US3766874A - Moored barge for arctic offshore oil drilling - Google Patents

Moored barge for arctic offshore oil drilling Download PDF

Info

Publication number
US3766874A
US3766874A US00167296A US3766874DA US3766874A US 3766874 A US3766874 A US 3766874A US 00167296 A US00167296 A US 00167296A US 3766874D A US3766874D A US 3766874DA US 3766874 A US3766874 A US 3766874A
Authority
US
United States
Prior art keywords
hull
ice
barge
rig
oil drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00167296A
Inventor
J Helm
R West
V Malcolm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Dynamics Corp
Original Assignee
General Dynamics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Dynamics Corp filed Critical General Dynamics Corp
Application granted granted Critical
Publication of US3766874A publication Critical patent/US3766874A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/08Ice-breakers or other vessels or floating structures for operation in ice-infested waters; Ice-breakers, or other vessels or floating structures having equipment specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2211/00Applications
    • B63B2211/06Operation in ice-infested waters

Definitions

  • ABSTRACT A'barge is provided for offshore oiltdrilling in Arctic waters.
  • the barge is formed of two frusto-conical sections (with the points of the extended cones being pointed downward) with the lower section being steeper than the upper section.
  • the angle of the upper cone serves to break ice impinging on the hull by riding up and breaking ice in bending.
  • the hull is moored by lines connected at the line of joinder between the two conical sections, which is below the waterline.
  • the present invention is concerned with oil drilling in offshore areas which are normally covered over by ice and in particular with a barge capable of withstanding the destructive forces of the ice, and barge mooring system which extends the station keeping ability in heavy moving ice concentrations.
  • Oil drilling rigs have long been in existence which were capable of maneuvering a drill and pipe from the surface of the water down to the sea bottom and drilling from there down to the place where oil may be found. So long as the environment which .the rig was exposed to was no more hostile than sea waves, the structure of the rig could be constructed from any one of a number of suitable types for comparatively shallow areas. A rig which actually sat on the bottom and extended above the surface of the water was useful. For deeper depth, a floating rig moored in place by conventional means was useful and needed only to be made less sensitive to and resistant against the forces of waves.
  • the offshore area is covered with up to several feet of ice for most of the year.
  • the ice which may be up to twelve feet thick, is as capable of crushing the side of a conventional oil drilling rig as it is capable of crushing the side of a conventional ocean vessel.
  • a movement of the ice around the rig would sever any mooring system which attempted to connectthe deck of the rig to the sea bottom.
  • the present invention solves theseand other prob lems of the prior art by the provision of a floating conical structure in which'the cone hull shape is upright, in that the points of the conic sections, if extended, would point downward, rather than upward as in the Gerwick Foundation.
  • This Arctic Drift Barge in an unmoored state, was designed to be able to drift in the Arctic ice pack without damage from ice.
  • a mooring system is provided for the hull at a point below the level of the ice. Means are also provided for attaching this mooring system to l the hull on location. Because of the connection of the hull substantially below the ice level, the mooring system itself is not subjected to severe hazard from ice.
  • FIG. 1 shows a pictorial representation of the arctic drilling rig of the present invention with a ship in the process of mooring the hull.
  • FIG. 2 is a vertical cross-sectional view of the drilling
  • FIG. 3 is a top view of the deckof the drilling rig.
  • FIG. 4 is a cross-sectional view of the drilling rig taken along lines 4-4 in FIG. 2.
  • FIG. 5 is a cross-sectional view of the drilling rig taken along lines 5-5 in FIG. 2.
  • FIG. 6 is a cross-sectional view, of the drilling rig taken along lines 6-,6 in FIG. 2.
  • FIG. '7 shows an inflatable device used as a portion of the system for attaching the mooring on site.
