US3802236A - Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills - Google Patents

Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills Download PDF

Info

Publication number
US3802236A
US3802236A US00215749A US21574972A US3802236A US 3802236 A US3802236 A US 3802236A US 00215749 A US00215749 A US 00215749A US 21574972 A US21574972 A US 21574972A US 3802236 A US3802236 A US 3802236A
Authority
US
United States
Prior art keywords
gauge
roll
roll stand
workpiece
rolling mill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00215749A
Other languages
English (en)
Inventor
A Smith
R Fox
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AEG Westinghouse Industrial Automation Corp
Original Assignee
Westinghouse Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to BE793758D priority Critical patent/BE793758A/fr
Application filed by Westinghouse Electric Corp filed Critical Westinghouse Electric Corp
Priority to US00215749A priority patent/US3802236A/en
Priority to AU50354/72A priority patent/AU456774B2/en
Priority to DE2263674A priority patent/DE2263674A1/de
Priority to CA160,395A priority patent/CA967265A/en
Priority to FR7300334A priority patent/FR2167730B1/fr
Application granted granted Critical
Publication of US3802236A publication Critical patent/US3802236A/en
Assigned to AEG WESTINGHOUSE INDUSTRIAL AUTOMATION CORPORATION reassignment AEG WESTINGHOUSE INDUSTRIAL AUTOMATION CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: WESTINGHOUSE ELECTRIC CORPORATION
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/16Control of thickness, width, diameter or other transverse dimensions

Definitions

  • a programmed computer'control system provides on line roll force gauge control for a tandem hot steel strip rolling mill.
  • An automatic gauge control system including a programmed digital computer calculates screwdown movement required for correction of determined gauge error on the basis of measured roll force and screwdown position values and on the basis of calculated gauge deviation corrections for the provided roll opening settings for the roll stands. To compensate for gauge error conditions, a gauge error correcting screwdown movement value is determined to establish the total amount of corrective screwdown movement required at any particular point in time. The control system operates the mill screwdowns in accordance with the program calculations.
  • the unloaded roll opening and the speed at each tandem mill stand or for each reversing mill pass'are set up by the operator to produce successive workpiece (strip or plate) reductions resulting in work product at the desired gauge.
  • the loaded roll opening at a stand equals the stand delivery gauge on the basis of the usually justifiable assumption that there is little or no elastic workpiece recovery.
  • a stand automatic gauge control system Since the operator provided initial setup conditions or the initial roll opening settings provided by an associated computer control system operative with model equation information to calculate the setup screwdown schedules for the rolling mill, can be in error and since in any event certain mill parameters affect the stand loaded roll opening during rolling and after setup conditions have been established, a stand automatic gauge control system must be employed if it is necessary that the stand delivery gauge be closely controlled. Thus, at the present state of the rolling mill art and particularly the steel rolling mill art, a stand gauge control system is normally used for a reversing mill stand and for predetermined stands in tandem rolling mills.
  • gaugemeter or roll force system has been widely used to produce stand gauge control in metal rolling mills and particularly in tandem hot steel strip rolling mills and reversing plate mills where experience has demonstrated that roll force control is particularly effective.
  • Earlier publications and patents such as an article entitled Installation and Operating Experience with Computer and Programmed Mill Controls by M. D. McMahon and M. A. Davis in the 1963 Iron and Steel Engineer Year Book at pages 726 to 733, an article entitled Automatic Gage Control for Modern l-Iot Strip Mills by J. W. Wallace in the December 1967 Iron and Steel Engineer at pages 75 to 86, U.S. Pat. No. 3,561,237 issued Feb. 9, 1971 to Eggers et al, and US. Pat. No. 2,726,541, issued Dec.
  • the roll force gauge control system uses Hooks law in controlling the screwdown position at a rolling stand, i.e., the loaded roll opening under workpiece rolling conditions equals the unloaded roll opening or screwdown position plus the mill spring stretch caused by the separating force applied to the rolls by the workpiece.
  • a load cell or other force detector measures the roll separating force at each controlled roll stand and the screwdown position is controlled to balance roll force changes from a reference value and thereby hold the loaded roll opening at a substantially constant value.
  • the following well known formula expresses the basic roll force gauge control relationship:
  • the roll force gauge control system is an analog arrangement including analog comparison and amplification circuitry which responds to roll force and screwdown position signals to control the screwdown position and hold-the following equality:
  • the lock-on screwdown position and the lock-on roll separating force are measured to establish what strip gauge should be maintained out of that roll stand.
  • the roll stand separating force and the roll stand screwdown position values are monitored and any undesired change in roll separating force is detected and compensated for by a corresponding correction change in screwdown position.
  • the lock-on gauge LOG is equal to the lock-on screwdown LOSD plus the lock-on force LOF multiplied by the mill stand spring modulus K.
  • the workpiece strip delivery gauge G leaving the roll stand at any time during the rolling operation is in accordance with above equation (I) and is equal to the unloaded screwdown position SD plus the rollseparating force F multiplied by the mill spring modulus K.
  • the gauge error is derived by subtracting the lock-on guage from the delivery gauge.
  • Equations 3, 4 and 5 set forth these relationships.
  • the initial screwdown position calibration is a direct electromechanical measurement technique made at the beginning of work roll life and if desired new initial calibrations are made at various subsequent time points in the work roll life.
  • the predetermined initial screwdown calibration is subject to change during mill operation and any such change-requires screwdown offset for correction of the roll force control operation.
  • calibration drift is caused by changes in roll stand heating, stand speed (bearing oil film thickness), roll wear, differential leveling operation of the screwdowns for shape control and possibly by changes in other mill conditions.
  • the actual loaded roll opening i.e. the actual gauge
  • the difference represents a gauge error condition which is correctable by a screwdown offset or, more specifically, a screwdown recalibration. If the mill spring constant'changes, the actual loaded roll opening differs from the expected value calculated with the use of a mill stretch which is based on the erroneous mill spring constant, and the resultant gauge error condition is normally similarly correctable by a screwdown offset.
  • the well known monitor gauge control system is usually employed to produce screwdown offset for the roll force controls.
  • an X-ray or other radiation gauge is placed at one or more predetermined process points and usually at least at a process point following the delivery end of the mill in order to sense actual delivery gauge after a workpiece transport delay from the point in time at which the actual delivery gauge is produced at the preceding stand or stands.
  • the monitor system compares the actual delivery gauge with the desired delivery gauge and develops an analog feedback control signal to adjust the operation of the reversing mill roll force gauge control system or one or more predetermined tandem mill stand roll force gauge control systems to supply desired steady state mill delivery gauge.
  • the conventional monitor system provides for transport delayed correction of steady state gauge errors which are caused or which are tending to be caused by a single mill variable or by a combination of mill variables.
  • a system and method for controlling a gauge in a metal rolling mill employs means for detecting at least one error condition representing gauge error and means for controlling screwdown position at each of one or more predetermined rolling stands of the mill. Means are also provided for determining the total amount of screwdown movement (position change) required to correct the error condition at predetermined mill spring constant and workpiece plasticity values.
  • roll force gauge control the roll force is detected and the determined error conditions is a gauge error.
  • a correction in relation to a gauge error or X-ray gauge deviation measured after the last roll stand which correction is for selected roll stands previous to the last roll stand.
  • This calculated correction is determined from the rolling of an initial workpiece strip for adjusting the roll opening settings of the selected roll stands before the subsequent rolling of another workpiece strip similar to that initial workpiece strip.
  • a selected number of previous roll stands are corrected while the last stand is roll force gauge controlled. This correction is determined by a mass flow relationship with the speed of the last stand and the speed of the corrected stand, the measured gauge deviation and a predetermined weighting factor.
  • a digital computer system is preferably employed to make the error correction screwdown movement determinations as well as to perform other mill control functions.
  • the computer employs a programming system including an automatic roll force gauge control program or AGC program which is executed at predetermined intervals to calculate the desired screwdown movement required at each roll force gauge controlled stand for gauge error correction including that stemming from roll force error detection at that stand. Screwdown movement for correcting roll force error is made on the basis of calculations which use selected workpiece plasticity and mill spring constant values stored in data tables in the computer system memory or otherwise determined by the computer system.
  • FIG. 1 shows a schematic diagram of a tandem hot steel strip rolling mill and a digital computer system au tomatic gauge control therefor arranged for operation in accordance with the principles of the invention
  • FIG. 2 illustrates a mill spring curve and a workpiece reduction curve for a given rolling mill stand and the manner in which roll force screwdown correction is determined in relation to a change in the stand load force;
  • FIG. 3 illustrates a mill spring cruve and a workpiece reduction curve for a given rolling mill stand and the manner in which roll force screwdown correction is determined in relation to a change in both the stand load force and the stand screwdown position setting;
  • FIG. 4 shows an illustrative mill stand deflection curve and product deformation curve to show the required screw movement to correct a determined gauge error
  • FIG. 5 shows a graphic representation of typical PW plasticity values, such as could be included in the use table as loaded into the computer control system memory or such as could be included in the adaptive table.
  • FIGS. 6A, 6B and 6C show an illustrative logic flow chart of an AGC program operative with a tandem hot strip rolling mill
  • FIGS. 7A and 7B show an illustrative logic flow chart of an X-ray routine program operative with the AGC program shown in FIGS. 6A, 6B and 6C;
  • FIG. 8 shows an illustrative logic flow chart of a feed forward routine program operative with the above AGC program shown in FIGS. 6A, 6B and 6C;
  • FIG. 9 shows an illustrative logic flow chart of a feedback routine program operative with the AGC program shown in FIGS. 6A, 6B and 6C;
  • FIG. 10 shows an illustrative logic flow chart of the adaptive routine program operative with the X-ray routine program shown in FIGS. 7A and 7B;
  • FIG. 11 shows an illustrative logic flow chart of the head end routine program operative with the X-ray routine program shown in FIGS. 7A and 78.
  • FIG. 1 a tandem hot strip steel finishing mill ll operated with improved gauge control performance by a process control system 13 in accordance with the principles of the invention.
  • the invention is applicable to various types of mills in which roll force gauge control is employed.
  • the invention can be suitably adapted for application in hot steel plate reversing and other rolling mills.
  • the tandem mill 11 includes a series of reduction rolling stands with only two of the stands S1 and S6 shown.
  • a workpiece 15 enters the mill 11 at the entry end in the form of a bar and it is elongated as it is transported through the successive stands to the delivery end of the mill where it is coiled as a strip on a downcoiler 17.
  • the entry bar would be of known steel grade and it typically would have a thickness of about 1 inch and a width within some limited range such as 20 inches to inches.
  • the delivered strip would usually have approximately the same width and a thickness based upon the production order for which it is intended.
  • the successive stands operate at successively higher speeds to maintain proper workpiece mass flow.
  • Each stand produces a predetermined reduction or draft such that the total mill draft reduces the entry bar to strip with the desired gauge or thickness.
  • Each stand is conventionally provided with a pair of backup rolls l9 and 21 and a pair of work rolls 23 and 25 between which the workpiece 15 is passed.
  • a large DC drive motor 27 is controllably energized at each stand to drive the corresponding work rolls at a controlled speed.
  • the sum of the unloaded work roll opening and the mill stretch substantially defines the workpiece gauge delivered from any particular stand in accordance with Hookes law.
  • a pair of screwdown motors 29 (only one shown at each stand) position respective screwdowns 31 (only one shown at each stand) which clamp against opposite ends of the backup rolls and thereby apply pressure to the work rolls.
  • the two screwdowns 31 at a particular stand would be in identical positions, but they can be located in different positions for strip guidance during threading, for flatness or other strip shape control purposes or possibly for other purposes.
  • a conventional screwdown position detector or encoder provides an electrical representation of screwdown position at each srand.
  • a screwdown position detection system which includes the screwdown position detector 33 can be calibrated from time to time in the manner previously described.
  • Roll force detection is provided at each of predetermined stands by a conventional load cell 35 which generates an electrical analog signal.
  • each roll force controlled stand is provided with a load cell 35 and in many cases stands without roll force gauge control would also be equipped with load cells.
  • the number of stands to which roll force gauge control is applied is predetermined during the mill design in accordance with cost-performance standards, and increasingly there is a tendency to apply roll force gauge control to all of the stands in a tandem hot strip steel mill. In the present case, a roll force gauge control system is assumed to be employed at each of the stands.
  • Conventional motorized sideguards 37 are located at predetermined points along the mill length. The sideguards 37 are operated during mill setup on the basis of the widths of the upcoming workpiece 15 thereby defining the sides of the workpiece travel path for guidance purposes.
  • the process control system 13 provides automatic control for the operation of the tandem mill 11 as well as may be desired for associated production processes (not indicated) such as the operation of a roughing mill.
  • the process control system 13 comprises a programmed process control digital computer system 39 which is interfaced with the varoius mill sensors and the various mill control devices to provide control over many of the various functions involved in operating the tandem mill 11.
  • the control system 13 can also include conventional manual and/or automatic analog controls for backup operation in performing preselected mill functions.
  • the digital computer system 39 includes a finishing mill on-line roll force gauge control computer system, such as a Prodac 2000 (P2000) sold by Westinghouse Electric Corporation.
  • P2000 Prodac 2000
  • a descriptive book entitled Prodac 2000 Computer Systems Reference Manual has been published in 1970 by Westinghouse Electric Corporation and made available for the purpose of describing in greater detail this computer system and its operation.
  • the computer processor is associated with well known predetermined input systems typically including a conventional contact closure input system which scans contact or other signals representing the status of various process conditions, a conventional analog input system which scans and converts process analog signals, and operator controlled and other information input devices and systems 41 such as paper tape teletypewriter and dial input systems.
  • information input devices 41 are generally indicated by a single block in FIG. 1 although different input devices can and typically would be associated with the computer system 39.
  • Various kinds of information are entered into the computer system 39 through the input devices 41 including, for example, desired strip delivery gauge and temperature, strip entry gauge and width and temperature (by entry detectors if desired), grade of steel being rolled, plasticity tables, hardware oriented programs and control programs for the programming system, and so forth.
  • the contact closure input systems and the analog input systems interface the computer system 39 with the processes through the medium of measured or detected variables.
  • the present invention is largely involved in the functioning of the automatic gauge control computer system, hereinafter referred to as the AGC computer.
  • various mill signals are applied to the AGC computer input systems. These mill signals include the following:
  • a roll force signal from the load cell 35 at each stand proportional to stand roll separating force for use in roll force gauge control.
  • the measured head end roll force is stored and used as a reference for roll force gauge control functioning at the respective stands if the AGC computer is in the lock-on mode of roll force operation.
  • a contact closure output system would normally be associated with the digital computer system 39.
  • various control devices are operated in response to control actions calculated or determined by execution of control programs in the AGC computer.
  • controlled devices are operated directly by means of output system contact closures or by means of analog signals derived from output system contact closures through a digital to analog converter.
  • the principal control action outputs from the AGC computer contact closure output system include screwdown positioning commands which are applied to respective screwdown positioning controls 55 in operating the screwdown motors 29 for screw movement, and speed control signals which are applied to the respective speed and tension control system 53 to cause a change in drive speed to compensate the force on the strip for a change in thickness being made by a screwdown movement.
  • Display and printout systems 51 such as numeral display, tape punch, and teletypewriter systems are also associated with the outputs of the digital computer system 39 in order to keep the mil-l operator generally informed about the mill operation and in order to signal the operator regarding an event or alarm condition which may require some action on his part.
  • the printout systems are also used to log mill data according to computer log program direction.
  • the AGC computer uses Hookes law to determine the total amount of screwdown movement required at each roll force controlled stand at the calculating point in time for roll force and gauge error correction, i.e., for loaded roll opening and stand delivery gauge correction to the desired value.
  • the calculation defines the total change in the unloaded roll opening required to offset a new mill stretch value or other roll force and gauge error causing condition.
  • the predicted corrective screwdown position change value is employed in a screwdown position control program in the AGC computer to define the screwdown motor position-time profile to be followed in making the corrective screwdown movement.
  • the on line gauge control system operates the stands to produce strip product having desired gauge and proper shape, i.e., flat with slight crown.
  • On line gauge control is produced by the roll force gauge control loops at the stands and the previously noted screwdown monitor gauge control system.
  • the X-ray gauge 47 produces the previously indicated X-ray deviation signal which indicates the difference between actual strip delivery thickness and desired or target strip delivery thickness. In other cases, it may be desirable to employ an absolute thickness measurement X-ray gauge signal to form a basis for monitor control actions or, more generally, for screwdown offset control actions.
  • the programmed AGC computer system operates on the screwdown position detector and load cell signals from each stand as well as the X-ray gauge deviation signal to determine the control actions required for producing desired strip delivery gauge. Screwdown motor speed is in this instance also applied to the computer system 39 in order to provide for programmed screwdown positioning control.
  • the AGC computer employs an AGC. programming system which forms a part of the total programming system for the computer system 39.
  • the AGC programming system includes programs oriented to controlling the AGC computer system hardware and programs oriented to developing the control actions.
  • a mill spring curve defines the separation between a pair of mill stand work rolls as a function of separating force and as a function of screwdown position.
  • the slope of the mill spring curve is the well known mill spring constant K which is subject to variation as previously described.
  • the indicated theoretical face intersect represents theoretical roll facing and it is for this theoretical condition that the screwdown position is assigned to a zero value.
  • roll facing actually occurs when the screwdown position is at a slightly negative value because of the nonlinearity of the lower part of the mill spring curve.
  • a definition of the screwdown calibration as being correct for the indicated theoretical condition is, however, convenient and appropriate for mill operation.
  • the stand workpiece delivery gauge equals the unloaded roll opening as defined by the screwdown position S plus the mill stretch caused by the workpiece. If the screwdown calibration is incorrect, i.e., if the number assigned to the theoretical roll facing screwdown position is something other than zero because of roll crown wear or other causes,
  • the stand workpiece delivery gauge equals the unloaded roll opening plus the mill stretch plus or minus the calibration drift.
  • the amount of mill stretch depends on the characteristic reduction curve for the workpiece.
  • a reduction curve 65 for a strip of predetermined width represents the amount of force required to reduce the workpiece from a stand entry thickness (height) of H
  • the workpiece plasticity P is the slope of the curve 65, and in this case the curve is shown as being linear although a small-amount of nonlinearity would normally exist.
  • Desired workpiece gauge H is the initial condition IC produced in this case since the amount of force required to reduce the workpiece from H to H is equal to the amount of roll separating force required to stretch the rolls to a loaded roll opening H i.e., the intersection of the mill spring curve at an initial screwdown opening S indicated by mill spring curve 67 and the workpiece reduction curve 65 lies at the desired gauge value.
  • the force error FE and the related gauge error GE must not only take into consideration the change in force from the initial value F but also the change in screwdown from the initial position S
  • the correction required in the screwdown position is A S to produce the desired gauge H and the new screwdown position S is o o A SRF where: S, is the present unloaded screwdown position A S is the required correction in the screwdown position.
  • a S is calculated to enable roll force gauge control operation in accordance with the following programmed algorithm:
  • Equation 7 is derived with reference to FIG. 3 as follows:
  • Equation 12 defines the difference between the present roll force F and the reference roll force F (either lock on or absolute as predetermined) in relation to the stand mill spring constant and subtracts from that difference the amount of change in roll force caused by screwdown movement made to correct previous roll force error.
  • S S in Equation l2 but in general 8,, would typically have some value other t hari S as shown in FIG. 3.
  • Corrective screwdown movement in the predicted amount produces further roll force change and FE becomes zero if the system behavior corresponds to predictions and if no new roll force error develops during the period of correction. If the system does not behave as predicted, FE does not become zero and in efiect a new roll force error PE is generated to the extent that the executed screwdown movement in the predicted amount fails to correct the stand delivery gauge.
  • each stand spring constant K is relatively accurately known. It is first determined by the conventional work roll screwdown test, and it is recalculated prior to each workpiece pass on the basis of the workpiece width and the backup roll diameter. Each resultant spring curve 61 is stored for on line gauge control use.
  • the form in which the spring constant K is stored can vary.
  • the slope of the linear part of the spring curve is stored as a single value.
  • the nonlinear part of the spring curve is estimated by three straight lines of increasing slope with the respective slopes stored as three separate spring constant values which are corresponding force range.
  • the operative value of the workpiece plasticity P at each stand is also relatively accurately determined, in the present case, P tables are stored in the computer system 39 to identify the various values of P which apply to the various mill stands for various grade class and gauge class workpiecesunder various operating conditions and at various operating times during the rolling of the strip 14.
  • the plasticity values are stored in the table as a plasticity for a product with a width of unity, typically in inches/l0 pounds/in wide.
  • the values in the table, PW are divided by the width of the product being rolled to obtain the appropriate value.
  • Hot strip mill gauge control using programmed digital computer evaluation of the roll force feedback information involves the combination of a number of process control operations. Roll force, screw position, and mill spring information is used to evaluate the gauge of the strip as it is worked in each stand, and an X-ray gauge is used on the strip as it passes out of the last stand to evaluate the absolute strip gauge produced by the rolling mill.
  • a multi-stand and continuous hot strip mill requires a gauge control system to maintain uniform gauge.
  • a hot strip mill will roll a single strip simultaneously in all of its stands. Therefore the gauge control system used with the mill should be able to determine gauge errors leaving each of the stands as quickly as possible, and it should be able to make corrections to those gauge errors in as many stands as may be necessary.
  • X-ray gauge measuring devices should be placed after each roll stand; they are accurate, but they are expensive, difficult to maintain, and can only detect errors after the workpiece strip has passed the provided distance between the associated roll stand and the subsequent gauge measuring X-ray device.
  • the roll force gauge error detection system is much less expensive, and can be more easily implemented in all roll stands; it detects errors in the workpiece strip gauge as the strip is still passing between the rolls, thereby allowing more immediate evaluation of required corrections to the roll stand screwdown position setting.
  • the roll force system provides only a relative evaluation of the strip gauge, since it measures how much the strip gauge has deviated from the gauge of the head end portion of the strip.
  • a practical combination of the above two gauge error detection systems is to use roll force feedback information to calculate fast desired corrections to errors in strip gauge, and to use one X-ray gauge measuring device after the last roll stand to evaluate the absolute gauge of the strip coming out of the last stand.
  • the fast corrections are calculated from the roll force feedback information, combined with the detected stand screwdown position and the predetermined modulus of elasticity of the rolling stand.
  • the slower X-ray device gauge error evaluation is used to calculate simultaneous monitor corrections to several stands so that the absolute value of the strip gauge leaving the rolling mill may be brought to the desired value.
  • the output of each of these systems is a screwdown correction gauge in the respective positions of the screwdowns of each of the stands.
  • FIG. 2 shows the linear approximations of the mill deflection curve 67 and the product deformation curve 65 for a typical rolling mill stand operation.
  • the unloaded roll opening S' sometimes called the screwdown because of the screw and nut system used for adjusting the roll opening, is the strip gauge that would be delivered if there were no roll separating force.
  • the delivery strip gauge increases, since the mill stand stretches or deflects. This is shown by the line 67 with slope K.
  • the product deformation characteristic is represented by the line 65 with slope P. If there were no force exerted by the roll stand on the product being rolled, the strip gauge would not be reduced and the delivery strip gauge would be equal to the entry strip gauge. If the roll force is caused to increase, the product is plastically deformed and the delivery strip gauge decreases.
  • the slope of the mill characteristic line 67 is called the mill spring modulus K
  • the slope of the product deformation characteristic line 65 is called the product plasticity P.
  • the delivery strip gauge is determined by the equilibrium point IC where the force exerted by the mill stand is equal to the force required to deform the product. Changes in workpiece strip entry gauge and/or changes in product hardness result in a change in stand roll force and delivery strip gauge.
  • the gauge error correcting control system must move the screwdown to correct for these resulting error changes in strip gauge.
  • the main advantage of using the roll force gauge control system is the ability to detect error changes in strip gauge the instant they take place as the product is being rolled in the roll stand.
  • a shift in strip delivery gauge or thickness can be caused by a change in entry thickness, or a change in hardness as usually caused by a change in temperature. This change in delivery gauge can be immediately detected by feedback information monitoring of the roll separating force on the roll stand.
  • FIG. 3 illustrates the operation of a gauge error detection system, with the mill spring line 67 and product plasticity line 65 representing the initial lock-on condition of operation and the mill spring line 63 and plasticity line 69 representing the future condition.
  • the screwdown system has moved in the closing direction and the roll separating force has increased because of a harder cold portion of the workpiece strip passing through the roll stand.
  • the required gauge error correction in screwdown position is not only dependent on the strip gauge error but also on the stand mill spring modulus and the product plasticity values.
  • FIG. 3 there is illustrated how the gauge error GE is removed by a screwdown correction A S
  • the screwdown correction A S is larger than and approximately twice the size of the gauge error GE, since this correction operation will actually result in an increase in stand roll force because of the greater reduction taken.
  • Relatively soft workpiece strip products require a screw correction A S very nearly the same as the gauge error GE but relatively hard products require a larger correction compared to the gauge error.
  • the necessary screwdown movement A S to correct a determined gauge error is determined as follows in relation to FIG. 4.
  • the screwdown correction A S can be determined by the realtionship:
  • I X is the amount of roll opening change and hence strip delivery gauge change due to the stretch of the roll stand GE is the gauge error.
  • the roll stand stretch X can be determined by the relationship:
  • a F is shown in FIG. 4 and is the change in roll force when the gauge error GE is corrected.
  • FIG. 4 shows a graphic representation of typical PW values stored for a seven stand tandem hot strip mill.
  • the six sets of values cover the range of thicknesses rolled from 0.050 inches to- 0.250 inches. This could be an illustration of a use table as loaded by the operator into the computer storage memory or it could be an illustration of a learned table provided by the adaptive program.
  • the main roll force AGC program as illustrated by the flowchart shown in FIG. 6, and the associated X-ray monitor program, as illustrated by the flowchart shown in FIG. 7, occupy the same task priority level, with both programs being initiated by the well known analog input signal scan operation.
  • the roll force AGC program operationally maintains a constant workpiece gauge based on the initial mill setup parameters provided by the operator, while the X-ray program backs up the roll force AGC control by monitoring the final product gauge and making desired adaptive corrections as needed.
  • the roll force AGC program corrects deviations from the initial or head end exit gauge of each stand, by adjusting the screw opening of the stand.
  • a deviation in the exit gauge of a stand from its initial or head end lock-on value is reflected in a sensed change in the roll force of the stand from its initial value.
  • a gauge error correction to the screw opening is determined and made by adjusting the screwdown position of the respective roll stand.
  • the main AGC program also includes a subroutine for making corrections to a stands entry gauge by feed- 7 ing back determined gauge error under specified conditions to the screw opening of the previous stand, this feedback program subroutine is illustrated by the flowstand can help with this desired gauge error correction needed in relation to the operation of that given stand.
  • FIGS. 6, 7 and 8 are written in an effort to be substantially self-explanatory to persons skilled in this particular art, with the functions to be performed at each step of the flow charts being set forth accordingly.
  • FIGS. 6A, 6B and 6C there is shown a flow chart to illustrate a preferred embodiment of a suitable AGC program operative with a tandem hot strip rolling mill.
  • a determination is made to see if the automatic gauge control or AGC program has been selected and desired by the operator to be functional.
  • the AGC program is run shortly after the head end of a workpiece strip has entered that standsof the rolling mill, and for each roll stand the initial lock-on roll force,
  • lock-on speed and lock-on screwdown position setting is measured and saved in memory storage.
  • a determination is made to see if this particular scan is not an X-ran scan; for a typical rolling mill installation, there may be seven roll stands to be scanned plus a scan of the X-ray device located after the last roll stand in relation to the provision of analog input signals to be scanned by the digital computer system.
  • This step 12 procedure relates to the organization of the analog signal inputs; if this is an X-ray input signal scan, the program goes to the X-ray subroutine at step 14, and if this is not an X-ray scan and instead this is an AGC program run in relation to one of the drive stands the program goes to step 16 to determine if roll force has been selected by the operator for this stand, i.e., stand N, where N can be each one of the roll stands in sequence. Step 18 is provided to see if automatic scan has been selected by the operator for this stand. Each of steps 16 and 18 must be satisfied, or the program goes to step 20 for reset of a head end software flag and to step 22 for turn-off of the AGC light for that stand on the operators control panel.
  • the operator has a roll force select switchby which he initiates the roll force AGC program operation.
  • a determination is made to see if the screwdown positioning mechanisms for this stand have been calibrated. lf they have, at step 26 the program checks to see that the workpiece strip is in this stand, and at step 28 to see if this is the first scan made on this particular strip. Each of these conditions has to be satisfied for the AGC program to run through for this stand as desired. For the first scan on this strip, the measured lock on force for this stand, the lock on speed and the lock on screwdown position is saved at step 30, since these parameter values will be later needed for control purposes.
  • the measured lock on roll force for this stand is used with a predetermined look-up table of mill spring modulus values provided in'storage, in relation to the well known nonlinear mill spring characteristic for a typical roll stand, to determine the value of the mill spring modulus K to use for subsequent calculations in relation to the lock on operation of this stand.
  • the upper portion of the mill spring characteristic curve is well known by persons skilled in this art to be substantially linear as shown in FIGS. 2 and 3 above an initial lower portion for the typical roll stand and in accordance with the disclosure of U.S. Pat. No. 2,726,541 of R. B. Sims.
  • the stand mill spring modulus K is corrected in relation to the known width of the workpiece strip.
  • the exit gauge class for this stand is determined, such that at step 38 an adaptive learned look-up table operation will provide the average plasticity PW for this gauge class.
  • the plasticity constant P is calculated in relation to this determined average value PW divided by the known width of the workpiece strip.
  • the desired hardness correction in relation to known grade of the strip being rolled is determined by a predetermined table look-up operation with operator provided values of same.
  • the plasticity P for this stand is corrected for hardness.
  • step 46 the stand screw position is read. It should be noted that if the present scan was not the first scan on this particular strip at step 28, the program then went to step 46, through NOT HEAD which is referenced in the program listing operative with the digital computer.
  • step 48 if the stand load cell is ON, the strip gauge error is calculated at step S0 in accordance with above Equation 13.
  • the desired screw position correction A Sap is calculated in accordance with above equation 11.
  • step 54 a check is made to see if the desired screw correction A S is greater than an operator determined minimum response deadband value; if this screw correction is not greater than this deadband value, at step 56 it is made zero, and is this screw correction is greater than the deadband, at step 58 the running average gauge error is calculated.
  • step 60 if the screw correction is not within the operator defined maximum correction limits, the program advances to step 62 where the screw condition is set to equal that maximum correction limit and the feed forward subroutine is entered by step 64 to feed forward some of the needed gauge error correction from the stand to the later stands of the rolling mill.
  • step 66 a check is made to see if a feed forward correction from a previous stand is approaching this stand, such as would happen in relation to a skidmark. if it is, a determination is made at step 68 if the skidmark is about to

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)
US00215749A 1972-01-06 1972-01-06 Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills Expired - Lifetime US3802236A (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
BE793758D BE793758A (fr) 1972-01-06 Procede et appareil de commande de calibre comprenant la correction d'ecart de calibre de piece travaillee pour laminoirs de metaux
US00215749A US3802236A (en) 1972-01-06 1972-01-06 Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills
AU50354/72A AU456774B2 (en) 1972-01-06 1972-12-21 Improvements in or relating to gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills
DE2263674A DE2263674A1 (de) 1972-01-06 1972-12-27 Verfahren zur herstellung von bandfoermigem walzgut unter verwendung eines rechners
CA160,395A CA967265A (en) 1972-01-06 1973-01-02 Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills
FR7300334A FR2167730B1 (fr) 1972-01-06 1973-01-05

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US00215749A US3802236A (en) 1972-01-06 1972-01-06 Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills

Publications (1)

Publication Number Publication Date
US3802236A true US3802236A (en) 1974-04-09

Family

ID=22804231

Family Applications (1)

Application Number Title Priority Date Filing Date
US00215749A Expired - Lifetime US3802236A (en) 1972-01-06 1972-01-06 Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills

Country Status (6)

Country Link
US (1) US3802236A (fr)
AU (1) AU456774B2 (fr)
BE (1) BE793758A (fr)
CA (1) CA967265A (fr)
DE (1) DE2263674A1 (fr)
FR (1) FR2167730B1 (fr)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3906764A (en) * 1974-11-08 1975-09-23 Bethlehem Steel Corp Rolling mill control method and apparatus
US3961509A (en) * 1974-05-21 1976-06-08 Vereinigte Flugtechnische Werke-Fokker Gesellschaft Mit Beschrankter Haftung Roll gap control
US4428054A (en) 1979-11-05 1984-01-24 Kawasaki Steel Corporation Automatic control methods and devices for rolling hills
US4845969A (en) * 1981-09-30 1989-07-11 Mitsubishi Denki Kabushiki Kaisha Dimension control device for continuous rolling machine
US20100192654A1 (en) * 2007-09-20 2010-08-05 Toshiba Mitsubishii-Electric Industrial Systems Corporation Gauge control apparatus
US20120253502A1 (en) * 2011-03-28 2012-10-04 Markus Holm Method Of Flatness Control Of A Strip And A Control System Therefor
CN102858475A (zh) * 2010-04-21 2013-01-02 东芝三菱电机产业系统株式会社 板厚控制装置、板厚控制方法、板厚控制程序

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60244413A (ja) * 1984-05-16 1985-12-04 Mitsubishi Electric Corp 連続圧延機における負荷配分制御方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3186201A (en) * 1961-06-21 1965-06-01 Steelworks Automation Ltd Production of metal strip
US3186200A (en) * 1961-10-31 1965-06-01 Gen Electric Automatic thickness regulator for strip rolling mills
US3232084A (en) * 1961-04-13 1966-02-01 Davy & United Eng Co Ltd Mill control systems
US3332263A (en) * 1963-12-10 1967-07-25 Gen Electric Computer control system for metals rolling mill
US3552162A (en) * 1968-04-22 1971-01-05 Bethlehem Steel Corp Rolling mill control system
US3568637A (en) * 1968-05-13 1971-03-09 Westinghouse Electric Corp Tandem mill force feed forward adaptive system
US3574280A (en) * 1968-11-12 1971-04-13 Westinghouse Electric Corp Predictive gauge control method and apparatus with adaptive plasticity determination for metal rolling mills
US3631697A (en) * 1969-08-25 1972-01-04 Westinghouse Electric Corp Rolling mill workpiece delivery thickness control

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3232084A (en) * 1961-04-13 1966-02-01 Davy & United Eng Co Ltd Mill control systems
US3186201A (en) * 1961-06-21 1965-06-01 Steelworks Automation Ltd Production of metal strip
US3186200A (en) * 1961-10-31 1965-06-01 Gen Electric Automatic thickness regulator for strip rolling mills
US3332263A (en) * 1963-12-10 1967-07-25 Gen Electric Computer control system for metals rolling mill
US3552162A (en) * 1968-04-22 1971-01-05 Bethlehem Steel Corp Rolling mill control system
US3568637A (en) * 1968-05-13 1971-03-09 Westinghouse Electric Corp Tandem mill force feed forward adaptive system
US3574280A (en) * 1968-11-12 1971-04-13 Westinghouse Electric Corp Predictive gauge control method and apparatus with adaptive plasticity determination for metal rolling mills
US3631697A (en) * 1969-08-25 1972-01-04 Westinghouse Electric Corp Rolling mill workpiece delivery thickness control

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3961509A (en) * 1974-05-21 1976-06-08 Vereinigte Flugtechnische Werke-Fokker Gesellschaft Mit Beschrankter Haftung Roll gap control
US3906764A (en) * 1974-11-08 1975-09-23 Bethlehem Steel Corp Rolling mill control method and apparatus
US4428054A (en) 1979-11-05 1984-01-24 Kawasaki Steel Corporation Automatic control methods and devices for rolling hills
US4845969A (en) * 1981-09-30 1989-07-11 Mitsubishi Denki Kabushiki Kaisha Dimension control device for continuous rolling machine
US20100192654A1 (en) * 2007-09-20 2010-08-05 Toshiba Mitsubishii-Electric Industrial Systems Corporation Gauge control apparatus
US8307678B2 (en) * 2007-09-20 2012-11-13 Toshiba Mitsubishi-Electric Industrial Systems Corporation Gauge control apparatus
CN102858475A (zh) * 2010-04-21 2013-01-02 东芝三菱电机产业系统株式会社 板厚控制装置、板厚控制方法、板厚控制程序
CN102858475B (zh) * 2010-04-21 2015-11-25 东芝三菱电机产业系统株式会社 板厚控制装置、板厚控制方法、板厚控制程序
US20120253502A1 (en) * 2011-03-28 2012-10-04 Markus Holm Method Of Flatness Control Of A Strip And A Control System Therefor
US9399245B2 (en) * 2011-03-28 2016-07-26 Abb Research Ltd. Method of flatness control of a strip and a control system therefor
TWI561947B (en) * 2011-03-28 2016-12-11 Abb Research Ltd Method of flatness control of a strip and a control system therefor

Also Published As

Publication number Publication date
AU456774B2 (en) 1974-12-09
DE2263674A1 (de) 1973-07-19
FR2167730A1 (fr) 1973-08-24
CA967265A (en) 1975-05-06
FR2167730B1 (fr) 1980-03-28
BE793758A (fr) 1973-07-09
AU5035472A (en) 1974-06-27

Similar Documents

Publication Publication Date Title
US3574280A (en) Predictive gauge control method and apparatus with adaptive plasticity determination for metal rolling mills
US3694636A (en) Digital computer process control with operational learning procedure
US3561237A (en) Predictive gauge control method and apparatus for metal rolling mills
US3574279A (en) Predictive gauge control method and apparatus with automatic plasticity determination for metal rolling mills
US3802236A (en) Gauge control method and apparatus including workpiece gauge deviation correction for metal rolling mills
US3934438A (en) Method of long-edge shape control for tandem rolling mill
US3841123A (en) Rolling mill gauge control method and apparatus including entry gauge correction
US3938360A (en) Shape control method and system for a rolling mill
US3977223A (en) Hot strip mill tension control
GB2118332A (en) Automatic plate thickness control device for a rolling mill
US3733866A (en) Method of controlling a continuous hot rolling mill
US3820366A (en) Rolling mill gauge control method and apparatus including temperatureand hardness correction
US3702071A (en) Gauge control method and apparatus for metal rolling mills
US3600920A (en) Screwdown offset system and method for improved gauge control
US3851509A (en) Rolling mill gauge control method and apparatus including speed correction
US3802235A (en) Rolling mill gauge control method and apparatus including x-ray correction
US3610005A (en) Roll positioning system calibration method and apparatus
US4483165A (en) Gauge control method and apparatus for multi-roll rolling mill
US4220025A (en) Feed forward automatic thickness controlling method
US4907434A (en) Method and device for controlling strip thickness in rolling mills
US3592030A (en) Rolling mill stand screwdown position control
US3892112A (en) Rolling mill gauge control
US3404550A (en) Workpiece shape and thickness control
US3798941A (en) Rolling mill gauge control method and apparatus including plasticity determination
US3841122A (en) Rolling mill gauge control method and apparatus including feedback correction

Legal Events

Date Code Title Description
AS Assignment

Owner name: AEG WESTINGHOUSE INDUSTRIAL AUTOMATION CORPORATION

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:WESTINGHOUSE ELECTRIC CORPORATION;REEL/FRAME:005424/0551

Effective date: 19900313