US20230266397A1 - Battery system - Google Patents

Battery system Download PDF

Info

Publication number
US20230266397A1
US20230266397A1 US18/310,570 US202318310570A US2023266397A1 US 20230266397 A1 US20230266397 A1 US 20230266397A1 US 202318310570 A US202318310570 A US 202318310570A US 2023266397 A1 US2023266397 A1 US 2023266397A1
Authority
US
United States
Prior art keywords
battery
battery pack
current
total current
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
US18/310,570
Inventor
Masatsugu KAWAKAMI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to US18/310,570 priority Critical patent/US20230266397A1/en
Assigned to TOYOTA JIDOSHA KABUSHIKI KAISHA reassignment TOYOTA JIDOSHA KABUSHIKI KAISHA ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KAWAKAMI, Masatsugu
Publication of US20230266397A1 publication Critical patent/US20230266397A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3842Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3828Arrangements for monitoring battery or accumulator variables, e.g. SoC using current integration
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/4207Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/441Methods for charging or discharging for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/482Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0029Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with safety or protection devices or circuits
    • H02J7/00302Overcharge protection
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present disclosure has been made in view of the above circumstances, and a main object thereof is to provide a battery system capable of avoiding an over charge with a simple sensor element.
  • the calculating section may calculate an absolute value of a difference between an integrated value S A of the total current I A and an integrated value S B of the total current I B as the determining value, and the determining section may determine the occurrence of the over charge from the absolute value being a threshold or more, and a constant increase of both of the integrated value S A and the integrated value S B during a period of a base point to the threshold.
  • FIG. 5 is a flow chart illustrating processes carried out by a control unit in the present disclosure.
  • a battery system capable of avoiding an over charge with a simple sensor element may be obtained by using the determining value calculated based on total current I A and total current I B .
  • the voltage per battery cell is measured in Patent Literature 1 in order to estimate respective charging conditions of the plurality of battery cells.
  • a voltage detecting line is necessary per battery cell so that the sensor element is likely to be complicated.
  • the sensor element since there is no need to provide the voltage detecting line per battery cell in the present disclosure, the sensor element may be simplified.
  • the simplification of the sensor element is realized by focusing on the occurrence of a drastic voltage increase during the over charge, and calculating the change of total current I A and total current I B that occurs due to the drastic voltage increase, as the determining value.
  • FIG. 6 is the result of a charging test to the battery cell using an inorganic solid electrolyte (sulfide solid electrolyte) as the solid electrolyte, and when the SOC (State of Charge) of the battery cell gets higher, the voltage of the battery cell increases drastically.
  • the SOC in FIG. 6 is a value calculated from the integrated value of the total current and the nominal capacity (rated capacity).
  • examples of the battery cell wherein the over charge is likely to occur may include a battery cell deteriorated over time due to charge/discharge faster.
  • a battery cell wherein capacity decrease has occurred due to charge/discharge is likely to be in an over charged condition during charge.
  • a battery system capable of avoiding an over charge with a simple sensor element may be obtained by using the determining value (a determining value based on the current change due to the drastic voltage increase during the over charge) calculated based on total current I A and total current I B .
  • the control unit in the present disclosure controls at least a charge of the battery module.
  • the control unit preferably controls charge and discharge of the battery module.
  • the control unit preferably includes ECU configured to determine start, continue and stop of the charge (preferably charge and discharge) based on the battery information obtained from the monitoring unit; and PCU configured to carry out the start, continue and stop of the charge (preferably charge and discharge) of the battery module based on the determination of the ECU.
  • the ECU is configured to determine the start, continue and stop of the charge (preferably charge and discharge) based on the battery information obtained from the monitoring unit.
  • the ECU usually includes a CPU (Central Processing Unit), a memory, an input/output port configured to input and output various signals.
  • the memory includes, for example, a ROM (Read Only Memory), a RAM (Random Access Memory), and a non-volatile memory that is rewritable. Various determinations are carried out by a program stored in the memory being carried out by CPU.
  • the ECU includes at least a calculating section, and a determining section as a processing block configured to realize the function.
  • the calculating section is set to calculate a determining value based on total current I A and total current I B . Also, the determining section preferably obtains total current I A over time from the first current sensor, and obtains total current I B over time from the second current sensor. Meanwhile, the determining section is set to determine an occurrence of an over charge based on the determining value calculated by the determining section.
  • the calculating section may calculate a current ratio of total current I A and total current I B as the determining value.
  • the determining section determines the occurrence of the over charge from a condition, wherein the value of the current ratio is a threshold or more, is maintained for a predetermined time.
  • I B /I A is always 1, as shown by Case I in FIG. 3 .
  • the threshold of the value of the current ratio is not particularly limited, and is, for example, 1.5 or more, may be 2 or more, and may be 5 or more.
  • the predetermined time is not particularly limited, and is, for example, 1 second or more, may be 5 seconds or more, and may be 1 minute or more.
  • the calculating section preferably adopt the higher value as the determining value, among current ratio I B /I A and current ratio I A /I B .
  • the determining section may determine the occurrence of the over charge from the condition that the value of the current ratio is the threshold or more, and that the current ratio is constantly increasing during the period of a base point (first base point) to the threshold, and for a predetermined time since the current ratio reaches the threshold.
  • the first base point is not particularly limited, and is, for example, an arbitrary time that satisfies 1 ⁇ current ratio ⁇ 1.5. Also, the preferable predetermined time is similar to those described above.
  • the determining section may determine the occurrence of the over charge from the condition that the value of the current ratio is the threshold or more, and that the current ratio is constantly a positive value during the period of a base point (first base point) to the threshold, and for a predetermined time since the current ratio reaches the threshold.
  • the preferable first base point and the preferably predetermined time are similar to those described above. Incidentally, the above described methods for determining may be used in combination.
  • the determining section may determine the occurrence of the over charge from the condition that the slope of the current ratio is the threshold or more, and that the slope of the current ratio is constantly a positive value during the period of a base point (second base point) to the threshold, and for a predetermined time since the slope of the current ratio reaches the threshold.
  • the preferable second base point and the preferable predetermined time are similar to those described above. Incidentally, the above described methods for determining may be used in combination.
  • the calculating section may calculate an absolute value of a difference between an integrated value S A of total current I A and an integrated value S B of total current I B as the determining value.
  • the determining section preferably determines the occurrence of the over charge from the absolute value being a threshold or more, and a constant increase of both of integrated value S A and integrated value S B during the period of a base point to the threshold.
  • the difference between integrated value S A of total current I A and integrated value S B of total current I B is 0, as shown in Case I in FIG. 4 .
  • the occurrence of the over charge may be determined in some cases from the difference between the integrated values being a threshold or more.
  • the threshold of the difference between the integrated values is not particularly limited, and when the initial battery capacity is regarded as 100%, the threshold is, for example, 10% or more, may be 20% or more, and may be 50% or more.
  • the battery capacity considering the deterioration due to charge/discharge may be regarded as 100%.
  • the determining section may determine the occurrence of the over charge from the condition that the difference between the integrated values (absolute value) is the threshold or more, and that the both of integrated value S A and integrated value S B are constantly increasing during the period of a base point (third base point) to the threshold.
  • composition of the sulfide solid electrolyte may include xLi 2 S ⁇ (1 ⁇ x)P 2 S 5 (0.7 ⁇ x ⁇ 0.8), yLiI ⁇ zLiBr ⁇ (100 ⁇ y ⁇ z)Li 3 PS 4 (0 ⁇ y ⁇ 30, 0 ⁇ z ⁇ 30).
  • Other examples of the composition of the sulfide solid electrolyte may include Li 4-x Ge 1-x P x S 4 (x satisfies 0 ⁇ x ⁇ 1).
  • Sb, Si, Sn, B, Al, Ga, In, Ti, Zr, V, and Nb may be used instead of at least one of Ge and P.
  • a part of Li may be substituted with Na, K, Mg, Ca, and Zn.
  • a part of S may be substituted with a halogen (F, Cl, Br, I).
  • the monitoring unit preferably includes no voltage sensor (individual voltage sensor) configured to measure a voltage of the battery cell in battery pack A individually.
  • the monitoring unit preferably includes no voltage sensor (individual voltage sensor) configured to measure a voltage of the battery cell in battery pack B individually.
  • the reason therefor is to avoid the complication of the sensor element.
  • the monitoring unit may include N/10 or less individual voltage sensor for each battery pack.
  • the monitoring unit may include a temperature sensor configured to measure the temperature of battery pack or the battery module.
  • the present disclosure is not limited to the embodiments.
  • the embodiments are exemplification, and any other variations are intended to be included in the technical scope of the present disclosure if they have substantially the same constitution as the technical idea described in the claim of the present disclosure and offer similar operation and effect thereto.
  • a slurry including an anode active material (graphite), a sulfide solid electrolyte (Li 2 S-P 2 S 5 ) , and a binder (PVDF) was prepared.
  • An anode structure including an anode current collector and an anode layer was obtained by coating the surface of an anode current collector (copper foil) with this slurry and drying.
  • a slurry including a sulfide solid electrolyte (Li 2 S-P 2 S 5 ), and a binder (PVDF) was prepared.
  • a solid electrolyte layer was formed on a transfer foil by coating the surface of the transfer foil (aluminum foil) with this slurry and drying.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

A main object of the present disclosure is to provide a battery system capable of avoiding an over charge with a simple sensor element. The present disclosure achieves the object by providing a battery system comprising: a battery module including a battery pack A including a plurality of battery cells connected in series, and a battery pack B including a plurality of battery cells connected in series, connected in parallel, a monitoring unit configured to monitor a condition of the battery module, and a control unit configured to control at least a charge of the battery module, and the monitoring unit includes: a first current sensor configured to measure a total current IA of the battery pack A, and a second current sensor configured to measure a total current IB of the battery pack B, and the control unit includes: a calculating section configured to calculate a determining value based on the total current IA and the total current IB, and a determining section configured to determine an occurrence of an over charge based on the determining value.

Description

    RELATED APPLICATION
  • This application is a continuation of U.S. patent application Ser. No. 17/326,594, filed May 21, 2021, which claims priority to Japanese Patent Application No. 2020-102252, filed on Jun. 12, 2020, including the specification, drawings and abstract, the entire disclosure of which is incorporated herein by reference.
  • TECHNICAL FIELD
  • The present disclosure relates to a battery system.
  • BACKGROUND ART
  • A method for estimating a charging condition of a battery, to protect the battery from an over charge, has been known. For example, Patent Literature 1 discloses a battery pack charging condition estimating device configured to estimate the charging condition of a battery block comprising a plurality of battery cells that estimates the charging condition of the battery cell from the voltage of each battery cell, and the charging condition of the battery block is estimated from the maximum value and the minimum value of the estimated values. This technique addresses to properly calculate the estimated value of the charging condition of the battery pack as a whole.
  • Also, a technique for preventing an over charge due to circulating current that occurs after the stop of charging, has been know. For example, Patent Literature 2 discloses a method for stopping charge of a power source system comprising a plurality of battery packs provided with a chargeable/dischargeable battery array and a battery monitoring system, and the plurality of the battery packs are connected to each other in series, wherein, when the power source system is charged by supplying electrical power from outside, the charge stopping condition of charging is changed according to either one of the difference of an open circuit voltage and SOC between the plurality of the battery packs.
  • CITATION LIST Patent Literatures
      • Patent Literature 1: Japanese Patent Application Laid-Open (JP-A) No. 2016-080560
      • Patent Literature 2: JP-A 2018-050400
    SUMMARY OF DISCLOSURE Technical Problem
  • The voltage per battery cell is measured in Patent Literature 1 in order to estimate respective charging conditions of the plurality of battery cells. In this case, a voltage detecting line is necessary per battery cell so that the sensor element is likely to be complicated.
  • The present disclosure has been made in view of the above circumstances, and a main object thereof is to provide a battery system capable of avoiding an over charge with a simple sensor element.
  • Solution to Problem
  • In order to achieve the object, the present disclosure provides a battery system comprising: a battery module including a battery pack A including a plurality of battery cells connected in series, and a battery pack B including a plurality of battery cells connected in series, connected in parallel, a monitoring unit configured to monitor a condition of the battery module, and a control unit configured to control at least a charge of the battery module, and the monitoring unit includes: a first current sensor configured to measure a total current IA of the battery pack A, and a second current sensor configured to measure a total current IB of the battery pack B, and the control unit includes: a calculating section configured to calculate a determining value based on the total current IA and the total current IB, and a determining section configured to determine an occurrence of an over charge based on the determining value.
  • According to the present disclosure, a battery system capable of avoiding an over charge with a simple sensor element may be obtained by using the determining value calculated based on the total current IA and the total current IB.
  • In the disclosure, the calculating section may calculate a current ratio of the total current IA and the total current IB as the determining value, and the determining section may determine the occurrence of the over charge from a condition, wherein the value of the current ratio is a threshold or more, is maintained for a predetermined time.
  • In the disclosure, the calculating section may calculate a slope of a current ratio of the total current IA and the total current IB as the determining value, and the determining section may determine the occurrence of the over charge from a condition, wherein the slope of the current ratio is a threshold or more, is maintained for a predetermined time.
  • In the disclosure, the predetermined time may be 1 second or more.
  • In the disclosure, the calculating section may calculate an absolute value of a difference between an integrated value SA of the total current IA and an integrated value SB of the total current IB as the determining value, and the determining section may determine the occurrence of the over charge from the absolute value being a threshold or more, and a constant increase of both of the integrated value SA and the integrated value SB during a period of a base point to the threshold.
  • In the disclosure, the battery cell in the battery pack A and the battery cell in the battery pack B may be respectively provided with a power generation unit including a cathode layer, an anode layer, and an electrolyte layer formed between the cathode layer and the anode layer, and the electrolyte layer includes an inorganic solid electrolyte.
  • In the disclosure, the monitoring unit may include no voltage sensor configured to measure a voltage of the battery cell in the battery pack A individually, and may include no voltage sensor configured to measure a voltage of the battery cell in the battery pack B individually.
  • Advantageous Effects of Disclosure
  • The battery system in the present disclosure exhibits an effect that an over charge may be avoided with a simple sensor element.
  • BRIEF DESCRIPTION OF DRAWINGS
  • FIG. 1 is a schematic cross-sectional view illustrating an example of a battery cell in the present disclosure.
  • FIG. 2 is a schematic view illustrating a battery system in the present disclosure.
  • FIGS. 3 is a graph explaining a current ratio change over time.
  • FIGS. 4 is a graph explaining an integrated current value change over time.
  • FIG. 5 is a flow chart illustrating processes carried out by a control unit in the present disclosure.
  • FIG. 6 is a graph showing the result of a charging test to the battery cell in Reference Example.
  • FIG. 7 is a schematic view showing battery pack A and battery pack B in Example.
  • FIG. 8 is a graph explaining changes over time of the total current and the total voltage in Example.
  • FIG. 9 is a graph explaining a current ratio change over time in Example.
  • FIG. 10 is a graph explaining an integrated current value (SOC standard) change over time in Example.
  • DESCRIPTION OF EMBODIMENTS
  • A battery system in the present disclosure will be hereinafter described in detail.
  • FIG. 1 is a schematic cross-sectional view illustrating an example of the battery cell in the present disclosure. Battery cell C shown in FIG. 1 includes cathode layer 1, anode layer 2, electrolyte layer 3 formed between cathode layer 1 and anode layer 2, cathode current collector 4 configured to collect currents of cathode layer 1, anode current collector 5 configured to collect currents of anode layer 2, and exterior body 6 configured to store them. Also, in the battery pack in the present disclosure, a plurality of battery cells are connected in series. The plurality of battery cells are preferably placed along the thickness direction (direction DT in FIG. 1 ).
  • FIG. 2 is a schematic view illustrating a battery system in the present disclosure. Battery system 20 shown in FIG. 2 comprises battery module M including battery pack 10A (battery pack A) including a plurality of battery cells connected in series, and battery pack 10B (battery pack B) including a plurality of battery cells connected in series, connected in parallel. Further, battery system 20 includes monitoring unit 11 configured to monitor the condition of battery pack 10A and battery pack B. Monitoring unit 11 includes a first current sensor configured to measure a total current IA of battery pack A, and a second current sensor configured to measure a total current IB of battery pack B.
  • Also, battery system 20 shown in FIG. 2 includes control unit 12 configured to control the charge and the discharge of battery module M. Control unit 12 includes, for example, ECU (Electronic Control Unit) 121 and PCU (Power Control Unit) 122. ECU 121 instructs (such as start instruction and stop instruction) PCU 122 to charge/discharge based on demand X (such as charge demand and discharge demand) from the outside, and a battery condition (condition of battery pack A and battery pack B) obtained from monitoring unit 11. PCU 122 receives electric power from power source 13 during charge, and supplies electric power to load 14 during discharge. Control unit 12 calculates a determining value based on total current IA and total current IB, and determines an occurrence of an over charge based on the determining value, and stops the charge.
  • According to the present disclosure, a battery system capable of avoiding an over charge with a simple sensor element may be obtained by using the determining value calculated based on total current IA and total current IB. As described above, the voltage per battery cell is measured in Patent Literature 1 in order to estimate respective charging conditions of the plurality of battery cells. In this case, a voltage detecting line is necessary per battery cell so that the sensor element is likely to be complicated. In contrast to this, since there is no need to provide the voltage detecting line per battery cell in the present disclosure, the sensor element may be simplified.
  • In the present disclosure, the simplification of the sensor element is realized by focusing on the occurrence of a drastic voltage increase during the over charge, and calculating the change of total current IA and total current IB that occurs due to the drastic voltage increase, as the determining value. Specifically, later described FIG. 6 is the result of a charging test to the battery cell using an inorganic solid electrolyte (sulfide solid electrolyte) as the solid electrolyte, and when the SOC (State of Charge) of the battery cell gets higher, the voltage of the battery cell increases drastically. Incidentally, the SOC in FIG. 6 is a value calculated from the integrated value of the total current and the nominal capacity (rated capacity). Also, when a commonly used liquid electrolyte is used, the drastic voltage increased may not be confirmed since an oxidation decomposition of the liquid electrolyte occurs before the drastic increase of the battery cell voltage. However, when a liquid electrolyte with high oxidation decomposition voltage is used, the drastic increase of the voltage is presumed to be confirmed. Also, the reason for the drastic increase of the battery cell voltage is presumed to be the occurrence of an overvoltage.
  • Also, among the battery cells included in battery pack, examples of the battery cell wherein the over charge is likely to occur may include a battery cell deteriorated over time due to charge/discharge faster. Particularly, a battery cell wherein capacity decrease has occurred due to charge/discharge, is likely to be in an over charged condition during charge. According to the present disclosure, a battery system capable of avoiding an over charge with a simple sensor element may be obtained by using the determining value (a determining value based on the current change due to the drastic voltage increase during the over charge) calculated based on total current IA and total current IB.
  • 1. Control Unit
  • The control unit in the present disclosure controls at least a charge of the battery module. Among the above, the control unit preferably controls charge and discharge of the battery module.
  • The control unit preferably includes ECU configured to determine start, continue and stop of the charge (preferably charge and discharge) based on the battery information obtained from the monitoring unit; and PCU configured to carry out the start, continue and stop of the charge (preferably charge and discharge) of the battery module based on the determination of the ECU.
  • The ECU is configured to determine the start, continue and stop of the charge (preferably charge and discharge) based on the battery information obtained from the monitoring unit. The ECU usually includes a CPU (Central Processing Unit), a memory, an input/output port configured to input and output various signals. The memory includes, for example, a ROM (Read Only Memory), a RAM (Random Access Memory), and a non-volatile memory that is rewritable. Various determinations are carried out by a program stored in the memory being carried out by CPU.
  • The ECU includes at least a calculating section, and a determining section as a processing block configured to realize the function. The calculating section is set to calculate a determining value based on total current IA and total current IB. Also, the determining section preferably obtains total current IA over time from the first current sensor, and obtains total current IB over time from the second current sensor. Meanwhile, the determining section is set to determine an occurrence of an over charge based on the determining value calculated by the determining section.
  • (1) Current Ratio
  • The calculating section may calculate a current ratio of total current IA and total current IB as the determining value. In this case, it is preferable that the determining section determines the occurrence of the over charge from a condition, wherein the value of the current ratio is a threshold or more, is maintained for a predetermined time. Here, when battery pack A and battery pack B do not include an abnormal cell (a battery cell wherein the over charge is likely to occur), IB/IA is always 1, as shown by Case I in FIG. 3 .
  • Meanwhile, when battery pack A includes an abnormal cell and battery pack B does not include an abnormal cell, since the drastic voltage increase occurs in in the abnormal cell, total current IA will be lower than total current IB. Therefore, as shown by Case II in FIG. 3 , the value of the current ratio (IB/IA) will be more than 1 at the time over charge occurs to, after that, the value of the current ratio (IB/IA) increases over time. Therefore, the occurrence of the over charge may be determined from a condition, wherein the value of the current ratio is a threshold or more, is maintained for a predetermined time.
  • The threshold of the value of the current ratio is not particularly limited, and is, for example, 1.5 or more, may be 2 or more, and may be 5 or more. Also, the predetermined time is not particularly limited, and is, for example, 1 second or more, may be 5 seconds or more, and may be 1 minute or more. Also, in Case II in FIG. 3 , a case wherein battery pack A includes an abnormal cell is assumed. In contrast to this, when a case wherein battery pack B includes an abnormal cell is assumed, the value is IB<IA<1 at the time over charge occurs t0. Therefore, the calculating section preferably adopt the higher value as the determining value, among current ratio IB/IA and current ratio IA/IB.
  • Meanwhile, when battery pack A includes an internally short-circuited cell as the abnormal cell, the voltage of the abnormal cell decreases instantaneously (total current IA will be higher than total current IB instantaneously). Specifically, as shown in Case III in FIG. 3 , current ratio IB/IA decreases instantaneously from the time internal short-circuit occurs t0, and then, recovers to the vicinity of IB/IA=1. Meanwhile, when assuming current ratio IA/IB that is an inverse of current ratio IB/IA in Case III in FIG. 3 , current ratio IA/IB may be the threshold or more for a moment, but such condition is not maintained. Therefore, the occurrence of the over charge and the occurrence of the internal short-circuit may be determined distinctively.
  • Based on the viewpoint of instantaneous change, the determining section may determine the occurrence of the over charge from the condition that the value of the current ratio is the threshold or more, and that the current ratio is constantly increasing during the period of a base point (first base point) to the threshold, and for a predetermined time since the current ratio reaches the threshold. The first base point is not particularly limited, and is, for example, an arbitrary time that satisfies 1<current ratio<1.5. Also, the preferable predetermined time is similar to those described above.
  • Also, at occurrence of the internal short-circuit, a sneak current usually occurs. When the value of the sneak current is higher than the value of the charging current, the value of the current ratio will be a negative value as shown by Case III in FIG. 3 . Based on this viewpoint, the determining section may determine the occurrence of the over charge from the condition that the value of the current ratio is the threshold or more, and that the current ratio is constantly a positive value during the period of a base point (first base point) to the threshold, and for a predetermined time since the current ratio reaches the threshold. The preferable first base point and the preferably predetermined time are similar to those described above. Incidentally, the above described methods for determining may be used in combination.
  • (2) Slope of Current Ratio
  • The calculating section may calculate a slope of a current ratio of total current IA and total current IB as the determining value. In this case, the determining section preferably determines the occurrence of the over charge from a condition, wherein the slope of the current ratio is a threshold or more, is maintained for a predetermined time. Here, when battery pack A and battery pack B do not include an abnormal cell (a battery cell wherein the over charge is likely to occur), the slope of IB/IA is always 0, as shown by Case I in FIG. 3 .
  • Meanwhile, when battery pack A includes an abnormal cell and battery pack B does not include an abnormal cell, since the drastic voltage increase occurs in the abnormal cell, total current IA will be lower than total current IB. Therefore, as shown by Case II in FIG. 3 , the slope of the current ratio (IB/IA) will be higher than 0 at the time over charge occurs t0. Therefore, the occurrence of the over charge may be determined from a condition, wherein the slope of the current ratio is a threshold or more, being maintained for a predetermined time. Incidentally, the slope of the current ratio is indicated with, for example, an arrow in FIG. 3 .
  • The threshold of the slope of the current ratio is not particularly limited, when the unit of the time is “second”, the threshold is, for example, 0.5 or more, may be 1 or more, and may be 2 or more. The slope of the current ratio may be determined as the amount of the change of the current ratio per unit time (such as 1 second). Also, the predetermined time is not particularly limited, and is, for example, 1 second or more, may be 5 seconds or more, and may be 1 minute or more. Also, in Case II in FIG. 3 , a case wherein battery pack A includes an abnormal cell is assumed. In contrast to this, when a case wherein battery pack B includes an abnormal cell is assumed, the value is IB<IA<1 at the time over charge occurs t0. Therefore, the calculating section preferably adopt a slope of a higher value as the determining value, among current ratio IB/IA and current ratio IA/IB.
  • Meanwhile, when battery pack A includes an internally short-circuited cell as the abnormal cell, the voltage of the abnormal cell decreases instantaneously (total current IA will be higher than total current IB instantaneously). Specifically, as shown in Case III in FIG. 3 , current ratio IB/IA decreases instantaneously from the time internal short-circuit occurs to, and then, recovers to the vicinity of IB/IA=1. Meanwhile, when assuming current ratio IA/IB that is an inverse of current ratio IB/IA in Case III in FIG. 3 , the slope of current ratio IA/IB may be the threshold or more for a moment, but such condition is not maintained. Therefore, the occurrence of the over charge and the occurrence of the internal short-circuit may be determined distinctively.
  • Based on the viewpoint of instantaneous change, the determining section may determine the occurrence of the over charge from the condition that the slope of the current ratio is the threshold or more, and that the slope of the current ratio is constantly increasing during the period of a base point (second base point) to the threshold, and for a predetermined time since the slope of the current ratio reaches the threshold. The second base point is not particularly limited, and is, for example, an arbitrary time that satisfies 0.01 slope of the current ratio<0.5, and may be an arbitrary time that satisfies 0.1 slope of the current ratio<0.5. Also, the preferably predetermined time is similar to those described above.
  • Also, at occurrence of the internal short-circuit, a sneak current usually occurs. When the value of the sneak current is higher than the value of the charging current, the slope of the current ratio will be, not only a positive value, but also a negative value as shown in Case III in FIG. 3 (strictly, when the curve of Case III is inverted upside down). Based on this viewpoint, the determining section may determine the occurrence of the over charge from the condition that the slope of the current ratio is the threshold or more, and that the slope of the current ratio is constantly a positive value during the period of a base point (second base point) to the threshold, and for a predetermined time since the slope of the current ratio reaches the threshold. The preferable second base point and the preferable predetermined time are similar to those described above. Incidentally, the above described methods for determining may be used in combination.
  • (3) Difference Between Integrated Current Values
  • The calculating section may calculate an absolute value of a difference between an integrated value SA of total current IA and an integrated value SB of total current IB as the determining value. In this case, the determining section preferably determines the occurrence of the over charge from the absolute value being a threshold or more, and a constant increase of both of integrated value SA and integrated value SB during the period of a base point to the threshold. Here, when battery pack A and battery pack B do not include the abnormal cell (a battery cell wherein the over charge is likely to occur), the difference between integrated value SA of total current IA and integrated value SB of total current IB is 0, as shown in Case I in FIG. 4 .
  • Meanwhile, when battery pack A includes an abnormal cell and battery pack B does not include an abnormal cell, since the drastic voltage increase occurs in in the abnormal cell, total current IA will be lower than total current I. Therefore, as shown by Case II in FIG. 4 , integrated value SA of total current IA will be relatively lower, and integrated value SB of total current IB will be relatively higher from the time over charge occurs to. Therefore, the occurrence of the over charge may be determined in some cases from the difference between the integrated values being a threshold or more. The threshold of the difference between the integrated values (absolute value) is not particularly limited, and when the initial battery capacity is regarded as 100%, the threshold is, for example, 10% or more, may be 20% or more, and may be 50% or more. Incidentally, instead of the initial battery capacity, the battery capacity considering the deterioration due to charge/discharge may be regarded as 100%.