  • FIG. 8 is a diagrammatic representation of the device in FIG. 7 being used to moor the hull of the drilling rig.
  • FIG. 9 shows an'alternate embodiment of an inflatable device used in the mooring system.
  • Ice breaker ship 11 serves the function of towing the drilling rig to the site and it is used additionally in the process of attaching the mooring system to the hull of the drilling rig 10.
  • An anchor 12 has been dug into the sea bottom at a distance from the drilling rig 10 by the ice breaker 1 l.
  • the anchor 12 is connected to a long chain 13 which is in the process of being handed over from the ice breaker ship 11 to the drilling rig 1 0.
  • the bitter end of the chain 13 is fed up through an opening in the hull of the drilling rig 10 in a manner which will be described subsequently.
  • FIG. 2 we see the drilling rig hull 10 having a central vertical shaft opening 21 through which oil drilling pipes and drills extend to the bottom.
  • An opening off this shaft 21 provides access for a rail system 22 along which can he slid a blowout preventer (BOP) stack which at the appropriate time can he slipped into place in the drilling operation.
  • BOP blowout preventer
  • the construction and operation of a BOP stack are done in a manner known in the art.
  • Extending above the drill rig over the center shaft 21 is a drill tower 24 having a monkey board 25, traveling block and swivel 26, crown block 27 and navigation light and radar antenna 28 all ofa type generally known in the art.
  • the traveling block serves to hoist and lower drill pipe in 60 foot long sections.
  • a rotary table 31 At the upper surface of the deck positioned over the shaft is a rotary table 31 on which the work of connecting and inserting pipes and drills is done.
  • a storage section 32 for the drill pipe in 60 foot sections is positioned around the center shaft.
  • Electric cranes 33 for lifting are positioned on the top deck. As indicated in FIG. 1, these cranes may be located to the side rather than in-line with the BOP stack.
  • the anchor chains'll3 are shown extended out in opposite directions from the side'ofthe drill rig.
  • the anchor chains extend through openings 34 which comprise shafts extending through the hull and up into anchor Windlass areas 35 on deck. (The deck area ineludes both the regular surface and the outer surface of the deck housing and top deck.) Once there, they are attached to anchor windlasses 36 which haul them and hold them tight against the anchors.
  • the bitter ends of each of the anchor chains 13 are stored in chain lockers 37, after passing through hawse pipes 38. As is shown, the sea extends up into passages 34 to the same level as it does on the outside of the ship.
  • the outer hull shape of the hull I is comprised of a pair of frusto-conical forms of which the lower one 41 has a steeper angle to the vertical than the upper one 42.
  • Passages 34 for the anchor chain exit from the hull approximately at the junction of the two frusto-conical forms, which also is approximately at the center of gravity of the hull.
  • the surface of the sea around the hull is significantly above this junction so that even with five feet of ice on the surface of the sea and making allowances for ice being forced downward by the pressure of the hull, the chain i3 will escape contact with the ice.
  • the upper portion 42 of the hull is a broader flatter angle so that ice coming in contact with it will be bent downwardly and be freetured in the manner which has been analyzed to be performed by the Drift Barge designed as above mentioned for the National Science Foundation.
  • the bottom of the rig is provided with two retractable motors (not shown) for minor adjustment of the position of the drill hull, which are useful during the mooring operation.
  • FIG. 8 shows the manner in which this device is used on site to feed the bitter end of the anchor chain 13 up through, passage 34.
  • Inflatable ring 51 descends through passageway 34 in the uninflated condition. After it has descended out of the opening 34 into the water just outside the hull the air hose attached to it fills it with air then causing it to come to the surface of the water outside of the ship.
  • the ring 511 can then be brought up to the surface of the deck from the outside by means of a hook 57 which may be supported by the crane 33.
