US3741532A - Proportioning control system for an asphalt plant - Google Patents

Proportioning control system for an asphalt plant Download PDF

Info

Publication number
US3741532A
US3741532A US00128586A US3741532DA US3741532A US 3741532 A US3741532 A US 3741532A US 00128586 A US00128586 A US 00128586A US 3741532D A US3741532D A US 3741532DA US 3741532 A US3741532 A US 3741532A
Authority
US
United States
Prior art keywords
aggregate
path
bitumen
weight
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00128586A
Inventor
R Farnham
F Prill
D Smith
J Plociennik
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Barber Greene Co
Original Assignee
Barber Greene Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Barber Greene Co filed Critical Barber Greene Co
Application granted granted Critical
Publication of US3741532A publication Critical patent/US3741532A/en
Assigned to M & I MARSHALL & ILSELEY BANK, NORTHWESTERN MUTUAL LIFE INSURANCECOMPANY, AND FIRST CHICAGO LEASING CORPORATION reassignment M & I MARSHALL & ILSELEY BANK, NORTHWESTERN MUTUAL LIFE INSURANCECOMPANY, AND FIRST CHICAGO LEASING CORPORATION SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BARBER-GREENE COMPANY
Assigned to BARBER-GREENE COMPANY reassignment BARBER-GREENE COMPANY RELEASED BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: FIRST NATIONAL BANK OF CHICAGO AS AGENT FOR SEE DOCUMENT FORNAMES
Assigned to BARBER-GREENE COMPANY, A DE. CORP. reassignment BARBER-GREENE COMPANY, A DE. CORP. ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: B.V. OCEANIC FINANCE COMPANY
Assigned to FIRST AMERICAN NATIONAL BANK OF NASHVILLE reassignment FIRST AMERICAN NATIONAL BANK OF NASHVILLE SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BARBER-GREENE COMPANY, A CORP. OF DE.
Assigned to BARBER-GREENE COMPANY reassignment BARBER-GREENE COMPANY RELEASED BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: FIRST AMERICAN NATIONAL BANK OF NASHVILLE
Assigned to FIRST NATIONAL BANK OF CHICAGO, THE reassignment FIRST NATIONAL BANK OF CHICAGO, THE SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). 4-27-89 Assignors: BARBER-GREENE COMPANY, ROADTEC, INC., TELSMITH, INC., TRENCOR JETCO, INC.
Anticipated expiration legal-status Critical
Assigned to CITIZENS AND SOUTHERN TRUST COMPANY (GEORGIA), FIRST NATIONAL BANK OF CHICAGO, THE reassignment CITIZENS AND SOUTHERN TRUST COMPANY (GEORGIA) AMENDMENT TO A PREVIOUSLY RECORDED SECURITY AGREEMENT DATED APRIL 27, 1989; SEE RECORD FOR DETAILS. Assignors: BARBER-GREENE COMPANY, ROADTEC, INC., TRENCOR JETCO, INC.
Assigned to ASTEC INDUSTRIES, INC., FIRST NATIONAL BANK OF CHICAGO, N.A., THE reassignment ASTEC INDUSTRIES, INC. TERMINATION & RELEASE OF SECURITY INTEREST IN PATENTS Assignors: NATIONSBANK OF GEORGIA, N.A. (F/K/A CITIZENS AND SOUTHERN TRUST COMPANY, N.A.)
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1059Controlling the operations; Devices solely for supplying or proportioning the ingredients
    • E01C19/1068Supplying or proportioning the ingredients

