US9181786B1 - Sea floor boost pump and gas lift system and method for producing a subsea well - Google Patents
Sea floor boost pump and gas lift system and method for producing a subsea well Download PDFInfo
- Publication number
- US9181786B1 US9181786B1 US14/491,593 US201414491593A US9181786B1 US 9181786 B1 US9181786 B1 US 9181786B1 US 201414491593 A US201414491593 A US 201414491593A US 9181786 B1 US9181786 B1 US 9181786B1
- Authority
- US
- United States
- Prior art keywords
- well
- gas
- pump
- fluid
- production tubing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 70
- 239000012530 fluid Substances 0.000 claims abstract description 99
- 239000007788 liquid Substances 0.000 claims abstract description 29
- 238000002347 injection Methods 0.000 claims abstract description 28
- 239000007924 injection Substances 0.000 claims abstract description 28
- 238000000034 method Methods 0.000 claims abstract description 19
- 238000005086 pumping Methods 0.000 claims description 7
- 238000012544 monitoring process Methods 0.000 claims 1
- 230000002706 hydrostatic effect Effects 0.000 abstract description 2
- 239000007789 gas Substances 0.000 description 97
- 238000004891 communication Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 239000012717 electrostatic precipitator Substances 0.000 description 3
- 239000000314 lubricant Substances 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/013—Connecting a production flow line to an underwater well head
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/122—Gas lift
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/128—Adaptation of pump systems with down-hole electric drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
- E21B43/168—Injecting a gaseous medium
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/36—Underwater separating arrangements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/40—Separation associated with re-injection of separated materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Definitions
- This disclosure relates in general to subsea wells and in particular to a sea floor booster pump and gas separator for directing a liquid well stream to the surface and re-injecting gas into a well for gas lift.
- Subsea hydrocarbon wells in deep water initially have enough natural or reservoir pressure to flow the well fluids to a wellhead at the sea floor, plus up a riser or flow line to a processing facility at the sea surface.
- the reservoir pressure declines over time, and eventually becomes inadequate to lift the well fluid to the surface processing facility, which may be thousands of feet above the sea floor.
- Even though the well may have sufficient pressure to lift the column to the sea floor, it may have to be closed in unless some type of artificial lift is employed.
- Well submersible pumps are commonly used in land-based wells to pump the well fluid to the wellhead when the reservoir pressure is inadequate.
- One type of submersible well pump is an electrical submersible pump (ESP), which normally employs a three-phase electrical motor to drive a centrifugal pump.
- the ESP is supported on a string of production tubing extending into the well.
- ESPs are capable of not only lifting the column of well fluid to the wellhead, but if installed in a subsea well, also up a riser or flow line to a production facility.
- ESPs have to be pulled from the well from time to time for maintenance or replacement.
- pulling an ESP from a subsea well is very expensive.
- a semi-submersible drilling rig is required to pull the production tubing and the ESP from a well. Consequently, operators are reluctant to install ESPs in deep water subsea wells.
- Sea floor pumps have been proposed to boost the pressure of the well fluid flowing out of the wellhead.
- a sea floor pump lifts the column of well fluid from the sea floor to a production facility at the surface.
- sea floor pumps are also quite expensive if installed in deep water.
- a gas lift mandrel will be secured in the production tubing.
- the gas lift mandrel has a port leading from the tubing annulus surrounding the production tubing to the interior of the production tubing.
- a check valve can be lowered on a wireline through the tubing and installed in the gas lift mandrel.
- the operator pumps compressed gas into the tubing annulus, which flows through the check valve into the column of well fluid in the production tubing.
- the injected gas lightens the column of well fluid in the tubing, facilitating flow to the well head.
- a drawback to subsea gas lift is the requirement for a gas source and compressor to inject the gas into the tubing annulus.
- the gas source and compressor would likely need to be located on the sea floor. The cost may be too much for deep water offshore wells.
- a method for producing a subsea well includes installing a pump and a gas/liquid separator on a sea floor. A discharge of the pump connects to an inlet of the separator. The method includes flowing a well fluid up the well, and with the separator separating gas from liquid. The separated liquid flows from the separator to a remote production facility. The separated gas is injected at a selected depth into the same well or into another well and into the well fluid flowing up the well to serve as a gas lift.
- the well employs production tubing that may have a port located at the selected depth.
- the injected gas flows into the port in the production tubing.
- the port may be in a gas lift mandrel containing a check valve.
- the gas is injected into the production tubing annulus surrounding the production tubing.
- the operator may lower an injection line into the production tubing to the selected depth.
- the gas is injected into the injection line.
- the pump may be an electrical submersible pump installed in a flow line jumper on the sea floor. If so, the gas separator is installed on the sea floor outside of the flow line jumper.
- the flow line jumper is retrievable with the pump inside.
- the method may include sensing a ratio of gas to liquid in the well fluid flowing to the pump.
- the system may inject gas from a storage facility into the well if the ratio due to inadequate naturally produced gas is less than a desired amount.
- the system may include a plurality of subsea wells that are connected to a manifold.
- Well fluid flows from each of the wells to the manifold, and from the manifold to the pump.
- the system injects at least some of the gas separated by the separator into at least one of the wells.
- FIG. 1 is a schematic view of one embodiment of a subsea well pumping system in accordance with this disclosure.
- FIG. 2 is a schematic view of an alternate way to FIG. 1 of injecting gas into the well of FIG. 1 , employing a gas injection tube rather than a gas lift mandrel.
- FIG. 3 is a schematic view of an alternate subsea well pumping system to the system of FIG. 1 , employing an external supply of gas for injection.
- FIG. 4 is a schematic view of an alternate to the subsea well pumping system of FIG. 1 , showing gas injection into multiple wells by a single pumping system.
- FIG. 5 is a schematic view of an alternate to the multi-phase pump of FIG. 1 , showing an electrical submersible pump installed in a flow line jumper.
- cased well 11 has openings, such as perforations 13 for admitting well fluid.
- Cased well 11 may be vertical, as shown, or it may be inclined or have a horizontal section.
- a string of production tubing 15 extends into cased well 11 .
- a packer 17 may be employed above perforations 13 to isolate the lower open end of production tubing 15 from cased well 11 above packer 17 .
- cased well 11 is arranged for a gas lift operation and has a gas lift mandrel 19 , which may also be called a side pocket mandrel, secured into production tubing 15 above packer 17 .
- Gas lift mandrel 19 is a conventional device having a check valve 21 that is normally retrievable and installable on a wire line (not shown) lowered into production tubing 15 .
- Check valve 21 is located within a port in production tubing 21 that has an inlet side in communication with an annulus 23 surrounding production tubing 15 .
- An outlet side of check valve 21 is in fluid communication with the interior of production tubing 15 .
- Gas lift mandrel 19 is located a selected depth in cased well 11 , which may be only a few feet above packer 17 .
- a production tree 25 located at the upper end of cased well 11 supports production tubing 15 .
- Tree 25 will be located at or near sea floor 27 .
- Tree 25 has an outlet 29 for discharging well fluid flowing up tubing 15 .
- Tree outlet 29 leads to a pump 31 capable of pumping well fluid containing liquid and a significant percentage of gas, possibly 40 percent or more.
- Pump 31 is also located at or near sea floor 27 , and it may be a multi-phase pump of a type too large in diameter to be installed in cased well 11 .
- the discharge of pump 31 connects to the inlet of a gas/liquid separator 35 , also located at or near sea floor 27 .
- Separator 35 may be a conventional type that has no moving parts and separates gas and liquid using a vortex structure or gravity or both.
- Separator 35 has a higher density or liquid outlet 37 that discharges a higher density stream containing predominately liquid.
- Separator 35 has a lower density or gas outlet 39 that discharges predominately gas.
- the flowing pressures at higher density outlet 37 and lower density outlet 39 are substantially the same.
- Higher density outlet 37 connects to a riser or flow line 38 that extends to a remote well fluid processor 41 , which may be on a production vessel 43 at the sea surface 45 .
- Lower density outlet 39 connects to a sea floor injection line 47 that extends back to tree 25 . Sea floor injection line 47 is in fluid communication with well annulus 23 .
- Various sensors 46 are at the inlet of pump 31 to sense fluid parameters such as the well fluid flowing pressure, temperature and/or flow rate.
- a controller 48 normally on production vessel 43 , is in electrical communication with sensors 46 .
- a choke or valve 50 at low density outlet 39 is controlled by controller 48 to change the flow area through injection line 47 .
- a choke or valve (not shown) could also be located at higher density outlet 37 of gas separator 35 .
- the various chokes and valves may be either fixed or variable to control the amount of gas being re-injected into cased well 11 . Controller 48 may optionally control the speed of pump 31 .
- well fluid flowing from perforations 13 may comprise a mixed flow of liquid and gas.
- Pump 31 increases the pressure of well fluid flowing from tree outlet 29 and delivers the well fluid at a higher pressure to separator 35 .
- Separator 35 separates at least a portion of the gas from the well fluid and delivers the higher density well fluid out higher density outlet 37 to flow line 38 .
- An additional pump downstream of separator 35 to pump the higher density fluid up flow line 38 is not required.
- Separator 35 delivers the lower density stream from lower density outlet 39 to sea floor injection line 47 .
- the lower density fluid mixed with the well fluid flowing from perforations 13 lightens the weight of the column of well fluid in production tubing 15 .
- the reduced hydrostatic head of the column of well fluid in tubing 15 above gas lift mandrel 19 facilitates the flow of well fluid up production tubing 15 .
- controller 48 may increase or decrease the opening of choke 50 . Controller 48 may also increase the speed of the motor driving pump 31 . For example, if the pressure sensed by sensors 46 declines, controller 48 may increase the speed of pump 31 or increase the opening of choke 50 . This action would increase the gas ratio in the well, causing the intake pressure of pump 31 to increase. It is likely more sensors and controls will be required.
- the gas produced by cased well 11 may remain in an essentially closed loop, with little of it flowing up flow line 38 .
- the gas ratio exiting perforations 13 is the same as the gas ratio exiting gas separator higher density outlet 37 into flow line 38 .
- FIG. 2 in that event a gas injection tube 49 may be inserted into production tubing 15 .
- Gas injection tube 49 has a lower end at a selected depth in production tubing 15 , which may be a short distance above packer 17 .
- Gas injection tube 49 may comprise coiled tubing.
- the upper end of gas injection tube 49 will be supported in production tree 25 ( FIG. 1 ) in fluid communication with sea floor gas injection line 47 ( FIG. 1 ).
- the embodiment of FIG. 2 operates in the same manner as the embodiment of FIG. 1 . In the FIG. 2 embodiment, gas is not injected in tubing annulus 23 .
- sensors 51 in tree outlet 29 or other subsea locations monitor the gas content in the well fluid flowing up production tubing 15 .
- Sensors 51 which may include pressure and temperature sensors, provide readings to a controller 53 , which may be located on production vessel 43 .
- a compressor 55 which also may be located on production vessel 43 or on the sea floor and controlled by controller 53 , delivers compressed gas via a gas flow line 57 to tree 25 .
- a subsea tank or accumulator may be employed at the sea floor to store and inject gas into annulus 23 .
- the gas need not be natural or production gas produced by perforations 13 . Rather the gas could be a non production gas such as nitrogen.
- the gas will flow from gas lift mandrel 19 into production tubing 15 when sensors 51 determine that the amount of gas entering pump 31 is inadequate to maintain the desired gas lift.
- Separator 35 will separate the gas from the well fluid being pumped by pump 31 and deliver the gas to sea floor injection line 47 in the same manner as in FIG. 1 .
- a choke or valve (not shown) in injection line 47 may also be controlled by controller 53 .
- the embodiment of FIG. 3 could alternately use a gas injection tube within tubing 15 , as shown in FIG. 2 , rather than a gas lift mandrel 19 .
- More than one cased well 11 could deliver well fluid containing injected gas to pump 31 .
- a plurality of wells 59 , 61 are connected to a sea floor manifold 63 .
- Manifold 63 combines the well fluid flows from wells 59 , 61 and delivers the combined well fluid flow to pump 31 .
- Pump 31 applies pressure to the well fluid and delivers the elevated pressure well fluid to separator 35 .
- Separator 35 separates at least part of the gas from the elevated pressure well fluid and directs the separated gas to separate sea floor gas injection lines 65 , 67 leading to wells 59 , 61 , respectively.
- Sensors 68 monitor the gas/liquid ratio at each tree outlet 29 , and a controller (not shown) controls the quantity of separated gas flowing back through each sea floor gas injection line 65 , 67 .
- the amount of gas flowing through each sea floor gas injection line 65 , 67 may differ.
- Gas optionally may be recirculated back into only one of the wells 59 , 61 .
- the multiple well embodiment of FIG. 4 could be employed with all of the other embodiments.
- one or more of the wells 59 , 61 of the FIG. 4 embodiment could be completely non gas producing.
- well 61 could be non gas producing while well 59 produces more than enough gas to gas lift well 59 .
- Separator 35 would inject into well 61 a portion of the gas produced by the well 59 , and if needed, re-inject a portion of the separated gas into well 59 .
- gas lift of well 59 may not be required, thus the only injection may be into well 61 .
- a flow line jumper 83 connects tree 25 to either a manifold or gas/liquid separator 35 .
- Flow line jumper 83 has a length sized for the spacing between tree 25 and separator 35 .
- Flow line jumper 83 has an upstream end or inlet 85 and a downstream end or outlet 87 .
- Connectors 89 connect jumper inlet 85 to tree outlet 29 and jumper outlet 87 to the inlet 90 of separator 35 .
- Jumper inlet 85 and outlet 87 are illustrated to have legs that face downward for connection to the upward facing tree outlet 29 and separator inlet 90 ; however, they could be oriented horizontally.
- Flow line jumper 83 includes an elongated horizontal chamber 91 that contains an electrical submersible pump (ESP) 93 .
- ESP 93 boosts the pressure of the well fluid flowing from tree 25 and delivers the fluid at an elevated pressure to separator 35 .
- ESP 93 has an electrical motor 95 that is typically a three-phase AC motor. Motor 95 is filled with a dielectric lubricant for lubricating and cooling.
- a seal section 97 connects to motor 95 for sealing the lubricant within motor 95 and reducing a pressure difference between well fluid pressure in chamber 91 and the lubricant pressure.
- Pump 99 may be a centrifugal pump having a large number of stages, each stage having an impeller and diffuser. Each stage is preferably a mixed flow type, which causes the well fluid to flow both radially and axially as it flows through pump 99 . The stages are designed to accommodate a considerable amount of gas in the well fluid, such as up to 40%.
- Pump 99 has an intake 101 that is in fluid communication with well fluid flowing into chamber 91 from tree 25 .
- Pump 99 has a discharge 103 that is isolated from the well fluid pressure within chamber 91 on the exterior of ESP 93 .
- well fluid flows from tree 25 into chamber 91 at a positive pressure.
- the well fluid flows past motor 95 into pump intake 101 .
- Pump 99 increases the pressure of the well fluid relative to the pressure at jumper inlet 85 .
- Pump 99 discharges the elevated pressure well fluid into separator 35 , which separates gas from liquid, and operates in the same manner as in the other embodiments.
- flow line jumper 83 is retrievable while ESP 93 remains inside. Additional flow line jumpers 83 (not shown) containing ESP's 93 could be located in parallel with flow line jumper 83 , so that one ESP 93 could continue operating while another is retrieved. Optionally, a rotary gas/liquid separator driven by motor 95 could be located inside flow line jumper 83 rather than separator 35 on the exterior.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Jet Pumps And Other Pumps (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/491,593 US9181786B1 (en) | 2014-09-19 | 2014-09-19 | Sea floor boost pump and gas lift system and method for producing a subsea well |
CA2961469A CA2961469C (fr) | 2014-09-19 | 2015-08-13 | Systeme d'extraction au gaz et de pompe de surpression de fond de mer et procede de production d'un puits sous-marin |
BR112017004686-5A BR112017004686B1 (pt) | 2014-09-19 | 2015-08-13 | Método para produzir pelo menos um poço submarino e sistema de bombeamento de poço submarino |
GB1705934.6A GB2546663B (en) | 2014-09-19 | 2015-08-13 | Sea floor boost pump and gas lift system and method for producing a subsea well |
PCT/US2015/044951 WO2016043877A1 (fr) | 2014-09-19 | 2015-08-13 | Systeme d'extraction au gaz et de pompe de surpression de fond de mer et procede de production d'un puits sous-marin |
NO20170508A NO342961B1 (en) | 2014-09-19 | 2017-03-28 | Sea floor boost pump and gas lift system and method for producing a subsea well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/491,593 US9181786B1 (en) | 2014-09-19 | 2014-09-19 | Sea floor boost pump and gas lift system and method for producing a subsea well |
Publications (1)
Publication Number | Publication Date |
---|---|
US9181786B1 true US9181786B1 (en) | 2015-11-10 |
Family
ID=54363401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/491,593 Active US9181786B1 (en) | 2014-09-19 | 2014-09-19 | Sea floor boost pump and gas lift system and method for producing a subsea well |
Country Status (6)
Country | Link |
---|---|
US (1) | US9181786B1 (fr) |
BR (1) | BR112017004686B1 (fr) |
CA (1) | CA2961469C (fr) |
GB (1) | GB2546663B (fr) |
NO (1) | NO342961B1 (fr) |
WO (1) | WO2016043877A1 (fr) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160130918A1 (en) * | 2013-06-06 | 2016-05-12 | Shell Oil Company | Jumper line configurations for hydrate inhibition |
WO2017218594A1 (fr) * | 2016-06-13 | 2017-12-21 | Trendsetter Vulcan Offshore, Inc | Système de production préliminaire destiné à une application en eau profonde |
US20180100382A1 (en) * | 2016-10-12 | 2018-04-12 | Weatherford Technology Holdings, Llc | Jet pump lift system for producing hydrocarbon fluids |
CN111502607A (zh) * | 2020-06-09 | 2020-08-07 | 美钻能源科技(上海)有限公司 | 一种海洋油气采集系统 |
GB2611539A (en) * | 2021-10-06 | 2023-04-12 | Equinor Energy As | Hydrocarbon production |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA3039771C (fr) * | 2016-10-11 | 2021-03-23 | Baker Hughes, A Ge Company, Llc | Injection chimique avec pompe de suralimentation sous-marine d'ecoulement de production |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4633954A (en) * | 1983-12-05 | 1987-01-06 | Otis Engineering Corporation | Well production controller system |
GB2329658A (en) * | 1996-06-12 | 1999-03-31 | Petroleo Brasileiro Sa | Method and equipment for offshore oil production with primary gas separation and flow using the injection of high pressure gas |
US6129150A (en) * | 1996-06-12 | 2000-10-10 | Petroleo Brasileiro S.A. - Petrobras | Method and equipment for offshore oil production by intermittent gas injection |
RU2168614C1 (ru) | 2000-09-28 | 2001-06-10 | Закрытое акционерное общество "НПАК "РАНКО" | Оборудование для газлифтного способа добычи нефти |
US6651745B1 (en) * | 2002-05-02 | 2003-11-25 | Union Oil Company Of California | Subsea riser separator system |
US20050072574A1 (en) * | 2001-10-12 | 2005-04-07 | Appleford David Eric | System and method for injecting gas into a hydrocarbon reservoir |
US7152681B2 (en) | 2000-10-20 | 2006-12-26 | Aker Kvaerner Subsea As | Method and arrangement for treatment of fluid |
US20070131429A1 (en) * | 2005-12-08 | 2007-06-14 | Vetco Gray Inc. | Subsea well separation and reinjection system |
US20070274842A1 (en) * | 2006-05-26 | 2007-11-29 | Clifford Howard Campen | Subsea multiphase pumping systems |
US20090008101A1 (en) * | 2007-07-06 | 2009-01-08 | Coady Patrick T | Method of Producing a Low Pressure Well |
US7565932B2 (en) | 2006-04-06 | 2009-07-28 | Baker Hughes Incorporated | Subsea flowline jumper containing ESP |
US7604064B2 (en) | 2006-01-17 | 2009-10-20 | ABI Technology, Inc | Multi-stage, multi-phase unitized linear liquid entrained-phase transfer apparatus |
US7654319B2 (en) | 2002-07-10 | 2010-02-02 | Weatherford/Lamb, Inc. | Closed loop multiphase underbalanced drilling process |
US7708059B2 (en) | 2007-11-13 | 2010-05-04 | Baker Hughes Incorporated | Subsea well having a submersible pump assembly with a gas separator located at the pump discharge |
US7882896B2 (en) | 2007-07-30 | 2011-02-08 | Baker Hughes Incorporated | Gas eduction tube for seabed caisson pump assembly |
US20110132615A1 (en) * | 2008-06-03 | 2011-06-09 | Romulo Gonzalez | Offshore drilling and production systems and methods |
US20110168413A1 (en) * | 2010-01-13 | 2011-07-14 | David Bachtell | System and Method for Optimizing Production in Gas-Lift Wells |
US8141625B2 (en) | 2009-06-17 | 2012-03-27 | Baker Hughes Incorporated | Gas boost circulation system |
WO2014027895A1 (fr) | 2012-08-14 | 2014-02-20 | Aker Subsea As | Pompe de surpression multiphase |
US8714264B2 (en) | 2011-05-19 | 2014-05-06 | Baker Hughes Incorporated | Dual barrier side pocket mandrel |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4989671A (en) * | 1985-07-24 | 1991-02-05 | Multi Products Company | Gas and oil well controller |
US6209651B1 (en) * | 1999-03-04 | 2001-04-03 | Roy F. Knight | Well production apparatus and method |
EP1353038A1 (fr) * | 2002-04-08 | 2003-10-15 | Cooper Cameron Corporation | Dispositif pour procédé sous-marin |
ATE557234T1 (de) * | 2003-09-04 | 2012-05-15 | Optimum Production Technologies Inc | Überdruckgasmantel für ein erdgasrohr |
US7806186B2 (en) * | 2007-12-14 | 2010-10-05 | Baker Hughes Incorporated | Submersible pump with surfactant injection |
-
2014
- 2014-09-19 US US14/491,593 patent/US9181786B1/en active Active
-
2015
- 2015-08-13 GB GB1705934.6A patent/GB2546663B/en active Active
- 2015-08-13 CA CA2961469A patent/CA2961469C/fr active Active
- 2015-08-13 BR BR112017004686-5A patent/BR112017004686B1/pt active IP Right Grant
- 2015-08-13 WO PCT/US2015/044951 patent/WO2016043877A1/fr active Application Filing
-
2017
- 2017-03-28 NO NO20170508A patent/NO342961B1/en unknown
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4633954A (en) * | 1983-12-05 | 1987-01-06 | Otis Engineering Corporation | Well production controller system |
GB2329658A (en) * | 1996-06-12 | 1999-03-31 | Petroleo Brasileiro Sa | Method and equipment for offshore oil production with primary gas separation and flow using the injection of high pressure gas |
US6129150A (en) * | 1996-06-12 | 2000-10-10 | Petroleo Brasileiro S.A. - Petrobras | Method and equipment for offshore oil production by intermittent gas injection |
RU2168614C1 (ru) | 2000-09-28 | 2001-06-10 | Закрытое акционерное общество "НПАК "РАНКО" | Оборудование для газлифтного способа добычи нефти |
US7152681B2 (en) | 2000-10-20 | 2006-12-26 | Aker Kvaerner Subsea As | Method and arrangement for treatment of fluid |
US20050072574A1 (en) * | 2001-10-12 | 2005-04-07 | Appleford David Eric | System and method for injecting gas into a hydrocarbon reservoir |
US6651745B1 (en) * | 2002-05-02 | 2003-11-25 | Union Oil Company Of California | Subsea riser separator system |
US7654319B2 (en) | 2002-07-10 | 2010-02-02 | Weatherford/Lamb, Inc. | Closed loop multiphase underbalanced drilling process |
US20070131429A1 (en) * | 2005-12-08 | 2007-06-14 | Vetco Gray Inc. | Subsea well separation and reinjection system |
US7604064B2 (en) | 2006-01-17 | 2009-10-20 | ABI Technology, Inc | Multi-stage, multi-phase unitized linear liquid entrained-phase transfer apparatus |
US7565932B2 (en) | 2006-04-06 | 2009-07-28 | Baker Hughes Incorporated | Subsea flowline jumper containing ESP |
US20070274842A1 (en) * | 2006-05-26 | 2007-11-29 | Clifford Howard Campen | Subsea multiphase pumping systems |
US20090008101A1 (en) * | 2007-07-06 | 2009-01-08 | Coady Patrick T | Method of Producing a Low Pressure Well |
US7882896B2 (en) | 2007-07-30 | 2011-02-08 | Baker Hughes Incorporated | Gas eduction tube for seabed caisson pump assembly |
US7708059B2 (en) | 2007-11-13 | 2010-05-04 | Baker Hughes Incorporated | Subsea well having a submersible pump assembly with a gas separator located at the pump discharge |
US20110132615A1 (en) * | 2008-06-03 | 2011-06-09 | Romulo Gonzalez | Offshore drilling and production systems and methods |
US8141625B2 (en) | 2009-06-17 | 2012-03-27 | Baker Hughes Incorporated | Gas boost circulation system |
US20110168413A1 (en) * | 2010-01-13 | 2011-07-14 | David Bachtell | System and Method for Optimizing Production in Gas-Lift Wells |
US8714264B2 (en) | 2011-05-19 | 2014-05-06 | Baker Hughes Incorporated | Dual barrier side pocket mandrel |
WO2014027895A1 (fr) | 2012-08-14 | 2014-02-20 | Aker Subsea As | Pompe de surpression multiphase |
Non-Patent Citations (1)
Title |
---|
U.S. Appl. No. 14/328,345-entitled: "Submersible Pump Assembly Inside Subsea Flow Line Jumper and Method of Operation". |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160130918A1 (en) * | 2013-06-06 | 2016-05-12 | Shell Oil Company | Jumper line configurations for hydrate inhibition |
WO2017218594A1 (fr) * | 2016-06-13 | 2017-12-21 | Trendsetter Vulcan Offshore, Inc | Système de production préliminaire destiné à une application en eau profonde |
US10036226B2 (en) | 2016-06-13 | 2018-07-31 | Trendsetter Vulcan Offshore, Inc. | Early production system for deep water application |
US20180100382A1 (en) * | 2016-10-12 | 2018-04-12 | Weatherford Technology Holdings, Llc | Jet pump lift system for producing hydrocarbon fluids |
CN111502607A (zh) * | 2020-06-09 | 2020-08-07 | 美钻能源科技(上海)有限公司 | 一种海洋油气采集系统 |
GB2611539A (en) * | 2021-10-06 | 2023-04-12 | Equinor Energy As | Hydrocarbon production |
WO2023057597A1 (fr) | 2021-10-06 | 2023-04-13 | Equinor Energy As | Production d'hydrocarbures |
Also Published As
Publication number | Publication date |
---|---|
CA2961469A1 (fr) | 2016-03-24 |
GB201705934D0 (en) | 2017-05-31 |
CA2961469C (fr) | 2019-05-21 |
BR112017004686B1 (pt) | 2022-03-29 |
WO2016043877A1 (fr) | 2016-03-24 |
NO342961B1 (en) | 2018-09-10 |
GB2546663B (en) | 2019-04-10 |
BR112017004686A2 (pt) | 2018-01-30 |
NO20170508A1 (en) | 2017-03-28 |
GB2546663A (en) | 2017-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2961469C (fr) | Systeme d'extraction au gaz et de pompe de surpression de fond de mer et procede de production d'un puits sous-marin | |
US11613972B2 (en) | System and method for low pressure gas lift artificial lift | |
US7686086B2 (en) | Subsea well separation and reinjection system | |
US6668925B2 (en) | ESP pump for gassy wells | |
US7093661B2 (en) | Subsea production system | |
US7363983B2 (en) | ESP/gas lift back-up | |
US7063161B2 (en) | Artificial lift with additional gas assist | |
US8950476B2 (en) | Coiled tubing deployed ESP | |
US7736133B2 (en) | Capsule for two downhole pump modules | |
US9435163B2 (en) | Method and apparatus for removing liquid from a horizontal well | |
EP1191185A1 (fr) | Séparateur centrifuge de fond de puits et procédé d'opération de celui-ci | |
AU2003241367A1 (en) | System and method for flow/pressure boosting in subsea | |
US10280728B2 (en) | Connector and gas-liquid separator for combined electric submersible pumps and beam lift or progressing cavity pumps | |
GB2477909A (en) | Coiled Tubing Deployed ESP | |
US10597993B2 (en) | Artificial lift system | |
US10794149B2 (en) | Artificial lift method and apparatus for horizontal well | |
RU40647U1 (ru) | Оборудование для одновременно раздельной эксплуатации скважины двух пластов | |
CA2731037A1 (fr) | Pompe submersible electrique (pse) deployee au moyen d'un tube spirale | |
EA043017B1 (ru) | Система для газлифтной механизированной эксплуатации скважины низкого давления |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: BAKER HUGHES INCORPORATED, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PORTMAN, LANCE, MR;REEL/FRAME:033781/0339 Effective date: 20140919 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |