US8627285B2 - Techniques for instantiating and configuring projects - Google Patents
Techniques for instantiating and configuring projects Download PDFInfo
- Publication number
- US8627285B2 US8627285B2 US13/675,420 US201213675420A US8627285B2 US 8627285 B2 US8627285 B2 US 8627285B2 US 201213675420 A US201213675420 A US 201213675420A US 8627285 B2 US8627285 B2 US 8627285B2
- Authority
- US
- United States
- Prior art keywords
- project
- definition
- sub
- stage
- machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1093—Calendar-based scheduling for persons or groups
- G06Q10/1097—Task assignment
Definitions
- word processing software has to be initially defined, developed and tested before it can be released for sale. These activities are usually managed internally by high-salaried project managers. For the most part, the project managers are administrators with skill in acquiring other personnel and equipment within an enterprise to make a project move from conception and development to release. In some cases, projects are so large within an enterprise that multiple layers of project managers are needed for any given project.
- a large project may include a plethora of assets and making all these assets available in one environment and at one time to the exclusion of other enterprise assets may prove too costly or draining on the enterprise. So, one or a few skilled employees may regularly and manually move and reconfigure assets on an as needed basis to alleviate the situation and make it workable. Yet, this scenario is ripe for errors and problems, especially when the skilled employees are out of the office or leave the enterprise.
- a method for dynamically instantiating a master project A project definition is acquired for a project within a first processing environment, which is associated with a first stage of a lifecycle for the project. Next, selective resources of the project that are associated with the first stage are dynamically instantiated and configured on demand and when the resources are requested using the project definition.
- FIG. 1 is a diagram of a method for dynamically instantiating a master project, according to an example embodiment.
- FIG. 2 is a diagram of a method for selectively instantiating portions of a project via a virtual project definition, according to an example embodiment.
- FIG. 3 is a diagram of a project instantiation and configuration system, according to an example embodiment.
- FIG. 4 is a diagram of another project instantiation and configuration system, according to an example embodiment.
- a “resource” includes a user, content, a processing device, a node, a service, an application, a system, a schema definition, a directory, an operating system (OS), a file system, a data store, a database, a policy definition, a configuration definition, a file, a World-Wide Web (WWW) service, a WWW page, groups of users, combinations of these things, etc.
- the terms “service,” “application,” and “system” may be used interchangeably herein and refer to a type of software resource that includes instructions, which when executed by a machine performs operations that change the state of the machine and that may produce output.
- a “principal” is a special type of resource that performs one or more actions against other resources. So a principal may be a user or an automated service.
- each resource is electronically defined and represented as having one or more attributes.
- Each attribute includes one or more name value pairs.
- IP Internet Protocol
- the server resource may also have its own identity (discussed below) and may include other attributes such as whether the IP address is static or dynamic, etc. Attributes may also include references to policy or even specific configuration details for a given processing environment that a resource is to be deployed to.
- a “project” refers to the activity associated with an enterprise or government producing a good (product) or personal service (e.g., financial advice, etc.) for consumption in the marketplace.
- the activity for the project is defined in various stages of the project's lifecycle, such as by way of example only project definition, project development, project testing, project release, etc.
- a “project” is represented and electronically defined as a series of stages associated with the project's lifecycle. Each stage includes its own processing environment having its own or shared resources. So, a stage is represented and electronically defined as one or more resources and their relationships with other resources of the same stage or a different stage.
- a project may also be viewed as a type of resource.
- a virtual project is one that includes other sub projects or nested projects. Some resources associated with a virtual project may be instantiated and ready for use while others are configured and instantiated according to policy.
- Projects and virtual projects are defined via configuration data, metadata, policy, and other directives or statements that can be interpreted by and acted upon by other services or resources to logically assemble and define a collection of resources as a particular project or meta resource.
- a “processing environment” refers to one or more physical processing devices organized within a local network. For example, several computers connected via a local area network (LAN) may collectively be viewed as a processing environment.
- the processing environment also refers to software configurations of the physical processing devices, such as but not limited to operating system, file system, directory service, etc.
- a single processing environment may be logically defined, such that it spans multiple different networks (e.g., multiple different LAN's, a LAN and a wide-area network (WAN), etc.).
- an “identity service” refers to a special type of service that is designed to manage and supply authentication services and authentication information for resources. So, an identity service may authenticate a given resource for access to a variety of local and external services being managed by that identity service. A single resource may have multiple identity services. In addition the identity service itself may be viewed as a type of resource. In this manner, identity service may authenticate and establish trust with one another viewing one another as specific type of resource.
