US3822558A US00276110A US27611072A US3822558A US 3822558 A US3822558 A US 3822558A US 00276110 A US00276110 A US 00276110A US 27611072 A US27611072 A US 27611072A US 3822558 A US3822558 A US 3822558A
Authority
US
United States
Prior art keywords
platform
ice
pipeline
channel
bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00276110A
Inventor
O Blankenship
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Global Marine Inc
Original Assignee
Global Marine Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Global Marine Inc filed Critical Global Marine Inc
Priority to US00276110A priority Critical patent/US3822558A/en
Priority to CA176,491A priority patent/CA978758A/en
Priority to US462749A priority patent/US3924896A/en
Application granted granted Critical
Publication of US3822558A publication Critical patent/US3822558A/en
Assigned to CHEMICAL BANK, A NY CORP. reassignment CHEMICAL BANK, A NY CORP. SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GLOBAL MARINE INC.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/10Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
    • E02F5/104Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables for burying conduits or cables in trenches under water
    • E02F5/109Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables for burying conduits or cables in trenches under water using rotating digging elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/08Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging wheels turning round an axis
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/10Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
    • E02F5/104Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables for burying conduits or cables in trenches under water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/16Laying or reclaiming pipes on or under water on the bottom
    • F16L1/168Laying or reclaiming pipes on or under water on the bottom under ice
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/16Laying or reclaiming pipes on or under water on the bottom
    • F16L1/18Laying or reclaiming pipes on or under water on the bottom the pipes being S- or J-shaped and under tension during laying

Definitions

  • a dredging facility is carried on a buoyant platform which is adapted for support on a cushion of air.
  • the dredging facility includes a dredging head which is operable, when engaged with the bed of a body of water to be dredged, for removing material from the bed.
  • a dredgings conductor tube is connectible between the dredging head and the platform for conducting dredged material from the head to the platform.
  • the dredging equipment also includes means carried by the platform for forming a channel through a layer of ice below the platform for passage of the conductor tube through the ice when the dredging apparatus is operated during iced conditions.
  • the pipelaying equipment includes a pipelaying facility carried by a buoyant platform, which is adapted for support on a cushion of air.
  • the pipelaying equipment includes means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water across which the pipeline is to be laid. The portion of the pipeline which extends between the platform and the bed of the body of water is supported.
  • the dredging apparatus and the pipelaying apparatus may be provided on a common buoyant platform adapted for support on a cushion of air. In such case,
  • the dredging facility is located on the platform forward of the pipelaying facility so that, during pipelaying operations through ice, pipe is laid through the channel formed in the ice for the dredgings conductor tube.
  • This invention pertains to marine arctic dredging and pipelaying. More specifically, this invention pertains to method and apparatus for performing dredging and pipelaying operations, in Waters susceptible to being covered by a layer of ice, during both iced and ice-free conditions.
  • Oil or gas may be produced from a suitable well only when, and to the extent that the oil or gas can be removed directly from the wellhead to a suitable storage facility or pipeline.
  • a suitable storage facility or pipeline In the case of offshore wells, the provision of local storage facilities is not possible, particularly in the artic. Accordingly, the successful and economic exploitation of the known and suspected oil and gas reserves in the arctic is dependent upon the provision of pipelines from the several wells across to ocean floor to centralized land-based storage and shipment facilities. These facilities may be adjacent a harbor which is ice-free for a sufficient periodduring every year to enable tankers and the like to collect and remove, within a few months time, all of the oil and gas produced annually fromthe wells in the area.
  • these facilities may be a central collection point for a large diameter gas or oil pipeline by which reserves to more southerly points of consumption and refinement is the use of marine pipelines from the oil and gas fields to points sufficiently far south that the ecological problems associated with across-land arctic pipelines are not encountered.
  • Such long distance marine pipelines like the smaller local pipelines necessary to interconnect offshore wells to central collection and storage facilities, would have to be laid under waters which are covered by ice for many months of the year the production from the adjacent oil and gas fields may be. transported, on a year-round basis, to remote locations of further use or processing.
  • thisinvention provides a method for laying a pipeline and the like across the bed of a body of water covered by a layerof ice.
  • the method inniques of oil and gas pipelines across the tundra of cludes the steps of dredging a trench in the bed along the path of the pipeline from a dredging operations station supported on the ice on a cushion of air, and laying the pipeline in the trench from a pipelaying operations station supported on the ice on a cushion of air.
  • the dredging and pipelaying operations stations are buoyant so that dredging and pipelaying operations may be performed during periods when the water is icefree as well as during periods when the water is covered by a layer of ice.
  • This invention also provides a method for dredging in water susceptible to being covered by a layer of ice.
  • a dredging facility is located on a buoyant platform adapted to be supported on a cushion of air.
  • the platform is floated in the water and dredging operations are performed from the platform during periods when the water is not covered by ice sufficient to restrict floating movement of the platform.
  • the platform is supported on a cushion of air and dredging operations are performed from the platfonn through the ice.
  • the dredging facility includes a dredging head which is operative to remove material from the bed of the water body, and a dredgings conductor pipe which is connected during dredging operations between the dredging head and the platform.
  • Means are carried by the platform for forming through an ice layer below the platform a channel through which the dredgings conductor pipe may be passed.
  • FIG. 1 is a cross-sectional elevation view of a dredging and pipelaying facility according to this invention
  • FIG. 2 is a top plan view of the dredging and pipelaying facility shown in FIG. 1;
  • FIG. 3 is a cross-sectional elevation view .of the mechanism provided-in the air cushion platform shown in FIG. 1 for forming a clearance channel through the ice layer for the dredgings conductor pipe and the pipeline;
  • FIG. 4 is a simplified top plan view of a dredging facility according to this invention in use during iced conditions;
  • FIG. 5 is an enlarged fragmentary cross-sectional elevation view of a portion of the structure shown in FIG. 4;
  • FIG. 6 is a cross-sectional elevation view of another dredging apparatus according to this invention.
  • An air cushion vehicle 10 is disposed over a sheet of ice 11 formed on the surface 9 of a body of water 12 which has a bottom or bed 13.
  • This vehicle is comprised of a buoyant platform-like hull 14 having a substantially flat deck 15 and a substantially flat bottom 16,
  • a plenum structure 17 for the distribution of pressurized air extends circumferentially of hull 14 adjacent its gunwalel8.
  • a flexible skirt assembly 19 is connected to the lower portions of the plenum structure and is arranged to depend below the bottom 16 of the hull to enclose a space 20 between the hull and the upper surfaces of ice sheet 11 when vehicle 10 is operated in its air cushion mode.
  • pressurized air is supplied to the space enclosed by skirt assembly 19 via plenum structure 17 so that the bottom surface of the hull and the upper surface of the ice sheet are spaced from each other and the vehicle hull is supported over the ice sheet on a cushion of air.
  • Air at superatmospheric pressure is supplied to plenum structure 17 via discharge ducts 21 interconnected between the plenum structure and the discharge openings of a pair of blowers 22 which, for example, are mounted to deck 15 adjacent the aft end thereof, and are operated by a suitable prime mover 23 (see FIG. 2) which may be an electric motor or a diesel engine, for example.
  • a forward portion of vehicle 10 defines a dredging station 24 within which a dredging facility 26 is mounted to hull 14.
  • the dredging facility includes a dredging head 27 which is carried by the lower end of a dredgings conductor tube 28 which extends downwardly through hull 14 via a well 29 from a pump 30.
  • the upper end of tube 28 is connected to the suction port of pump 30.
  • a discharge conduit 31 is connected to the discharge port of the pump and extends to adjacent the gunwale of the hull where it is supported on a boom 32 (see FIG. 2).
  • Boom 32 extends laterally of the side of vehicle 10 from a suitable king post 33 or the like.
  • the boom is provided for supporting conduit 31 above ice surface 11 for a desired distance laterally away from vehicle 10 so that dredgings gathered from bed formation 13 by dredging head 27 and conducted to pump 30 by tube 28 may be discharged via conduit 31 onto the ice surface a suitable distance laterally from vehicle 10.
  • Dredging head 27 preferably is of the suction type which operates in response to the operation of pump 30 to gather the material of bed formation 13 from the bed in the vicinity of the dredging head. Accordingly, as vehicle 10 moves across ice 11 along a desired path, a trench 35 is formed by dredging head 27 in bed formation 13 below vehicle 10.
  • a suitable seal 36 cooperates between the structure of hull '14 and the dredgings conductor tube within well 29 so that super-atmospheric pressure may effectively be generated and maintained within space 20 by operation of blowers 22.
  • the dredging facility illustrated in FIGS. 1 and'2 and described above is merely exemplary of a dredging facility which may be provided in any apparatus according to this invention for the performance of the procedures contemplated by this invention.
  • the area of vehicle 15 aft of dredging station 25 is designated as a pipelaying station 38 and is the location in vehicle 10 where a pipelaying facility 39 is located.
  • the pipelaying facility includes a pipe welding assembly 40, preferably located along the centerline 48 of hull l4 forwardly of a pipe holding and tensioning assembly 41.
  • the pipe welding and pipe holding assemblies may be of conventional configuration and arrangement.
  • Pipe welding station 40 is provided for welding the rear end of a pipe length 42, disposed above deck 15 on suitable supports 43 (see FIG. 1), to the forward end of a plurality of pipe lengths which have been welded together to define a continuum 44 of pipe.
  • the pipe continuum extends from welding assembly 40 through pipe holding and tensioning assembly 41 aft of vehicle 10 and into trench 35, as shown in FIG. 1.
  • a portion of the pipeline continuum 44 disposed in trench 35 and supported by formation 13 at the bottom of the trench constitutes a portion of a submarine pipeline 415 being laid under body of water 12 by operations carried out on and from the platform defined by vehicle 10.
  • a suitable seal 49 cooperates between the walls of the passage and the pipe continuum within the length of the passage for preventing undue leakage of pressurized air through the passage from space 20 so that a region of air at superatmospheric pressure may be generated below hull 14 in response to the operation of blowers 22.
  • pipelaying vehicle 10 includes an ice cutting assembly 50 for forming an open channel 51 through ice sheet 11 of sufficient width that the dredgings conductor tube and the pipe continuum with its associated supportive stinger assembly 52 may be passed through the ice sheet.
  • ice cutting assembly 50 includes a centerline icecutting mechanism 54 and a pair of side ice cutting mechanisms 55 disposed on opposite sides of and equidistantly from centerline mechanism 54.
  • Each of mechanisms 54 and 55 is provided in the form of an enlarged chain saw having an elongate blade 56 (see FIG. 1) the circumference of which defines a quide-way for an encircling tooth-carrying chain 57.
  • Each chain carries a plurality of teeth 58 and 58' adapted upon operation of the associated mechanism for cutting ice with which the teeth may be brought into contact.
  • the blades of ice cutting mechanisms 54 and 55 are adapted to be movable between an operative position in which they depend from the bottom 16 of hull 14 through ice layer 11 and a retracted position in which the blades are disposed in respective elongated recesses 60 formed in hull 14 to open downwardly from the hull into space 20.
  • Recesses 60 are defined within the interior of corresponding elongate housings 61 which extend upwardly within hull 14 from the bottom of the hull, as shown in FIG. 3. Housings 61 are parallel to each other and extend fore-and-aft within hull 14.
  • the blades 56 of ice cutting mechanisms 54 and 55 are carried by a hollow axle 62 which extends transversely of the hull within the hull and through the upper portions of housings 61.
  • a pair of indexing devices 63 are connected to the axle on either side of central housing 61, and are operable for rotating the axle through an arc of about 90 degrees for moving the ice cutting mechanisms between their operative and retracted positions.
  • Axle 62 is so positioned relative to housings 61, and the housings are so configured in cooperation with the ice cutting mechanisms, that when the ice cutting mechanisms are in their retracted positions within recesses 60, the mechanisms are disposed wholly above the bottom surface 16 of hull 14.
  • a suitable sprocket wheel (not shown, but
  • each chain 57 coaxially of axle 62 for driving chains 57 around the circumference of respective blades 56.
  • the sprockets are secured to a drive shaft 64 which extends coaxially of the axle as shown in FIG. 3.
  • the drive shaft is connected at its opposite ends to a pair of drive motors 65 mounted to the structure of hull 14 within the hull.
  • the teeth 58 of central ice cutting mechanism 54 have a greater width transversely of the vehicle it) than do the teeth 58 of the side ice cutting mechanisms.
  • Teeth 58 are sized to cut a channel 67 through ice layer 11, which channel has a width sufficiently greater than the outer diameter of dredgings conductor tube 28 that the conductor tube may be passed readily through this channel.
  • Teeth 58, asso ciated with side ice cutting mechanisms 55 are sized to cut somewhat narrower channels 68 through ice layer 11 on either side of and parallel to channel 67, thereby to define a pair of strips 69 of ice which are severed from ice layer ll 1 by operation of the ice cutting mechanisms.
  • the aggregate width of channels 67 and 68 is greater than the width of stinger assembly 52 provided in conjunction with pipelaying facility 39.
  • the forward end of the stinger assembly is pointed to wedge ice strips 69 apart from each other to permit the free passage of the stinger assembly, or at least its upper end, through a widened channel 51 which has a width equal to the aggregate of the width of channels 67 and 68.
  • ice cutting assembly 50 provides a means for forming an open channel through ice sheet 11 as vehicle 10 moves over the ice above the path along which it is desired to lay pipeline 45.
  • ice cutting assembly 50 is disposed wholly within the limits of the air cushion support area for vehicle 10 when it is operated in its air cushion mode.
  • suitable means are provided in cooperation with stinger assembly 52 for sealing skirt assembly 19 to the stinger assembly at the aft end of the vehicle. Accordingly, the front end of channel 51 is at all times defined at a point below hull 14 within skirt assembly 19.
  • the generation of open channel 51through ice layer 11 does not provide a source of leakage for air from chamber 20 during air cushion mode operation of the vehicle and the vehicle is effectively supported on ice layer 11 by a cushion of air when blowers 22 are operated.
  • the force applied to the ice by the pressurized air within skirt assembly 19 may be effective to break the ice adequately to enable passage of dredgings conductor tube 28, pipe continuum 44, the stinger assembly 52 through the ice. Ice cutting assembly 50 is not required under such circumstances.
  • Stinger 52 is an elongate buoyant structure which has a width which is somewhat less than the aggregate width of ice channels 67 and 68 formed through ice layer 11 by operation of ice cutting mechanisms 54 and 55.
  • the stinger has an enlarged upper end 70 and varies appropriately in cross-sectional configuration along its length so that when the stinger assembly is submerged and engaged with pipe continuum 44 as shown in FIG. 1, the buoyant forces developed by the submerged stinger are applied in the desired manner to the pipe continuum.
  • the stinger is provided to impart support to pipe continuum 44 so that the pipe continuum, as it passes from the vehicle into the water, is not bent about a sufficiently small radius of curvature to result in kinking or other damage to the pipe continuum.
  • the support forces applied to the pipe continuum by the stinger also assures that the bend of the continuum as it engages the bottom of trench 35 is not so sharp as to produce kinking or other damage to the pipe.
  • the upper portions of stinger 52 are transversely dished along the length of the stinger to provide a guide channel 71 (see FIG. along which pipe continuum 14 is passed during pipelaying operations.
  • the interior of the stinger is hollow and preferably is subdivided by partitions 72 to prevent complete flooding of the stinger in the event that a leak should develop through the stinger structure at some localized point.
  • the upper end 70 of the stinger is secured, as by tether cables 73, to the underside of hull 14 within the perimeter of the space enclosed by skirt assembly 19.
  • connection of the stinger to the hull is so arranged that the pipe guide channel 71 defined in the upper portions of the stinger defines an extension of the pipe supporting surfaces of passage 47 through the hull when the pipe continuum is engaged with the stinger as shown in FIG. 1.
  • Stinger 52 is used during pipelaying operations whether or not the pipelaying operations are carried out on an ice layer. In the absence of ice over the intended path of the pipeline, or in the event the water is ice covered but not sufficiently to interfere with floating movement of hull 14, the hull is buoyantly supported in water 12. On the other hand, where the intended path of the pipeline is covered by a layer of ice sufficiently thick to impair or prevent floating movement of hull 14, then pipelaying operations are carried out from vehicle while the vehicle is operated at its air cushion mode.
  • FIG. 5 illustrates that stinger 52 includes structure for maintaining an effective seal around space 20 in the vicinity of ice channel 51 during air cushion mode operation of the vehicle.
  • Skirt assembly 19 includes an outer sheet 75 which is connected along its upper margin 76 to the lower portions of plenum structure 17 outboard of hull 14. Outer sheet 75 also has a lower edge 77 which, during air cushion mode-operation of vehicle 10 is disposed below the bottom 16 of hull 14. The outer sheet of skirt assembly 19 preferably is held during air cushion mode operation of the vehicle in a desired relation to the structure of hull 14 by a plurality of webs 78 interconnected between the hull and the inner surfaces of outer sheet 75.
  • outer sheet 75 is fabricated of a fabric impregnated with a suitable material such as latex or a latex-based material to render the same impervious to the flow of air through the fabric.
  • a yoke member 79 is connected to stinger 52 to straddle channel 71 along which pipe continuum-44 passes during pipe-laying operations.
  • a flap member 80 preferably fabricated of much the same material as outer sheet 75 of skirt assembly 19, is connected to the upper portion of stinger 52 in the vicinity of yoke 79. Flap 80, adjacent the location at which the pipe continuum passes through the yoke, is carried by the exterior portion of the yoke.
  • the clearance within yoke 79 for pipe continuum 44 is relatively small so that a minimum leakage of air from space 20 through the yoke is afforded in those few operational situations where yoke 79 is not fully submerged in water 12.
  • Flap 80 is disposed to extend into skirt assembly 19 along the inner surfaces of outer sheet for a selected distance above the lower edge 77 of the skirt assembly during air cushion mode operation of the vehicle.
  • the increased air pressure within space 20 biases the flap into registration with the inner surfaces of skirt outer sheet 75.
  • the lower edge 77 of the skirt assembly is disposed in spaced relation to the proximate portions of stinger 52 during pipelaying operations while the vehicle is operated in its air cushionmode. This spacing between the stinger and the lower portions of the skirt assembly allows the stinger to move relative to the vehicle hull about the connection provided by tether cables 73, and such relative motion is accommodated by flap 81) sliding within skirt assembly 19.
  • flap 81 transversely of the length of stinger 52 is a small amount greater than the width of channel 51 within which stinger 52 is disposed during air cushion mode operation of the vehicle. It will be apparent, herefore, that when vehicle 111 is operated in its air cushion mode during pipelaying operations, flap 8! ⁇ forms an effective seal across the upper portions of channel 51 below skirt assembly 19. In this manner, undue leakage from space 20 to the atmosphere around vehicle 10 is prevented so that blowers 22 may be oper ated to maintain an effective air cushion within space 20 for the support of hull 14.
  • skirt assembly partitions 78 at the aft end of hull 14 is selected so that the partitions closest to the centerline of the hull are spaced from each other a distance greater than the extent of flap 8t) transversely of stinger 52.
  • FIG. 4 illustrates the manner in which vehicle 10 preferably is moved across the ice sheet during dredging and pipelaying operations.
  • FIG. 10 only the dredging facility is illustrated, it being understood that the pipelaying facility, which has been eliminated from FIG. 4 for the purposes of simplicity of illustration, is also present.
  • the principles illustrated in FIG. 4 are applicable to movement of dredging and pipelaying platforms provided separately from each other across an ice sheet for performance of dredging or pipelaying operations, respectively.
  • a winch 81 is mounted to hull deck 15 adjacent each comer of the hull; the hull preferably is of rectangular planform configuration.
  • each winch is disposed so that a mooring cable 82 wound upon the winch drum is conveniently led away from the hull along a line substantially parallel to a diagonal line across the hull.
  • Each mooring cable 82 extends to an anchor point 83 affixed in ice sheet 11.
  • the anchor points may be provided by any suitable means, as by pilings frozen into holes formedin ice sheet 11.
  • Two rows of anchor points 83 are provided parallel to the intended path of vehicle 11) across the ice sheet and on opposite sides equidistantly from the desired path of the vehicle.
  • Anchor points 83 are installed in ice sheet 11 in advance of the movement of vehicle 10 across the ice sheet.
  • the spacing of the anchor points in each parallel line of anchor points is such that the vehicle may be moved along its intended path of movement by selective reeling in and paying out of mooring cables 82 from winches 81.
  • mooring cables associated with the winches at the forward comers of vehicles 10 are reeled in while the cables extending away' along its intended path I of motion, and during such movement the platform is maintained by the cables in the desired position on the ice sheet.
  • vehicle 90 also provides an air cushion dredging vehicle 90.
  • vehicle 90 includes a buoyant hull 14 which carries a dredging facility 26'.
  • Air is supplied at superatmospheric pressure to space 20 via skirt assembly 19 through an air distribution plenum structure 17 in response to operation of lower end of which is connected to a dredging head 92.
  • the dredging head preferably is of the rotary type operated in response to the passage of water upwardly through the conductor tube by operation of pump 30.
  • Conductor tube 91 differs from conductor tube 28, illustrated in FIG. 1, by the inclusion in its length of a flexible section 93 which preferably is disposed sufflciently below hull 14 as to be positioned below the bottom of ice sheet 11 when vehicle 90 is operated in its air cushion mode over ice.
  • the dredging facility provided in vehicle 10 is adapted primarily for forming trench into which pipeline 45 may be laid
  • dredging facility 26' of vehicle 90 is adapted for general purpose dredging on a year-round basis in waters susceptible of being covered by an ice sheet of appreciable thickness.
  • rotary dredging head 92 and flexible section 93 in dredgings tube 91 adapt dredging facility 26' to general purpose dredging operations.
  • a single ice cutting mechanism 54 is carried by vehicle'90 for forming through ice sheet 11 a single channel 94 of suflicient width that conductor tube 91 and dredging head 92 may be passed through the channel.
  • conductor tube 91 above flexible portion 93 passes through a well 29 formed through hull 14.
  • a suitable seal 36 is provided between the hull and the conductor tube within the well for the purposes described above.
  • a collar 95 is secured to conductor tube 91 below flexible portion 93.
  • a plurality of cables 96 are connected between collar 95 and a plurality of winches W 97 mounted to hull M.
  • winches 97 are disposed in recesses 9% formed in the flat bottom 16 of bull 14 adjacent conductor tube: well 29.
  • winches 97 are provided in vehicle 90, and are located fore and aft, port and starboard, respectively, from the position at which the conductor tube passes v through the bottom surface of the hull. Selective operation of winches 97 to reel in or pay out cables 96 produces movement of dredging head 92 forward, rearwardly, or in either direction laterally relative to hull M. Such movement of the lower portion of dredging tube 91 is accommodated by the flexible portion of the tube below ice sheet ill.
  • ice cutting mechanism 54 When the submerged location to be dredged is free of an ice cover or is covered by an ice layer of insuffi shown in FIG. 6, ice cutting mechanism 54 preferably is movable between theoperative position shown in FIG. 6 and a retracted position in which the mechanism is disposed in a recess 60, preferably provided in the manner described above conceming vehicle 10.
  • channel 51 for'example, through ice layer 11 during pipelaying operations from vehicle 10, for example, provides a discontinuity in.the ice. Wind, wave or tidal forces acting on the ice may tend to close channel 51 around stinger 52, for example, or to further open the channel more than may be safe relative to vehicle It).
  • preferred practice of the pipelaying and dredging operations through ice according to this invention includes the installation across the ice channel behind the vehicle, such as vehicle it), of means for maintaining the channel at the desired width.
  • the channel maintaining means are provided in the form of steel bars 100 bent to resemble enlarged staples in that the end portions of the bar are bent at right angles, parallel to each other, relative to the straight central portions of the bar.
  • the central portions of the bars have a length which exceeds the width of the channel, as initially formed, by a desired amount, and the end portions of the bars have lengths preferably at least equal to the thickness of ice layer 11.
  • the bars are installed across the channel behind the vehicle as it moves along'its intended path at appropriate intervals along the length of the channel.
  • the installation of the bars across the channel may be achieved by drilling holes through the ice at aligned locations along the channel and on opposite sides of the channel.
  • the holes preferably are sized to snugly receive the end portions of the bars.
  • the bars are then installed by inserting their end portions into corresponding ones of the aligned holes. When so installed, the bars act to inhibit opening or closing of the channel.
  • Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air, a pipelaying facility carried by the platform, and means carried by the platform operable for forming through an ice layer below the platform achannel through which pipe may be laid from the platform to the bed of the body of water, and wherein the means for supporting the platform on a cushion of air includes a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, and the means for forming the channel is operable through the space.
  • Apparatus according to claim 1 including a dredging facility on the platform operable for dredging through the channel a trench in the bed of the body of water for receipt of pipeline laid from the platform.
  • a method for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of dredging a trench in the bed along the path of the pipeline from a dredging operations station supported on the ice on a cushion of air, said dredging step including operation of a dredging facility which comprises a dredging head engageable with said bed and carried by a conductor tube depending from the dredging operations station, forming an open channel through the ice over the path of the pipeline and extending the conductor tube through the channel for engagement of the dredging head with said bed, laying the pipeline in the trench through the channel from a pipelaying operations station supported on the ice on a cushion of air, and installing means for inhibiting widening or narrowing of the channel proximately rearwardly adjacent the pipelaying operations station.
  • a method for laying pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of locating a pipelaying facility on a platform, forming a channel through the ice over the path along which the pipeline is to be laid, supporting the platform over the ice over the channel on a cushion of air, laying pipeline on the bed from the facility through the platform, supporting the pipeline between the bed and the platform along at least a portion of the length thereof adjacent the platform, said supporting step including providing a stinger assembly for the platform, disposing the forward end of the stinger assembly below the platform within the area of air cushion support of the platform, and coupling the stinger assembly to the platform, and installing means for inhibiting widening or narrowing of the channel proximately rearwardly adjacent the platform.
  • Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air including a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, a pipelaying facility carried by the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water, said channel forming means being operable through the space and being movable between a retracted position substantially within the platform and an operative position in which it extends into the space into operative engagement with ice below the platform.
  • channel forming means comprises means for mechanically cutting through the ice.
  • Apparatus for laying a pipeline and the like across thebed of a body of water covered by a layer of ice comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air and including a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to 'the space, a pipelaying facility carried by the platform, pipeline passage means through the platform from the pipelaying facility to the space, means cooperable with the pipeline disposed in the passage for preventing substantial leakage of air through the passage from the space during air cushion operation of the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water.
  • Apparatus according to claim 7 including a buoyant elongate stinger assembly engageable adjacent the platform with pipeline extending from the platform for at least partially supporting in a desired manner pipeline engaged thereby, and means for coupling the stinger assembly to the platform within said space adjacent the passage over the channel for positioning the stinger assembly in the channel.
  • Apparatus according to claim 8 including means cooperable between the stinger assembly and the skirt assembly for preventing substantial leakage of air through the channel from the space during air-cushion operation of the platform.
  • a method for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of forming an open channel through the ice over the path of the pipeline, and laying the pipeline on the bed through the channel from a pipelaying operations station supported over the ice on a cushion of air by a procedure which includes buoyantly supporting the pipeline for at least a portion of its length between the operations station and the bed by disposing a buoyant pipeline stinger assembly in the channel adjacent the operations station and by positioning the stinger assembly with its upper end below the operations station within the area of air cushion support of the station.
  • a method for laying pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of v l. locating a pipelaying facility on a platform,

Abstract

Apparatus for arctic dredging and marine pipelaying during icefree and iced conditions is described. For dredging, a dredging facility is carried on a buoyant platform which is adapted for support on a cushion of air. The dredging facility includes a dredging head which is operable, when engaged with the bed of a body of water to be dredged, for removing material from the bed. A dredgings conductor tube is connectible between the dredging head and the platform for conducting dredged material from the head to the platform. The dredging equipment also includes means carried by the platform for forming a channel through a layer of ice below the platform for passage of the conductor tube through the ice when the dredging apparatus is operated during iced conditions. The pipelaying equipment includes a pipelaying facility carried by a buoyant platform, which is adapted for support on a cushion of air. The pipelaying equipment includes means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water across which the pipeline is to be laid. The portion of the pipeline which extends between the platform and the bed of the body of water is supported along at least a portion of its length adjacent the pipelaying platform. This support of the pipeline may be provided by a stinger assembly coupled to the platform with its upper end disposed within the area of air cushion support of the platform. The dredging apparatus and the pipelaying apparatus may be provided on a common buoyant platform adapted for support on a cushion of air. In such case, the dredging facility is located on the platform forward of the pipelaying facility so that, during pipelaying operations through ice, pipe is laid through the channel formed in the ice for the dredgings conductor tube.

