US3496729A - Protective tube for concrete pile - Google Patents

Protective tube for concrete pile Download PDF

Info

Publication number
US3496729A
US3496729A US731862A US3496729DA US3496729A US 3496729 A US3496729 A US 3496729A US 731862 A US731862 A US 731862A US 3496729D A US3496729D A US 3496729DA US 3496729 A US3496729 A US 3496729A
Authority
US
United States
Prior art keywords
tube
protective tube
concrete
concrete pile
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US731862A
Inventor
Friedrich Wilhelm Pleuger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3496729A publication Critical patent/US3496729A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Definitions

  • This invention relates to a protective tube which remains around a concrete pile after the concrete has set.
  • This arrangement has the drawback that the removal of the drilling pipe and the filling with the casting mass must take place simultaneously.
  • the pipe remaining around the concrete pile has a comparatively low friction value with reference to the surrounding soil so that the carrying capacity of the concrete pile is substantially determined by the pressure of the lower end of the pile upon the soil.
  • An object of the present invention is to improve the prior art procedure by eliminating the necessity of using a casting mass, by providing a higher friction value between concrete and soil and in general by simplifying the method of producing a concrete pile.
  • a protective tube consisting of a stretchable or expandible material, preferably a plastic material, including a plastic textile material.
  • the outer surface of the tube is made of wavelike, rhomblike or similar curved configuration so that it can expand easily into a cylindrical tube of larger cross-sectional area.
  • Tubes of plastic material are preferred since their edges can be easily welded together on location, so that the size and length of the tubes can be easily adapted to the size of the drill tubes and the depth of the hole.
  • the lower end of the protective tube has the shape of a bag with greater expanding capacity than the rest of the tube, being made, for example, of a plastic textile material.
  • the bag When it is filled with a liquid concrete mixture, the bag will expand and when concrete solidifies, the pressure of the pile will produce a mushroom-shaped pile foot which will greatly contribute to the stability of the pile.
  • FIGURE 1 is a vertical section showing the filling of a protective tube with concrete prior to the removal of the drill tube.
  • FIGURE 2 is a section showing the same protective tube after the removal of the drill tube.
  • FIGURE 3 is a section similar to that of FIG. 1, but showing a protective tube of a somewhat different shape.
  • a hollow drill tube 6 is drilled into the soil 1 to make a drill hole of the desired size and depth. Then an expandible tube 2 of plastic material is introduced into the interior of the drill tube 6.
  • the tube 2 has outer wave-like surfaces. Initially the outer surface of the tube 2 are located at a distance from the inner surfaces of the drill 6.
  • the tube 2a has outer surfaces shaped as saw teeth with horizontal lower flanges. In all other respects the arrangement of FIG. 3 is the same as that of FIG. 1.
  • the protective tube may have outer surfaces of various other shapes the purpose of Which is to facilitate the expansion of the tube.
  • each protective tube is closed by a bag 5 consisting preferably of a textile material with plastic threads which has a greater capacity to expand than the rest of the tube.
  • FIGS. 1 and 3 show the process at the moment when the concrete is being poured in and before the protective tube has begun to expand, primarily to illustrate the initial shape of the tubes. Obviously, the tubes will begin to expand as soon as concrete has been poured in. However, the drill tube 6 can be quickly and easily removed before the pressure of the walls of the protective tube will become effective. It is also possible to pour an additional amount of concrete after the removal of the drill tube.
  • the protective tube 2 presses with all its outer surfaces against the surrounding layers of soil 1.
  • the initial curved shape of the outer surfaces of the tube may increase the friction value as far as the surrounding soil is concerned.
  • the lower bag 5 will be enlarged to a greater extent under the weight of the concrete column, so that when concrete is solidified, a mushroom-like foot will be formed at the bottom of the concrete pile.
  • a protective tube for a concrete pile adapted to be inserted into a drill tube and thereafter to be filled with hardenable concrete, said protective tube comprising a body portion formed of expandible material so that the diameter of said protective tube is greater than that of said drill tube after removal of said drill tube, and a closed lower portion with greater expansion capacity than the remaining portion of the tube, whereby when filled with hardenable concrete under pressure, the lower por- 10 tion becomes substantially wider than the remaining portion of the tube.
  • a protective tube as set forth in claim '1 wherein said tube is formed of material selected from the class consisting of plastic materials and textile materials.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

2 Sheets-Sheet 1 F. W. PLEUGER PROTECTIVE TUBE FOR CONCRETE PILE Feb. 24, 1970 Filed May 24, 1968 INVENTOR (A). 2W3 2x as ATTQRNEYS Feb. 24 1970 F. w. PLEUGER 3,
PROTECTIVE TUBE FOR CONCRETE PILE Filed May 24, 1968 2 Sheets-Sheet 2 NVENTOR 1' l). Paw
I Gkawcu ATTORNEYS United States Patent 3,496,729 PROTECTIVE TUBE FOR CONCRETE PILE Friedrich Wilhelm Pleuger, Hamburg-Wandsbeck, Germany, assignor to Berud Pleuger, Hamburg, Germany Continuation-impart of application Ser. No. 553,909, May 31, 1966. This application May 24, 1968, Ser. No. 731,862
Int. Cl. E02d 5/44, 5/36 US. Cl. 61-53.6 4 Claims ABSTRACT OF THE DISCLOSURE The present application is a continuation-in-part of my co-pending patent application Ser. No. 553,909, filed May 31, 1966, now abandoned.
This invention relates to a protective tube which remains around a concrete pile after the concrete has set.
When making foundations and the like, it is often necessary to drill a long hole into the ground and then fill the hole with concrete which is allowed to set to form a concrete pile.
It was found that during the setting, concrete may be washed out, dissolved or otherwise damaged by certain types of ground water, particularly if it is sea water or if the water contains acids and the like.
Heretofore, attempts were made to protect the concrete pile by inserting a pipe into the hollow drill tube used for drilling the hole in the soil. When the hole is drilled, concrete is poured into this pipe, then the drill tube is removed and a casting mass is poured to fill the space between the pipe and the adjacent surfaces of the hole in the soil.
This arrangement has the drawback that the removal of the drilling pipe and the filling with the casting mass must take place simultaneously. The pipe remaining around the concrete pile has a comparatively low friction value with reference to the surrounding soil so that the carrying capacity of the concrete pile is substantially determined by the pressure of the lower end of the pile upon the soil.
An object of the present invention is to improve the prior art procedure by eliminating the necessity of using a casting mass, by providing a higher friction value between concrete and soil and in general by simplifying the method of producing a concrete pile.
Other objects will become apparent in the course of the following specification.
In the accomplishment of the objectives of the present invention it was found desirable to provide a protective tube consisting of a stretchable or expandible material, preferably a plastic material, including a plastic textile material. Furthermore, the outer surface of the tube is made of wavelike, rhomblike or similar curved configuration so that it can expand easily into a cylindrical tube of larger cross-sectional area. Tubes of plastic material are preferred since their edges can be easily welded together on location, so that the size and length of the tubes can be easily adapted to the size of the drill tubes and the depth of the hole. These tubes can be inserted into the drill tubes without any difficulty and the drill tubes can be easily removed after the pouring of concrete. There- "ice upon the soil settles against the enlarged surface of the protective tube so that a high friction value between the concrete pile and the enclosing soil is produced.
According to a further feature of the present invention the lower end of the protective tube has the shape of a bag with greater expanding capacity than the rest of the tube, being made, for example, of a plastic textile material. When it is filled with a liquid concrete mixture, the bag will expand and when concrete solidifies, the pressure of the pile will produce a mushroom-shaped pile foot which will greatly contribute to the stability of the pile.
The invention will appear more clearly from the following detailed description when taken in connection with the accompanying drawings, showing by way of example, preferred embodiments of the inventive idea.
In the drawings:
FIGURE 1 is a vertical section showing the filling of a protective tube with concrete prior to the removal of the drill tube.
FIGURE 2 is a section showing the same protective tube after the removal of the drill tube.
FIGURE 3 is a section similar to that of FIG. 1, but showing a protective tube of a somewhat different shape.
As shown in the drawings, initially a hollow drill tube 6 is drilled into the soil 1 to make a drill hole of the desired size and depth. Then an expandible tube 2 of plastic material is introduced into the interior of the drill tube 6.
In the example shown in FIG. 1 the tube 2 has outer wave-like surfaces. Initially the outer surface of the tube 2 are located at a distance from the inner surfaces of the drill 6.
In the example shown in FIG. 3 the tube 2a has outer surfaces shaped as saw teeth with horizontal lower flanges. In all other respects the arrangement of FIG. 3 is the same as that of FIG. 1.
It is apparent that the protective tube may have outer surfaces of various other shapes the purpose of Which is to facilitate the expansion of the tube.
The lower end of each protective tube is closed by a bag 5 consisting preferably of a textile material with plastic threads which has a greater capacity to expand than the rest of the tube.
Then the usual reinforcement 4 and a concrete mixture 3 are inserted into the protective tube. FIGS. 1 and 3 show the process at the moment when the concrete is being poured in and before the protective tube has begun to expand, primarily to illustrate the initial shape of the tubes. Obviously, the tubes will begin to expand as soon as concrete has been poured in. However, the drill tube 6 can be quickly and easily removed before the pressure of the walls of the protective tube will become effective. It is also possible to pour an additional amount of concrete after the removal of the drill tube.
In the final condition shown in FIG. 2 the protective tube 2 presses with all its outer surfaces against the surrounding layers of soil 1. However, the initial curved shape of the outer surfaces of the tube may increase the friction value as far as the surrounding soil is concerned. The lower bag 5 will be enlarged to a greater extent under the weight of the concrete column, so that when concrete is solidified, a mushroom-like foot will be formed at the bottom of the concrete pile.
It is apparent that the protective tube remaining around the concrete pile will effectively protect the pile against detrimental effect of water, including salt water, acidcontaining water and the like.
It is further apparent that the examples described above have been given merely by way of illustration and not by way of limitation and that they are capable of many variations and modifications within the scope of the present invention.
What is claimed is:
1. A protective tube for a concrete pile adapted to be inserted into a drill tube and thereafter to be filled with hardenable concrete, said protective tube comprising a body portion formed of expandible material so that the diameter of said protective tube is greater than that of said drill tube after removal of said drill tube, and a closed lower portion with greater expansion capacity than the remaining portion of the tube, whereby when filled with hardenable concrete under pressure, the lower por- 10 tion becomes substantially wider than the remaining portion of the tube.
2. A protective tube as set forth in claim '1, wherein said tube is formed of material selected from the class consisting of plastic materials and textile materials.
3. A protective tube as set forth in claim 1, wherein the outer side of the tube is wave-shaped.
4. A protective tube as set forth in claim 1, the outer side of the tube wall being formed in saw tooth shape and having horizontal lower flanges.
References Cited UNITED STATES PATENTS 951,668 3/1910 Welsh 6153.7 X 3,209,546 10/1965 Lawton 61-53.6 3,375,670 4/1968 Serota 61-53.6
FOREIGN PATENTS 935,797 9/ 1963 Great Britain.
JACOB SHAPIRO, Primary Examiner US. Cl. X.R. 61-53.62, 53.64
US731862A 1968-05-24 1968-05-24 Protective tube for concrete pile Expired - Lifetime US3496729A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US73186268A 1968-05-24 1968-05-24

Publications (1)

Publication Number Publication Date
US3496729A true US3496729A (en) 1970-02-24

Family

ID=24941244

Family Applications (1)

Application Number Title Priority Date Filing Date
US731862A Expired - Lifetime US3496729A (en) 1968-05-24 1968-05-24 Protective tube for concrete pile

Country Status (1)

Country Link
US (1) US3496729A (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3641772A (en) * 1970-06-04 1972-02-15 Losinger Ag Rock anchor
US3753354A (en) * 1971-01-12 1973-08-21 K Bauer Corrosion-protected anchoring rods for anchoring structural parts in the earth, as well as method of producing anchorings with corrosion-protected anchor rods
US3946570A (en) * 1973-10-02 1976-03-30 S.E.F.I. Sondages-Etanchements-Forages-Injections Support and foundation composite pile for various works and method for manufacturing the same
US4060994A (en) * 1975-11-11 1977-12-06 Fondedile S.P.A. Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
US4355927A (en) * 1980-07-28 1982-10-26 Karl Stephan Piling structure and methods
US4605339A (en) * 1981-07-29 1986-08-12 Roger Bullivant Of Texas, Inc. Situ pile construction in ground liable to uplift
US4818148A (en) * 1985-05-14 1989-04-04 Nippon Kokan Kabushiki Kaisha Frost damage proofed pile
US5472296A (en) * 1992-08-20 1995-12-05 Dyckerhoff & Widmann Aktiengesellschaft Corrosion protected support element for a soil anchor or a rock anchor, a pressure pile or the like
US5593623A (en) * 1992-10-09 1997-01-14 Mohss; Anders Casting mould
US6623212B1 (en) * 1998-12-11 2003-09-23 Dominique Fonfrede Cut-off device for concrete structures
US20050135882A1 (en) * 2003-12-18 2005-06-23 Barrett Robert K. Method and apparatus for creating soil or rock subsurface support
EP1712685A1 (en) * 2005-01-19 2006-10-18 BONOMI, Cristiano Process for the consolidation of excavation faces by means of expansible tension member
US20060263150A1 (en) * 2003-12-18 2006-11-23 Barrett Robert K Method and Apparatus for Creating Soil or Rock Subsurface Support
US20070172315A1 (en) * 2003-12-18 2007-07-26 Barrett Robert K Method and Apparatus for Creating Soil or Rock Subsurface Support
US7384217B1 (en) 2007-03-29 2008-06-10 Barrett Robert K System and method for soil stabilization of sloping surface
WO2008001352A3 (en) * 2006-06-25 2008-12-18 Basem Hazzan Device and method for improved pile casting
US8376661B2 (en) 2010-05-21 2013-02-19 R&B Leasing, Llc System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports
US20130279992A1 (en) * 2010-09-13 2013-10-24 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a support pier
US8851801B2 (en) 2003-12-18 2014-10-07 R&B Leasing, Llc Self-centralizing soil nail and method of creating subsurface support
US9273442B2 (en) 2003-12-18 2016-03-01 R&B Leasing, Llc Composite self-drilling soil nail and method
US9567723B2 (en) 2010-09-13 2017-02-14 Geopier Foundation Company, Inc. Open-end extensible shells and related methods for constructing a support pier
WO2018232391A1 (en) 2017-06-16 2018-12-20 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier
US20200115877A1 (en) * 2015-07-27 2020-04-16 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US951668A (en) * 1909-02-20 1910-03-08 American Concrete Piling Company Pile.
GB935797A (en) * 1961-01-11 1963-09-04 Nibler G.M.B.H.
US3209546A (en) * 1960-09-21 1965-10-05 Lawton Lawrence Method and apparatus for forming concrete piles
US3375670A (en) * 1965-11-26 1968-04-02 Serota Stanley Method of piling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US951668A (en) * 1909-02-20 1910-03-08 American Concrete Piling Company Pile.
US3209546A (en) * 1960-09-21 1965-10-05 Lawton Lawrence Method and apparatus for forming concrete piles
GB935797A (en) * 1961-01-11 1963-09-04 Nibler G.M.B.H.
US3375670A (en) * 1965-11-26 1968-04-02 Serota Stanley Method of piling

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3641772A (en) * 1970-06-04 1972-02-15 Losinger Ag Rock anchor
US3753354A (en) * 1971-01-12 1973-08-21 K Bauer Corrosion-protected anchoring rods for anchoring structural parts in the earth, as well as method of producing anchorings with corrosion-protected anchor rods
US3946570A (en) * 1973-10-02 1976-03-30 S.E.F.I. Sondages-Etanchements-Forages-Injections Support and foundation composite pile for various works and method for manufacturing the same
US4060994A (en) * 1975-11-11 1977-12-06 Fondedile S.P.A. Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
US4355927A (en) * 1980-07-28 1982-10-26 Karl Stephan Piling structure and methods
US4605339A (en) * 1981-07-29 1986-08-12 Roger Bullivant Of Texas, Inc. Situ pile construction in ground liable to uplift
US4818148A (en) * 1985-05-14 1989-04-04 Nippon Kokan Kabushiki Kaisha Frost damage proofed pile
US5472296A (en) * 1992-08-20 1995-12-05 Dyckerhoff & Widmann Aktiengesellschaft Corrosion protected support element for a soil anchor or a rock anchor, a pressure pile or the like
US5593623A (en) * 1992-10-09 1997-01-14 Mohss; Anders Casting mould
US6623212B1 (en) * 1998-12-11 2003-09-23 Dominique Fonfrede Cut-off device for concrete structures
US20050135882A1 (en) * 2003-12-18 2005-06-23 Barrett Robert K. Method and apparatus for creating soil or rock subsurface support
US20060263150A1 (en) * 2003-12-18 2006-11-23 Barrett Robert K Method and Apparatus for Creating Soil or Rock Subsurface Support
US7226247B2 (en) 2003-12-18 2007-06-05 Barrett Robert K Method and apparatus for creating soil or rock subsurface support
US20070172315A1 (en) * 2003-12-18 2007-07-26 Barrett Robert K Method and Apparatus for Creating Soil or Rock Subsurface Support
US7338233B2 (en) 2003-12-18 2008-03-04 Barrett Robert K Soil nail and method of installing a subsurface support
US9273442B2 (en) 2003-12-18 2016-03-01 R&B Leasing, Llc Composite self-drilling soil nail and method
US8851801B2 (en) 2003-12-18 2014-10-07 R&B Leasing, Llc Self-centralizing soil nail and method of creating subsurface support
US20100054866A1 (en) * 2003-12-18 2010-03-04 Barrett Robert K Method and apparatus for creating soil or rock subsurface support
EP1712685A1 (en) * 2005-01-19 2006-10-18 BONOMI, Cristiano Process for the consolidation of excavation faces by means of expansible tension member
US20090279960A1 (en) * 2006-06-25 2009-11-12 Basem Hazzan Device and Method for Improved Pile Casting
WO2008001352A3 (en) * 2006-06-25 2008-12-18 Basem Hazzan Device and method for improved pile casting
AU2007264734B2 (en) * 2006-06-25 2019-06-20 Basem Hazzan Device and method for improved pile casting
US7384217B1 (en) 2007-03-29 2008-06-10 Barrett Robert K System and method for soil stabilization of sloping surface
US8708597B2 (en) 2010-05-21 2014-04-29 R&B Leasing, Llc System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports
US8376661B2 (en) 2010-05-21 2013-02-19 R&B Leasing, Llc System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports
US10513831B2 (en) * 2010-09-13 2019-12-24 Geopier Foundation Company, Inc. Open-end extensible shells and related methods for constructing a support pier
US20130279992A1 (en) * 2010-09-13 2013-10-24 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a support pier
US9091036B2 (en) * 2010-09-13 2015-07-28 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a support pier
US9567723B2 (en) 2010-09-13 2017-02-14 Geopier Foundation Company, Inc. Open-end extensible shells and related methods for constructing a support pier
US20170159257A1 (en) * 2010-09-13 2017-06-08 Geopier Foundation Company, Inc. Open-end extensible shells and related methods for constructing a support pier
US10858796B2 (en) * 2015-07-27 2020-12-08 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier
US20200115877A1 (en) * 2015-07-27 2020-04-16 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier
US11479935B2 (en) 2015-07-27 2022-10-25 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier
US12012715B2 (en) 2015-07-27 2024-06-18 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier
WO2018232391A1 (en) 2017-06-16 2018-12-20 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier
EP3638853A4 (en) * 2017-06-16 2021-03-31 Geopier Foundation Company, Inc. Extensible shells and related methods for constructing a ductile support pier

Similar Documents

Publication Publication Date Title
US3496729A (en) Protective tube for concrete pile
US4618289A (en) Method of forming a cast-in-place support column
US3540225A (en) Construction pile and a method of producing same in situ
US4165198A (en) Method for forming pier foundation columns
US3512365A (en) Method of forming a pile in situ
CN214328842U (en) Bagged concrete karst cave supporting disc pile
US3396546A (en) Method of producing concrete piles for foundations
US3559412A (en) Method of forming enlarged base encased concrete piles
JP4812798B2 (en) Ground stabilization method and reinforcement for ground stabilization
US3254492A (en) Casting of piles in situ
US3410095A (en) Method of making water-sealing pile barrier around an excavation cutoff area
US3269126A (en) Methods for stabilizing and raising foundation structures
US1907654A (en) Foundation construction
US2027511A (en) Method of casting bell-bottom place-piling in soft sandy material
JP2004211544A (en) Method of improving soft ground
JP2509005B2 (en) Ground reinforcement method
JPS6160928B2 (en)
JP2000120066A (en) Execution method for steel pipe pile
JPS58189414A (en) Construction of sheathing wall
JPS6046210B2 (en) Horizontal force reinforcement pile construction method and its equipment
JPH0562170B2 (en)
JP2741095B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2004211543A (en) Method of improving soft ground
JPS6128770B2 (en)
JPH0324925B2 (en)