US4113401A - Method of pavement repair - Google Patents
Method of pavement repair Download PDFInfo
- Publication number
- US4113401A US4113401A US05/784,615 US78461577A US4113401A US 4113401 A US4113401 A US 4113401A US 78461577 A US78461577 A US 78461577A US 4113401 A US4113401 A US 4113401A
- Authority
- US
- United States
- Prior art keywords
- asphalt
- hot
- rubber
- pavement
- aggregate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/187—Repairing bituminous covers, e.g. regeneration of the covering material in situ, application of a new bituminous topping
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/005—Methods or materials for repairing pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/26—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
- E01C7/265—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
Definitions
- the so-called "flexible-type pavement” is actually not a particularly flexible structure.
- flexible-type pavements could be classified as very brittle, particularly in cold weather or when the pavement surface has suffered a long period of embrittlement from oxidation and age.
- the cracking caused by this lack of flexibility has created a tremendous problem, when considered on a nation wide scale. Traveling over the streets and highways of this country, one can seldom go more than a few miles without finding distressed pavement which is basically caused by repeated flexing by the surface of the pavement under the traffic loads.
- This type of failure has been variously defined as flexure cracking, elastic-type failure, and fatigue failure. It is characterized by multiple cracking of the "chicken-wire,” or “alligator” type pattern without plastic deformation of the pavement surface. The cracking is due to fatigue of the bituminous pavement mixture from repeated deflection of the pavement surface under vehicle load and subsequent recovery of the pavement surface. This deflection and recovery is caused by elasticity of some member of the substructure or foundation of the pavement surface. Fatigue failure is the most prevalent of the three most common types of failure occuring in flexible-type pavements. The other types of failure are:
- the surface-type failure which is characterized by attrition, or stripping and emulsification of the asphalt in a surface of the pavement. There is raveling and loss of material in the surface but no significant amount of cracking in the surface. Although this type of failure is very common, it is not as serious as fatigue-failure because it can be corrected by the application of a seal coat.
- Fatigue cracking resulting from elastic-type failure is entirely different from the above two types of failure, and solutions to fatigue cracking have not only been difficult and expensive, but in many cases quite uncertain in their result because there is resilience in some member of the substructure. This resilience must be counteracted by either making the substructure or the surface so rigid that it cannot bend, or by making the surface so flexible that it will take the bending. Part of the difficulty in solving this problem lies in the fact that the deflections required to produce elastic-type failure are so small that almost complete elimination of the resilience in the substructure is required. Repeated deflections of a very small order are sufficient to produce this type of failure.
- Complicating the solution to the problem of repairing fatigue cracking from elastic-type failure is the fact that the source of such a small magnitude of elasticity may be difficult to determine.
- the elasticity may be either in the subgrade, subbase, or base course.
- An increase in the normal moisture content of even a good subgrade, caused by frost action for instance, may cause the subgrade to become "quickie" resulting in a condition where vehicle load is born by hydrostatic pore pressure.
- there is almost no reasonable thickness of overlying material or pavement that will prevent the deflection caused by the vehicle load on the pavement surface.
- the pavement surface of a four foot fill over a quickie soil has been observed to visibly deflect under vehicle load. This condition also develops in densely graded base courses through frost action.
- Asphalt-rubber compositions are described and claimed in many patents; however, none of these patents disclose the unique elastomeric material that I have prepared from rubber and asphalt. Preparations of asphalt containing rubber have been prepared in the past by workers in the art.
- the Wilkinson U.S. Pat. No. 108,666 discloses a roofing compound composed of ground anthracite coal, ground gypsum, ground tan-bark, India rubber dissolved and prepared coal tar and/or commercial pitch.
- a hard composition containing rubber and bitumen is disclosed which is useful as a substitute for porcelain, earthware, ebonite, vulcanite and the like is disclosed.
- This composition contains principally slate powder and lesser amounts of ground rubber and optionally bitumen and/or coloring matter.
- the Sadtler U.S. Pat. No. 1,758,913 discloses a rubberized-asphalt mixture which is useful as a road covering. The mixture is prepared by adding aggregate to a pug mill; adding liquefier or asphalt-solvent to saturate the entire aggregate; adding rubber to the saturated aggregate so the finished mixture contains only one-half of one percent rubber based on the weight of the total asphalt added; adding asphalt or other bituminous material to the mixture at a temperature of 250° F. or higher.
- the Grant U.S. Pat. No. 2,040,256 discloses a rubberized-asphalt composition for sealing pipe joints and the like.
- the composition is prepared by melting asphalt at a temperature not in excess of 180° C. (375° F.). Ground tacky rubber is added to the molten asphalt. The resulting mixture is raised to a temperature of 245° C. (475° F.) for a period of not less than 10 minutes. The temperature is maintained while the mixture is stirred until no lumps of rubber are detectable in the mixture.
- the resulting composition consists of 0.5 to 15% rubber and 99.5 to 85% asphalt. The ductility of the composition is slightly less than that of the asphalt and its penetration is not more than 2% less than that of the asphalt.
- 1,884,240 discloses a rubberized-tar product prepared by heating and stirring rubber, water-gas tar and coal tar and/or pitch until a homogenous mass is obtained. Sulfur is added to the mixture and thoroughly mixed therein.
- the Taylor U.S. Pat. No. 2,686,169 discloses a method of incorporating rubber latex into hot bitumen, the resulting composition contains 2 to 6% rubber.
- the Endres et al U.S. Pat. No. 2,700,655 discloses a powdered rubber-containing composition for incorporation in the asphalt. The powdered composition contains from 10 to 50% rubber and from about 90 to 50% filler. Dasher U.S. Pat. No.
- 2,853,742 discloses a method of producing powdered rubber from scrap vulcanized rubber material which can be employed for mixing with asphalt for the production of bituminous concrete paving mixtures as well as in the production of various types of asphalt coatings and similar compositions in which it is desired that a portion of the rubber be present in the coating.
- the rubber is prepared in a Banbury machine.
- the Endres et al U.S. Pat. No. 3,127,367 discloses a method and apparatus for adding latex to hot asphalt to obtain a composition containing between 1 and 2% rubber.
- the Endres et al U.S. Pat. No. 3,202,623 discloses a dry, powdered rubberized composition for incorporating into asphalt.
- the composition is prepared by combining a water suspension of hard bitumen with rubber latex and then co-precipitating the mixture by means of a coagulant to yield a product containing 5 to 40% by weight rubber.
- the Peaker et al U.S. Pat. No. 3,242,114 discloses a method of dispersing a rubber-resin composition into asphalt. The resulting composition contains from 1 to 20 parts of rubber per hundred parts of asphalt.
- the Endres U.S. Pat. No. 3,253,251 discloses paving blocks composed of rubberized bitumen cement and rubber aggregate. This invention can be visualized as blocks of aggregate rubber particles bound by rubberized-asphalt cement. The rubberized bitumen cement contains a very small percentage of rubber.
- a commercial product, Ramflex, a powdered rubber specially devulcanized in less than 5 minutes for use in combination with asphalt and aggregate, for asphaltic-type pavement is produced by the U.S. Rubber Reclaiming Company, Inc.
- RAMFLEX rubber is mixed in a pug mill with asphalt and aggregate. Five to ten percent of RAMFLEX rubber is used for each part of asphalt employed in the total mixture.
- the total mixture is prepared by adding hot stone or sand and filler to a pug mill in the usual manner; then RAMFLEX rubber is added to the pug mill and mixed 10 to 20 seconds; finally the asphalt is mixed therein for an additional 30 seconds. The material is then ready for application.
- the present invention is directed to a method of repairing pavements, such as roads, run ways, walk ways, and roofs, which are subject to cracking, especially fatigue-type cracking characterized by an alligator cracking pattern.
- the method comprises preparing a hot asphalt-rubber elastomeric material and applying it to the area to be repaired.
- the area to be repaired is first cleaned of all loose debris and then the hot elastomeric material is applied thereto.
- the pavement area to be repaired can be tacked with a binder such as cut-back asphalt, hot tar, and the like.
- the present method is especially useful for the repair of relatively large areas of cracked pavement.
- the asphalt and rubber are heated and mixed at the site and then spread with conventional equipment to a depth of less than one-fourth inch, although other thicknesses can be applied. Aggregate, such as crushed rock or gravel, is then spread on the surface of the asphalt-rubber elastomeric mixture as a dressing, for the purpose of taking the abrasive wear of traffic. When the asphalt-rubber mixture is applied hot, a tack coat can often be omitted. Under the present method of repair, the surface, the base and sub-grade of the pavement do not have to be dug up and replaced with new materials as would be necessary for permanent repair of the pavements by existing methods.
- the present invention is directed to a method of repairing pavements, such as roads, run ways, walk ways, and roofs, which are subject to cracking, especially fatigue-type cracking characterized by an alligator cracking pattern.
- the method comprises applying a prefabricated cold patch to the area to be repaired.
- the area to be repaired is first cleaned of all debris.
- the pavement area to be repaired is tacked with a binder such as cut-back asphalt, hot tar, and the like.
- the cold patch is applied to the tacked area.
- the present method is especially useful for the repair of relatively small areas of cracked pavement.
- the surface, the base and subgrade of the pavement do not have to be dug up and replaced with new materials as would be necessary for permanent repair of the pavements by existing methods.
- the prefabricated patch employed in the present method will be synonymously referred to herein as the prefabricated elastomeric cold patch, the elastomeric cold patch, the elastomeric patch, the cold patch and the patch.
- Repairs made with the present patching material are more permanent than those made with existing materials because they are completely elastic and do not crack under repeated deflections as do conventional patching materials.
- a high percentage of the maintenance costs of repairing asphalt surfaces arises from the fact that repeated repairs of the same location, caused by movement of the sub-structure, are required when fatigue-type cracking of pavement is involved.
- the elastomeric material of the present invention is a formulation of paving grade asphalt with penetration ranges of 10 through 300 and commercially-processed reclaimed rubber or unprocessed rubber buffings and aggregate (crushed rock, gravel, or stone).
- the asphalt and rubber are combined in proportions and at temperatures to form a gel which, when cooled, results in a tough, elastic mass.
- the mineral aggregate is added either to the hot mixture of asphalt and rubber, or subsequently after application.
- a rubber-asphalt material could be made to have the consistency of a thick slurry or gel when hot which forms a tough elastic mass when cooled.
- the best consistency for our purpose could be obtained by heating paving grade asphalt to from about 350° and about 500° F. and then stirring into it rubber, such as partially devulcanized reclaimed rubber (a commercial product), in the proportion of about two to three parts of asphalt to about one part of rubber.
- the laboratory tests showed that the consistency of the final product depended not only on the rubber content, but also on degree of solution or jelling and surface interaction of the rubber. The higher the temperature of the mixture, the greater the degree of solution and surface interaction of the rubber and the asphalt and the more nearly the end product resembled the properties of rubber rather than asphalt.
- the elastomeric composition has been prepared from a variety of rubbers, such as ordinary reclaimed rubber obtained from a local vulcanizing shop.
- the reclaimed rubber was a finely granulated product obtained from the buffing of tires for retreading. This material can be mixed in the proportion of about 2 to about 3 parts of paving grade asphalt to one part of reclaimed rubber. Ground whole tire rubber, asphalt soluble rubber, unprocessed rubber tire buffings and salvaged tire rubber can also be used in the elastomeric material.
- the claimed elastomeric material consists essentially of asphalt and rubber of certain proportions which have been heated together within a specified temperature range to form a jellied composition.
- the claimed material consists essentially of paving grade asphalt and rubber in the ratio of about 2-3 to about 1 by weight respectively.
- the asphalt is heated to a temperature between about 350° and about 500° F. and the rubber is mixed therein to form a reaction product, the jellied composition.
- This elastomeric material has several exceptional and unexpected properties. For example, it does not reflect underlying fatigue cracks after application on the cracked distressed pavement. As shown above, the conventional pavement repair materials such as hot mix, sand-asphalt and slurry seal cannot be successfully employed to repair cracked-distressed pavements because cracks reflect through the repair material.
- the claimed elastomeric material can be used to successfully repair cracked-distressed pavement by merely covering the surface of the pavement with a thin layer, e.g. about one-fourth inch thick, of the hot elastomeric material.
- the elastomeric material has excellent and unexpected weatherability and wearability on pavement.
- several cracked-distressed pavements repaired with the elastomeric material have been subject to severe inundation without any detremental effects on the claimed material (see the examples).
- the claimed elastomeric material has shown exceptional wearability under severe traffic conditions as shown in the examples. As of 1973, seven years after the preparation, two of the panels of Example 1 are still in service.
- the novel elastomeric composition of the present invention on a weight basis is not as inexpensive as conventional repair materials.
- the cost of the material is not out of line with heavier overlays which are commonly used and generally unsuccessful in combating the problem of fatigue cracking, or with slurry seals also commonly used and generally unsuccessful in preventing reflection cracking.
- the cost of the material is relatively a minor item.
- the big cost item in maintenance repair work is the labor involved.
- a product that will eliminate repeated repairs to the same distressed pavement area has a tremendous economic advantage over the conventional repair materials.
- the present composition is applied to the pavement in relatively thin layers between one-twentieth and one-half inch in thickness. Since the material can be layed in relatively thin layers the economics of the present product are not out-of-line when compared with conventional materials.
- the elastomeric patch material of the present invention will flow into the chicken-wire or alligator pattern cracks and bond the fractured pavement together with an elastic bond to prevent further surface cracking and penetration of moisture.
- Other materials used for this purpose such as asphalts, or asphalts with little rubber content, are primarily plastic with little or no elasticity to take or recover from repeated deformation, particularly in cold weather when they become very brittle.
- the elastomeric material of the present invention is unique in that it retains some flexibility under all weather conditions.
- FIG. 1 illustrates a cut-away perspective view of an alligator crack pavement surface repaired by the present method
- FIG. 2 illustrates a cross-sectional view of a repaired alligator crack pavement taken along lines 2--2 of FIG. 1;
- FIG. 3 illustrates a cross-sectional view of a road prepared by the present method
- FIG. 4 is a cross-sectional view of one embodiment of the cold patch used in the method of the present invention.
- FIG. 5 is a cross-sectional view of one embodiment of a road constructed by the present method
- FIG. 6 is a cross-sectional view of another embodiment of a road constructed by the present method.
- FIG. 7 is a cross-sectional view of a pavement structure prepared according to the present method.
- the elastomeric paving repair composition is prepared by heating paving grade asphalt with a penetration range of 10 through 300 to a temperature within the range of from about 300° to about 500° F. and adding particulate rubber (one-half inch to +200 mesh USS) thereto. The resulting mixture is thoroughly mixed until the composition gels or becomes jellied. No additional heating is required once the rubber is added to the asphalt. About one part rubber is added to each two to three parts asphalt. I have used 85-100 penetration grade asphalt in my test work for convenience although other penetration grades of paving asphalt such as 120-150 grade are equally suitable and are generally used for practice of the invention.
- the elastomeric cold patch employed in the present method is prepared from the elastomeric paving repair composition.
- the hot elastomeric material is applied to sheets of paper, cardboard, fabric or plastic to form a layer of hot material on the sheet.
- the patch is formed in a form to give a patch of relatively uniform depth. Normally between 1/2 and about 1 gallon of the hot elastomeric material are applied per each square yard of sheet. However, lesser amounts, such as 1/4 gallon per square yard or greater amounts such as 21/2 gallons per square yard can also be applied.
- the layer of hot elastomeric material normally is from about 0.2 to about 0.25 inches in thickness.
- thinner layers such as paper-thin layers or thicker layers, such as layers an inch thick, can also be formed and used.
- the layer is dressed with an aggregate cover that is preferably tamped or rolled into the elastomeric material.
- an aggregate cover that is preferably tamped or rolled into the elastomeric material.
- Nominally sized aggregate of 1/4 or 3/4 inch is normally used; however, smaller sized aggregate such as sand or larger aggregate sizes can also be employed.
- the resulting product is then allowed to cool to form an elastomeric cold patch.
- the patch can be cut, if desired, into various sizes and shapes.
- aggregate preferably preheated to a temperature between about 300 and about 500° F.
- the hot composition can be added to the hot composition before it is applied to the paper or cardboard sheet.
- the end product will preferably have between about 20 and about 50 pounds of aggregate per square yard of the cold patch, preferably between about 25 and 40 pounds of aggregate per square yard of cold patch.
- the cold patch of the present invention also can be prepared without a sheet backing.
- the hot elastomeric material is applied to a nonadhesive surface to which the hot elastomeric material will not adhere such as a plastic or Teflon resin coated surface.
- the aggregate can be added to the composition before it is applied to the surface or it can be applied afterwards and tamped and rolled therein.
- the composition is applied at such a rate that the thickness of the resulting cold patch is normally between about 0.2 and about 0.25 inches in thickness.
- the thickness of the elastomeric cold patch layer can be thinner, such as about 0.1 inch in thickness, or thicker, such as about 0.5 inch in thickness, as described above.
- the cold patch after cooling should be treated with a material that will prevent sticking of the cold patch to other surfaces. Lime has been found to be an ideal material for this application. However, other adhesive breaking types of materials known to the art to prevent sticking and tacking can also be used. An adhesive breaker when applied to the surface of the patches, inhibits the patches from sticking together, especially when the patches are stored in stacks.
- Suitable rubbers that can be employed include unvulcanized, vulcanized or reclaimed rubbers including natural rubber, (NR, polyisoprene polymer), isoprene rubber (IR, polyisoprene polymer), butadiene rubber (BR, polybutadiene polymer), butadiene-styrene rubber (SBR, butadiene-styrene copolymer), butyl rubber (IIR, the isobutylene isoprene polymer) and ethylene propylene rubber (EPM and EPDM, ethylene propylene copolymers and terpolymers) which are unvulcanized, vulcanized or reclaimed.
- natural rubber NR, polyisoprene polymer
- IR isoprene rubber
- BR polybutadiene polymer
- SBR butadiene-styrene rubber
- IIR the isobutylene isoprene polymer
- EPM and EPDM ethylene propylene copo
- the reclaimed rubber can be devulcanized or partially devulcanized and can be prepared from vulcanized or unvulcanized rubber by the digester process, Heater or Pan process, high pressure steam process, Lancaster-Banbury process, reclamation or other conventional reclaiming processes (Maurice Morton, Introduction to Rubber Technology, Van Nostrand Reinhold Co., New York, 1959, pps. 404-435). Normally the reclaimed rubber will be prepared from old, worn tires, tire scrap, innertube scrap, retread scrap, tire peel, tire carcass, rubber buffings and other rubber scrap.
- rubber which has not been found suitable for the composition are: nitrile (NBR, butadiene acrylonitrile copolymers), epichlorohydrin (ECO, epichlorohydrin polymer and copolymer), neoprene rubber (CR, chloroprene polymers), hypalon (CSM, chloro-sulfonated polyethylene polymers), urethane rubber (AU, EU, urethane polymers or elastomers), polysulfide or thiokol rubber (T, organic polysulfides), silicone rubber (Si, organic silicone polymers), fluoro silicone rubber (FSi, fluorinated organic silicone polymers), fluoro elastomer (FTM, fluorocarbon polymers), acrylic rubbers and polyacrylates (ACM, copolymer of
- the following types of rubbers are preferred for use in the invention: (1) ground whole tire rubber (with and without carcass fabric residue; (2) unprocessed rubber buffings, that is rubber buffings that have not been subject to devulcanization or reclaiming processes (a by-product of tire retreading); (3) ground innertubes (natural rubbers and synthetic butyl rubbers); (4) reclaimed rubber; (5) partially devulcanized reclaimed rubber; and (6) asphalt soluble rubber.
- the preferred particle size for the rubber is from about 4 mesh to about +200 mesh USS.
- Unprocessed rubber refers to rubber that has not been chemically or thermally altered. Unprocessed rubber includes rubber that have been ground, screened, decontaminated, and treated to remove metals, cord and fabric therefrom.
- the composition is applied directly to the pavement area to be repaired.
- the pavement area to be repaired is first swept clean of all debris and made thoroughly dry.
- a tack coat of hot asphalt, solvent cut asphalt such as kerosene and asphalt, or an asphalt solvent, such as gasoline or kerosene can be applied to the area to be repaired.
- the pavement surface is asphaltic, the surface can be made adhesive and tacky by heating with a torch or the like.
- the hot elastomeric material is then applied to the area to be repaired to form a continuous layer averaging in thickness of from about one twentieth to about one half inch. Thicker or heavier layers can be applied.
- the hot elastomeric composition can be applied by spraying.
- sand or mineral aggregate or chips are applied on top of the hot elastomeric material and rolled therein to provide a protective wear surface for the hot elastomeric composition.
- the aggregate is normally sized to one fourth or three eighths inch but other size aggregate can be used.
- the chips can be optionally treated with asphalt to eliminate the dust problem.
- the chips are coated by heating them to a temperature between 250° and 325° F. and pre-coating them with a small amount of asphalt. With three eighth inch nominal size chips the application rate is about 25-40 pounds of chips per square yard of hot elastomeric material.
- the hot elastomeric material can also be dressed with sand or a mixture of aggregate and sand.
- the alligator cracked pavement structure 10 is comprised of the top pavement layer 12, a base 14, and a sub-base 16.
- Pavement structures vary for different conditions; normally, however, the pavement top layer 12 consists of aggregate bound with asphalt, or concrete.
- the pavement layer 12 is generally 1-6 inches in thickness; however, in certain situations such as the landing area of a runway, the thickness of the layer 12 can be thicker.
- the base 14 normally consists of sized aggregate fill, preferably crushed aggregate. In some situations in order to give the pavement structure greater rigidity, the aggregate is cemented together with asphalt or cement. In the latter situation, there is generally a sub-base layer 16 situated below the base layer which is filled with aggregate or similar road building material.
- the final layer of most pavement construction is the sub-grade (not shown) which is compacted earth which can be compacted with aggregate and/or treated with cement, asphalt or other additives.
- the hot elastomeric repair material is either sprayed on, shoveled on or mopped on to the top surface of layer 12 to form a patch or panel 22.
- the hot elastomeric material is applied to the surface at a rate of from about 1/2 to about 1 gallon of the composition per square yard of pavement surface.
- lesser amounts such as 1/4 gallon per square yard, or greater amounts, such as 2.5 gallons per square yard of the composition may be applied.
- the hot patch 22 is covered with a coating of conventional mineral aggregate 24 (see FIG. 2).
- the cold patch is applied to the pavement surface and tamped or rolled preferably rolled, thereon to insure maximum adhesion between the bottom of the patch and the surface of the pavement 12 and to force out any air bubbles trapped between the underside of the patch and the pavement surface.
- the patch has a release type backing, the backing is removed from the patch prior to its application to the pavement.
- the patch has a backing that is permanent, such as a paper backing, the backing side of the patch can face either up or down when the patch is applied to the pavement. Normally, after a period of time, vehicular traffic will wear the backing off the top surface of the patch when it faces upward.
- the elastomeric cold patch is similar in structure to the elastomeric patch 22; the elastomeric patch 22 being formed on the pavement while the elastomeric cold patch is formed elsewhere by the method described above.
- the elastomeric cold patch is idealy suited for small cracked areas.
