US3233027A - Method of making prestressed concrete beams - Google Patents

Method of making prestressed concrete beams Download PDF

Info

Publication number
US3233027A
US3233027A US162542A US16254261A US3233027A US 3233027 A US3233027 A US 3233027A US 162542 A US162542 A US 162542A US 16254261 A US16254261 A US 16254261A US 3233027 A US3233027 A US 3233027A
Authority
US
United States
Prior art keywords
end wall
mould
concrete
wall members
stressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US162542A
Inventor
Wennstrom Elof
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB4569261A external-priority patent/GB936555A/en
Application filed by Individual filed Critical Individual
Priority to US162542A priority Critical patent/US3233027A/en
Application granted granted Critical
Publication of US3233027A publication Critical patent/US3233027A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed

Definitions

  • This invention relates to a process for using a device for making prestressed concrete beams and is essentially characterized by the fact that the device is a combination of a mould and means introduceable into said mould for putting the reinforcing rods under stress, said stressing means being adapted for removal from the mould together with the concrete beam cast in the mould and having the stressed reinforcing rods embedded therein.
  • the invention is also concerned with a method of making prestressed concrete beams with the use of the device according to the invention.
  • This method is essentially characterized by the fact that the stressing means is removed from the mould together with the concrete beam cast in the mould and having the stressed reinforcing rods embedded therein, before the beam has set so that the final setting of the concrete around the reinforcing rods takes place outside the mould.
  • the invention makes it possible to make prestressed concrete beams in ordinary moulds substantially at the same rate as customary reinforced concrete beams.
  • the invention permits manufacturing prestressed concrete beams at considerably lower costs than has hitherto been possible.
  • FIG. 1 is a cross section of the device on line II in FIG. 2 before the mould has been filled with concrete;
  • FIG. 2 is a top plan view of the device shown in FIG. 1;
  • FIG. 3 is a cross section on line IIIIII in FIG. 4;
  • FIG. 4 is a top plan view of a concrete beam immediately after it has been removed from the mould;
  • FIGS. 5 and 6 are respectively an end view and a plan view of a concrete beam some time after it has been removed from the mould.
  • the concrete beam 2 is of U-shaped cross section but it is understood that other cross sectional forms can also be chosen.
  • the mould 1 is combined with means 3 introduceable thereinto for stressing the reinforcing rods 4, and said stressing means 3 is adapted for removal from the mould 1 together with the concrete beam 2 cast in the mould 1 and having the stressed reinforcing rods 4 embedded therein.
  • said means comprises two end wall members 5 and 6 for the concrete beam 2, which members are constituents parts of the mould 1, and a telescoping stressing element 7 arranged between said end wall members 5 and 6 which are provided with, or formed as, fastenings for the reinforcing rods 4.
  • the stressing element 7 is arranged to lie outside that part of the mould 1 in which the con-crete beam 2 is cast. As shown in the drawing, the stressing element 7 thus lies beneath the bottom 8 of the mould 1, which bottom has a recess for accommodating the stress- Patented Feb. 1, 1966 ing element 7. During casting a plate or like member is to cover said recess in the mould bottom 8.
  • the stressing element 7 is removably secured to the end wall members 5 and 6 in a per se known manner.
  • the ends of the stressing element 7 can be arranged to engage either the facing sides of the end wall members 5 and 6, as is shown in the drawing, or the sides of said members 5 and 6 which face away from each other.
  • the end wall members 5 and 6 are moved apart by means of any suitable device so that the reinforcing rods 4 are given the desired prestress. Then the two parts of the stressing element 7 are fixed relative to each other in a suitable manner so that the prestress is maintained.
  • the end wall members 5 and 6 can be moved apart before the stressing means 3 is introduced into the mould 1, but as will be seen from the drawing where the position of the end wall member 6 before prestressing is indicated by dash lines, the end wall members 5 and 6 can be moved apart also with the stressing means in position in the mould.
  • the mould 1 is pivotally mounted in a frame 10. Associated with the mould 1 is a cover 11 which can be secured thereto. After the mould 1 with the stressing means 3 therein has been filled with concrete and possibly also vibrated the cover 11 is mounted in position on the mould which is then swung about the shaft 12 to the position in which the opening of the mould 1 is turned downwards. The cover 11 is now caused to engage a base whereupon it is loosened from the mould 1. By displacing the mould 1 and the cover 11 relative to each other the beam 2 with the stressed reinforcing rods 4 therein and the stressing means 3 will leave the mould 1 and be deposited on the cover 11, as will be seen from FIGS. 3 and 4.
  • the beam 2 can be deposited on the cover 11 practically immediately after casting and thus long before the concrete finally sets around the reinforcing rods 4.
  • the mould 1 is immediately available for casting a new beam with the use of another stressing means 3, since the earlier stressing means 3 still fulfills its function on the beam just east.
  • the stressing element 7 can be removed from the end wall members 5 and 6 and used in the casting of another prestressed concrete beam. This removal of the stressing element 7 is possible because the concrete beam 2 is now capable, during the final setting of the concrete, of maintaining the end wall members 5 and 6 at the distance determined for the prestressing.
  • FIGS. 5 and 6 are meant to illustrate this. The time after which the stressing element 7 is removed has to be determined from case to case.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

Feb. 1, 1966 WENNSTRGM METHOD OF MAKING PRES'I'RESSED CONCRETE BEAMS Filed Dec. 2'7. 1961 United States Patent 3,233,027 METHOD 0F MAKING PRESTRESSED CONCRETE BEAMS Elof Wennstriirn, Femkampsgatan 25, Orebro, Sweden Filed Dec. 27, 1961, Ser. No. 162,542 2 Claims. (Cl. 264228) This invention relates to a process for using a device for making prestressed concrete beams and is essentially characterized by the fact that the device is a combination of a mould and means introduceable into said mould for putting the reinforcing rods under stress, said stressing means being adapted for removal from the mould together with the concrete beam cast in the mould and having the stressed reinforcing rods embedded therein.
The invention is also concerned with a method of making prestressed concrete beams with the use of the device according to the invention. This method is essentially characterized by the fact that the stressing means is removed from the mould together with the concrete beam cast in the mould and having the stressed reinforcing rods embedded therein, before the beam has set so that the final setting of the concrete around the reinforcing rods takes place outside the mould.
The invention makes it possible to make prestressed concrete beams in ordinary moulds substantially at the same rate as customary reinforced concrete beams. As the device for making the prestressed concrete beams moreover is not very expensive, the invention permits manufacturing prestressed concrete beams at considerably lower costs than has hitherto been possible.
For a better understanding the invention will be more fully described in the following, reference being made to the accompanying drawing which illustrates the method using an embodiment, chosen by way of example, of the device suggested by the invention. In the drawing:
FIG. 1 is a cross section of the device on line II in FIG. 2 before the mould has been filled with concrete;
FIG. 2 is a top plan view of the device shown in FIG. 1;
FIG. 3 is a cross section on line IIIIII in FIG. 4;
FIG. 4 is a top plan view of a concrete beam immediately after it has been removed from the mould;
FIGS. 5 and 6 are respectively an end view and a plan view of a concrete beam some time after it has been removed from the mould.
1 denotes the upwardly open mould in which the prestressed concrete beam 2 is cast. According to the embodiment shown the concrete beam 2 is of U-shaped cross section but it is understood that other cross sectional forms can also be chosen.
According to the invention, the mould 1 is combined with means 3 introduceable thereinto for stressing the reinforcing rods 4, and said stressing means 3 is adapted for removal from the mould 1 together with the concrete beam 2 cast in the mould 1 and having the stressed reinforcing rods 4 embedded therein.
As will appear from the drawing which shows a preferred embodiment of the stressing means 3, said means comprises two end wall members 5 and 6 for the concrete beam 2, which members are constituents parts of the mould 1, and a telescoping stressing element 7 arranged between said end wall members 5 and 6 which are provided with, or formed as, fastenings for the reinforcing rods 4.
In the position of the stressing means 3 introduced into the mould 1, the stressing element 7 is arranged to lie outside that part of the mould 1 in which the con-crete beam 2 is cast. As shown in the drawing, the stressing element 7 thus lies beneath the bottom 8 of the mould 1, which bottom has a recess for accommodating the stress- Patented Feb. 1, 1966 ing element 7. During casting a plate or like member is to cover said recess in the mould bottom 8.
The stressing element 7 is removably secured to the end wall members 5 and 6 in a per se known manner. The ends of the stressing element 7 can be arranged to engage either the facing sides of the end wall members 5 and 6, as is shown in the drawing, or the sides of said members 5 and 6 which face away from each other.
