US20220349297A1 - Generating drilling paths using a drill model - Google Patents
Generating drilling paths using a drill model Download PDFInfo
- Publication number
- US20220349297A1 US20220349297A1 US17/812,794 US202217812794A US2022349297A1 US 20220349297 A1 US20220349297 A1 US 20220349297A1 US 202217812794 A US202217812794 A US 202217812794A US 2022349297 A1 US2022349297 A1 US 2022349297A1
- Authority
- US
- United States
- Prior art keywords
- parameters
- wellbore path
- actual
- generating
- generate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B45/00—Measuring the drilling time or rate of penetration
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/26—Storing data down-hole, e.g. in a memory or on a record carrier
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V3/00—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
- G01V3/38—Processing data, e.g. for analysis, for interpretation, for correction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/20—Computer models or simulations, e.g. for reservoirs under production, drill bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/10—Correction of deflected boreholes
Definitions
- Drilling into the subsurface of the Earth may be an arduous and complicated task. Drilling is expensive and many errors may occur as a driller attempts to drill to a final target location. Drilling a borehole has become increasingly difficult due to the complexity added by drilling long, deviated, or horizontal wells that require accurate and consistent directional drilling. Directional drilling may result in an actual wellbore path that is unintentionally tortuous, as opposed to the planned wellbore which is perfectly smooth. Often directional drillers lack accurate information regarding the actual path of a tortuous wellbore when drilling toward a target location, because of uncertainties linked to the wellbore measurements, directional behavior of the drilling system, or the rock formation.
- FIG. 1 shows a perspective view of a drilling environment in accordance with at least some embodiments
- FIG. 2 shows a representation of a wellbore path in accordance with at least some embodiments
- FIG. 3 shows a graph depicting aspects of various parameters corresponding to an earth model in accordance with several embodiments
- FIG. 4 shows a method diagram in accordance with several embodiments.
- FIG. 5 shows, in block diagram form, a computer system in accordance with at least some embodiments.
- the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . .”
- the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection or through an indirect connection via other devices and connections.
- the ability to accurately reconstruct a drilled wellbore path that is tortuous as well as to predict a future wellbore path as drilling continues may be beneficial to entities and individuals tasked with extracting minerals from the Earth.
- the embodiments described below assess the directional behavior of a drilling system to both reconstruct the drilled wellbore path and predict a future wellbore path.
- the described embodiments take into account several factors including: bit directional responsiveness; mechanical behavior of the directional system (i.e., behavior of a bottom hole assembly); and effect of the rock formation in the drilling environment.
- various methods and systems using a drill model that takes into account the several factors including rock formation data, are described below.
- FIG. 1 shows an environment 100 in which a drilling rig 108 may be used to penetrate the surface 102 of the Earth.
- Environment 100 may represent a terrestrial environment, where surface 102 represents land.
- environment 100 may represent a marine environment, where surface 102 represents the bottom of a body of water such as an ocean or lake.
- targeted locations 106 in subsurface 104 may contain minerals or hydrocarbons that will be extracted. The targeted locations are generally positioned along the planned wellbore path trajectory intended to be drilled.
- Drilling rig 108 is representative of any machine such as a drill, with an ability to drill holes in to the earth's subsurface 104 and create a wellbore path, such as wellbore path 110 .
- Drilling rig 108 may represent equipment small enough to move manually or massive structures housing equipment used to drill boreholes.
- Drilling techniques used by drilling rig 108 may include directional drilling, which increases the number of reserves that may be reached and can also increase production rate.
- Drilling rig 108 equipment such as drilling system 122 includes drill string 112 , comprising a hollow drill pipe that transmits drilling fluid and torque to a drill bit 114 coupled on a distal end of the drill string 112 .
- the distal end of the drill string 112 comprises a bottom hole assembly (BHA) 116 that extends from the drill pipe of the drill string 112 to the drill bit 114 .
- BHA bottom hole assembly
- the BHA 116 may include drill collars, stabilizers, reamers, shocks, hole-openers, bit sub, and drill bit 114 . Characteristics of BHA 116 help to determine the wellbore shape, direction, and other geometric characteristics.
- the BHA 116 can be of any type or variation currently used by a person of ordinary skill in the art and may include but not be limited to: a rotary assembly, a steerable mud motor, rotary steerable systems, or a fulcrum, stabilization, or pendulum assembly.
- the proper selection of a type of BHA 116 can ensure good directional behavior, borehole quality (smoothness of the well path as opposed to tortuous), high rate of penetration (ROP), and result in a drilling process being completed quickly and efficiently.
- the directional behavior of the drilling system 122 may be defined as the manner in which the drilling system may change direction and how effectively it is able to change direction.
- the directional behavior of the drill depends on a complex coupling of bit directional responsiveness (bit steerability), bit walk tendency (WALK), mechanical behavior of the directional system (BHA), and the rock formation characteristics of the subsurface being drilled into.
- a resulting wellbore path 110 may be tortuous while being directed toward a given targeted location 106 .
- Information about the actual tortuous path of the drilled wellbore path 110 may be unknown to an operator of the drilling system.
- An “operator” may refer to a person or people who operate or direct the operation of the drilling system, and may also be known in the industry as a directional driller, a drilling engineer, or a driller.
- survey data may be collected by a measurement-while-drilling (MWD) tool of the BHA 116 .
- WMD measurement-while-drilling
- Survey data are comprised of measured depth, inclination, and azimuth of the well path at discrete positions (also known as survey stations) along the wellbore. For example, survey data are collected every 100 feet or so (but can also be collected more or less frequently if necessary).
- Survey data can then be transmitted to an electronic drilling recorder (EDR 124 ) at various increments of time, distance, depth, etc. during the drilling process.
- EDR 124 electronic drilling recorder
- the EDR 124 records at a 1 to 10 seconds time range based on drilling data coming from different sensors available on the rig 108 , such as weight on bit (WOB), torque at surface, rotation speed, mud weight, hook load, flow rate, stand pipe pressure, differential pressure, rate of penetration, and other information pertinent to the drilling process.
- WOB weight on bit
- FIG. 1 survey data is collected every hundred feet at locations 118 a , 118 b , and 118 c . Survey data are then utilized to reconstruct the well path using a mathematical model such as the minimum of curvature method, to estimate the position of the well path in the Earth.
- a mathematical model such as the minimum of curvature method
- Directional drilling data may include more specifically how the BHA steers or guides the well path, information such as toolface orientation (TFO) (e.g., mode sliding or rotating), activation level of the rotary steerable system, and other information pertinent to the steering mode of the BHA.
- TFO toolface orientation
- activation level of the rotary steerable system e.g., activation level of the rotary steerable system
- Additional information corresponding to locations from which drilling data is gathered may include geological characteristics surrounding the locations such as rock formation data including unconfined or confined compressive strength (UCS or CCS) of the rock, dip/strike, and gamma ray (GR).
- the rock formation data may generally come from acoustic logs of wells being drilled or offset wells previously drilled.
- survey data may include the measurements of three parameters, as noted above: measured depth (MD), inclination of the borehole, and azimuth of the borehole.
- the drilling system 122 may have drilled a few hundred or thousand feet since beginning at the surface 102 and various data (for example, survey data, drilling data, and directional data) at location 118 a are collected.
- various data for example, survey data, drilling data, and directional data
- the drill bit 114 is located at location 118 a .
- the drilling system 122 may proceed to drill for another hundred feet until the drill bit 114 reaches location 118 b at which point additional survey data are collected.
- the drilling system 122 continues to drill another hundred feet at which point the drill bit 114 is located at 118 c . Additional survey data at location 118 c are collected.
- data about the survey locations 118 a , 118 b , and 118 c may be known, however, the actual path 110 of the wellbore path between the survey locations 118 a , 118 b , and 118 c is unknown, because no survey data is collected between these survey locations.
- the distance of one hundred feet is an example of a measurement interval, and any measurement interval may be used between surveys.
- the collected survey data in particular, the measured depth, and inclination and azimuth of the wellbore path, may be used to recreate a representation of the wellbore path using a mathematical method, such as the method of minimum curvature. For example, between two consecutive survey points (e.g., between 118 a and 118 b ), one single geometrical arc with a given radius of curvature is generally calculated to represent the shape of the well path. However, it is known that this is not completely true as many changes of well path may occur, creating multiple small arcs, leading to tortuosity. Given the tortuous path of the wellbore, an accurate understanding of the wellbore path may be beneficial to an operator to make a better determination of the actual position of the well path relative to the reservoir or pay zone.
- a mathematical method such as the method of minimum curvature.
- the collected survey and drilling data may be accessed while drilling is taking place, and in other embodiments, the collected survey and drilling data may be stored in one or more databases 120 a , which are coupled to EDR 124 .
- the dashed lines 125 represent any wired or wireless communication channels between equipment located at intermittent locations 118 a , 118 b , or 118 c and the database 120 a .
- Database 120 a may represent a single machine located in a single location or several machines located in the same or disparate locations.
- the database 120 a may be located at the drilling rig 108 , at a drilling hub, or elsewhere.
- the survey and drilling data may be stored on a non-transitory storage media, where the storage media is computer-readable.
- the non-transitory computer-readable storage media may be coupled to a database 120 a to transfer and store the survey data in database 120 a.
- a borehole path estimator 126 which may run on computer system 120 b , may use the drill model to predict the future wellbore path.
- the borehole path estimator 126 may comprise a program that is executable by a processor and that may be stored on a storage device and access the various data discussed throughout (e.g., survey data, drilling data, rock formation data, etc.) and data stored in database 120 a .
- the borehole path estimator 126 may predict both projections of the future wellbore path as well as reconstruct an actual path in accordance with the methods discussed herein.
- the borehole path estimator 126 is coupled to a drilling control system 128 .
- the drilling control system 128 controls various parameters discussed further below, such as WOB, differential pressure, RPM, drilling mode, etc.
- the drilling control system 128 may apply path information provided by the borehole path estimator 126 to keep the wellbore path on target.
- the output of a borehole path estimator 126 may be shown to an operator on a display. This display is discussed now in relation to FIG. 2 .
- FIG. 2 aspects of a display 200 representing results from a drilling model are discussed.
- the display 200 may be provided to a directional driller or drilling engineer to aid in determining a steering mode of the drilling system 122 and BHA 116 when drilling the next segment of the wellbore path 110 .
- a method flow for running the drill model which generates the results shown in graph 202 is discussed in further detail in FIG. 3 .
- the graph 202 depicts measured depth (MD) along the x-axis 204 and a true vertical depth (TVD) along the y-axis 206 .
- Various layers of the rock may also be depicted in graph 202 (e.g., layers 218 a , 218 b , and 218 c ).
- the display 200 is in two dimensions or 2-D, but other embodiments include a display in three dimensions or 3-D to represent the wellbore path in 3-D space.
- a planned path 208 and an actual path 210 are shown.
- the planned path 208 is less tortuous than the actual path 210 as is often the case.
- an operator is aware of the planned path 208 but the operator has inaccurate knowledge of the actual path the wellbore has taken during drilling because of the unknown tortuosity.
- Increased knowledge of the actual path 210 may be useful in decisions related to the vertical and horizontal position of the wellbore in the Earth which is critical to staying within the payzone.
- Modeling software that has the ability to accurately reconstruct an actual path 210 may also have increased accuracy when constructing a future wellbore path that has yet to be drilled. Differences in vertical and horizontal position of the wellbore up to 50 feet can be observed if one does not consider well bore tortuosity.
- Graph 202 is divided by a line of demarcation 212 separating section 214 and section 216 .
- the line of demarcation 212 may correspond to the position of the drill bit 114 .
- section 214 a representation of a drilled portion of the wellbore path 110 is depicted, and in section 216 various representations of possible directions the wellbore path 110 may take with further drilling, are depicted.
- the portion of earth represented in section 216 has not yet been drilled. Accordingly, portions of both an actual wellbore path (e.g., wellbore path 110 ) and an undrilled section of the wellbore path are represented in graph 202 .
- an underlying drill model may use step by step calculations to determine the actual path 210 .
- survey data from surveys 118 a , 118 b , and 118 c may provide some information about the orientation and location of the wellbore path at discrete points, additional and more robust information may be gleaned from drilling and directional data in conjunction with the borehole path estimator.
- the EDR 124 collects drilling and directional data continuously during drilling, or more frequently than survey data is gathered, for example, at a frequency of every foot of measured depth drilled. This data may be used by a borehole path estimator 126 to reconstruct an actual path 210 of a drilled wellbore path 110 .
- Various inputs to the drill model used to reconstruct the actual path 210 may be calibrated by comparing an expected result and an output of the drill model, where the output is used to generate the reconstruction of the actual path 210 .
- one set of input parameters that may be modified include: bit steerability (BS), walk angle (WALK), overgauge (OVG) borehole, and coefficient of friction (FF).
- BS bit steerability
- WALK walk angle
- OVG overgauge
- FF coefficient of friction
- the initial set of parameters may be either estimated by a modeling software or simply set as defaults, given that, for example, BS is around 0.1, WALK is around ⁇ 12 degrees, OVG is about 1 ⁇ 8 inch, and FF is around 0.2.
- a future wellbore path may be defined as a portion of the wellbore that has not yet been drilled.
- the future wellbore path may be a representation of a prediction of the location and path that may form once a segment of the earth's subsurface has been drilled.
- the path of a future wellbore may depend on a variety of factors including the drilling parameters, the drilling bit, the BHA, and type of rock being drilled.
- a plurality of future trajectories 220 a , 220 b , 220 c , and 220 d are represented.
- the future trajectories 220 a , 220 b , 220 c , and 220 d are generated based on any known prediction methodology, and utilizing the modified input parameters of the drill model.
- the future trajectories 220 a , 220 b , 220 c , and 220 d are displayed in real-time based on operating parameters selected by the operator by way of buttons 222 . This enables the operator to choose operating parameters that the operator wants to achieve a desired trajectory.
- the operator may have a goal of remaining as close as possible to a planned trajectory for a wellbore path, minimizing dog legs, and maximizing a Rate of Penetration (ROP).
- ROP Rate of Penetration
- the drill model predicts the resulting future wellbore paths 220 a , 220 b , 220 c , and 220 d corresponding to four different WOBs.
- Each future wellbore path is specific to one set of parameters. More specifically, a wellbore path may be formed according to future wellbore path 220 a if, for example, a WOB of forty kilo-pounds is applied.
- a WOB of forty kilo-pounds is applied.
- the drill model predicts a wellbore path may be formed according to the different future wellbore path 220 b.
- buttons 222 provide an operator with the ability to select various drilling parameters to see how varying the parameters may impact future wellbore paths.
- the button 222 a enables an operator to control the distance ahead the operator would like to see.
- the operator may be planning to drill a next section of the subsurface of the earth, where the next section is a hundred feet long.
- setting button 222 a to one hundred feet makes it such that the future wellbore paths 220 a , 220 b , 200 c , and 220 d are shown out to one hundred feet.
- Button 222 b allows an operator to specify a distance the drilling system 122 rotates
- button 222 c allows the operator to specify a distance the drilling system 122 slides, while using, for example, a steerable mud motor.
- the operator may specify parameters such as the tool face orientation (TFO), WOB, and differential pressure, which are buttons 222 d , 222 e , and 222 f , respectively.
- TFO tool face orientation
- the rotate and slide buttons ( 222 b and 222 c ) reference the ability of drilling system 122 to alternate between a rotating and sliding mode.
- a rotating mode an entire drill string 112 may be rotated by a drilling rig's rotary table or topdrive.
- the drilling system 122 may maintain a straight drilling path. If a drilling system 122 deviates from an intended course while in rotating mode, the sliding mode may be used.
- the drillstring 112 does not rotate; instead the drill bit 114 may be turned by a downhole motor, and the wellbore path may be drilled in the direction the drill bit 114 is pointing.
- the direction the drill bit 114 is pointing may be controlled by TFO.
- the TFO defines an orientation of the deflection tool (e.g., downhole motor), which controls the direction of drilling.
- the deflection tool is oriented in a particular direction to make a desired deflection within the wellbore.
- the underlying borehole path estimator 126 may utilize the drill model to output a build up rate (BUR) indicator 224 , and a turn rate (TR) indicator 226 over the course length selected at 222 a .
- BUR build up rate
- TR turn rate
- the directional behavior of the system can be quantified by the build or drop rate of the system and the turn rate of the system.
- the build or drop rate may be further defined as the rate of change of the inclination of the wellbore over a given distance.
- the turn rate may be further defined as the rate of azimuth change over the same given distance.
- An example unit for a build/drop rate and turn rate is degree/100 ft.
- FIG. 3 a plot 302 showing a log of an initial set of parameters specifically used by the drill model are shown.
- the four parameters: bit steerability (BS) 318 , overgauge (OVG) 320 , coefficient of friction (FF) 322 , and bit walk tendency (Walk) 324 , are utilized in conjunction with operating parameters, rock formation data, drill bit data, and BHA data to both reconstruct an actual path of the wellbore 210 and generate predictions of possible future wellbore paths 220 a , 220 b , 220 c , and 220 d .
- BS bit steerability
- OVG overgauge
- FF coefficient of friction
- Walker bit walk tendency
- the four parameters BS 318 , OVG 320 , FF 322 , and Walk 324 are calibrated as the actual path of the wellbore 210 is reconstructed and the calibrated four parameters may be further utilized to generate the plurality of future trajectories 220 a , 220 b , 220 c , and 220 d that are generated by the drill model.
- a measured depth is shown along the x-axis 304 a .
- the y-axis 304 b are values of the various parameters in column 306 shown in the plot 302 .
- Line 308 may depict values of a parameter in column 306 , for example, the line 308 may represent values of the WOB for the respective sections of the actual path 210 .
- the values of the parameters in column 306 e.g., WOB
- WOB may be taken from EDR 124 and the values of the parameters may be used to calibrate the initial set of parameters including the BS 318 , OVG 320 , FF 322 , and WALK 324 .