  • the air hose 53 is disconnected at the inside end and messenger wire 54 is then pulled down through the opening 34 and up the outside of the hull by pulling from the outside of the hull until eye 55 has reached the deck from the outside.
  • the bitter end of the chain 13 which as shown in FIG. 1 has been handed over by the ice breaker is then attached to the eye 55.
  • the inflatable ring 51 and air hose 53 are disengaged from eye 55 and the bitter end of the chain 13 is dropped back into the water.
  • Pulling on the chain retrieval wire 56 then hauls the chain up through the passageway 34 to the anchor windlass 36. Once the anchor chain 13 is attached to the anchor windlass 36 and is being pulled over it, the
  • chain retriever wire 56 and eye 55 are disengaged from the anchor chain 13 and it is pulled over the anchor Windlass 36 and down through the hawse pipe 38 into the chain locker 37.
  • the inflatable ring 51 may then be deflated and taken over to the next passageway 34 and the process repeated.
  • FIG. 9 shows an alternative embodiment of the inflatable device which brings the end of the messenger wire $4 to the surface.
  • This device comprises a small air capsule 61 attached by a valve 62 to an inflatable bag or ring 64.
  • Valve 62 is operated by a pull wire 63 linked to the messenger wire 54.
  • Attached to the end of the inflatable bag or ring 64 is a solid ring 65 which when the bag 64 is inflated will be floating at the top of the device within reach of the hook.
  • bag 64 and ring 65 are stored in a shallow open compartment 66.
  • the embodiment of FIG. 9 may be face out from the rig. It is then pulled by the hook 57.
  • FIG. 3 is shown to better advantage the compartments 32 for the pipe sections positioned approximately three quarters of the way around the shaft 241 in FIG. 4 are shown doors 41 which close around shaft 21 except during the period when the BOP stack is passing through one way or the other. These doors prevent splashing of the sea which at this point is immediately below the floor of the storage section of the BOP stack 23.
  • Hawse pipes 38 are shown. There are a total of eight sets of openings 34, Windlass 36 hawse pipes 38, and chain lockers 37.
  • FIGS. 5 and 6 show the manner in which the openings 34 descend to the point of exit on the outer hull.
  • An inflatable ring 51 is shown in MG. 7 attached to a small weight 52. Attached to the inflatable ring .is an The eye 55 is fed through passageway 34 and the bitter end ofthe chain 13 attached to it as before, after which the chain 13 is hauled up through passageway 34 to the anchor Windlass 36.
  • air capsule instead of air capsule at being operated by a pull wire 63, it may be operated by an electrical signal, or
  • Hull 10 is hauled by the ice breaker 11 to the desired location of the rig.
  • the first of the anchors 12 may be dropped off the rear end of the'rig and its grip on the sea bottom is pulled tight by the forward motion of the ice breaker till.
  • This first of the anchors 12 may be attached to the anchor windlass 36 before reaching the site, since the rear of the hull as it is towed through the ice is sufficiently shielded from ice rubbing.
  • the ice breaker 11 disengages from the hull l0 and moves out from it in a direction opposite to the first anchor 12.
  • the second anchor 12 is dropped and its grip on the bottom is tightened as before.
  • the bitter end is then brought back to the hull rig and fed into the Windlass 36 in the above described manner.
  • the position of the hull 10 is fixed.
  • the ice breaker 11 then moves around the hull l setting the other six anchors 12 in turn and handing their bitter ends to the hull 10.
  • the hull 10 is anchored by eight chains 13 each set on the bottom and each attached to the hull 10 at a point on the hull for below water level.
  • the opening of passageway 34 will be about fifteen feet below sea level, or at least ten feet below the ice even for five foot ice.
  • foot ice is considered the maximum condition the hull can withstand.
  • the position of the rig thereafter is controlled by controlling the tension on the eight anchor windlasses 36, by appropriate hydraulic or electric motors 59, of known type.
  • a floating oil drilling barge comprising:
  • a lower upright frusto-conicai section of a steeper angle than said upper section said sections being joined together to form a hull having a bottom, said hull having within it a central vertical cylindrical opening in communication with the body of water in which said hull is floating;