- a series of cold patches can be used to repair a large area, although difficulties may be encountered when sealing the adjacent side of the joints of the cold patches so that water will not seep there between.
- Adjacent cold patches can be permanently sealed by applying the hot elastomeric pavement repair material from which the cold patch is prepared to seal the joints.
- the cold patch 25 normally has a thickness of from one twentieth to about one half inches in thickness, preferably from about 0.18 to about 0.25 inches in thickness.
- Each square yard of cold patch contains about 25-40 pounds of aggregate cover which has been blended, tamped or contacted into the cold patch as described herein.
- the top surface of the cold patch 25 is completely dressed or exposed to aggregate 24 so there are no bald spots.
- the aggregate protects the elastomeric composition 28 of the cold patch from abrasion and stripping by vehicular traffic.
- the cold patch 25 consists of a backing layer 26, aggregate 24 and the elastomeric pavement repair material composition layer 28.
- the backing 26 can be a permanent backing or can be a release type backing.
- the backing is normally prepared from paper, cardboard, or plastic and if it has a release type backing, it has a coating of plastic, such as a polyvinylchloride, adjacent to the composition layer 28.
- the composition layer 28 is normally from about one twentieth to about one half inches in thickness, preferably from about 0.2 to about 0.025 inches in thickness.
- the aggregate chips 24 are normally from about one fourth to about three eighth inch chips; however, smaller size chips including sand, and larger size chips can be used. The aggregate permeates the complete thickness of layer 28 and projects above the top surface of layer 28 so that no bald spots or uncovered areas are exposed.
- the cold patch 25 has no backing layer 26.
- the backing layer is generally used in order to enhance production of the cold patch and to prevent cold patches from sticking to one another when stacked or piled.
- the cold patch can be prepared without such a backing layer and can be covered with an adhesive breaker, such as talc, to prevent sticking when cold patches are piled.
- a light traffic road 30 is illustrated. That is a road that does not bear a great deal of vehicular traffic, especially heavy truck traffic.
- the road consists of a pavement layer 32 a compact sub-grade 34, an earth sub-grade 36.
- the road illustrated in FIG. 3 has drainage ditches 38 on both sides of the road.
- the road can be quickly and rapidly prepared by grading and compacting an area to obtain sub-grade 34 over sub-grade 36.
- sub-grade 34 can be compacted with gravel, sand and aggregate and/or treated with a binder, cement, asphalt, or cutback asphalt.
- the road can be prepared without sub-grade 34 (not shown).
- the road can be constructed with an intermediate layer 33 (See FIG.
- the hot elastomeric composition can be applied to the outer top edges and shoulder 39, if any, of the drainage ditches 38 when composition is applied to the bottom and back slopes of the ditches.
- the composition is preferably covered with aggregate at a rate of between about 20 and about 50 pounds of aggregate per square yard of the hot composition.
- the back slopes and, outer top edges and shoulder 39 of the ditches 38 are also covered with aggregate.
- This interlayer 42 acts as a stress absorbing membrane between the underlying foundation or base 40 and 36 and the overlying pavement layer 44.
- pavements often undergo deflection and recovery movements when subject to loads because of the elasticity of the pavement substructure or foundation.
- Conventional pavement materials, such as macadam, asphalt concrete or concrete do not possess sufficient flexibility to flex, without cracking, under such deflection and recovery movement.
- the elastomeric material interlayer 42 is elastomeric and inhibits reflection of the deflection and recovery movements of the substructure or foundation 36 and 40 to the top pavement layer 44 and thus prevents cracking of the pavement layer 44.
- the hot elastomeric material is covered with a dressing of aggregate or other suitable roofing dressing or material in order to prevent pick up when someone walks across the surfaced roof. Due to the ability of the elastomeric material to withstand oxidation and degradation better than asphalt alone, and its elastomeric properties, it makes a long life, tough and resistant water-proof membrane for roofing and other structures.
- the elastomeric repair composition can also be applied to line earthen canals, repair cracked inner dike or dam surfaces, that is the surface exposed to the water, and it can be used to form a water-proof membrane for earthern reservoirs and the like.
- the material can be layed in a relatively thin layer such as between one twentieth and one fourth of an inch in thickness.
- the elastomeric material is covered with aggregate or a thick course of earth, such as a layer of earth about 3 to about 12 inches thick, in all these applications to protect it from abrasion and pick up and other mechanical type damage.
- the temperature susceptibility of the elastomeric rubber-asphalt pavement repair material is far less than with paving grade asphalt alone. This is, of course, a tremendous advantage in achieving control of reflective cracking.
- the elastomeric material retains some flexibility down to below freezing temperature although it does soften some under summer heat, it apparently does not soften to such a point that it is picked up by vehicular traffic.
- the elastomeric material will be quite soft to the touch when warm and show tracking under truck tires. However, instead of the material shoving and rolling under vehicular traffic, it rebounds and tends to resume its original location. A somewhat leathery skin develops on the surface of the elastomeric material after application and cooling which is dry and resists pickup. The elastomeric material will pick up, however, if a tacky material such as asphalt is applied to this dry surface. However, the aggregate or sand covering protects against this type of problem.
- Patching by this process is comparable to that of the manufacture and placing of slurry seal.
- the only difference between this process of pavement repair and pavement repair with a slurry seal is that the liquid composition must be hot when applied.
- the hot elastomeric material after application can be smoothed out with a rubber squeegee in the same manner that slurry seal is smoothed out when applied to a street.
- the similarity of the processes ends after smoothing with the squeegee.
- a cover aggregate surface is added to the composition to prevent traffic pickup. As soon as the aggregate surface has been applied and the composition allowed to cool, traffic may be allowed on the repaired surface almost immediately.
- a pavement surface is repaired with slurry seal a considerable curing time must elapse from the time of application before traffic can be permitted to use the repaired street otherwise vehicular traffic will destroy the repaired street surface.
- a hot elastomeric pavement composition was prepared from two parts of 85-100 penetration asphalt and one part of unprocessed shredded reclaimed rubber from a rubber tire shop.
- the asphalt was heated to a temperature of 440° F.; thereafter, the rubber was heated and mixed with the asphalt to form the hot elastomeric composition.
- the composition was applied to the pavement at the rate of one gallon of composition per square yard of surface area giving a patch having a thickness of 0.18 inch.
- the pavement surface was first tacked with kerosene cut asphalt (4 parts 85-100 penetration grade asphalt and 5 parts kerosene).
- the hot elastomeric material after application was completely covered with one fourth inch seal coat aggregate and turned over to traffic. This panel remained in excellent condition until it was destroyed when the street was completely rebuilt. No cracking or stripping occurred up to the time of its destruction although some spreading occurred in the direction of traffic.
- the repair panel was very soft and spreading in the direction of traffic and to the sides causing thin spots with some minor resultant reflection cracking.
- This panel appeared to be softer than the panels of Example I. This is probably due to a combination of an excess of tack coat and greater thickness of the rubber-asphalt material resulting in slower curing. Ideal average thickness seems to be about 0.2 inches which is obtained by spreading 1 gallon of the hot elastomeric material over a square yard of the pavement surface.
- the road can be optionally built with ditches on both sides of the road or a ditch on one side of the road to prevent water from eroding away the earth foundation of the road.
- An elastomeric pavement repair patch was placed on a street which had a traffic count of 18,500 vehicles per day. Many of these vehicles are of the commercial and industrial type. This street section was in an area which had given continuous trouble for street maintenance for some time.
- An elastomeric composition was prepared from two parts of 85-100 penetration grade asphalt to one part of locally obtained, unprocessed, shredded, reclaimed rubber by weight.
- the asphalt was heated to a temperature of 420° F. when mixed with the reclaimed rubber to form a hot jellied composition.
- the area to be repaired was tacked with a solvent cut asphalt consisting of four parts of 85-100 penetration grade asphalt and five parts of kerosene.