- the BS 318 and WALK 324 are parameters that define the directional behavior of the drill bit 114
- the OVG 320 and FF 322 are parameters representing additional factors that affect the directional behaviors of a system in a given rock formation.
- the directional behavior of a system can be quantified by the build or drop rate and the turn rate of the system.
- the directional behavior of the drill bit 114 may be characterized by its walk tendency (WALK) and bit steerability (BS).
- the BS 318 corresponds to the ability of the drill bit 114 to initiate a lateral deviation, taking into account the lateral and axial forces placed on the drill bit 114 .
- the BS 318 can be defined as the ratio of lateral vs. axial drillability
- D lat represents the lateral drillability, defined as the lateral displacement per bit revolution versus the side force.
- D ax represents the axial drillability, which is the axial penetration per bit revolution versus the WOB.
- the BS 318 which may be equivalent to the bit anisotropic index, may fall generally in the range of 0.02 to 0.4 for various embodiments of the drill bit 114 .
- the value of the BS 318 may depend on the cutting profile, gauge cutters, gauge pad characteristics, and rock hardness (UCS).
- a high BS value (high steerability) for a drill bit implies a strong propensity for lateral deviation, which may enable maximum dogleg potential.
- the WALK 324 may be further quantified by a walk angle which is the angle measured in a plane perpendicular to the drill bit axis, between the direction of the side force applied to the bit 114 and that of the lateral displacement of the bit 114 .
- the walk angle quantifies the intrinsic azimuth behavior of the bit 114 .
- the FF 322 is a value ranging generally from 0.1 to 0.5, and represents the ratio between the force necessary to move the tubular or downhole tools through the borehole and the pressure between the surfaces of the tubular or downhole tools and the borehole.
- the FF 322 has an influence on the directional behavior of the system, especially the turn rate of the system; the FF 322 may depend on the type of drilling fluid and type of rock.
- a resulting borehole size may be slightly higher than the nominal size of the drill bit 114 , which in turn may create an overgauge (OVG) borehole.
- OVG overgauge
- the overgauge may range generally from 0 to 2 inches over the nominal size, and the OVG has an impact on the deflection and contact forces of the BHA 116 , and thus on the build/drop rate of the system.
- the four parameters including the BS 318 , OVG 320 , FF 322 , and WALK 324 have a value in each segment of the reconstructed actual path 210 .
- a segment of the reconstructed actual path 210 is a portion between two survey points. The survey points are identified by X's. While predicted survey points are identified by O's.
- the values of the four parameters BS 318 , OVG 320 , FF 322 , and WALK 324 are plotted in section 312 .
- the four parameters BS 306 , OVG 308 , FF 310 , and WALK 312 are recalibrated and thus have different values in the segment 314 .
- a future wellbore path is predicted.
- the values of the four parameters BS 318 , OVG 320 , FF 322 , and WALK 324 are chosen based on their values in the previous segment 314 .
- An uncertainty level may be defined to provide uncertainty about the prediction, where the uncertainty level is based on previous variation of the calibrated parameters BS 318 , OVG 320 , FF 322 , and WALK 324 .
- Various embodiments of a method that may be used to generate the values of the four parameters BS 318 , OVG 320 , FF 322 , and WALK 324 are discussed next.
- blocks 402 , 404 , and 406 represent steps in which various data are collected to the drill model in block 408 .
- a computer system may receive various data such as BHA data, a set of operating parameters, and a set of rock formation data.
- the BHA data may include both data corresponding to the drill bit 114 as well as the BHA 116 /string data.
- Operating parameters may include data such as mud weight, WOB, differential pressure, TFO, activation level, RPM and flow rate.
- the BHA data are generally received from the directional drilling company through a report stating all elements starting from the drill bit, with all length internal and external dimensions, weight, etc.
- Operating parameters may be received from the EDR 124 , which in turn received the data from the drilling rig 108 .
- rock formation data may include hardness of the rock defined as the Unconfined or Confined Compressive Strength (UCS/CCS) values, dip/strike, and gamma ray (GR).
- the rock formation data may be received from an acoustic logger.
- An acoustic logger may measure characteristics of sound waves propagated through a wellbore environment.
- the acoustic logging may be done in offset wells that have previously been drilled in the wellbore environment.
- Several parameters may be taken or inferred from an acoustic log including density, elastic properties, hardness of the rock, etc.
- the first set of parameters includes initial values of BS, OVG, FF, and WALK.
- planned and initial values for the BS, OVG, FF, and WALK may be predetermined for the entire segment to drill and may be based on directional drilling, planning, rock formation, and drill bit characteristics.
- the initial values BS, OVG, FF, and WALK will be calibrated during drilling based on actual data collected during the drilling.
- data corresponding to a measured depth (MD), azimuth, and inclination may be collected from a prior survey.
- the prior survey may be a survey at the beginning of a respective segment of the wellbore path.
- the MD, azimuth, and inclination data in block 406 may come from survey 118 a ( FIG. 3 ).
- a determination is made regarding whether a rock formation change has occurred since the prior survey.
- actual rock formation data may be collected from an acoustic logger, where the acoustic logger collects data in an offset well located in the area where the segment of the wellbore path being reconstructed is located.
- Changes in rock formation may include a change in hardness.
- a detection of a change in rock formation may occur when drilling in rock with anisotropic characteristics, where various properties of the rock are directionally dependent.
- the flow proceeds to block 412 , where a rock formation correction may be applied to the measured depth, inclination and azimuth data.
- the rock formation correction may include applying an external side force at the bit due to the rock anisotropy as known by drillers when drilling rock formations that present bedding planes, or interbedded layers (from hard to soft rocks, or vice versa), as described in publication SPE14764 (1987).
- the flow does not apply a rock formation correction and instead provides the MD, inclination, and azimuth data ( 406 ) to the drill model in block 408 .
- the drill model Upon collecting data in blocks 402 , 404 , and 406 , the drill model runs in block 408 .
- the drill model may be any type of known 3D-rock-bit-BHA model known in the art used to model the directional behavior of a drilling system.
- the drill model is run to generate an output including a calculated BUR, calculated TR, calculated inclination, and calculated azimuth.
- the results including the calculated BUR, TR, inclination, and azimuth may be presented numerically and plotted to predict the next future trajectory (e.g., 220 a ).
- An initial plot of the actual path of the wellbore may be reconstructed by the drill model every foot or so (reconstructed survey), using the calculated BUR, TR, inclination, and azimuth.
- the four parameters, BS, OVG, FF, and WALK may be calibrated based on received data corresponding to an actual BUR and TR. More specifically, calibrating the four parameters, BS, OVG, FF, and WALK, may entail minimizing an error between the actual and reconstructed surveys at a given depth using the four parameters and rock formation effects. More specifically, the difference between a measured and calculated inclination and azimuth may be minimized such that the difference could be between +/ ⁇ 0.05 degree accuracy, for example.
- any mathematical or computing technique may be used that varies the four parameters within an admissible range until a solution is found that minimizes the error or difference between the actual and reconstructed surveys.
- the drill model may use artificial intelligence, machine learning techniques such as neural network techniques, or any other known techniques for calibration, adjustment, and minimization.
- a sag correction may be applied, or any other survey correction, such as but not limited to pipe stretch correction, thermal effects, magnetic interference, multi-station correction, etc.
- the sag corresponds to the difference in angle between the borehole axis and the measurement tool axis.
- the drill model may use the calibrated four parameters ( 416 ) to generate one or more future trajectories as well.
- the one or more future trajectories are based on operating parameters selected by the operator including drilling mode (sliding/rotating), and system parameters such as rotary steerable system (RSS), steerable mud motor, TFO, WOB, and differential pressure.
- drilling mode sliding/rotating
- system parameters such as rotary steerable system (RSS), steerable mud motor, TFO, WOB, and differential pressure.
- an operator may plan to drill a particular, first segment that is 100 feet long.
- the drilling control system 128 may have a visual interface generated by the drill model, similar to the one described in FIG. 2 .
- the visual interface allows the operator to visualize, in 2-D or 3-D, and in real-time the predicted future trajectory based on operating parameters selected by the operator, by way of buttons 222 .
- the drill model can enable an operator to achieve drilling goals such as remaining as close as possible to a planned trajectory, minimizing dog legs, and maximizing a rate of penetration (ROP).
- ROP rate of penetration
- a predictive and desired trajectory may be estimated by the drill model based on a calculated BUR and calculated TR for a given BS, FF, OVG, and WALK.
- the calculated BUR and TR are generated by the 3-D rock-bit-BHA model.
- a survey is taken and the four parameters BS, FF, OVG, and WALK are calibrated to match an actual BUR and TR achieved during the drilling of the first segment. These calibrated four parameters are then used to reconstruct the actual path of the wellbore in the first segment and the inclination and azimuth are calculated every foot or so during the reconstruction of the actual path.
- the calibrated four parameters, as well as possible rock formation change corrections, are fine-tuned and used to predict future trajectories in the next segment to be drilled.
- a steering mode or various operating parameters of the drilling system 122 and BHA 116 may be determined or altered based on the predicted future trajectories.
- a sag correction may also be applied to produce a more accurate representation of the reconstructed actual path. This process may be repeated for all subsequent sections that are to be drilled.
- FIG. 5 shows a computer system 500 which is illustrative of a computer system that may perform method steps in accordance with the method discussed in FIG. 4 .
- the computer system 500 may be illustrative of, for example, a laptop, a desktop computer, a computer within a node of several computers, or any other computing system that may be connected to a network of computers.
- the computer system 500 comprises a processor 502 , and a main memory 504 coupled to processor 502 . Additionally, processor 502 and main memory 504 may be coupled to storage device 506 , and a network interface device 508 .
- Programs, such as the borehole path estimator 126 , executable by the processor 502 may be stored on the storage device 506 (e.g., a hard drive, solid state disk, memory stick, optical disc), and accessed when needed by the processor 502 .
- Programs stored on the storage device 506 may comprise programs to implement various processes on the computer system 500 , including method steps in accordance with the method discussed above in FIG. 4 .
- the programs are copied from the storage device 506 to the main memory 504 , and the programs are executed from the main memory 504 .
- both the main memory 504 and storage device 506 shall be considered computer-readable storage mediums.
- network interface device 508 may allow computer system 500 to exchange data over a wireless or wired network.
- the network interface device 508 may allow computer system 120 b to exchange data over a wireless or wired network with database 120 a .
- the computer system 500 may be connected to a plurality of other computers within a shared network.
- FIG. 4 While many aspects of the method discussed in FIG. 4 may be performed serially, various embodiments enable parallel processing to speed up the overall processing time. Performing the method described in FIG. 4 may comprise major computational elements, however these procedures may be performed in parallel processes.
- the borehole path estimator 126 may control the drilling control system 128 .
- the drilling control system 128 may be communicatively coupled to BHA 116 or drilling rig 108 where the drilling control system 128 controls various operating parameters of the drill to keep the wellbore path on target.
- the drilling control system 128 may receive signals from the borehole path estimator 126 which determine the specifics of operating the drill.
- references to “one embodiment,” “an embodiment,” “some embodiments,” “various embodiments,” or the like indicate that a particular element or characteristic is included in at least one embodiment of the invention. Although the phrases may appear in various places, the phrases do not necessarily refer to the same embodiment or example.
Abstract
A method of modeling a wellbore path in an earth model, including receiving, from an electronic drilling recorder coupled to a bottom hole assembly (BHA), a set of BHA data, and a set of operating parameters data and receiving, a set of rock formation data; generating, a representation of a wellbore path in a first section of the earth model, by assessing the set of BHA data, the set of operating parameters data, the set of rock formation data, and a first set of parameters quantifying bit steerability, walk, coefficient of friction, and overgauge borehole information. The method includes modifying, based on data received from a survey corresponding to the first section of the earth model, the first set of parameters to generate a second set of parameters, and generating a future wellbore path in a second section of the earth model by applying the second set of parameters.
