US3841123A - Rolling mill gauge control method and apparatus including entry gauge correction - Google Patents
Rolling mill gauge control method and apparatus including entry gauge correction Download PDFInfo
- Publication number
- US3841123A US3841123A US00303721A US30372172A US3841123A US 3841123 A US3841123 A US 3841123A US 00303721 A US00303721 A US 00303721A US 30372172 A US30372172 A US 30372172A US 3841123 A US3841123 A US 3841123A
- Authority
- US
- United States
- Prior art keywords
- stand
- gauge
- roll stand
- roll
- workpiece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
Definitions
- ABSTRACT 7 An automatic gaugecontrol is disclosed to provide on line control of the delivery gauge or thickness from at least one roll stand of a tandem rolling mill, for which one roll stand it is not desired to adjust the roll opening for the purpose of controlling the delivery gauge of workpiece strip leaving that roll stand.
- The. gauge error of the workpiece strip leaving that one roll stand is corrected by predetermined adjustment of a selected previous roll stand in relation to the work-piece gauge error measured at that one roll stand and to provide a desired entry gauge correction in relation to that one roll stand.
- the present invention relates to workpiece strip metal tandem rolling mills and more particularly to roll force gauge control systems and methods used in operating such rolling mills.
- the unloaded roll opening and the speed at each tandem mill stand or for each reversing mill pass are set up to produce successive workpiece strip or plate reductions resulting in work product at the desired gauge.
- the loaded roll opening at a stand equals the stand delivery gauge or thickness on the basis of the usual assumption that there is little or no elastic work-piece recovery.
- the roll force gauge control system uses Hookes law in controlling the screwdown position at a rolling stand, ie the loaded roll opening under workpiece rolling conditions equals the unloaded roll opening or screwdown position plus the mill stand spring stretch caused by the separating force applied to the rolls by the workpiece.
- a load cell or other force detector measures the roll separating force at each controlled roll stand and the screwdown position is controlled to balance roll force changes from a reference value and thereby hold the loaded roll opening at a substantially constant value.
- Hot strip mill automatic gauge control including evaluation of roll force feedback information involves the combination of a number of process variables, such as roll force, screw position, and mill spring which are all used to evaluate the gaugeof the strip as it is worked in each stand.
- process variables such as roll force, screw position, and mill spring which are all used to evaluate the gaugeof the strip as it is worked in each stand.
- an X-ray gauge is used on the strip as it passes out of the last stand to evaluate the absolute strip gauge produced.
- the two gauge error detection systems that are commonly used are the X-ray and roll force.
- X-ray gauges can be placed between each stand, but they are expensive, difficult to maintain, and can detect errors only as the strip passes between stands.
- the roll force error detection system is much less expensive, and can be more easily implemented in relation tothe operation of all stands, to detect errors in gauge as the strip passes between the rolls of a particular roll stand, providing immediate evaluation of desired corrections to the roll openings;
- the roll force system provides onlya relative evaluation of the gauge, since itmeasuresthe amount of gauge deviation from a reference gauge, such asthe' gauge at the head end of the strip.
- the slower X-ray gauge evaluation caculates simultaneous corrections to several stands, so that'the absolute value of the gauge may be brought to the desired value.
- the roll force gauge control system is an analog arrangement including analog comparison and amplification circuitry which responds to roll force and screwdown position signals to control the screwdown position and hold the following equality:
- the lock-on screwdown position LOSD and the lock-on roll separating force LOF are measured to establish what strip delivery gauge G should be maintained out of that roll stand.
- the roll stand separating force F and the roll stand screwdown position value SD are monitored periodically and any undesired change in roll separating force is detected and compensated for by a corresponding correction change in screwdown position.
- the lock-on gauge LOG is equal to the lockon screwdown LOSD plus the lock-on force LOF multiplied by the mill stand spring modulus K.
- the workpiece strip delivery gauge Gleaving the 'roll stand at any time during the rolling operation is in'accordance with above equation (I) and is equal to the unloaded screwdown position SD plus the roll separating force F multiplied by the mill spring modulus K.
- the roll force determined gauge error GE in relation to a particular roll stand is derived by subtracting the lock-on gauge LOG from the present delivery gauge G. The following Equations 3, 4 and set forth these relationships.
- the well known X-ray monitor gauge control system is usually employed to produce screwdown offset for the roll force control.
- an X-ray or other radiation gauge sensing device is placed at one or more predetermined process points, and usually at least at a process point following the delivery end after the last roll stand of the mill, in order to sense actual delivery gauge after a workpiece transport delay from the point in time at which the actual delivery gauge is produced at the preceding stand or stands.
- the monitor system compares the actual delivery gauge with the desired delivery gauge and develops an X-ray gauge error as an analog feedback control signal to adjust the operation of the reversing mill roll force gauge control system or one or more predetermined tandem mill stand roll force gauge control systems to supply desired steady state mill delivery gauge.
- the conventional monitor system provides for transport delayed correction of steady state gauge errors which are caused or-which are tending to be caused by a single mill variable or by a combination of mill variables.
- a programmed digital computer system can be employed to make'the gauge error correction screwdown movement determinations as'well as to perform other mill control functions.
- the computer employs a programming system" including an automatic roll force gauge control program or AGCprogram which is executed at predetermined periodic intervals to calculate the desired screwdown movement required at each roll force gauge controlled stand for gauge error correction including that stemming from roll force error detection at that stand.
- a system and method for controlling gauge in a metal rolling mill employs means for detecting at least one error condition representing gauge error in the workpiece delivered from a given roll stand, which roll stand is not permitted to make a screwdown adjustment to correct this gauge error, and means for controlling the screwdown position of at least one previous rolling stand of the mill for providing a predetermined correction to the entry gauge in relation to that given roll stand and this detected gauge error.
- FIG. 1 shows a schematic diagram of a tandem hot steel strip rolling mill and an automatic gauge control system arranged for operation in accordance with the present invention
- FIG. 2 illustrates the typical mill spring curve and workpiece reduction curve for a given rolling mill stand and the operation of that roll stand for reducing the gauge of a workpiece passed through the roll stand;
- FIG. 3 illustrates, in relation to the mill spring curve and the workpiece reduction curve, the effect of a correction made to the screwdown position setting for changing the unloaded roll opening of a roll stand to provide a desired change in the workpiece gauge 'delivered from that roll stand.
- FIG. 4 shows an illustrative correction of a determined gauge error for a roll stand by changing the entry gauge of the workpiece before it is passed through that roll stand.
- FIG. 5 shows an adjustmentmade in the screwdown position of previous stand N-l as required to provide a desired change in the entry gauge of the workpiece in relation to the operation of the subsequent roll stand N.
- FIG. 1 a tandem hot strip steel finishing mill 11 operated with improved, gauge control performance by a process control system 13 in accor- In the reduction rolling process, the successive stands operate at successively higher speeds to maintain proper workpiece mass flow. Each stand produces a predetermined reduction or draft such that the total mill draft reduces the entry bar to strip with the desired gauge or thickness.
- Each stand is conventionally provided with a pair of backup rolls l9 and 21 and a pair of work rolls'23 and 25 between which the workpiece 15 is passed.
- a large DC drive motor 27 is controllably energized at each stand to drive the corresponding work rolls at a controlled speed.
- the sum of the unloaded work roll opening and the mill stretch substantially defines theworkpiece gauge delivered from any particular stand in accordance with I-Iookes law.
- a pair of screwdown motors 29 (only one shown at each stand) position respective screwdowns 31 (only one shown at each stand) which clamp against opposite ends of the backup rolls and thereby apply pressure to the work rolls.
- the two screwdowns 31 at a particular stand would be in identical positions, but they can be dance with the principles of the invention.
- the entry bar would be of known steel grade class and it typically would have a known input gauge or thickness of about 1 inch and'a width within some limited range such as 20 inches to 80 inches.
- the delivered strip would usually have approximately the same width and a thickness based upon the production order for which it is intended.
- a conventional screwdown position detector or encoder 33 provides an electrical signal representation of screwdown position at each stand.
- a screwdown position detection system which includes the screwdown position detector 33 can be provided and calibrated from time to time.
- Roll force detection is provided at each of predetermined stands by a conventional load cell 35 which generates an electrical analog signal in accordance with the stand roll force.
- each roll force controlled stand is provided with a load cell 35 and in many cases stands without roll force gauge control would also be equipped with load cells.
- the number of stands to which roll force gauge control isapplied is predetermined during the mill design in accordance with cost-performance standards, and increasingly there is a tendency to apply roll force gauge control to all of the stands in a tandem hot strip steel mill. In the present case, a roll force gauge control system is assumed to be employed at each of the stands.
- Conventional motorized sideguards 37 are located at predetermined points along the mill length.
- the sideguards 37 areoperated during'mill setup on the basis of the widths of the upcoming workpiece 15 thereby defining the sides of the workpiece travel path for guidance purposes.
- the process control system 13 provides automatic control for the operation of the tandem mill [1 as well as desired control for associated production processes (not indicated) such as the operation-of a roughing mill.
- the process control system 13 can include a programmedprocess contol digital computer system which is interfaced with the various mill sensors and the various mill control devices to provide control over many of the various functions involved in operating the tan dem mill 1 1.
- the control system 13, can also include conventional manual and- /or automatic analog controls for selected process control functions.
- automatic gauge control system 39 can include a digital computer system operative to provide the finishing mill on-line roll force gauge control function, such as a Prodac 2000 (P2000) sold by Westinghouse Electric Corporation.
- P2000 Prodac 2000
- a descriptive book entitled Prodac 2000 Computer Systems Reference Manual has been published in I970 by Westinghouse Electric Corporation and made available for the purpose of describing in greater detail this computer system and its operation.
- the digital computer processor can be associated with well known predetermined input systems typically including a conventional contact closure input system which scans contact or other signals representing the status of various process conditions, a conventional analog input system which scans and converts process analog signals, and operator controlled and other information input devices and systems 41 such as paper tape teletypewriter and dial input systems. It is noted that the information input devices 41 are generally indicated by a single block in FIG. 1 although different input devices can and typically would be associated with the control system. Various kinds of information are entered into the control system through the input devices 41 including, for example, desired strip delivery gauge and temperature, strip entry gauge and width and temperature (by entry detectors if desired), grade of steel being rolled, plasticity tables, hardware oriented programs and control programs for the programming system, and so forth.
- the principal control action outputs from the automatic gauge control or AGC system include screwdown poisitioning reference commands which are applied to respective screwdown positioning controls 55 for operating the screwdown motors 29 for screw movement, and speed control signals which are applied to the respective speed and tension control system 53 to cause a change in drive speed to compensate for a change in thickness being made by a screwdown movement.
- Display and printout devices 51 such as numeral display, tape punch, and teletypewriter systems can also be provided to keep the mill operator generally informed about the mill operation and in order to signal the operator regarding an event or alarm condition which may require some action on his part.
- the printout devices are also used to log mill data according to computer log program direction.
- the AGC system uses Hookes law to determine the total amount of screwdown movement required at each roll force controlled stand at the calculating point in time for roll force and gauge error correction, i.e. for loadedroll opening and stand delivery gauge correction to the desired value.
- the calculation defines the total change in the unloaded roll opening required to offset the gauge error causing condition.
- the on line gauge control system operates the stands to produce strip product having desired gauge and proper shape. i.e. flat with slight crown.
- On line gauge control is produced by the roll force gauge control loops at the stands and the previously noted X-ray monitor gauge control system.
- the X-ray gauge 47- produces the X-ray gauge error or deviation signal which indicates the difference between actual strip delivery thickness and desired or target strip delivery thickness.
- the AGC system operates at predetermined time periods such as every 2/ 10 second with the screwdown position detector and load cell provided signals from each stand as well as the X-ray gauge error signal to determine the respective stand screwdown adjustment control actions required for producing desired strip delivery gauge.
- a mill modulus characteristic or mill spring curve defines the separation between a pair of workpiece reducing mill stand work rolls as a function of separating force and as a function of screwdown position.
- the slope of the mill spring curve 100 is the well known mill spring modulus or constant K which is subject to variation as well known to persons skilled in this art.
- the entry gauge H of the workpiece passed through the roll stand is reduced to the indicated delivery gauge H as defined by the intersection of the mill spring curve 100 and the product reduction curve 102 to establish the stand roll force required for the indicated operation.
- the unloaded roll opening sometimes called the screwdown because of the screw and nut system used for adjusting the roll opening, is the gauge that would be delivered if there was no roll separating force. As the force increases with a constant roll opening, the delivery gauge increases, since the mill deflects as shown by the mill spring curve 100.
- the gauge would not be reduced and the delivery gauge would be equal to the entry gaugeJWhen the roll force increases,'the product is'pla'stically deformed and the delivery gauge decreases;
- the slope' of the mill spring characteristic line is called the mill modulus (K) and the slope of the product reduction characteristic is called the product plasticity (P).
- K mill modulus
- P product plasticity
- the delivery gauge is determined by the equilibrium point at which the force exerted by the mill is equal to the force required to deform the product. Changes in entry gauge and product hardness result in a change-in roll force and delivery gauge. The automatic gauge control moves the screwdown to correct for these gauge changes.
- the main advantage of the roll-force gauge control system is its ability to detect changes in gauge the instant they take place, as the product is being rolled in the stand.
- a shift in delivery thickness can be caused by a change in entry thickness or a change in hardness (usually caused by a change in temperature). This change in delivery gauge is immediately detected by monitoring the roll separating force of the roll stand.
- the stand workpiece delivery gauge I-I equals the unloaded roll opening as defined by the screwdown position SDREF plus the mill stretch (F*K) caused by the workpiece. If the screwdown calibration is incorrect, i.e., if the number assigned to the theoretical roll facing screwdown position is something other than zero because of roll crown wear or other causes, the stand workpiece delivery gaugeI-I then equals the unloaded roll opening plus the mill stretch, plus or minus the calibration drift.
- the amount of mill stretch depends on the product deformation characteristicor reduction curve 102 for the workpiece.
- the reduction curve 102 for a strip of predetermined width represents the amount of force Frequired to reduce the workpiece from the stand entry gauge (height) H
- the workpiece plasticity P is the slope of the curve 102, and the curve 102 is shown as being linear although a small amount of nonlinearity would normally exist.
- Desired workpiece delivery gauge H is produced since the amount of force F required to reduce the workpiece from H to H to equal to the amount of roll separating force required to stretch the rolls to a loaded roll opening H i.e. the intersection of the mill spring curve 100 at an initial screwdown opening SDREF indicated by mill spring curve 100 and the workpiece reduction curve 102 lies at the desired gauge value H
- the actual stand present gauge Hx is not the same as the desired gauge I-I there is a gauge error GE to be corrected. This condition can be corrected by changing the provided screwdown position reference SDREF to the stand, such that a new mill spring curve 104 becomes operative to result in the desired gauge I-I being delivered from the roll stand and the gauge error GE is now removed.
- the workpiece exit gauge leaving a previous roll stand (N-l) is equal to the workpiece entry gauge ad vanced to the next succeeding roll stand (N) since no reduction has been made in the workpiece gauge.
- Exit gauge (N-l) entry gauge (N) It is known in accordance with the teachings of above referenced U.S. Pat. No. 3,561,237 that the required corrective screwdown adjustment ASD to correct a stand delivery gauge error GE is equal to the product of that gauge error GE times the sum of the ratio of the workpiece plasticity P for that same stand with the mill spring modulus K for that same stand and one, as follows in relation to stand (N):
- Exit gauge error (N-l) entry gauge error (N) The total stand (N-l) gauge error GE(N- l) that it is desired be corrected by screwdown adjustment at stand N-l is equal to the roll force system determined gauge error at stand (N-l) plus the desired tobe corrected feedback gauge error from stand N that is determined at stand N by operation of the stand N roll force systern.
- the entry gauge correction of stand N that is.determined by operation of stand N roll force system is the product of the measured stand N exit gauge error GE(N) times the quantity K(N) divided by P(N) plus one, as follows:
- Entry gauge error GE(N) exit GE(N) [P(N)/K(N) I 13)
- the required feedback screwdown correction needed at previous stand (NJ) to remove the stand N entry gauge error, since the stand N is not permitted to make the screwdown adjustment for this purpose, is established by combining above equations (8) and (13) as follows:
- the total screwdown correction needed at stand (N-l) for correcting both the exit gauge error measured at stand (N-l) and the entry gauge error measured at stand N is determined as follows:
- I mined at stand (N-l) by the roll force system of stand (N-l) is desired to be corrected by suitable screwdown adjustment at stand (N-l).
- the entry gauge error at stand N that is determined at stand N is the equivalent of an exit gauge error leaving stand (N-l) and determined at stand N as above set forth.
- this same entry gauge correction equation can be utilized when a gauge error in relation to a given roll stand is detected, for example by an X-ray gauge positioned after that given roll stand such as the last roll stand and screwdown position feedback corrections are then applied to one or more of the preceding stands of the rolling mill.
- the workpiece strip gauge error delivered by a given stand, and as determined by the sensed operational variables at that same stand, is in accordance with the roll force system relationship shown in above equation l2).
- the exit gauge error leaving stand (N) for example, equals the sum of a first quantity, which is the difference between the presently measured screwdown position SD(N) and the initiallock on screwdown position LOSD(N), and a secondquantity, which is the determined mill spring modulus K(N) times the difference between the presently measured roll separation force F(N) and the initial lock on roll force LOF(N).
- nextprevious roll stand N-l is also in a limited screwdown position condition of operation, it may be desired to adjust in this manner the screwdown position of the roll stand N-2 in relation to the exit gauge error detected by the screwdown position limited roll stand N.
- Stand N is not the first roll stand.
- the load cell for stand N is on, and
- the feedback program can be entered. If one of these conditions is not true, the feedback program is skipped.
- step 270 if this is the first stand then no error correction can be physically fed back to an earlier stand so the program ends.
- the preceding stand (N-l) is addressed, with the present stand being stand N.
- step 274 the desired flags in relation to operator established screwdown movement limits and stand calibration are picked up, and it is now desired to check why the feedback program was entered.
- step 280 a check is made to see if the stand (N-l) screw positioning mechanism was properly calibrated and if so the feedback correction is calculated at step 278.
- the feedback program can be enetered if stand N went into screw position limits as well as if the load cell of-stand (Nl) was faulty.
- step 282 the stand address indexing is set up and the program operation ends.
- the typical AGC control program is written as a loop operation such that one set of coding processes all of the roll stands, and every time the program operates through the loop a calculation is made to determine the desired screwdown adjustment for each of the roll stands in relation to the gauge error and the feedback correction when appropriate.
- FIG. 9 there is shown a more detailed feedback correction control program in accordance with the present invention.
- the program can feedback agau'ge error correction not only to one previous stand, but can feed back such a correction two stands if desired.
- This I gives the program additional power under the situation where stand N is in limits, and stand (N-l) 'is in limits, and it .is desired to make a correction at stand (N-2).
- the provided logic operation selects which previous stand to feed the determined correction back to. If the load cell of previous stand (N-l) is broken and the load cell of stand N is not broken, that is a legitimate reason correction screw position movement, such that it is desired to feed back a correction to the previous stand -l).
- the Feedback program makes the following three checks on previous stand (N-l):
- the screw for stand (N-l) is not at the same position limit as stand N, i.e. if stand N is at its up limit, stand (N-l) is not at its up limit.
- the screws for stand (N-l) are in calibration. If all these three checks are true, a feedback correction to the exit gauge of stand (N-l) can be made.
- the feedback in progress flag for stand N is set and a time delay is initiated, so that no further feedback gauge error correction can be made to stand (N-l) until the present feedback correction reaches stand N.
- the time delay equals the determined transport time between stand (N-l) and stand N. If one of the above three subroutine checks fails for stand (N-l), the entire checking procedure is repeated, with stand (N-2) substituted for stand (N-l). If one of the three checks also fails for stand (N-2), the feedback routine is exited without making any corrections.
- the feedback routine shown in FIG. 9 can operate back two previous stands if it is necessary, so the first thing to determine is if stand N is the first stand. If this is stand one at step 900 then stand (N-l) is not greater than zero and this ends the program since there is no previous stand to feed back 'a correction to; If this is not stand 1, then stand (N-l) is greater than zero at step 900. The program then advances to address stand (N-l) at step 902 and checks the limit flags and the calibrat io'n flags at step 904 for stand (N-l) to determine which stand to operate on.
- the program at step 906 detennines that stand (N-Z) is not stand 0, and if it is not, at step 908 the program addresses stand (N-2) and picks up the limit and calibration flags at step 910 for that stand.
- a comparison is made of the flags for stands N, (NJ) and (N-2) trying to find the proper stand to feed a correction back to.
- the feedback routine has been entered, but it. is not known if it was entered because the roll force, sensing was faulty at stand (N-l) or this stand N was in limits.
- a determination is made at step 914 tosee if stands N and (N-l) are at the same limit. If they are, then it is necessary to go back to stand (N-2) to make the feedback correction.
- step 916 a check is made to see if the stand (N-l) is calibrated, since there is not a desire to feed back to a'dead stand. lf stand (N-l) is not calibrated, a check is made at step 918 to" see if stands N and (N-2) are at the same limit condition. If not, at step 920 a check is made to see if stand (N-2) is calibrated. If stand (N-"l )is calibrated at step 916, then at step 922 the address of that stand is saved and the program goes to the transport time delay calculation at step 924.
- step 920 if stand (N-'2) is calibrated at step 920, the address of that stand is saved at step 926 and the program goes to step 924 since there is a possibility of doing a feedback correction operation.
- the program has selected a previous stand to feed a gauge'error correction back to and is now going to calculate the feedback correction itself.
- step 924 there is calculated a transport time delay for'a segment of'workpiece strip to pass from stand N-l to stand N.
- the feedback correction operation is not run continuously, but instead is run once every transport time delay.
- a correction is made at stand (N-l) and then the program waits until the correction has been received at the detection stand N so that the control operation is stable and not running away.
- the transport time delay calculation depends on whether the feedback correction is to be made at stand (N-l) or with stand (N-2).
- the flow chart includes a check at step 928 to see whether an additional time delay is to be calculated at step 930 from stand (N-2) to (N-l) in order to get the true transport time delay from where the correction is to be made. These calculations are determined in relation to the known strip speed and known stand distance to establish the travel or time delay.
- the calculation is made of the actual feedback correction, which is the calculation in accordance with FIG. 7.
- the feedback correction value is stored in memory at step 934 when the automatic gauge control operation for the corrected roll stand either (N-l) or (N-2), using the relationships of above equation (5) calculates the exit gauge error for the corrected roll stand and above equation (8) determines the stand screwdown adjustment needed to correct the exit gauge error detected at that same roll stand, this additional feedback correction is added and also applied at the same time.
- the feedback in progress flag is set to indicate that a correction is being made and a time delay is needed for future calculations.
- a time delay operation is done by setting up a timer to prevent reentering the feedback routine until the required transport time is elapsed.
- the workstrip entry gauge into the first stand was in the order of 30 to 36 millimeters and the exit gauge leaving the last stand was in the order of 1.50 to 12 millimeters.
- the screwdown movement position limits for the respective roll stands were established as follows in terms of position encoder units, with the relationship being 80 encoder units per millimeter:
- an instruction program listing that has been prepared to control the roll force automatic gauge control operation of a tandem rolling mill in accordance with the here disclosed control system and method.
- the instruction program listing is written inthe machine language of the PRODAC P2000 digital computer system, which is sold by Westinghouse Electric Corporation for real time process control computer applications. Many of these digital computer systems have already been supplied to customers, including customer instruction books and descriptive documentation to explain to persons skilled in this art the operation of the hardware logic and the executive software of this digital computer system.
- This instruction program listing is included to provide an illustration of one suitable embodiment of the present control system and method that has actually been prepared.
- Step One Study the workpiece rolling mill and its operation to be controlled, and then establish the desired control system and method concepts.
- Step Two Develop an understanding of the control system logic analysis, regarding both hardware and software.
- Step Three Prepare the system flowcharts and/or the more detailed programmerss flowcharts.
- Step Four Prepare the actual computer instruction program listings from the flowcharts.
- ASD(N-l) is the required adjustment of said first roll stand
- K(N) is the mill spring modulus of said second roll stand
- K(N-l) is the mill spring modulus of said first roll stand
- a gauge control system for a rolling mill having at least a first roll stand followed by a second roll stand and being operative to reduce the gauge of a workpiece passed through said first and second roll stands, said system comprising:
- means for determining the second stand delivery gauge error of said workpiece leaving said second roll stand in relation to the roll force of that second roll stand and with said second roll stand being in a condition of roll opening position adjustment limit means operative in accordance with a predetermined relationship including said second stand delivery gauge error for determining the required adjustment of said first roll stand to correct said second stand delivery gauge error by the passage of said workpiece through said first roll stand, and
- K(N) is the mill spring modulus of the second roll stand
- K(N-l) is the mill spring modulus of the first roll stand
- K(N) is the mill spring modulus of said later roll stand
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE793759D BE793759A (fr) | 1972-11-06 | Procede et appareil de commande de calibre de laminoir comprenant la correction du calibre d'entree | |
US00303721A US3841123A (en) | 1972-11-06 | 1972-11-06 | Rolling mill gauge control method and apparatus including entry gauge correction |
FR7300335A FR2205373B1 (enrdf_load_stackoverflow) | 1972-11-06 | 1973-01-05 | |
JP12408673A JPS543463B2 (enrdf_load_stackoverflow) | 1972-11-06 | 1973-11-06 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00303721A US3841123A (en) | 1972-11-06 | 1972-11-06 | Rolling mill gauge control method and apparatus including entry gauge correction |
Publications (1)
Publication Number | Publication Date |
---|---|
US3841123A true US3841123A (en) | 1974-10-15 |
Family
ID=23173380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00303721A Expired - Lifetime US3841123A (en) | 1972-11-06 | 1972-11-06 | Rolling mill gauge control method and apparatus including entry gauge correction |
Country Status (4)
Country | Link |
---|---|
US (1) | US3841123A (enrdf_load_stackoverflow) |
JP (1) | JPS543463B2 (enrdf_load_stackoverflow) |
BE (1) | BE793759A (enrdf_load_stackoverflow) |
FR (1) | FR2205373B1 (enrdf_load_stackoverflow) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3515429A1 (de) * | 1984-05-09 | 1985-11-14 | Mitsubishi Denki K.K., Tokio/Tokyo | Formsteuervorrichtung fuer flachmaterial |
WO1991019189A1 (en) * | 1990-05-31 | 1991-12-12 | International Digital Modeling Corporation | An apparatus and method for nondestructively determining the dimensional changes of an object as a function of temperature |
US5379237A (en) * | 1990-05-31 | 1995-01-03 | Integrated Diagnostic Measurement Corporation | Automated system for controlling the quality of regularly-shaped products during their manufacture |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS54180177U (enrdf_load_stackoverflow) * | 1978-06-05 | 1979-12-20 | ||
JPS5599114A (en) * | 1979-01-18 | 1980-07-28 | Iseki Agricult Mach | Power transmission of working machine |
JPS5596017A (en) * | 1979-01-18 | 1980-07-21 | Iseki Agricult Mach | Threshed straw binder of combined harvester or the like |
JPS59109111A (ja) * | 1982-12-14 | 1984-06-23 | 株式会社クボタ | 脱穀機の排ワラ結束処理装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2680978A (en) * | 1950-07-05 | 1954-06-15 | British Iron Steel Research | Production of sheet and strip |
US3232084A (en) * | 1961-04-13 | 1966-02-01 | Davy & United Eng Co Ltd | Mill control systems |
US3357217A (en) * | 1965-05-12 | 1967-12-12 | Westinghouse Electric Corp | Slave gauge control system for a rolling mill |
US3406547A (en) * | 1966-08-02 | 1968-10-22 | Bethlehem Steel Corp | Automatic gage control and method of operating for rolling mill |
US3561237A (en) * | 1967-11-29 | 1971-02-09 | Westinghouse Electric Corp | Predictive gauge control method and apparatus for metal rolling mills |
US3709008A (en) * | 1970-10-14 | 1973-01-09 | Westinghouse Electric Corp | Gauge control method and apparatus for metal rolling mills |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2110418A1 (en) * | 1970-10-14 | 1972-06-02 | Westinghouse Electric Corp | Strip or plate caliber control - in metal rolling mills |
-
0
- BE BE793759D patent/BE793759A/xx not_active IP Right Cessation
-
1972
- 1972-11-06 US US00303721A patent/US3841123A/en not_active Expired - Lifetime
-
1973
- 1973-01-05 FR FR7300335A patent/FR2205373B1/fr not_active Expired
- 1973-11-06 JP JP12408673A patent/JPS543463B2/ja not_active Expired
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2680978A (en) * | 1950-07-05 | 1954-06-15 | British Iron Steel Research | Production of sheet and strip |
US3232084A (en) * | 1961-04-13 | 1966-02-01 | Davy & United Eng Co Ltd | Mill control systems |
US3357217A (en) * | 1965-05-12 | 1967-12-12 | Westinghouse Electric Corp | Slave gauge control system for a rolling mill |
US3406547A (en) * | 1966-08-02 | 1968-10-22 | Bethlehem Steel Corp | Automatic gage control and method of operating for rolling mill |
US3561237A (en) * | 1967-11-29 | 1971-02-09 | Westinghouse Electric Corp | Predictive gauge control method and apparatus for metal rolling mills |
US3709008A (en) * | 1970-10-14 | 1973-01-09 | Westinghouse Electric Corp | Gauge control method and apparatus for metal rolling mills |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3515429A1 (de) * | 1984-05-09 | 1985-11-14 | Mitsubishi Denki K.K., Tokio/Tokyo | Formsteuervorrichtung fuer flachmaterial |
WO1991019189A1 (en) * | 1990-05-31 | 1991-12-12 | International Digital Modeling Corporation | An apparatus and method for nondestructively determining the dimensional changes of an object as a function of temperature |
US5379237A (en) * | 1990-05-31 | 1995-01-03 | Integrated Diagnostic Measurement Corporation | Automated system for controlling the quality of regularly-shaped products during their manufacture |
US5414648A (en) * | 1990-05-31 | 1995-05-09 | Integrated Diagnostic Measurement Corporation | Nondestructively determining the dimensional changes of an object as a function of temperature |
US5608660A (en) * | 1990-05-31 | 1997-03-04 | Integrated Diagnostic Measurement Corp. | Automated system for controlling the quality of geometrically regular-shaped products during their manufacture |
Also Published As
Publication number | Publication date |
---|---|
FR2205373B1 (enrdf_load_stackoverflow) | 1976-05-14 |
JPS4978658A (enrdf_load_stackoverflow) | 1974-07-29 |
JPS543463B2 (enrdf_load_stackoverflow) | 1979-02-23 |
BE793759A (fr) | 1973-07-09 |
FR2205373A1 (enrdf_load_stackoverflow) | 1974-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3574280A (en) | Predictive gauge control method and apparatus with adaptive plasticity determination for metal rolling mills | |
US3694636A (en) | Digital computer process control with operational learning procedure | |
US3561237A (en) | Predictive gauge control method and apparatus for metal rolling mills | |
GB982232A (en) | Improvements in or relating to automatic strip gauge control for a rolling mill | |
US3531961A (en) | Method and system for controlling strip thickness in a tandem reduction mill | |
US3574279A (en) | Predictive gauge control method and apparatus with automatic plasticity determination for metal rolling mills | |
US3934438A (en) | Method of long-edge shape control for tandem rolling mill | |
US3841123A (en) | Rolling mill gauge control method and apparatus including entry gauge correction | |
US3802236A (en) | Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills | |
US3610005A (en) | Roll positioning system calibration method and apparatus | |
US3568637A (en) | Tandem mill force feed forward adaptive system | |
US3564882A (en) | Rolling mill control system | |
GB2118332A (en) | Automatic plate thickness control device for a rolling mill | |
US3702071A (en) | Gauge control method and apparatus for metal rolling mills | |
US4428054A (en) | Automatic control methods and devices for rolling hills | |
US3820366A (en) | Rolling mill gauge control method and apparatus including temperatureand hardness correction | |
US3600920A (en) | Screwdown offset system and method for improved gauge control | |
US3851509A (en) | Rolling mill gauge control method and apparatus including speed correction | |
US3709008A (en) | Gauge control method and apparatus for metal rolling mills | |
US4137741A (en) | Workpiece shape control | |
US3468145A (en) | Billet mill wherein the rolling gap is controlled during the penultimate pass and fixed during the final pass | |
US3802235A (en) | Rolling mill gauge control method and apparatus including x-ray correction | |
US3592030A (en) | Rolling mill stand screwdown position control | |
US3641325A (en) | Method of computer control of rolling mills | |
US3841122A (en) | Rolling mill gauge control method and apparatus including feedback correction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: AEG WESTINGHOUSE INDUSTRIAL AUTOMATION CORPORATION Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:WESTINGHOUSE ELECTRIC CORPORATION;REEL/FRAME:005424/0551 Effective date: 19900313 |