Description

United States Patent [191 Blankenship 1 July 9, 1974 ARCTIC DREDGING AND PIPELAYING [75] .lnventor: Owen D. Blankenship, Houston,
Tex.
[73] Assignee: Global Marine Inc., Los Angeles,
Calif.
22 Filed: July 28, 1972 21 Appl. No.: 276,110
[52] U.S. C1 til/72.1, 61/723, 61/72.4, 37/54, 37/64, 180/116 [51] Int. Cl. F161 l/00, B63b 35/04 [58] Field of Search 61/721, 72.3, 46.5, 1; 114/40, 41, 42; 37/64, 65, 54, 58; 180/116, 72.4
[56] References Cited UNITED STATES PATENTS 716,713 12/1902 Bates 37/65 2,755,632 7/1956 Hauber et al. 61/724 3,438,213 4/1969 Broussard et al... 61/723 3,462,963 8/1969 Moore. 61/724 3,632,172 1/1972 Robinson 114/42 3,673,729 9/1972 Blurton 61/465 X 3,631,927 8/1972 Duc 61/723 X Primary ExaminerJacob Shapiro Attorney, Agent, or F irmChristie, Parker & Hale [57] ABSTRACT Apparatus for arctic dredging and marine pipelaying during ice-free and iced conditions is described. For dredging, a dredging facility is carried on a buoyant platform which is adapted for support on a cushion of air. The dredging facility includes a dredging head which is operable, when engaged with the bed of a body of water to be dredged, for removing material from the bed. A dredgings conductor tube is connectible between the dredging head and the platform for conducting dredged material from the head to the platform. The dredging equipment also includes means carried by the platform for forming a channel through a layer of ice below the platform for passage of the conductor tube through the ice when the dredging apparatus is operated during iced conditions.
The pipelaying equipment includes a pipelaying facility carried by a buoyant platform, which is adapted for support on a cushion of air. The pipelaying equipment includes means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water across which the pipeline is to be laid. The portion of the pipeline which extends between the platform and the bed of the body of water is supported The dredging apparatus and the pipelaying apparatus may be provided on a common buoyant platform adapted for support on a cushion of air. In such case,
'the dredging facility is located on the platform forward of the pipelaying facility so that, during pipelaying operations through ice, pipe is laid through the channel formed in the ice for the dredgings conductor tube.
11 Claims, 6 Drawing Figures PATENTEB- 9W III ARCTIC DREDGING AND PIPELAYING FIELD OF THE INVENTION This invention pertains to marine arctic dredging and pipelaying. More specifically, this invention pertains to method and apparatus for performing dredging and pipelaying operations, in Waters susceptible to being covered by a layer of ice, during both iced and ice-free conditions.
BACKGROUND OFTl-IE INVENTION Substantial reserves of oil and gas are either known to exist or are suspected to exist inareas lying offshore from northern Alaska and Canada. The precise seaward extent of these reserves from the adjacent shore line has not yet been defined with precision. It is known, however, that many of the established reserves lie under water which is covered by ice for many months of the year and which, during any given-year, may be covered year-round by ice.
Oil or gas may be produced from a suitable well only when, and to the extent that the oil or gas can be removed directly from the wellhead to a suitable storage facility or pipeline. In the case of offshore wells, the provision of local storage facilities is not possible, particularly in the artic. Accordingly, the successful and economic exploitation of the known and suspected oil and gas reserves in the arctic is dependent upon the provision of pipelines from the several wells across to ocean floor to centralized land-based storage and shipment facilities. These facilities may be adjacent a harbor which is ice-free for a sufficient periodduring every year to enable tankers and the like to collect and remove, within a few months time, all of the oil and gas produced annually fromthe wells in the area. On the other hand, these facilities may be a central collection point for a large diameter gas or oil pipeline by which reserves to more southerly points of consumption and refinement is the use of marine pipelines from the oil and gas fields to points sufficiently far south that the ecological problems associated with across-land arctic pipelines are not encountered. Such long distance marine pipelines like the smaller local pipelines necessary to interconnect offshore wells to central collection and storage facilities, would have to be laid under waters which are covered by ice for many months of the year the production from the adjacent oil and gas fields may be. transported, on a year-round basis, to remote locations of further use or processing.
The economic feasibility and desirability of constructing oil or gas pipelines across the land of northern Alaska and Canada are topics which have not yet been resolved, due primarily to the fact that such pipelines would. have to be constructed across the arctic tundra. The tundra presents delicate and complex ecological problems. In the extreme north, the surface vegetation is delicate and, if destroyed, only slowly reestablishes itself. Surface vegetation is particularly vital to the preservation of the arctic terrain due to the presence of permafrost under the surface vegetation. Surface vegetation provides a natural insulative barrier to complete thawingof the permafrost during the arctic summer..
water courses in the area. For example, the roadways across which military vehicles moved in Alaska dunng the arctic summers of World War II are now visible as trenches 8 feet or more in depth and 40 feet or more in width; these trenches are the direct result of the destruction of the surface vegetation by such vehicles.
These ecologicalconsiderations, therefore, arguestrongly against the construction by conventional techor which, in a given year, may be covered year-round.
The marine pipelaying procedures and devices described in the prior art may be used only to lay pipeline under waters which are ice-free. Therefore, reliance upon existing procedures and equipment to construct long distance marine pipelines in the arctic is feasible during only a few months of the year, and may not be possible at all in some areas where ice may exist on a year-round basis. The construction of long distance marine pipelines in the arctic by existing techniques and equipment would be prohibitively expensive due to the short construction season afforded in these areas and the need to move pipelaying equipment into and out of construction areas during the ice-free period. Dependence upon existing marine pipelaying procedures and equipment means that if long distance marine pipelines are to be used to provide a solution to the ecological problems reviewed above, such pipelines would require several years to construct and would be far more costly per mile than any other pipeline now known.
In view of the foregoing, it is apparent that great need exists for procedures and equipment which will enable the construction on a substantially yearround basis and at reasonable cost of marine pipelines through and under waters which are susceptible to coverage by ice for substantial periods of the year.
SUMMARY OF THE INVENTION therefore, makes possible the economic construction on an essentially year-round basis of marine pipelines which may be used as substitutes for or alternates to cross-land pipelines.
Generally speaking, thisinvention provides a method for laying a pipeline and the like across the bed of a body of water covered by a layerof ice. The method inniques of oil and gas pipelines across the tundra of cludes the steps of dredging a trench in the bed along the path of the pipeline from a dredging operations station supported on the ice on a cushion of air, and laying the pipeline in the trench from a pipelaying operations station supported on the ice on a cushion of air. Prefer- 3 ably, the dredging and pipelaying operations stations are buoyant so that dredging and pipelaying operations may be performed during periods when the water is icefree as well as during periods when the water is covered by a layer of ice.
This invention also provides a method for dredging in water susceptible to being covered by a layer of ice. A dredging facility is located on a buoyant platform adapted to be supported on a cushion of air. The platform is floated in the water and dredging operations are performed from the platform during periods when the water is not covered by ice sufficient to restrict floating movement of the platform. During periods when the water is covered by ice sufficient to restrict floating movement of the platform, the platform is supported on a cushion of air and dredging operations are performed from the platfonn through the ice. Preferably, the dredging facility includes a dredging head which is operative to remove material from the bed of the water body, and a dredgings conductor pipe which is connected during dredging operations between the dredging head and the platform. Means are carried by the platform for forming through an ice layer below the platform a channel through which the dredgings conductor pipe may be passed.
DESCRIPTION OF THE DRAWINGS The above-mentioned and other features of this invention are more fully set forth in the following description of certain presently preferred embodiments of the invention, which description is presented with reference to the accompanying drawings, wherein:
FIG. 1 is a cross-sectional elevation view of a dredging and pipelaying facility according to this invention;
FIG. 2 is a top plan view of the dredging and pipelaying facility shown in FIG. 1;
FIG. 3 is a cross-sectional elevation view .of the mechanism provided-in the air cushion platform shown in FIG. 1 for forming a clearance channel through the ice layer for the dredgings conductor pipe and the pipeline;
FIG. 4 is a simplified top plan view of a dredging facility according to this invention in use during iced conditions;
FIG. 5 is an enlarged fragmentary cross-sectional elevation view of a portion of the structure shown in FIG. 4; and
FIG. 6 is a cross-sectional elevation view of another dredging apparatus according to this invention.
DESCRIPTION OF THE ILLUSTRATED EMBODIMENTS An air cushion vehicle 10 is disposed over a sheet of ice 11 formed on the surface 9 of a body of water 12 which has a bottom or bed 13. This vehicle is comprised of a buoyant platform-like hull 14 having a substantially flat deck 15 and a substantially flat bottom 16, A plenum structure 17 for the distribution of pressurized air extends circumferentially of hull 14 adjacent its gunwalel8. A flexible skirt assembly 19 is connected to the lower portions of the plenum structure and is arranged to depend below the bottom 16 of the hull to enclose a space 20 between the hull and the upper surfaces of ice sheet 11 when vehicle 10 is operated in its air cushion mode. During air cushion mode operation of the vehicle, pressurized air is supplied to the space enclosed by skirt assembly 19 via plenum structure 17 so that the bottom surface of the hull and the upper surface of the ice sheet are spaced from each other and the vehicle hull is supported over the ice sheet on a cushion of air. Air at superatmospheric pressure is supplied to plenum structure 17 via discharge ducts 21 interconnected between the plenum structure and the discharge openings of a pair of blowers 22 which, for example, are mounted to deck 15 adjacent the aft end thereof, and are operated by a suitable prime mover 23 (see FIG. 2) which may be an electric motor or a diesel engine, for example.
A forward portion of vehicle 10 defines a dredging station 24 within which a dredging facility 26 is mounted to hull 14. The dredging facility includes a dredging head 27 which is carried by the lower end of a dredgings conductor tube 28 which extends downwardly through hull 14 via a well 29 from a pump 30. The upper end of tube 28 is connected to the suction port of pump 30. A discharge conduit 31 is connected to the discharge port of the pump and extends to adjacent the gunwale of the hull where it is supported on a boom 32 (see FIG. 2). Boom 32 extends laterally of the side of vehicle 10 from a suitable king post 33 or the like. The boom is provided for supporting conduit 31 above ice surface 11 for a desired distance laterally away from vehicle 10 so that dredgings gathered from bed formation 13 by dredging head 27 and conducted to pump 30 by tube 28 may be discharged via conduit 31 onto the ice surface a suitable distance laterally from vehicle 10. Dredging head 27 preferably is of the suction type which operates in response to the operation of pump 30 to gather the material of bed formation 13 from the bed in the vicinity of the dredging head. Accordingly, as vehicle 10 moves across ice 11 along a desired path, a trench 35 is formed by dredging head 27 in bed formation 13 below vehicle 10.
In order that dredging facility 26 may be operated to form trench 35 during air cushion mode operation of vehicle 10, a suitable seal 36 cooperates between the structure of hull '14 and the dredgings conductor tube within well 29 so that super-atmospheric pressure may effectively be generated and maintained within space 20 by operation of blowers 22. I
The dredging facility illustrated in FIGS. 1 and'2 and described above is merely exemplary of a dredging facility which may be provided in any apparatus according to this invention for the performance of the procedures contemplated by this invention.
As shown most clearly in FIG. 2, the area of vehicle 15 aft of dredging station 25 is designated as a pipelaying station 38 and is the location in vehicle 10 where a pipelaying facility 39 is located. The pipelaying facility includes a pipe welding assembly 40, preferably located along the centerline 48 of hull l4 forwardly of a pipe holding and tensioning assembly 41. The pipe welding and pipe holding assemblies may be of conventional configuration and arrangement. Pipe welding station 40 is provided for welding the rear end of a pipe length 42, disposed above deck 15 on suitable supports 43 (see FIG. 1), to the forward end of a plurality of pipe lengths which have been welded together to define a continuum 44 of pipe. The pipe continuum extends from welding assembly 40 through pipe holding and tensioning assembly 41 aft of vehicle 10 and into trench 35, as shown in FIG. 1. A portion of the pipeline continuum 44 disposed in trench 35 and supported by formation 13 at the bottom of the trench constitutes a portion of a submarine pipeline 415 being laid under body of water 12 by operations carried out on and from the platform defined by vehicle 10. Pipe storage areas 46 hull 14 when operated in its air cushion mode. Accordingly, a passage 47 is provided through hull 14 along the centerline of the hull. Passage 47 slopes downwardly and rearwardly from its upper end at deck 15 to its lower end through bottom 16 of the hull. A suitable seal 49 cooperates between the walls of the passage and the pipe continuum within the length of the passage for preventing undue leakage of pressurized air through the passage from space 20 so that a region of air at superatmospheric pressure may be generated below hull 14 in response to the operation of blowers 22.
It is apparent that when vehicle 10 is operated over ice 1], some mechanism must be provided for forming openings through ice 11 for the passage of dredgings conducting tube 28 and pipe continuum 44 into contact with bed formation 13. Accordingly, pipelaying vehicle 10 includes an ice cutting assembly 50 for forming an open channel 51 through ice sheet 11 of sufficient width that the dredgings conductor tube and the pipe continuum with its associated supportive stinger assembly 52 may be passed through the ice sheet. As shown best in FIG. 3, ice cutting assembly 50 includes a centerline icecutting mechanism 54 and a pair of side ice cutting mechanisms 55 disposed on opposite sides of and equidistantly from centerline mechanism 54. Each of mechanisms 54 and 55 is provided in the form of an enlarged chain saw having an elongate blade 56 (see FIG. 1) the circumference of which defines a quide-way for an encircling tooth-carrying chain 57. Each chain carries a plurality of teeth 58 and 58' adapted upon operation of the associated mechanism for cutting ice with which the teeth may be brought into contact. The blades of ice cutting mechanisms 54 and 55 are adapted to be movable between an operative position in which they depend from the bottom 16 of hull 14 through ice layer 11 and a retracted position in which the blades are disposed in respective elongated recesses 60 formed in hull 14 to open downwardly from the hull into space 20.
Recesses 60 are defined within the interior of corresponding elongate housings 61 which extend upwardly within hull 14 from the bottom of the hull, as shown in FIG. 3. Housings 61 are parallel to each other and extend fore-and-aft within hull 14. The blades 56 of ice cutting mechanisms 54 and 55 are carried by a hollow axle 62 which extends transversely of the hull within the hull and through the upper portions of housings 61. A pair of indexing devices 63 are connected to the axle on either side of central housing 61, and are operable for rotating the axle through an arc of about 90 degrees for moving the ice cutting mechanisms between their operative and retracted positions. Axle 62 is so positioned relative to housings 61, and the housings are so configured in cooperation with the ice cutting mechanisms, that when the ice cutting mechanisms are in their retracted positions within recesses 60, the mechanisms are disposed wholly above the bottom surface 16 of hull 14. A suitable sprocket wheel (not shown, but
well known from the chain saw technology) cooperates with each chain 57 coaxially of axle 62 for driving chains 57 around the circumference of respective blades 56. The sprockets are secured to a drive shaft 64 which extends coaxially of the axle as shown in FIG. 3. The drive shaft is connected at its opposite ends to a pair of drive motors 65 mounted to the structure of hull 14 within the hull.
As shown in FIG. 3, the teeth 58 of central ice cutting mechanism 54 have a greater width transversely of the vehicle it) than do the teeth 58 of the side ice cutting mechanisms. Teeth 58 are sized to cut a channel 67 through ice layer 11, which channel has a width sufficiently greater than the outer diameter of dredgings conductor tube 28 that the conductor tube may be passed readily through this channel. Teeth 58, asso ciated with side ice cutting mechanisms 55, are sized to cut somewhat narrower channels 68 through ice layer 11 on either side of and parallel to channel 67, thereby to define a pair of strips 69 of ice which are severed from ice layer ll 1 by operation of the ice cutting mechanisms. The aggregate width of channels 67 and 68 is greater than the width of stinger assembly 52 provided in conjunction with pipelaying facility 39. Preferably the forward end of the stinger assembly is pointed to wedge ice strips 69 apart from each other to permit the free passage of the stinger assembly, or at least its upper end, through a widened channel 51 which has a width equal to the aggregate of the width of channels 67 and 68.
It is apparent, therefore, that ice cutting assembly 50 provides a means for forming an open channel through ice sheet 11 as vehicle 10 moves over the ice above the path along which it is desired to lay pipeline 45.
It will be observed from FIG. 1 that ice cutting assembly 50 is disposed wholly within the limits of the air cushion support area for vehicle 10 when it is operated in its air cushion mode. As will be described below, suitable means are provided in cooperation with stinger assembly 52 for sealing skirt assembly 19 to the stinger assembly at the aft end of the vehicle. Accordingly, the front end of channel 51 is at all times defined at a point below hull 14 within skirt assembly 19. Thus, the generation of open channel 51through ice layer 11 does not provide a source of leakage for air from chamber 20 during air cushion mode operation of the vehicle and the vehicle is effectively supported on ice layer 11 by a cushion of air when blowers 22 are operated.