Definitions

  • This invention relates to asphalt plants and more particularly to methods and apparatus for controlling the production of asphaltic mixes.
  • a conventional asphalt plant utilizes certain basic components in order to produce high type asphaltic mixes for use in, for example, heavy-duty roadways. These components include a multiple aggregate cold feed wherein several sizes of stone and sand are required for a suitable mix; a cold conveyor or elevator to gather and transport material from the cold feeders and elevated to a dryer; a dryer for removing moisture from the aggregate and heating the aggregate to mixing temperature, most commonly about 300F.; a dust collector which provides one or more stages of dust collection from the exhaust gases of the dryer to return valuable dust to the system and for providing a draft to support combustion in the dryer; a hot elevator or conveyor for transporting the heated aggregate from the dryer to the screen; a screen for separating the output of the dryer into two or more sizes of stone and sand, which sizes mayor may not match the cold feed sizes; hot bins to receive and store surges of hot aggregates, which aggregates are divided into compartments to match the size segregation afforded by the screen separations; a hot aggregate proportioning mechanism which
  • an elevator or conveyor except in tower plants where the hot bins are mounted over the mixer, for transporting the hot aggregate to the mix; an asphalt proportioning mechanism, usuallya bucket on a scale in batch plants, and a calibrated positive displacement pump in continuousplants, for providing the proper amount of asphalt to the mixture in accordance with the amount of hot aggregate; and a mixer, either batchtype or continuous, to convert the segregated aggregate and asphalt inputs into a homogeneous mix.
  • the screen for example, is ordinarily a huge machine for present day capacities and would necessarily be increased in size, with an attendant increase in cost, to handle the capacities now being requested for future plants. This alone appears to be impractical.
  • the hot aggregate proportioning mechanism merely recombines the materials separated by the screen and, inasmuch as material is not manufactured,
  • the cold feed must be correct in order to continue the 2-. runs continuously and includes supervision and control of the various operating components thereof resulting in a more compact and economical facility which may be operated at a high rate of production.
  • the above-described screen, hot bins, aggregate proportioning mechanism and hot elevator of present production techniques may be eliminated and asphalt production may be realized by the utilization of a system employing the other mentioned equipments under the control of a supervisory and control system which employs sensing apparatus located at certain flow stations within the plant for signalling a monitoring system which, in turn, controls the amount of material inputs to the mixer.
  • This control is effected by sampling the hot aggregates flowing into the mixer and controlling material flow in accordance with the samples.
  • the amounts of cold and hot feeds to the dryer and mixer, respectively, and dust from the dust collector are determined by weighing mechanism which provides signals as a function of weight to the control system.
  • the control system causes samples to be made of the hot aggregate for adjusting the flow of aggregate and controls the output of asphalt pumping equipment in accordance with the hot aggregate input into the mixer.
  • Another object of theinvention is to provide an asphalt plant in which material flow is continuously monitored and controlled by a supervisory and control system.
  • FIG. 1 is a schematic diagram of an asphalt plant according to the present invention which employs a supervisory and control system;
  • FIGS. 2A andZB together form an elevational view of an asphalt plant constructed and operable in accordance with the techniques of the present invention.
  • FIG. 3 is an elevational view of a sampling .bin which may be advantageously employed in practicing the present invention.
  • Conveyor l9 delivers the cold aggregate to input 22 of a dryer 21.
  • the aggregate In the dryer the aggregate is heated for drying and for elevating its temperature to that suitable for mixing, preferably about 300F at which temperature it is delivered from the output 23 of dryer 21 to a conveyor 24 for movement to a mixer.
  • dryer 21 In addition to outlet 23, dryer 21 has a second output 25 connected to a duct 26 through which air is drawn to support combustion for the dryer and for collecting dust given off from the aggregate during the drying process. This dust is valuable and should be returned to the aggregate flow.
  • Conveyor 24 operates in a direction indicated by arrow 31 to carry the hot dried aggregate to input 33 of a mixer pug mill 32.
  • Asphalt tank 40 supply a flow of liquid bitumen by way of pump 41, meter 42 and conduit 43 to an asphalt spray bar 43' in input 33 of the mixer 32, whereupon the asphalt and the aggregate are mixed as is well known in the art and delivered by way of mixer output 34 to a conveyor 35 operating as indicated by arrow 36
  • Conveyor 35 transports the asphalt composition to a mix storage hopper 37 having an input 38 for receiving the mix and an output 39 for servicing haulage vehicles.
  • the asphalt material stored in hopper 37 includes the aforementioned valuable dust which is drawn by way of duct 26 into a dust storage apparatus 27 having a dust collector 27a which separates the dust from the exhaust gases, a dust storage bin 27b and an output 28 which meters the dust onto conveyor 24 by way of conveyor 29 operating as indicated by arrow 30.
  • Conveyor 19 Conveyor 19, conveyor 24 and conveyor 29 each include a continuous weighing device operably associated therewith as referenced at 56, 61, and 59, respectively. Each of these weighing devices continually monitor the amount of aggregate flowing thereover and provides indications to a supervisory and control apparatus 54 over the respective signalling channels 55, 60 and 58. In this manner the amount of material traversing the cold conveyor, the hot conveyor and the dust conveyor may be continuously monitored by weight. In addition to the monitoring of total aggregate weight for delivery to the mixer, the present invention utilizes apparatus for monitoring the quality of the aggregate being supplied. In this connection, attention is invited to conveyor or chute 44 of FIG.
  • the weighing apparatus 45 is illustrated in greater detail as comprising a plurality of bins 47-50 each of which includes an aggregate release apparatus, such as 75, 76 and 77, for releasing individual aggregate components to a chute 51 for delivery from the scale to a conveyor 52, upon receipt or release signals over channel 74.
  • the weighing apparatus 45 is ofthe type well known in the art and no further description thereof is deemed necessary except that the scale is adapted to record, and deliver indications of such recordings to the supervisory and control system of the individual aggregate components by way of the scale mechanism 63 and information channel 62.
  • apparatus such as a Type C cutting sampler is employed at reference 73 as is well known in the crushed stone art. More specifically, such a cutting sampler moves a receptacle through the aggregate flow and delivers the diverted sample of a true cross-section of material flow through a conveyor or chute 44 for delivery to screen 46.
  • screen 46 is much smaller than that required previously in the main flow of material and is therefore not pushed to capacity and accordingly can provide a much more accurate gradation analysis. It can make separations much finer than are practical over a screen which is required to handle the full plant capacity. Advantageously, it can be very small and inexpensive.
  • the present invention includes the control of aggregate flow in accordance with the weights sensed.
  • the plant is provided with a supervisory control system 54 for receiving the weight indications from the sensing devices 42, 56, 59, 61 and 63 by way of their respective signalling channels 42a, 55, 58, and 62.
  • the control section of apparatus 54 includes outgoing control channel 57 for controlling the individual aggregate feeds and outputs 14-16 of the cold storage feeder containers 11-13 respectively.
  • the system includes a control channel 64 for controlling the flow from pump 41 by way of a pump flow adjuster 6S and a control channel 28a for controlling the output of the dust storage apparatus 27.
  • the supervisory and control system 54 receives weight signals from the various stations in the asphalt plant and responds accordingly .to vary the aggregate feed and pump operation to meet the requirements of the desired mix.
  • the supervisory and control system 54 detects the aggregate flow rate at sensor 61 and employs the signals therefrom to control the proportioning of other additives, the dust and the asphalt, by way of their respective control channels.
  • the sensors and corresponding signalling channels are employed to signal the control system 54 that the correct amounts are being added and corrections are automatically made if the correct proportions are not being added.
  • Total capacity is sensed by sensor 56, and the apparatus 54 adjusts feeders 14-16 so as to maintain the preset desired flow rate over sensor 56.
  • the proportional relationship between the feed rates of these aggregates is adjusted occasionally in response to the data received in the gradation analysis at elements 44 and 45. This may be done either manually or automatically.
  • a reject mechanism 67 is provided for diverting an unwanted aggregate mix which may occasion the input to the mixer.
  • the reject mechanism includes a flop gate 69 and an actuator 68 which are operated manually to divert the aggregate into chute 70. This condition most normally will occur when proportions are not yet stabilized upon startup of the process.
  • the present invention also applies to such mixes and may be advantageously employed in the production of these cold mixes.
  • the improved cold 7 feed control eliminates surges in the dryer resulting in better dryer operation and the valuable dust is collected and accurately controlled and metered back into the aggregate flow.
  • the asphalt plant becomes more compact and portable with the elimination of the large gradation unit and screen of conventional plants which require a large crane to stack one upon the other.
  • the present invention makes a recordation practical with respect to continuous plants, such recordation being required by increasing numbers of highway departments and including a printed record of the weight of each ingredient of every batch for quality control of the mix. ln practicing the present invention, as each aggregate sample is removed, screened and weighed, a quality control record is produced.
  • a method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components comprising the steps of feeding the aggregate along a path from the aggregate supply to a first station,
  • a method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components comprising the steps of heating the aggregate
  • a method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components comprising the steps of feeding aggregate from the supply for heating,
  • a method of producing asphalt material from supply of bitumen and a supply of aggregate having a plurality of aggregate components comprising the steps of heating the aggregate