- the hot elastomeric composition was spread over the tacked area at an average thickness of 0.18 inches and the hot material was completely covered with one fourth inch seal coat aggregate.
- An elastomeric composition was prepared from three parts of 85-100 penetration grade asphalt to one part of No. 30 mesh ground whole tire rubber (Rubber No. 9306 of the U.S. Rubber Reclaiming Co.). The asphalt was heated to a temperature of 400° F. then the rubber was added thereto and mixed therein to form the hot elastomeric composition. The hot elastomeric composition was applied to the street at the rate of one gallon of the composition per square yard of pavement area. After application, the material was completely covered with concrete sand and turned over to traffic. The atmospheric temperature at the time of application was 107° F. officially, the atmospheric temperature three feet above the pavement was 114° F., and the pavement temperature was 156° F. This patch held up exceedingly well until completely destroyed when the street was rebuilt. At the time of its destruction, it showed no sign of reflection cracking or stripping.
- a tack coat can be applied before placement of the hot elastomeric material to the pavement surface to be repaired if desired.
- a tack coat may not be necessary. The important thing is to have the surface of the pavement to be repaired clean of all debris and dry. If the surface is to be tacked, the surface can be tacked with hot asphalt, solvent cut asphalt, emulsified asphalt, or by heating the pavement surface, if it is an asphaltic pavement surface, with a torch to make the surface adhesive and tacky.
- One gallon of the elastomeric pavement repair material made for the last two panels in Example I were molded in a steel concrete cylinder test can. After the mixture had cooled, the cans were removed and the two specimens were removed. Each block measured 6 in. in diameter and 7 to 8 inches in height.
- the specimen molded from the elastomeric pavement repair material the last patch in Example I was the designated specimen A and the speciment molded from the elastomeric pavement repair material of the next to last patch in Example I was designated as specimen B.
- specimens were tested for elasticity (compression and recovery) as follows: The height of each specimen was determined; each specimen was compressed by applying a vertical load until a 2 in. displacement in height was observed.
- 85-100 penetration grade asphalt was heated to a temperature about 420° F. and then mixed with ground partially devulcanized reclaimed rubber. The portions of asphalt and rubber were two to one by weight. The rubber was mixed with hot asphalt until a thick jellied composition formed which had the viscosity of a thick pancake batter.
- the hot elastomeric material was applied to a clean pavement surface at the rate of a half gallon of hot material per square yard of pavement area. The hot elastomeric material was completely covered after application with one-half inch seal coat aggregrate. Four years after this patch was applied, the patch was still in excellent condition with no stripping or cracking observed.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Road Repair (AREA)
Abstract
Description
______________________________________ Sieve Size % Passing ______________________________________ 1/2" 100 3/8" 70-100 #8 0-5 #200 0-2 ______________________________________
______________________________________
Sieve size % Passing
______________________________________
3/8" 100
1/4" 80-100
#8 0-5
#200 0-2
______________________________________
______________________________________
1. Temperature at time of mixing - 350° F.
Consistency - thin slurry
Mixed for 2 min. before observing consistency.
Consistency after 16 hr. curing at 140° F. - soft, sticky,
and stringy.
Consistency after 4 hr. curing at 250° F - soft.
2. Temperature at time of mixing - 400° F.
Consistency -slurry.
Mixed for 2 min. before observing consistency.
Temperature after mixing - 300° F.
Consistency after 16 hr. curing at 140° F. - soft, sticky,
and stringy.
Consistency after 4 hr. curing at 250° F. - soft.
3. Temperature at time of mixing - 450° F.
Temperature after mixing - 330° F.
Mixed for 2 min. before observing consistency.
Consistency - thick slurry.
Consistency after 16 hr. curing at 140° F. - semi-soft, not
sticky.
Consistency after 4 hr. curing at 250° F. - soft.
4. Temperature at time of mixing - 500° F.
Temperature after mixing - 350° F.
Consistency - very thick slurry
Mixed for 2 min. before observing consistency
Consistency after 16 hr. curing at 140° F. - spongy, not
sticky.
Consistency after 4 hr. curing at 250° F. - soft.
______________________________________
______________________________________ [Sample No.] (Mixing Temp.) [Flow] ______________________________________ Flow at 170° F. for 2 hr. 1 (350 deg) very small 2 (400 deg) none 3 (450 deg) none 4 (500 deg) none Flow at 210° F for 4 hr. 1 (350 deg) very small 2 (400 deg) none 3 (450 deg) none 4 (500 deg) none Flow at 330° F. for 2 hr. 1 (350 deg) 4 in. 2 (400 deg) 2 in. 3 (450 deg) 3 in. 4 (500 deg) none ______________________________________
Claims (31)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US68338176A | 1976-05-05 | 1976-05-05 |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US68338176A Continuation | 1976-05-05 | 1976-05-05 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US4113401A true US4113401A (en) | 1978-09-12 |
Family
ID=24743807
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US05/784,615 Expired - Lifetime US4113401A (en) | 1976-05-05 | 1977-04-04 | Method of pavement repair |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US4113401A (en) |
Cited By (51)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4265563A (en) * | 1977-03-17 | 1981-05-05 | Owens-Corning Fiberglas Corporation | Road pavement and repair |
| FR2508509A1 (en) * | 1981-06-26 | 1982-12-31 | Colas Sa | COMPOSITE STRUCTURE FOR PAVEMENTS AND ROADS |
| FR2520774A1 (en) * | 1982-01-29 | 1983-08-05 | Route Ste Chimique | Bituminous coating for roads - comprises two layers of different particle size material agglomerated with styrene!-butene! polymer binder |
| US4451171A (en) * | 1980-11-07 | 1984-05-29 | Owens-Corning Fiberglas Corporation | Polyamide as a primer for use with asphaltic membranes |
| US4507013A (en) * | 1980-06-06 | 1985-03-26 | Bonifac Martinak | Device and method for repair of pot holes |
| US4873807A (en) * | 1987-09-30 | 1989-10-17 | Stanislaw Filip | Roof insulating and waterproofing methods and structures |
| US5183353A (en) * | 1991-10-21 | 1993-02-02 | Buckelew Jack E | Pavement hole seal covered repair fill |
| US5244304A (en) * | 1991-03-13 | 1993-09-14 | American Stone-Mix, Inc. | Cement based patching composition for asphalt pavement |
| FR2693490A1 (en) * | 1992-07-07 | 1994-01-14 | Elf Antar France | Improved anti-backcracking system interposed between the structural layer and the wearing course of a roadway and method for producing such a system. |
| US5279500A (en) * | 1990-08-08 | 1994-01-18 | Colas S.A. | Apparatus for spreading a road surfacing material |
| US5455291A (en) * | 1994-02-14 | 1995-10-03 | U.S. Intec, Inc. | Coal-tar-pitch-based compositions |
| US5464304A (en) * | 1994-08-11 | 1995-11-07 | Dittmar; William G. | Method for recreational surface crack repair |