Description
- This application is a continuation of and claims the benefit of priority of U.S. patent application Ser. No. 16/619,381, filed on Dec. 4, 2019, entitled GENERATING DRILLING PATHS USING A DRILL MODEL, which is a 371 U.S. national stage entry of PCT/US2018/031176, filed May 4, 2018, entitled GENERATING DRILLING PATHS USING A DRILL MODEL, which in turn claims the benefit of priority of U.S. Provisional Patent Application No. 62/520,287 filed Jun. 15, 2017, entitled GENERATING DRILLING PATHS USING A drill model. U.S. patent application Ser. Nos. 16/619,381, 62/520,287 and International Patent No. PCT/US2018/031176 are hereby incorporated by reference herein in their entirety
- Drilling into the subsurface of the Earth may be an arduous and complicated task. Drilling is expensive and many errors may occur as a driller attempts to drill to a final target location. Drilling a borehole has become increasingly difficult due to the complexity added by drilling long, deviated, or horizontal wells that require accurate and consistent directional drilling. Directional drilling may result in an actual wellbore path that is unintentionally tortuous, as opposed to the planned wellbore which is perfectly smooth. Often directional drillers lack accurate information regarding the actual path of a tortuous wellbore when drilling toward a target location, because of uncertainties linked to the wellbore measurements, directional behavior of the drilling system, or the rock formation.
- For a detailed description of various embodiments, reference will now be made to the accompanying drawings in which:
-
FIG. 1 shows a perspective view of a drilling environment in accordance with at least some embodiments; -
FIG. 2 shows a representation of a wellbore path in accordance with at least some embodiments; -
FIG. 3 shows a graph depicting aspects of various parameters corresponding to an earth model in accordance with several embodiments; -
FIG. 4 shows a method diagram in accordance with several embodiments; and -
FIG. 5 shows, in block diagram form, a computer system in accordance with at least some embodiments. - Certain terms are used throughout the following description and claims to refer to particular system components. As one skilled in the art will appreciate, different companies may refer to a component by different names. This document does not intend to distinguish between components that differ in name but not function.
- In the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . .” Also, the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection or through an indirect connection via other devices and connections.
- The following discussion is directed to various embodiments of the invention. Although one or more of these embodiments may be preferred, the embodiments disclosed should not be interpreted, or otherwise used, as limiting the scope of the disclosure, including the claims. In addition, one skilled in the art will understand that the following description has broad application, and the discussion of any embodiment is meant only to be exemplary of that embodiment, and not intended to intimate that the scope of the disclosure, including the claims, is limited to that embodiment.
- The ability to accurately reconstruct a drilled wellbore path that is tortuous as well as to predict a future wellbore path as drilling continues may be beneficial to entities and individuals tasked with extracting minerals from the Earth. The embodiments described below assess the directional behavior of a drilling system to both reconstruct the drilled wellbore path and predict a future wellbore path. In order to assess directional drilling, the described embodiments take into account several factors including: bit directional responsiveness; mechanical behavior of the directional system (i.e., behavior of a bottom hole assembly); and effect of the rock formation in the drilling environment. In order to accurately reconstruct a drilled wellbore path as well as predict a future wellbore path to guide a
drilling system 122, various methods and systems using a drill model that takes into account the several factors including rock formation data, are described below. -
FIG. 1 shows anenvironment 100 in which adrilling rig 108 may be used to penetrate thesurface 102 of the Earth.Environment 100 may represent a terrestrial environment, wheresurface 102 represents land. In other embodiments,environment 100 may represent a marine environment, wheresurface 102 represents the bottom of a body of water such as an ocean or lake. Below thesurface 102, one or several targetedlocations 106 insubsurface 104, may contain minerals or hydrocarbons that will be extracted. The targeted locations are generally positioned along the planned wellbore path trajectory intended to be drilled. -
Drilling rig 108 is representative of any machine such as a drill, with an ability to drill holes in to the earth'ssubsurface 104 and create a wellbore path, such aswellbore path 110. Drillingrig 108 may represent equipment small enough to move manually or massive structures housing equipment used to drill boreholes. Drilling techniques used by drillingrig 108 may include directional drilling, which increases the number of reserves that may be reached and can also increase production rate. - Drilling
rig 108 equipment such asdrilling system 122 includes drill string 112, comprising a hollow drill pipe that transmits drilling fluid and torque to adrill bit 114 coupled on a distal end of the drill string 112. In particular, the distal end of the drill string 112 comprises a bottom hole assembly (BHA) 116 that extends from the drill pipe of the drill string 112 to thedrill bit 114. The BHA 116 may include drill collars, stabilizers, reamers, shocks, hole-openers, bit sub, anddrill bit 114. Characteristics of BHA 116 help to determine the wellbore shape, direction, and other geometric characteristics. The BHA 116 can be of any type or variation currently used by a person of ordinary skill in the art and may include but not be limited to: a rotary assembly, a steerable mud motor, rotary steerable systems, or a fulcrum, stabilization, or pendulum assembly. The proper selection of a type of BHA 116 can ensure good directional behavior, borehole quality (smoothness of the well path as opposed to tortuous), high rate of penetration (ROP), and result in a drilling process being completed quickly and efficiently. - The directional behavior of the
drilling system 122 may be defined as the manner in which the drilling system may change direction and how effectively it is able to change direction. The directional behavior of the drill depends on a complex coupling of bit directional responsiveness (bit steerability), bit walk tendency (WALK), mechanical behavior of the directional system (BHA), and the rock formation characteristics of the subsurface being drilled into. - Given the complex coupling of at least these factors, although the drill string 112 is capable of drilling a non-vertical well, or directional drilling, a resulting
wellbore path 110 may be tortuous while being directed toward a given targetedlocation 106. Information about the actual tortuous path of the drilledwellbore path 110 may be unknown to an operator of the drilling system. An “operator” may refer to a person or people who operate or direct the operation of the drilling system, and may also be known in the industry as a directional driller, a drilling engineer, or a driller. - As the
wellbore path 110 is drilled, survey data may be collected by a measurement-while-drilling (MWD) tool of theBHA 116. Survey data are comprised of measured depth, inclination, and azimuth of the well path at discrete positions (also known as survey stations) along the wellbore. For example, survey data are collected every 100 feet or so (but can also be collected more or less frequently if necessary). Survey data can then be transmitted to an electronic drilling recorder (EDR 124) at various increments of time, distance, depth, etc. during the drilling process. In some embodiments, the EDR 124 records at a 1 to 10 seconds time range based on drilling data coming from different sensors available on therig 108, such as weight on bit (WOB), torque at surface, rotation speed, mud weight, hook load, flow rate, stand pipe pressure, differential pressure, rate of penetration, and other information pertinent to the drilling process. InFIG. 1 , survey data is collected every hundred feet atlocations - Directional drilling data may include more specifically how the BHA steers or guides the well path, information such as toolface orientation (TFO) (e.g., mode sliding or rotating), activation level of the rotary steerable system, and other information pertinent to the steering mode of the BHA.
- Additional information corresponding to locations from which drilling data is gathered may include geological characteristics surrounding the locations such as rock formation data including unconfined or confined compressive strength (UCS or CCS) of the rock, dip/strike, and gamma ray (GR). In various embodiments, the rock formation data may generally come from acoustic logs of wells being drilled or offset wells previously drilled. In the context of embodiments of the drill model described further in
FIG. 4 , survey data may include the measurements of three parameters, as noted above: measured depth (MD), inclination of the borehole, and azimuth of the borehole. - Next, an example describing a method of collecting survey and drilling data is described. At
location 118 a, thedrilling system 122 may have drilled a few hundred or thousand feet since beginning at thesurface 102 and various data (for example, survey data, drilling data, and directional data) atlocation 118 a are collected. At this juncture in the example, thedrill bit 114 is located atlocation 118 a. Thedrilling system 122 may proceed to drill for another hundred feet until thedrill bit 114 reacheslocation 118 b at which point additional survey data are collected. Similarly, thedrilling system 122 continues to drill another hundred feet at which point thedrill bit 114 is located at 118 c. Additional survey data atlocation 118 c are collected. Thus, with a survey taken every hundred feet, data about thesurvey locations actual path 110 of the wellbore path between thesurvey locations - The collected survey data, in particular, the measured depth, and inclination and azimuth of the wellbore path, may be used to recreate a representation of the wellbore path using a mathematical method, such as the method of minimum curvature. For example, between two consecutive survey points (e.g., between 118 a and 118 b), one single geometrical arc with a given radius of curvature is generally calculated to represent the shape of the well path. However, it is known that this is not completely true as many changes of well path may occur, creating multiple small arcs, leading to tortuosity. Given the tortuous path of the wellbore, an accurate understanding of the wellbore path may be beneficial to an operator to make a better determination of the actual position of the well path relative to the reservoir or pay zone.
- In various embodiments the collected survey and drilling data may be accessed while drilling is taking place, and in other embodiments, the collected survey and drilling data may be stored in one or more databases 120 a, which are coupled to
EDR 124. The dashedlines 125 represent any wired or wireless communication channels between equipment located atintermittent locations drilling rig 108, at a drilling hub, or elsewhere. - In some embodiments, the survey and drilling data may be stored on a non-transitory storage media, where the storage media is computer-readable. The non-transitory computer-readable storage media may be coupled to a database 120 a to transfer and store the survey data in database 120 a.
- When the collected survey and drilling data and rock formation data is input into a drill model, the drill model may then be used to generate a display depicting the
actual path 110 of the wellbore path as well as various predictions of what a future wellbore path may be beyond the section of the earth's subsurface that has already been drilled. In various embodiments, aborehole path estimator 126 which may run oncomputer system 120 b, may use the drill model to predict the future wellbore path. Theborehole path estimator 126 may comprise a program that is executable by a processor and that may be stored on a storage device and access the various data discussed throughout (e.g., survey data, drilling data, rock formation data, etc.) and data stored in database 120 a. Theborehole path estimator 126 may predict both projections of the future wellbore path as well as reconstruct an actual path in accordance with the methods discussed herein. - In some embodiments, the
borehole path estimator 126 is coupled to adrilling control system 128. In embodiments comprising thedrilling control system 128, thedrilling control system 128 controls various parameters discussed further below, such as WOB, differential pressure, RPM, drilling mode, etc. Thedrilling control system 128 may apply path information provided by theborehole path estimator 126 to keep the wellbore path on target. In some embodiments, the output of aborehole path estimator 126 may be shown to an operator on a display. This display is discussed now in relation toFIG. 2 . - Turning now to
FIG. 2 , aspects of adisplay 200 representing results from a drilling model are discussed. In various embodiments, thedisplay 200 may be provided to a directional driller or drilling engineer to aid in determining a steering mode of thedrilling system 122 andBHA 116 when drilling the next segment of thewellbore path 110. A method flow for running the drill model which generates the results shown ingraph 202 is discussed in further detail inFIG. 3 . - In a first portion of the
display 200, thegraph 202 depicts measured depth (MD) along thex-axis 204 and a true vertical depth (TVD) along the y-axis 206. Various layers of the rock may also be depicted in graph 202 (e.g., layers 218 a, 218 b, and 218 c). In the embodiment shown, thedisplay 200 is in two dimensions or 2-D, but other embodiments include a display in three dimensions or 3-D to represent the wellbore path in 3-D space. - In graph 202 a planned path 208 and an
actual path 210 are shown. In the example shown inFIG. 2 , the planned path 208 is less tortuous than theactual path 210 as is often the case. In various instances, an operator is aware of the planned path 208 but the operator has inaccurate knowledge of the actual path the wellbore has taken during drilling because of the unknown tortuosity. Increased knowledge of theactual path 210 may be useful in decisions related to the vertical and horizontal position of the wellbore in the Earth which is critical to staying within the payzone. Modeling software that has the ability to accurately reconstruct anactual path 210 may also have increased accuracy when constructing a future wellbore path that has yet to be drilled. Differences in vertical and horizontal position of the wellbore up to 50 feet can be observed if one does not consider well bore tortuosity. -
Graph 202 is divided by a line ofdemarcation 212separating section 214 andsection 216. The line ofdemarcation 212 may correspond to the position of thedrill bit 114. Insection 214, a representation of a drilled portion of thewellbore path 110 is depicted, and insection 216 various representations of possible directions thewellbore path 110 may take with further drilling, are depicted. Thus, the portion of earth represented insection 216 has not yet been drilled. Accordingly, portions of both an actual wellbore path (e.g., wellbore path 110) and an undrilled section of the wellbore path are represented ingraph 202. - To reconstruct the actual path of a wellbore path an underlying drill model may use step by step calculations to determine the