After the reinforcing rods 4 have been secured to the end wall members 5 and 6 with the aid of nuts 9, keys or like means the end wall members are moved apart by means of any suitable device so that the reinforcing rods 4 are given the desired prestress. Then the two parts of the stressing element 7 are fixed relative to each other in a suitable manner so that the prestress is maintained. The end wall members 5 and 6 can be moved apart before the stressing means 3 is introduced into the mould 1, but as will be seen from the drawing where the position of the end wall member 6 before prestressing is indicated by dash lines, the end wall members 5 and 6 can be moved apart also with the stressing means in position in the mould.
According to the preferred embodiment shown the mould 1 is pivotally mounted in a frame 10. Associated with the mould 1 is a cover 11 which can be secured thereto. After the mould 1 with the stressing means 3 therein has been filled with concrete and possibly also vibrated the cover 11 is mounted in position on the mould which is then swung about the shaft 12 to the position in which the opening of the mould 1 is turned downwards. The cover 11 is now caused to engage a base whereupon it is loosened from the mould 1. By displacing the mould 1 and the cover 11 relative to each other the beam 2 with the stressed reinforcing rods 4 therein and the stressing means 3 will leave the mould 1 and be deposited on the cover 11, as will be seen from FIGS. 3 and 4. The beam 2 can be deposited on the cover 11 practically immediately after casting and thus long before the concrete finally sets around the reinforcing rods 4. As a consequence, the mould 1 is immediately available for casting a new beam with the use of another stressing means 3, since the earlier stressing means 3 still fulfills its function on the beam just east. A given time after the concrete beam 2 has been removed from the mould 1 but before the final setting of the concrete takes place, the stressing element 7 can be removed from the end wall members 5 and 6 and used in the casting of another prestressed concrete beam. This removal of the stressing element 7 is possible because the concrete beam 2 is now capable, during the final setting of the concrete, of maintaining the end wall members 5 and 6 at the distance determined for the prestressing. FIGS. 5 and 6 are meant to illustrate this. The time after which the stressing element 7 is removed has to be determined from case to case.
In the embodiment illustrated it is only the four reinforcing rods 4 located in the web of the beam 2 that are put under prestress. However, in other embodiments all or other reinforcing rods 4 can be put under prestress.
During casting the suction between the concrete and the converging outwardly facing sides 13 of the mould 1 shall thus give the corresponding sides of the concrete beam 2 rough surfaces to facilitate joining of the concrete beams 2.
The above embodiment of the invention was described for purpose of illustration rather than limitation. All conceivable variations or modifications of the invention are understood as being included in the scope of the appended claims.
- tending between said end wall members, placing said end wall members and reinforcing rods under stress by a stressing element removably attached to said end Wall members, inverting said mold prior to final setting of said concrete and removing the mold but not said end wall members from the concrete beam formed, then removing said stressing element from said end Wall members and allowing the concrete to finally set.
2. A method as set forth in claim 1 wherein said stressing elements are removed from said end Wall members after said concrete beam has been removed from the mold with said end wall members but before the final setting of the concrete.
UNITED STATES PATENTS 1,624,191 4/1927 Venzie 25118 2,080,074 5/ 1937 Freyssinet et al. 25118 2,496,850 2/ 1950 Bertrand 25-418 XR 2,725,612 12/1955 Lipske 25118 2,913,798 11/1959 Breguet 25118 2,966,717 1/1961 Fuller et al. 25-118 XR FOREIGN PATENTS 61,275 11/1954 France. 974,181 10/ 1960 Germany. 854,448 11/ 1960 Great Britain.
15 ALEXANDER H. BRODMERKEL, Primary Examiner.
ROBERT F. WHITE, Examiner.

Claims (1)

1. A METHOD FOR MAKING PRESTRESSED CONCRETE BEAMS COMPRISING POURING CONCRETE INTO A MOLD HAVING END WALL MEMBERS LOCATED IN SAID MOLD WITH REINFORCING RODS EXTENDING BETWEEN SAID END WALL MEMBERS, PLACING SAID END WALL MEMBERS AND REINFORCING RODS UNDER STRESS BY A STRESSING ELEMENT REMOVABLY ATTACHED TO SAID END WALL MEMBERS, INVERTING SAID MOLD PRIOR TO FINAL SETTING OF SAID CONCRETE AND REMOVING THE MOLD BUT NOT SAID END WALL MEMBERS FROM THE CONCRETE BEAM FORMED, THEN REMOVING SAID STRESSING ELEMENT FORM SAID END WALL MEMBERS AND ALLOWING THE CONCRETE TO FINALLY SET.
US162542A 1961-12-20 1961-12-27 Method of making prestressed concrete beams Expired - Lifetime US3233027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US162542A US3233027A (en) 1961-12-20 1961-12-27 Method of making prestressed concrete beams

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB4569261A GB936555A (en) 1961-12-20 1961-12-20 Improvements in or relating to devices for making pre-stressed concrete beams and a method of making such beams
US162542A US3233027A (en) 1961-12-20 1961-12-27 Method of making prestressed concrete beams

Publications (1)

Publication Number Publication Date
US3233027A true US3233027A (en) 1966-02-01

Family

ID=26265643

Family Applications (1)

Application Number Title Priority Date Filing Date
US162542A Expired - Lifetime US3233027A (en) 1961-12-20 1961-12-27 Method of making prestressed concrete beams

Country Status (1)

Country Link
US (1) US3233027A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3732053A (en) * 1969-10-30 1973-05-08 Cone J L Apparatus for removing cured concrete articles from pallets
FR2519898A1 (en) * 1982-01-21 1983-07-22 Vagneux Traverses Beton Arme S PRECONTRAINT WALL CONCRETE ELEMENTS MOLDING ASSEMBLY, IN PARTICULAR TRAVERS, AND METHOD OF MANUFACTURING THESE ELEMENTS
US4493177A (en) * 1981-11-25 1985-01-15 Grossman Stanley J Composite, pre-stressed structural member and method of forming same
US4781875A (en) * 1985-09-24 1988-11-01 Jantzen Steven L Manufacture of pre-stressed concrete railroad ties
US4953280A (en) * 1987-06-03 1990-09-04 Gifford-Hill & Company, Inc. Method of manufacturing prestressed concrete culverts
US20090084059A1 (en) * 2007-10-01 2009-04-02 Jose Constantino Moreno Building framing beams or studs composed of a cementitious material and method of making
WO2020075195A1 (en) * 2018-10-10 2020-04-16 Indian Institute Of Technology Bombay System and method for producing prestressed concrete composite beam using fibre reinforced polymer bar

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1624191A (en) * 1925-07-22 1927-04-12 Frederick M Venzie Mold for cementitious conduits
US2080074A (en) * 1928-10-02 1937-05-11 Freyssinet Eugene Piece of reenforced concrete
US2496850A (en) * 1950-02-07 Method and apparatus fob manu
FR61275E (en) * 1950-11-14 1955-04-25 Parisienne Pour L Ind Electr S Improvements in the constitution and manufacture of reinforced concrete supported channels
US2725612A (en) * 1955-12-06 Lipski
US2913798A (en) * 1952-12-10 1959-11-24 Claire J Breguet Manufacture of hollow rounded ele-ments of prestressed concrete
DE974181C (en) * 1954-07-08 1960-10-06 Ingrid Vogt Method for producing a prestressed reinforced concrete ceiling for roadways or the like.
GB854448A (en) * 1956-10-08 1960-11-16 Concrete Ltd Improvements in or relating to stressing beds for the manufacture of pre-stressed concrete members
US2966717A (en) * 1956-09-21 1961-01-03 Northern Virginia Construction Apparatus for casting concrete elements

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2496850A (en) * 1950-02-07 Method and apparatus fob manu
US2725612A (en) * 1955-12-06 Lipski
US1624191A (en) * 1925-07-22 1927-04-12 Frederick M Venzie Mold for cementitious conduits
US2080074A (en) * 1928-10-02 1937-05-11 Freyssinet Eugene Piece of reenforced concrete
FR61275E (en) * 1950-11-14 1955-04-25 Parisienne Pour L Ind Electr S Improvements in the constitution and manufacture of reinforced concrete supported channels
US2913798A (en) * 1952-12-10 1959-11-24 Claire J Breguet Manufacture of hollow rounded ele-ments of prestressed concrete
DE974181C (en) * 1954-07-08 1960-10-06 Ingrid Vogt Method for producing a prestressed reinforced concrete ceiling for roadways or the like.
US2966717A (en) * 1956-09-21 1961-01-03 Northern Virginia Construction Apparatus for casting concrete elements
GB854448A (en) * 1956-10-08 1960-11-16 Concrete Ltd Improvements in or relating to stressing beds for the manufacture of pre-stressed concrete members

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3732053A (en) * 1969-10-30 1973-05-08 Cone J L Apparatus for removing cured concrete articles from pallets
US4493177A (en) * 1981-11-25 1985-01-15 Grossman Stanley J Composite, pre-stressed structural member and method of forming same
FR2519898A1 (en) * 1982-01-21 1983-07-22 Vagneux Traverses Beton Arme S PRECONTRAINT WALL CONCRETE ELEMENTS MOLDING ASSEMBLY, IN PARTICULAR TRAVERS, AND METHOD OF MANUFACTURING THESE ELEMENTS
US4758393A (en) * 1982-01-21 1988-07-19 Societe Anonyme De Traverses En Beton Arme Systeme Vagneux Process for casting elements in reinforced concrete
US4781875A (en) * 1985-09-24 1988-11-01 Jantzen Steven L Manufacture of pre-stressed concrete railroad ties
US4953280A (en) * 1987-06-03 1990-09-04 Gifford-Hill & Company, Inc. Method of manufacturing prestressed concrete culverts
US20090084059A1 (en) * 2007-10-01 2009-04-02 Jose Constantino Moreno Building framing beams or studs composed of a cementitious material and method of making
WO2020075195A1 (en) * 2018-10-10 2020-04-16 Indian Institute Of Technology Bombay System and method for producing prestressed concrete composite beam using fibre reinforced polymer bar

Similar Documents

Publication Publication Date Title
US3233027A (en) Method of making prestressed concrete beams
US2942321A (en) Means for making and heat curing concrete structures
US984491A (en) Method of constructing concrete buildings.
US3797801A (en) Four-piece hot top with foldable subassemblies
JPS5824051A (en) Constructing of slab
JP2946728B2 (en) Beam formwork PC plate and its manufacturing method
JPH08302710A (en) Machine base for installation equipment and constructing method thereof
JPS5817907A (en) Finishing of opening part of structural body
CA1036797A (en) Building panels
JPS58195630A (en) Concrete placement method
JPH062359A (en) Form for semi-pc beam
DE3164169D1 (en) Building element cast in one piece for reinforced concrete framework panels, and mould for its production
SU361994A1 (en)
JP2746637B2 (en) Precast concrete beam construction method
DK0814221T3 (en) Process for producing a concrete mast, device for carrying out this method and mast provided by this method
JP2532801B2 (en) Method of manufacturing decorative columns
RU2099184C1 (en) Method for manufacture of box-type reinforced-concrete articles and plant for its embodiment
EP0273492A3 (en) Method of manufacturing system floors
JP2539942B2 (en) Bendable PC form and method of manufacturing the same
JP2896238B2 (en) Method of manufacturing semi-finished product outer wall Pca plate with return rib
GB1600219A (en) Methods of making building modules
JPS6250624B2 (en)
JPH0242043B2 (en)
JPS646009B2 (en)
JPH08108411A (en) Method and apparatus for manufacturing concrete article