US945086A - Pile-construction device. - Google Patents
Pile-construction device. Download PDFInfo
- Publication number
- US945086A US945086A US47389109A US1909473891A US945086A US 945086 A US945086 A US 945086A US 47389109 A US47389109 A US 47389109A US 1909473891 A US1909473891 A US 1909473891A US 945086 A US945086 A US 945086A
- Authority
- US
- United States
- Prior art keywords
- pile
- piles
- secured
- barges
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 16
- 230000007246 mechanism Effects 0.000 description 4
- 238000005086 pumping Methods 0.000 description 2
- 241000282472 Canis lupus familiaris Species 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- VKYKSIONXSXAKP-UHFFFAOYSA-N hexamethylenetetramine Chemical compound C1N(C2)CN3CN1CN2C3 VKYKSIONXSXAKP-UHFFFAOYSA-N 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 239000006187 pill Substances 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
Definitions
- the invention relates to improvements in pile construction devices, as described in the following specification and illustrated in the accompanying drawings that form part of the same.
- the invention consists essentially in the novel construction and arrangement of parts, whereby the piles are held in suitable guides suspended from a barge,-and said piles lowered and raised in said guides by a suitable lowering and raising mechanism traveling on said barge.
- the objects of the invention are, to facilitate the work of building piers, breakwaters, dams, caissons and other llke structures, and to provide a device for handling and placing piling with the least expenditure of time and labor.
- Figure 1 is a perspective view of the device shown in operating position placing a set of piling for a section of a pier or breakwater.
- Fig. 2 is a cross section through the device showing a traveling pile device mounted on one of the barges.
- Fig. 3 is an enlarged perspective detail of a portion of one of the guide-frames showing the means for securing the piles in the said guides and one means for raising the piles.
- Fig. 4 is a perspective detail of the end of one of the guide-frames.
- Fig. 5 is an enlarged sectional View through the guide-strip and supports for the guide frames.
- 1 and 2 are barges having the bulk heads 3 and 4; therein forming water tight compartments in the bottom thereof.
- 5 are longitudinal timbers secured to the decks of the said barges.
- the ends of the frame work 6 rest on the longitudinal timbers 5 and are adjustably secured to said timbers by the screws 11, said screws being'threaded in suitable blocks secured to the frame. 7
- 17 and 18 are the upper and lower guide strips secured to the inner sides of the barges and extending from end to end thereon the upper strips 17 having the longitudinal grooves 19 in their upper edges.
- the guide frames preferably formed of a pair of I beams suitably trussed and having the ends 21 formed of channel sections with the flanges turned inwardly, said channels having the pairs of vertical slots 22 at the top and bottom.
- the guides here shown as shaped to receive the flanges of the locking sections of the piling and secured to the I beams 20 and spaced apart to allow the insertion of the members of the piling arranged between said locking members.
- a particular form of piling is shown herein, but it must be understood that many different forms of piling may be used with this device, the guides 17 being formed to suit.
- 24 are hook members secured to the upper beam of the guide frames 20 and having a downwardly extendingflange ada ted to fit into the longitudinal grooves 19 in the upper guide strips, said hook members supporting said guide frames from the bar es, the lower guide strips holding said guice frames in a vertical position.
- 25 are rods extending lon itudinally of the guide frames and suitably supported.
- 26 are cam levers pivotally supported on the rods 25 and havin the cam portions adapted to engage the pills members and lock said members securely in said guides.
- 27 are links pivotally. secured to -said cam levers.
- cam levers and their co-acting parts form a simple means for securing the pile members in the guide frames either to support the piles in a raised position from the barges or to hold the frames to the piling when the barges are taken away, but it must be understood that many simple means may be devised for securing said piles and frames together.
- 32 are gear pinions turning on the studs 31.
- 33 are hand levers turning on the studs 31 and carrying the ratchet pawls 34:, said ratchet pawls engaging the teeth of said pinions.
- 35 are spring held dogs secured to said brackets 30 and engaging-the teeth of said pinions and holding said pinions from movement in one -direction.
- 36 are gear racks secured to the piles extending between the locking members, said racks meshing with the gear pinions 32. This ratchet and gear mechanism is shown as applied to one of the piles, but it must be understood that it may be applied to all of the piles.
- the locking pile members are shown provided with a plurality of holes 37 in their outer flanges. These holes are provided so that crowbars may be inserted therein to raise said members.
- Each of the piles is also provided with the holes 38in the web portion through which a hook from the pile driver or derrick may be inserted to raise the said piles.
- 39 are pipes opening through the side walls of the barges below the water line and leading to the water tight compartment formed in the bottom thereof and said pipes are provided with suitable valves to control the inflow of water to said compartment.
- 40 are pumps of any suitable style connected by suitable piping to said water tight compartments and adapted to beused to empty said compartments of water when desired.
- the piles are placed in the guides and held by the locking devices with their lower ends a suflicient height to clear the bottom of the lake or other body of water in which the structure is to be built.
- the barges are then floated to their proper position and anchored.
- the traveling pile drivers may then be brought into use and operated to drive the piles to their proper position the barges remaining stationary.
- a temporary caisson is formed.
- the valves in the pipes 39 are then opened and the water filling the water tight compartments sinks the barges a suflicient distance to disengage the hook members supporting the guide frames from the upper guide strips.
- the barges may then be floated away allowing the further operation of pumping out the water and sand from the caisson and the filling in of the concrete work.
- the piling forming the sides of a completed section may be removed.
- the barges are floated into place and the water emptied from the water compartments, thus raising them so that the hook members engage the upper guide strips.
- the piles are then raised either by the gear mechanism described or by the them. up, and as each pile is raised it is gripped by the cam levers and held securely.
- the barges are shown secured together for placing a double row of piling, but it will be readily understood that the device may be used with equal facility for a single line of work, the barges being merely disconnected and rearranged so that the guide frames will be on the outer side of the barge.
- Guides may be secured to the cross frame as shown or they may be supported at both ends for single piers or caisson work or they may not be used at all.
- What I claim as my invention is 1.
- a pile construction device the combination with a suitable barge, of a pile guiding frame suspended from said barge, and traveling means for lowering and raming said piles.
- a pile construction device the combination with a suitable barge, of a pile guiding frame removably sus ended from said barge, traveling means for lowering and raising said piles in said frame, and means for locking said piles to said guide frame.
- a pile construction device the combination with a suitable barge, of a frame suspended from the side of said barge, guides for the piling fixedly secured to said frame, means for lowering and raising the piles in said guides, and means for locking the piles in said guides.
- a pile construction device the combination with a suitable barge, of a guide frame suitably trussed and suspended from said barge and having a plurality of cross slots formed in the upper member thereof, a plurality of guide blocks rigidly secured to the upper and lower members of said guide frame and arranged in pairs in vertical alinement, a rod extending from end to end of said guide frame, a plurality of cam levers pivotally supported on said rod, links secured to said cam levers and extending upwardly through the cross slots in the upper frame, said links having notches therein forming teeth adapted to engage the ends of said slots.
- a barge having longitudinal strips secured to the side thereof, one of said strips being adjacent to the top and the other below the water, the upper strip having a longitudinal groove therein, a guide frame suitably trussed and having hook members secured thereto extending over said upper strip on said barge and resting in a longitudinal groove in sa1d strip, guide blocks for receiving the pipe members fixedly secured to said guide frame, and lockin means supported in said guide frame for locking the said frame and piles together.
- a pile construction device the combination with a suitable barge, of a frame removably suspended from the side of said barge, the end members of said frames having pairs of bolt slots adjacent to the upper and lower ends thereof, a plurality of uide blocks fixedly secured to the outer si e of said guide frame and adapted to receive the pile members, and means for locking said pile members to said frame.
- a barge having bulk heads formin a plurality of water-tight compartments therein below, the water line, said bulkheads having openings therein, pipes leading from said openings and communicating with the outside Water, suitable valves in said pi es, means for pumping the water from sai compartments, a frame having suitable guides secured thereto in which the piles are slidably supported, said frame being detachably suspended from said barge, and means for locking said piles in said guides.
- a pile construction device a pair of bar -es, each having a suitable track-way extencing longitudinally thereon, a frame work rigidly secured to said barges at one end thereof and holding said barges apart, said frame having a suitable track-way thereon, a truss extending across the other ends of said barges and rigidly secured thereto, suitable pile driving and raising mechanisms traveling on said track-ways, and pile guiding frames removably suspended from said barges.
- a pontoon forming an inclosure, a plurality of guides secured to said pontoons in said inclosure, and traveling means supported on said pontoon for lowering and raising said piling.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
c. J. FENSOM. PILE CONSTRUCTION DEVICE.
APPLICATION nun JAN. 23, 1900.
' Patented Jan. 4, 1910.
h z sums-sum 1.
Wad
CHARLES JOSEPH FENSOM, 0F TORONTO, ONTARIO, CANADA.
FILE-CONSTRUCTION DEVICE.
Specification of Letters Patent.
Patented Jan. 4, 1910.
Application filed January 23, 1909. Serial No. 473,891.
To all whom it may concern:
Be it known that I, CHARLES JOSEPH FEN- SOM, a subject of the King of Great Britain, and resident of the city of Toronto, county of York, Province of Ontario, Dominion of Canada, have invented certain new and useful Improvements in Pile-Construction Devices, of which the following is a specification.
The invention relates to improvements in pile construction devices, as described in the following specification and illustrated in the accompanying drawings that form part of the same.
The invention consists essentially in the novel construction and arrangement of parts, whereby the piles are held in suitable guides suspended from a barge,-and said piles lowered and raised in said guides by a suitable lowering and raising mechanism traveling on said barge.
The objects of the invention are, to facilitate the work of building piers, breakwaters, dams, caissons and other llke structures, and to provide a device for handling and placing piling with the least expenditure of time and labor.
In the drawings, Figure 1 is a perspective view of the device shown in operating position placing a set of piling for a section of a pier or breakwater. Fig. 2 is a cross section through the device showing a traveling pile device mounted on one of the barges. Fig. 3 is an enlarged perspective detail of a portion of one of the guide-frames showing the means for securing the piles in the said guides and one means for raising the piles. Fig. 4 is a perspective detail of the end of one of the guide-frames. Fig. 5 is an enlarged sectional View through the guide-strip and supports for the guide frames.
Like numerals of reference indicate corresponding parts in each fi ure.
Referring to the drawings, 1 and 2 are barges having the bulk heads 3 and 4; therein forming water tight compartments in the bottom thereof. 5 are longitudinal timbers secured to the decks of the said barges.
6 is a frame-work formed of the side timbers 7 and end timbers 8 securely bolted together and braced by the cross timbers 9 and diagonal braces 10.
11 is a truss extending upwardly from the outer one of the side timbers 7 and firmly bolted thereto.
The ends of the frame work 6 rest on the longitudinal timbers 5 and are adjustably secured to said timbers by the screws 11, said screws being'threaded in suitable blocks secured to the frame. 7
12 is a truss spanning the opposite ends of the barges and firmly secured to the longitndinal timbers 5 and supported at the inner sides of the said barges by the block 13.
14: are rails forming tracks secured to the decks of the barges toward their inner sides and extending from end to end thereof and upon which suitable traveling pile drivers or derricks 15 are mounted.
16 are rails forming trackssecured to the frame work 6 and extending from end to end thereof and adapted to support a suitable pile driver or derrick. I
17 and 18 are the upper and lower guide strips secured to the inner sides of the barges and extending from end to end thereon the upper strips 17 having the longitudinal grooves 19 in their upper edges.
20 are the guide frames preferably formed of a pair of I beams suitably trussed and having the ends 21 formed of channel sections with the flanges turned inwardly, said channels having the pairs of vertical slots 22 at the top and bottom.
23 are the guides here shown as shaped to receive the flanges of the locking sections of the piling and secured to the I beams 20 and spaced apart to allow the insertion of the members of the piling arranged between said locking members. A particular form of piling is shown herein, but it must be understood that many different forms of piling may be used with this device, the guides 17 being formed to suit. 24 are hook members secured to the upper beam of the guide frames 20 and having a downwardly extendingflange ada ted to fit into the longitudinal grooves 19 in the upper guide strips, said hook members supporting said guide frames from the bar es, the lower guide strips holding said guice frames in a vertical position. 25 are rods extending lon itudinally of the guide frames and suitably supported. 26 are cam levers pivotally supported on the rods 25 and havin the cam portions adapted to engage the pills members and lock said members securely in said guides. 27 are links pivotally. secured to -said cam levers.
held in a raised position by the teeth formed by said notches engaging the said beam and said links are held securely by suitable blocks or wedges 29 inserted in the slots 28 behind them.
The cam levers and their co-acting parts form a simple means for securing the pile members in the guide frames either to support the piles in a raised position from the barges or to hold the frames to the piling when the barges are taken away, but it must be understood that many simple means may be devised for securing said piles and frames together.
30 are brackets secured to the upper members of the guide frames having studs 31 secured therein. 32 are gear pinions turning on the studs 31. 33 are hand levers turning on the studs 31 and carrying the ratchet pawls 34:, said ratchet pawls engaging the teeth of said pinions. 35 are spring held dogs secured to said brackets 30 and engaging-the teeth of said pinions and holding said pinions from movement in one -direction. 36 are gear racks secured to the piles extending between the locking members, said racks meshing with the gear pinions 32. This ratchet and gear mechanism is shown as applied to one of the piles, but it must be understood that it may be applied to all of the piles.
The locking pile members are shown provided with a plurality of holes 37 in their outer flanges. These holes are provided so that crowbars may be inserted therein to raise said members. Each of the piles is also provided with the holes 38in the web portion through which a hook from the pile driver or derrick may be inserted to raise the said piles.
39 are pipes opening through the side walls of the barges below the water line and leading to the water tight compartment formed in the bottom thereof and said pipes are provided with suitable valves to control the inflow of water to said compartment. 40 are pumps of any suitable style connected by suitable piping to said water tight compartments and adapted to beused to empty said compartments of water when desired.
In the use of this device, the piles are placed in the guides and held by the locking devices with their lower ends a suflicient height to clear the bottom of the lake or other body of water in which the structure is to be built. The barges are then floated to their proper position and anchored. The
' piling is then released and if the bottom is soft they will sink a considerable distance with their own weight. The traveling pile drivers may then be brought into use and operated to drive the piles to their proper position the barges remaining stationary. As soon as all of the piles are driven home with the guide frames locked thereto, a temporary caisson is formed. The valves in the pipes 39 are then opened and the water filling the water tight compartments sinks the barges a suflicient distance to disengage the hook members supporting the guide frames from the upper guide strips. The barges may then be floated away allowing the further operation of pumping out the water and sand from the caisson and the filling in of the concrete work. If a breakwater or pier is being constructed, after a few sections have been completed, the piling forming the sides of a completed section may be removed. In removing the piling, the barges are floated into place and the water emptied from the water compartments, thus raising them so that the hook members engage the upper guide strips. The piles are then raised either by the gear mechanism described or by the them. up, and as each pile is raised it is gripped by the cam levers and held securely.
When the full complement of piles is raised, the barges are moved farther apart by means of the screws 11, so that the piling supported thereby will clear the piling of the succeeding sections of the work. The barges are then floated to the end of the end section and the ends of the guides are securely bolted to the preceding guide frames, thus obtaining a perfect alinement for the succeeding section.
The barges are shown secured together for placing a double row of piling, but it will be readily understood that the device may be used with equal facility for a single line of work, the barges being merely disconnected and rearranged so that the guide frames will be on the outer side of the barge.
Guides may be secured to the cross frame as shown or they may be supported at both ends for single piers or caisson work or they may not be used at all.
The details of construction of this device may be altered considerably without departing from the spirit of the invention, that is to say, so long as the essential feature of providing guides for the piles removably suspended from a barge and means for raising and lowering said piles, is adhered to.
It has been particularly shown and described that the guide frames are separable the fresh concrete work and in such cases the guides will be rigidly secured to the said barges.
What I claim as my invention is 1. In a pile construction device, the combination with a suitable barge, of a pile guiding frame suspended from said barge, and traveling means for lowering and raming said piles.
2. In a pile construction device, the combination with a suitable barge, of a pile guiding frame suspended from said barge, and a suitable pile driver traveling on said barge from end to end thereof.
3. In a pile construction device, the combination with a suitable barge, of a pile guiding frame removably sus ended from said barge, traveling means for lowering and raising said piles in said frame, and means for locking said piles to said guide frame.
4. In a pile construction device, the combination with a suitable barge, of a frame suspended from the side of said barge, guides for the piling fixedly secured to said frame, means for lowering and raising the piles in said guides, and means for locking the piles in said guides.
5. In a pile construction device, the combination with a suitable barge, of a guide frame suitably trussed and suspended from said barge and having a plurality of cross slots formed in the upper member thereof, a plurality of guide blocks rigidly secured to the upper and lower members of said guide frame and arranged in pairs in vertical alinement, a rod extending from end to end of said guide frame, a plurality of cam levers pivotally supported on said rod, links secured to said cam levers and extending upwardly through the cross slots in the upper frame, said links having notches therein forming teeth adapted to engage the ends of said slots.
6. In a pile construction device, a barge having longitudinal strips secured to the side thereof, one of said strips being adjacent to the top and the other below the water, the upper strip having a longitudinal groove therein, a guide frame suitably trussed and having hook members secured thereto extending over said upper strip on said barge and resting in a longitudinal groove in sa1d strip, guide blocks for receiving the pipe members fixedly secured to said guide frame, and lockin means supported in said guide frame for locking the said frame and piles together.
7. In a pile construction device, the combination with a suitable barge, of a frame removably suspended from the side of said barge, the end members of said frames having pairs of bolt slots adjacent to the upper and lower ends thereof, a plurality of uide blocks fixedly secured to the outer si e of said guide frame and adapted to receive the pile members, and means for locking said pile members to said frame.
8. In a pile construction device, a barge having bulk heads formin a plurality of water-tight compartments therein below, the water line, said bulkheads having openings therein, pipes leading from said openings and communicating with the outside Water, suitable valves in said pi es, means for pumping the water from sai compartments, a frame having suitable guides secured thereto in which the piles are slidably supported, said frame being detachably suspended from said barge, and means for locking said piles in said guides.
9. In a pile construction device, a pair of bar -es, each having a suitable track-way extencing longitudinally thereon, a frame work rigidly secured to said barges at one end thereof and holding said barges apart, said frame having a suitable track-way thereon, a truss extending across the other ends of said barges and rigidly secured thereto, suitable pile driving and raising mechanisms traveling on said track-ways, and pile guiding frames removably suspended from said barges.
10. In a pile construction device, a pontoon. forming an inclosure, a plurality of guides secured to said pontoons in said inclosure, and traveling means supported on said pontoon for lowering and raising said piling.
Signed at the city of Toronto, county of York, Province of ntario, in the Dominion of Canada, this 12th day of January, 1909.
CHARLES JOSEPH FENSOM.
Witnesses H. DENNISON, E. HERON.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US47389109A US945086A (en) | 1909-01-23 | 1909-01-23 | Pile-construction device. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US47389109A US945086A (en) | 1909-01-23 | 1909-01-23 | Pile-construction device. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US945086A true US945086A (en) | 1910-01-04 |
Family
ID=3013508
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US47389109A Expired - Lifetime US945086A (en) | 1909-01-23 | 1909-01-23 | Pile-construction device. |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US945086A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3001592A (en) * | 1954-09-03 | 1961-09-26 | De Long Corp | Well drilling and servicing barge including bridge and rig structure and methods |
| US4208158A (en) * | 1978-04-10 | 1980-06-17 | Franklin Enterprises, Inc. | Auxiliary offshore rig and methods for using same |
| AU576832B2 (en) * | 1984-05-07 | 1988-09-08 | Betz International, Inc. | Liquid mixing device |
-
1909
- 1909-01-23 US US47389109A patent/US945086A/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3001592A (en) * | 1954-09-03 | 1961-09-26 | De Long Corp | Well drilling and servicing barge including bridge and rig structure and methods |
| US4208158A (en) * | 1978-04-10 | 1980-06-17 | Franklin Enterprises, Inc. | Auxiliary offshore rig and methods for using same |
| AU576832B2 (en) * | 1984-05-07 | 1988-09-08 | Betz International, Inc. | Liquid mixing device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7513713B2 (en) | Structure for transporting, commissioning and decommissioning of a deck of a fixed oil platform and method for implementing the structure | |
| US3183676A (en) | Mobile sea platform | |
| US4456404A (en) | Method and apparatus for positioning a working barge above a sea surface | |
| US1310461A (en) | Floatable concrete construction | |
| US3830071A (en) | Jack-up drilling platform | |
| JPH05503124A (en) | Method and apparatus for constructing artificial islands and islands thus obtained | |
| DE2700624A1 (en) | DOCKING SYSTEM | |
| US3804369A (en) | Jacking mechanisms | |
| US2050727A (en) | Caisson belt apparatus and method | |
| NO170769B (en) | SUBSTANT CONCENTRATE, PROCEDURE FOR MANUFACTURING, AND USE OF SUBSTANT CONCENTRATE | |
| LT4474B (en) | Method of and device for renovation of quay | |
| US715768A (en) | Method of constructing and laying subaqueous tunnels. | |
| US1048700A (en) | Structure for use in building embankments in water. | |
| US2591225A (en) | Offshore platform | |
| US1394571A (en) | Subaqueous structure and method | |
| US1267129A (en) | Apparatus for driving piles. | |
| US2976692A (en) | Mobile breakwater | |
| RU2794790C1 (en) | Berth and method of its construction | |
| US764798A (en) | Apparatus for building tunnels or the like. | |
| US192171A (en) | Improvement in bulk-heads and piers | |
| US1160180A (en) | Apparatus for constructing dry-docks. | |
| US2282481A (en) | Floating launching ways | |
| US1524A (en) | John s | |
| RU2783828C1 (en) | Device for strengthening earth structures | |
| US1966974A (en) | Method and apparatus for use in connection with the setting of bridge pier caissons |