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

An asphalt plant employs a supervisory control system including weighing apparatus at different plant stations for signaling weights of flowing material in the plant for controlling the amount of material and bitumen flow. Continuous supervision and control of asphalt production enables optimum operation of an asphalt plant utilizing fewer components of production equipment than found in conventional asphalt plants.

Description

[ June 26, 1973 United States, Patent 1 Farnham et al.
[54] PROPORTIONING CONTROL SYSTEM FOR 2,877,524 3/1959 259/154 4/1968 Adams......
AN ASPHALT PLANT [75] Inventors: Robert E. Farnllam, Naperville;
Fredric w u; Donald w Smith, FOREIGN. PATENTS OR APPLICATIONS both of Aurora; Jam
es L. Plociennik, North Aurora, all of I11.
[73] Assignee: Barber-Greene Company, Aurora,
Primary Examiner-Robert W1 Jenkins Attorney-Clarence J. Fleming ABSTRACT Related US. Application Data [62] Division of Ser. No. 856,007, Sept. 8, 1969, Pat. No.
Sf mnmwmfim d m t fl 1. a n hnman ll pe e 0 mt m vine t mmmmmnfm n. .1 u mrfm mm u Hi S Wmhn n O IaOnO .m ml n vi amfc f fiu Ou t en d ag o o U .mr. lm MD. atw mf m oa W nm n n D .w. .mme m SOWUM e hm m t.m ae
i t nhe P m h W U 0 l S C Pe h mm uke a ob hn nu w P nn Sd ..l nu elm n n??? A.m:mCC hru wm m.
2 Pas 0 5 u d a sum 3 UIF [56] References Cited found in conventional asphalt plants.
UNITED STATES PATENTS 8/1966 F mham.............;..............
259/154 7 Claims, 4 Drawing Figures PAIENIEDJUI 26 I975 SHEH'HIF I In I J TF Li 1% IIIIII IL In Q"! IV- w m lm r.
PROPORTIONING CONTROL SYSTEM FOR AN ASPHALT PLANT This application is a division of application Ser. No. 856,007, filed Sept. 8, 1969, now US. Pat. No. 3,625,488.
BACKGROUND OF THE INVENTION 1. Field of the Invention This invention relates to asphalt plants and more particularly to methods and apparatus for controlling the production of asphaltic mixes.
2. Description of the Prior Art Generally, a conventional asphalt plant utilizes certain basic components in order to produce high type asphaltic mixes for use in, for example, heavy-duty roadways. These components include a multiple aggregate cold feed wherein several sizes of stone and sand are required for a suitable mix; a cold conveyor or elevator to gather and transport material from the cold feeders and elevated to a dryer; a dryer for removing moisture from the aggregate and heating the aggregate to mixing temperature, most commonly about 300F.; a dust collector which provides one or more stages of dust collection from the exhaust gases of the dryer to return valuable dust to the system and for providing a draft to support combustion in the dryer; a hot elevator or conveyor for transporting the heated aggregate from the dryer to the screen; a screen for separating the output of the dryer into two or more sizes of stone and sand, which sizes mayor may not match the cold feed sizes; hot bins to receive and store surges of hot aggregates, which aggregates are divided into compartments to match the size segregation afforded by the screen separations; a hot aggregate proportioning mechanism which is usually a hopper on a scale in a batch plant,
and continuous feeders in a continuous plant, for each aggregate; an elevator or conveyor, except in tower plants where the hot bins are mounted over the mixer, for transporting the hot aggregate to the mix; an asphalt proportioning mechanism, usuallya bucket on a scale in batch plants, and a calibrated positive displacement pump in continuousplants, for providing the proper amount of asphalt to the mixture in accordance with the amount of hot aggregate; and a mixer, either batchtype or continuous, to convert the segregated aggregate and asphalt inputs into a homogeneous mix.
Each of the foregoing equipments are expensive, and of course, require a'certain amount of installation area. The screen, for example, is ordinarily a huge machine for present day capacities and would necessarily be increased in size, with an attendant increase in cost, to handle the capacities now being requested for future plants. This alone appears to be impractical. In addition, the hot aggregate proportioning mechanism merely recombines the materials separated by the screen and, inasmuch as material is not manufactured,
the cold feed must be correct in order to continue the 2-. runs continuously and includes supervision and control of the various operating components thereof resulting in a more compact and economical facility which may be operated at a high rate of production.
SUMMARY OF THE INVENTION According to the invention, the above-described screen, hot bins, aggregate proportioning mechanism and hot elevator of present production techniques may be eliminated and asphalt production may be realized by the utilization of a system employing the other mentioned equipments under the control of a supervisory and control system which employs sensing apparatus located at certain flow stations within the plant for signalling a monitoring system which, in turn, controls the amount of material inputs to the mixer. This control is effected by sampling the hot aggregates flowing into the mixer and controlling material flow in accordance with the samples. The amounts of cold and hot feeds to the dryer and mixer, respectively, and dust from the dust collector, are determined by weighing mechanism which provides signals as a function of weight to the control system. The control system causes samples to be made of the hot aggregate for adjusting the flow of aggregate and controls the output of asphalt pumping equipment in accordance with the hot aggregate input into the mixer.
It is therefore a primary object of the invention to ,provide a new asphalt plant which will operate at ahigher rate of production and at a lower rateof cost than present asphalt plants.
Another object of theinvention is to provide an asphalt plant in which material flow is continuously monitored and controlled by a supervisory and control system.
BRIEF DESCRIPTION OF THE DRAWINGS Other objects, features and advantages of the invention, its organization, construction and operation will be readily apparent from the following description of a preferred embodiment thereof, taken in conjunction with the accompanying drawings, although variations and modifications may be effected without departing from the spirit and scope of the novel concepts of the disclosure, and in which:
FIG. 1 is a schematic diagram of an asphalt plant according to the present invention which employs a supervisory and control system;
FIGS. 2A andZB together form an elevational view of an asphalt plant constructed and operable in accordance with the techniques of the present invention; and
FIG. 3 is an elevational view of a sampling .bin which may be advantageously employed in practicing the present invention.
DESCRIPTION OF THE PREFERRED EMBODIMENT to a second elevator or conveyor 19 which is moving in a direction indicated by the arrow 20.
Conveyor l9 delivers the cold aggregate to input 22 of a dryer 21. In the dryer the aggregate is heated for drying and for elevating its temperature to that suitable for mixing, preferably about 300F at which temperature it is delivered from the output 23 of dryer 21 to a conveyor 24 for movement to a mixer. In addition to outlet 23, dryer 21 has a second output 25 connected to a duct 26 through which air is drawn to support combustion for the dryer and for collecting dust given off from the aggregate during the drying process. This dust is valuable and should be returned to the aggregate flow.
Conveyor 24 operates in a direction indicated by arrow 31 to carry the hot dried aggregate to input 33 of a mixer pug mill 32.
Asphalt tank 40 supply a flow of liquid bitumen by way of pump 41, meter 42 and conduit 43 to an asphalt spray bar 43' in input 33 of the mixer 32, whereupon the asphalt and the aggregate are mixed as is well known in the art and delivered by way of mixer output 34 to a conveyor 35 operating as indicated by arrow 36 Conveyor 35 transports the asphalt composition to a mix storage hopper 37 having an input 38 for receiving the mix and an output 39 for servicing haulage vehicles.
The asphalt material stored in hopper 37 includes the aforementioned valuable dust which is drawn by way of duct 26 into a dust storage apparatus 27 having a dust collector 27a which separates the dust from the exhaust gases, a dust storage bin 27b and an output 28 which meters the dust onto conveyor 24 by way of conveyor 29 operating as indicated by arrow 30.
Conveyor 19, conveyor 24 and conveyor 29 each include a continuous weighing device operably associated therewith as referenced at 56, 61, and 59, respectively. Each of these weighing devices continually monitor the amount of aggregate flowing thereover and provides indications to a supervisory and control apparatus 54 over the respective signalling channels 55, 60 and 58. In this manner the amount of material traversing the cold conveyor, the hot conveyor and the dust conveyor may be continuously monitored by weight. In addition to the monitoring of total aggregate weight for delivery to the mixer, the present invention utilizes apparatus for monitoring the quality of the aggregate being supplied. In this connection, attention is invited to conveyor or chute 44 of FIG. 1 which receives samples of hot aggregate from the input to the mixer 32 and provides the sample to a separating screen 46 as a part of the sampling apparatus 73 and the weighing apparatus 45 for the samples. Screen 46 separates and sizes the aggregate into separate bins 47, 48, 49, and 50 for individual weighing thereof. The total weight of the individual aggregates are detected by scale 63 and signals to the supervisory and control circuit 54 over buss or channel 62 for monitoring. Individual weights, obtained by a subtraction process upon dumping, are recorded. Referring specifically to FIG. 3, the weighing apparatus 45 is illustrated in greater detail as comprising a plurality of bins 47-50 each of which includes an aggregate release apparatus, such as 75, 76 and 77, for releasing individual aggregate components to a chute 51 for delivery from the scale to a conveyor 52, upon receipt or release signals over channel 74. The weighing apparatus 45 is ofthe type well known in the art and no further description thereof is deemed necessary except that the scale is adapted to record, and deliver indications of such recordings to the supervisory and control system of the individual aggregate components by way of the scale mechanism 63 and information channel 62.
In order to provide the sampling as just described in general, apparatus such as a Type C cutting sampler is employed at reference 73 as is well known in the crushed stone art. More specifically, such a cutting sampler moves a receptacle through the aggregate flow and delivers the diverted sample of a true cross-section of material flow through a conveyor or chute 44 for delivery to screen 46. In this type of an arrangement screen 46 is much smaller than that required previously in the main flow of material and is therefore not pushed to capacity and accordingly can provide a much more accurate gradation analysis. It can make separations much finer than are practical over a screen which is required to handle the full plant capacity. Advantageously, it can be very small and inexpensive.
In addition to monitoring the weights of aggregate at various points of the plant the present invention includes the control of aggregate flow in accordance with the weights sensed. To realize this capability, the plant is provided with a supervisory control system 54 for receiving the weight indications from the sensing devices 42, 56, 59, 61 and 63 by way of their respective signalling channels 42a, 55, 58, and 62. Further, the control section of apparatus 54 includes outgoing control channel 57 for controlling the individual aggregate feeds and outputs 14-16 of the cold storage feeder containers 11-13 respectively. Also, the system includes a control channel 64 for controlling the flow from pump 41 by way of a pump flow adjuster 6S and a control channel 28a for controlling the output of the dust storage apparatus 27.
The supervisory and control system 54 receives weight signals from the various stations in the asphalt plant and responds accordingly .to vary the aggregate feed and pump operation to meet the requirements of the desired mix. The supervisory and control system 54 detects the aggregate flow rate at sensor 61 and employs the signals therefrom to control the proportioning of other additives, the dust and the asphalt, by way of their respective control channels. The sensors and corresponding signalling channels are employed to signal the control system 54 that the correct amounts are being added and corrections are automatically made if the correct proportions are not being added. Total capacity is sensed by sensor 56, and the apparatus 54 adjusts feeders 14-16 so as to maintain the preset desired flow rate over sensor 56. In addition, the proportional relationship between the feed rates of these aggregates is adjusted occasionally in response to the data received in the gradation analysis at elements 44 and 45. This may be done either manually or automatically.