- identity services are described in “Techniques for Dynamically Establishing and Managing Authentication and Trust Relationships,” filed on Jan. 27, 2004, and having the U.S. Ser. No. 10/765,523; “Techniques for Establishing and Managing a Distributed Credential Store,” filed on Jan. 29, 2004, and having the U.S. Ser. No. 10/767,884; and “Techniques for Establishing and Managing Trust Relationships,” filed on Feb. 3, 2004, and having the U.S. Ser. No. 10/770,677; all of which are commonly assigned to Novell, Inc., of Provo, Utah and the disclosures of which are incorporated by reference herein.
- An identity service may also provide single sign-on services to a resource. That is, a resource may sign-on to an identity service and acquire identities and credentials to access a variety of other services or resources. In some cases, the identity service is modified or enhanced to perform some of the teachings presented herein and below.
- a resource is recognized via an “identity.”
- An identity is authenticated via various techniques (e.g., challenge and response interaction, cookies, assertions, etc.) that use various identifying information (e.g., identifiers with passwords, biometric data, hardware specific data, digital certificates, digital signatures, etc.).
- identifying information e.g., identifiers with passwords, biometric data, hardware specific data, digital certificates, digital signatures, etc.
- a “true identity” is one that is unique to a resource across any context that the resource may engage in over a network (e.g., Internet, Intranet, etc.).
- each resource may have and manage a variety of identities, where each of these identities may only be unique within a given context (given service interaction, given processing environment, given virtual processing environment, etc.).
- the identity may also be a special type of identity that the resource assumes for a given context.
- the identity may be a “crafted identity” or a “semantic identity.”
- An example for creating and using crafted identities may be found in U.S. patent application Ser. No. 11/225,993; entitled “Crafted Identities;” filed on Sep. 14, 2005; and the disclosure of which is incorporated by reference herein.
- An example for creating and using semantic identities may be found in U.S. patent application Ser. No. 11/261,970; entitled “Semantic Identities;” filed on Oct. 28, 2005; and the disclosure of which is incorporated by reference herein.
- FIG. 1 is a diagram of a method 100 for dynamically instantiating a master project, according to an example embodiment.
- the method 100 (hereinafter “project instantiation service”) is implemented as instructions in a machine-accessible and readable medium. The instructions when executed by a machine perform the processing depicted in FIG. 1 .
- the project instantiation service is also operational over and processes within a network.
- the network may be wired, wireless, or a combination of wired and wireless.
- the project instantiation service permits a project to be defined in such a manger that the project instantiation service can dynamically and selectively instantiate, configure, and make resources available on demand, when needed, or when requested.
- the project instantiation service acquires a project definition for a project within a first processing environment.
- the first processing environment is associated with a first stage of a lifecycle for the project.
- the use of the adjective “first” is not to be limited to an initial stage or the lifecycle as it can be any stage associated with the lifecycle in this sense it may be viewed as a particular stage of the lifecycle. It is noted that in some cases, the term “first” may also be used to represent the initial stage but it is not limited in all case to the initial stage of the project lifecycle.
- the project instantiation service acquires the project definition as one or more of the following: a data structure, a table, a database table, metadata, configuration data, and a virtual project definition that logically defines the project.
- the project instantiation service identifies triggers, events, and/or policies within the virtual project definition. These items conditionally define when some of the selective resources are to be instantiated and configured within the first stage and the first processing environment.
- the events may be associated with a first principal acting within the first processing environment, the first processing environment as a whole, or event raised by resources or other projects associated with external and different processing environments.
- the project instantiation service recognizes sub project definitions within the project definition.
- Each sub project definition includes configuration information for a subset of the selective resources.
- the sub project definitions can be included in the project definition via an identifier or reference that the project instantiation service uses to access a configuration repository or policy repository to acquire the full sub project definition.
- the sub project definition is entirely contained as a sub portion of the project definition.
- the project instantiation service identifies at least one sub project definition that is masked or hidden from view and access within the project definition. So, an alias reference or identifier or other masked code may appear in the project definition.
- the project instantiation service uses the reference or code to directly/indirectly (via another service) acquire the sub project definition.
- This hidden sub project can, according to policy directives, be auto mapped and configured when it is appropriate to do so within the first stage and the first processing environment. Security may prevent a first principal from even knowing that the hidden sub project exists and is operating within the first processing environment. This type of hidden project may be used for a variety of reasons, such as but not limited to an auditing project, a tracking project, etc.
- the project instantiation service recognizes the project definition as a series of definitions for multiple independent projects that are combined within the project definition to define a global or meta project that represents the project.
- the project can be a collection of smaller independently processing projects that are recognized, assembled, and processed as a single meta project via the project definition and its directives.
- the project definition includes statements, references to statements, files, references to files, resources, identifiers for resources, and/or policies that the project instantiation service interprets and uses to drive when resources are to be instantiated and configured for the project in the first processing environment.
- the project instantiation service dynamically instantiates and configures selective resources of the project that are associated with the first stage.
- the dynamic instantiation and configuration occurs on demand and when the resources are requested as defined in the project definition.
- Instantiation means that the resources are loaded into memory and/or initiated for processing. Any configuration details required for use are also established. It is noted that from the viewpoint of the principal, the resources appear to always be there and available for use.
- the project instantiation service dynamically instantiates and configures them. In this manner, the first processing environment does not become loaded and memory intensive when certain selective resources are not being used or needed. This makes this dynamic approach more process and memory efficient than conventional approaches and does so in an automated manner.
- the project instantiation service configures at least some resources for access within the first stage when those second resources are located in an entirely different processing environment and different second stage of the project lifecycle.
- the project definition can drive the project instantiation service to act or facilitate a proxy arrangement where external resources appear to be and act as if they are present and operating within the first processing environment. This again serves to alleviate the processing and memory loads of the first processing environment and permits mega projects to be handled within a first processing environment that may have limited processor and memory capabilities.
- FIG. 2 is a diagram of a method 200 for selectively instantiating portions of a project via a virtual project definition, according to an example embodiment.
- the method 200 (hereinafter “virtual project management service”) is implemented as instructions in a machine-accessible and readable medium. The instructions when executed by a machine perform the processing depicted in FIG. 2 .
- the virtual project management service is also operational over and processes within a network.
- the network may be wired, wireless, or a combination of wired and wireless.
- the virtual project management service represents an enhanced perspective of the project instantiation service represented by the method 100 discussed above with the FIG. 1 .
- the virtual project management service can be viewed as an enhancement version of the project instantiation service.
- the virtual project management service actively monitors a lifecycle for a project via a virtual project definition.
- the virtual project definition includes a variety of sub portions where each sub portion can be a reference to an entirely independent sub project of the project.
- the virtual project management service detects an attempted access to a sub portion of the project, which is defined in the virtual project definition.
- the attempted access is detected within a particular stage of the project lifecycle.
- the attempted access can be detected in a variety of manners.
- the virtual project management service can detect the attempted access as a condition or event defined within the virtual project definition that when stratified triggers that attempted access notification or detection, which the virtual project management service notices.
- the virtual project management service can recognize the sub portion included within the virtual project definition as an entirely self-contained and independent project having its own different virtual project definition.
- the self-contained project is a sub project, but from the view of the self-contained project it views itself as a project with no dependency on the project that contains it.
- the virtual project management service configures and instantiates logical and physical resources associated with the sub portion when the attempted access is made.
- resources used and defined within the sub project are just configured and instantiated when the virtual project management service decides it is appropriate to do so, and it is appropriate to do so when policy in or associated with the virtual project definition dictates that it is appropriate to do so.
- the virtual project management service dynamically instantiates the sub portion for immediate access within the particular stage. So, again the sub portion is instantiated and configured on demand for use in the particular stage. This situation is much more efficient than instantiating and configuring the sub portion when it is not needed, since if that were done resources (processor and memory) are wasted and the loaded and unused resources also degrade other resources that are actively needed within the particular stage and its processing environment.
- the virtual project management service deploys the sub portion to one or more other independent projects associated with other stages different from the particular stage of the project lifecycle. So, the sub portion may be spawned as an independent project to process in an entirely different stage and processing environment and yet be configured to be accessed and used with the project from the particular stage and particular processing environment.
- the virtual project management service hides a selective and different portion of the project from view within the particular stage and its particular processing environment. So, as discussed above with reference to the method 100 , portions of the project can be entirely secretive and hidden from principals operating on the project within the first stage. These hidden stages can be populated and instantiated based on actions of the principals and unknown to the principals for purposes of such things as auditing, tracking, etc.
- the virtual project management service uses policy to initially instantiate selective other portions of the project when the project is first transitioned to an initial stage of the project lifecycle. So, some portions and associated resources can be populated, loaded, and instantiated based on policy when a transition in the project is detected or when the project is initiated in its initial stage of the lifecycle.
- FIG. 3 is a diagram of a project instantiation and configuration system 300 , according to an example embodiment.
- the project instantiation and configuration system 300 is implemented as instructions on or within a machine-accessible and readable medium. The instructions when executed by a machine perform various aspects of the processing depicted with respect to the method 100 of the FIG. 1 and the method 200 of the FIG. 2 .
- the project instantiation and configuration system 300 is also operational over a network and the network may be wired, wireless, or a combination of wired and wireless.
- the project instantiation and configuration system 300 includes a master project managing service 301 and a virtual project definition 302 . Each of these components and their interactions with one another will now be discussed in turn.
- the master project managing service 301 is implemented in a machine-accessible and readable medium and is to process on a machine within one or more processing environments of the network. Example processing associated with the master project managing service 301 was described in detail above with reference to the project instantiation service represented by the method 100 of the FIG. 1 and the virtual project management service represented by the method 200 of the FIG. 2 .
- the master project managing service 301 interprets the virtual project definition 302 and its directives, references, statements, and associated policies for purposes of managing a master project.
- the master project includes a plurality of stages associated with its project lifecycle. Moreover, each stage is associated with a different processing environment.
- the master project managing service 301 In response to the directives and policies included in the virtual project definition 302 , the master project managing service 301 initially deploys some resources associated with the virtual project definition 302 when the master project is initiated in an initial stage of the lifecycle. Furthermore, the master project managing service 301 intentionally delays deploying other deferred resources associated with the master project until permitted to deploy those deferred resources in response to the policies.
- the master project managing service 301 recognizes that some of the virtual project definitions 302 include nested virtual project definitions for sub projects that are independent of the master project and tied to the master project via the virtual project definition 302 . Further, a few of these nested virtual project definitions are associated with already instantiated and configured resources for some of those sub projects. Thus, the master project managing service 301 can make these particular sub projects immediately available for use within the master project when the policies permit this to be the case.
- the master project managing service 301 assembles the sub projects and their sub project resources for use within a particular stage and provides access to a number of the sub project resources from the particular stage when those sub project resources are located in different stages or the lifecycle. So, the master project managing service 301 can act as a proxy or facilitate a proxy arrangement for sub project resources already available in external or different stages and processing environments and the master project managing service 301 can actually cause the sub project and their resources to be instantiated and available for use within a particular stage.
- the master project managing service 301 deploys each of the sub projects in a variety of different stages for the lifecycle in response to the policies of the virtual project definition 302 . Moreover, the master project managing service 301 , when directed by the policies, re-assembles the sub projects as the master project within a particular or target stage of the lifecycle. The particular stage can also be determined by the policies of the virtual project definition 302 for the master project. So, the sub projects can be initiated in a variety of processing environments and stages of their lifecycles and the master project can define for the master project managing service 301 via the policies when they should be logically re-assembled and associated for use within a particular stage of the master project.
- the virtual project definition 302 is implemented in a machine-accessible and readable medium and is interpreted by the master project managing service 301 .
- the virtual project definition 302 is interpreted by the master project managing service 301 and includes directives and policies that drive the processing of the master project managing service 301 to determine when and if sub projects and resources are to be configured and instantiated for use with the master project.
- the virtual project definition 302 includes nested virtual project definitions for sub projects that are entirely independent of the master project, as was discussed above. In some cases, at lease one of these nested virtual project definitions is hidden from a user or principal's view with a masked code, reference, or alias identifier within the virtual project definition 302 . When deployed sub project resources used in the hidden sub project are not accessible or viewable to the user or principal.
- FIG. 4 is a diagram of another project instantiation and configuration system 400 , according to an example embodiment.
- the project instantiation and configuration system 400 is implemented as instructions on or within a machine-accessible and readable medium.
- the instructions when executed by a machine perform various aspects of the processing depicted with respect to the methods 100 and 200 of the FIGS. 1 and 2 , respectively, and processing associated with the system 300 of the FIG. 3 .
- the project instantiation and configuration system 400 is also operational over a network and the network may be wired, wireless, or a combination of wired and wireless.
- the project instantiation and configuration system 400 presents an alternative perspective to the project instantiation and configuration system 300 represented by the FIG. 3 .
- the project instantiation and configuration system 400 includes a project lifecycle management service 401 and a master project definition 402 . Each of these components and their interactions with one another will now be discussed in turn.
- the project lifecycle management service 401 is implemented in a machine-accessible and readable medium and is to process on a machine within a first processing environment of the network. Example processing of the project lifecycle management service 401 was described in detail above with reference to the methods 100 and 200 and the system 300 of the FIGS. 1-3 , respectively.
- the project lifecycle management service 401 monitors activities of a first principal within a first processing environment with respect to the master project definition 402 to determine when some or each of the independent sub projects are to be configured and made available to the first principal in the first processing environment.
- the project lifecycle management service 401 tracks events, actions, and activities and uses directives and policy defined in the master project definition 402 to determine when some or all of the sub projects defined in the master project definition 402 are to be instantiated and configured for use within the first processing environment for use and access by the first principal. Again, some of these sub projects may be hidden and not accessible to the first principal via the directives and the policies.
- the project lifecycle management service 401 also monitors other events associated with the independent sub projects. Some of the vents are communicated and occur in other external processing environments occurring over a wide-area network (WAN), such as the Internet or World-Wide Web (WWW).
- WAN wide-area network
- WWW World-Wide Web
- the master project definition 402 is implemented in a machine-accessible and readable medium and is to be interpreted by the project lifecycle management service 401 .
- the master project definition 402 includes nested project definitions or references to independent sub projects. Furthermore, the master project definition 402 also defines, via the nested project definitions, a single master project. The single master project having multiple stages in a lifecycle of that master project.
- At least one nested project definition is associated with a particular sub project that is unavailable and not viewable by the first principal.
- the particular sub project has resources that automap, configure, and instantiate to the first processing environment according to policy defined in the master project definition.
- the sub projects appear to the first principal to be present and available for access within the first processing environment even when some of the sub projects are not yet configured and actually available for use within the first processing environment. So, the first principal believes all resources and sub projects are there in the first processing environment, when in fact some are not and are only instantiated and configured when needed or when access is attempted.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Data Mining & Analysis (AREA)
- Storage Device Security (AREA)
- Stored Programmes (AREA)
Abstract
Description
Claims (17)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/675,420 US8627285B2 (en) | 2007-07-31 | 2012-11-13 | Techniques for instantiating and configuring projects |
US14/148,275 US9058579B2 (en) | 2007-07-31 | 2014-01-06 | Techniques for instantiating and configuring projects |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/831,222 US7962889B2 (en) | 2007-07-31 | 2007-07-31 | Techniques for instantiating and configuring projects |
US13/108,321 US8370792B2 (en) | 2007-07-31 | 2011-05-16 | Techniques for instantiating and configuring projects |
US13/675,420 US8627285B2 (en) | 2007-07-31 | 2012-11-13 | Techniques for instantiating and configuring projects |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/108,321 Continuation US8370792B2 (en) | 2007-07-31 | 2011-05-16 | Techniques for instantiating and configuring projects |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/148,275 Continuation US9058579B2 (en) | 2007-07-31 | 2014-01-06 | Techniques for instantiating and configuring projects |
Publications (2)
Publication Number | Publication Date |
---|---|
US20130073332A1 US20130073332A1 (en) | 2013-03-21 |
US8627285B2 true US8627285B2 (en) | 2014-01-07 |
Family
ID=40339373
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/831,222 Expired - Fee Related US7962889B2 (en) | 2007-07-31 | 2007-07-31 | Techniques for instantiating and configuring projects |
US13/108,321 Expired - Fee Related US8370792B2 (en) | 2007-07-31 | 2011-05-16 | Techniques for instantiating and configuring projects |
US13/675,420 Expired - Fee Related US8627285B2 (en) | 2007-07-31 | 2012-11-13 | Techniques for instantiating and configuring projects |
US14/148,275 Expired - Fee Related US9058579B2 (en) | 2007-07-31 | 2014-01-06 | Techniques for instantiating and configuring projects |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/831,222 Expired - Fee Related US7962889B2 (en) | 2007-07-31 | 2007-07-31 | Techniques for instantiating and configuring projects |
US13/108,321 Expired - Fee Related US8370792B2 (en) | 2007-07-31 | 2011-05-16 | Techniques for instantiating and configuring projects |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/148,275 Expired - Fee Related US9058579B2 (en) | 2007-07-31 | 2014-01-06 | Techniques for instantiating and configuring projects |
Country Status (1)
Country | Link |
---|---|
US (4) | US7962889B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9058579B2 (en) | 2007-07-31 | 2015-06-16 | Novell, Inc. | Techniques for instantiating and configuring projects |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8219967B2 (en) * | 2005-07-25 | 2012-07-10 | International Business Machines Corporation | Method and apparatus for enabling enterprise project management with service oriented resource and using a process profiling framework |
US20090048894A1 (en) * | 2007-08-14 | 2009-02-19 | Michel Shane Simpson | Techniques for propagating changes in projects |
US7996429B2 (en) | 2008-06-12 | 2011-08-09 | Novell, Inc. | Mechanisms to persist hierarchical object relations |
US9904578B2 (en) * | 2010-11-29 | 2018-02-27 | International Business Machines Corporation | Resource allocation for software development |
US8738414B1 (en) * | 2010-12-31 | 2014-05-27 | Ajay R. Nagar | Method and system for handling program, project and asset scheduling management |
US8607233B2 (en) * | 2011-04-20 | 2013-12-10 | International Business Machines Corporation | Web service management |
FI20125700A (en) * | 2012-06-21 | 2013-12-22 | Tekla Corp | Shared data with relationship information |
US20150294245A1 (en) * | 2014-04-14 | 2015-10-15 | Ajay R Nagar | Method and system for handling program, project and asset scheduling management with reserves management and application integration |
US11424931B2 (en) | 2016-01-27 | 2022-08-23 | Blackberry Limited | Trusted execution environment |
US10599409B2 (en) * | 2016-02-02 | 2020-03-24 | Blackberry Limited | Application lifecycle operation queueing |
US10204059B2 (en) * | 2016-09-29 | 2019-02-12 | International Business Machines Corporation | Memory optimization by phase-dependent data residency |
WO2020087011A2 (en) * | 2018-10-25 | 2020-04-30 | Qlytics LLC | Resource configuration and management system |
WO2020118638A1 (en) | 2018-12-13 | 2020-06-18 | Entit Software Llc | Project management visualization interface |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6138104A (en) | 1996-04-26 | 2000-10-24 | Workgroup Technology Corporation | Product development system and method using integrated process and data management |
US6351734B1 (en) | 1998-09-09 | 2002-02-26 | Unisys Corporation | System and method for resource allocation and planning |
US20020184250A1 (en) | 2000-09-01 | 2002-12-05 | Jonathan Kern | Methods and systems for auto-instantiation of storage hierarchy for project plan |
US20030103089A1 (en) * | 2001-09-07 | 2003-06-05 | Karthik Ramani | Systems and methods for collaborative shape design |
US20030137886A1 (en) * | 2001-11-15 | 2003-07-24 | Numerical Technologies, Inc. | Cutting patterns for full phase shifting masks |
US20030187670A1 (en) | 2002-03-28 | 2003-10-02 | International Business Machines Corporation | Method and system for distributed virtual enterprise project model processing |
US20040103405A1 (en) * | 2002-11-20 | 2004-05-27 | Vargas Byron D. | System for translating programming languages |
US20040111705A1 (en) | 2002-12-06 | 2004-06-10 | Tetsuro Motoyama | Software development environment with design specification verification tool |
US6766334B1 (en) | 2000-11-21 | 2004-07-20 | Microsoft Corporation | Project-based configuration management method and apparatus |
US6810401B1 (en) | 1999-10-08 | 2004-10-26 | Edgenet Inc. | Automated configuration system and method |
US20070198785A1 (en) * | 2006-02-17 | 2007-08-23 | Kogge Peter M | Computer systems with lightweight multi-threaded architectures |
US20090037921A1 (en) | 2007-07-31 | 2009-02-05 | Michel Shane Simpson | Techniques for instantiating and configuring projects |
US7650591B2 (en) * | 2003-01-24 | 2010-01-19 | Bea Systems, Inc. | Marshaling and un-marshaling data types in XML and Java |
US7734491B2 (en) | 2004-06-15 | 2010-06-08 | Microsoft Corporation | Hierarchical projects in a computer-enabled project management method and system |
US7739137B2 (en) | 2005-02-04 | 2010-06-15 | Suresh Jagtiani | Project management software |
US7810067B2 (en) | 2002-08-30 | 2010-10-05 | Sap Aktiengesellschaft | Development processes representation and management |
US7870535B2 (en) | 2001-02-22 | 2011-01-11 | Accenture Global Services Gmbh | Distributed development environment for building internet applications by developers at remote locations |
US8171485B2 (en) | 2007-03-26 | 2012-05-01 | Credit Suisse Securities (Europe) Limited | Method and system for managing virtual and real machines |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW588446B (en) * | 2003-03-21 | 2004-05-21 | Advanced Semiconductor Eng | Multi-chips stacked package |
EP1678606A2 (en) * | 2003-09-17 | 2006-07-12 | Research In Motion Limited | System and method for management of mutating applications |
US7698383B2 (en) * | 2004-02-27 | 2010-04-13 | Research In Motion Limited | System and method for building component applications using metadata defined mapping between message and data domains |
-
2007
- 2007-07-31 US US11/831,222 patent/US7962889B2/en not_active Expired - Fee Related
-
2011
- 2011-05-16 US US13/108,321 patent/US8370792B2/en not_active Expired - Fee Related
-
2012
- 2012-11-13 US US13/675,420 patent/US8627285B2/en not_active Expired - Fee Related
-
2014
- 2014-01-06 US US14/148,275 patent/US9058579B2/en not_active Expired - Fee Related
Patent Citations (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6138104A (en) | 1996-04-26 | 2000-10-24 | Workgroup Technology Corporation | Product development system and method using integrated process and data management |
US6351734B1 (en) | 1998-09-09 | 2002-02-26 | Unisys Corporation | System and method for resource allocation and planning |
US6810401B1 (en) | 1999-10-08 | 2004-10-26 | Edgenet Inc. | Automated configuration system and method |
US20020184250A1 (en) | 2000-09-01 | 2002-12-05 | Jonathan Kern | Methods and systems for auto-instantiation of storage hierarchy for project plan |
US7096222B2 (en) | 2000-09-01 | 2006-08-22 | Borland Software Corporation | Methods and systems for auto-instantiation of storage hierarchy for project plan |
US20040216089A1 (en) | 2000-11-21 | 2004-10-28 | Microsoft Corporation | Project-based configuration management method and apparatus |
US6766334B1 (en) | 2000-11-21 | 2004-07-20 | Microsoft Corporation | Project-based configuration management method and apparatus |
US20040216090A1 (en) | 2000-11-21 | 2004-10-28 | Microsoft Corporation | Project-based configuration management method and apparatus |
US20040215646A1 (en) | 2000-11-21 | 2004-10-28 | Microsoft Corporation | Project-based configuration management method and apparatus |
US20050091291A1 (en) | 2000-11-21 | 2005-04-28 | Microsoft Corporation | Project-based configuration management method and apparatus |
US6928447B2 (en) | 2000-11-21 | 2005-08-09 | Microsoft Corporation | Project-based configuration management method and apparatus |
US6973466B2 (en) | 2000-11-21 | 2005-12-06 | Microsoft Corporation | Project-based configuration management method and apparatus |
US7870535B2 (en) | 2001-02-22 | 2011-01-11 | Accenture Global Services Gmbh | Distributed development environment for building internet applications by developers at remote locations |
US20030103089A1 (en) * | 2001-09-07 | 2003-06-05 | Karthik Ramani | Systems and methods for collaborative shape design |
US20030137886A1 (en) * | 2001-11-15 | 2003-07-24 | Numerical Technologies, Inc. | Cutting patterns for full phase shifting masks |
US20030187670A1 (en) | 2002-03-28 | 2003-10-02 | International Business Machines Corporation | Method and system for distributed virtual enterprise project model processing |
US7810067B2 (en) | 2002-08-30 | 2010-10-05 | Sap Aktiengesellschaft | Development processes representation and management |
US20040103405A1 (en) * | 2002-11-20 | 2004-05-27 | Vargas Byron D. | System for translating programming languages |
US20040111705A1 (en) | 2002-12-06 | 2004-06-10 | Tetsuro Motoyama | Software development environment with design specification verification tool |
US7650591B2 (en) * | 2003-01-24 | 2010-01-19 | Bea Systems, Inc. | Marshaling and un-marshaling data types in XML and Java |
US7734491B2 (en) | 2004-06-15 | 2010-06-08 | Microsoft Corporation | Hierarchical projects in a computer-enabled project management method and system |
US7739137B2 (en) | 2005-02-04 | 2010-06-15 | Suresh Jagtiani | Project management software |
US20070198785A1 (en) * | 2006-02-17 | 2007-08-23 | Kogge Peter M | Computer systems with lightweight multi-threaded architectures |
US8171485B2 (en) | 2007-03-26 | 2012-05-01 | Credit Suisse Securities (Europe) Limited | Method and system for managing virtual and real machines |
US20090037921A1 (en) | 2007-07-31 | 2009-02-05 | Michel Shane Simpson | Techniques for instantiating and configuring projects |
US7962889B2 (en) | 2007-07-31 | 2011-06-14 | Novell, Inc. | Techniques for instantiating and configuring projects |
US20110219353A1 (en) | 2007-07-31 | 2011-09-08 | Michel Shane Simpson | Techniques for instantiating and configuring projects |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9058579B2 (en) | 2007-07-31 | 2015-06-16 | Novell, Inc. | Techniques for instantiating and configuring projects |
Also Published As
Publication number | Publication date |
---|---|
US7962889B2 (en) | 2011-06-14 |
US20130073332A1 (en) | 2013-03-21 |
US20110219353A1 (en) | 2011-09-08 |
US8370792B2 (en) | 2013-02-05 |
US20090037921A1 (en) | 2009-02-05 |
US20140195292A1 (en) | 2014-07-10 |
US9058579B2 (en) | 2015-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8627285B2 (en) | Techniques for instantiating and configuring projects | |
US8959578B2 (en) | Techniques for project lifecycle staged-based access control | |
US11675918B2 (en) | Policy-based user device security checks | |
US10986080B1 (en) | Permission management method and system for trustworthiness mechanism of big-data blockchain | |
US10885182B1 (en) | System and method for secure, policy-based access control for mobile computing devices | |
US8010991B2 (en) | Policy resolution in an entitlement management system | |
JP5373900B2 (en) | Computer application package with customization | |
US20090205018A1 (en) | Method and system for the specification and enforcement of arbitrary attribute-based access control policies | |
US20140181801A1 (en) | System and method for deploying preconfigured software | |
US11290322B2 (en) | Honeypot asset cloning | |
US20070288904A1 (en) | Method, system and program product for validating a runtime environment | |
WO2011162848A2 (en) | System and method for providing impact modeling and prediction of attacks on cyber targets | |
US12113824B2 (en) | Distributed system for autonomous discovery and exploitation of an organization's computing | |
US9313208B1 (en) | Managing restricted access resources | |
US20080300943A1 (en) | Techniques for project transformation and management | |
CN112150113A (en) | Method, device and system for borrowing file data and method for borrowing data | |
US8903889B2 (en) | Method, system and article for mobile metadata software agent in a data-centric computing environment | |
US20090048894A1 (en) | Techniques for propagating changes in projects | |
US20080300945A1 (en) | Techniques for sharing resources across multiple independent project lifecycles | |
US9178867B1 (en) | Interacting with restricted environments | |
US20090048888A1 (en) | Techniques for claim staking in a project stage-based environment | |
Bessani et al. | The TClouds platform: from the concept to the implementation of benchmark scenarios | |
US20090030705A1 (en) | Project management black box protections | |
US8682706B2 (en) | Techniques for temporarily holding project stages | |
US11882123B2 (en) | Kernel level application data protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
AS | Assignment |
Owner name: BANK OF AMERICA, N.A., CALIFORNIA Free format text: SECURITY INTEREST;ASSIGNORS:MICRO FOCUS (US), INC.;BORLAND SOFTWARE CORPORATION;ATTACHMATE CORPORATION;AND OTHERS;REEL/FRAME:035656/0251 Effective date: 20141120 |
|
AS | Assignment |
Owner name: MICRO FOCUS SOFTWARE INC., DELAWARE Free format text: CHANGE OF NAME;ASSIGNOR:NOVELL, INC.;REEL/FRAME:040020/0703 Effective date: 20160718 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.) |
|
AS | Assignment |
Owner name: JPMORGAN CHASE BANK, N.A., DELAWARE Free format text: SECURITY INTEREST;ASSIGNORS:ATTACHMATE CORPORATION;BORLAND SOFTWARE CORPORATION;NETIQ CORPORATION;AND OTHERS;REEL/FRAME:044183/0718 Effective date: 20170901 |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.) |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20180107 |
|
AS | Assignment |
Owner name: NETIQ CORPORATION, WASHINGTON Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 Owner name: MICRO FOCUS SOFTWARE INC. (F/K/A NOVELL, INC.), WASHINGTON Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 Owner name: ATTACHMATE CORPORATION, WASHINGTON Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 Owner name: SERENA SOFTWARE, INC, CALIFORNIA Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 Owner name: MICRO FOCUS (US), INC., MARYLAND Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 Owner name: BORLAND SOFTWARE CORPORATION, MARYLAND Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 Owner name: MICRO FOCUS LLC (F/K/A ENTIT SOFTWARE LLC), CALIFORNIA Free format text: RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:062746/0399 Effective date: 20230131 |