Under some conditions of ice thickness and structural characteristics, the force applied to the ice by the pressurized air within skirt assembly 19 may be effective to break the ice adequately to enable passage of dredgings conductor tube 28, pipe continuum 44, the stinger assembly 52 through the ice. Ice cutting assembly 50 is not required under such circumstances.
Stinger 52 is an elongate buoyant structure which has a width which is somewhat less than the aggregate width of ice channels 67 and 68 formed through ice layer 11 by operation of ice cutting mechanisms 54 and 55. The stinger has an enlarged upper end 70 and varies appropriately in cross-sectional configuration along its length so that when the stinger assembly is submerged and engaged with pipe continuum 44 as shown in FIG. 1, the buoyant forces developed by the submerged stinger are applied in the desired manner to the pipe continuum. The stinger is provided to impart support to pipe continuum 44 so that the pipe continuum, as it passes from the vehicle into the water, is not bent about a sufficiently small radius of curvature to result in kinking or other damage to the pipe continuum. The support forces applied to the pipe continuum by the stinger also assures that the bend of the continuum as it engages the bottom of trench 35 is not so sharp as to produce kinking or other damage to the pipe.
The upper portions of stinger 52 are transversely dished along the length of the stinger to provide a guide channel 71 (see FIG. along which pipe continuum 14 is passed during pipelaying operations. The interior of the stinger is hollow and preferably is subdivided by partitions 72 to prevent complete flooding of the stinger in the event that a leak should develop through the stinger structure at some localized point. As shown in FIG. 1, the upper end 70 of the stinger is secured, as by tether cables 73, to the underside of hull 14 within the perimeter of the space enclosed by skirt assembly 19. The connection of the stinger to the hull is so arranged that the pipe guide channel 71 defined in the upper portions of the stinger defines an extension of the pipe supporting surfaces of passage 47 through the hull when the pipe continuum is engaged with the stinger as shown in FIG. 1.
Stinger 52 is used during pipelaying operations whether or not the pipelaying operations are carried out on an ice layer. In the absence of ice over the intended path of the pipeline, or in the event the water is ice covered but not sufficiently to interfere with floating movement of hull 14, the hull is buoyantly supported in water 12. On the other hand, where the intended path of the pipeline is covered by a layer of ice sufficiently thick to impair or prevent floating movement of hull 14, then pipelaying operations are carried out from vehicle while the vehicle is operated at its air cushion mode. FIG. 5 illustrates that stinger 52 includes structure for maintaining an effective seal around space 20 in the vicinity of ice channel 51 during air cushion mode operation of the vehicle.
Skirt assembly 19 includes an outer sheet 75 which is connected along its upper margin 76 to the lower portions of plenum structure 17 outboard of hull 14. Outer sheet 75 also has a lower edge 77 which, during air cushion mode-operation of vehicle 10 is disposed below the bottom 16 of hull 14. The outer sheet of skirt assembly 19 preferably is held during air cushion mode operation of the vehicle in a desired relation to the structure of hull 14 by a plurality of webs 78 interconnected between the hull and the inner surfaces of outer sheet 75. Preferably, outer sheet 75 is fabricated of a fabric impregnated with a suitable material such as latex or a latex-based material to render the same impervious to the flow of air through the fabric.
A yoke member 79 is connected to stinger 52 to straddle channel 71 along which pipe continuum-44 passes during pipe-laying operations. A flap member 80, preferably fabricated of much the same material as outer sheet 75 of skirt assembly 19, is connected to the upper portion of stinger 52 in the vicinity of yoke 79. Flap 80, adjacent the location at which the pipe continuum passes through the yoke, is carried by the exterior portion of the yoke. The clearance within yoke 79 for pipe continuum 44 is relatively small so that a minimum leakage of air from space 20 through the yoke is afforded in those few operational situations where yoke 79 is not fully submerged in water 12. Flap 80 is disposed to extend into skirt assembly 19 along the inner surfaces of outer sheet for a selected distance above the lower edge 77 of the skirt assembly during air cushion mode operation of the vehicle. The increased air pressure within space 20 biases the flap into registration with the inner surfaces of skirt outer sheet 75. Preferably, the lower edge 77 of the skirt assembly is disposed in spaced relation to the proximate portions of stinger 52 during pipelaying operations while the vehicle is operated in its air cushionmode. This spacing between the stinger and the lower portions of the skirt assembly allows the stinger to move relative to the vehicle hull about the connection provided by tether cables 73, and such relative motion is accommodated by flap 81) sliding within skirt assembly 19. Preferably the extent of flap 81) transversely of the length of stinger 52 is a small amount greater than the width of channel 51 within which stinger 52 is disposed during air cushion mode operation of the vehicle. It will be apparent, herefore, that when vehicle 111 is operated in its air cushion mode during pipelaying operations, flap 8!} forms an effective seal across the upper portions of channel 51 below skirt assembly 19. In this manner, undue leakage from space 20 to the atmosphere around vehicle 10 is prevented so that blowers 22 may be oper ated to maintain an effective air cushion within space 20 for the support of hull 14.
Preferably the spacing of skirt assembly partitions 78 at the aft end of hull 14 is selected so that the partitions closest to the centerline of the hull are spaced from each other a distance greater than the extent of flap 8t) transversely of stinger 52.
FIG. 4 illustrates the manner in which vehicle 10 preferably is moved across the ice sheet during dredging and pipelaying operations. In FIG. 10, only the dredging facility is illustrated, it being understood that the pipelaying facility, which has been eliminated from FIG. 4 for the purposes of simplicity of illustration, is also present. On the other hand, the principles illustrated in FIG. 4 are applicable to movement of dredging and pipelaying platforms provided separately from each other across an ice sheet for performance of dredging or pipelaying operations, respectively. As shown in FIG. 4, a winch 81 is mounted to hull deck 15 adjacent each comer of the hull; the hull preferably is of rectangular planform configuration. Preferably each winch is disposed so that a mooring cable 82 wound upon the winch drum is conveniently led away from the hull along a line substantially parallel to a diagonal line across the hull. Each mooring cable 82 extends to an anchor point 83 affixed in ice sheet 11. The anchor points may be provided by any suitable means, as by pilings frozen into holes formedin ice sheet 11. Two rows of anchor points 83 are provided parallel to the intended path of vehicle 11) across the ice sheet and on opposite sides equidistantly from the desired path of the vehicle.
Anchor points 83 are installed in ice sheet 11 in advance of the movement of vehicle 10 across the ice sheet. The spacing of the anchor points in each parallel line of anchor points is such that the vehicle may be moved along its intended path of movement by selective reeling in and paying out of mooring cables 82 from winches 81. For example, mooring cables associated with the winches at the forward comers of vehicles 10 are reeled in while the cables extending away' along its intended path I of motion, and during such movement the platform is maintained by the cables in the desired position on the ice sheet. When the vehicle is advanced to a point at which the forward cables extend substantially transversely of the vehicle to their anchor points (such as anchor points 83' first one and then the other of the forward mooring cables are transferred to the next pair of anchor points more forwardly of the vehicle along its path of motion. The vehicle is moved still further along its path until anchor points 83 are located substantially transversely from, but slightly behind vehicle 10, at which time the aft mooring cables are removed from anchor points 83 and connected to anchor points 83. In this manner, the vehicle is moved on an air cushion support across the ice sheet while being maintained at all times securely in the desired position over the intended path of pipeline 45. Anchor points 83 left behind vehicle 10 as it moves across the ice sheet may be recoveredas desired.
This invention also provides an air cushion dredging vehicle 90. As shown in FIG. 6, vehicle 90 includes a buoyant hull 14 which carries a dredging facility 26'.
14. Air is supplied at superatmospheric pressure to space 20 via skirt assembly 19 through an air distribution plenum structure 17 in response to operation of lower end of which is connected to a dredging head 92.
The dredging head preferably is of the rotary type operated in response to the passage of water upwardly through the conductor tube by operation of pump 30. Conductor tube 91 differs from conductor tube 28, illustrated in FIG. 1, by the inclusion in its length of a flexible section 93 which preferably is disposed sufflciently below hull 14 as to be positioned below the bottom of ice sheet 11 when vehicle 90 is operated in its air cushion mode over ice. Whereas the dredging facility provided in vehicle 10 is adapted primarily for forming trench into which pipeline 45 may be laid, dredging facility 26' of vehicle 90 is adapted for general purpose dredging on a year-round basis in waters susceptible of being covered by an ice sheet of appreciable thickness. The provision of rotary dredging head 92 and flexible section 93 in dredgings tube 91 adapt dredging facility 26' to general purpose dredging operations. To adapt vehicle 90 for dredging operation through ice sheet 11, a single ice cutting mechanism 54 according to the foregoing description is carried by vehicle'90 for forming through ice sheet 11 a single channel 94 of suflicient width that conductor tube 91 and dredging head 92 may be passed through the channel.
as shown in FIG. 6, conductor tube 91 above flexible portion 93 passes through a well 29 formed through hull 14. A suitable seal 36 is provided between the hull and the conductor tube within the well for the purposes described above. Toada'pt the vehicle for dredging an area in bed formation 13 which is wider than ice channel 94, a collar 95 is secured to conductor tube 91 below flexible portion 93. A plurality of cables 96 are connected between collar 95 and a plurality of winches W 97 mounted to hull M. Preferably winches 97 are disposed in recesses 9% formed in the flat bottom 16 of bull 14 adjacent conductor tube: well 29. Preferably four winches 97 are provided in vehicle 90, and are located fore and aft, port and starboard, respectively, from the position at which the conductor tube passes v through the bottom surface of the hull. Selective operation of winches 97 to reel in or pay out cables 96 produces movement of dredging head 92 forward, rearwardly, or in either direction laterally relative to hull M. Such movement of the lower portion of dredging tube 91 is accommodated by the flexible portion of the tube below ice sheet ill.
When the submerged location to be dredged is free of an ice cover or is covered by an ice layer of insuffi shown in FIG. 6, ice cutting mechanism 54 preferably is movable between theoperative position shown in FIG. 6 and a retracted position in which the mechanism is disposed in a recess 60, preferably provided in the manner described above conceming vehicle 10.
The formation of channel 51, for'example, through ice layer 11 during pipelaying operations from vehicle 10, for example, provides a discontinuity in.the ice. Wind, wave or tidal forces acting on the ice may tend to close channel 51 around stinger 52, for example, or to further open the channel more than may be safe relative to vehicle It). Accordingly, preferred practice of the pipelaying and dredging operations through ice according to this invention includes the installation across the ice channel behind the vehicle, such as vehicle it), of means for maintaining the channel at the desired width. Preferably the channel maintaining means are provided in the form of steel bars 100 bent to resemble enlarged staples in that the end portions of the bar are bent at right angles, parallel to each other, relative to the straight central portions of the bar. The central portions of the bars have a length which exceeds the width of the channel, as initially formed, by a desired amount, and the end portions of the bars have lengths preferably at least equal to the thickness of ice layer 11. The bars are installed across the channel behind the vehicle as it moves along'its intended path at appropriate intervals along the length of the channel. The installation of the bars across the channel may be achieved by drilling holes through the ice at aligned locations along the channel and on opposite sides of the channel. The holes preferably are sized to snugly receive the end portions of the bars. The bars are then installed by inserting their end portions into corresponding ones of the aligned holes. When so installed, the bars act to inhibit opening or closing of the channel.
This invention has been described above with reference to certain presently preferred structural arrangements and operational sequencesrThose skilled in the art to which this invention pertains will readily realize that the structures illustrated in the accompanying drawings, as well as the proceduresand operations described above, may be altered or modified without departing from the scope of this invention. Accordingly, the foregoing description should not be considered as limiting this invention.
What is claimed is:
1. Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice, comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air, a pipelaying facility carried by the platform, and means carried by the platform operable for forming through an ice layer below the platform achannel through which pipe may be laid from the platform to the bed of the body of water, and wherein the means for supporting the platform on a cushion of air includes a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, and the means for forming the channel is operable through the space.
2. Apparatus according to claim 1 including a dredging facility on the platform operable for dredging through the channel a trench in the bed of the body of water for receipt of pipeline laid from the platform.
3. A method for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of dredging a trench in the bed along the path of the pipeline from a dredging operations station supported on the ice on a cushion of air, said dredging step including operation of a dredging facility which comprises a dredging head engageable with said bed and carried by a conductor tube depending from the dredging operations station, forming an open channel through the ice over the path of the pipeline and extending the conductor tube through the channel for engagement of the dredging head with said bed, laying the pipeline in the trench through the channel from a pipelaying operations station supported on the ice on a cushion of air, and installing means for inhibiting widening or narrowing of the channel proximately rearwardly adjacent the pipelaying operations station.
4. A method for laying pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of locating a pipelaying facility on a platform, forming a channel through the ice over the path along which the pipeline is to be laid, supporting the platform over the ice over the channel on a cushion of air, laying pipeline on the bed from the facility through the platform, supporting the pipeline between the bed and the platform along at least a portion of the length thereof adjacent the platform, said supporting step including providing a stinger assembly for the platform, disposing the forward end of the stinger assembly below the platform within the area of air cushion support of the platform, and coupling the stinger assembly to the platform, and installing means for inhibiting widening or narrowing of the channel proximately rearwardly adjacent the platform.
5. Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice, comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air including a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, a pipelaying facility carried by the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water, said channel forming means being operable through the space and being movable between a retracted position substantially within the platform and an operative position in which it extends into the space into operative engagement with ice below the platform.
6. Apparatus according to claim wherein the channel forming means comprises means for mechanically cutting through the ice.
7. Apparatus for laying a pipeline and the like across thebed of a body of water covered by a layer of ice, comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air and including a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to 'the space, a pipelaying facility carried by the platform, pipeline passage means through the platform from the pipelaying facility to the space, means cooperable with the pipeline disposed in the passage for preventing substantial leakage of air through the passage from the space during air cushion operation of the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water.
8. Apparatus according to claim 7 including a buoyant elongate stinger assembly engageable adjacent the platform with pipeline extending from the platform for at least partially supporting in a desired manner pipeline engaged thereby, and means for coupling the stinger assembly to the platform within said space adjacent the passage over the channel for positioning the stinger assembly in the channel.
9. Apparatus according to claim 8 including means cooperable between the stinger assembly and the skirt assembly for preventing substantial leakage of air through the channel from the space during air-cushion operation of the platform.
10. A method for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of forming an open channel through the ice over the path of the pipeline, and laying the pipeline on the bed through the channel from a pipelaying operations station supported over the ice on a cushion of air by a procedure which includes buoyantly supporting the pipeline for at least a portion of its length between the operations station and the bed by disposing a buoyant pipeline stinger assembly in the channel adjacent the operations station and by positioning the stinger assembly with its upper end below the operations station within the area of air cushion support of the station.
11. A method for laying pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of v l. locating a pipelaying facility on a platform,
2. supporting the platform over the ice on a cushion of air over the path along which the pipeline is to be laid,
3. forming a channel through the ice over the path,
4. laying pipeline on said bed from the facility through he platform and through the channel, and
3,822,558 13 M 5. supporting the pipeline between the bed and the bly below the platform within the area of air platform along at least a portion of the length rt fth 1 tr d thereof adjacent the platform by Cus Ion Suppo e p a an providing a Stinger assemby for the pipeline 0. coupling the stinger assembly to the platform. b. disposing the forward end of the stinger assem- 5 I

