US3593918A - Apparatus for temporarily connecting a conventional bolted rail to a laid portion of a continuous welded rail of a railway track - Google Patents

Apparatus for temporarily connecting a conventional bolted rail to a laid portion of a continuous welded rail of a railway track Download PDF

Info

Publication number
US3593918A
US3593918A US716799A US3593918DA US3593918A US 3593918 A US3593918 A US 3593918A US 716799 A US716799 A US 716799A US 3593918D A US3593918D A US 3593918DA US 3593918 A US3593918 A US 3593918A
Authority
US
United States
Prior art keywords
rail
bolted
switch point
laid
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US716799A
Inventor
Henry V Borst
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3593918A publication Critical patent/US3593918A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B11/00Rail joints
    • E01B11/02Dismountable rail joints
    • E01B11/18Fishplates for temporarily repairing broken rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B11/00Rail joints
    • E01B11/44Non-dismountable rail joints; Welded joints
    • E01B11/46General methods for making gapless tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/17Lengths of rails assembled into strings, e.g. welded together

Definitions

  • OBoyle ABSTRACT Apparatus for use in temporarily operationally connecting one or both rails of bolted railway track to a laid portion of' continuous vwelded rail or rails of railway track, without permanently bending or cutting the welded rail, during the course of removal of bolted or jointed rails and replacement thereof with continuous welded rail, when it is desired to connect a bolted rail and a welded rail to enable train traffic thereover,
  • Continuous welded rail (C.W.R.) as defined by American railway Engineering Association, consists of sufficient lengths of conventional rail welded together to form a string 40() feet or longer.
  • a eut is made by burning the rail, and this operation usually requires the services of a welder and a helper; after the rail has been cut, it is drilled preparatory to temporarily connecting it to the conventional rail, and when the period allotted for train traffic expires, the temporary connection is disconnected, and the free ends of the welded rail portions are permanently joined by welding.
  • Another item of expense is the per diem charge for foreign cars, namely, cars belonging to other railroads which ears usually must be returned to the home roads" before midnight, otherwisc the user road will be charged for another day for each car. Additional expense for many railroads also arises in connection with so-callcd Iconnection time," that is to say, the particular time which the railroads guarantee arrival of their trains at a specific connection or location; and failure to perform is considered a breach of contract, so to speak, resulting in forfeiture of a sum of money, which is frequently a substantial amount.
  • the above-noted potential extra costs are further indicative of the desirability of increasing the volume of train traffic normally permitted during the course of replacement of the rails of a railway track, in accordance with present practice, and with concomitant increase of on-track working time bythe track crew during a regular work day,
  • l have found that a laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, can be temporarily, operationally connected during the course of replacement of bolted rail with continuous welded rail, without permanently bending or cutting or severing thc welded rail in order to temporarily con neet thc rails according to the teachings of the prior art. More particularly, l have found that by means of the apparatus of the present invention that the track may be closed up to permit normal train traffic in a relatively short time, as compared with conventional methods, and at approximately 5 percentl0 percent of the cost of such methods, including the time required to disconnect the rails when installation of welded rail is to be resumed.
  • the improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of bolted rail during the course of replacement of the bolted rail with continuous welded rail, without cutting or severing the welded rail comprises, essentially, a switch point, including heel and tip portions, supported on cross ties with the heel portion connected in abutting relation with the terminal end of the laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail and merging therewith, and means to immobilize the switch point in the operative position with respect to the laid portion of the welded rail, comprising a plurality of guard rail clamps constructed and arranged in predetermined relation longitudinally of the switch point between selected pairs of cross ties, and a plurality of adjustable switch slides secured to selected intermediate ties, with the switch point supported thereon.
  • An object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement of the bolted rail with continuous welded rail on existing cross ties, without cutting or otherwise severing the welded rail, or bending the same.
  • Another object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous: welded rail and a laid section of conventional rail without cutting or severing the welded rail, said improved construction being designed whereby the temporary, operational connection between the welded rail and the bolted rail may be economically achieved in a relatively short period of time, as compared with prior 3 methods, thus substantially increasing the on-track time of the track crew.
  • Yet another yobject of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, during the course of replacement of the bolted rail with the welded rail, without cutting or severing the welded rail, said construction being designed whereby the welded rail may be connected to the bolted rail in substantially less time and at approximately onetenth of the cost of temporarily connecting the rails in accordance with present methods.
  • Still-another object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail of a railway track, said construction being designed whereby the track may be closed up at the end of the workday to permit train traffic thcrcover until the track laying operations are resumed the next workday.
  • a further object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of welded rail with a laid section of bolted rail, during the course of replacement of the bolted rail with the welded rail, without cutting or severing the welded rail, said construction comprising a relatively small number of components which are of' strong and sturdy construction adapted to be repeatedly employed for their intended purpose over a long period of time.
  • FIG. l is a schematic plan view showing the laid portion of a string of continuous welded rail temporarily, operationally connected to a laid section of conventional bolted rail, in accordance with the present invention
  • FIG. 2 is an enlarged plan view of the portion of FIG. l embodying the invention
  • FIG. 3 is a sectional view along line 33 of F IG. 2;
  • FIG. 4 is asectional view along line 4-4 of FIG. 2;
  • FIG. 5 is a sectional view along line S-S of FIG. 2;
  • FIG. 6 is a view along line 6-6 ofFIG. 2.
  • a string of continuous welded rail designated v generally by numeral l0, having a laid portion ll, temporarily, operationally connected as at l2 to a laid section of one of the conventional bolted rails 13 of a railroad track supported on crossties 14; and a diagrammatic view of railroad train units 15 traveling on the bolted rails in the direction of' the means employed to close up the track between the end of one of the bolted rails and the laid portion of the welded rail.
  • FIG. 2 is an enlarged plan view of the portion of FIG. l embodying the improved construction of the present invention, comprising a switch point 16 of the same weight of rail as the welded rail, having its heel portion 17 connected to the end portion of the bolted rail I3 by means of angle bars 18 and associated bolts 19, the tip portion 20 of the switch point being positioned in contiguous relation with the angularly disposed portion 2l of the welded rail, the end portion 22 of the tip merging with the rectilinear portion 23 of the welded rail, as shown.
  • the means employed to immobilizc the switch point 16 in the operative position with respect to thc laid portion Il of the welded rail comprises novel guard rail clamps 24, 25 and 26, having wedges 27 and keys 27a, as will be described more fully hereinafter, said guard rail clamps being positioned between pairs of ties 14 at the tip end of the switch point, at a point intermediate the tip and heel portions, and at the heel portion, respectively.
  • adjustable switch slides 28 and braces may be used on each tie or on every other tie. If an adjustable slide and brace is used on every other tie, then a frog slide or hook plate 29 is used on each of the remaining ties.
  • twin hook plates may be employed, if desired, arranged side by side on atie and facing in opposite directions.
  • the second rail of the track is conventional bolted rail 13 supported on standard tie plates 30, and secured to the tics by means of spikes.
  • one ofthe adjustable switch slides 28 is shown in the operative position with respect to the welded rail 10 seated on a suitable tic plate 3l, the wedge member 32 of the slide being retained in adjusted wedging position against the face of the web portion 33 of the rail by means of a pivotal detent 34, constructed and arranged to seat in a registering slot 35 of the wedge.
  • the tie plate 3l and flange 36 of the switch point I6 are secured tothe tie 14 by means of spikes 37 driven into the tie through openings formed in the plate.
  • a single hook plate 29 is shown in the operative position with its hook member 38 projecting over the upper surface of the bottom flange 39 on the rail I0, the switch point I6 being clamped in fixed position by means of spikes 37; and the guard rail clamp 24 nearest the heel portion of the switch point 16 is shown in FIG. 5, together with wedges 27 having portions 27' adapted for frictional bearing engagement with the curvilinear surfaces 40 of the end portions 4I of the clamps.
  • the procedure in connection with the replacement of the old rail with welded rail is as follows: permission must first be obtained from the train dispatcher before the rail gang can begin to work on the track. Assuming that the dispatcher authorizes the foreman to proceed with the work for a period of approximately l hour or more, the foreman then decides how much old rail can be removed and thereafter replaced with welded rail, within the allotted time.
  • the crane moves over the switch point and removes the remaining unlaid portion of thc rail from the center of the track to the outside thereof on the shoulder of the road bed.
  • the rail is laid on the ties directly from the shoulder.
  • the track may be closed up at the end of the workday, in order to permit train traffic thereover until track laying operations are resumed the next workday.
  • the temporary connection is left in the track overnight, for example, it is connected to the signal circuit, and the trains operate at normal speeds.
  • the signal circuit comprises a bond wire 42 having one end welded to the old rail, the opposite end of the wire being welded to the switch point, on the outside of the ball of rail, which is the standard location.
  • the welded rail is held against the outside of the switch point by the crane operator until one guard rail clamp is tightened and one tie is spiked.
  • the operations are completed in live minutes by two men, while the crane is moving to clearance; and approximately the same period of time for two men to remove the temporary connection after a train passes.
  • the welded rail it is laid in a direction so that the old rail can be removed while the crane is returning from the clearance point.
  • some railroads prefer to weld strings of length 1,400 feet together toform continuous lengths of l mile or more.
  • the welding is performed on the ground, after the 1,400 foot strings are unloaded. The reason for welding the shorter lengths together after they are unloaded is because better welds are obtained, and additionally, welding the short strings in-track delays production.
  • the improvement comprising the combination of a switch point, including a tip portion and a heel portion, said switch point being supported on the tics with its heel portion connected to the terminal end ofthe laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail;
  • the improvement comprising the combination of a switch point, including a tip portion and a heel portion, said switch point being supported on the ties with its heel portion connected to the terminal end of the laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail;
  • the means immobilizing the switch point in the operative position relative to the ties, the bolted rail section and the laid portion ofthe welded rail comprises a series of guard rail clamps arranged in predetermined spaced relation longitudinally of the switch point between selected adjacent pairs of crossties, an adjustable switch slide secured to one of the ties of each selected pair, and a tie plate :secured to each of the remaining

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

Apparatus for use in temporarily operationally connecting one or both rails of bolted railway track to a laid portion of continuous welded rail or rails of railway track, without permanently bending or cutting the welded rail, during the course of removal of bolted or jointed rails and replacement thereof with continuous welded rail, when it is desired to connect a bolted rail and a welded rail to enable train traffic thereover.

Description

United States Patent l5 ll Inventor Henry Borst Box 266, Waymart, Pa. 18472 Appl. No. 716,799 Filed Mar. 28, 1968 Patented July 20, 1971 APPARATUS FOR TEMPORARILY CONNECTING A CONVENTIONAL BOLTED RAIL TO A LAID PORTION OF A CONTINUOUS WELDED RAIL 0F A RAILWAY TRACK 3 Claims, 6 Drawing Figs.
Us. c1 zas/zx, 104/2, 23S/1, 23a/1o R, 23a/2o, 23S/151,
1m.c| soins/1s, Eo1b11/os,Eo1b29/4o riem Search 23S/21,17,
[56] References Cited UNITED STATES PATENTS 1,427,737 8/1922 Henke 238/21 1,497,066 6/1924 Burton 238/21 1,818,885 8/1931 Enstrom 246/435 1,672,865 6/1928 Allendorfet al 238/21 Primary Examiner-Arthur L. LaPoin't Assistant Examiner-Richard A. Bertsch Attorneys-Gardner J. OBoyle and .lames G. OBoyle ABSTRACT: Apparatus for use in temporarily operationally connecting one or both rails of bolted railway track to a laid portion of' continuous vwelded rail or rails of railway track, without permanently bending or cutting the welded rail, during the course of removal of bolted or jointed rails and replacement thereof with continuous welded rail, when it is desired to connect a bolted rail and a welded rail to enable train traffic thereover,
PATENTE@ UL20 :91|
SHEET l UF 2 TNVENTOR non@ 0Com
V. BORST HENRY PATENEUJuLeocQn SHEU E UF 2 3,593,918
INVENTOR HENRY V. EIORST APPARATUS FOR TEMPORARILY CONNECTING A CONVENTIONAL BOL'IED RAIL T0 A LAID PORTION OF A CONTINUOUS WELDED RAIL OF A RAILWAY TRACK BACKGROUND OF THE INVENTION Continuous welded rail (C.W.R.) as defined by American Railway Engineering Association, consists of sufficient lengths of conventional rail welded together to form a string 40() feet or longer. The strings currently employed very in length from 1,320 feet to 1,440 feet, approximately, and a train load of continuous ribbons or strings, each string being one-quarter of a mile long, usually consists of 40 strings equal to l0 miles of rail or track miles.
ln recent years, there has been considerable activity by many railroads to utilize continuous welded rail, in lieu of conventional bolted rail, and some roads have adopted it as standard for replacement of bolted rails and for new installations in connection with the construction of cutoffs or other line i changes.
It will be appreciated that the handling and installation of continuous welded rail requires special equipment in order that the rail gang may lay this type of rail faster and more efficiently than conventional bolted rails. The man-hours required to lay a track mile of welded rail varies according to the method employed, conditions encountered, and the nature of the operation, that is to say, whether laying the rail on single track under traffic, or on multiple tracks where one track can be closed to traffic. Of course, the ideal condition when laying rails, whether welded or bolted, is to divert all traffic so that the crew will have substantially full on-track working time; however, as a practical matter, this condition is rarely encountered and it is difficult, if not impossible, to achieve.
With reference to diversion of traic so that the track crew may have full on-track working time, a decision in this regard will be based primarily on a study of the economic feasibility of diverting the traie, and it will be appreciated that the results of such study will be in terms of expense incident to diverting traffic versus permitting reduced flow of traffic by employing the methods andprocedures heretofore practiced. The expense involved in connection with diverting traffic is in terms of loss of revenue normally received for transporting passengers and freight over the closed portion of track during the period traffic is interrupted. The expense incurred in connection with reduced How of traffic depends upon a number of factors, and more particularly (l) upon the frequency of which the rails are temporarily connected to permit train traf fic thereover, (2) the time required to disconnect the rails to allow the track replacement operation to proceed, and (3) the method employed to temporarily connect the rails.
Assuming that a study of the project for replacing bolted rails with continuous welded rails indicates that it would be advisable to permit reduced flow of train traffic, the principal item of expense incident thereto will be the time required to temporarily, operationally connect the rails and to disconnect the same, so that the track gang can resume installation of the welded rails. ln accordance with present practice, from 2--3 hours are required to install a string of continuous welded rail 1,400 feet long, and if the operation is such that train traffic is permitted, it is necessary to cut the welded rail at an ap propriate point beyond the end of the laid portion thereof, and then connect the free end portion of the welded rail and the contiguous end portion of the conventional rail by means of suitable clamps, joint bars and the like. A eut is made by burning the rail, and this operation usually requires the services of a welder and a helper; after the rail has been cut, it is drilled preparatory to temporarily connecting it to the conventional rail, and when the period allotted for train traffic expires, the temporary connection is disconnected, and the free ends of the welded rail portions are permanently joined by welding. ln view of the man-hours required to connect and disconnect the rails so that installation of welded rail can be resumed, plus the cost of the material involved, it has been found that cvcn under favorable conditions, the minimum cost at current rates will be something of the order of $1000() or more, each time a welded rail and a conventional rail are conA nccted and disconnected, in accordance with the above described procedure,
Another item of expense is the per diem charge for foreign cars, namely, cars belonging to other railroads which ears usually must be returned to the home roads" before midnight, otherwisc the user road will be charged for another day for each car. Additional expense for many railroads also arises in connection with so-callcd Iconnection time," that is to say, the particular time which the railroads guarantee arrival of their trains at a specific connection or location; and failure to perform is considered a breach of contract, so to speak, resulting in forfeiture of a sum of money, which is frequently a substantial amount.
Accordingly, the above-noted potential extra costs are further indicative of the desirability of increasing the volume of train traffic normally permitted during the course of replacement of the rails of a railway track, in accordance with present practice, and with concomitant increase of on-track working time bythe track crew during a regular work day,
After considerable research and experimentation, l have found that a laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, can be temporarily, operationally connected during the course of replacement of bolted rail with continuous welded rail, without permanently bending or cutting or severing thc welded rail in order to temporarily con neet thc rails according to the teachings of the prior art. More particularly, l have found that by means of the apparatus of the present invention that the track may be closed up to permit normal train traffic in a relatively short time, as compared with conventional methods, and at approximately 5 percentl0 percent of the cost of such methods, including the time required to disconnect the rails when installation of welded rail is to be resumed.
SUMMARY OF THE INVENTION The improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of bolted rail during the course of replacement of the bolted rail with continuous welded rail, without cutting or severing the welded rail, comprises, essentially, a switch point, including heel and tip portions, supported on cross ties with the heel portion connected in abutting relation with the terminal end of the laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail and merging therewith, and means to immobilize the switch point in the operative position with respect to the laid portion of the welded rail, comprising a plurality of guard rail clamps constructed and arranged in predetermined relation longitudinally of the switch point between selected pairs of cross ties, and a plurality of adjustable switch slides secured to selected intermediate ties, with the switch point supported thereon.
An object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement of the bolted rail with continuous welded rail on existing cross ties, without cutting or otherwise severing the welded rail, or bending the same.
Another object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous: welded rail and a laid section of conventional rail without cutting or severing the welded rail, said improved construction being designed whereby the temporary, operational connection between the welded rail and the bolted rail may be economically achieved in a relatively short period of time, as compared with prior 3 methods, thus substantially increasing the on-track time of the track crew.' l
Yet another yobject of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, during the course of replacement of the bolted rail with the welded rail, without cutting or severing the welded rail, said construction being designed whereby the welded rail may be connected to the bolted rail in substantially less time and at approximately onetenth of the cost of temporarily connecting the rails in accordance with present methods.
Still-another object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail of a railway track, said construction being designed whereby the track may be closed up at the end of the workday to permit train traffic thcrcover until the track laying operations are resumed the next workday.
A further object of my invention is to provide an improved construction for temporarily, operationally connecting the laid portion of a string of welded rail with a laid section of bolted rail, during the course of replacement of the bolted rail with the welded rail, without cutting or severing the welded rail, said construction comprising a relatively small number of components which are of' strong and sturdy construction adapted to be repeatedly employed for their intended purpose over a long period of time.
DESCRIPTION OF THE DRAWINGS FIG. l is a schematic plan view showing the laid portion of a string of continuous welded rail temporarily, operationally connected to a laid section of conventional bolted rail, in accordance with the present invention;
FIG. 2 is an enlarged plan view of the portion of FIG. l embodying the invention;
FIG. 3 is a sectional view along line 33 of F IG. 2;
FIG. 4 is asectional view along line 4-4 of FIG. 2;
FIG. 5 is a sectional view along line S-S of FIG. 2; and
FIG. 6 is a view along line 6-6 ofFIG. 2.
DESCRIPTION OF THE PREFERRED EMBODIMENT Referring to the drawings, and more particularly to FIG. l,
there is shown a string of continuous welded rail designated v generally by numeral l0, having a laid portion ll, temporarily, operationally connected as at l2 to a laid section of one of the conventional bolted rails 13 of a railroad track supported on crossties 14; and a diagrammatic view of railroad train units 15 traveling on the bolted rails in the direction of' the means employed to close up the track between the end of one of the bolted rails and the laid portion of the welded rail.
Reference being had to FIG. 2, which is an enlarged plan view of the portion of FIG. l embodying the improved construction of the present invention, comprising a switch point 16 of the same weight of rail as the welded rail, having its heel portion 17 connected to the end portion of the bolted rail I3 by means of angle bars 18 and associated bolts 19, the tip portion 20 of the switch point being positioned in contiguous relation with the angularly disposed portion 2l of the welded rail, the end portion 22 of the tip merging with the rectilinear portion 23 of the welded rail, as shown.
The means employed to immobilizc the switch point 16 in the operative position with respect to thc laid portion Il of the welded rail, comprises novel guard rail clamps 24, 25 and 26, having wedges 27 and keys 27a, as will be described more fully hereinafter, said guard rail clamps being positioned between pairs of ties 14 at the tip end of the switch point, at a point intermediate the tip and heel portions, and at the heel portion, respectively. In addition, adjustable switch slides 28 and braces may be used on each tie or on every other tie. If an adjustable slide and brace is used on every other tie, then a frog slide or hook plate 29 is used on each of the remaining ties. While only single frog or hook plates are shown, it will be understood that twin hook plates may be employed, if desired, arranged side by side on atie and facing in opposite directions. For purposes of illustration, it has been assumed that the second rail of the track is conventional bolted rail 13 supported on standard tie plates 30, and secured to the tics by means of spikes.
Referring to FIG. 3, one ofthe adjustable switch slides 28 is shown in the operative position with respect to the welded rail 10 seated on a suitable tic plate 3l, the wedge member 32 of the slide being retained in adjusted wedging position against the face of the web portion 33 of the rail by means ofa pivotal detent 34, constructed and arranged to seat in a registering slot 35 of the wedge. The tie plate 3l and flange 36 of the switch point I6 are secured tothe tie 14 by means of spikes 37 driven into the tie through openings formed in the plate. In FIG. 4, a single hook plate 29 is shown in the operative position with its hook member 38 projecting over the upper surface of the bottom flange 39 on the rail I0, the switch point I6 being clamped in fixed position by means of spikes 37; and the guard rail clamp 24 nearest the heel portion of the switch point 16 is shown in FIG. 5, together with wedges 27 having portions 27' adapted for frictional bearing engagement with the curvilinear surfaces 40 of the end portions 4I of the clamps.
The procedure in connection with the replacement of the old rail with welded rail is as follows: permission must first be obtained from the train dispatcher before the rail gang can begin to work on the track. Assuming that the dispatcher authorizes the foreman to proceed with the work for a period of approximately l hour or more, the foreman then decides how much old rail can be removed and thereafter replaced with welded rail, within the allotted time. There are several operations which must be completed after the old rail is removed before the welded rail is placed; for example, removal of the old tie plates, plugging the spike holes, adzing the ties and replacing the tie plates, As the above-noted operations progress, the welded rail is laid, and when the foreman selects the stopping point, the switch point is connected to the old rail, the tics are adzed, if necessary, and the guard rail clamps positioned between selected pairs of tics, switch slides and the hook plates are placed on the ties under the switch point. When the crane which handles the welded rail reaches the switch point, the operator places the welded rail to the outside of the switch point and holds it against the switch point until one guard rail clamp is tightened and one tie is spiked. If the welded rail has been laid from the center of the track, the crane moves over the switch point and removes the remaining unlaid portion of thc rail from the center of the track to the outside thereof on the shoulder of the road bed. When work is resumed, the rail is laid on the ties directly from the shoulder.
As indicated hereinabove, the track may be closed up at the end of the workday, in order to permit train traffic thereover until track laying operations are resumed the next workday. When the temporary connection is left in the track overnight, for example, it is connected to the signal circuit, and the trains operate at normal speeds. In this regard, reference again being had to FIG. 2, the signal circuit comprises a bond wire 42 having one end welded to the old rail, the opposite end of the wire being welded to the switch point, on the outside of the ball of rail, which is the standard location. There is also a connecting wire 43 between the old rail and the welded rail just beyond the end of the switch point. lt will be understood that when making a temporary connection to permit passage of only one train, wires 42 and 43 may be clamped to thc rails so as to complete the signal circuit. When the temporary connection is left in the track overnight, a switch box 44 having electrical circuit breakers connected through suitable leads to the signal circuit, is positioned outside of the welded rail on the end portion of the first tie at the tip of the switch point. lf for any reason, the switch point opens, the circuit breakers are actuated to open the signal circuit, thus causing the signals to move to stop position,
JSome railroads operate trains every hour or less, and where certain of these roads operate single track, with a relatively large number of trains, it would be practically impossible to place welded rail under these conditions, in accordance with prior suggested methods, wherein the welded rail is severed,
, then bolted tothe old rail to close up the track to permit train traffic, and is uncoupled from the old rail when laying of welded rail is resumed. ln addition to the time required to sever the new rail, bolt it to the old rail, disconnect it, and then reweld the new rail to form a continuous rail, requires approximately one-half hour before operations can begin after a train or trains have passed. This time includes placing the track machines and other equipment on the track from an access road, and bring some machines from the clearance point switch. By means of the construction employed in accordance with the present invention, with close timing and efficient planning, a portion of welded rail can be laid every hour.
As explained hereinabove, the welded rail is held against the outside of the switch point by the crane operator until one guard rail clamp is tightened and one tie is spiked. The operations are completed in live minutes by two men, while the crane is moving to clearance; and approximately the same period of time for two men to remove the temporary connection after a train passes. When applying the welded rail, it is laid in a direction so that the old rail can be removed while the crane is returning from the clearance point.
Other situations arise in which the construction of the present invention can be economically employed while the rail gang is waiting a train after the track has been closed up. For example, it sometimes happens the train is delayed because of a hotbox, crippled cars, stalling on grades, engine failure or derailment. These delays would not be long enough to install a string of welded rail, but the train dispatcher would permit rail gangs to work on the track provided it could be closed up in a matter of a few minutes.
lt will be appreciated that when the track is closed up, as described hereinabove, to permit train traffic thereover, such traffic may proceed at normal speed, that is to say, it is not necessary to reduce the speed. This is an important feature of the construction of the present invention, particularly when the track is closed up for an extended period of time, as for example overnight.
ln connection with the lengths of the strings of continuous rail, some railroads prefer to weld strings of length 1,400 feet together toform continuous lengths of l mile or more. The welding is performed on the ground, after the 1,400 foot strings are unloaded. The reason for welding the shorter lengths together after they are unloaded is because better welds are obtained, and additionally, welding the short strings in-track delays production.
lclaim:
1. ln a construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement ofthe bolted rail with continuous welded rail on existing cross ties, without permanently bending or severing the welded rail; the improvement comprising the combination of a switch point, including a tip portion and a heel portion, said switch point being supported on the tics with its heel portion connected to the terminal end ofthe laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail; means immobilizing the switch point in the operative position with respect to the bolted rail section and the laid portion of the welded rail between the tip and the heel portonof said switch point, comprising a series of guard rails clamps constructed and arranged in predetermined spaced relation longitudinally of the switch point between selected adjacent pairs of cross ties, and a plurality of adjustable switch slides secured to selected intermediate ties, with the switch point supported thereon, whereby to close up the track and permit normal train trafc thereover.
2. ln a construction for temporarily, operationally connecting the laid portion cfa string of continuous welded rail and a laid sectIon of conventional bolted rall, constituting one rail of a railway track, during the course of replacement ofthe bolted rail with continuous welded rail on existing crossties, without permanently bending or severing the welded rail; the improvement comprising the combination of a switch point, including a tip portion and a heel portion, said switch point being supported on the ties with its heel portion connected to the terminal end of the laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail; wherein the means immobilizing the switch point in the operative position relative to the ties, the bolted rail section and the laid portion ofthe welded rail, comprises a series of guard rail clamps arranged in predetermined spaced relation longitudinally of the switch point between selected adjacent pairs of crossties, an adjustable switch slide secured to one of the ties of each selected pair, and a tie plate :secured to each of the remaining ties, with the switch point supported on the switch slides and the tic plates.
3. ln a construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement of the bolted rail with continuous welded rail on existing crossties, without permanently bending or severing the welded rail; as called for by claim 2, wherein the guard rail clamps of the switch point immobilizing means are positioned between pairs of ties at the tip, heel and middle portions, respectively, of the switch pointA

Claims (3)

1. In a construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement of the bolted rail with continuous welded rail on existing cross ties, without permanently bending or severing the welded rail; the improvement comprising the combination of a switch point, including a tip portion and a heel portion, said switch point being supported on the ties with its heel portion connected to the terminal end of the laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail; means immobilizing the switch point in the operative position with respect to the bolted rail section, and the laid portion of the welded rail between the tip and the heel portion of said switch point, comprising a series of guard rails clamps constructed and arranged in predetermined spaced relation longitudinally of the switch point between selected adjacent pairs of cross ties, and a plurality of adjustable switch slides secured to selected intermediate ties, with the switch point supported thereon, whereby to close up the track and permit normal train traffic thereover.
2. In a construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement of the bolted rail with continuous welded rail on existing crossties, without permanently bending or severing the welded rail; the improvement comprising the combination of a switch point, including a tip portion and a heel portion, said switch point being supported on the ties with its heel portion connected to the terminal end of the laid section of the bolted rail, the tip portion being positioned in contiguous relation with the welded rail; wherein the means immobilizing the switch point in the operative position relative to the ties, the bolted rail section and the laid portion of the welded rail, comprises a series of guard rail clamps arranged in predetermined spaced relation longitudinally of the switch point between selected adjacent pairs of crossties, an adjustable switch slide secured to one of the ties of each selected pair, and a tie plate secured to each of the remaining ties, with the switch point supported on the switch slides and the tie plates.
3. In a construction for temporarily, operationally connecting the laid portion of a string of continuous welded rail and a laid section of conventional bolted rail, constituting one rail of a railway track, during the course of replacement of the bolted rail with continuous welded rail on existing crossties, without permanently bending or severing the welded rail; as called for by claim 2, wherein the guard rail clamps of the switch point immobilizing means are positioned between pairs of ties at the tip, heel and middle portions, respectively, of the switch point.
US716799A 1968-03-28 1968-03-28 Apparatus for temporarily connecting a conventional bolted rail to a laid portion of a continuous welded rail of a railway track Expired - Lifetime US3593918A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US71679968A 1968-03-28 1968-03-28

Publications (1)

Publication Number Publication Date
US3593918A true US3593918A (en) 1971-07-20

Family

ID=24879487

Family Applications (1)

Application Number Title Priority Date Filing Date
US716799A Expired - Lifetime US3593918A (en) 1968-03-28 1968-03-28 Apparatus for temporarily connecting a conventional bolted rail to a laid portion of a continuous welded rail of a railway track

Country Status (1)

Country Link
US (1) US3593918A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060102042A1 (en) * 2004-08-20 2006-05-18 Martin Green Long rail pick-up and delivery system
US20110233292A1 (en) * 2008-12-11 2011-09-29 Keith Allen Langenbeck Integrated train rail system with ties and thermal expansion joints
US10525995B2 (en) * 2015-07-24 2020-01-07 Robel Bahnbaumaschinen Gmbh Safeguarding system for an emergency fish-plate connector

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1427737A (en) * 1922-06-03 1922-08-29 Cincinnati Frog & Switch Compa Extension-rail clamp
US1497066A (en) * 1923-10-19 1924-06-10 Burton Carroll Spring fastening for guard-rail clamps
US1672865A (en) * 1928-02-04 1928-06-12 George A Allendorf Attaching means for railroad rails
US1818885A (en) * 1930-05-31 1931-08-11 Pettibone Mulliken Company Split-switch structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1427737A (en) * 1922-06-03 1922-08-29 Cincinnati Frog & Switch Compa Extension-rail clamp
US1497066A (en) * 1923-10-19 1924-06-10 Burton Carroll Spring fastening for guard-rail clamps
US1672865A (en) * 1928-02-04 1928-06-12 George A Allendorf Attaching means for railroad rails
US1818885A (en) * 1930-05-31 1931-08-11 Pettibone Mulliken Company Split-switch structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060102042A1 (en) * 2004-08-20 2006-05-18 Martin Green Long rail pick-up and delivery system
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20080163781A1 (en) * 2004-08-20 2008-07-10 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20110233292A1 (en) * 2008-12-11 2011-09-29 Keith Allen Langenbeck Integrated train rail system with ties and thermal expansion joints
US10525995B2 (en) * 2015-07-24 2020-01-07 Robel Bahnbaumaschinen Gmbh Safeguarding system for an emergency fish-plate connector

Similar Documents

Publication Publication Date Title
US3593918A (en) Apparatus for temporarily connecting a conventional bolted rail to a laid portion of a continuous welded rail of a railway track
US11001973B2 (en) Apparatus and components for turnout/crossover section for railway track
US3682383A (en) Method for temporarily connecting rails
US7604205B2 (en) Turnout/crossover section for railway track
US1640204A (en) Railroad switching device
Delgado et al. Resilience of rail infrastructure in the US Northeast corridor
US2174367A (en) Welded anchor block
US1598584A (en) Railroad highway crossing
US5024380A (en) Method and apparatus for continuous welded rail
RU185951U1 (en) INTERCONNECT TRANSFER AND CONNECTING DEVICE
US779964A (en) Railroad-track.
US2620137A (en) Railway track securing means
US3317725A (en) Automatic yard switch
US2044060A (en) Interlocking guardrail brace
US498724A (en) o shea
Wolek Maglev freight-one possible path forward in the USA
US2529077A (en) Prefabricated detachable guard rail, particularly for mine tracks
US310284A (en) Cable-way for railway traction-cables
US1086901A (en) Substructure for railway-crossings.
US497456A (en) Alonzo w
US790010A (en) Railway-switch construction.
i Inert 30injured
US1081541A (en) Railway-crossing.
CN104264536A (en) Turnout for track traffic route
US838574A (en) Metallic tie for railway-tracks.