US746179A - Railway structure. - Google Patents

Railway structure. Download PDF

Info

Publication number
US746179A
US746179A US15078703A US1903150787A US746179A US 746179 A US746179 A US 746179A US 15078703 A US15078703 A US 15078703A US 1903150787 A US1903150787 A US 1903150787A US 746179 A US746179 A US 746179A
Authority
US
United States
Prior art keywords
ties
tie
rails
cross
flanges
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US15078703A
Inventor
Samuel F Seely
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US15078703A priority Critical patent/US746179A/en
Application granted granted Critical
Publication of US746179A publication Critical patent/US746179A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/16Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from steel
    • E01B3/22Longitudinal sleepers; Longitudinal sleepers integral or combined with tie-rods; Combined longitudinal and transverse sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)

Description

PATENTBD DEC. '8', 1903.
s snzms-sunnr1J M3. b N E. i M lnl I s. P. SEELY;
- RAILWAY STRUCTURE.
APPLICATION FILED APR. 2, 1903. H0 MODEL.
E ica-Hi V No. 746.179. PATENTED DEC. 8, 1903.
' S. F. SEELY. Y
RAILWAY STRUCTURE. APPLICATION FILED APR. 2. 1903. I HQ MODEL. 3 SHEETS-SHEET 2.
I 5 Jumntoz f eey PATENT-ED m 1903,.
s. P. SEELY. RAILWAY STRUCTURE.
APPLIOATION FILED APR. 2, 1903.
3 SHEETSSHEET 3.
N0 MODEL.
m. l v Q u UNITED I STATES Patented December 8, 1903 PATENT OFFIC SAMUEL F. sEn Y, on TOLEDO, orno.
RAILWAY STR U GTU RE.
SPECIFICATION Application filed April 2, 1903. Serial No. 150,787. (No model.)
forming part of Letters Patent No. 746,179, dated December 8, 1903.
To aZZ-whom it m aly concern/.-
, Be it kn own that I, SAMUEL F. SEELY, a citizen of the United States, residing at Toledo, in
the county of Lucas and State of Ohio,have invented certain new and useful Improvements in Railway Structures; and I do declare the following to be afull, clear, and exact description of the invention, such as will enable others skilled in the art-to which it appertains to make and use the same.
My invention relates to new and useful improvements in rallw'ay construction; and its object is to produce a rail-supporting struc-l ture which is simple durable in use.
With the above and other objects in view,
in construction and very which will readily appear as the nature of the invention is better understood, said invention consists in certain novel features of construction and combination and arrangement of Fig. 5 is a plan view of asection of a modified form of my improved railway structure. Fig. 6 is a longitudinal section on the line '6 6 of Fig. 5. Fig. 7 is a cross-section on theline 7 7 of Fig. 5. Fig. 8 is a detail perspective View of the end of one of the metallic ties, showing another manner in which the rails maybe secured. Fig. 9 is 'a detail'view show-v 'to bridges, trestles, and the like.
ing the manner of securing the rails and ties Fig. 10 is a longitudinal sectional view through one of the ties adapted to be used as a'longitudina'l support and showing an extension applied thereto.' Fig. 11 is a view similar to Fig. 9, showing another manner of securing thejrails and ties to trestles and bridges.
Referring more particularly to Figsl to4of the drawings, the numeral 1 denotes metallic cross-ties provided with beveled side and end flanges 2 and 3 and with hook-lugs 4, riveted upon the upper surface at each end, which are adapted to engage the outer base-flange of the track-rails 5 to hold the same and to preventspreading. The inner base-flange of ing in position.
the rails is secured to the ties by the plates or clips 6, which overlie said flange and which are adapted to be securelyclarnped by bolts 8, provided with hooked heads to engage the side flange 2 of the tie, said bolts passing upwardly through alining apertures in the top of the tie and the plate, and nuts 9, screwed upon their ends, securely ,clamp the said plates or clips upon the flanges of the rails.
In order to support the rail more perfectly, I arrange a tie longitudinally between each two cross-ties, as seen in Fig. 1. The rails are secured to these longitudinal supportingties in a manner similar to that inwhich they are held upon the cross-ties. These metallic ties, owing to the beveled flanges 2 and 3, are trough-shaped and are adapted to be filled or'packed with any desired filling, but preferably with a cement composed of crushed stone or gravel, sand, Water-lime, asphalt,
coal-tar, orany desiredymaterials'mixed in i any desired proportions. This waterproof filling 10 greatly strengthens the tie and increases the weight of the structure to give it firmness and durability. In preparing my ties the entire inside and. outside is heavily coated with asphaltor pitch after the bolts have been placed in'position, and the filling of cement is then put in and tamped down to within aqua rter or half inchof the edge or bottom of the tie; but, if desired, I may fill the ties flush with the lower edge orbottom, and instead of a cement filling I may use any desired material which will stand the strain. Metal straps or braces 11 may also be used to strengthen the tie and to hold the cement fill- In building the road the ties are'first arranged, as shown in Fig. 1,upon athoroughlytamped foundation, and the rails are then secured in position. I tamp the soil of the roadbed solidly under the ties, so as to fill up the quarter or half inch space, as I find that by so doing the tie will have less tendency to slip. I then thoroughly saturate the road-bed all around the lower edge of the ties with asphalt,
Both'the middle of the road-bed and the outside portions toabout a foot or more beyond the ends of the cross-ties 'are thus filled up, thoroughly tamped, and then pitch, or coal or oil tar. Earth is thenpacked in around the ties to level with their upper surfaces.
saturated with crude oil to the depth of two or three inches. It is thus seen thatatrackway isproduced which is both water and dust proof and which is extremely solid and durable in use. It will be understood that instead of having the hook-lugs 4 riveted to the tie they may be dispensed with and a hookbolt and plate may be used to clamp the outer base-flange of the rail.
In the construction illustrated in Figs. 5, 6 and 7 I have placed the cross-ties 1 beneath the longitudinal ties 1 which I place nearer to each other. In order to secure the longitudinal ties upon the cross-ties and to prevent the spreading of the former, I provide the cross-ties with the hook-lugs 4?,which may be riveted or otherwise secured upon the top of the ties and which engage the outer flanges 2 of the longitudinal ties. The plates or clips 6 engage the inner flanges of the longitudinal ties and are clamped upon the crossties by the hook-bolts 8, similar to the manner in which the rails are secured to the ties. In this form of my invention I fill the longitudinal ties with cement flush with the bottom edges at each end where they rest upon the cross-ties, but I make the central portion concave, so that the soil will be forced up under the tie and hold the same more firmly. The cross-ties are not filled flush with the bottom edge and are also made slightly concave for the same reason. When this construction of road-bed is used, should the car leave the rails the damage would be much less than if the crossties were upon the same level as the longitudinal ones.
In the construction illustrated in Fig. 8 the hook-bolts 8 instead of being upon the inside of the tie are arranged upon the outside and pass through apertures formed in projections 12 upon the flanges 2 and 3 of the tie. In this construction the clamp plates or clips are used both upon the inner and outer base-flanges of the rail to hold the same upon the ties. By having the bolts upon the outside of the tie they may be more easily removed and replaced.
Upon bridges and trestles I fill the ties flush to the bottom with wood thoroughly saturated with asphalt or pitch or boiled in oil-tar, as I find that this kind of filling will stand the jar and vibration better than cement. Upon bridges and trestles I may, if desired, place all the ties longitudinally and dispense with the cross-tie. WVhen my structure is laid upon the ground, I prefer to use the belts with hooked ends, as shown in Figs. 1 and 4, but upon bridges and trestles I prefer to use eyebolts 8, as illustrated in Figs. 9 and 11. Fig. 9 shows the bolt 8 with an eye upon its lower end and a lag-screw S passing through the same and into the wooden beam or girder 8 of the bridge or trestle. The screw 8 is first dipped in oil-tar and is then forced to enter the beam at an angle to prevent water work ing in around it. Upon the bridges and trestles in which the beams and girders are metal the eyes of the bolts 8 are bent at an angle, so as to lie flat upon the top flange 8 of the beam or girder 8 and a bolt 8 is then passed through the eye and an opening in said flange, as illustrated in Fig. 11.
Upon piling where there are no girders the ties are filled to within an inch of the bottom with wood, thus giving ahold upon the head of the piles, and upon piles the cross-ties are always used to prevent the rails from spreading.
WVhen it is desired to have longer ties, the ties may be lengthened by the extension 14, as shown in Fig. 10. A locking-rib 15 is riveted or otherwise secured upon the beveled flange 3 of the tie and is adapted to coact with a similar locking-rib 16, secured upon the under side of the extension 14. The said extension has a beveled end 17, which bears upon the beveled flange 3 of the tie, and shoulders or stops 18, formed upon the beveled end 17 of the extensions, engage the bottom of the flange 3 to lock the parts together.
The cross-ties in Figs. 5, 6, and 7 are preferably made half the depth of the longitudinal ties which they support.
From the foregoing description, taken in connection with the accompanying drawings, it is thought that the construction, operation, and advantages of my improved railway structure will be readily apparent without requiring a more extended explanation.
Various changes in the form, proportion, and the minor details of construction may be resorted to without departing from the principle or sacrificing any of the advantages of this invention.
Having thus described my invention, what I claim as new, and desire to secure by Letters Patent, is-
1. A railway structure comprising metallic cross-ties filled with cement, longitudinal supporting-ties filled with cement and arranged between said cross-ties, track-rails, plates adapted to engage the base-flanges of the rails, bolts formed with hooked heads to engage the tie and adapted to clamp the plates upon the rail and tie, substantially as set forth.
2. A railway structure comprising metallic trough shaped cross ties formed with surrounding flanges and filled with cement, longitudinal supporting-ties formed with surrounding flanges and filled with cement, straps or braces upon-said ties to support the cement in position, track-rails, plates adapted to overlie the base-flanges of said rails, and bolts having hooked ends to engage the flanges of the ties and adapted to pass through the tie and plate to clamp the rail to said tie, substantially as set forth.
3. The combination with a metallic tie formed with side and end flanges, and a rib upon the end flange, of a tie extension having one end cut away to coact with the end flange of the tie and having a rib to coact with the rib upon the tie, and shoulders formed the tie and adapted to clamp the plates upon [0 upon the tie extension to coact with the end flanges of the tie, substantially as set forth.
4. A railway structure, comprising cross- 5 ties filled with cement, longitudinal rail-supporting ties filled with cement and secured upon said cross-ties, track-rails, plates adapted to engage the base-flanges of the rails, bolts formed with hooked heads to engage the rail and tie, substantially-as described.
In testimony whereof I have hereunto set my hand in presence of two subscribing witnesses.
SAMUEL F. SEELY. Witnesses:
H. HAAOK, WM. HILL.
US15078703A 1903-04-02 1903-04-02 Railway structure. Expired - Lifetime US746179A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15078703A US746179A (en) 1903-04-02 1903-04-02 Railway structure.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US15078703A US746179A (en) 1903-04-02 1903-04-02 Railway structure.

Publications (1)

Publication Number Publication Date
US746179A true US746179A (en) 1903-12-08

Family

ID=2814674

Family Applications (1)

Application Number Title Priority Date Filing Date
US15078703A Expired - Lifetime US746179A (en) 1903-04-02 1903-04-02 Railway structure.

Country Status (1)

Country Link
US (1) US746179A (en)

Similar Documents

Publication Publication Date Title
US746179A (en) Railway structure.
US590108A (en) Railroad-rail chair
US1119232A (en) Railway-tie and brace.
US1101436A (en) Railway-tie.
US628283A (en) Tramway.
US925698A (en) Railway-tie.
US626612A (en) Metallic cross-tie for railway-tracks
US722473A (en) Railway-tie.
US759852A (en) Concrete railway-tie.
US206385A (en) Improvement in elevated railways
US978343A (en) Cross-tie or sleeper of reinforced concrete or other plastic material.
US1066085A (en) Rail-support.
US128120A (en) Improvement in railway tracks
US517277A (en) Railway-track structure
US1012152A (en) Reinforced-concrete railway tie and rail-securing means.
US1009020A (en) Railway road-bed, track, and rail construction.
US999966A (en) Railway-rail support.
US365511A (en) geoeget
US253381A (en) Railroad-tie
US763538A (en) Railway-tie.
US1312645A (en) Railway-track
US633413A (en) Composition railroad-tie and means for securing rails thereto.
US615923A (en) Railway-tie
US761647A (en) Concrete railway-tie.
US446446A (en) Street-railway track