US3702542A - Ice control about marine structures - Google Patents

Ice control about marine structures Download PDF

Info

Publication number
US3702542A
US3702542A US120565A US3702542DA US3702542A US 3702542 A US3702542 A US 3702542A US 120565 A US120565 A US 120565A US 3702542D A US3702542D A US 3702542DA US 3702542 A US3702542 A US 3702542A
Authority
US
United States
Prior art keywords
ice
insulating material
layer
thermal insulating
movement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US120565A
Inventor
Russell A Hemstock
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
Exxon Production Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxon Production Research Co filed Critical Exxon Production Research Co
Application granted granted Critical
Publication of US3702542A publication Critical patent/US3702542A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/0021Means for protecting offshore constructions against ice-loads

Definitions

  • ABSTRACT Ice is controlled about a marine structure after a continuous ice cover has been formed by applying a layer of solid insulating material sufficiently thick to balance heat float when the ice reaches the desired thickness to the surface of the ice.
  • This invention provides a method for controlling the thickness of the ice cover around a marine structure so that ice moving against the structure never becomes thick enough to cause significant damage.
  • a layer of foamed plastic, sawdust, wood chips, snow or similar insulating material of predetermined thickness is applied to the surface of the ice around the marine structure after a complete ice cover has been formed and the surface is safe to work on.
  • This layer should be sufficiently thick to balance heat flow through the ice after the desired ice thickness has been attained and should extend over an area sufficiently large to prevent contact of the unprotected ice with the structure as the ice cover moves.
  • FIG. 1 is a vertical elevation showing an offshore oil production platform which has been protected against damage due to the movement of shore-fast ice in accordance with the invention
  • FIG. 2 is a top view of a platform of the type shown in FIG. 1 which illustrates the distribution of insulating material in an area where the direction of movement of the shore-fast ice is unpredictable;
  • FIG. 3 is a top view similar to that of FIG. 2 which illustrates the distribution of insulating material in an area where movement of the shore-fast ice is predictable;
  • FIG. 4 illustrates the use of insulating material for controlling the thickness of shore-fast ice along a route over which a tanker or similar vessel must pass.
  • the offshore oil production platform shown in FIG. 1 of the drawing is a monopod type structure having an upright leg 11 on which a deck 12 is mounted.
  • the wells on the structure extend downwardly through the leg into the earth beneath the water.
  • the production equipment normally mounted on the platform is not shown. It should be understood that the method of the invention is not restricted to this particular type of platform and instead is equally applicable to any offshore structure which extends upwardly through shore-fast ice.
  • a snow fence or similar barrier 14 has been erected on the surface of the ice around the leg of the platform by drilling holes into the ice, inserting stakes or similar supporting members, and allowing them to freeze in place. Bales of hay that can be wet down and frozen into place or other barriers may be used if desired. The use of a barrier is not always essential and may in some cases be dispensed with.
  • the barrier will generally be arranged in a circular pattern around the leg of the platform as shown in FIG. 2 of the drawing.
  • the direction of the wind and current forces are such that the ice moves back and forth along a relatively straight line and in those cases a long narrow pattern such as that shown in FIG. 3 of the drawing may be used in lieu of a circular pattern.
  • the distance separating the barrier from the leg of the platform should be somewhat greater than the maximum distance the ice is expected to move during the winter season.
  • insulating material 15 Any of a variety of fibrous, granular or sheet materials having suitably low coefficients of thermal conductivity may be employed. Suitable materials include, for example, expanded silica, asbestos fibers, corrugated cardboard, cotton batting, granulated or sheet cork, diatomaceous earth, kapok, mineral wool, sawdust, slag wool, foamed-in-place plastics, crumpled paper, wood chips or shavings, snow, and expanded synthetic resins such asthe expanded phenol-formaldehydes, urea-formaldehydes, polyurethanes, polyethylenes, cellulose acetates, and the like.
  • a particularly effective class of expanded materials for purposes of the invention are the cellular polyurethanes. These can be prepared by the reaction of the dicarboxylic acid ester of a polyfunctional alcohol containing free hydroxyl groups, an adipic acid ester of glycerol, for example, with a dior polyisocyanate such as toluene diisocyanate.
  • the dior polyisocyanate reacts in part with the hydroxyl groups on the ester to form polyurethane bonds. Due to the increase in temperature as the exothermic reaction takes place, the carboxyl groups react with isocyanate group to form cross links and liberate carbon dioxide.
  • a tough spongy mass which turns into a very hard rigid foam is formed.
  • a thermal blowing agent such as trichloromonofluoromethane, Unicel or Porofor may be included to increase the production of gas and thus obtain a lower density material.
  • Surface active agents, fillers and other additives can also be included if desired. This method and other techniques which may be used to produce rigid polyurethane foams, including the use of free flowing powders which melt, expand and cure when heated, have been described in detail in the literature and will be familiar to those skilled in the art.
  • insulating materials suitable for purposes of the invention have very low densities and must be confined to prevent them from being blown away. It is therefor generally preferred to place the insulating material in waterproof bags and pack these into the confined space between the barrier and leg of the platform. Plastic bags used to ship and store the material are generally suitable. This protects the insulating material against wind and water, facilitates its placement around the leg of the platform, and permits its recovery at the end of the season.
  • the ice between the barrier and platform can be covered with a sheet of polyethylene or similar waterproof plastic material, loose insulating material can be placed on top of this sheet, and the insulating material can then be covered with a second sheet of plastic or similar material to protect it. Other placement methods can also be used.
  • the insulating material is applied to the surface of the ice after a continuous ice cover sufficiently thick to work on has been formed.
  • An ice layer from about 4 to about 6 inches thick is generally preferred. This will normally permit safe installation of the insulating material and will not cause any appreciable damage due to ice movement against the structure.
  • the thickness of the layer of insulating material applied to the ice will depend in part upon the climatic conditions in the area and the particular insulating material selected.
  • the layer applied should be sufficient to prevent the formation of thick ice that might damage the structure but should not be thick enough to cause any significant thawing of the ice.
  • the thickness required can be approximated by subtracting the thickness of the ice at the time the material is applied from the normal ice cover thickness under midwinter conditions and then calculating the amount of insulating material that will be necessary to provide the same insulation afforded by that quantity of ice.
  • a more accurate method is to calculate the thickness of insulating material necessary to balance heat flow through the ice under various temperature conditions.
  • the presence of the insulating material on the ice surrounding the platform retards heat flow from the water through the ice to the colder air above it. As shown in FIG. 1 of the drawing, the ice beneath the insulating material therefore remains relatively thin.
  • the surrounding ice increases in thickness as the winter season progresses. Movement of the ice cover will result in crushing of the protected ice against the leg of the platform without any appreciable damage to the structure. If the platform were surrounded by ice of normal thickness, severe damage might well occur. As the protected ice is crushed against the platform a portion of the layer of insulating material will be destroyed. This material can be replaced as soon as the water refreezes about the structure and the new ice is safe to work on.
  • the insulating material can be removed from the surface of the ice after the winter season has passed and can be stored for reuse the following season.
  • the method of the invention is not restricted to the protection of fixed structures such as that shown in FIG. 1 and instead can also be used for the protection of ships and other floating vessels and to facilitate the movement of such vessels in arctic port or terminal areas.
  • a method for controlling the thickness of ice in a selected area at a marine location which comprises erecting a barrier about said area after an initial ice cover has been formed and applying a layer of thermal insulating material of predetermined thickness to the surface of the ice enclosed by said barrier, said layer being sufficiently thick to retard heat flow through the ice without causing significant thawing.
  • a method for reducing damage to a marine structure due to the movement of shore-fast ice which comprises applying a layer of thermal insulating material of predetermined thickness to the surface of the ice after an initial ice cover sufficiently thick to work on has been formed, said layer being sufficiently thick to retard heat flow through the ice without causing significant thawing and said layer being applied over an area extending from said structure a distance greater than the maximum anticipated movement of the ice.
  • thermo insulating material is a synthetic plastic.
  • thermo insulating material is enclosed by a barrier erected on the surface of said ice.
  • thermal insulating material is a finely divided solid having a thermal conductivity on the order of about 0.02 to 0.03 BTU/hr./ft F./ft.
  • thermo insulating material comprises wood chips.
  • a method for facilitating the movement of a floating vessel along a predetermined route covered by shorefast ice which comprises applying a layer of solid insulating material of predetermined thickness to the surface of said ice along said route after an ice cover sufficiently thick to work on has been formed, said layer of insulating material being sufiicient to substantially balance heat flow through the ice after the ice reaches a predetermined thickness but insufficient to cause significant thawing of the ice.
  • said insulating material is a foamed plastic.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Thermal Insulation (AREA)

Abstract

Ice is controlled about a marine structure after a continuous ice cover has been formed by applying a layer of solid insulating material sufficiently thick to balance heat float when the ice reaches the desired thickness to the surface of the ice.

Description

United States Patent Hemstock ICE CONTROL ABOUT MARINE STRUCTURES [72] Inventor: Russell A. Helmtock, Calgary,
Canada [73] Assignee: Esso Production Research Company [22] Filed: March 3, 1971 [21] Appl. No.: 120,565
[52] US. Cl. ..62/66, 61/54, 62/259, 1 14/40 [51] Int. Cl. ..F25c l/02, E02d 5/22 [58] Field of Search...6l/l, 46 X, 54 X, 369; 62/259, 62/260, 66, 340; 114/40 X [451 Nov. 14, 1972 ABSTRACT Ice is controlled about a marine structure after a continuous ice cover has been formed by applying a layer of solid insulating material sufficiently thick to balance heat float when the ice reaches the desired thickness to the surface of the ice.
[56] References Cited 12 Clains, 4 Drawing Figures UNITED STATES PATENTS 3,170,299 2/1965 Clarke .6l/54 2( ll '5 1 I4 PATENT-BMW 14 1972 SHEET 1 BF 2 FIG. 2
1 1V VEIV'TOR.
RUSSELL Av HEMSTOCK BYW a Q L AT TORNEY ICE CONTROL ABOUT MARINE STRUCTURES BACKGROUND OF THE INVENTION 1. Field of the Invention This invention relates to the control of ice in the vicinity of piles, piers, ships and other partially submerged objects normally exposed to severe icing conditions. I
2. Description of the Prior Art In many arctic areas, water near the coast is covered by shore-fast ice during much of the year. The ice thickness increases rapidly during the early fall, reaches a maximum in late winter, and diminishes in the spring. Experience has shown that this ice moves in response to wind, current and thermal forces and that such movement may amount to several feet during a season. The forces exerted by the moving ice on pilings and similar members extending through the ice cover may be quite large and hence the design and maintenance of piers, offshore platforms and similar structures present severe problems. Sleeves and similar devices which can be installed around the legs of such structures to prevent the freezing of water adjacent the legs and thus avoid lifting of the structures by the ice have been proposed but such methods do not eliminate difficulties due to horizontal movement of the shorefast ice cover.
SUMMARY OF THE INVENTION This invention provides a method for controlling the thickness of the ice cover around a marine structure so that ice moving against the structure never becomes thick enough to cause significant damage. In accordance with the invention, a layer of foamed plastic, sawdust, wood chips, snow or similar insulating material of predetermined thickness is applied to the surface of the ice around the marine structure after a complete ice cover has been formed and the surface is safe to work on. This layer should be sufficiently thick to balance heat flow through the ice after the desired ice thickness has been attained and should extend over an area sufficiently large to prevent contact of the unprotected ice with the structure as the ice cover moves. By thus controlling the thickness of the ice that contacts the structure, the forces exerted against it can be kept sufficiently low to avoid significant damage. Studies indicate that this method permits the use of substantially conventional structures in shore-fast ice areas and will allow year round operations in areas which are now accessible for only very limited periods during the year. It is substantially less expensive than methods requiring melting of the ice.
BRIEF DESCRIPTION OF THE DRAWING FIG. 1 is a vertical elevation showing an offshore oil production platform which has been protected against damage due to the movement of shore-fast ice in accordance with the invention;
FIG. 2 is a top view of a platform of the type shown in FIG. 1 which illustrates the distribution of insulating material in an area where the direction of movement of the shore-fast ice is unpredictable;
FIG. 3 is a top view similar to that of FIG. 2 which illustrates the distribution of insulating material in an area where movement of the shore-fast ice is predictable;
FIG. 4 illustrates the use of insulating material for controlling the thickness of shore-fast ice along a route over which a tanker or similar vessel must pass.
DESCRIPTION OF THE PREFERRED EMBODIMENTS The offshore oil production platform shown in FIG. 1 of the drawing is a monopod type structure having an upright leg 11 on which a deck 12 is mounted. The wells on the structure extend downwardly through the leg into the earth beneath the water. The production equipment normally mounted on the platform is not shown. It should be understood that the method of the invention is not restricted to this particular type of platform and instead is equally applicable to any offshore structure which extends upwardly through shore-fast ice.
The water surrounding the platform of FIG. 1 is covered by a layer of shore-fast ice 13. A snow fence or similar barrier 14 has been erected on the surface of the ice around the leg of the platform by drilling holes into the ice, inserting stakes or similar supporting members, and allowing them to freeze in place. Bales of hay that can be wet down and frozen into place or other barriers may be used if desired. The use of a barrier is not always essential and may in some cases be dispensed with.
The direction in which the shore-fast ice will move during the weather season is often unpredictable and hence the barrier will generally be arranged in a circular pattern around the leg of the platform as shown in FIG. 2 of the drawing. There are some areas, however, where the direction of the wind and current forces are such that the ice moves back and forth along a relatively straight line and in those cases a long narrow pattern such as that shown in FIG. 3 of the drawing may be used in lieu of a circular pattern. In either case, the distance separating the barrier from the leg of the platform should be somewhat greater than the maximum distance the ice is expected to move during the winter season.
The enclosed space within barrier 14 has been filled with a layer of insulating material 15. Any of a variety of fibrous, granular or sheet materials having suitably low coefficients of thermal conductivity may be employed. Suitable materials include, for example, expanded silica, asbestos fibers, corrugated cardboard, cotton batting, granulated or sheet cork, diatomaceous earth, kapok, mineral wool, sawdust, slag wool, foamed-in-place plastics, crumpled paper, wood chips or shavings, snow, and expanded synthetic resins such asthe expanded phenol-formaldehydes, urea-formaldehydes, polyurethanes, polyethylenes, cellulose acetates, and the like. Certain of these materials, of course, have better properties than others and are therefore preferred. In general, materials which have thermal conductivities on the order of about 0.02 to 0.03 BTU/hr./ft /F/ft., possess sufficient strength to avoid excessive packing, and are unaffected by the presence of water are most effective.
A particularly effective class of expanded materials for purposes of the invention are the cellular polyurethanes. These can be prepared by the reaction of the dicarboxylic acid ester of a polyfunctional alcohol containing free hydroxyl groups, an adipic acid ester of glycerol, for example, with a dior polyisocyanate such as toluene diisocyanate. The dior polyisocyanate reacts in part with the hydroxyl groups on the ester to form polyurethane bonds. Due to the increase in temperature as the exothermic reaction takes place, the carboxyl groups react with isocyanate group to form cross links and liberate carbon dioxide. A tough spongy mass which turns into a very hard rigid foam is formed. A thermal blowing agent such as trichloromonofluoromethane, Unicel or Porofor may be included to increase the production of gas and thus obtain a lower density material. Surface active agents, fillers and other additives can also be included if desired. This method and other techniques which may be used to produce rigid polyurethane foams, including the use of free flowing powders which melt, expand and cure when heated, have been described in detail in the literature and will be familiar to those skilled in the art.
Many of the insulating materials suitable for purposes of the invention have very low densities and must be confined to prevent them from being blown away. It is therefor generally preferred to place the insulating material in waterproof bags and pack these into the confined space between the barrier and leg of the platform. Plastic bags used to ship and store the material are generally suitable. This protects the insulating material against wind and water, facilitates its placement around the leg of the platform, and permits its recovery at the end of the season. In lieu of this, the ice between the barrier and platform can be covered with a sheet of polyethylene or similar waterproof plastic material, loose insulating material can be placed on top of this sheet, and the insulating material can then be covered with a second sheet of plastic or similar material to protect it. Other placement methods can also be used.
As pointed out earlier, the insulating material is applied to the surface of the ice after a continuous ice cover sufficiently thick to work on has been formed. An ice layer from about 4 to about 6 inches thick is generally preferred. This will normally permit safe installation of the insulating material and will not cause any appreciable damage due to ice movement against the structure.
The thickness of the layer of insulating material applied to the ice will depend in part upon the climatic conditions in the area and the particular insulating material selected. The layer applied should be sufficient to prevent the formation of thick ice that might damage the structure but should not be thick enough to cause any significant thawing of the ice. The thickness required can be approximated by subtracting the thickness of the ice at the time the material is applied from the normal ice cover thickness under midwinter conditions and then calculating the amount of insulating material that will be necessary to provide the same insulation afforded by that quantity of ice. A more accurate method, however, is to calculate the thickness of insulating material necessary to balance heat flow through the ice under various temperature conditions. This will result in a series of thickness values that can be used as a basis for applying insulation in stages as the weather becomes colder and the temperature decreases. in some areas, the climatic conditions are such that it is preferable to apply the insulation in stages and in other areas they are such that it is normally satisfactory to apply all of the insulation at one time.
The presence of the insulating material on the ice surrounding the platform retards heat flow from the water through the ice to the colder air above it. As shown in FIG. 1 of the drawing, the ice beneath the insulating material therefore remains relatively thin. The surrounding ice, on the other hand, increases in thickness as the winter season progresses. Movement of the ice cover will result in crushing of the protected ice against the leg of the platform without any appreciable damage to the structure. If the platform were surrounded by ice of normal thickness, severe damage might well occur. As the protected ice is crushed against the platform a portion of the layer of insulating material will be destroyed. This material can be replaced as soon as the water refreezes about the structure and the new ice is safe to work on. The insulating material can be removed from the surface of the ice after the winter season has passed and can be stored for reuse the following season.
The method of the invention is not restricted to the protection of fixed structures such as that shown in FIG. 1 and instead can also be used for the protection of ships and other floating vessels and to facilitate the movement of such vessels in arctic port or terminal areas. in areas where a tanker must dock at infrequent intervals, for example, it may be advantageous to apply sufficient insulation 20 to the ice 21 along the approach 22 to such an area as illustrated in FIG. 4 to prevent the formation of very thick ice which would otherwise preclude movement of the vessel 23. Similarly, in some cases it may be advisable to apply insulation to the ice covering channels adjacent refineries and similar installations to facilitate the movement of fire boats and other emergency vehicles if necessary. Still other applications of the method will suggest themselves to those skilled in the art.
I claim:
1. A method for controlling the thickness of ice in a selected area at a marine location which comprises erecting a barrier about said area after an initial ice cover has been formed and applying a layer of thermal insulating material of predetermined thickness to the surface of the ice enclosed by said barrier, said layer being sufficiently thick to retard heat flow through the ice without causing significant thawing.
2. A method for reducing damage to a marine structure due to the movement of shore-fast ice which comprises applying a layer of thermal insulating material of predetermined thickness to the surface of the ice after an initial ice cover sufficiently thick to work on has been formed, said layer being sufficiently thick to retard heat flow through the ice without causing significant thawing and said layer being applied over an area extending from said structure a distance greater than the maximum anticipated movement of the ice.
3. A method as defined by claim 2 wherein said thermal insulating material is a synthetic plastic.
4. A method as defined by claim 2 wherein said thermal insulating material is enclosed by a barrier erected on the surface of said ice.
5. A method as defined by claim 2 wherein said thermal insulating material is applied over a circular pattern surrounding said structure.
6. A method as defined by claim 2 wherein the thickness of said layer of thermal insulating material is increased as the weather becomes colder.
7. A method as defined by claim 2 wherein said thermal insulating material is a finely divided solid having a thermal conductivity on the order of about 0.02 to 0.03 BTU/hr./ft F./ft.
8. A method as defined by claim 2 wherein said thermal insulating material comprises wood chips.
9. A method for facilitating the movement of a floating vessel along a predetermined route covered by shorefast ice which comprises applying a layer of solid insulating material of predetermined thickness to the surface of said ice along said route after an ice cover sufficiently thick to work on has been formed, said layer of insulating material being sufiicient to substantially balance heat flow through the ice after the ice reaches a predetermined thickness but insufficient to cause significant thawing of the ice.
10. A method as defined by claim 9 wherein said insulating material is a foamed plastic.
11. A method as defined by claim 9 wherein said insulating material is contained in waterproof bags.
12. A method as defined by claim 9 wherein said insulating material is placed on top of a sheet of waterproof plastic and is covered by a second sheet of plastic material.

Claims (11)

  1. 2. A method for reducing damage to a marine structure due to the movement of shore-fast ice which comprises applying a layer of thermal insulating material of predetermined thickness to the surface of the ice after an initial ice cover sufficiently thick to work on has been formed, said layer being sufficiently thick to retard heat flow through the ice without causing significant thawing and said layer being applied over an area extending from said structure a distance greater than the maximum anticipated movement of the ice.
  2. 3. A method as defined by claim 2 wherein said thermal insulating material is a synthetic plastic.
  3. 4. A method as defined by claim 2 wherein said thermal insulating material is enclosed by a barrier erected on the surface of said ice.
  4. 5. A method as defined by claim 2 wherein said thermal insulating material is applied over a circular pattern surrounding said structure.
  5. 6. A method as defined by claim 2 wherein the thickness of said layer of thermal insulating material is increased as the weather becomes colder.
  6. 7. A method as defined by claim 2 wherein said thermal insulating material is a finely divided solid having a thermal conductivity on the order of about 0.02 to 0.03 BTU/hr./ft2/*F./ft.
  7. 8. A method as defined by claim 2 wherein said thermal insulating material comprises wood chips.
  8. 9. A method for facilitating the movement of a floating vessel along a predetermined route covered by shore-fast ice which comprises applying a layer of solid insulating material of predetermined thickness to the surface of said ice along said route after an ice cover sufficiently thick to work on has been formed, said layer of insulating material being sufficient to substantially balance heat flow through the ice after the ice reaches a predetermined thickness but insufficient to cause significant thawing of the ice.
  9. 10. A method as defined by claim 9 wherein said insulating material is a foamed plastic.
  10. 11. A method as defined by claim 9 wherein said insulating material is contained in waterproof bags.
  11. 12. A method as defined by claim 9 wherein said insulating material is placed on top of a sheet of waterproof plastic and is covered by a second sheet of plastic material.
US120565A 1971-03-03 1971-03-03 Ice control about marine structures Expired - Lifetime US3702542A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12056571A 1971-03-03 1971-03-03

Publications (1)

Publication Number Publication Date
US3702542A true US3702542A (en) 1972-11-14

Family

ID=22391138

Family Applications (1)

Application Number Title Priority Date Filing Date
US120565A Expired - Lifetime US3702542A (en) 1971-03-03 1971-03-03 Ice control about marine structures

Country Status (2)

Country Link
US (1) US3702542A (en)
CA (1) CA944965A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4260292A (en) * 1979-10-25 1981-04-07 The Offshore Company Arctic offshore platform

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4323322A (en) * 1979-07-05 1982-04-06 Dome Petroleum Limited Warm air canopy system for providing ice-free zone

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3170299A (en) * 1962-04-27 1965-02-23 John H O Clarke Means for prevention of ice damage to boats, piers and the like
US3192898A (en) * 1962-02-05 1965-07-06 Thomas H Oster Limnological process

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3192898A (en) * 1962-02-05 1965-07-06 Thomas H Oster Limnological process
US3170299A (en) * 1962-04-27 1965-02-23 John H O Clarke Means for prevention of ice damage to boats, piers and the like

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4260292A (en) * 1979-10-25 1981-04-07 The Offshore Company Arctic offshore platform

Also Published As

Publication number Publication date
CA944965A (en) 1974-04-09

Similar Documents

Publication Publication Date Title
US4295758A (en) Working platform for oil drilling operations in ice covered sea areas
US3749162A (en) Arctic oil and gas development
US6099208A (en) Ice composite bodies
US3552131A (en) Offshore installation
US3750412A (en) Method of forming and maintaining offshore ice structures
US4523879A (en) Ice barrier construction
CA1215848A (en) Chilled gas pipeline installation and method
CA1068496A (en) Arctic island
US4326822A (en) Artificial island for installing oil drilling equipment in ice covered sea areas
CA1231542A (en) Arctic offshore production platform
US3702542A (en) Ice control about marine structures
SU1220572A3 (en) Method of producing bodies from ice and device for effecting same
US4098086A (en) Breakwater
US4456072A (en) Ice island structure and drilling method
CA1206010A (en) Mobile offshore structure for arctic exploratory drilling
US4518281A (en) Ice suppression mat
US5224800A (en) Protective system against icebergs or floating objects
CA1156477A (en) Method and apparatus for constructing an artificial island
US4080797A (en) Artificial ice pad for operating in a frigid environment
CA1331102C (en) Strengthened protective structure
US4265569A (en) Ice barrier for islands
Kowalski Scrap tire floating breakwaters
US3834337A (en) Submarine reservoirs
US4854780A (en) System and method of damping waves on a body of water using towable field of ice pieces of random sizes
US4941888A (en) Commodity storage pile protection with a rainwater holding sponge