Claims (15)

1. Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice, comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air, a pipelaying facility carried by the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water, and wherein the means for supporting the platform on a cushion of air includes a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, and the means for forming the channel is operable through the space.
2. Apparatus according to claim 1 including a dredging facility on the platform operable for dredging through the channel a trench in the bed of the body of water for receipt of pipeline laid from the platform.
2. supporting the platform over the ice on a cushion Of air over the path along which the pipeline is to be laid,
3. forming a channel through the ice over the path,
3. A method for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of dredging a trench in the bed along the path of the pipeline from a dredging operations station supported on the ice on a cushion of air, said dredging step including operation of a dredging facility which comprises a dredging head engageable with said bed and carried by a conductor tube depending from the dredging operations station, forming an open channel through the ice over the path of the pipeline and extending the conductor tube through the channel for engagement of the dredging head with said bed, laying the pipeline in the trench through the channel from a pipelaying operations station supported on the ice on a cushion of air, and installing means for inhibiting widening or narrowing of the channel proximately rearwardly adjacent the pipelaying operations station.
4. A method for laying pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of locating a pipelaying facility on a platform, forming a channel through the ice over the path along which the pipeline is to be laid, supporting the platform over the ice over the channel on a cushion of air, laying pipeline on the bed from the facility through the platform, sUpporting the pipeline between the bed and the platform along at least a portion of the length thereof adjacent the platform, said supporting step including providing a stinger assembly for the platform, disposing the forward end of the stinger assembly below the platform within the area of air cushion support of the platform, and coupling the stinger assembly to the platform, and installing means for inhibiting widening or narrowing of the channel proximately rearwardly adjacent the platform.
4. laying pipeline on said bed from the facility through he platform and through the channel, and
5. supporting the pipeline between the bed and the platform along at least a portion of the length thereof adjacent the platform by a. providing a stinger assemby for the pipeline, b. disposing the forward end of the stinger assembly below the platform within the area of air cushion support of the platform, and c. coupling the stinger assembly to the platform.
5. Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice, comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air including a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, a pipelaying facility carried by the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water, said channel forming means being operable through the space and being movable between a retracted position substantially within the platform and an operative position in which it extends into the space into operative engagement with ice below the platform.
6. Apparatus according to claim 5 wherein the channel forming means comprises means for mechanically cutting through the ice.
7. Apparatus for laying a pipeline and the like across the bed of a body of water covered by a layer of ice, comprising a buoyant platform, means carried by the platform and operable for supporting the platform on a cushion of air and including a skirt assembly mounted to the platform for enclosing a space below the platform and means for supplying air at superatmospheric pressure to the space, a pipelaying facility carried by the platform, pipeline passage means through the platform from the pipelaying facility to the space, means cooperable with the pipeline disposed in the passage for preventing substantial leakage of air through the passage from the space during air cushion operation of the platform, and means carried by the platform operable for forming through an ice layer below the platform a channel through which pipe may be laid from the platform to the bed of the body of water.
8. Apparatus according to claim 7 including a buoyant elongate stinger assembly engageable adjacent the platform with pipeline extending from the platform for at least partially supporting in a desired manner pipeline engaged thereby, and means for coupling the stinger assembly to the platform within said space adjacent the passage over the channel for positioning the stinger assembly in the channel.
9. Apparatus according to claim 8 including means cooperable between the stinger assembly and the skirt assembly for preventing substantial leakage of air through the channel from the space during air-cushion operation of the platform.
10. A method for laying a pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of forming an open channel through the ice over the path of the pipeline, and laying the pipeline on the bed through the channel from a pipelaying operations station supported over the ice on a cushion of air by a procedure which includes buoyantly supporting the pipeline for at least a portion of its length between the operations station and the bed by disposing a buoyant pipeline stinger assembly in the channel adjacent the operations station and by positioning the stinger assembly with its upper end below the operations station within the area of air cushion support of the station.
11. A method for laying pipeline and the like across the bed of a body of water covered by a layer of ice comprising the steps of
US00276110A 1972-07-28 1972-07-28 Arctic dredging and pipelaying Expired - Lifetime US3822558A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US00276110A US3822558A (en) 1972-07-28 1972-07-28 Arctic dredging and pipelaying
CA176,491A CA978758A (en) 1972-07-28 1973-07-16 Arctic dredging and pipelaying
US462749A US3924896A (en) 1972-07-28 1974-04-22 Air cushion dredge for use in ice-covered waters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US00276110A US3822558A (en) 1972-07-28 1972-07-28 Arctic dredging and pipelaying

Publications (1)

Publication Number Publication Date
US3822558A true US3822558A (en) 1974-07-09

Family

ID=23055211

Family Applications (1)

Application Number Title Priority Date Filing Date
US00276110A Expired - Lifetime US3822558A (en) 1972-07-28 1972-07-28 Arctic dredging and pipelaying

Country Status (2)

Country Link
US (1) US3822558A (en)
CA (1) CA978758A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3927536A (en) * 1974-07-31 1975-12-23 American Tractor Equip Corp Device for burying rigid wall pipe
US3950955A (en) * 1974-02-20 1976-04-20 Banister Continental Ltd. Underwater pipelaying system
US4014180A (en) * 1975-11-21 1977-03-29 Hydro Tech International, Inc. Method for making a remote controlled sub-sea pipe connection
US4015435A (en) * 1975-01-30 1977-04-05 J. Ray Mcdermott & Co., Inc. Marine pipelaying apparatus
US4137986A (en) * 1977-06-17 1979-02-06 Sea-Log Corporation Captured air bubble arctic vehicle with ice cutters
US4497342A (en) * 1983-06-20 1985-02-05 Lockheed Missiles & Space Company, Inc. Flexible retractable cold water pipe for an ocean thermal energy conversion system
WO1987005878A1 (en) * 1981-04-10 1987-10-08 Jen Industries Incorporated Inshore submersible amphibious machines
US4713896A (en) * 1981-04-10 1987-12-22 Jennens Eric G Inshore submersible amphibious machines
NL1005824C2 (en) * 1997-04-16 1998-10-19 Allseas Group Sa Device for laying a pipeline in deep water.
US6200069B1 (en) * 1999-07-20 2001-03-13 George Austin Miller Hovercraft work platform
US20100080657A1 (en) * 2007-03-07 2010-04-01 Saipem S.P.A. Undersea pipe-laying
US20100104371A1 (en) * 2007-03-07 2010-04-29 Saipem S.P.A. Prefabrication of pipe strings on board of pipe-laying vessels
WO2014046770A1 (en) * 2012-09-19 2014-03-27 Exxonmobil Upstream Research Company Arctic walker for hydrocarbon exploration
US20150056019A1 (en) * 2013-08-23 2015-02-26 Haydar Arslan Pipeline Burial in Offshore and Arctic Offshore Regions
US10597849B2 (en) 2015-09-11 2020-03-24 Saipem S.P.A. Method and system for burying a pipeline in a bed of a body of water

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US716713A (en) * 1902-05-27 1902-12-23 Thomas Hughes Cigar-stand.
US2755632A (en) * 1952-03-14 1956-07-24 Brown & Root Submarine burying apparatus
US3438213A (en) * 1966-12-08 1969-04-15 Shell Oil Co Pipe-laying barge with adjustable pipe discharge ramp
US3462963A (en) * 1967-08-02 1969-08-26 Brown & Root Apparatus for pipelaying and trenching operations in a body of water
US3632172A (en) * 1969-07-17 1972-01-04 Dresser Ind Method of and apparatus for weakening ice for assisting an icebreaker
US3673729A (en) * 1970-07-07 1972-07-04 Ervin E Lintz Fishing float
US3681927A (en) * 1969-08-18 1972-08-08 Inst Francais Du Petrole Device for laying submarine cables and pipes in areas covered with ice

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US716713A (en) * 1902-05-27 1902-12-23 Thomas Hughes Cigar-stand.
US2755632A (en) * 1952-03-14 1956-07-24 Brown & Root Submarine burying apparatus
US3438213A (en) * 1966-12-08 1969-04-15 Shell Oil Co Pipe-laying barge with adjustable pipe discharge ramp
US3462963A (en) * 1967-08-02 1969-08-26 Brown & Root Apparatus for pipelaying and trenching operations in a body of water
US3632172A (en) * 1969-07-17 1972-01-04 Dresser Ind Method of and apparatus for weakening ice for assisting an icebreaker
US3681927A (en) * 1969-08-18 1972-08-08 Inst Francais Du Petrole Device for laying submarine cables and pipes in areas covered with ice
US3673729A (en) * 1970-07-07 1972-07-04 Ervin E Lintz Fishing float

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3950955A (en) * 1974-02-20 1976-04-20 Banister Continental Ltd. Underwater pipelaying system
US3927536A (en) * 1974-07-31 1975-12-23 American Tractor Equip Corp Device for burying rigid wall pipe
US4015435A (en) * 1975-01-30 1977-04-05 J. Ray Mcdermott & Co., Inc. Marine pipelaying apparatus
US4014180A (en) * 1975-11-21 1977-03-29 Hydro Tech International, Inc. Method for making a remote controlled sub-sea pipe connection
US4137986A (en) * 1977-06-17 1979-02-06 Sea-Log Corporation Captured air bubble arctic vehicle with ice cutters
WO1987005878A1 (en) * 1981-04-10 1987-10-08 Jen Industries Incorporated Inshore submersible amphibious machines
US4713896A (en) * 1981-04-10 1987-12-22 Jennens Eric G Inshore submersible amphibious machines
US4497342A (en) * 1983-06-20 1985-02-05 Lockheed Missiles & Space Company, Inc. Flexible retractable cold water pipe for an ocean thermal energy conversion system
GB2328996B (en) * 1997-04-16 2001-08-29 Allseas Group Sa Apparatus for laying a pipeline in deep water
WO1998046920A1 (en) * 1997-04-16 1998-10-22 Allseas Group S.A. Apparatus for laying a pipeline in deep water
GB2328996A (en) * 1997-04-16 1999-03-10 Allseas Group Sa Apparatus for laying a pipeline in deep water
NL1005824C2 (en) * 1997-04-16 1998-10-19 Allseas Group Sa Device for laying a pipeline in deep water.
US6390731B1 (en) 1997-04-16 2002-05-21 Allseas Group S.A. Apparatus for laying a pipeline in deep water
US6200069B1 (en) * 1999-07-20 2001-03-13 George Austin Miller Hovercraft work platform
US20100104371A1 (en) * 2007-03-07 2010-04-29 Saipem S.P.A. Prefabrication of pipe strings on board of pipe-laying vessels
US20100080657A1 (en) * 2007-03-07 2010-04-01 Saipem S.P.A. Undersea pipe-laying
US8777517B2 (en) 2007-03-07 2014-07-15 Saipem S.P.A. Undersea pipe-laying
US8998533B2 (en) 2007-03-07 2015-04-07 Saipem S.P.A. Prefabrication of pipe strings on board of pipe-laying vessels
WO2014046770A1 (en) * 2012-09-19 2014-03-27 Exxonmobil Upstream Research Company Arctic walker for hydrocarbon exploration
US9316092B2 (en) 2012-09-19 2016-04-19 Exxonmobil Upstream Research Company Arctic walker for hydrocarbon exploration
DK178854B1 (en) * 2012-09-19 2017-03-27 Exxonmobil Upstream Res Co Arctic Walker For Hydrocarbon Exploration
US20150056019A1 (en) * 2013-08-23 2015-02-26 Haydar Arslan Pipeline Burial in Offshore and Arctic Offshore Regions
US9388918B2 (en) * 2013-08-23 2016-07-12 Exxonmobil Upstream Research Company Pipeline burial in offshore and arctic offshore regions
US10597849B2 (en) 2015-09-11 2020-03-24 Saipem S.P.A. Method and system for burying a pipeline in a bed of a body of water

Also Published As

Publication number Publication date
CA978758A (en) 1975-12-02

Similar Documents

Publication Publication Date Title
US3822558A (en) Arctic dredging and pipelaying
US4242010A (en) Method and means for protecting a sea bottom surface and an installation on same
US8668406B2 (en) Subsea cable installation
EA021881B1 (en) System for laying underground a continuous elongated member in a bed of a body of water
US3844129A (en) Arctic pipelaying
US3924896A (en) Air cushion dredge for use in ice-covered waters
CA1156477A (en) Method and apparatus for constructing an artificial island
US3238734A (en) Apparatus for burying and recovering pipe in underwater locations
US4470720A (en) Underwater trenching & pipelaying apparatus
RU2165121C1 (en) Method and device for underwater routing of cables and polyethylene pipelines below bottom elevation of water reservoir
EP1573137B1 (en) Process and system for the installation of pipelines in shallow or very shallow water
CN112575834A (en) Self-walking cable burying machine under shallow sea water
JP2961211B2 (en) Underwater traction type sediment discharge line
US4615645A (en) Pipeline trenching
Brown et al. Submarine pipeline trenching by multipass ploughs
US4710059A (en) Method and apparatus for simultaneous trenching and pipe laying in an arctic environment
WO2002043214A9 (en) Cable installation
US3742715A (en) Protecting a structure in water covered with sheet ice
US4686919A (en) Method for constructing large-scale marine structure
Kober et al. New advances in jet-assisted plowing for the undersea cable construction industry
AU2006200517A1 (en) Trenching apparatus
Green et al. 3. The Design and Construction of Underwater Pipelines (USA)
ES2358803T3 (en) PROCEDURE AND SYSTEM FOR INSTALLING AND MAINTAINING A PIPE AT A TIME THAT MINIMIZES THE DISTURBANCE OF THE ASSOCIATED LAND.
Hetherington et al. PD 6 (4) Offshore Drilling and Production in Deep Ice Covered Waters
Hettinger et al. Cable and pipeline burial at 3,000 meters-Washington, DC September 19-23, 2005

Legal Events

Date Code Title Description
AS Assignment

Owner name: CHEMICAL BANK, A NY CORP.

Free format text: SECURITY INTEREST;ASSIGNOR:GLOBAL MARINE INC.;REEL/FRAME:005294/0214

Effective date: 19891027