US20240167361A1 - Systems for Inter-Fracture Flooding of Wellbores and Methods of Using the Same - Google Patents
Systems for Inter-Fracture Flooding of Wellbores and Methods of Using the Same Download PDFInfo
- Publication number
- US20240167361A1 US20240167361A1 US18/430,407 US202418430407A US2024167361A1 US 20240167361 A1 US20240167361 A1 US 20240167361A1 US 202418430407 A US202418430407 A US 202418430407A US 2024167361 A1 US2024167361 A1 US 2024167361A1
- Authority
- US
- United States
- Prior art keywords
- valve
- valves
- tubular
- unidirectional
- passageway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 52
- 239000012530 fluid Substances 0.000 claims abstract description 81
- 230000001965 increasing effect Effects 0.000 claims abstract description 11
- 229930195733 hydrocarbon Natural products 0.000 claims abstract description 10
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract description 10
- 230000015572 biosynthetic process Effects 0.000 claims description 52
- 238000004891 communication Methods 0.000 claims description 27
- 230000035699 permeability Effects 0.000 claims description 7
- 230000004044 response Effects 0.000 claims description 5
- 238000005086 pumping Methods 0.000 claims description 2
- 238000002347 injection Methods 0.000 description 53
- 239000007924 injection Substances 0.000 description 53
- 238000005755 formation reaction Methods 0.000 description 52
- 238000004519 manufacturing process Methods 0.000 description 51
- 208000010392 Bone Fractures Diseases 0.000 description 31
- 238000011084 recovery Methods 0.000 description 19
- 239000007789 gas Substances 0.000 description 12
- 238000004088 simulation Methods 0.000 description 12
- 238000005336 cracking Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 239000004215 Carbon black (E152) Substances 0.000 description 6
- 230000008901 benefit Effects 0.000 description 4
- 238000005553 drilling Methods 0.000 description 4
- 238000002955 isolation Methods 0.000 description 4
- 239000007788 liquid Substances 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 125000004122 cyclic group Chemical group 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000004971 Cross linker Substances 0.000 description 1
- 230000017488 activation-induced cell death of T cell Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000010205 computational analysis Methods 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000000839 emulsion Substances 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 238000010992 reflux Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000004094 surface-active agent Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/08—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/10—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Definitions
- the present invention relates generally to systems for hydrocarbon production, and more specifically but without limitation, to systems for inter-fracture flooding of wellbores and methods of using the same.
- Oil production from tight formations became particularly significant over the last decade, with advances in horizontal drilling and multi-stage hydraulic fracturing. Despite such advances, however, primary recovery from tight formations remains low—in some instances, 90% or more of the formation's oil is left in place.
- post-primary recovery methods are sometimes used, but these methods typically have limited success.
- One such method is flooding between wells, in which a fluid (e.g., water and/or gas) is injected into a wellbore that is near the producing wellbore, in hopes that the fluid will “sweep” oil from the formation into the producing wellbore where it can then be recovered.
- a fluid e.g., water and/or gas
- the tight nature of the formation limits the fluid's ability to enter the formation from the injecting wellbore, or the fluid short-circuits to the producing wellbore (e.g., via fractures), leaving the formation unswept.
- Another post-primary recovery method is refracturing, in which new fractures are generated in the wellbore to increase access to the formation.
- Cyclic gas injection is another post-primary recovery method, which involves: (1) injecting gas into the wellbore to pressurize the formation's oil and reduce its viscosity (“huff”); and (2) producing the energized fluid (“puff”) through the wellbore. While huff-and-puff has had some success, results are inconsistent, it requires a large amount of gas, and its usage of the same is relatively inefficient.
- Fracture-to-fracture flooding within a single wellbore has also been proposed as a post-primary recovery method, whether through simultaneous fluid injection into certain fractures and production from others, or fluid injection into certain fractures followed sequentially by production from others. Both options have shown positive results in simulations; an intra-wellbore fracture-to-fracture flooding pattern, particularly using an oil-miscible gas, might lead to substantial hydrocarbon recovery. In practice, however, both require complex downhole tool systems and/or complex operations. For simultaneous injection and flooding, a dual-tubing system is needed, with a tubular to connect injection zones in the wellbore and a tubular to connect production zones in the wellbore, ensuring isolation between the injection and production zones.
- the present systems and methods address this need by providing for such a process that is self-regulating; for example, performed by managing the wellhead pressure at the surface or changing the well's operating mode between injection and production. In some embodiments, this is achieved by disposing a tubular into a lateral, isolating zones along the lateral, and associating pressure-responsive valves with those zones, where ones of the valves associated with injection zones open in response to higher pressure within the tubular than outside of the tubular, and ones of the valves associated with production zones open in response to lower pressure within the tubular than outside the tubular (e.g., during production).
- inter-fracture flooding is interchangeable with “inter-fracture flooding,” and the term “cyclic injection” is interchangeable with “huff-and-puff.” Further, an inter-fracture flooding process conducted in a sequential manner can also be referred to as an “inter-fracture huff-and-puff” process.
- Some embodiments of the present systems for inter-fracture flooding of a wellbore comprise: a tubular defining a passageway, one or more packers coupled to the tubular, and two or more unidirectional valves coupled to the tubular, the unidirectional valves including one or more first unidirectional valves, each configured to open to permit fluid communication from the passageway to outside of the tubular through the first unidirectional valve, and close to prevent fluid communication from outside of the tubular to the passageway through the first unidirectional valve, and one or more second unidirectional valves, each configured to open to permit fluid communication from outside of the tubular to the passageway through the second unidirectional valve, and close to prevent fluid communication from the passageway to outside of the tubular through the second unidirectional valve, wherein, for each of the second unidirectional valve(s), at least one of the packer(s) is disposed between the second unidirectional valve and each adjacent one of the first unidirectional valve(s) along the tubular.
- At least one of the first and second unidirectional valves is configured to open in response to a pressure differential between the passageway and outside of the tubular that acts on the unidirectional valve. In some systems, at least one of the first and second unidirectional valves is a check valve.
- At least one of the first unidirectional valve(s) is biased closed. In some systems, at least one of the first unidirectional valve(s) is configured to open when pressure in the passageway acting on the first unidirectional valve is at least 1 pound per square inch (psi) higher than pressure outside of the tubular acting on the first unidirectional valve. In some systems, at least one of the second unidirectional valve(s) is biased closed. In some systems, at least one of the second unidirectional valve(s) is configured to open when pressure outside of the tubular acting on the second unidirectional valve is at least 1 psi higher than pressure in the passageway acting on the second unidirectional valve.
- psi pound per square inch
- the packer(s) comprise two or more packers, and at least two of the packers are disposed between adjacent ones of the first and second unidirectional valves along the tubular.
- the packer(s) comprise two or more packers, wherein the first unidirectional valve(s) comprise two or more first unidirectional valves, and at least two of the first unidirectional valves are disposed between adjacent ones of the packers along the tubular, or the second unidirectional valve(s) comprise two or more second unidirectional valves, and at least two of the second unidirectional valves are disposed between adjacent ones of the packers along the tubular.
- Some of the present methods for inter-fracture flooding of a wellbore comprise: disposing a tubular having a passageway into the wellbore, the tubular coupled to one or more first valves and one or more second valves, increasing pressure within the passageway such that, responsive to the increasing pressure, the first valve(s) open and fluid flows from the passageway, through the first valve(s), and into one or more first fractures of the wellbore, and reducing pressure within the passageway such that, responsive to the reducing pressure, the first valve(s) close, the second valve(s) open, and hydrocarbons flow from one or more second fractures of the wellbore, through the second valve(s), and into the passageway.
- increasing pressure within the passageway is performed at least by pumping fluid into the passageway.
- the pumped fluid comprises a majority, by volume and/or mass, of a gas.
- At least one of the first and second valves is a unidirectional valve. In some methods, at least one of the first and second valves is a check valve. In some methods, at least one of the first valve(s) is biased closed. In some methods, at least one of the second valve(s) is biased closed.
- one or more packers are coupled to the tubular, and, for each of the second valve(s), at least one of the packer(s) is disposed between the second valve and each adjacent one of the first valve(s) along the tubular.
- the packer(s) comprise two or more packers, and at least two of the packers are disposed between adjacent ones of the first and second valves along the tubular.
- a formation into which the wellbore extends has an average permeability that is less than approximately 0.5 millidarcies (mD), optionally, less than approximately 0.1 mD. In some methods, the wellbore is cased.
- mD millidarcies
- Coupled is defined as connected, although not necessarily directly, and not necessarily mechanically; two items that are “coupled” may be unitary with each other.
- the terms “a” and “an” are defined as one or more unless this disclosure explicitly requires otherwise.
- the term “substantially” is defined as largely but not necessarily wholly what is specified—and includes what is specified; e.g., substantially 90 degrees includes 90 degrees and substantially parallel includes parallel—as understood by a person of ordinary skill in the art.
- the terms “substantially” and “approximately” may each be substituted with “within [a percentage] of” what is specified, where the percentage includes 0.1, 1, 5, and 10 percent.
- A, B, and/or C includes: A alone, B alone, C alone, a combination of A and B, a combination of A and C, a combination of B and C, or a combination of A, B, and C.
- “and/or” operates as an inclusive or.
- the term “or,” as used herein, refers to an inclusive or and is interchangeable with the term “and/or.”
- any embodiment of any of the apparatuses, systems, and methods can consist of or consist essentially of—rather than comprise/have/include—any of the described steps, elements, and/or features.
- the term “consisting of” or “consisting essentially of” can be substituted for any of the open-ended linking verbs recited above, in order to change the scope of a given claim from what it would otherwise be using the open-ended linking verb.
- an apparatus, system, or method that is configured in a certain way is configured in at least that way, but it can also be configured in other ways than those specifically described.
- FIG. 1 is a schematic of an example of one of the present system installed in a wellbore.
- FIG. 2 is a schematic of another example of one of the present system installed in a wellbore.
- FIG. 3 A is a schematic of a wellbore having first and second fractures in fluid communication with a formation.
- FIG. 3 B is a schematic of the wellbore of FIG. 3 A , shown after insertion of an example of a tubular of the present systems.
- FIG. 3 C is a schematic of the wellbore of FIG. 3 A , shown during an injection process.
- FIG. 3 D is a schematic of the wellbore of FIG. 3 A , shown during a production process.
- FIG. 4 A illustrates simulations of the oil production rate achieved through use of one of the present systems over a 3-cycle operation after primary depletion of a reservoir section where: (1) injection and production fractures are isolated (“Inter-Frac Huff-n-Puff”); and (2) where injection and production fractures are in fluid communication (“Inter-Frac Huff-n-Puff (Frac Comm)”).
- FIG. 4 B illustrates the cumulative oil production of the simulations of FIG. 4 A .
- System 10 includes a tubular 26 that defines a passageway 28 and a plurality of valves (e.g., 30 , 34 ) coupled to the tubular, each of the valves configured to selectively permit fluid communication with the passageway.
- one or more first valves 30 coupled to tubular 26 may permit fluid communication from passageway 28 to formation 18
- one or more second valves 34 coupled to the tubular may permit fluid communication from the formation to the passageway.
- one or more packers 38 may be coupled to tubular 26 to isolate a portion(s) of wellbore 14 .
- packers 38 can be disposed on opposing sides of second valve 34 , thereby isolating a portion of formation 18 (e.g., near fractures 24 ) from other portions of the formation (e.g., near fractures 22 ).
- the first and second valves 30 , 34 may be positioned adjacent to, or aligned with, a fracture (e.g., 22 , 24 ) or a group of fractures to enable fluid communication between passageway 28 and formation 18 .
- tubular 26 is positioned within wellbore 14 such that first valves 30 are positioned adjacent to first fractures 22 and second valves 34 are positioned adjacent to second fractures 24 .
- First valves 30 and second valves 34 need not be positioned directly adjacent to first and second fractures, respectively, but may be positioned within zones corresponding to the first and second fractures, respectively (e.g., injection and production zones) that can defined and isolated by packers 38 .
- system 10 may utilize certain fractures (e.g., first fractures 22 ) for injection and utilize other fractures (e.g., second fractures 24 ) for production.
- first fractures 22 e.g., first fractures 22
- second fractures 24 e.g., second fractures 24
- fluid flowing from passageway 28 into formation 18 flows from the passageway, through first valves 30 , and into first fractures 22 of wellbore 14 and fluid flowing from the formation to the passageway flows from second fractures 24 of the wellbore, through second valves 34 , and into the passageway.
- system 10 allows for injecting fluids preferentially into certain fractures—those in injection zones—and producing fluids preferentially from others—those in production zones—to promote flooding in which fluid injected to injection zones will “sweep” oil from formation 18 into producing zones where it can be recovered.
- Some embodiments of system 10 enhance such flooding by isolating these injection and production zones from one another (e.g., via packers 38 ).
- first and second valves 30 , 34 may be a unidirectional valve such as, for example, a check valve (e.g., nozzle check valve, ball check valve, diaphragm check valve, swing check valve, stop-check valve, etc.), non-return valve, reflux valve, retention valve, foot valve, one-way valve, or the like.
- first valves 30 are configured to open to permit fluid communication from passageway 28 to outside of tubular 26 (e.g., an annulus of wellbore 14 ) (e.g., to first fracture 22 ) through the first valves and close to prevent fluid communication from outside of the tubular to the passageway through the first valves.
- second valves 34 are configured to open to permit fluid communication from outside of tubular 26 (e.g., from second fractures 24 ) to passageway 28 through the second valves and close to prevent fluid communication from the passageway to outside of the tubular through the second valves.
- system 10 include two first valves and one second valve 34 in the depicted section of wellbore 14 ; however, any number of first or second valves may be employed (e.g., between one and one hundred valves) in a particular section of the wellbore. A larger number of valves may reduce the likelihood of the valves running at their limits and decrease risk of failure and a lower number of valves may reduce cost and complexity of the system.
- each of the first and second valves 30 , 34 is a passive valve such that each valve (e.g., 30 , 34 ) is configured to open in response to a pressure within passageway 28 that acts on the valve, a pressure outside of tubular 26 that acts on the valve, or a pressure differential between those two pressures.
- the valves are self-regulating. For example, operation of the valves can be achieved through managing the wellhead pressure at the surface or changing the operating mode between injection and production. Passive valves can provide simplicity and reduce costs.
- such passive valves are mechanical as opposed to electronically-controlled, which can provide the additional advantage of increased reliability.
- electrical flow regulators require components (mechanical and electronic) that may be damaged due to shocks and vibrations that are common in drilling, injection, and production processes.
- passive valves may be electronically-controlled.
- a valve can be associated with one or more sensors configured to capture data indicative of pressure within passageway 28 that acts on the valve and/or a pressure outside of tubular 26 that acts on the valve, and the valve can be configured to open or close based on one or both of these pressures or the difference between them.
- valves 30 , 34 may be biased toward an open position—permitting fluid communication—or, alternatively, a closed position-preventing fluid communication.
- first valve 30 is biased toward the closed position
- a pressure within passageway 28 must be greater than a pressure outside of tubular 26 at the first valve for it to open.
- second valve 34 is biased toward the closed position
- a pressure outside of tubular 26 must be greater than a pressure within passageway 28 at the second valve for it to open.
- First valve 30 may be biased via a biasing member (e.g., spring, swing, magnetic, elastic, or other biasing member) to prevent opening of the first valve unless the differential between passageway 28 and outside of tubular 26 is greater than or equal to a cracking pressure.
- a biasing member e.g., spring, swing, magnetic, elastic, or other biasing member
- At least one of (up to and including all of) first valves 30 is configured to open when pressure in passageway 28 acting on the first valve is greater than or equal to any one of, or between any two of: 1, 2, 5, 8, and 10 percent (%), or greater than or equal to any one of, or between any two of: 0.1, 0.2, 0.3, 0.4, 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 4.0, 4.5, 5.0, 6.0, 6.5, 7.0, 8.0, 9.0, 10.0, 20.0, 50.0, 75.0, 100.0, 150.0, 200.0, 300.0, 400.0, 500.0, 750.0, or 1000.0 psi, higher than pressure outside of tubular 26 acting on the first valve.
- one or more second valves 34 may be biased similarly to that described above for first valves 30 , except that such a second valve is configured to open when pressure outside of tubular 26 acting on the second valve is greater than pressure in passageway 28 acting on the second valve.
- At least one of first valves 30 can be configured to open at a pressure differential (e.g., cracking pressure) that is different than an opening pressure differential of at least one other of the first valves.
- a pressure differential e.g., cracking pressure
- the frictional pressure drop across tubular 26 may be substantial, particularly when the fluid injection rates or production rates are high.
- one or more first valves (e.g., 30 ) near a toe of the well may have a lower cracking pressure than one or more first valves near a heel of the well.
- the higher cracking pressure for valves near the heel can at least partially account for a higher injection pressure at the heel and thereby suppress preferential flow of the injection fluid into zones near the heel over those near the toe.
- different cracking pressures can be applied to the plurality of second valves 34 positioned within one zone or different zones along tubular 26 . Such variable biasing may promote a more even distribution of fluid injection into and/or production from different reservoir sections along wellbore 14 .
- One or more additional components may be coupled to, or included with, the valves 30 , 34 .
- an orifice may be coupled to an inlet of a valve to limit the rate of fluid flow through the valve in certain zones of preferential flow, which can mitigate problems such as thief zones or direct communication between injection and production fractures.
- a sand control device may be coupled to an inlet of a valve to reduce the risk of the valve clogging.
- an AICD, or autonomous inflow control device may be coupled to a valve to preferentially flow liquid or gas through the valve.
- a re-closable sleeve may be coupled to a valve to shut in flow through the valve completely when desired; the re-closable sleeve may have a different operating mechanism, e.g. opened or closed mechanically by a coil tubing unit or controlled electrically, than the valve to which it is coupled.
- packers 38 are coupled to tubular at locations to isolate certain fractures (e.g., 24 ).
- system 10 can include two or more packers 38 that are disposed on opposing sides of one or more second fractures 24 , thereby isolating the second fracture(s) from one or more first fractures 22 .
- the locations where the packers 38 are set may depend largely on the fracture locations along wellbore 14 and the properties of the fractures (e.g., 22 , 24 ). If the fractures are distinctive fractures along wellbore 14 , at reasonable spacing, then packers 38 may be set to isolate individual fractures (e.g. Pinpoint Fracturing). Alternatively, if the fractures are tightly spaced or do not have clear spacing, packers 38 may be set to isolate groups of fractures.
- formation 18 may include an injection zone (e.g., portion of wellbore 14 including first fractures 22 or associated with first valves 30 ), a production zone (e.g., portion of wellbore 14 including second fractures 22 or associated with second valves 34 ), and a dead zone 48 .
- Dead zone 48 may correspond to a non-productive or problematic zone, such as an aquifer or other groundwater zone. Though not depicted in FIG. 2 , dead zone 48 may also have one or more fractures associated with it.
- each zone may be isolated from at least one other zone of the wellbore via packers 38 disposed on opposing sides of the zone.
- packers 38 are set such the injection zone, production zone, and dead zone 48 are not in fluid communication with one another within the wellbore.
- packers 38 define the boundaries of the zones of wellbore 14 .
- wellbore 14 may include any number of respective zones.
- First valves 30 and second valves 34 may be coupled to tubular 26 such that the first valves are disposed at injection zones and in fluid communication with first fractures 22 while the second valves are disposed at production zones and in fluid communication with second fractures 24 .
- more than one first valve 30 or more than one second valve 34 is disposed between adjacent packers 38 (e.g., within a zone).
- two second valves 34 are disposed between adjacent ones of packers 38 along tubular 26 .
- a single second valve e.g., 34
- more than two second valves e.g., 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, or more second valves
- first valves 30 can be disposed between adjacent packers 38 along tubular 26 .
- first valves 30 and second valves 34 may be disposed in formation 18 at locations without fractures.
- first and second valves 30 , 34 may have sufficient fluid communication with formation 18 without needing fractures.
- valves may be omitted from sections of tubular 26 that are associated with or disposed within dead zone 48 . As shown in FIG. 2 , a portion of tubular 26 disposed between a pair of adjacent packers 38 (e.g., dead zone 48 ) does not include valves. In this way, multiple (e.g., two or more) packers 38 may be disposed between adjacent ones of first and second valves 30 , 34 along tubular 26 . Such embodiments may improve isolation between zones within formation 18 .
- FIGS. 1 and 2 illustrate wellbore portions with one or two first fractures 22 or second fractures 24
- first or second fractures 22 , 24 can be created via hydraulic fracturing, in which a fracturing fluid (e.g., comprising water, a friction-reducer, a polymer, a cross-linker, a gel, a foam, an oil-based fluid, a surfactant, and/or the like) is injected into wellbore 14 at a high enough pressure to fracture formation 18 .
- a fracturing fluid e.g., comprising water, a friction-reducer, a polymer, a cross-linker, a gel, a foam, an oil-based fluid, a surfactant, and/or the like
- a proppant such as sand, ceramic particles, and/or the like, can then be pumped into fractures 22 , 24 to keep them open and thereby provide flow paths between wellbore 14 and formation 18 for injection and production.
- First and second fractures 22 , 24 are depicted as biwing planar fractures, but more complex fractures are also suitable, such as those that extend into formation 18 in multiple directions to form a three-dimensional fracture network.
- First fractures 22 or second fractures 24 can be pre-existing, created in wellbore 14 as part of the present methods, or combination thereof.
- some of the present methods encompass creating one or more additional first or second fractures 22 , 24 in a pre-existing wellbore portion having one or more pre-existing first or second fractures, enhancing (e.g., via refracturing) one or more of the pre-existing fracture(s), drilling the wellbore portion (e.g., from a pre-existing vertical wellbore, by extending a pre-existing lateral of a wellbore, or the like) and subsequently creating the fractures, and/or the like.
- a distance 42 (labeled in FIG. 1 ) between adjacent ones of a first fracture (e.g., 22 ) and a second fracture (e.g., 24 ), measured along wellbore 14 can be greater than or equal to any one of, or between any two of: 10, 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 125, 150, 175, 200, 225, 250, 275, 300, 350, 400, 450, 500, 550, 600, 650, 700, 750, 800, 850, 900, 950, 1,000, 1,100, 1,200, 1,300, 1,400, 1,500, 1,600, 1,700, 1,800, 1,900, or 2,000 ft., with illustrative distances including 30, 45, 60, 90, 120, 150, 200, 300, 400, 500, 600, 800, 1,000, 1,500, and 2,000 ft.
- Distance 42 can, but need not, be substantially the same for different pairs of adjacent first and second fractures 22 , 24 .
- distance 42 between one of the first fractures 22 and a second fracture 24 may be the same as, or different from, a distance 44 between one other of the first fractures 22 and the second fracture.
- first and second fractures 22 , 24 may be disposed in clusters; for such wellbores, distances (e.g., 42 , 44 ) are measured between adjacent ones of the clusters.
- distances (e.g., 42 , 44 ) between adjacent ones of the first and second fractures can be selected to enhance hydrocarbon recovery from formation 18 .
- tubular 26 may be inserted within a portion 52 wellbore 14 to convey fluid (e.g., liquid, gas, or a combination thereof) into and out of the wellbore.
- fluid e.g., liquid, gas, or a combination thereof
- wellbore 14 is a horizontal wellbore.
- wellbore portion 52 can have an inclination angle 56 that is at least 80 or 85 degrees, can be a “lateral” as that term is understood in the art, and/or the like.
- the length of wellbore portion 52 can be, for example, greater than or equal to any one of, or between any two of: 100, 200, 500, 1,000, 2,000, 3,000, 5,000, 7,500, 10,000, 15,000, 20,000, or 30,000 ft.
- Wellbore portion 52 can be drilled along a direction of minimum horizontal stress in formation 18 (e.g., within 45, 40, 35, 30, 25, 20, 15, or 10 degrees of that direction), which encourages the fractures to propagate orthogonally to the wellbore portion. In some cases, however, other considerations may weigh against drilling wellbore portion 52 in the direction of minimum horizontal stress.
- Wellbore portion 52 includes one or more first fractures 22 and one or more second fractures 24 .
- Wellbore portion 52 is merely illustrative and the wellbore portion and one or more of its fractures 22 , 24 can be formed in any manner as described herein or that is common in the art.
- wellbore portion 52 is open-hole, having no casing or liner at the wellbore-formation interface, however, in other embodiments a wellbore portion (e.g., 52 ), or at least a section thereof, can be cased or lined.
- formation 18 can have an average permeability that is less than approximately 5.0 mD, such as an average permeability that is less than or equal to any one of, or between any two of: 5.0, 4.5, 4.0, 3.5, 3.0, 2.5, 2.0, 1.5, 1.0, 0.9, 0.8, 0.7, 0.6, 0.5, 0.4, 0.3, 0.2, 0.1, 0.75, 0.50, 0.25, 0.10, 0.075, 0.05, 0.025, 0.01, 0.0075, 0.005, 0.0025, 0.001, 0.00075, 0.0005, 0.00025, 0.0001, 0.000075, 0.00005, or 0.000025 mD.
- the present system 10 may be particularly effective on tight formations where hydrocarbon recovery from primary and traditional post-primary recovery methods was or would be low, such as formations having an average permeability that is less than 0.1, 0.01, 0.001, or 0.0005 mD.
- fluid 60 may be pumped into wellbore portion 52 via passageway 28 .
- pressure within the passageway increases until the pressure within the passageway acting against a first valve 30 is greater that a pressure outside tubular 26 (e.g., reservoir pressure) acting against the first valve, at which point the first valve opens to permit the fluid to flow into formation 18 via first fracture 22 .
- first valves 30 are responsive to the pressure differential in wellbore 14 .
- first valves 30 open and fluid 60 flows from passageway 28 , through the first valves, and into first fractures 22 .
- the pressure within the passageway acting against the first valve must be greater than a pressure outside of tubular 26 acting against the first valve by a selected cracking pressure in order for the first valve to open.
- fluid 60 e.g., injection fluid
- first fractures 22 e.g., injection fractures
- second fractures 24 e.g., production fractures
- Fluid 60 can comprise a liquid, a gas, or a combination of both, and the composition of the fluid can change over the course of injection.
- Non-limiting examples of suitable gasses for fluid 60 include methane, other hydrocarbon gasses, nitrogen, carbon dioxide, and/or the like, which desirably are miscible, and non-limiting examples of suitable liquids for the fluid include water as well as any solutions, emulsions, suspensions, or mixtures that are used for water flooding.
- gas is preferred for use as the injection fluid (e.g., 60 ) due, in part, to its enhanced ability to enter the formation and its compressibility; to illustrate, in some methods, fluid 60 comprises a majority, by volume (determined at the pressure at which the fluid is injected, measured at the surface, into the formation) and/or mass, of a gas.
- the injection process as depicted in FIG. 3 C can be performed (e.g., substantially continuously) for a period of time that is greater than or equal to any one of, or between any two of: 1 week, 2 weeks, 1 month, 3 months, 6 months, 1 year, 2 years, or 4 years.
- Pressurizing of formation 18 may end when, for example, an injection rate of fluid 60 into wellbore portion 52 falls below a target or threshold rate, a target amount of fluid has been injected, or the like.
- first valves 30 disposed at one portion (e.g., 52 ) of wellbore 14 may continue injecting fluid 60 into formation 18 while other first valves (e.g., valves having a higher cracking pressure) disposed at another portion of the wellbore are closed.
- fluid 64 e.g., hydrocarbons, or a fluid mixture thereof
- fluid 64 can then be produced from the formation via second fractures 24 .
- a pressure outside of tubular 26 in wellbore portion 52 can be increased.
- a pressure within passageway 28 can be reduced.
- first valves 30 close and at least some of second valves 34 open.
- one or more components e.g., pumps may be utilized to create a low pressure within passageway 28 to further increase the pressure differential.
- second valves 34 releases fluid 64 that is held within formation 18 into passageway 28 .
- fluid 64 flows back through passageway 28 , the fluid is directed to the well head (e.g., produced).
- Such production performed by system 10 results in greater hydrocarbon recovery as compared to that achievable through primary or other post-primary recovery methods.
- the production process can be performed (e.g., substantially continuously) for a period of time that is greater than or equal to any one of, or between any two of: 1 week, 2 weeks, 1 month, 3 months, 6 months, 1 year, 2 years, or 4 years.
- Production from formation 18 may end when, for example, a production rate falls below a target or threshold rate, a target amount of fluid has been produced, or the like.
- second valves 34 disposed at one portion (e.g., 52 ) of wellbore 14 may continue producing fluid 64 from formation 18 while other second valves (e.g., valves having a higher cracking pressure) disposed at another portion of the wellbore are closed.
- Each injection and production cycle can last days, months, or years, depending on the reservoir properties, injection and production pressures, the fracture properties, and system settings.
- the cycles can be conducted simply through changing the pressure within passageway 28 to fluctuate between injection and production operating modes.
- System 10 can be employed in new or pre-existing wells to enable inter-fracture flooding via cyclic injection and production operations.
- a fluid e.g., 60
- it can flow into fractures (e.g., 22 ) that are designated as injection fractures (e.g., only), thereby pressurizing the reservoir and pushing reservoir fluid (e.g., 64 ) toward production fractures (e.g., 22 ).
- reservoir fluid e.g., 64
- valves e.g., 30
- valves e.g., 34
- production fractures are open, and the fluid flows into the wellbore from the production fractures.
- Injection and production may be alternately conducted.
- Each injection or production step of a cycle may last days, months, or years. One or more cycles may be conducted.
- the system may be installed in multiple wells that are on the same pad. Through synchronized operations among the wells, inter-well fracture communications may be mitigated for better recovery at individual wells. Through a controlled asynchronous operation, the recovery may be further enhanced by sweeping the reservoirs in between adjacent wells, especially if the fractures are generated in a controlled manner with predictable patterns.
- FIGS. 4 A and 4 B indicate an example of operating the well using the present system.
- the secondary recover process was installed after 4 years of primary depletion, which is illustrated by the dashed line.
- a miscible gas was injected into the formation for 18 months at an injection pressure approximately equal to the initial reservoir pressure.
- a production process was then implemented for 2 years, letting the well flow naturally before applying artificial lift, or directly applying artificial lift to the well. Two additional injection and production cycles of the same durations were calculated after the first recovery process.
- simulation 402 a case where each of the injection and production fractures were isolated from one another
- simulation 404 a case where all of the injection and production fractures were in fluid communication with one another.
- the oil recovery was slightly higher for simulation 404 as compared to primary depletion (dashed line), while simulation 402 provided double the oil recovery from primary depletion.
- the results of simulation 404 were similar to that of typical, conventional huff-and-puff processes.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
Some systems and methods include a tubular defining a passageway, one or more packers coupled to the tubular, and two or more valves coupled to the tubular. Some such systems are operable by increasing pressure within the passageway such that, responsive to the increasing pressure, one or more first ones of the valves open and fluid flows from the passageway, through the first valve(s), and into one or more first fractures of the wellbore, and reducing pressure within the passageway such that, responsive to the reducing pressure, the first valve(s) close and one or more second ones of the valves open and hydrocarbons flow from one or more second fractures of the wellbore, through the second valve(s), and into the passageway. The first and second valves can be unidirectional valves.
Description
- The present application is a continuation of U.S. patent application Ser. No. 17/219,222, filed Mar. 31, 2021, which claims the benefit of U.S. Provisional Patent Application No. 63/002,569, filed Mar. 31, 2020, both of which are incorporated herein by reference in their entireties.
- The present invention relates generally to systems for hydrocarbon production, and more specifically but without limitation, to systems for inter-fracture flooding of wellbores and methods of using the same.
- Oil production from tight formations became particularly significant over the last decade, with advances in horizontal drilling and multi-stage hydraulic fracturing. Despite such advances, however, primary recovery from tight formations remains low—in some instances, 90% or more of the formation's oil is left in place.
- To address this, post-primary recovery methods are sometimes used, but these methods typically have limited success. One such method is flooding between wells, in which a fluid (e.g., water and/or gas) is injected into a wellbore that is near the producing wellbore, in hopes that the fluid will “sweep” oil from the formation into the producing wellbore where it can then be recovered. Often, however, the tight nature of the formation limits the fluid's ability to enter the formation from the injecting wellbore, or the fluid short-circuits to the producing wellbore (e.g., via fractures), leaving the formation unswept. Another post-primary recovery method is refracturing, in which new fractures are generated in the wellbore to increase access to the formation. But if the designated portion of the formation is already pressure-depleted through the original fractures, such new fractures will usually not substantially increase oil recovery. Cyclic gas injection, or “huff-and-puff,” is another post-primary recovery method, which involves: (1) injecting gas into the wellbore to pressurize the formation's oil and reduce its viscosity (“huff”); and (2) producing the energized fluid (“puff”) through the wellbore. While huff-and-puff has had some success, results are inconsistent, it requires a large amount of gas, and its usage of the same is relatively inefficient.
- Fracture-to-fracture flooding within a single wellbore has also been proposed as a post-primary recovery method, whether through simultaneous fluid injection into certain fractures and production from others, or fluid injection into certain fractures followed sequentially by production from others. Both options have shown positive results in simulations; an intra-wellbore fracture-to-fracture flooding pattern, particularly using an oil-miscible gas, might lead to substantial hydrocarbon recovery. In practice, however, both require complex downhole tool systems and/or complex operations. For simultaneous injection and flooding, a dual-tubing system is needed, with a tubular to connect injection zones in the wellbore and a tubular to connect production zones in the wellbore, ensuring isolation between the injection and production zones. And for sequential injection and flooding, while a single tubular can be used, it needs to be opened and closed at each of the injection and production zones to ensure such isolation. Due, in part, to the currently available down hole systems not readily meeting this tool-system requirement, neither simultaneous nor sequential intra-wellbore injection and production has had meaningful success.
- There accordingly is a need in the art for a simple system through which an intra-wellbore fracture-to-fracture flooding pattern can be conducted. The present systems and methods address this need by providing for such a process that is self-regulating; for example, performed by managing the wellhead pressure at the surface or changing the well's operating mode between injection and production. In some embodiments, this is achieved by disposing a tubular into a lateral, isolating zones along the lateral, and associating pressure-responsive valves with those zones, where ones of the valves associated with injection zones open in response to higher pressure within the tubular than outside of the tubular, and ones of the valves associated with production zones open in response to lower pressure within the tubular than outside the tubular (e.g., during production).
- The term “intra-wellbore fracture-to-fracture flooding” is interchangeable with “inter-fracture flooding,” and the term “cyclic injection” is interchangeable with “huff-and-puff.” Further, an inter-fracture flooding process conducted in a sequential manner can also be referred to as an “inter-fracture huff-and-puff” process.
- Some embodiments of the present systems for inter-fracture flooding of a wellbore comprise: a tubular defining a passageway, one or more packers coupled to the tubular, and two or more unidirectional valves coupled to the tubular, the unidirectional valves including one or more first unidirectional valves, each configured to open to permit fluid communication from the passageway to outside of the tubular through the first unidirectional valve, and close to prevent fluid communication from outside of the tubular to the passageway through the first unidirectional valve, and one or more second unidirectional valves, each configured to open to permit fluid communication from outside of the tubular to the passageway through the second unidirectional valve, and close to prevent fluid communication from the passageway to outside of the tubular through the second unidirectional valve, wherein, for each of the second unidirectional valve(s), at least one of the packer(s) is disposed between the second unidirectional valve and each adjacent one of the first unidirectional valve(s) along the tubular.
- In some systems, at least one of the first and second unidirectional valves is configured to open in response to a pressure differential between the passageway and outside of the tubular that acts on the unidirectional valve. In some systems, at least one of the first and second unidirectional valves is a check valve.
- In some systems, at least one of the first unidirectional valve(s) is biased closed. In some systems, at least one of the first unidirectional valve(s) is configured to open when pressure in the passageway acting on the first unidirectional valve is at least 1 pound per square inch (psi) higher than pressure outside of the tubular acting on the first unidirectional valve. In some systems, at least one of the second unidirectional valve(s) is biased closed. In some systems, at least one of the second unidirectional valve(s) is configured to open when pressure outside of the tubular acting on the second unidirectional valve is at least 1 psi higher than pressure in the passageway acting on the second unidirectional valve.
- In some systems, the packer(s) comprise two or more packers, and at least two of the packers are disposed between adjacent ones of the first and second unidirectional valves along the tubular. In some systems, the packer(s) comprise two or more packers, wherein the first unidirectional valve(s) comprise two or more first unidirectional valves, and at least two of the first unidirectional valves are disposed between adjacent ones of the packers along the tubular, or the second unidirectional valve(s) comprise two or more second unidirectional valves, and at least two of the second unidirectional valves are disposed between adjacent ones of the packers along the tubular.
- Some of the present methods for inter-fracture flooding of a wellbore comprise: disposing a tubular having a passageway into the wellbore, the tubular coupled to one or more first valves and one or more second valves, increasing pressure within the passageway such that, responsive to the increasing pressure, the first valve(s) open and fluid flows from the passageway, through the first valve(s), and into one or more first fractures of the wellbore, and reducing pressure within the passageway such that, responsive to the reducing pressure, the first valve(s) close, the second valve(s) open, and hydrocarbons flow from one or more second fractures of the wellbore, through the second valve(s), and into the passageway.
- In some methods, increasing pressure within the passageway is performed at least by pumping fluid into the passageway. In some methods, the pumped fluid comprises a majority, by volume and/or mass, of a gas.
- In some methods, at least one of the first and second valves is a unidirectional valve. In some methods, at least one of the first and second valves is a check valve. In some methods, at least one of the first valve(s) is biased closed. In some methods, at least one of the second valve(s) is biased closed.
- In some methods, one or more packers are coupled to the tubular, and, for each of the second valve(s), at least one of the packer(s) is disposed between the second valve and each adjacent one of the first valve(s) along the tubular. In some methods, the packer(s) comprise two or more packers, and at least two of the packers are disposed between adjacent ones of the first and second valves along the tubular.
- In some methods, a formation into which the wellbore extends has an average permeability that is less than approximately 0.5 millidarcies (mD), optionally, less than approximately 0.1 mD. In some methods, the wellbore is cased.
- The term “coupled” is defined as connected, although not necessarily directly, and not necessarily mechanically; two items that are “coupled” may be unitary with each other. The terms “a” and “an” are defined as one or more unless this disclosure explicitly requires otherwise. The term “substantially” is defined as largely but not necessarily wholly what is specified—and includes what is specified; e.g., substantially 90 degrees includes 90 degrees and substantially parallel includes parallel—as understood by a person of ordinary skill in the art. In any disclosed embodiment, the terms “substantially” and “approximately” may each be substituted with “within [a percentage] of” what is specified, where the percentage includes 0.1, 1, 5, and 10 percent.
- The phrase “and/or” means and or or. To illustrate, A, B, and/or C includes: A alone, B alone, C alone, a combination of A and B, a combination of A and C, a combination of B and C, or a combination of A, B, and C. In other words, “and/or” operates as an inclusive or. Unless specified otherwise, the term “or,” as used herein, refers to an inclusive or and is interchangeable with the term “and/or.”
- The terms “comprise” and any form thereof such as “comprises” and “comprising,” “have” and any form thereof such as “has” and “having,” and “include” and any form thereof such as “includes” and “including” are open-ended linking verbs. As a result, an apparatus that “comprises,” “has,” or “includes” one or more elements possesses those one or more elements but is not limited to possessing only those one or more elements. Likewise, a method that “comprises,” “has,” or “includes” one or more steps possesses those one or more steps but is not limited to possessing only those one or more steps.
- Any embodiment of any of the apparatuses, systems, and methods can consist of or consist essentially of—rather than comprise/have/include—any of the described steps, elements, and/or features. Thus, in any of the claims, the term “consisting of” or “consisting essentially of” can be substituted for any of the open-ended linking verbs recited above, in order to change the scope of a given claim from what it would otherwise be using the open-ended linking verb.
- Further, an apparatus, system, or method that is configured in a certain way is configured in at least that way, but it can also be configured in other ways than those specifically described.
- The feature or features of one embodiment may be applied to other embodiments, even though not described or illustrated, unless expressly prohibited by this disclosure or the nature of the embodiments.
- Some details associated with the embodiments described above and others are described below.
- The following drawings illustrate by way of example and not limitation. For the sake of brevity and clarity, every feature of a given structure is not always labeled in every figure in which that structure appears. Identical reference numbers do not necessarily indicate an identical structure. Rather, the same reference number may be used to indicate a similar feature or a feature with similar functionality, as may non-identical reference numbers.
-
FIG. 1 is a schematic of an example of one of the present system installed in a wellbore. -
FIG. 2 is a schematic of another example of one of the present system installed in a wellbore. -
FIG. 3A is a schematic of a wellbore having first and second fractures in fluid communication with a formation. -
FIG. 3B is a schematic of the wellbore ofFIG. 3A , shown after insertion of an example of a tubular of the present systems. -
FIG. 3C is a schematic of the wellbore ofFIG. 3A , shown during an injection process. -
FIG. 3D is a schematic of the wellbore ofFIG. 3A , shown during a production process. -
FIG. 4A illustrates simulations of the oil production rate achieved through use of one of the present systems over a 3-cycle operation after primary depletion of a reservoir section where: (1) injection and production fractures are isolated (“Inter-Frac Huff-n-Puff”); and (2) where injection and production fractures are in fluid communication (“Inter-Frac Huff-n-Puff (Frac Comm)”). -
FIG. 4B illustrates the cumulative oil production of the simulations ofFIG. 4A . - Referring to
FIG. 1 , shown is anembodiment 10 of the present system that is illustrated in awellbore 14 that is drilled into aformation 18 having fractures (e.g., 22) in fluid communication with a portion of the formation.System 10 includes a tubular 26 that defines apassageway 28 and a plurality of valves (e.g., 30, 34) coupled to the tubular, each of the valves configured to selectively permit fluid communication with the passageway. In some embodiments, one or morefirst valves 30 coupled to tubular 26 may permit fluid communication frompassageway 28 toformation 18, and one or moresecond valves 34 coupled to the tubular may permit fluid communication from the formation to the passageway. As shown inFIG. 1 , one ormore packers 38 may be coupled to tubular 26 to isolate a portion(s) ofwellbore 14. For example,packers 38 can be disposed on opposing sides ofsecond valve 34, thereby isolating a portion of formation 18 (e.g., near fractures 24) from other portions of the formation (e.g., near fractures 22). - The first and
second valves passageway 28 andformation 18. In some embodiments, tubular 26 is positioned withinwellbore 14 such thatfirst valves 30 are positioned adjacent tofirst fractures 22 andsecond valves 34 are positioned adjacent tosecond fractures 24.First valves 30 andsecond valves 34 need not be positioned directly adjacent to first and second fractures, respectively, but may be positioned within zones corresponding to the first and second fractures, respectively (e.g., injection and production zones) that can defined and isolated bypackers 38. In this way and others,system 10 may utilize certain fractures (e.g., first fractures 22) for injection and utilize other fractures (e.g., second fractures 24) for production. To illustrate, fluid flowing frompassageway 28 intoformation 18 flows from the passageway, throughfirst valves 30, and intofirst fractures 22 ofwellbore 14 and fluid flowing from the formation to the passageway flows fromsecond fractures 24 of the wellbore, throughsecond valves 34, and into the passageway. - Thus, unlike conventional huff-and-puff where the injection and production are conducted at the same fracture locations,
system 10 allows for injecting fluids preferentially into certain fractures—those in injection zones—and producing fluids preferentially from others—those in production zones—to promote flooding in which fluid injected to injection zones will “sweep” oil fromformation 18 into producing zones where it can be recovered. Some embodiments ofsystem 10 enhance such flooding by isolating these injection and production zones from one another (e.g., via packers 38). - Each of the first and
second valves first valves 30 are configured to open to permit fluid communication frompassageway 28 to outside of tubular 26 (e.g., an annulus of wellbore 14) (e.g., to first fracture 22) through the first valves and close to prevent fluid communication from outside of the tubular to the passageway through the first valves. In contrast,second valves 34 are configured to open to permit fluid communication from outside of tubular 26 (e.g., from second fractures 24) topassageway 28 through the second valves and close to prevent fluid communication from the passageway to outside of the tubular through the second valves. As shown inFIG. 1 ,system 10 include two first valves and onesecond valve 34 in the depicted section ofwellbore 14; however, any number of first or second valves may be employed (e.g., between one and one hundred valves) in a particular section of the wellbore. A larger number of valves may reduce the likelihood of the valves running at their limits and decrease risk of failure and a lower number of valves may reduce cost and complexity of the system. - In some embodiments, each of the first and
second valves passageway 28 that acts on the valve, a pressure outside of tubular 26 that acts on the valve, or a pressure differential between those two pressures. In at least this way, the valves are self-regulating. For example, operation of the valves can be achieved through managing the wellhead pressure at the surface or changing the operating mode between injection and production. Passive valves can provide simplicity and reduce costs. - In some embodiments, such passive valves are mechanical as opposed to electronically-controlled, which can provide the additional advantage of increased reliability. To illustrate, electrical flow regulators require components (mechanical and electronic) that may be damaged due to shocks and vibrations that are common in drilling, injection, and production processes. Nevertheless, such passive valves may be electronically-controlled. For example, such a valve can be associated with one or more sensors configured to capture data indicative of pressure within
passageway 28 that acts on the valve and/or a pressure outside of tubular 26 that acts on the valve, and the valve can be configured to open or close based on one or both of these pressures or the difference between them. - In some embodiments,
valves first valve 30 is biased toward the closed position, a pressure withinpassageway 28 must be greater than a pressure outside of tubular 26 at the first valve for it to open. Similarly, in some embodiments in whichsecond valve 34 is biased toward the closed position, a pressure outside of tubular 26 must be greater than a pressure withinpassageway 28 at the second valve for it to open. -
First valve 30 may be biased via a biasing member (e.g., spring, swing, magnetic, elastic, or other biasing member) to prevent opening of the first valve unless the differential betweenpassageway 28 and outside oftubular 26 is greater than or equal to a cracking pressure. As an illustrative example, at least one of (up to and including all of)first valves 30 is configured to open when pressure inpassageway 28 acting on the first valve is greater than or equal to any one of, or between any two of: 1, 2, 5, 8, and 10 percent (%), or greater than or equal to any one of, or between any two of: 0.1, 0.2, 0.3, 0.4, 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 4.0, 4.5, 5.0, 6.0, 6.5, 7.0, 8.0, 9.0, 10.0, 20.0, 50.0, 75.0, 100.0, 150.0, 200.0, 300.0, 400.0, 500.0, 750.0, or 1000.0 psi, higher than pressure outside of tubular 26 acting on the first valve. Additionally, or alternatively, one or moresecond valves 34 may be biased similarly to that described above forfirst valves 30, except that such a second valve is configured to open when pressure outside of tubular 26 acting on the second valve is greater than pressure inpassageway 28 acting on the second valve. - In some embodiments, at least one of
first valves 30 can be configured to open at a pressure differential (e.g., cracking pressure) that is different than an opening pressure differential of at least one other of the first valves. For example, in along wellbore 14, the frictional pressure drop acrosstubular 26 may be substantial, particularly when the fluid injection rates or production rates are high. Accordingly, one or more first valves (e.g., 30) near a toe of the well may have a lower cracking pressure than one or more first valves near a heel of the well. In at least this way, the higher cracking pressure for valves near the heel can at least partially account for a higher injection pressure at the heel and thereby suppress preferential flow of the injection fluid into zones near the heel over those near the toe. Additionally, or alternatively, different cracking pressures can be applied to the plurality ofsecond valves 34 positioned within one zone or different zones alongtubular 26. Such variable biasing may promote a more even distribution of fluid injection into and/or production from different reservoir sections alongwellbore 14. - One or more additional components may be coupled to, or included with, the
valves - Referring again to
FIG. 1 ,packers 38 are coupled to tubular at locations to isolate certain fractures (e.g., 24). For example,system 10 can include two ormore packers 38 that are disposed on opposing sides of one or moresecond fractures 24, thereby isolating the second fracture(s) from one or morefirst fractures 22. The locations where thepackers 38 are set may depend largely on the fracture locations alongwellbore 14 and the properties of the fractures (e.g., 22, 24). If the fractures are distinctive fractures alongwellbore 14, at reasonable spacing, thenpackers 38 may be set to isolate individual fractures (e.g. Pinpoint Fracturing). Alternatively, if the fractures are tightly spaced or do not have clear spacing,packers 38 may be set to isolate groups of fractures. - Referring now to
FIG. 2 , shown is another illustrative portion ofwellbore 14 defined information 18 in whichsystem 10 may be deployed. Provided by way of illustration,formation 18 may include an injection zone (e.g., portion ofwellbore 14 includingfirst fractures 22 or associated with first valves 30), a production zone (e.g., portion ofwellbore 14 includingsecond fractures 22 or associated with second valves 34), and adead zone 48.Dead zone 48 may correspond to a non-productive or problematic zone, such as an aquifer or other groundwater zone. Though not depicted inFIG. 2 ,dead zone 48 may also have one or more fractures associated with it. As shown, each zone may be isolated from at least one other zone of the wellbore viapackers 38 disposed on opposing sides of the zone. For example,packers 38 are set such the injection zone, production zone, anddead zone 48 are not in fluid communication with one another within the wellbore. In some embodiments,packers 38 define the boundaries of the zones ofwellbore 14. Although shown as having on a single injection zone, production zone, anddead zone 48, wellbore 14 may include any number of respective zones. -
First valves 30 andsecond valves 34 may be coupled to tubular 26 such that the first valves are disposed at injection zones and in fluid communication withfirst fractures 22 while the second valves are disposed at production zones and in fluid communication withsecond fractures 24. In some embodiments, more than onefirst valve 30 or more than onesecond valve 34 is disposed between adjacent packers 38 (e.g., within a zone). For example, as shown inFIG. 2 , twosecond valves 34 are disposed between adjacent ones ofpackers 38 alongtubular 26. In other embodiments, a single second valve (e.g., 34) or more than two second valves (e.g., 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, or more second valves) are disposed betweenadjacent packers 38. Additionally, or alternatively, one or more first valves 30 (e.g., 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 or more first valves) can be disposed betweenadjacent packers 38 alongtubular 26. In some embodiments, such as those with high formation permeability,first valves 30 andsecond valves 34 may be disposed information 18 at locations without fractures. In such embodiments, first andsecond valves formation 18 without needing fractures. - In some embodiments, valves may be omitted from sections of tubular 26 that are associated with or disposed within
dead zone 48. As shown inFIG. 2 , a portion of tubular 26 disposed between a pair of adjacent packers 38 (e.g., dead zone 48) does not include valves. In this way, multiple (e.g., two or more)packers 38 may be disposed between adjacent ones of first andsecond valves tubular 26. Such embodiments may improve isolation between zones withinformation 18. - Although
FIGS. 1 and 2 illustrate wellbore portions with one or twofirst fractures 22 orsecond fractures 24, in other embodiments, other numbers of first or second fractures—1, 2, 4, 5, 6, 7, 8, 9, 10, or more—are also suitable.Fractures wellbore 14 at a high enough pressure to fractureformation 18. A proppant, such as sand, ceramic particles, and/or the like, can then be pumped intofractures wellbore 14 andformation 18 for injection and production. First andsecond fractures formation 18 in multiple directions to form a three-dimensional fracture network. -
First fractures 22 orsecond fractures 24 can be pre-existing, created inwellbore 14 as part of the present methods, or combination thereof. To illustrate, some of the present methods encompass creating one or more additional first orsecond fractures - A distance 42 (labeled in
FIG. 1 ) between adjacent ones of a first fracture (e.g., 22) and a second fracture (e.g., 24), measured alongwellbore 14, can be greater than or equal to any one of, or between any two of: 10, 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 125, 150, 175, 200, 225, 250, 275, 300, 350, 400, 450, 500, 550, 600, 650, 700, 750, 800, 850, 900, 950, 1,000, 1,100, 1,200, 1,300, 1,400, 1,500, 1,600, 1,700, 1,800, 1,900, or 2,000 ft., with illustrative distances including 30, 45, 60, 90, 120, 150, 200, 300, 400, 500, 600, 800, 1,000, 1,500, and 2,000 ft.Distance 42 can, but need not, be substantially the same for different pairs of adjacent first andsecond fractures distance 42 between one of thefirst fractures 22 and asecond fracture 24 may be the same as, or different from, adistance 44 between one other of thefirst fractures 22 and the second fracture. In some wellbores, first andsecond fractures first fractures 22 orsecond fractures 24 are created as part of the present methods, distances (e.g., 42, 44) between adjacent ones of the first and second fractures can be selected to enhance hydrocarbon recovery fromformation 18. - Referring to
FIGS. 3A-3D , a method of operating system 10 (e.g., for inter-fracture flooding) is shown. As shown inFIGS. 3A and 3B , tubular 26 may be inserted within aportion 52 wellbore 14 to convey fluid (e.g., liquid, gas, or a combination thereof) into and out of the wellbore. As depicted, wellbore 14 is a horizontal wellbore. To illustrate,wellbore portion 52 can have aninclination angle 56 that is at least 80 or 85 degrees, can be a “lateral” as that term is understood in the art, and/or the like. The length ofwellbore portion 52 can be, for example, greater than or equal to any one of, or between any two of: 100, 200, 500, 1,000, 2,000, 3,000, 5,000, 7,500, 10,000, 15,000, 20,000, or 30,000 ft.Wellbore portion 52 can be drilled along a direction of minimum horizontal stress in formation 18 (e.g., within 45, 40, 35, 30, 25, 20, 15, or 10 degrees of that direction), which encourages the fractures to propagate orthogonally to the wellbore portion. In some cases, however, other considerations may weigh againstdrilling wellbore portion 52 in the direction of minimum horizontal stress. -
Wellbore portion 52 includes one or morefirst fractures 22 and one or moresecond fractures 24.Wellbore portion 52 is merely illustrative and the wellbore portion and one or more of itsfractures wellbore portion 52 is open-hole, having no casing or liner at the wellbore-formation interface, however, in other embodiments a wellbore portion (e.g., 52), or at least a section thereof, can be cased or lined. As another example,formation 18 can have an average permeability that is less than approximately 5.0 mD, such as an average permeability that is less than or equal to any one of, or between any two of: 5.0, 4.5, 4.0, 3.5, 3.0, 2.5, 2.0, 1.5, 1.0, 0.9, 0.8, 0.7, 0.6, 0.5, 0.4, 0.3, 0.2, 0.1, 0.75, 0.50, 0.25, 0.10, 0.075, 0.05, 0.025, 0.01, 0.0075, 0.005, 0.0025, 0.001, 0.00075, 0.0005, 0.00025, 0.0001, 0.000075, 0.00005, or 0.000025 mD. Thepresent system 10 may be particularly effective on tight formations where hydrocarbon recovery from primary and traditional post-primary recovery methods was or would be low, such as formations having an average permeability that is less than 0.1, 0.01, 0.001, or 0.0005 mD. - Turning now to
FIG. 3C , fluid 60 may be pumped intowellbore portion 52 viapassageway 28. Asfluid 60 is pumped intopassageway 28, pressure within the passageway increases until the pressure within the passageway acting against afirst valve 30 is greater that a pressure outside tubular 26 (e.g., reservoir pressure) acting against the first valve, at which point the first valve opens to permit the fluid to flow intoformation 18 viafirst fracture 22. In this way,first valves 30 are responsive to the pressure differential inwellbore 14. By increasing pressure withinpassageway 28,first valves 30 open and fluid 60 flows frompassageway 28, through the first valves, and intofirst fractures 22. In some embodiments in which afirst valve 30 is biased, the pressure within the passageway acting against the first valve must be greater than a pressure outside of tubular 26 acting against the first valve by a selected cracking pressure in order for the first valve to open. - As shown, while at least some of
first valves 30 are open,second valves 34 remain closed. Accordingly, fluid 60 (e.g., injection fluid) entersformation 18 through first fractures 22 (e.g., injection fractures) associated with the outflow zones oftubular 26, pressurizing the reservoir and displacing the reservoir fluid toward second fractures 24 (e.g., production fractures) associated with the inflow zones of the tubular.Fluid 60 can comprise a liquid, a gas, or a combination of both, and the composition of the fluid can change over the course of injection. Non-limiting examples of suitable gasses forfluid 60 include methane, other hydrocarbon gasses, nitrogen, carbon dioxide, and/or the like, which desirably are miscible, and non-limiting examples of suitable liquids for the fluid include water as well as any solutions, emulsions, suspensions, or mixtures that are used for water flooding. For at least some formations (e.g., 18), gas is preferred for use as the injection fluid (e.g., 60) due, in part, to its enhanced ability to enter the formation and its compressibility; to illustrate, in some methods,fluid 60 comprises a majority, by volume (determined at the pressure at which the fluid is injected, measured at the surface, into the formation) and/or mass, of a gas. - The injection process, as depicted in
FIG. 3C can be performed (e.g., substantially continuously) for a period of time that is greater than or equal to any one of, or between any two of: 1 week, 2 weeks, 1 month, 3 months, 6 months, 1 year, 2 years, or 4 years. Pressurizing offormation 18 may end when, for example, an injection rate offluid 60 intowellbore portion 52 falls below a target or threshold rate, a target amount of fluid has been injected, or the like. In some embodiments,first valves 30 disposed at one portion (e.g., 52) ofwellbore 14 may continue injectingfluid 60 intoformation 18 while other first valves (e.g., valves having a higher cracking pressure) disposed at another portion of the wellbore are closed. - Referring now to
FIG. 3D , withformation 18 significantly more pressurized (e.g., via the injection process), fluid 64 (e.g., hydrocarbons, or a fluid mixture thereof) can then be produced from the formation viasecond fractures 24. Due, at least in part, to pressurization offormation 18, a pressure outside of tubular 26 inwellbore portion 52 can be increased. Additionally, asfluid 60 is no longer pumped intotubular 26, a pressure withinpassageway 28 can be reduced. As a result, the pressure insidetubular 26 is lower than outside the tubular, such that—responsive to the pressure differential—first valves 30 close and at least some ofsecond valves 34 open. In some embodiments, one or more components (e.g., pumps) may be utilized to create a low pressure withinpassageway 28 to further increase the pressure differential. - The opening of
second valves 34 releases fluid 64 that is held withinformation 18 intopassageway 28. Asfluid 64 flows back throughpassageway 28, the fluid is directed to the well head (e.g., produced). Such production performed bysystem 10 results in greater hydrocarbon recovery as compared to that achievable through primary or other post-primary recovery methods. - The production process can be performed (e.g., substantially continuously) for a period of time that is greater than or equal to any one of, or between any two of: 1 week, 2 weeks, 1 month, 3 months, 6 months, 1 year, 2 years, or 4 years. Production from
formation 18 may end when, for example, a production rate falls below a target or threshold rate, a target amount of fluid has been produced, or the like. In some embodiments,second valves 34 disposed at one portion (e.g., 52) ofwellbore 14 may continue producingfluid 64 fromformation 18 while other second valves (e.g., valves having a higher cracking pressure) disposed at another portion of the wellbore are closed. - Each injection and production cycle can last days, months, or years, depending on the reservoir properties, injection and production pressures, the fracture properties, and system settings. For
system 10, the cycles can be conducted simply through changing the pressure withinpassageway 28 to fluctuate between injection and production operating modes. -
System 10 can be employed in new or pre-existing wells to enable inter-fracture flooding via cyclic injection and production operations. In such operations, when a fluid (e.g., 60) is injected into the well, it can flow into fractures (e.g., 22) that are designated as injection fractures (e.g., only), thereby pressurizing the reservoir and pushing reservoir fluid (e.g., 64) toward production fractures (e.g., 22). When fluid (e.g., 64) is extracted from the well, valves (e.g., 30) associated with injection fractures are closed and valves (e.g., 34) associated with production fractures are open, and the fluid flows into the wellbore from the production fractures. Injection and production may be alternately conducted. Each injection or production step of a cycle may last days, months, or years. One or more cycles may be conducted. - Furthermore, the system may be installed in multiple wells that are on the same pad. Through synchronized operations among the wells, inter-well fracture communications may be mitigated for better recovery at individual wells. Through a controlled asynchronous operation, the recovery may be further enhanced by sweeping the reservoirs in between adjacent wells, especially if the fractures are generated in a controlled manner with predictable patterns.
- The present invention will be described in greater detail by way of specific examples. The following examples are offered for illustrative purposes only and are not intended to limit the present invention in any manner. Those skilled in the art will readily recognize a variety of non-critical parameters that can be changed or modified to yield essentially the same results.
- Computational analysis was performed to determine oil recovery in a horizontal well with hydraulic fractures spaced along the lateral at a spacing of approximately 60 feet, the hydraulic fractures being planar fractures. The analysis was performed using an average formation permeability of 0.0001 mD.
FIGS. 4A and 4B indicate an example of operating the well using the present system. As best shown inFIG. 4B , the secondary recover process was installed after 4 years of primary depletion, which is illustrated by the dashed line. During the secondary recovery process, a miscible gas was injected into the formation for 18 months at an injection pressure approximately equal to the initial reservoir pressure. A production process was then implemented for 2 years, letting the well flow naturally before applying artificial lift, or directly applying artificial lift to the well. Two additional injection and production cycles of the same durations were calculated after the first recovery process. - The analysis was done for two different assumptions, a case where each of the injection and production fractures were isolated from one another (simulation 402), and a case where all of the injection and production fractures were in fluid communication with one another (simulation 404). As shown, the oil recovery was slightly higher for
simulation 404 as compared to primary depletion (dashed line), whilesimulation 402 provided double the oil recovery from primary depletion. The results ofsimulation 404 were similar to that of typical, conventional huff-and-puff processes. - In practice, complete isolation of each injection and production fracture—as assumed for
simulation 402—is improbable. Accordingly, an accurate practical simulation of the present system would lie somewhere in-betweensimulation 402 andsimulation 404. With proper setup and operation, the present system should be able to almost double the oil production from primary depletion. - The above specification and examples provide a complete description of the structure and use of illustrative embodiments. Although certain embodiments have been described above with a certain degree of particularity, or with reference to one or more individual embodiments, those skilled in the art could make numerous alterations to the disclosed embodiments without departing from the scope of this invention. As such, the various illustrative embodiments of the methods and systems are not intended to be limited to the particular forms disclosed. Rather, they include all modifications and alternatives falling within the scope of the claims, and embodiments other than the one shown may include some or all of the features of the depicted embodiment. For example, elements may be omitted or combined as a unitary structure, and/or connections may be substituted. Further, where appropriate, aspects of any of the examples described above may be combined with aspects of any of the other examples described to form further examples having comparable or different properties and/or functions, and addressing the same or different problems. Similarly, it will be understood that the benefits and advantages described above may relate to one embodiment or may relate to several embodiments.
- The claims are not intended to include, and should not be interpreted to include, means-plus- or step-plus-function limitations, unless such a limitation is explicitly recited in a given claim using the phrase(s) “means for” or “step for,” respectively.
Claims (20)
1. A system for inter-fracture flooding of a wellbore, the system comprising:
a tubular defining a passageway;
one or more packers coupled to the tubular; and
two or more unidirectional valves coupled to the tubular, the unidirectional valves including:
one or more first unidirectional valves, each configured to:
open to permit fluid communication from the passageway to outside of the tubular through the first unidirectional valve; and
close to prevent fluid communication from outside of the tubular to the passageway through the first unidirectional valve; and
one or more second unidirectional valves, each configured to:
open to permit fluid communication from outside of the tubular to the passageway through the second unidirectional valve; and
close to prevent fluid communication from the passageway to outside of the tubular through the second unidirectional valve;
wherein, for each of the second unidirectional valve(s), at least one of the packer(s) is disposed between the second unidirectional valve and each adjacent one of the first unidirectional valve(s) along the tubular.
2. The system of claim 1 , wherein at least one of the first and second unidirectional valves is configured to open in response to a pressure differential between the passageway and outside of the tubular that acts on the unidirectional valve.
3. The system of claim 2 , wherein at least one of the first unidirectional valve(s) is biased closed.
4. The system of claim 3 , wherein at least one of the first unidirectional valve(s) is configured to open when pressure in the passageway acting on the first unidirectional valve is at least 1 pound per square inch (psi) higher than pressure outside of the tubular acting on the first unidirectional valve.
5. The system of claim 2 , wherein at least one of the second unidirectional valve(s) is biased closed.
6. The system of claim 5 , wherein at least one of the second unidirectional valve(s) is configured to open when pressure outside of the tubular acting on the second unidirectional valve is at least 1 psi higher than pressure in the passageway acting on the second unidirectional valve.
7. The system of claim 1 , wherein at least one of the first and second unidirectional valves is a check valve.
8. The system of claim 1 , wherein:
the packer(s) comprise two or more packers; and
at least two of the packers are disposed between adjacent ones of the first and second unidirectional valves along the tubular.
9. The system of claim 1 , wherein:
the packer(s) comprise two or more packers;
wherein:
the first unidirectional valve(s) comprise two or more first unidirectional valves, and at least two of the first unidirectional valves are disposed between adjacent ones of the packers along the tubular; or
the second unidirectional valve(s) comprise two or more second unidirectional valves, and at least two of the second unidirectional valves are disposed between adjacent ones of the packers along the tubular.
10. A method for inter-fracture flooding of a wellbore, the method comprising:
disposing a tubular having a passageway into the wellbore, the tubular coupled to one or more first valves and one or more second valves;
increasing pressure within the passageway such that, responsive to the increasing pressure, the first valve(s) open and fluid flows from the passageway, through the first valve(s), and into one or more first fractures of the wellbore; and
reducing pressure within the passageway such that, responsive to the reducing pressure:
the first valve(s) close; and
the second valve(s) open and hydrocarbons flow from one or more second fractures of the wellbore, through the second valve(s), and into the passageway.
11. The method of claim 10 , wherein:
one or more packers are coupled to the tubular; and
for each of the second valve(s), at least one of the packer(s) is disposed between the second valve and each adjacent one of the first valve(s) along the tubular.
12. The method of claim 11 , wherein:
the packer(s) comprise two or more packers; and
at least two of the packers are disposed between adjacent ones of the first and second valves along the tubular.
13. The method of claim 10 , wherein at least one of the first and second valves is a unidirectional valve.
14. The method of claim 10 , wherein at least one of the first valve(s) is biased closed.
15. The method of claim 10 , wherein at least one of the second valve(s) is biased closed.
16. The method of claim 10 , wherein at least one of the first and second valves is a check valve.
17. The method of claim 10 , wherein increasing pressure within the passageway is performed at least by pumping fluid into the passageway.
18. The method of claim 17 , wherein the pumped fluid comprises a majority, by volume and/or mass, of a gas.
19. The method of claim 10 , wherein a formation into which the wellbore extends has an average permeability that is less than approximately 0.5 millidarcies (mD), optionally, less than approximately 0.1 mD.
20. The method of claim 10 , wherein the wellbore is cased.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US18/430,407 US20240167361A1 (en) | 2020-03-31 | 2024-02-01 | Systems for Inter-Fracture Flooding of Wellbores and Methods of Using the Same |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US202063002569P | 2020-03-31 | 2020-03-31 | |
US17/219,222 US11920428B2 (en) | 2020-03-31 | 2021-03-31 | Systems for inter-fracture flooding of wellbores and methods of using the same |
US18/430,407 US20240167361A1 (en) | 2020-03-31 | 2024-02-01 | Systems for Inter-Fracture Flooding of Wellbores and Methods of Using the Same |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/219,222 Continuation US11920428B2 (en) | 2020-03-31 | 2021-03-31 | Systems for inter-fracture flooding of wellbores and methods of using the same |
Publications (1)
Publication Number | Publication Date |
---|---|
US20240167361A1 true US20240167361A1 (en) | 2024-05-23 |
Family
ID=77854498
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/219,222 Active US11920428B2 (en) | 2020-03-31 | 2021-03-31 | Systems for inter-fracture flooding of wellbores and methods of using the same |
US18/430,407 Pending US20240167361A1 (en) | 2020-03-31 | 2024-02-01 | Systems for Inter-Fracture Flooding of Wellbores and Methods of Using the Same |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/219,222 Active US11920428B2 (en) | 2020-03-31 | 2021-03-31 | Systems for inter-fracture flooding of wellbores and methods of using the same |
Country Status (4)
Country | Link |
---|---|
US (2) | US11920428B2 (en) |
EP (1) | EP4127393A4 (en) |
CA (1) | CA3179013A1 (en) |
WO (1) | WO2021203137A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324542B (en) * | 2022-07-14 | 2023-06-09 | 中国石油大学(北京) | Method and system for oil extraction by water injection between multiple well seams of horizontal well of low-permeability tight oil reservoir |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8408314B2 (en) * | 2009-10-06 | 2013-04-02 | Schlumberger Technology Corporation | Multi-point chemical injection system for intelligent completion |
RU2530810C2 (en) * | 2010-05-26 | 2014-10-10 | Шлюмбергер Текнолоджи Б.В. | Intelligent system of well finishing for wells drilled with large vertical deviation |
US9587474B2 (en) * | 2011-12-13 | 2017-03-07 | Exxonmobil Upstream Research Company | Completing a well in a reservoir |
WO2013130491A2 (en) * | 2012-03-01 | 2013-09-06 | Shell Oil Company | Fluid injection in light tight oil reservoirs |
US9562422B2 (en) | 2012-04-20 | 2017-02-07 | Board Of Regents Of The University Of Texas Systems | System and methods for injection and production from a single wellbore |
US20150369023A1 (en) | 2013-02-12 | 2015-12-24 | Devon Canada Corporation | Well injection and production method and system |
GB2512122B (en) | 2013-03-21 | 2015-12-30 | Statoil Petroleum As | Increasing hydrocarbon recovery from reservoirs |
US9695675B2 (en) * | 2014-01-03 | 2017-07-04 | Weatherford Technology Holdings, Llc | High-rate injection screen assembly with checkable ports |
CA2937865A1 (en) * | 2015-07-28 | 2017-01-28 | Devon Canada Corporation | Well injection and production methods, apparatus and systems |
CA3026636C (en) * | 2016-06-29 | 2022-04-12 | Chw As | System and method for enhanced oil recovery |
CN110295879A (en) * | 2018-03-23 | 2019-10-01 | 熊暮羽 | A kind of staged fracturing horizontal well in segments period note adopts dual string |
-
2021
- 2021-03-31 WO PCT/US2021/070344 patent/WO2021203137A1/en unknown
- 2021-03-31 US US17/219,222 patent/US11920428B2/en active Active
- 2021-03-31 CA CA3179013A patent/CA3179013A1/en active Pending
- 2021-03-31 EP EP21780640.5A patent/EP4127393A4/en active Pending
-
2024
- 2024-02-01 US US18/430,407 patent/US20240167361A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
EP4127393A1 (en) | 2023-02-08 |
WO2021203137A1 (en) | 2021-10-07 |
US20210301622A1 (en) | 2021-09-30 |
US11920428B2 (en) | 2024-03-05 |
EP4127393A4 (en) | 2024-04-24 |
CA3179013A1 (en) | 2021-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10024148B2 (en) | Hydrocarbon recovery process exploiting multiple induced fractures | |
US10400562B2 (en) | Intermittent fracture flooding process | |
US7559373B2 (en) | Process for fracturing a subterranean formation | |
US9341049B2 (en) | Controlled production and injection | |
US20240167361A1 (en) | Systems for Inter-Fracture Flooding of Wellbores and Methods of Using the Same | |
WO2004063310A2 (en) | Advanced gas injection method and apparatus liquid hydrocarbon recovery complex | |
US10077643B2 (en) | Method of completing and producing long lateral wellbores | |
US11274538B2 (en) | Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding | |
US20150211347A1 (en) | Process for inhibiting flow of fracturing fluid in an offset wellbore | |
US20060076140A1 (en) | Gas Lift Apparatus and Method for Producing a Well | |
US10767456B2 (en) | Methods and systems for recovering oil from subterranean reservoirs | |
US20090301708A1 (en) | Parallel fracturing system for wellbores | |
RU2418162C1 (en) | Method for improving permeability of bed during extraction of high-viscosity oil | |
CA2517497C (en) | Well product recovery process | |
US10570714B2 (en) | System and method for enhanced oil recovery | |
US11346181B2 (en) | Engineered production liner for a hydrocarbon well | |
US9410413B2 (en) | Well system with annular space around casing for a treatment operation | |
US20210189853A1 (en) | Methods of Pressurizing a Wellbore to Enhance Hydrocarbon Production | |
Bell Jr et al. | Achieving high-rate completions with innovative through-tubing sand control | |
Carpenter | Production Strategy Calls for Injection of High-Gas/Oil-Ratio HP/HT Crude |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |