US2805720A - Selective plugging of oil wells - Google Patents

Selective plugging of oil wells Download PDF

Info

Publication number
US2805720A
US2805720A US480757A US48075755A US2805720A US 2805720 A US2805720 A US 2805720A US 480757 A US480757 A US 480757A US 48075755 A US48075755 A US 48075755A US 2805720 A US2805720 A US 2805720A
Authority
US
United States
Prior art keywords
formation
water
bottom hole
oil
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US480757A
Inventor
Frederick W Wiegand
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US480757A priority Critical patent/US2805720A/en
Application granted granted Critical
Publication of US2805720A publication Critical patent/US2805720A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/50Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
    • C09K8/502Oil-based compositions
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S507/00Earth boring, well treating, and oil field chemistry
    • Y10S507/925Completion or workover fluid

Definitions

  • An object of the present invention is to provide a simple, inexpensive, and effective seal for the water flow problem by yan operation requiring a minimum of time and no special equipment or skill. Neither is there any need for a reboring operation, as often is required with present day cementing methods.
  • the proposal is to plug off water flow by injecting into the producing formation a petroleum asphalt, which is soluble in the petroleum fluid but is insoluble in water, and to easily accomplish that purpose by utilizing a petroleum asphalt which is pure in the sense that it is normally an extremely hard solid at ordinary temperatures and free of foreign matter except that during its injection and for convenience of handling it contains a certain amount of water and is in an em-ulsifed liquid state for flow into the well from the surface and downward to the formation level to be plugged, whereupon, under the application of pressure, the liquid asphalt emulsion is injected into the pores of the wall of the well bore, with the emulsion water being removed in the process and the solid asphalt then filling the porous formation and affording an insoluble barrier to further water ow but going into solution with petroleum uids so that water sands remain sealed while oil and gas sands are free for production.
  • Figures l and 2 are vertical, sectional views illustrating what may be considered a typical lower fragment of a well bore and respectively showing a load of emulsied, viscous asphalt ready for pressure action thereon, and a treated bottom hole in condition for production.
  • the drawing is intended as illustrative of a bottom, open hole of a well into which extends from the surface the customary outer casing 1 and the production tubing string 2, with a packer assembly 3 near the lower ends of the casing and the tubing to seal ot the annular space between them.
  • Different Strata, as at 4, 5, and 6, are indicated as intersected by the bottom hole.
  • the strata 4 and 6 may be considered respectively as an oil sand and the water sand separated from one another by an intervening nonproducing layer 5. There will not always be a distinct line of demarcation at the bottom hole between separate producing formations, and often the water producing sand will be above the petroleum producing formation.
  • Plump pressure controlled at the surface end of the tubing is applied on the body of emulsiiied asphalt in the bottom hole through a standing fluid column.
  • Compressed air or petroleum gas or a liquid such as oil or water may be employed for the pressure transmitting column.
  • Such pressure on the emulsied asphalt will push it outwardly from the bottom well hole and into the surrounding formation sands.
  • the extrusion of the asphalt into the porous formation will continue until the hole is clear or practically clear, which is to say, the pressuring operation may be ended so as to leave a thin asphalt lining on the wall.
  • the method of sealing off a portion of the producing formation at the bottom hole including flowing down the tubing from the surface and substantially filling the packed-off bottom hole with pure petroleum asphalt emulsitied with approximately thirty percent water and without temperature elevation, forcing the same from the bottom hole into the porous formation wall by transmission of pressure against the hole contained body of water emulsitied asphalt and through a tubing confined fl-uid column, which column pressure application injects through and lls the formation pores at said bottom hole with solid asphalt which is impervious to water and blocks production at a formation water zone but is soluble in oil and dissolves to reopen oil production from a formation oil zone.
  • a method of reworking an existing oil Well having a production tubing string communicating with and being peripherally packed off immediately above the hole cavity at the producing formation comprising discontinuing the normal withdrawal of oil through the production tubing string from the packed-off formation hole f f- 2,805,720 f cavity, then substantially lling the hole cavity by passing downwardly through the production tubing ,string ka ,pref

Description

Sept. 10, 1957 F. W. WIEGAND SELECTIVE PLUGGING oF on. WELLS Filed Jan. lO, 1955 Frede/"MA W. VV/eya/m/ BY 867W United States Patent() SELECTIVE PLUGGIYG F OIL WELLS Frederick W. Wiegand, San Antonio, Tex. Application January 10, 1955, Serial No. 480,757 y 3 Claims. (Cl. 166-32) This invention relates to the reworking of oil and gas wells, and more particularly to an improvement in the sealing off of water formations.
Pay production from a well is sometimes interfered with by production of water in sands at the petroleum fluid formations. Wells have been abandoned when corrective measures have failed economically to remedy the diculty. Attempts are made to reduce or block water ow by cementing off -a water producing formation, but cementing and other known expedients are complex and costly and run into unforeseen troubles and unpredictable undersurface conditions.
An object of the present invention is to provide a simple, inexpensive, and effective seal for the water flow problem by yan operation requiring a minimum of time and no special equipment or skill. Neither is there any need for a reboring operation, as often is required with present day cementing methods. The proposal is to plug off water flow by injecting into the producing formation a petroleum asphalt, which is soluble in the petroleum fluid but is insoluble in water, and to easily accomplish that purpose by utilizing a petroleum asphalt which is pure in the sense that it is normally an extremely hard solid at ordinary temperatures and free of foreign matter except that during its injection and for convenience of handling it contains a certain amount of water and is in an em-ulsifed liquid state for flow into the well from the surface and downward to the formation level to be plugged, whereupon, under the application of pressure, the liquid asphalt emulsion is injected into the pores of the wall of the well bore, with the emulsion water being removed in the process and the solid asphalt then filling the porous formation and affording an insoluble barrier to further water ow but going into solution with petroleum uids so that water sands remain sealed while oil and gas sands are free for production.
Other objects and advantages will become apparent during the course of the following specification having reference to the accompanying drawing, wherein Figures l and 2 are vertical, sectional views illustrating what may be considered a typical lower fragment of a well bore and respectively showing a load of emulsied, viscous asphalt ready for pressure action thereon, and a treated bottom hole in condition for production.
The drawing is intended as illustrative of a bottom, open hole of a well into which extends from the surface the customary outer casing 1 and the production tubing string 2, with a packer assembly 3 near the lower ends of the casing and the tubing to seal ot the annular space between them. Different Strata, as at 4, 5, and 6, are indicated as intersected by the bottom hole. For this discussion, the strata 4 and 6 may be considered respectively as an oil sand and the water sand separated from one another by an intervening nonproducing layer 5. There will not always be a distinct line of demarcation at the bottom hole between separate producing formations, and often the water producing sand will be above the petroleum producing formation. Theactual relationice ship of the bottom hole formation is of no consequence to the practice of this invention, since there is contemplated the lling 4of the bottom hole with an ample volume of water-emulsied petroleum asphalt to reach into the entire formation which surrounds the open hole, as is illustrated in Fig. l, wherein the uid or emulsiied asphalt body is indicated at 7.
When Water flow into a well renders further operation unprotable, the production is discontinued and the hole is pumped as dry as possible. Immediately thereafter, petroleum asphalt emulsiied with approximately thirty percent water to form a thick viscous liquid is supplied, as by pouring into the upper or surface end of the tubing string 2 in an estimated amount to drop by gravity and completely fill the open hole and preferably, also, a short length of the lower end yof the tubing string. The amount of emulsiiied 'asphalt required for any given well will vary, and may be as little as ten barrels and as much as thirty barrels.
Plump pressure controlled at the surface end of the tubing is applied on the body of emulsiiied asphalt in the bottom hole through a standing fluid column. Compressed air or petroleum gas or a liquid such as oil or water may be employed for the pressure transmitting column. Such pressure on the emulsied asphalt will push it outwardly from the bottom well hole and into the surrounding formation sands. The extrusion of the asphalt into the porous formation will continue until the hole is clear or practically clear, which is to say, the pressuring operation may be ended so as to leave a thin asphalt lining on the wall. The applied pressure of the thick viscous asphalt body will tend to squeeze out the emulsifying water, and the separation `of Water is further effected by the ow through the finely divided formation pores of the asphalt in thin particle streams, which frees the water. With the separation of the emulsion agent, the solid asphalt particles ll and plug the formation. Water flow pores will remain blocked; but since petroleum asphalt is soluble in petrolum fluids, it will go into the petroleum fluid, and the oil and gas producing formations will clear up after a short interval. The result will be somewhat as illustrated in Fig. 2, wherein the oil sand 4 is open, as it was initially, and the water sand 6 is blanked off by the diffusion therein of the asphalt 7. Thus, after only a minimum lapse of time, the well may be put back into paying operation.
What is claimed is:
1. In the production -of an oil well having a packedoif bottom hole and a production tubing between the surface and the bottom hole of the well, the method of sealing off a portion of the producing formation at the bottom hole including flowing down the tubing from the surface and substantially filling the packed-off bottom hole with pure petroleum asphalt emulsitied with approximately thirty percent water and without temperature elevation, forcing the same from the bottom hole into the porous formation wall by transmission of pressure against the hole contained body of water emulsitied asphalt and through a tubing confined fl-uid column, which column pressure application injects through and lls the formation pores at said bottom hole with solid asphalt which is impervious to water and blocks production at a formation water zone but is soluble in oil and dissolves to reopen oil production from a formation oil zone.
2. A method of reworking an existing oil Well having a production tubing string communicating with and being peripherally packed off immediately above the hole cavity at the producing formation, said method comprising discontinuing the normal withdrawal of oil through the production tubing string from the packed-off formation hole f f- 2,805,720 f cavity, then substantially lling the hole cavity by passing downwardly through the production tubing ,string ka ,pref
' tion of the emulsion, continuing such uid pressure application ,until substantially all the asphalt is pushed out of the hole cavity and into .the porous formation, thenV removing such uid pressureapplication and after a time interval suicient to permit the asphalt lill in the oil zone of the formation to be dissolved into and ow with the Y oil into the formationhole cavity and thereafter resuming the withdrawal `of oil through the production tubing string from the formation hole cavity.
3.7The method of reworking a petroleum uid well also producing gas yin order to reduce the gas-oil ratio and without pulling the packed-off production pipe from the well, comprising pumping .Water emulsied asphalt at 4 ordinary air temperature through the production pipe downwardly into the packed-olf well cavity .and out into the cavity wall formations producing oil and gas to an extent that the emulsion on being ejected from the well cavity is divided by itsV entrance into the smallrpores of the formations into thin streams from which the water separates as the solid asphalt penetrates the pores and plugs off the formations, .allowing a time interval during which the solid asphalt plugging the pores of the oil formation Vdissolves into the oil and then producing through the production string and from the well cavity while that formation containing dry gas remains blocked References Cited in the file of this patent UNITED STATES PATENTS 1,307,027 Swan June 17,1919 2,380,156 DobsonEet al. July 10, 1945 2,527,581 Searer Oct. 3-1, 1950 2,604,947 Martin `Tuly 29, 1952 Y 2,667,224 Howard Jan. 26, 1954 y l 2,713,906 Y Allen July 26, 1955 2,747,839 Moore May 29, 1956

Claims (1)

1. IN THE PRODUCTION OF AN OIL WELL HAVING A PACKEDOFF BOTTOM HOLE AND A PRODUCTION TUBING BETWEEN THE SURFACE AND THE BOTTOM HOLE OF THE WELL, THE METHOD OF SEALING OFF A PORTION OF THE PRODUCING FORMATION AT THE BOTTOM HOLE INCLUDING FLOWING DOWN THE TUBING FROM THE SURFACE AND SUBSTANTIALLY FILLING THE PACKED-OFF BOTTOM HOLE WITH PURE PETROLEUM ASPHALT EMULSIFIED WTH APPROXIMATELY THIRTY PRESENT WATER AND WITHOUT TEMPERATURE ELEVATION, FORCING THE SAME FROM THE BOTTOM HOLE INTO THE POROUS FORMATION WALL BY TRANSMISSION OF PRESSURE AGAINST THE HOLE CONTAINED BODY OF WATER EMULSIFIED ASPHALT AND THROUGH A TUBING CONFINED FLUID COLUMN, WHICH COLUMN PRESSURE APPLILCATION INJECTS THROUGH AND FILLS THE FORMATION PORES AT SAID BOTTOM HOLE WITH SOLID ASPHALT WHICH IS IMPERVIOUS TO WATER AND BLOCKS PRODUCTION AT A FORMATION WATER ZONE BUT IS SOLUBLE IN OIL AND DISSOLVES TO REOPEN OIL PRODUCTION FROM A FORMATION OIL ZONE.
US480757A 1955-01-10 1955-01-10 Selective plugging of oil wells Expired - Lifetime US2805720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US480757A US2805720A (en) 1955-01-10 1955-01-10 Selective plugging of oil wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US480757A US2805720A (en) 1955-01-10 1955-01-10 Selective plugging of oil wells

Publications (1)

Publication Number Publication Date
US2805720A true US2805720A (en) 1957-09-10

Family

ID=23909244

Family Applications (1)

Application Number Title Priority Date Filing Date
US480757A Expired - Lifetime US2805720A (en) 1955-01-10 1955-01-10 Selective plugging of oil wells

Country Status (1)

Country Link
US (1) US2805720A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2873250A (en) * 1953-12-28 1959-02-10 Pan American Petroleum Corp Composition for plugging highly permeable formations
US3032499A (en) * 1958-05-23 1962-05-01 Western Co Of North America Treatment of earth formations
US3087543A (en) * 1960-01-27 1963-04-30 Jersey Prod Res Co Method for improving oil-water ratios of oil and gas wells
US3093192A (en) * 1958-07-14 1963-06-11 Texaco Inc Oil well treatment to overcome water coning
US3180415A (en) * 1963-06-03 1965-04-27 Texaco Inc Oil well treatment to overcome water coning
US3241612A (en) * 1962-06-29 1966-03-22 Chevron Res Method of plugging porous formations
US20040045707A1 (en) * 2002-09-11 2004-03-11 Nguyen Philip D. Method for determining sand free production rate and simultaneously completing a borehole

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1307027A (en) * 1918-09-07 1919-06-17 John C Swan Method of excluding water from drilled wells for oil.
US2380156A (en) * 1941-06-10 1945-07-10 Richfield Oil Corp Well drilling
US2527581A (en) * 1945-08-01 1950-10-31 Durez Plastics And Chemicals I Treatment of earth formations
US2604947A (en) * 1946-11-22 1952-07-29 Hercules Powder Co Ltd Plugging agent and process
US2667224A (en) * 1949-06-29 1954-01-26 Stanolind Oil & Gas Co Well completion process
US2713906A (en) * 1952-12-31 1955-07-26 Texas Co Preventing of gas coning in the production of oil from combination reservoirs
US2747839A (en) * 1951-04-30 1956-05-29 Socony Mobil Oil Co Inc Method for correcting lost circulation of drilling fluids

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1307027A (en) * 1918-09-07 1919-06-17 John C Swan Method of excluding water from drilled wells for oil.
US2380156A (en) * 1941-06-10 1945-07-10 Richfield Oil Corp Well drilling
US2527581A (en) * 1945-08-01 1950-10-31 Durez Plastics And Chemicals I Treatment of earth formations
US2604947A (en) * 1946-11-22 1952-07-29 Hercules Powder Co Ltd Plugging agent and process
US2667224A (en) * 1949-06-29 1954-01-26 Stanolind Oil & Gas Co Well completion process
US2747839A (en) * 1951-04-30 1956-05-29 Socony Mobil Oil Co Inc Method for correcting lost circulation of drilling fluids
US2713906A (en) * 1952-12-31 1955-07-26 Texas Co Preventing of gas coning in the production of oil from combination reservoirs

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2873250A (en) * 1953-12-28 1959-02-10 Pan American Petroleum Corp Composition for plugging highly permeable formations
US3032499A (en) * 1958-05-23 1962-05-01 Western Co Of North America Treatment of earth formations
US3093192A (en) * 1958-07-14 1963-06-11 Texaco Inc Oil well treatment to overcome water coning
US3087543A (en) * 1960-01-27 1963-04-30 Jersey Prod Res Co Method for improving oil-water ratios of oil and gas wells
US3241612A (en) * 1962-06-29 1966-03-22 Chevron Res Method of plugging porous formations
US3180415A (en) * 1963-06-03 1965-04-27 Texaco Inc Oil well treatment to overcome water coning
US20040045707A1 (en) * 2002-09-11 2004-03-11 Nguyen Philip D. Method for determining sand free production rate and simultaneously completing a borehole
US7143826B2 (en) * 2002-09-11 2006-12-05 Halliburton Energy Services, Inc. Method for determining sand free production rate and simultaneously completing a borehole

Similar Documents

Publication Publication Date Title
US2933136A (en) Well treating method
US3028914A (en) Producing multiple fractures in a cased well
US2970645A (en) Producing multiple fractures in a well
US3136361A (en) Fracturing formations in wells
US2787455A (en) Method for developing cavities in salt or other soluble rock
CA2062071C (en) Control of flow and production of water and oil or bitumen from porous underground formations
US2784787A (en) Method of suppressing water and gas coning in oil wells
US3361201A (en) Method for recovery of petroleum by fluid injection
US2642142A (en) Hydraulic completion of wells
US3134439A (en) Gravel packing apparatus
CN104153753B (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
US2814347A (en) Method of completing a well
US2990016A (en) Method of and composition for sealing lost circulation in wells
US2805720A (en) Selective plugging of oil wells
US3437143A (en) Formation consolidation
US3333638A (en) Liquid disposal
US3393741A (en) Method of fracturing subsurface formations
US3330353A (en) Thermal soak zones by fluidized fractures in unconsolidated, petroleum producing reservoirs
US3228470A (en) Method of mitigating the production of undesirable gas or water in oil wells
US3438439A (en) Method for plugging formations by production of sulfur therein
US3369605A (en) Method of treating oil wells to prevent water coning
US3172471A (en) Reduction of gas and water coning into oil wells
US3866682A (en) Process for controlling water and gas coning
US3431977A (en) Forming fractures in the desired direction in earth formations
US3208522A (en) Method of treating subterranean formations