO2019126187A1 (en) | Integrated construction system | |
| CN108612329A (en) | A kind of safeguard structure and its construction method of skyscraper internal core tube construction | |
| AU2013100389A4 (en) | Scaffolding system | 
Legal Events
| Date | Code | Title | Description | 
|---|---|---|---|
| AS | Assignment | 
             Owner name: APACHE INDUSTRIAL SERVICES. INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HULETT, BURT;BRETHERTON, DAVID;REEL/FRAME:032951/0806 Effective date: 20140430  | 
        |
| STCF | Information on status: patent grant | 
             Free format text: PATENTED CASE  | 
        |
| AS | Assignment | 
             Owner name: WILMINGTON TRUST, NATIONAL ASSOCIATION, MINNESOTA Free format text: SECURITY INTEREST;ASSIGNOR:APACHE INDUSTRIAL SERVICES, INC.;REEL/FRAME:041160/0585 Effective date: 20170202  | 
        |
| AS | Assignment | 
             Owner name: PNC BANK, NATIONAL ASSOCIATION, PENNSYLVANIA Free format text: SECURITY INTEREST;ASSIGNOR:APACHE INDUSTRIAL SERVICES, INC.;REEL/FRAME:051684/0222 Effective date: 20200130  | 
        |
| MAFP | Maintenance fee payment | 
             Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4  | 
        |
| AS | Assignment | 
             Owner name: APACHE INDUSTRIAL SERVICES, INC., TEXAS Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WILMINGTON TRUST, NATIONAL ASSOCIATION, AS AGENT;REEL/FRAME:059528/0598 Effective date: 20220325  | 
        |
| FEPP | Fee payment procedure | 
             Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY  | 
        |
| FEPP | Fee payment procedure | 
             Free format text: 7.5 YR SURCHARGE - LATE PMT W/IN 6 MO, LARGE ENTITY (ORIGINAL EVENT CODE: M1555); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY  | 
        |
| MAFP | Maintenance fee payment | 
             Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8  |