A reject mechanism 67 is provided for diverting an unwanted aggregate mix which may occasion the input to the mixer. The reject mechanism includes a flop gate 69 and an actuator 68 which are operated manually to divert the aggregate into chute 70. This condition most normally will occur when proportions are not yet stabilized upon startup of the process.
All high-type asphalt paving mixes use dried and heated aggregates. However, there are some mixes which have asphalt emulsions for the bitumen and do not require heating and drying of the aggregate, nor
dust collection. The present invention also applies to such mixes and may be advantageously employed in the production of these cold mixes.
Generally then there has been described a novel asphalt plant having several advantages. Plant cost is reduced, particularly for larger plant sizes in that the components added to the plant of the present invention are less expensive than those eliminated from conventional asphalt plants. Segregation of material in the hot bins is eliminated with the elimination of such bins. There is no material waste such as occurs when the cold feed is out of balance with the gradation unit of a conventional plant. The sampling screen, because it is not in the main flow of material and is therefore not being pushed to capacity, can provide a much more accurate gradation analysis and make separations much finer than are practical over a screen which is required to handle the full plant capacity. In addition, the sampling screen is very much smaller and less expensive than those of conventional plants. The improved cold 7 feed control eliminates surges in the dryer resulting in better dryer operation and the valuable dust is collected and accurately controlled and metered back into the aggregate flow. The asphalt plant becomes more compact and portable with the elimination of the large gradation unit and screen of conventional plants which require a large crane to stack one upon the other.
The present invention makes a recordation practical with respect to continuous plants, such recordation being required by increasing numbers of highway departments and including a printed record of the weight of each ingredient of every batch for quality control of the mix. ln practicing the present invention, as each aggregate sample is removed, screened and weighed, a quality control record is produced.
We claim:
1. A method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of feeding the aggregate along a path from the aggregate supply to a first station,
continuously weighing the aggregate being fed,
drying the aggregate at the first station,
exacting dust from the aggregate during drying,
continuously weighing the dried aggregate at a second station along the path, metering the extracted dust back to the path of aggregate travel in accordance with the weight sensed at the second station, varying the aggregate feed in accordance with the weight sensed of aggregate being fed and the weight sensed of aggregate passing the second station,
delivering a flow of bitumen into the path of travel of the aggregate at a third station,
metering the flow of bitumen in accordance with the weight of aggregate sensed at the second station, and
mixing the bitumen and aggregate delivered to the third station.
2. The method defined in claim 1, wherein the step of drying includes heating the aggregate.
3. The method defined in claim 1, comprising the further steps of delivering a portion of aggregate flow from the path upstream of the third station,
separating the portion into the aggregate components,
weighing each of the components and automatically recording the weights thereof, and
delivering the portion back to the path upstream of the second station.
4. The method defined in claim 3, further comprising the steps of controlling individual aggregate component feed in accordance with the weight detected in a diverted portion.
5. A method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of heating the aggregate,
transporting the heated aggregate along a path,
continuously weighing the aggregate passing a first point along said path,
delivering a flow of bitumen to a second point along said path,
diverting a portion of the aggregate from said path at a third point intermediate said first and second points for sampling,
separating said diverted portion of the aggregate into its constituent components and weighing each of said components,
returning said diverted portion to said path in advance of said second point,
metering the flow of bitumen in accordance with the weight of the aggregate passing said first point and in accordance with the weight of said components, and
thereafter mixing the heated aggregate and the bitumen.
6. A method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of feeding aggregate from the supply for heating,
continuously weighing the aggregate fed from the pp y. transporting the heated aggregate along a path, continuously weighing the heated aggregate passing a first point along said path, varying the feed of aggregate in accordance with the weight of aggregate being fed from the supply and the weight of aggregate passing said first point, delivering a flow of bitumen to a second point along said path, metering the flow of bitumen in accordance with the weight of aggregate, and thereafter mixing the heated aggregate and the bitumen.
7. A method of producing asphalt material from supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of heating the aggregate,
extracting dust from the aggregate during heating of the aggregate,
transporting the heated aggregate along a path,
continuously weighing the aggregate passing a first point along said path, transporting the dust to said path and metering the dust into the heated aggregate in accordance with the weight of aggregate passing said first point,
delivering a flow of bitumen to a second point along said path,
metering the flow of bitumen in accordance with the weight of aggregate, and
thereafter mixing the heated aggregate and the bitumen.
t 4 t i

Claims (7)

1. A method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of feeding the aggregate along a path from the aggregate supply to a first station, continuously weighing the aggregate being fed, drying the aggregate at the first station, exacting dust from the aggregate during drying, continuously weighing the dried aggregate at a second station along the path, metering the extracted dust back to the path of aggregate travel in accordance with the weight sensed at the second station, varying the aggregate feed in accordance with the weight sensed of aggregate being fed and the weight sensed of aggregate passing the second station, delivering a flow of bitumen into the path of travel of the aggregate at a third station, metering the flow of bitumen in accordance with the weight of aggregate sensed at the second station, and mixing the bitumen and aggregate delivered to the third station.
2. The method defined in claim 1, wherein the step of drying includes heating the aggregate.
3. The method defined in claim 1, comprising the further steps of delivering a portion of aggregate flow from the path upstream of the third station, separating the portion into the aggregate components, weighing each of the components and automatically recording the weights thereof, and delivering the portion back to the path upstream of the second station.
4. The method defined in claim 3, further comprising the steps of controlling individual aggregate component feed in accordance with the weight detected in a diverted portion.
5. A method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of heating the aggregate, transporting the heated aggregate along a path, continuously weighing the aggregate passing a first point along said path, delivering a flow of bitumen to a second point along said path, diverting a portion of the aggregate from said path at a third point intermediate said first and second points for sampling, separating said diverted portion of the aggregate into its constituent components and weighing each of said components, returning said diverted portion to said path in advance of said second point, metering the flow of bitumen in accordance with the weight of the aggregate passing said first point and in accordance with the weight of said components, and thereafter mixing the heated aggregate and the bitumen.
6. A method of producing asphalt material from a supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of feeding aggregate from the supply for heating, continuously weighing the aggregate fed from the supply, transporting the heated aggregate along a path, continuously weighing the heated aggregate passing a first point along said path, varying the feed of aggregate in accordance with the weight of aggregate being fed from the supply and the weight of aggregate passing said first point, delivering a flow of bitumen to a second point along said path, metering the flow of bitumen in accordance with the weight of aggregate, and thereafter mixing the heated aggregate and the bitumen.
7. A method of producing asphalt material from supply of bitumen and a supply of aggregate having a plurality of aggregate components, comprising the steps of heating the aggregate, extracting dust from the aggregate during heating of the aggregate, transporting the heated aggregate along a path, continuously weighing the aggregate passing a first point along said path, transporting the dust to said path and metering the dust into the heated aggregate in accordance with the weight of aggregate passing said first point, delivering a flow of bitumen to a second point along said path, metering the flow of bitumen in accordance with the weight of aggregate, and thereafter mixing the heated aggregate and the bitumen.
US00128586A 1969-09-08 1971-03-26 Proportioning control system for an asphalt plant Expired - Lifetime US3741532A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US85600769A 1969-09-08 1969-09-08
US12858671A 1971-03-26 1971-03-26

Publications (1)

Publication Number Publication Date
US3741532A true US3741532A (en) 1973-06-26

Family

ID=26826729

Family Applications (1)

Application Number Title Priority Date Filing Date
US00128586A Expired - Lifetime US3741532A (en) 1969-09-08 1971-03-26 Proportioning control system for an asphalt plant

Country Status (1)

Country Link
US (1) US3741532A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3857552A (en) * 1972-03-28 1974-12-31 K Ohlson Asphalt mixing plants for making asphalt concrete mix
US4025057A (en) * 1972-11-03 1977-05-24 Pavement Systems, Inc. Equipment for making asphalt paving compositions
US4218145A (en) * 1979-03-14 1980-08-19 Astec Industries, Inc. Liquid asphalt weigh out system
US4248359A (en) * 1978-06-05 1981-02-03 Astec Industries, Inc. Weigh-out system for collapsible surge bin
US4638747A (en) * 1985-04-01 1987-01-27 Astec Industries, Inc. Coal-fired asphalt plant
US4898472A (en) * 1986-04-25 1990-02-06 Taisei Road Construction Company, Ltd. Plant of batch system for producing a composite paving material by using a bituminous waste pavement material
US5251976A (en) * 1992-04-06 1993-10-12 Astec Industries, Inc. Asphalt plant adapted for the batch production of asphalt mix containing recycle asphalt paving
US5470146A (en) * 1986-06-30 1995-11-28 Standard Havens, Inc. Countercurrent drum mixer asphalt plant
GB2356824A (en) * 2000-07-04 2001-06-06 Allchem Internat Ltd Apparatus for blending and delivering pelletised additives for incorporation in asphalt
US20050018530A1 (en) * 2003-07-21 2005-01-27 Alain Romier Method of manufacturing a bituminous coated aggregate mix
US6929393B1 (en) * 1998-10-08 2005-08-16 Astec, Inc. Asphalt production plant
EP2354879A1 (en) * 2010-02-02 2011-08-10 Famaro Method to estimate the target flow of bitumen or bituminous binders to be introduced in an installation producing bituminous conglomerate in continuous
US20120051982A1 (en) * 2010-08-25 2012-03-01 Kois Brother Equipment Co. Brine maker
US20140108182A1 (en) * 2012-10-16 2014-04-17 Okanagan Quality Control Ltd. Aggregate processing control system
CN104195921A (en) * 2014-08-20 2014-12-10 山西路桥建设集团有限公司 Embedded display and input method of matching curve of asphalt mixing equipment
US9441339B2 (en) 2010-08-25 2016-09-13 Kois Brothers Equipment Co., Inc. Brine maker
CN106436529A (en) * 2016-08-31 2017-02-22 天津领先正华能源科技发展有限公司 Modified asphalt rapid heating system
CN110195401A (en) * 2019-06-20 2019-09-03 镇江盛广拓再生装备科技有限公司 A kind of regeneration cold-repairing material MIXING SYSTEM CONTROLLED BY
US20200061632A1 (en) * 2017-03-02 2020-02-27 Cams S.R.L. A control method of a treatment plant of elements to be recycled or disposed and a treatment plant of elements to be recycled or disposed
US11377381B2 (en) * 2017-06-06 2022-07-05 Cde Global Limited Slurry handling apparatus
US11707864B2 (en) * 2016-08-17 2023-07-25 Saroj Vanijya Private Limited System and process for producing dry mix construction materials with improved engineering properties

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1541717A (en) * Shredder of secret documents
US2877524A (en) * 1954-07-01 1959-03-17 Mechanical Handling Sys Inc Apparatus for mixing and feeding shell molding material
US3263971A (en) * 1962-03-21 1966-08-02 Barber Greene Co Automatic sampling means for asphalt plants
US3380717A (en) * 1967-05-12 1968-04-30 Ramsey Eng Co Binless batching system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1541717A (en) * Shredder of secret documents
US2877524A (en) * 1954-07-01 1959-03-17 Mechanical Handling Sys Inc Apparatus for mixing and feeding shell molding material
US3263971A (en) * 1962-03-21 1966-08-02 Barber Greene Co Automatic sampling means for asphalt plants
US3380717A (en) * 1967-05-12 1968-04-30 Ramsey Eng Co Binless batching system

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3857552A (en) * 1972-03-28 1974-12-31 K Ohlson Asphalt mixing plants for making asphalt concrete mix
US4025057A (en) * 1972-11-03 1977-05-24 Pavement Systems, Inc. Equipment for making asphalt paving compositions
US4248359A (en) * 1978-06-05 1981-02-03 Astec Industries, Inc. Weigh-out system for collapsible surge bin
US4218145A (en) * 1979-03-14 1980-08-19 Astec Industries, Inc. Liquid asphalt weigh out system
US4638747A (en) * 1985-04-01 1987-01-27 Astec Industries, Inc. Coal-fired asphalt plant
US4898472A (en) * 1986-04-25 1990-02-06 Taisei Road Construction Company, Ltd. Plant of batch system for producing a composite paving material by using a bituminous waste pavement material
US5470146A (en) * 1986-06-30 1995-11-28 Standard Havens, Inc. Countercurrent drum mixer asphalt plant
US5251976A (en) * 1992-04-06 1993-10-12 Astec Industries, Inc. Asphalt plant adapted for the batch production of asphalt mix containing recycle asphalt paving
US6929393B1 (en) * 1998-10-08 2005-08-16 Astec, Inc. Asphalt production plant
GB2356824A (en) * 2000-07-04 2001-06-06 Allchem Internat Ltd Apparatus for blending and delivering pelletised additives for incorporation in asphalt
US20020075753A1 (en) * 2000-07-04 2002-06-20 Kevin Taylor Asphalt additive mixing apparatus and methods
US6843592B2 (en) 2000-07-04 2005-01-18 Kevin Taylor Asphalt additive mixing apparatus
US20050018530A1 (en) * 2003-07-21 2005-01-27 Alain Romier Method of manufacturing a bituminous coated aggregate mix
US7114843B2 (en) * 2003-07-21 2006-10-03 Htp Est Method of manufacturing a bituminous coated aggregate mix
EP2354879A1 (en) * 2010-02-02 2011-08-10 Famaro Method to estimate the target flow of bitumen or bituminous binders to be introduced in an installation producing bituminous conglomerate in continuous
US9441339B2 (en) 2010-08-25 2016-09-13 Kois Brothers Equipment Co., Inc. Brine maker
US8529845B2 (en) * 2010-08-25 2013-09-10 Kois Brother Equipment Co. Brine maker
US20120051982A1 (en) * 2010-08-25 2012-03-01 Kois Brother Equipment Co. Brine maker
US20140108182A1 (en) * 2012-10-16 2014-04-17 Okanagan Quality Control Ltd. Aggregate processing control system
US9146554B2 (en) * 2012-10-16 2015-09-29 Adam Hoban Aggregate processing control system
CN104195921B (en) * 2014-08-20 2017-02-15 山西路桥建设集团有限公司 Embedded display and input method of matching curve of asphalt mixing equipment
CN104195921A (en) * 2014-08-20 2014-12-10 山西路桥建设集团有限公司 Embedded display and input method of matching curve of asphalt mixing equipment
US11707864B2 (en) * 2016-08-17 2023-07-25 Saroj Vanijya Private Limited System and process for producing dry mix construction materials with improved engineering properties
CN106436529A (en) * 2016-08-31 2017-02-22 天津领先正华能源科技发展有限公司 Modified asphalt rapid heating system
US20200061632A1 (en) * 2017-03-02 2020-02-27 Cams S.R.L. A control method of a treatment plant of elements to be recycled or disposed and a treatment plant of elements to be recycled or disposed
US11377381B2 (en) * 2017-06-06 2022-07-05 Cde Global Limited Slurry handling apparatus
CN110195401A (en) * 2019-06-20 2019-09-03 镇江盛广拓再生装备科技有限公司 A kind of regeneration cold-repairing material MIXING SYSTEM CONTROLLED BY
CN110195401B (en) * 2019-06-20 2021-04-23 镇江盛广拓再生装备科技有限公司 Regeneration cold-patch mixing system

Similar Documents

Publication Publication Date Title
US3741532A (en) Proportioning control system for an asphalt plant
US3625488A (en) Proportioning control system for an asphalt plant
US4089509A (en) Composition control system for an asphalt plant
CN100458604C (en) Material balance intelligent control system
US3477529A (en) Simplified automatic charging system for blast furnaces
CN204490829U (en) A kind of Coal Blending System
US5754423A (en) Method and apparatus for preparing a mixture of materials
US2822028A (en) Method of manufacturing wood particle boards
US2965316A (en) Plant operating control means
CN108700376B (en) Blast furnace storage room device
US3110421A (en) Supervising apparatus for maintaining predetermined mixture proportions in the dry constituents of a mixture more particularly for road construction
CN103808370B (en) The solid flow detection means and application method of a kind of volume metering method
US3263971A (en) Automatic sampling means for asphalt plants
CN108940462B (en) Online control method for crushing fineness of coking matched coal
US3994404A (en) Portable mixing plant for concrete and the like
US7182204B2 (en) Treatment method and device, in particular for excavation material
CN2334487Y (en) Automatic mixer for fertilizer mixing productive line
US3499144A (en) Apparatus for sampling and analyzing pulverulent material
CN2258612Y (en) Automatically quantitative sampler for ore
CN1039982A (en) Moulding-sand property detecting and control method and equipment thereof
EP2554746A1 (en) Method and device for manufacturing asphalt
US4156507A (en) Apparatus for removing samples of stream of granular material and for preparing analytical samples therefrom
US3869110A (en) Aggregate analysis and delivery system
CN107755064A (en) A kind of mobile screening station
US3344921A (en) Method and apparatus for measurement and control of moisture

Legal Events

Date Code Title Description
AS Assignment

Owner name: M & I MARSHALL & ILSELEY BANK, NORTHWESTERN MUTUAL

Free format text: SECURITY INTEREST;ASSIGNOR:BARBER-GREENE COMPANY;REEL/FRAME:004246/0253

Effective date: 19840203

AS Assignment

Owner name: BARBER-GREENE COMPANY,ILLINOIS

Free format text: RELEASED BY SECURED PARTY;ASSIGNOR:FIRST NATIONAL BANK OF CHICAGO AS AGENT FOR SEE DOCUMENT FORNAMES;REEL/FRAME:004688/0001

Effective date: 19861224

Owner name: BARBER-GREENE COMPANY, 400 N. HIGHLAND AVE., AUROR

Free format text: RELEASED BY SECURED PARTY;ASSIGNOR:FIRST NATIONAL BANK OF CHICAGO AS AGENT FOR SEE DOCUMENT FORNAMES;REEL/FRAME:004688/0001

Effective date: 19861224

AS Assignment

Owner name: BARBER-GREENE COMPANY, A DE. CORP.,ILLINOIS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:B.V. OCEANIC FINANCE COMPANY;REEL/FRAME:004730/0767

Effective date: 19861229

Owner name: BARBER-GREENE COMPANY, 400 NORTH HIGHLAND AVENUE,

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:B.V. OCEANIC FINANCE COMPANY;REEL/FRAME:004730/0767

Effective date: 19861229

AS Assignment

Owner name: FIRST AMERICAN NATIONAL BANK OF NASHVILLE, TENNESS

Free format text: SECURITY INTEREST;ASSIGNOR:BARBER-GREENE COMPANY, A CORP. OF DE.;REEL/FRAME:004748/0440

Effective date: 19861229

Owner name: FIRST AMERICAN NATIONAL BANK OF NASHVILLE, NASHVIL

Free format text: SECURITY INTEREST;ASSIGNOR:BARBER-GREENE COMPANY, A CORP. OF DE.;REEL/FRAME:004748/0440

Effective date: 19861229

AS Assignment

Owner name: BARBER-GREENE COMPANY, ILLINOIS

Free format text: RELEASED BY SECURED PARTY;ASSIGNOR:FIRST AMERICAN NATIONAL BANK OF NASHVILLE;REEL/FRAME:005000/0045

Effective date: 19880606

Owner name: BARBER-GREENE COMPANY, 400 NORTH HIGHLAND, AURORA,

Free format text: RELEASED BY SECURED PARTY;ASSIGNOR:FIRST AMERICAN NATIONAL BANK OF NASHVILLE;REEL/FRAME:005000/0045

Effective date: 19880606

AS Assignment

Owner name: FIRST NATIONAL BANK OF CHICAGO, THE

Free format text: SECURITY INTEREST;ASSIGNORS:BARBER-GREENE COMPANY;ROADTEC, INC.;TRENCOR JETCO, INC.;AND OTHERS;REEL/FRAME:005357/0010

Effective date: 19900516

AS Assignment

Owner name: CITIZENS AND SOUTHERN TRUST COMPANY (GEORGIA), GEO

Free format text: AMENDMENT TO A PREVIOUSLY RECORDED SECURITY AGREEMENT DATED APRIL 27, 1989;;ASSIGNORS:BARBER-GREENE COMPANY;ROADTEC, INC.;TRENCOR JETCO, INC.;REEL/FRAME:006113/0075

Effective date: 19910301

Owner name: FIRST NATIONAL BANK OF CHICAGO, THE, ILLINOIS

Free format text: AMENDMENT TO A PREVIOUSLY RECORDED SECURITY AGREEMENT DATED APRIL 27, 1989;;ASSIGNORS:BARBER-GREENE COMPANY;ROADTEC, INC.;TRENCOR JETCO, INC.;REEL/FRAME:006113/0075

Effective date: 19910301

AS Assignment

Owner name: FIRST NATIONAL BANK OF CHICAGO, N.A., THE, ILLINOI

Free format text: TERMINATION & RELEASE OF SECURITY INTEREST IN PATENTS;ASSIGNOR:NATIONSBANK OF GEORGIA, N.A. (F/K/A CITIZENS AND SOUTHERN TRUST COMPANY, N.A.);REEL/FRAME:007603/0227

Effective date: 19940720

Owner name: ASTEC INDUSTRIES, INC., TENNESSEE

Free format text: TERMINATION & RELEASE OF SECURITY INTEREST IN PATENTS;ASSIGNOR:NATIONSBANK OF GEORGIA, N.A. (F/K/A CITIZENS AND SOUTHERN TRUST COMPANY, N.A.);REEL/FRAME:007603/0227

Effective date: 19940720