US2355190A - Prestressed composite pile - Google Patents

Prestressed composite pile Download PDF

Info

Publication number
US2355190A
US2355190A US447872A US44787242A US2355190A US 2355190 A US2355190 A US 2355190A US 447872 A US447872 A US 447872A US 44787242 A US44787242 A US 44787242A US 2355190 A US2355190 A US 2355190A
Authority
US
United States
Prior art keywords
concrete
steel
pile
composite pile
prestressed composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US447872A
Inventor
Maxwell M Upson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raymond Concrete Pile Co
Original Assignee
Raymond Concrete Pile Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raymond Concrete Pile Co filed Critical Raymond Concrete Pile Co
Priority to US447872A priority Critical patent/US2355190A/en
Application granted granted Critical
Publication of US2355190A publication Critical patent/US2355190A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Definitions

  • This invention pertains to improvements in concrete piles for dock and pier work in which the concrete must be protected from the deteriorating chemical action of sea water and the destruction wrought by oxidation of the reinforcing steel.
  • sea water in many cases carries sulphates which combine with any free calcium hydroxide in the concrete to form calcium sulphate which in turn reacts with hydrated calcium aluminates to form calcium sulfo-aluminate.
  • This compound swells and disintegrates the surface of the concrete. It is, therefore, evident that any method that can be used to make that section of the pile that is exposed above low water impenetrable and free from the consequences of contraction cracks is of importance.
  • the formation of cracks during setting may be prevented by pre-stressing thesteel and pouring the concrete around the steel while it is in tension.
  • the steel usually is of comparatively small diameter and of very high elastic limit. It is pre-stressed almost to its elastic limit during the pouring of the concrete. As the concrete sets the tension is released and the steel shortens. The amount of shrinkage of the concrete is not sufficient to take all the tension out of the steel. In consequence the steel continues its tension perpetually and keeps the concrete under continuous compression, preventing surface cracks and at the same time providing a denser and more compact concrete.
  • this invention covers my improved pile as an .article of manufacture as distinguished from the particular method of making it.
  • My novel pile may be constructed by use of a slightly modified form of the apparatus shown in the United States Patent No. 2,080,074, patented May 11, 1937, on application led by Freyssinet et al., as will now be apparent to those of average skill in the art, after having read the foregoing disclosure of my invention.
  • a concrete pile having steel reinforcement throughout its length, the reinforcement in a pre-selected portion of said pile being pre-stressed as compared with the reinforcement elsewhere in said pile.
  • said pile having longitudinal steel reinforcements throughout its length, the steel in only the said upper part of the pile being longitudinally pre-stressed, and the steel in the said 5 lower part being substantially free from longitudinal tension.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

Aug. 8, 1944.
M. M. UPSON` PRE-STRESSED COMPOSITE PILE Filed June` 20', 1942 @f//VFORCED COA/CRETE P/L E INVENToR.- 44AM/fa /M Z/Qso/v ATTORNEY Patented Aug. 8, 1944 PRESTRESSED COMPOSITE PILE Maxwell M. Upson, Englewood, N. J., assgnor to Raymond Concrete Pile Company, New York, N. Y., a corporation of New Jersey Application June 20, 1942, Serial No. 447,872
(Cl. (i1-56) 3 Claims.
This invention pertains to improvements in concrete piles for dock and pier work in which the concrete must be protected from the deteriorating chemical action of sea water and the destruction wrought by oxidation of the reinforcing steel.
As is well known, when piles are subjected to the rise and fall of the tide the portions of the piles exposed alternately to air and water are subject to much more rapid disintegration and deterioration than are those portions which are continuously submerged. Many methods have been tried in efforts to meet this condition, none of which has been in all ways satisfactory. The enlarging of the cross-section of the pile and placing of the steel further inward so that it is far removed from the surface results only in increasing the surface cracks on the pile and in consequence the porosity of the concrete protecting the steel. Furthermore, large piles are extremely heavy and expensive. A pile twentyfour inches in diameter and one hundred feet long weighs in the neighborhood of 35 tons. This requires special and very expensive equipment for handling and driving, which is expensive not only in cost but also costly to transport.
One of the principal causes of disintegration of concrete piles in the area exposed between low and high water has to do with shrinkage of the concrete. Pre-cast piles in order to be handled must have a substantial amount of longitudinal steel in order to provide sufficient strength to take care of the handling stresses. As is well known, concrete shrinks when it sets. The steel does not shorten during the period of setting and in consequence the steel tends to hold the interior concrete from moving. As a result the surface of the concrete develops an innite number of very minute cracks. These cracksl are usually extremely small and frequently can not be seen without a magnifying glass. However, they provide openings which admit water and air into contact with the steel reinforcing. This causes oxidation. 4Since ferrie oxide occupies more than twice the volume of metallic steel it naturally disrupts the concrete and destroys the strength of the unit.
In addition, sea water in many cases carries sulphates which combine with any free calcium hydroxide in the concrete to form calcium sulphate which in turn reacts with hydrated calcium aluminates to form calcium sulfo-aluminate. This compound swells and disintegrates the surface of the concrete. It is, therefore, evident that any method that can be used to make that section of the pile that is exposed above low water impenetrable and free from the consequences of contraction cracks is of importance.
The formation of cracks during setting may be prevented by pre-stressing thesteel and pouring the concrete around the steel while it is in tension. In the practice of this process the steel usually is of comparatively small diameter and of very high elastic limit. It is pre-stressed almost to its elastic limit during the pouring of the concrete. As the concrete sets the tension is released and the steel shortens. The amount of shrinkage of the concrete is not sufficient to take all the tension out of the steel. In consequence the steel continues its tension perpetually and keeps the concrete under continuous compression, preventing surface cracks and at the same time providing a denser and more compact concrete.
This method of pre-stressing concrete is known. However, it has been impracticable and not commercial to build forms of suflicient strength to permit the pre-stressingr of the steel during the period of pouring the concrete. Hundreds of tons of resistance may be necessary in order properly to pre-stress the steel. I therefore contemplate forming a pile having only the upper portion prestressed, the rest being reinforced in the conventional manner. This invention covers my improved pile as an article of manufacture as distinguished from the method of making it.
In the drawing, which is a sectional elevation broken away at its lower portion, I have shown a reinforced concrete pile illustrative of one form of my invention. It will be noted that the steel reinforcement above the low tide level, and up to the high tide level, is pre-stressed, while the steel reinforcement below the low tide level is not prestressed.
As stated, this invention covers my improved pile as an .article of manufacture as distinguished from the particular method of making it. My novel pile may be constructed by use of a slightly modified form of the apparatus shown in the United States Patent No. 2,080,074, patented May 11, 1937, on application led by Freyssinet et al., as will now be apparent to those of average skill in the art, after having read the foregoing disclosure of my invention.
I claim:
1. A concrete pile having steel reinforcement throughout its length, the reinforcement in a pre-selected portion of said pile being pre-stressed as compared with the reinforcement elsewhere in said pile.
level, said pile having longitudinal steel reinforcements throughout its length, the steel in only the said upper part of the pile being longitudinally pre-stressed, and the steel in the said 5 lower part being substantially free from longitudinal tension.
MAXWELL M. UPSON.
US447872A 1942-06-20 1942-06-20 Prestressed composite pile Expired - Lifetime US2355190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US447872A US2355190A (en) 1942-06-20 1942-06-20 Prestressed composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US447872A US2355190A (en) 1942-06-20 1942-06-20 Prestressed composite pile

Publications (1)

Publication Number Publication Date
US2355190A true US2355190A (en) 1944-08-08

Family

ID=23778080

Family Applications (1)

Application Number Title Priority Date Filing Date
US447872A Expired - Lifetime US2355190A (en) 1942-06-20 1942-06-20 Prestressed composite pile

Country Status (1)

Country Link
US (1) US2355190A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2706498A (en) * 1950-11-13 1955-04-19 Raymond Concrete Pile Co Prestressed tubular concrete structures
US4317643A (en) * 1979-11-14 1982-03-02 Miller Donald S Steel reinforced concrete piles
US5788419A (en) * 1994-05-03 1998-08-04 Whitty, Jr.; Stephen K. Pre-cast prestressed concrete foundation pile and associated installation components
US5934835A (en) * 1994-05-03 1999-08-10 Whitty, Jr.; Stephen K. Prestressing concrete foundation pile having a single prestressing strand
US20080313907A1 (en) * 2005-02-22 2008-12-25 Freyssinet Method For Reinforcing a Metal Tubular Structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2706498A (en) * 1950-11-13 1955-04-19 Raymond Concrete Pile Co Prestressed tubular concrete structures
US4317643A (en) * 1979-11-14 1982-03-02 Miller Donald S Steel reinforced concrete piles
US5788419A (en) * 1994-05-03 1998-08-04 Whitty, Jr.; Stephen K. Pre-cast prestressed concrete foundation pile and associated installation components
US5934835A (en) * 1994-05-03 1999-08-10 Whitty, Jr.; Stephen K. Prestressing concrete foundation pile having a single prestressing strand
US20080313907A1 (en) * 2005-02-22 2008-12-25 Freyssinet Method For Reinforcing a Metal Tubular Structure
US8201332B2 (en) * 2005-02-22 2012-06-19 Soletanche Freyssinet Method for reinforcing a metal tubular structure

Similar Documents

Publication Publication Date Title
Torres-Acosta et al. Residual life of corroding reinforced concrete structures in marine environment
US2355190A (en) Prestressed composite pile
O’Reilly et al. Evaluation of multiple corrosion protection systems for reinforced concrete bridge decks
Oleson et al. Reproducing a Roman maritime structure with Vitruvian pozzolanic concrete
Melchers et al. Long-term durability of reinforced concrete piles from the Hornibrook Highway bridge
Baldwin et al. The assessment of reinforcing bars with inadequate anchorage
Tang et al. Corrosion-induced concrete cracking, steel-concrete bond loss, and mechanical degradation of steel bars
Zhang et al. Study on seismic behavior of reinforced concrete columns after ECE treatment
Bernardo et al. Cyclic bond testing of steel bars in high-performance underwater concrete
Mak et al. Correlation between surface crack width and steel corrosion in reinforced concrete
Ali Flexural behavior of reinforced beams reinforced with corrosive rebar
Peyronnet et al. Experimental study on the behavior of concrete structural elements in natural sea water
Aligizaki Modeling of concrete cracking due to corrosion of embedded reinforcement
RU2111145C1 (en) Method of lifting load to surface of liquid
Alarab The Effect of Crack Opening Size and Repair Methods on Corrosion of Steel Reinforcement in Concrete
O’Reilly Performance of multiple corrosion protection systems for reinforced concrete bridge decks
Shakib et al. Initiation and Propagation of Crack Due to Corrosion of Reinforcement-An Experimental Investigation
Mathern et al. Experimental study of time-dependent properties of a low-pH concrete for deposition tunnels
TSUJI Recommended practice for expansive concrete
Lepakshi et al. Shear Strength Parameters and Mohr–Coulomb Failure Envelopes
Papé et al. Investigating the effects of corrosion on 45-year-old prestressed concrete bridge beams
Carpio et al. Rehabilitation of a damaged reinforced concrete bridge in a marine environment
Xhexhi Comparison of the Compression Test and the Rebound Test for Evaluating the Brand of Concrete in Precast Reinforced Concrete Elements.
Hanche Behaviour and Strength of Ferrocement Rectangular Beams in Shear-A Experimental Study
Thanh et al. Identification of the properties of rust trough the behavior of damageable structures