  • Meanwhile, when battery pack A includes an internally short-circuited cell as the abnormal cell, the voltage of the abnormal cell decreases instantaneously (total current IA will be higher than total current IB instantaneously). Specifically, as shown in Case III in FIG. 4 , integrated value SA of total current IA drastically increases from the time internal short-circuit occurs t0. Meanwhile, integrated value SB of total current IB temporary decreases due to the sneak current. Therefore, the determining section may determine the occurrence of the over charge from the condition that the difference between the integrated values (absolute value) is the threshold or more, and that the both of integrated value SA and integrated value SB are constantly increasing during the period of a base point (third base point) to the threshold. The third base point is not particularly limited, and when the initial battery capacity is regarded as 100%, the third base point is, for example, an arbitrary time that satisfies 3%<the difference between the integrated values (absolute value)<10%, and may be an arbitrary time that satisfies 5%<the difference between the integrated values (absolute value)<10%. Incidentally, instead of the initial battery capacity, the battery capacity considering the deterioration due to charge/discharge may be regarded as 100%. Also, the determining section may further determine the occurrence of the over charge from a condition that the both of integrated value SA and integrated value SB are constantly increasing for a predetermined time since the difference between the integrated values (absolute value) reaches the threshold.
  • (4) Others
  • The PCU is configure to carry out the start, continue and stop of the charge (preferably charge and discharge) of the battery module based on the determination of the ECU. For the PCU, those similar to a PCU in a usual battery system may be used. Also, the battery system in the present disclosure may include a display unit configured to display a warning when an over charge occurs. Examples of the display unit may include a liquid crystal display.
  • FIG.5 is a flow chart illustrating processes carried out by a control unit in the present disclosure. In step S1, as shown in FIG. 5 , total voltage V, and total current I of a battery module during charge are obtained. In step S2, total current IA of battery pack A and total current IB of battery pack B are obtained. In step SB, the above described determination value is calculated based on total current IA and total current IB. In step S4, the determining value and the threshold previously memorized in the memory are compared, and return to step S1 when a condition wherein the determining value is the threshold or more, is not maintained for a predetermined time. Meanwhile, when the condition wherein the determining value is the threshold or more, is maintained for a predetermined time, it is determined that an over charge has occurred, moved ahead to step S5, and the charging is stopped. In step S6, a warning indicating an over charge is displayed so as to complete the processes.
  • 2. Battery Module
  • The battery module in the present disclosure includes a battery pack A including a plurality of battery cells connected in series, and a battery pack B including a plurality of battery cells connected in series.
  • (1) Battery Cell
  • The battery cell is provided with a power generation unit including a cathode layer, an anode layer, and an electrolyte layer formed between the cathode layer and the anode layer. Further, the battery cell is provided with a cathode current collector configured to collect currents of the cathode layer, and an anode current collector configured to collect currents of the anode layer.
  • The cathode layer includes at least a cathode active material, and preferably further includes at least one kind of an electrolyte, a conductive material, and a binder, as required. The kind of the cathode active material is not particularly limited, and examples thereof may include an oxide active material. Examples of the oxide active material may include rock salt bed type active materials such as LiCoO2, LiMnO2, LiNiO2, LiVO2, LiNi1/3Co1/3Mn1/3O2; spinel type active materials such as LiMn2O4, Li4Ti5O12, and Li(Ni0.5Mn1.5)O4; and olivine type active materials such as LiFePO4, LiMnPO4, LiNiPO4, and LiCoPO4.
  • As the electrolyte to be used for the cathode layer, the material similar to the electrolyte to be used for the electrolyte layer described later may be used. Examples of the conductive material may include carbon materials such as acetylene black (AB), Ketjen black (KB), carbon fiber, carbon nanotube (CNT), and carbon nanofiber (CNF). Examples of the binder may include fluorine-based binders such as polyvinylidene fluoride (PVDF).
  • The anode layer includes at least an anode active material, and preferably further includes at least one of an electrolyte, a conductive material, and a binder as required. Examples of the anode active material may include carbon active materials such as graphite; and metal active materials such as Si, Sn, In, and Al. The electrolyte, the conductive material, and the binder may be in the same contents as those described for the cathode layer above.
  • The electrolyte layer includes at least an electrolyte. The electrolyte may be an inorganic solid electrolyte, may be a solid polymer electrolyte, may be an electrolyte solution (liquid electrolyte), and may be a semisolid electrolyte (clay type electrolyte). Among the above, the inorganic solid electrolyte is preferable. The reason therefor is because an oxidation decomposition due to the over charge is not likely to occur. That is, the battery cell in the present disclosure is preferably an all solid state battery cell including a solid electrolyte layer including an inorganic solid electrolyte. The oxidation decomposition voltage of the electrolyte is, for example, 5 V (vs Li/Li+) or more, may be 15 V (vs Li/Li+) or more, and may be 30 V (vs Li/Li+) or more.
  • Examples of the inorganic solid electrolyte may include sulfide solid electrolyte, oxide solid electrolyte, nitride solid electrolyte, and halide solid electrolyte. Examples of the sulfide solid electrolyte may include solid electrolyte including a Li element, an X element (X is at least one kind of P, As, Sb, Si, Ge, Sn, B, Al, Ga, and In) and a S element. Also, the sulfide solid electrolyte may further include at least either one of an O element and a halogen element. Examples of the halogen element may include a F element, a Cl element, a Br element, and an I element.
  • The sulfide solid electrolyte may be a glass type solid electrolyte, may be a glass ceramic type solid electrolyte, and may be a crystal type solid electrolyte. Also, the sulfide solid electrolyte may include a crystal phase with high ion conductivity. Examples of the crystal phase may include a Thio-LISICON type crystal phase, a LGPS type crystal phase, and an algirodite type crystal phase.
  • Examples of the composition of the sulfide solid electrolyte may include xLi2S·(1−x)P2S5 (0.7≤x≤0.8), yLiI·zLiBr·(100−y−z)Li3PS4 (0≤y≤30, 0≤z≤30). Other examples of the composition of the sulfide solid electrolyte may include Li4-xGe1-xPxS4 (x satisfies 0<x<1). In this composition, Sb, Si, Sn, B, Al, Ga, In, Ti, Zr, V, and Nb may be used instead of at least one of Ge and P. Also, a part of Li may be substituted with Na, K, Mg, Ca, and Zn. Further, a part of S may be substituted with a halogen (F, Cl, Br, I).
  • Examples of the oxide solid electrolyte may include solid electrolyte including a Li element, a Y element (Y is at least one kind of Nb, B, Al, Si, P, Ti, Zr, Mo, W, and S) and an O element. Specific examples of the oxide solid electrolyte may include a garnet type solid electrolyte such as Li7La3Zr2O12, a perovskite type solid electrolyte such as (Li, La)TiO3, a nasicon type solid electrolyte such as Li(Al, Ti) (PO4)3. Also, examples of the nitride solid electrolyte may include Li3N. Examples of the halide solid electrolyte may include LiCl, LiI, and LiBr.
  • A generally used current collector may be used for the cathode current collector and the anode current collector. Also, the kind of the exterior body is not particularly limited, and it may be a laminated type exterior body, and may be a case type exterior body.
  • The battery cell in the present disclosure may include only one power generation unit of a cathode layer, an electrolyte layer and an anode layer, and may include two or more of them. In the latter case, a plurality of power generation units are preferably placed along the thickness direction. Also, a bipolar structure may be formed with a plurality of the power generation units. Also, the kind of the battery cell is not particularly limited, and is preferably a lithium ion battery.
  • (2) Battery Pack
  • The battery module in the present disclosure includes a battery pack A and a battery pack B as the battery pack. The battery pack includes a plurality of battery cells connected in series. The number of the battery cells in the battery pack is usually 2 or more, may be 6 or more, may be 10 or more, and may be 20 or more. Meanwhile, the number of the battery cells in the battery pack is, for example, 1000 or less, and may be 500 or less. The number of the battery cells in battery pack A and the number of the battery cells in battery pack B may be the same, and may be different.
  • The total voltage (fully charged) of the battery pack is, for example, 5 V or more, may be 10 V or more, may be 30 V or more, and may be 100 V or more. Meanwhile, the total voltage (fully charged) of the battery pack is, for example, 400 V or less. The total voltage (fully charged) of battery pack A and the total voltage (fully charged) of battery pack B may be the same, and may be different.
  • In the battery module in the present disclosure, only battery pack A and battery pack B may be connected in parallel, and in addition to battery pack A and battery pack B, other battery pack of one or two or more may be connected in parallel.
  • 3. Monitoring Unit
  • The battery system in the present disclosure is provided with a monitoring unit configured to monitor a condition of battery pack A and battery pack B. Specifically, the monitoring unit includes a first current sensor configured to measure a total current IA of the battery pack A, and a second current sensor configured to measure a total current IB of the battery pack B. Incidentally, when the battery module includes other battery pack of one or two or more connected in parallel, in addition to battery pack A and battery pack B, the monitoring unit may include a current sensor configured to measure the total current of the other battery pack respectively. Also, the monitoring unit may include a voltage sensor (total voltage sensor) configured to measure total voltage V of the battery module. A generally used sensor may be used for the current sensor and the voltage sensor respectively.
  • Meanwhile, the monitoring unit preferably includes no voltage sensor (individual voltage sensor) configured to measure a voltage of the battery cell in battery pack A individually. Similarly, the monitoring unit preferably includes no voltage sensor (individual voltage sensor) configured to measure a voltage of the battery cell in battery pack B individually. The reason therefor is to avoid the complication of the sensor element. Incidentally, when the number of the battery cell in the battery pack is regarded as N (N≥10) the monitoring unit may include N/10 or less individual voltage sensor for each battery pack. Also, the monitoring unit may include a temperature sensor configured to measure the temperature of battery pack or the battery module.
  • The present disclosure is not limited to the embodiments. The embodiments are exemplification, and any other variations are intended to be included in the technical scope of the present disclosure if they have substantially the same constitution as the technical idea described in the claim of the present disclosure and offer similar operation and effect thereto.
  • EXAMPLES Reference Example Production of Cathode Structure
  • A slurry including a cathode active material (LiNi1/3Mn1/3Co1/3O2), a sulfide solid electrolyte (Li2S-P2S5), a binder (PVDF) and a conductive material (vapor grown carbon fiber) was prepared. A cathode structure including a cathode current collector and a cathode layer was obtained by coating the surface of a cathode current collector (aluminum foil) with this slurry and drying.
  • Production of Anode Structure
  • A slurry including an anode active material (graphite), a sulfide solid electrolyte (Li2S-P2S5) , and a binder (PVDF) was prepared. An anode structure including an anode current collector and an anode layer was obtained by coating the surface of an anode current collector (copper foil) with this slurry and drying.
  • Production of Solid Electrolyte Layer
  • A slurry including a sulfide solid electrolyte (Li2S-P2S5), and a binder (PVDF) was prepared. A solid electrolyte layer was formed on a transfer foil by coating the surface of the transfer foil (aluminum foil) with this slurry and drying.
  • Production of Battery Cell
  • The transfer foil was peeled off from the solid electrolyte layer in an inert gas, the cathode structure was placed on one side surface of the solid electrolyte layer, the anode structure was placed on other side surface, and the stack was pressed to obtain a battery cell. The obtained battery cell was charged under the condition of current rate of 2 C. The result is shown in FIG. 6 . Incidentally, the closed circuit voltage of 4.41 V (open circuit voltage of 4.35 V) was set as SOC (State of Charge) 100%. As shown in FIG. 6 , it was confirmed that a drastic voltage increase occurred in the high SOC region.
  • Example
  • A battery module as shown in FIG. 7 was produced. Specifically, the battery module was produced by using battery pack A including 10 battery cells (CA1 to CA10) connected in series, and battery pack B including 10 battery cells (CB1 to CB10) connected in series. In this battery module, a battery cell wherein SOC was adjusted to 100% was used as battery cell CA1, battery cells wherein SOC was adjusted to 0% was used as battery cells CA2 to CA10/and battery cells wherein SOC was adjusted to 2% was used as battery cells CB1 to CB10. Each battery cell was produced similarly as Reference Example.
  • The obtained battery module was charged, and total current IA of battery pack A, total current IB of battery pack B, total voltage V of the battery module were measured. The results are shown in FIGS. 8 to 10 . As shown in FIG. 8 , the value of total current IA was lower than the value total current IB. Incidentally, FIG. 8 shows that the current value is higher in the lower side of the figure, for convenience sake. Also, as shown in FIG. 9 , it was confirmed that the value of current ratio IB/IA increased along with the charge. Also, as shown in FIG. 10 , it was confirmed that the difference between integrated value SA of total current IA and integrated value SB of total current IB was increased along with the charge. As described above, it was confirmed that the over charge may be avoided by using the determining value (value of current ratio, slope of current ratio, and difference between integrated current values) based on total current IA and total current IB.
  • REFERENCE SIGNS LIST
      • 1 . . . cathode layer
      • 2 . . . anode layer
      • 3 . . . electrolyte layer
      • 4 . . . cathode current collector
      • 5 . . . anode current collector
      • 6 . . . exterior body
      • 10 . . . battery pack
      • 11 . . . monitoring unit
      • 12 . . . control unit
      • 13 . . . power source
      • 14 . . . load
      • 20 . . . battery system

Claims (1)

What is claimed is:
1. A method for determining an occurrence of an over charge for a battery module, wherein the battery module includes a battery pack A including a plurality of battery cells connected in series, and a battery pack B including a plurality of battery cells connected in series, and the battery pack A and the battery pack B are connected in parallel,
the method comprising:
measuring a total current IA of the battery pack A,
measuring a total current IB of the battery pack B,
calculating a determining value based on the total current IA and the total current IB, and
determining the occurrence of the over charge based on the determining value,
wherein a slope of a current ratio of the total current IA and the total current IB is calculated as the determining value, and
the occurrence of the over charge is determined from a condition, wherein the slope of the current ratio is a threshold or more, is maintained for a predetermined time.
US18/310,570 2020-06-12 2023-05-02 Battery system Pending US20230266397A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US18/310,570 US20230266397A1 (en) 2020-06-12 2023-05-02 Battery system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2020102252A JP2021197806A (en) 2020-06-12 2020-06-12 Battery system
JP2020-102252 2020-06-12
US17/326,594 US11680988B2 (en) 2020-06-12 2021-05-21 Battery system
US18/310,570 US20230266397A1 (en) 2020-06-12 2023-05-02 Battery system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US17/326,594 Continuation US11680988B2 (en) 2020-06-12 2021-05-21 Battery system

Publications (1)

Publication Number Publication Date
US20230266397A1 true US20230266397A1 (en) 2023-08-24

Family

ID=78825253

Family Applications (2)

Application Number Title Priority Date Filing Date
US17/326,594 Active 2041-07-03 US11680988B2 (en) 2020-06-12 2021-05-21 Battery system
US18/310,570 Pending US20230266397A1 (en) 2020-06-12 2023-05-02 Battery system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US17/326,594 Active 2041-07-03 US11680988B2 (en) 2020-06-12 2021-05-21 Battery system

Country Status (3)

Country Link
US (2) US11680988B2 (en)
JP (1) JP2021197806A (en)
CN (1) CN113809412A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7238734B2 (en) * 2019-11-13 2023-03-14 トヨタ自動車株式会社 Method for manufacturing all-solid-state battery and all-solid-state battery

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010033773A (en) * 2008-07-25 2010-02-12 Panasonic Corp Battery pack and battery system
JP2011027608A (en) * 2009-07-28 2011-02-10 Denso Corp System for monitoring state of battery pack
JP5701279B2 (en) * 2012-12-11 2015-04-15 三菱重工業株式会社 Charge control device, battery system, and charge control method
JP5720753B2 (en) * 2013-10-02 2015-05-20 トヨタ自動車株式会社 Sulfide solid electrolyte material, battery, and method for producing sulfide solid electrolyte material
JP6458441B2 (en) 2014-10-20 2019-01-30 株式会社豊田自動織機 Battery charge state estimation apparatus and method
KR101648893B1 (en) * 2015-02-03 2016-08-17 삼성에스디아이 주식회사 Battery pack and controlling method thereof
JP6618443B2 (en) 2016-09-21 2019-12-11 株式会社エンビジョンAescジャパン How to stop charging the power system
JP6779949B2 (en) * 2018-09-04 2020-11-04 本田技研工業株式会社 Power storage system and abnormality judgment method
JP7120062B2 (en) * 2019-02-07 2022-08-17 トヨタ自動車株式会社 BATTERY CHARGE/DISCHARGE CONTROL DEVICE AND BATTERY CHARGE/DISCHARGE CONTROL METHOD
JP7452273B2 (en) * 2020-06-12 2024-03-19 トヨタ自動車株式会社 battery system

Also Published As

Publication number Publication date
JP2021197806A (en) 2021-12-27
US11680988B2 (en) 2023-06-20
CN113809412A (en) 2021-12-17
US20210389382A1 (en) 2021-12-16

Similar Documents

Publication Publication Date Title
EP2573858B1 (en) Battery control system for a lithium ion battery and assembled battery control system
KR101337153B1 (en) Device for detecting abnormality of state of charge in a lithium secondary battery and method for testing the same
US8773069B2 (en) Charge/discharge control method
US8604755B2 (en) Lithium-ion secondary battery system
US9935342B2 (en) Li/metal battery with shape change control
US20240113347A1 (en) Battery system
US9543622B2 (en) Lithium solid state secondary battery system
EP2874272B1 (en) Charging control method for secondary cell and charging control device for secondary cell
JPWO2011033781A1 (en) Charge / discharge method of positive electrode active material in lithium secondary battery, and charge / discharge system including lithium secondary battery, battery pack, battery module, electronic device, and vehicle
US8859123B2 (en) System and method for pressure determination in a Li-ion battery
US11085970B2 (en) Secondary battery degradation state estimation method, degradation state estimation device, control method, and control system
US20230266397A1 (en) Battery system
KR102470882B1 (en) Unit battery module and measuring for state of health thereof
JP6164157B2 (en) Sulfide-based all-solid secondary battery system
CN110277595B (en) Secondary battery system and secondary battery control method
JP2013044701A (en) Battery system
JP7003745B2 (en) Rechargeable battery system
US20220216720A1 (en) Battery system
KR20240027757A (en) Deterioration state estimation device, deterioration state estimation method and program
JP2020198268A (en) All-solid lithium ion secondary battery system, and device and method for charging all-solid lithium ion secondary battery

Legal Events

Date Code Title Description
AS Assignment

Owner name: TOYOTA JIDOSHA KABUSHIKI KAISHA, JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KAWAKAMI, MASATSUGU;REEL/FRAME:063517/0729

Effective date: 20210421

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED