US419237A - Jetty - Google Patents

Jetty Download PDF

Info

Publication number
US419237A
US419237A US419237DA US419237A US 419237 A US419237 A US 419237A US 419237D A US419237D A US 419237DA US 419237 A US419237 A US 419237A
Authority
US
United States
Prior art keywords
mattress
brush
jetty
timbers
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US419237A publication Critical patent/US419237A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment

Definitions

  • This invention relates to a jetty or dike, and has for its object the production of a jetty which can be economically constructed, which can be readily and with certainty located and anchored in position, and which effects the objects for which jetties are constructed in a simple and satisfactory manner.
  • the well-known purpose for which j etties are built is to confine bodies of running water between fixed embankments or limits for the purpose of preventing the overiiow of the water upon adjacent lands, or for the pur pose of compelling the confined body of running water to scour out and carry away the sand and mud on the bottom of the channel, and thus provide a deeper body of water, and which is navigable by vessels of deeper drat'tthan could be used in the unimproved channel. This has been accomplished by building embanknients on either side of.
  • My improvement consists in employinga single continuous mattress, or atleast a mattress made in Very long lengths, and extending practically unbroken from one end of the work to the other, or such lengths as may be desirable7 all compactly bound together and having the loading material all interspersed throughout the brush-work, so that the combined brush-work and loading material together form a homogeneous mass that is of itself stable in position in the water and so compact as to reduce to a minimum the percolation of water through or under it.
  • the construction also, is such as to protect the brush-work almost entirely from the destructive action of the teredoa result which is especially useful in work in the waters ad jacent the Gulf of Mexico, where the teredo abounds.
  • Figure l represents a longitudinal section of my jetty with the mattress in process of construction, showing the completed part of the mattress at the bottom of the water.
  • Fig. 2 shows a cross-section, showing the mattress sunk, and a loading of compression-stones on top of it and a concrete coping on top of the stone.
  • Fig. 3 shows a detail of the manner in which the longitudinal stringers are pressed and held together.
  • Fig. et shows one of the stringers in longitudinal cross-section, showing a cross-section of the wire or rope ties and the method of holding the wire tie to the longitudinal stringere.
  • Fig. 5 is a section showing the connection between the brushwork, the binding-ties, and the longitudinal Stringer.
  • the height of the trestlework or railway above the surface of the Water which is indicated by the dotted line w w, should be suiiicient to allow for workingroom between ties T T and the suspended mattress-strips L L.
  • On the timbers L thus suspended I place a layer of brush or reeds, mingling with the brush as it is placed on the timbers broken stone, gravel, shell, or clay, so as to till the interstices in the brush and form a homogeneous mass of mingled brush and weighting material.
  • the brush is placed on alternate layers at right angles to IOO each other, one layer lying across the timbers L, a second layer lying at right angles to that, and a third layer lying again crosswise of the timbers L, and when a sufficient thickness of brush has been built up a second longitudinal timber is placed above the brush against the suspending wire or rope W, and the two longitudinal timbers ⁇ are pressed together by means of the device shown in Fig. 3, or any equivalent device, the device consisting of a means of obtaining a grip on the suspending-wire, and with that as a fulcrum pressing downen the upper timber L by means of the lever I and the perforated pressure-block Z9.
  • the construction is continued un ⁇ til a sufficient depth of mattress has been built to reach from the bottom to the surface of the water.
  • the building of the mattress continues from one end to the other of the jetty, or such length as may be desired, there being a suliicient flexibility in the long lines of stringers to allow the constructed part to rest'on the bottom, while the forward part of the structure is still at the surface and the portion between the forward and rear part is in process of construction and in process of sinking.
  • a layer of stone, or stone and earth F F is for the purpose of further consolidating and weighting the mattress, and also for the purpose of furnishing a firm and comparatively smooth surface for the support of a concrete coping K, which is built on the substructure, and which extends above the surface of the water and finishes the dike in a very substantial and permanent manner.
  • the coping K is made of concrete or bton, and
  • a mattress for use in building jetties composed of brush and earthy material intermingled so as to form a uniform structure throughout, and bound together by timber and ties, substantially as described.
  • a jetty consisting of a continuous mattress of brush and earthy material mingled in a homogeneous mass and bound together by timber and ties, substantially as described.y
  • a jetty consisting of the combination of a homogeneous mass of mingled brush and earthy material held together between timber and ties, and one or more rows of piles driven along the course of the jetty and around and between which the brush-work rests, substantially as described.

Description

(No Model.) 2 Sheets-Sheet G. Y. WISNER.
JETTY. 110.419,23?. Patented Jan. 14,1890
(No Model.) 2 Sheets-Sheet 2.
G` Y. WISNER.
JETTY.
No. 419,237.' Patented Jan. 14,1890.
N. Pains. Phmvmnogmpmr. washing, n4 c,
UNITED STATES PATENT OFFICE.
GEORGE Y. IVISNER, OF DETROIT, MICHIGAN.
JETTY.
SPECIFICATION forming part of Letters Patent-No. 419,237, dated January 14, 1890.
Application filed June 19, 1889. Serial No. 314,825. (No model.)
To (LM whom it may concern,.-
Be it known that I, GEORGE Y. WIsNER, a citizen of the United States, residing at Detroit, in the county of Vayne and State of Michigan, have invented a new and useful Improvement in Jetties, of which the following is aspecication.
This invention relates to a jetty or dike, and has for its object the production of a jetty which can be economically constructed, which can be readily and with certainty located and anchored in position, and which effects the objects for which jetties are constructed in a simple and satisfactory manner.
The well-known purpose for which j etties are built is to confine bodies of running water between fixed embankments or limits for the purpose of preventing the overiiow of the water upon adjacent lands, or for the pur pose of compelling the confined body of running water to scour out and carry away the sand and mud on the bottom of the channel, and thus provide a deeper body of water, and which is navigable by vessels of deeper drat'tthan could be used in the unimproved channel. This has been accomplished by building embanknients on either side of. the channel through the shallow water, and by using in building such embankments any material which would prevent thc water from spreading sidewise out of the channel, and it has been customary to make use of brush and reeds laid together in masses, the practice being to construct them at some convenient spot and then move them to the place where they are to be located and sink them, using the mattress when sunk as a foundation of basis over and around which to build a superstructure of stones and mud or other material with which to conne the water. Sometimes the mattress has been built in the place where it is to be used and then sunk and loaded or otherwise fastened to the ground.
My improvement consists in employinga single continuous mattress, or atleast a mattress made in Very long lengths, and extending practically unbroken from one end of the work to the other, or such lengths as may be desirable7 all compactly bound together and having the loading material all interspersed throughout the brush-work, so that the combined brush-work and loading material together form a homogeneous mass that is of itself stable in position in the water and so compact as to reduce to a minimum the percolation of water through or under it. The construction, also, is such as to protect the brush-work almost entirely from the destructive action of the teredoa result which is especially useful in work in the waters ad jacent the Gulf of Mexico, where the teredo abounds.
Figure l represents a longitudinal section of my jetty with the mattress in process of construction, showing the completed part of the mattress at the bottom of the water. Fig. 2 shows a cross-section, showing the mattress sunk, and a loading of compression-stones on top of it and a concrete coping on top of the stone. Fig. 3 shows a detail of the manner in which the longitudinal stringers are pressed and held together. Fig. et shows one of the stringers in longitudinal cross-section, showing a cross-section of the wire or rope ties and the method of holding the wire tie to the longitudinal stringere. Fig. 5 is a section showing the connection between the brushwork, the binding-ties, and the longitudinal Stringer. I
Along the course Where the jetty is to rest I drive two or more rows of piles S S S S, across the top of which are placed tie-timbers T T T, and upon thc tie-timbers is laid a rail R R for a temporary railway-track. The driving of the piles and the building of the railway are carried on in advance of the construction of the mattress. From the ties T, or from the rails R R, I suspend longitudinal timbers L L. These timbers may behung directly to `the suspending-wires lV NV, or they may be laid upon cross-timbers AA, suspended from the timbers T T. The height of the trestlework or railway above the surface of the Water, which is indicated by the dotted line w w, should be suiiicient to allow for workingroom between ties T T and the suspended mattress-strips L L. On the timbers L thus suspended I place a layer of brush or reeds, mingling with the brush as it is placed on the timbers broken stone, gravel, shell, or clay, so as to till the interstices in the brush and form a homogeneous mass of mingled brush and weighting material. The brush is placed on alternate layers at right angles to IOO each other, one layer lying across the timbers L, a second layer lying at right angles to that, and a third layer lying again crosswise of the timbers L, and when a sufficient thickness of brush has been built up a second longitudinal timber is placed above the brush against the suspending wire or rope W, and the two longitudinal timbers `are pressed together by means of the device shown in Fig. 3, or any equivalent device, the device consisting of a means of obtaining a grip on the suspending-wire, and with that as a fulcrum pressing downen the upper timber L by means of the lever I and the perforated pressure-block Z9. Vhen the layers of brush have been compressed in this way between the timbers L and L', a staple is driven over the tie-wire into the timber L. Upon the timbers L a second layer of mattress-work is built, and the operation is repeated until av suflicient depth of mattress-work is built up. When the trestle-work becomes so iilled up that it is inconvenient to Work on top of the brushework under the cross-timbers of the trestle-work, the upper ends of '.the suspending wires or ropes IV are let go and the mattress sinks until its upper surface is nearly level with the surface of the water. If at this time it has not sunk so low as to rest on the bottom, the construction is continued un` til a sufficient depth of mattress has been built to reach from the bottom to the surface of the water. The building of the mattress continues from one end to the other of the jetty, or such length as may be desired, there being a suliicient flexibility in the long lines of stringers to allow the constructed part to rest'on the bottom, while the forward part of the structure is still at the surface and the portion between the forward and rear part is in process of construction and in process of sinking.
Upon the top of the submerged mattress, after that has been' completed and sunk, I place a layer of stone, or stone and earth F F. This is for the purpose of further consolidating and weighting the mattress, and also for the purpose of furnishing a firm and comparatively smooth surface for the support of a concrete coping K, which is built on the substructure, and which extends above the surface of the water and finishes the dike in a very substantial and permanent manner. The coping K is made of concrete or bton, and
being made in large blocks assists very materially in holding down the mattress-work, and is itself very firmly supported in place by the mattress beneath it. This form of construction provides a homogeneous structure, in which the interlacing brush-work serves to keep the included earth and 'rock work safe from the scouring action or erosive action of the moving water, and on the other hand the included earth and rock work serves to lill all the interstices of the brush-work and to prevent the percolation of water through the dike. The water is thus more securely coniined in the desired channel andacts with greater efficiency in scouring out the channel. Thelines of piles supporting the trestlework aid materially in giving stability to the structure and are usually allowed to remain.
Having thus described my invention, its method of construction, and its mode of operation, what I claim as novel, and desire to be secured to me by Letters Patent, is
1. The process of constructing a jetty or dike, consisting in first building a trestlework along the line of the proposed jetty, then suspending timbers by means of wire or ropes attached to the timbers of the trestlework, then building upon the timbers a mattress of brush and earthy material, the said structure to loe either continuous lfrom one end to the other of the proposed jetty, or of such shorter length as may be desirable, and the sinking of said mattress progressively as fast as completed.
2. A mattress for use in building jetties, composed of brush and earthy material intermingled so as to form a uniform structure throughout, and bound together by timber and ties, substantially as described.
3. A jetty consisting of a continuous mattress of brush and earthy material mingled in a homogeneous mass and bound together by timber and ties, substantially as described.y
4. A jetty consisting of the combination of a homogeneous mass of mingled brush and earthy material held together between timber and ties, and one or more rows of piles driven along the course of the jetty and around and between which the brush-work rests, substantially as described.
GEO. Y. WISNER,
In presence of- ALEX. E. KAsTL', E. S. DEWEY.
IOO
US419237D Jetty Expired - Lifetime US419237A (en)

Publications (1)

Publication Number Publication Date
US419237A true US419237A (en) 1890-01-14

Family

ID=2488157

Family Applications (1)

Application Number Title Priority Date Filing Date
US419237D Expired - Lifetime US419237A (en) Jetty

Country Status (1)

Country Link
US (1) US419237A (en)

Similar Documents

Publication Publication Date Title
CN210104758U (en) Foundation pit supporting system of soil nail bored concrete pile anchor cable combination
US2466343A (en) Jetty
US419237A (en) Jetty
US875699A (en) Reinforced composite structure.
US1423884A (en) Ocean pier
US1112018A (en) Protection of levees, embankments, dams, and other natural or artificial structures.
US782557A (en) Floatable concrete pier.
US1633211A (en) Roadway embankment
RU2655312C1 (en) Device for strengthening earth heavy reliefs
US517879A (en) Mattress for riprap
US407500A (en) Eleazar s
GB190813189A (en) Improved Method of Tunnelling Under Streets, Roads, Squares, Tracks and the like Surfaces of the Ground.
US1505238A (en) Breakwater-wall construction
US932565A (en) Anticipatory riprap-dikes.
US380934A (en) John b
US600832A (en) Construction of levees
US170832A (en) Improvement in mattresses for forming embankments
US714205A (en) Method of laying tunnels.
Mitchell et al. Brickwork and Masonry: A Practical Text Book for Students, and Those Engaged in the Design and Execution of Structures in Brick and Stone
US1006247A (en) Dock construction and method of constructing docks.
US1178531A (en) Driven concrete pile.
US2338110A (en) Graving dry dock and method of construction
US1444622A (en) John a
US1306725A (en) small
SU1093750A1 (en) Dam of locally available materials