Abstract

A barge is provided for offshore oil drilling in Arctic waters. The barge is formed of two frusto-conical sections (with the points of the extended cones being pointed downward) with the lower section being steeper than the upper section. The angle of the upper cone serves to break ice impinging on the hull by riding up and breaking ice in bending. The hull is moored by lines connected at the line of joinder between the two conical sections, which is below the waterline.

Description

United States Patent 1 Helm et al.
[451 Oct. 23, 1973 MOORED BARGE FOR ARCTIC OFFSHORE OIL DRILLING [75] Inventors: John L. Helm, Groton; Robert L.
West, North Stonington; Vincent T. Malcolm, Jr., Old Saybrook, all of Conn.
[73] Assignee: General Dynamics Corporation, St.
Louis, Mo.
[22] Filed: July 29, 1971 [21] Appl. No.: 167,296
[52] 11.5. CI. 114/05 D, 61/46.5, 114/40 [51] Int. Cl B63b 35/08 [58] Field of Search 114/.5 R, .5 D, 40;
[56] References Cited UNITED STATES PATENTS Richardson 9/8 P Feyling 9/8 R OTHER PUBLICATIONS Kurt Lawrence, A Conceptual Study of the Arctic Drift Barge; Dec. 16, 1966, General Dynamics Corp., Groton, Conn., Electric Boat Div.. pp. l-3, 1-4.
Primary Examiner-Duane A. Reger Assistant ExaminerJesus D. Sotelo Attorney-William C. Everett [57] ABSTRACT A'barge is provided for offshore oiltdrilling in Arctic waters. The barge is formed of two frusto-conical sections (with the points of the extended cones being pointed downward) with the lower section being steeper than the upper section. The angle of the upper cone serves to break ice impinging on the hull by riding up and breaking ice in bending. The hull is moored by lines connected at the line of joinder between the two conical sections, which is below the waterline.
1 Claim, 9,1)rawing Figures PATENTEUnm 23 1915 3766.874
SHEET u 0F 5 Pmimiuom 23 ms SHEJI The present invention is concerned with oil drilling in offshore areas which are normally covered over by ice and in particular with a barge capable of withstanding the destructive forces of the ice, and barge mooring system which extends the station keeping ability in heavy moving ice concentrations.
Offshore drilling, until comparatively recently, was conducted almost exclusivelyin warm climates such as California, Gulf of Mexico, and the Arabian countries;
Oil drilling rigs have long been in existence which were capable of maneuvering a drill and pipe from the surface of the water down to the sea bottom and drilling from there down to the place where oil may be found. So long as the environment which .the rig was exposed to was no more hostile than sea waves, the structure of the rig could be constructed from any one of a number of suitable types for comparatively shallow areas. A rig which actually sat on the bottom and extended above the surface of the water was useful. For deeper depth, a floating rig moored in place by conventional means was useful and needed only to be made less sensitive to and resistant against the forces of waves.
More recentlyoil has been discovered in extremely inhospitable areas of the far north such as Alaska and Northern Canada wherethe offshore area is covered with up to several feet of ice for most of the year. Even when the ice has broken up in the short summer season, there are floating ice formations and other aspects of the environment far more hostile to an oil drilling rig than those previously experienced. For example, the ice, which may be up to twelve feet thick, is as capable of crushing the side of a conventional oil drilling rig as it is capable of crushing the side of a conventional ocean vessel. Additionally, a movement of the ice around the rig would sever any mooring system which attempted to connectthe deck of the rig to the sea bottom. This means that the conventional type of oil drilling rig that sits on the bottom and extends above the surface of the seais not acceptable and the normal floating drilling .rig which is moored from the deck of the rig is equally unacceptable. More recently, at the 1970 Offshore Technology Conference, a new approach was suggested by Gerwick-and Lloyd comprising a bottom sitting inverted conically shaped structure which istowed to the site and sunk in place. This relieves the problem of ice crushing to a considerable ex-' tent, but still possesses major disadvantages. It is not usable for deeper depth where a floating structure is required. In addition, the inverted conical shape means a very substantial volume of the total 'hull will be underwater where it is relatively less useful. Moreover, even with the conical shape, a bottom fixed structure is inherently less resistant to ice crushing than a floating structure.
The present invention'solves theseand other prob lems of the prior art by the provision of a floating conical structure in which'the cone hull shape is upright, in that the points of the conic sections, if extended, would point downward, rather than upward as in the Gerwick Foundation. This Arctic Drift Barge, in an unmoored state, was designed to be able to drift in the Arctic ice pack without damage from ice. In the drilling structure of the present invention, a mooring system is provided for the hull at a point below the level of the ice. Means are also provided for attaching this mooring system to l the hull on location. Because of the connection of the hull substantially below the ice level, the mooring system itself is not subjected to severe hazard from ice.