| WO1996009439A1 (en) * | 1994-09-19 | 1996-03-28 | The Board Of Trustees Of The University Of Illinois | Stress absorbing composite for road repair |
| US5630677A (en) * | 1995-07-25 | 1997-05-20 | Barroso; Luther C. | Method for repair of cracked pavement |
| US5660498A (en) * | 1996-01-16 | 1997-08-26 | Freeman; Roger | Patching system and method for repairing roadways |
| RU2186745C2 (en) * | 2000-07-17 | 2002-08-10 | Тюменская государственная архитектурно-строительная академия | Asphalt-concrete mix |
| US6444258B1 (en) * | 2000-07-14 | 2002-09-03 | Phillip Rand Terry | Method of treating a pavement surface and apparatus for performing such method |
| US6450729B1 (en) | 2000-01-14 | 2002-09-17 | Daniel C. Clapp | Pavement surface crack repair method |
| RU2192401C2 (en) * | 1999-05-24 | 2002-11-10 | Открытое акционерное общество Фирма "Кубаньдорблагоустройство" | Method of preparing mixture for surface treatment of road cover, mixture composition and method of its application |
| US20050175410A1 (en) * | 2004-02-06 | 2005-08-11 | Kang Sung S. | Permeable and elastic pavement blocks |
| US20060204332A1 (en) * | 2005-03-11 | 2006-09-14 | Guy Boudreau | Method for repairing holes in pavement |
| US20060204330A1 (en) * | 2005-03-11 | 2006-09-14 | Guy Boudreau | Method for repairing holes in pavement |
| US20070272353A1 (en) * | 2006-05-26 | 2007-11-29 | Wheatley Donald E | Method and Apparatus of Sealing Seams in Segmented Bridges |
| US20080247821A1 (en) * | 2007-04-04 | 2008-10-09 | Hinding Thomas P | Method and system for repairing cracks in a paved surface |
| US8534954B2 (en) * | 2011-05-19 | 2013-09-17 | The Geary Trust | Pot hole repair patch and method of installation |
| US8858115B2 (en) | 2011-05-19 | 2014-10-14 | Geary Trust, The | Pothole and utility cut repair overlay and method of installation |
| US8876428B2 (en) | 2013-03-15 | 2014-11-04 | Carvin Pallenberg | Method of repairing a court surface |
| US8992118B2 (en) | 2013-03-15 | 2015-03-31 | William B. Coe | Pavement repair system utilizing solid phase autoregenerative cohesion |
| US9034775B2 (en) | 2006-05-26 | 2015-05-19 | Fortress Stabilization Systems | Carbon reinforced concrete |
| US9057163B1 (en) | 2013-03-15 | 2015-06-16 | William B. Coe | Pavement repair system |
| US20150225907A1 (en) * | 2014-02-07 | 2015-08-13 | Zorutek, S.L.L. | Procedure for construction of pavements and resulting pavement |
| JP2015197022A (en) * | 2014-04-03 | 2015-11-09 | 株式会社Nippo | Asphalt pavement and construction method of asphalt pavement |
| US20160340839A1 (en) * | 2015-05-20 | 2016-11-24 | Sika Technology Ag | Simple application of an adhesive material to a substrate with excellent adhesion to asphalt |
| US20170073531A1 (en) * | 2014-06-12 | 2017-03-16 | Akzo Nobel Chemicals International B.V. | Method for Producing Bituminous Coatings With Reduced Tackiness |
| US9637870B1 (en) | 2013-03-15 | 2017-05-02 | William B. Coe | Pavement repair system |
| US10246838B1 (en) * | 2018-06-14 | 2019-04-02 | James L Andrews | High impact joint and crack fillers |
| US20190177925A1 (en) * | 2015-03-09 | 2019-06-13 | Heritage Research Group | Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications |
| US10329719B1 (en) * | 2018-05-28 | 2019-06-25 | Richard P Giles | Composition and method for surface repair |
| US10465345B2 (en) | 2015-03-10 | 2019-11-05 | Heritage Research Group | Apparatus and method for applying asphalt binder compositions including void reducing asphalt membrane compositions for paving applications |
| US10808340B2 (en) | 2007-09-20 | 2020-10-20 | Fortress Stabilization Systems | Woven fiber reinforcement material |
| US11186959B2 (en) | 2017-02-14 | 2021-11-30 | William B. Coe | Apparatus and method for preparing asphalt and aggregate mixture |
| US11207919B2 (en) | 2016-06-21 | 2021-12-28 | Bridgestone Americas Tire Operations, Llc | Methods for treating inner liner surface, inner liners resulting therefrom and tires containing such inner liners |
| US20220010166A1 (en) * | 2020-07-07 | 2022-01-13 | Viking Products Group, Inc. | Roof sloping system |
| US11332893B2 (en) | 2019-12-13 | 2022-05-17 | C & M Surfaces, LLC | Method of resurfacing a sports court |
| CN115142315A (en) * | 2021-03-30 | 2022-10-04 | 苏州凌云建设有限公司 | Concrete road repairing construction method |
| US11697260B2 (en) | 2016-06-30 | 2023-07-11 | Bridgestone Americas Tire Operations, Llc | Methods for treating inner liners, inner liners resulting therefrom and tires containing such inner liners |
| US11697306B2 (en) | 2016-12-15 | 2023-07-11 | Bridgestone Americas Tire Operations, Llc | Sealant-containing tire and related processes |
| US11794430B2 (en) | 2016-12-15 | 2023-10-24 | Bridgestone Americas Tire Operations, Llc | Methods for producing polymer-containing coatings upon cured inner liners, methods for producing tires containing such inner liners, and tires containing such inner liners |
| US12017958B2 (en) | 2021-08-04 | 2024-06-25 | Midwest Industrial Supply, Inc. | Method for constructing scientifically engineered and constructed unpaved runways |
| US12103338B2 (en) | 2016-12-15 | 2024-10-01 | Bridgestone Americas Tire Operations, Llc | Sealant layer with barrier, tire containing same, and related processes |
| US12515990B2 (en) | 2021-08-04 | 2026-01-06 | Midwest Industrial Supply, Inc. | Method for constructing scientifically engineered and constructed unpaved runways |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1661828A (en) * | 1922-12-23 | 1928-03-06 | Hopkinson Ernest | Paving material and method of laying the same |
| US1823682A (en) * | 1931-09-15 | Method of making road surfaces | ||
| US2977864A (en) * | 1958-05-28 | 1961-04-04 | Harold B Pullar | Rubber composition |
| US3253521A (en) * | 1960-03-16 | 1966-05-31 | Goodyear Tire & Rubber | Flexible paving composition |
| US3272098A (en) * | 1962-07-23 | 1966-09-13 | Minnesota Mining & Mfg | Paving material and paving surfacing |
| US3400644A (en) * | 1967-06-07 | 1968-09-10 | Charles M. Baskin | Membrane surfaced runways |
| US3568579A (en) * | 1967-08-11 | 1971-03-09 | Leslie Hoad | Portable and flexible paving strips |
| US3891585A (en) * | 1966-10-21 | 1975-06-24 | Charles H Mcdonald | Elastomeric pavement repair composition for pavement failure and a method of making the same |
| US3915581A (en) * | 1974-02-01 | 1975-10-28 | Jr Martin Phillip Copp | Rubber paving |
| US3930100A (en) * | 1966-10-21 | 1975-12-30 | Charles H Mcdonald | Elastomeric cold patch for pavement repair |
-
1977
- 1977-04-04 US US05/784,615 patent/US4113401A/en not_active Expired - Lifetime
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1823682A (en) * | 1931-09-15 | Method of making road surfaces | ||
| US1661828A (en) * | 1922-12-23 | 1928-03-06 | Hopkinson Ernest | Paving material and method of laying the same |
| US2977864A (en) * | 1958-05-28 | 1961-04-04 | Harold B Pullar | Rubber composition |
| US3253521A (en) * | 1960-03-16 | 1966-05-31 | Goodyear Tire & Rubber | Flexible paving composition |
| US3272098A (en) * | 1962-07-23 | 1966-09-13 | Minnesota Mining & Mfg | Paving material and paving surfacing |
| US3891585A (en) * | 1966-10-21 | 1975-06-24 | Charles H Mcdonald | Elastomeric pavement repair composition for pavement failure and a method of making the same |
| US3930100A (en) * | 1966-10-21 | 1975-12-30 | Charles H Mcdonald | Elastomeric cold patch for pavement repair |
| US3891585B1 (en) * | 1966-10-21 | 1989-11-14 | ||
| US3400644A (en) * | 1967-06-07 | 1968-09-10 | Charles M. Baskin | Membrane surfaced runways |
| US3568579A (en) * | 1967-08-11 | 1971-03-09 | Leslie Hoad | Portable and flexible paving strips |
| US3915581A (en) * | 1974-02-01 | 1975-10-28 | Jr Martin Phillip Copp | Rubber paving |
Cited By (83)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4265563A (en) * | 1977-03-17 | 1981-05-05 | Owens-Corning Fiberglas Corporation | Road pavement and repair |
| US4507013A (en) * | 1980-06-06 | 1985-03-26 | Bonifac Martinak | Device and method for repair of pot holes |
| US4451171A (en) * | 1980-11-07 | 1984-05-29 | Owens-Corning Fiberglas Corporation | Polyamide as a primer for use with asphaltic membranes |
| FR2508509A1 (en) * | 1981-06-26 | 1982-12-31 | Colas Sa | COMPOSITE STRUCTURE FOR PAVEMENTS AND ROADS |
| EP0069015A1 (en) * | 1981-06-26 | 1983-01-05 | Societe Internationale D'etudes, De Participation Et De Gestion | Composite structure for roads and roll-on areas |
| FR2520774A1 (en) * | 1982-01-29 | 1983-08-05 | Route Ste Chimique | Bituminous coating for roads - comprises two layers of different particle size material agglomerated with styrene!-butene! polymer binder |
| US4873807A (en) * | 1987-09-30 | 1989-10-17 | Stanislaw Filip | Roof insulating and waterproofing methods and structures |
| US5279500A (en) * | 1990-08-08 | 1994-01-18 | Colas S.A. | Apparatus for spreading a road surfacing material |
| US5244304A (en) * | 1991-03-13 | 1993-09-14 | American Stone-Mix, Inc. | Cement based patching composition for asphalt pavement |
| US5183353A (en) * | 1991-10-21 | 1993-02-02 | Buckelew Jack E | Pavement hole seal covered repair fill |
| FR2693490A1 (en) * | 1992-07-07 | 1994-01-14 | Elf Antar France | Improved anti-backcracking system interposed between the structural layer and the wearing course of a roadway and method for producing such a system. |
| ES2112746A1 (en) * | 1992-07-07 | 1998-04-01 | Elf Antar France | Advanced rising crack prevention system between the structural and wearing courses of a roadway, and method for producing same |
| WO1994001623A1 (en) * | 1992-07-07 | 1994-01-20 | Elf Antar France | Advanced rising crack prevention system between the structural and wearing courses of a roadway, and method for producing same |
| US5455291A (en) * | 1994-02-14 | 1995-10-03 | U.S. Intec, Inc. | Coal-tar-pitch-based compositions |
| US5464304A (en) * | 1994-08-11 | 1995-11-07 | Dittmar; William G. | Method for recreational surface crack repair |
| WO1996009439A1 (en) * | 1994-09-19 | 1996-03-28 | The Board Of Trustees Of The University Of Illinois | Stress absorbing composite for road repair |
| US5513925A (en) * | 1994-09-19 | 1996-05-07 | The Board Of Trustees Of The University Of Illinois | Stress absorbing composite for road repair and method |
| US5630677A (en) * | 1995-07-25 | 1997-05-20 | Barroso; Luther C. | Method for repair of cracked pavement |
| US5660498A (en) * | 1996-01-16 | 1997-08-26 | Freeman; Roger | Patching system and method for repairing roadways |
| RU2192401C2 (en) * | 1999-05-24 | 2002-11-10 | Открытое акционерное общество Фирма "Кубаньдорблагоустройство" | Method of preparing mixture for surface treatment of road cover, mixture composition and method of its application |
| US6450729B1 (en) | 2000-01-14 | 2002-09-17 | Daniel C. Clapp | Pavement surface crack repair method |
| US6444258B1 (en) * | 2000-07-14 | 2002-09-03 | Phillip Rand Terry | Method of treating a pavement surface and apparatus for performing such method |
| RU2186745C2 (en) * | 2000-07-17 | 2002-08-10 | Тюменская государственная архитектурно-строительная академия | Asphalt-concrete mix |
| US20050175410A1 (en) * | 2004-02-06 | 2005-08-11 | Kang Sung S. | Permeable and elastic pavement blocks |
| US6960046B2 (en) * | 2004-02-06 | 2005-11-01 | Sung Soon Kang | Permeable and elastic pavement blocks |
| US20060204330A1 (en) * | 2005-03-11 | 2006-09-14 | Guy Boudreau | Method for repairing holes in pavement |
| US20060204332A1 (en) * | 2005-03-11 | 2006-09-14 | Guy Boudreau | Method for repairing holes in pavement |
| US20070272353A1 (en) * | 2006-05-26 | 2007-11-29 | Wheatley Donald E | Method and Apparatus of Sealing Seams in Segmented Bridges |
| US9034775B2 (en) | 2006-05-26 | 2015-05-19 | Fortress Stabilization Systems | Carbon reinforced concrete |
| US20080247821A1 (en) * | 2007-04-04 | 2008-10-09 | Hinding Thomas P | Method and system for repairing cracks in a paved surface |
| US7597503B2 (en) * | 2007-04-04 | 2009-10-06 | Rite Way Crack Repair Llc | Method and system for repairing cracks in a paved surface |
| US20100014915A1 (en) * | 2007-04-04 | 2010-01-21 | Rite Way Crack Repair Llc | Method and system for repairing cracks in a paved surface |
| US10808340B2 (en) | 2007-09-20 | 2020-10-20 | Fortress Stabilization Systems | Woven fiber reinforcement material |
| US8534954B2 (en) * | 2011-05-19 | 2013-09-17 | The Geary Trust | Pot hole repair patch and method of installation |
| US8858115B2 (en) | 2011-05-19 | 2014-10-14 | Geary Trust, The | Pothole and utility cut repair overlay and method of installation |
| US9169606B2 (en) | 2013-03-15 | 2015-10-27 | William B. Coe | Emitter unit for asphalt pavement repair utilizing solid phase autoregenerative cohesion |
| US10364534B2 (en) | 2013-03-15 | 2019-07-30 | William B. Coe | Pavement repair system |
| US9074328B1 (en) | 2013-03-15 | 2015-07-07 | William B. Coe | Pavement repair system utilizing solid phase autoregenerative cohesion |
| US10934669B2 (en) | 2013-03-15 | 2021-03-02 | William B. Coe | Method for preparing asphalt paving material utilizing solid phase autoregenerative cohesion |
| US9127413B2 (en) | 2013-03-15 | 2015-09-08 | William B. Coe | Pavement repair system utilizing solid phase autoregenerative cohesion |
| US8992118B2 (en) | 2013-03-15 | 2015-03-31 | William B. Coe | Pavement repair system utilizing solid phase autoregenerative cohesion |
| US8876428B2 (en) | 2013-03-15 | 2014-11-04 | Carvin Pallenberg | Method of repairing a court surface |
| US9347187B2 (en) | 2013-03-15 | 2016-05-24 | William B. Coe | Pavement repair system |
| US10724183B2 (en) | 2013-03-15 | 2020-07-28 | William B. Coe | Pavement repair system |
| US9481967B2 (en) | 2013-03-15 | 2016-11-01 | William B. Coe | Pavement repair system utilizing solid phase autoregenerative cohesion |
| US9057163B1 (en) | 2013-03-15 | 2015-06-16 | William B. Coe | Pavement repair system |
| US9551117B2 (en) | 2013-03-15 | 2017-01-24 | William B. Coe | Pavement repair system utilizing solid phase autoregenerative cohesion |
| US9551114B2 (en) | 2013-03-15 | 2017-01-24 | William B. Coe | Pavement repair system |
| US10081920B2 (en) | 2013-03-15 | 2018-09-25 | William B. Coe | Hot asphalt pavement installation method utilizing solid phase autoregenerative cohesion |
| US9624625B2 (en) | 2013-03-15 | 2017-04-18 | William B. Coe | Pavement repair system |
| US9637870B1 (en) | 2013-03-15 | 2017-05-02 | William B. Coe | Pavement repair system |
| US20150225907A1 (en) * | 2014-02-07 | 2015-08-13 | Zorutek, S.L.L. | Procedure for construction of pavements and resulting pavement |
| US9458577B2 (en) * | 2014-02-07 | 2016-10-04 | Zorutek, S.L.L. | Procedure for construction of pavements and resulting pavement |
| JP2015197022A (en) * | 2014-04-03 | 2015-11-09 | 株式会社Nippo | Asphalt pavement and construction method of asphalt pavement |
| US20170073531A1 (en) * | 2014-06-12 | 2017-03-16 | Akzo Nobel Chemicals International B.V. | Method for Producing Bituminous Coatings With Reduced Tackiness |
| US9745480B2 (en) * | 2014-06-12 | 2017-08-29 | Akzo Nobel Chemicals International B.V. | Method for producing bituminous coatings with reduced tackiness |
| US10364535B2 (en) * | 2015-03-09 | 2019-07-30 | Heritage Research Group | Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications |
| US10907309B2 (en) | 2015-03-09 | 2021-02-02 | Heritage Research Group | Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications |
| US10435850B1 (en) | 2015-03-09 | 2019-10-08 | Heritage Research Group | Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications |
| US10480130B2 (en) | 2015-03-09 | 2019-11-19 | Heritage Research Group | Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications |
| US20190177925A1 (en) * | 2015-03-09 | 2019-06-13 | Heritage Research Group | Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications |
| US10465345B2 (en) | 2015-03-10 | 2019-11-05 | Heritage Research Group | Apparatus and method for applying asphalt binder compositions including void reducing asphalt membrane compositions for paving applications |
| US20160340839A1 (en) * | 2015-05-20 | 2016-11-24 | Sika Technology Ag | Simple application of an adhesive material to a substrate with excellent adhesion to asphalt |
| US9915037B2 (en) * | 2015-05-20 | 2018-03-13 | Sika Technology Ag | Simple application of an adhesive material to a substrate with excellent adhesion to asphalt |
| US11207919B2 (en) | 2016-06-21 | 2021-12-28 | Bridgestone Americas Tire Operations, Llc | Methods for treating inner liner surface, inner liners resulting therefrom and tires containing such inner liners |
| US12030350B2 (en) | 2016-06-21 | 2024-07-09 | Bridgestone Americas Tire Operations, Llc | Methods for treating inner liner surface, inner liners resulting therefrom and tires containing such inner liners |
| US11697260B2 (en) | 2016-06-30 | 2023-07-11 | Bridgestone Americas Tire Operations, Llc | Methods for treating inner liners, inner liners resulting therefrom and tires containing such inner liners |
| US12337625B2 (en) | 2016-12-15 | 2025-06-24 | Bridgestone Americas Tire Operations, Llc | Sealant-containing tire and related processes |
| US12285923B2 (en) | 2016-12-15 | 2025-04-29 | Bridgestone Americas Tire Operations, Llc | Methods for producing polymer-containing coatings upon cured inner liners, methods for producing tires containing such inner liners, and tires containing such inner liners |
| US11697306B2 (en) | 2016-12-15 | 2023-07-11 | Bridgestone Americas Tire Operations, Llc | Sealant-containing tire and related processes |
| US11794430B2 (en) | 2016-12-15 | 2023-10-24 | Bridgestone Americas Tire Operations, Llc | Methods for producing polymer-containing coatings upon cured inner liners, methods for producing tires containing such inner liners, and tires containing such inner liners |
| US12103338B2 (en) | 2016-12-15 | 2024-10-01 | Bridgestone Americas Tire Operations, Llc | Sealant layer with barrier, tire containing same, and related processes |
| US11186959B2 (en) | 2017-02-14 | 2021-11-30 | William B. Coe | Apparatus and method for preparing asphalt and aggregate mixture |
| US10329719B1 (en) * | 2018-05-28 | 2019-06-25 | Richard P Giles | Composition and method for surface repair |
| US10246838B1 (en) * | 2018-06-14 | 2019-04-02 | James L Andrews | High impact joint and crack fillers |
| US11332893B2 (en) | 2019-12-13 | 2022-05-17 | C & M Surfaces, LLC | Method of resurfacing a sports court |
| US12139633B2 (en) * | 2020-07-07 | 2024-11-12 | Viking Products Group, Inc. | Roof sloping system |
| US20220010166A1 (en) * | 2020-07-07 | 2022-01-13 | Viking Products Group, Inc. | Roof sloping system |
| US12545806B2 (en) | 2020-07-07 | 2026-02-10 | Garland Industries, Inc. | Roof sloping system |
| CN115142315A (en) * | 2021-03-30 | 2022-10-04 | 苏州凌云建设有限公司 | Concrete road repairing construction method |
| US12017958B2 (en) | 2021-08-04 | 2024-06-25 | Midwest Industrial Supply, Inc. | Method for constructing scientifically engineered and constructed unpaved runways |
| US12515990B2 (en) | 2021-08-04 | 2026-01-06 | Midwest Industrial Supply, Inc. | Method for constructing scientifically engineered and constructed unpaved runways |
| US12643822B2 (en) | 2021-08-04 | 2026-06-02 | Midwest Industrial Supply, Inc. | Method and composition for constructing scientifically engineered and constructed unpaved runways |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4069182A (en) | Elastomeric pavement repair composition | |
| US3930100A (en) | Elastomeric cold patch for pavement repair | |
| US4744693A (en) | Pot hole filler material and method of filling same | |
| US3919148A (en) | Pavement composition | |
| US4068023A (en) | Rubberized asphalt paving composition and use thereof | |
| CN105949797B (en) | Pore reduction bituminous membrane compositions, methods and apparatus for asphalt paving applications | |
| WO2010022034A2 (en) | Pavement life extension product and method | |
| US20100075029A1 (en) | Pavement life extension product and method | |
| EP0750595A1 (en) | Road surfacing composition and process | |
| US20040116557A1 (en) | Paving and sealing composition and method of use | |
| US4118137A (en) | Pavement and process of providing the same | |
| GB2596053A (en) | Synthetic binder for repairing potholes, apparatus and method of making the same | |
| KR100641021B1 (en) | Asphalt composition used for crack repair due to excellent adhesion and waterproofness | |
| Orr | Pavement Maintenance | |
| WO2002020661A9 (en) | Paving and sealing composition and method of use | |
| Barenberg et al. | Pavement Distress Identification and Repair | |
| JPH0726362B2 (en) | Bituminous pavement construction method | |
| Huffman | The use of ground vulcanized rubber in asphalt | |
| RU2202023C1 (en) | Pavement | |
| Olsen | Rubber-asphalt binder for seal coat construction | |
| Abate | Concrete paving blocks: an overview | |
| Yao et al. | Functional Layer Materials of and Preventive Maintenance Materials of Pavement | |
| Korochkin | The use of crumb rubber-based composite materials in the road pavement | |
| JPS625041Y2 (en) | ||
| JPH0231163B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STCF | Information on status: patent grant |
Free format text: PATENTED FILE - (OLD CASE ADDED FOR FILE TRACKING PURPOSES) |
|
| AS | Assignment |
Owner name: JACOBSON, CARL C., JR., Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNORS:WINTERS, ROBERT E.;MCDONALD, CHARLES H.;REEL/FRAME:005023/0846 Effective date: 19861217 Owner name: JOHNSON, E. J., ARIZONA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNORS:WINTERS, ROBERT E.;MCDONALD, CHARLES H.;REEL/FRAME:005023/0846 Effective date: 19861217 |
|
| AS | Assignment |
Owner name: FIRST INTERSTATE BANK OF ARIZONA, ARIZONA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:JOHNSON & JACOBSON;REEL/FRAME:005795/0390 Effective date: 19910730 |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED FILE - (OLD CASE ADDED FOR FILE TRACKING PURPOSES) |