Accordingly, it is an object of the present invention to provide a moored drilling rig capable of withstanding ice crushing loads in an arctic environment.
It is further object of the invention to provide a moored drilling rig of a double frusto-conical shape to fracture ice impinging on the hull.
It is yet another object of the invention to provide a mooring system attached to the hull at a point where it will contain the-hull up to a predetermined ice thickness and force without damage to the mooring system from ice crushing loads.
It is yet another object of the invention to provide a means for attaching the aforesaid mooring system to the hull on the site location.
These and other objects of the invention will become more apparent in the following description when taken together with the following drawings.
FIG. 1 shows a pictorial representation of the arctic drilling rig of the present invention with a ship in the process of mooring the hull.
FIG. 2 is a vertical cross-sectional view of the drilling FIG. 3 is a top view of the deckof the drilling rig.
FIG. 4 is a cross-sectional view of the drilling rig taken along lines 4-4 in FIG. 2.
FIG. 5is a cross-sectional view of the drilling rig taken along lines 5-5 in FIG. 2.
FIG. 6 is a cross-sectional view, of the drilling rig taken along lines 6-,6 in FIG. 2.
FIG. '7 shows an inflatable device used as a portion of the system for attaching the mooring on site.
FIG. 8 is a diagrammatic representation of the device in FIG. 7 being used to moor the hull of the drilling rig.
FIG. 9 shows an'alternate embodiment of an inflatable device used in the mooring system.
Referring now to FIG. 1, there is shown adrilling rig 10 with ice breaker ship 11 alongside. Ice breaker ship 11 serves the function of towing the drilling rig to the site and it is used additionally in the process of attaching the mooring system to the hull of the drilling rig 10. An anchor 12 has been dug into the sea bottom at a distance from the drilling rig 10 by the ice breaker 1 l. The anchor 12 is connected to a long chain 13 which is in the process of being handed over from the ice breaker ship 11 to the drilling rig 1 0. The bitter end of the chain 13 is fed up through an opening in the hull of the drilling rig 10 in a manner which will be described subsequently.
In FIG. 2 we see the drilling rig hull 10 having a central vertical shaft opening 21 through which oil drilling pipes and drills extend to the bottom. An opening off this shaft 21 provides access for a rail system 22 along which can he slid a blowout preventer (BOP) stack which at the appropriate time can he slipped into place in the drilling operation. The construction and operation of a BOP stack are done in a manner known in the art. Extending above the drill rig over the center shaft 21 is a drill tower 24 having a monkey board 25, traveling block and swivel 26, crown block 27 and navigation light and radar antenna 28 all ofa type generally known in the art. The traveling block serves to hoist and lower drill pipe in 60 foot long sections.
At the upper surface of the deck positioned over the shaft is a rotary table 31 on which the work of connecting and inserting pipes and drills is done. A storage section 32 for the drill pipe in 60 foot sections is positioned around the center shaft. Electric cranes 33 for lifting are positioned on the top deck. As indicated in FIG. 1, these cranes may be located to the side rather than in-line with the BOP stack.
The anchor chains'll3 are shown extended out in opposite directions from the side'ofthe drill rig. The anchor chains extend through openings 34 which comprise shafts extending through the hull and up into anchor Windlass areas 35 on deck. (The deck area ineludes both the regular surface and the outer surface of the deck housing and top deck.) Once there, they are attached to anchor windlasses 36 which haul them and hold them tight against the anchors. The bitter ends of each of the anchor chains 13 are stored in chain lockers 37, after passing through hawse pipes 38. As is shown, the sea extends up into passages 34 to the same level as it does on the outside of the ship.
As shown in FIG.'2, the outer hull shape of the hull I is comprised of a pair of frusto-conical forms of which the lower one 41 has a steeper angle to the vertical than the upper one 42. Passages 34 for the anchor chain exit from the hull approximately at the junction of the two frusto-conical forms, which also is approximately at the center of gravity of the hull. The surface of the sea around the hull is significantly above this junction so that even with five feet of ice on the surface of the sea and making allowances for ice being forced downward by the pressure of the hull, the chain i3 will escape contact with the ice. The upper portion 42 of the hull is a broader flatter angle so that ice coming in contact with it will be bent downwardly and be freetured in the manner which has been analyzed to be performed by the Drift Barge designed as above mentioned for the National Science Foundation. The lower age, water, and other necessary systems for maintenance of the rig. The bottom of the rig is provided with two retractable motors (not shown) for minor adjustment of the position of the drill hull, which are useful during the mooring operation.
air hose 53 which is attached by a light messenger wire 54 to an eye 55 attached to a chain retriever wire 56. FIG. 8 shows the manner in which this device is used on site to feed the bitter end of the anchor chain 13 up through, passage 34. Inflatable ring 51 descends through passageway 34 in the uninflated condition. After it has descended out of the opening 34 into the water just outside the hull the air hose attached to it fills it with air then causing it to come to the surface of the water outside of the ship. The ring 511 can then be brought up to the surface of the deck from the outside by means of a hook 57 which may be supported by the crane 33. Once the inflatable ring 51 is on deck, the air hose 53 is disconnected at the inside end and messenger wire 54 is then pulled down through the opening 34 and up the outside of the hull by pulling from the outside of the hull until eye 55 has reached the deck from the outside. The bitter end of the chain 13 which as shown in FIG. 1 has been handed over by the ice breaker is then attached to the eye 55. The inflatable ring 51 and air hose 53 are disengaged from eye 55 and the bitter end of the chain 13 is dropped back into the water. Pulling on the chain retrieval wire 56 then hauls the chain up through the passageway 34 to the anchor windlass 36. Once the anchor chain 13 is attached to the anchor windlass 36 and is being pulled over it, the
chain retriever wire 56 and eye 55 are disengaged from the anchor chain 13 and it is pulled over the anchor Windlass 36 and down through the hawse pipe 38 into the chain locker 37. The inflatable ring 51 may then be deflated and taken over to the next passageway 34 and the process repeated.
FIG. 9 shows an alternative embodiment of the inflatable device which brings the end of the messenger wire $4 to the surface. This device comprises a small air capsule 61 attached by a valve 62 to an inflatable bag or ring 64. Valve 62 is operated by a pull wire 63 linked to the messenger wire 54. Attached to the end of the inflatable bag or ring 64 is a solid ring 65 which when the bag 64 is inflated will be floating at the top of the device within reach of the hook. In the uninflated position, bag 64 and ring 65 are stored in a shallow open compartment 66. The embodiment of FIG. 9 may be face out from the rig. It is then pulled by the hook 57.
in FIG. 3 is shown to better advantage the compartments 32 for the pipe sections positioned approximately three quarters of the way around the shaft 241 in FIG. 4 are shown doors 41 which close around shaft 21 except during the period when the BOP stack is passing through one way or the other. These doors prevent splashing of the sea which at this point is immediately below the floor of the storage section of the BOP stack 23. Hawse pipes 38 are shown. There are a total of eight sets of openings 34, Windlass 36 hawse pipes 38, and chain lockers 37.
FIGS. 5 and 6 show the manner in which the openings 34 descend to the point of exit on the outer hull.
An inflatable ring 51 is shown in MG. 7 attached to a small weight 52. Attached to the inflatable ring .is an The eye 55 is fed through passageway 34 and the bitter end ofthe chain 13 attached to it as before, after which the chain 13 is hauled up through passageway 34 to the anchor Windlass 36.
Instead of air capsule at being operated by a pull wire 63, it may be operated by an electrical signal, or
it may be set to open in response to water pressure greater than a predetermined amount.
Reference to FIG. 11 again will disclose the process of mooring. Hull 10 is hauled by the ice breaker 11 to the desired location of the rig. Upon reaching the site the first of the anchors 12 may be dropped off the rear end of the'rig and its grip on the sea bottom is pulled tight by the forward motion of the ice breaker till. This first of the anchors 12 may be attached to the anchor windlass 36 before reaching the site, since the rear of the hull as it is towed through the ice is sufficiently shielded from ice rubbing. After the first anchor 12 is set in place and the hull Ml) is holding position by means of its motors, the ice breaker 11 disengages from the hull l0 and moves out from it in a direction opposite to the first anchor 12. The second anchor 12 is dropped and its grip on the bottom is tightened as before. The bitter end is then brought back to the hull rig and fed into the Windlass 36 in the above described manner. After the first two anchors 12 are set, the position of the hull 10 is fixed. The ice breaker 11 then moves around the hull l setting the other six anchors 12 in turn and handing their bitter ends to the hull 10.
By this process the hull 10 is anchored by eight chains 13 each set on the bottom and each attached to the hull 10 at a point on the hull for below water level. On a typical rig the opening of passageway 34 will be about fifteen feet below sea level, or at least ten feet below the ice even for five foot ice. Although there is leeway for 12 foot ice, as a practical matter, foot ice is considered the maximum condition the hull can withstand. The position of the rig thereafter is controlled by controlling the tension on the eight anchor windlasses 36, by appropriate hydraulic or electric motors 59, of known type.
We claim:
1. A floating oil drilling barge comprising:
a. an upper upright frusto-conical section;
b. a lower upright frusto-conicai section of a steeper angle than said upper section, said sections being joined together to form a hull having a bottom, said hull having within it a central vertical cylindrical opening in communication with the body of water in which said hull is floating; and
c. means connected to said barge for mooring it in a body of water, said means engaging the outer surface of said barge at the line of joinder of said'sections.

Claims (1)

1. A floating oil drilling barge comprising: a. an upper upright frusto-conical section; b. a lower upright frusto-conical section of a steeper angle than said upper section, said sections being joined together to form a hull having a bottom, said hull having within it a central vertical cylindrical opening in communication with the body of water in which said hull is floating; and c. means connected to said barge for mooring it in a body of water, said means engaging the outer surface of said barge at the line of joinder of said sections.
US00167296A 1971-07-29 1971-07-29 Moored barge for arctic offshore oil drilling Expired - Lifetime US3766874A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US16729671A 1971-07-29 1971-07-29

Publications (1)

Publication Number Publication Date
US3766874A true US3766874A (en) 1973-10-23

Family

ID=22606774

Family Applications (1)

Application Number Title Priority Date Filing Date
US00167296A Expired - Lifetime US3766874A (en) 1971-07-29 1971-07-29 Moored barge for arctic offshore oil drilling

Country Status (2)

Country Link
US (1) US3766874A (en)
IS (1) IS848B6 (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3872814A (en) * 1973-09-24 1975-03-25 Global Marine Inc Twin-hull ship for drilling in ice-covered waters
US4048943A (en) * 1976-05-27 1977-09-20 Exxon Production Research Company Arctic caisson
US4075964A (en) * 1975-08-29 1978-02-28 Global Marine, Inc. Ice melting system
US4230190A (en) * 1978-10-13 1980-10-28 Guinn David C Blow out preventer handling system
US4239418A (en) * 1979-04-27 1980-12-16 Chevron Research Company Arctic multi-angle conical structure having a discontinuous outer surface
US4245929A (en) * 1979-04-27 1981-01-20 Chevron Research Company Arctic multi-angle conical structure
US4260292A (en) * 1979-10-25 1981-04-07 The Offshore Company Arctic offshore platform
US4312287A (en) * 1977-09-30 1982-01-26 The University Of Strathclyde Apparatus for handling submersibles at sea
DE3312951A1 (en) * 1982-04-16 1983-10-27 Mitsui Engineering & Shipbuilding Co. Ltd., Tokyo FLOATING OFF SHORE CONSTRUCTION
EP0169218A1 (en) * 1983-12-30 1986-01-29 William Bennet Semi-submersible vessel.
FR2581362A1 (en) * 1985-05-06 1986-11-07 Metalliques Entrepr Cie Fse Semi-submersible platform, in particular for exploration and/or working underwater deposits in cold seas
US6125780A (en) * 1997-04-15 2000-10-03 Mobil Oil Corporation Floating barge-platform and method of assembly
US20050092497A1 (en) * 2003-10-29 2005-05-05 Rashid Omar A. Blow out preventer transfer platform
US20090126616A1 (en) * 2007-01-01 2009-05-21 Nagan Srinivasan Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications
WO2009136799A1 (en) * 2008-05-09 2009-11-12 Sevan Marine As Floating platform and method for operation thereof
US20100186653A1 (en) * 2009-01-29 2010-07-29 Friede & Goldman, Ltd. Extended-deck jack-up
US20110237142A1 (en) * 2008-07-16 2011-09-29 Jon Hovik Mooring Arrangement
US8568063B2 (en) 2009-04-30 2013-10-29 Exxonmobil Upstream Research Company Mooring system for floating arctic vessel
FR3107250A1 (en) * 2020-02-17 2021-08-20 Fondation Tara Polar zone ship

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3279404A (en) * 1963-12-20 1966-10-18 Offshore Co Floating mooring system
US3423777A (en) * 1966-11-10 1969-01-28 Eg & G Inc Buoy apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3279404A (en) * 1963-12-20 1966-10-18 Offshore Co Floating mooring system
US3423777A (en) * 1966-11-10 1969-01-28 Eg & G Inc Buoy apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Kurt Lawrence, A Conceptual Study of the Arctic Drift Barge; Dec. 16, 1966, General Dynamics Corp., Groton, Conn., Electric Boat Div. pp. 1 3, 1 4. *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3872814A (en) * 1973-09-24 1975-03-25 Global Marine Inc Twin-hull ship for drilling in ice-covered waters
US4075964A (en) * 1975-08-29 1978-02-28 Global Marine, Inc. Ice melting system
US4117794A (en) * 1975-08-29 1978-10-03 Global Marine, Inc. Ice melting system and method
US4048943A (en) * 1976-05-27 1977-09-20 Exxon Production Research Company Arctic caisson
US4312287A (en) * 1977-09-30 1982-01-26 The University Of Strathclyde Apparatus for handling submersibles at sea
US4230190A (en) * 1978-10-13 1980-10-28 Guinn David C Blow out preventer handling system
US4245929A (en) * 1979-04-27 1981-01-20 Chevron Research Company Arctic multi-angle conical structure
US4239418A (en) * 1979-04-27 1980-12-16 Chevron Research Company Arctic multi-angle conical structure having a discontinuous outer surface
US4260292A (en) * 1979-10-25 1981-04-07 The Offshore Company Arctic offshore platform
DE3312951A1 (en) * 1982-04-16 1983-10-27 Mitsui Engineering & Shipbuilding Co. Ltd., Tokyo FLOATING OFF SHORE CONSTRUCTION
US4519728A (en) * 1982-04-16 1985-05-28 Mitsui Engineering And Shipbuilding Company, Ltd. Floating offshore structure
US4571125A (en) * 1982-04-16 1986-02-18 Mitsui Engineering And Shipbuilding Company, Limited Floating offshore structure
EP0169218A1 (en) * 1983-12-30 1986-01-29 William Bennet Semi-submersible vessel.
EP0169218A4 (en) * 1983-12-30 1986-08-21 William Bennet Semi-submersible vessel.
FR2581362A1 (en) * 1985-05-06 1986-11-07 Metalliques Entrepr Cie Fse Semi-submersible platform, in particular for exploration and/or working underwater deposits in cold seas
US6125780A (en) * 1997-04-15 2000-10-03 Mobil Oil Corporation Floating barge-platform and method of assembly
US20050092497A1 (en) * 2003-10-29 2005-05-05 Rashid Omar A. Blow out preventer transfer platform
US7451821B2 (en) 2003-10-29 2008-11-18 Saudi Arabian Oil Company Blow out preventer transfer platform
US7958835B2 (en) * 2007-01-01 2011-06-14 Nagan Srinivasan Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications
US20090126616A1 (en) * 2007-01-01 2009-05-21 Nagan Srinivasan Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications
WO2009136799A1 (en) * 2008-05-09 2009-11-12 Sevan Marine As Floating platform and method for operation thereof
NO336984B1 (en) * 2008-05-09 2015-12-07 Sevan Marine As Liquid platform and method of operation thereof
DK179027B1 (en) * 2008-05-09 2017-09-04 Sevan Marine Asa Liquid platform and method of operation thereof
US20110237142A1 (en) * 2008-07-16 2011-09-29 Jon Hovik Mooring Arrangement
US8544400B2 (en) * 2008-07-16 2013-10-01 Aker Pusnes As Mooring arrangement
US20100186653A1 (en) * 2009-01-29 2010-07-29 Friede & Goldman, Ltd. Extended-deck jack-up
US8568063B2 (en) 2009-04-30 2013-10-29 Exxonmobil Upstream Research Company Mooring system for floating arctic vessel
US9233739B2 (en) 2009-04-30 2016-01-12 Exxonmobil Upstream Research Company Mooring system for floating arctic vessel
FR3107250A1 (en) * 2020-02-17 2021-08-20 Fondation Tara Polar zone ship

Also Published As

Publication number Publication date
IS848B6 (en) 1974-01-17
IS2076A7 (en) 1973-01-30

Similar Documents

Publication Publication Date Title
US3766874A (en) Moored barge for arctic offshore oil drilling
US3739736A (en) Mooring system for drilling hull in arctic waters
US4995762A (en) Semisubmersible vessel with captured constant tension buoy
US3540396A (en) Offshore well apparatus and system
US4966495A (en) Semisubmersible vessel with captured constant tension buoy
US3191201A (en) Mooring system
US4892495A (en) Subsurface buoy mooring and transfer system for offshore oil and gas production
US4434741A (en) Arctic barge drilling unit
US4784529A (en) Mooring apparatus and method of installation for deep water tension leg platform
US6113314A (en) Disconnectable tension leg platform for offshore oil production facility
US3886882A (en) Mooring apparatus for ice-breaking drill ship
US4906139A (en) Offshore well test platform system
US3537412A (en) Stabilizer for marine vessels
CN100393576C (en) Berthing method and system
US4033277A (en) Underhull quick disconnect mooring system
US9315242B2 (en) Releasable mooring systems and methods for drilling vessels
US6651580B2 (en) Method and system for mooring
US3759046A (en) Movement of marine structures in saline ice
US4354446A (en) Temporary mooring of tension leg platforms
US4294331A (en) Method and system for escaping from an offshore drilling platform
WO2000027692A1 (en) Device for positioning of vessels
US3481294A (en) Anchored riser pipe mooring system for drilling vessel
US3646771A (en) Underwater communication between a vessel and a structure and vessel-positioning means
US3902447A (en) Mooring system for semisubmersible drilling platform
US4632663A (en) Mooring and transfer system and method