actual path 210. For example, although survey data fromsurveys EDR 124 collects drilling and directional data continuously during drilling, or more frequently than survey data is gathered, for example, at a frequency of every foot of measured depth drilled. This data may be used by aborehole path estimator 126 to reconstruct anactual path 210 of a drilledwellbore path 110. - Various inputs to the drill model used to reconstruct the
actual path 210 may be calibrated by comparing an expected result and an output of the drill model, where the output is used to generate the reconstruction of theactual path 210. More specifically, one set of input parameters that may be modified include: bit steerability (BS), walk angle (WALK), overgauge (OVG) borehole, and coefficient of friction (FF). In some embodiments, the initial set of parameters may be either estimated by a modeling software or simply set as defaults, given that, for example, BS is around 0.1, WALK is around −12 degrees, OVG is about ⅛ inch, and FF is around 0.2. - Once the various inputs have been calibrated and an
actual path 210 is produced that falls within an acceptable margin of error threshold, the various inputs and additional known data of the formations remaining to be drilled may be used to predict a future wellbore path. In various embodiments, a future wellbore path may be defined as a portion of the wellbore that has not yet been drilled. The future wellbore path may be a representation of a prediction of the location and path that may form once a segment of the earth's subsurface has been drilled. The path of a future wellbore may depend on a variety of factors including the drilling parameters, the drilling bit, the BHA, and type of rock being drilled. - Referring to
section 216, where predicted future wellbore paths are shown, a plurality offuture trajectories future trajectories future trajectories buttons 222. This enables the operator to choose operating parameters that the operator wants to achieve a desired trajectory. In various embodiments, the operator may have a goal of remaining as close as possible to a planned trajectory for a wellbore path, minimizing dog legs, and maximizing a Rate of Penetration (ROP). - For example, given the various drilling parameters specified by the operator by way of
buttons 222, the drill model predicts the resultingfuture wellbore paths wellbore path 220 a if, for example, a WOB of forty kilo-pounds is applied. As one of the abilities to vary the directional tendency of the assembly comes from varying the WOB, modifying the WOB effectively tunes the directional tendency of theBHA 116 and thus thedrilling system 122. Accordingly, with a WOB of thirty-five kilo-pounds, the drill model predicts a wellbore path may be formed according to the different futurewellbore path 220 b. - As mentioned above,
various buttons 222 provide an operator with the ability to select various drilling parameters to see how varying the parameters may impact future wellbore paths. The button 222 a enables an operator to control the distance ahead the operator would like to see. The operator may be planning to drill a next section of the subsurface of the earth, where the next section is a hundred feet long. Thus, indisplay 200, setting button 222 a to one hundred feet makes it such that thefuture wellbore paths - Button 222 b allows an operator to specify a distance the
drilling system 122 rotates, andbutton 222 c allows the operator to specify a distance thedrilling system 122 slides, while using, for example, a steerable mud motor. Additionally, the operator may specify parameters such as the tool face orientation (TFO), WOB, and differential pressure, which arebuttons - The rotate and slide buttons (222 b and 222 c) reference the ability of
drilling system 122 to alternate between a rotating and sliding mode. In a rotating mode, an entire drill string 112 may be rotated by a drilling rig's rotary table or topdrive. In the rotation mode, thedrilling system 122 may maintain a straight drilling path. If adrilling system 122 deviates from an intended course while in rotating mode, the sliding mode may be used. In the sliding mode, the drillstring 112 does not rotate; instead thedrill bit 114 may be turned by a downhole motor, and the wellbore path may be drilled in the direction thedrill bit 114 is pointing. The direction thedrill bit 114 is pointing may be controlled by TFO. - The TFO defines an orientation of the deflection tool (e.g., downhole motor), which controls the direction of drilling. The deflection tool is oriented in a particular direction to make a desired deflection within the wellbore. In one example, the toolface orientation may be based on High Side (TFO=0 degrees) or Low Side (TFO=180 degrees), where the TFO is measured from the high side of the borehole in a plane perpendicular to the axis of the hole.
- The WOB is the amount of downward force exerted on the
drill bit 114 and in some embodiments may be measured in thousands of pounds. Differential pressure defines a pressure of the drilling fluid and may be measured in pounds per square inch, and represents the difference in pressure when the bit is off-bottom (WOB=0) and on-botttom (WOB>0). - Given the parameters set by the operators at
buttons borehole path estimator 126 may utilize the drill model to output a build up rate (BUR)indicator 224, and a turn rate (TR)indicator 226 over the course length selected at 222 a. The directional behavior of the system can be quantified by the build or drop rate of the system and the turn rate of the system. The build or drop rate may be further defined as the rate of change of the inclination of the wellbore over a given distance. The turn rate may be further defined as the rate of azimuth change over the same given distance. An example unit for a build/drop rate and turn rate is degree/100 ft. - Turning now to
FIG. 3 , aplot 302 showing a log of an initial set of parameters specifically used by the drill model are shown. The four parameters: bit steerability (BS) 318, overgauge (OVG) 320, coefficient of friction (FF) 322, and bit walk tendency (Walk) 324, are utilized in conjunction with operating parameters, rock formation data, drill bit data, and BHA data to both reconstruct an actual path of thewellbore 210 and generate predictions of possiblefuture wellbore paths parameters BS 318,OVG 320,FF 322, and Walk 324 are calibrated as the actual path of thewellbore 210 is reconstructed and the calibrated four parameters may be further utilized to generate the plurality offuture trajectories - In the
plot 302, a measured depth (MD) is shown along the x-axis 304 a. Along the y-axis 304 b are values of the various parameters incolumn 306 shown in theplot 302.Line 308 may depict values of a parameter incolumn 306, for example, theline 308 may represent values of the WOB for the respective sections of theactual path 210. The values of the parameters in column 306 (e.g., WOB) may be taken fromEDR 124 and the values of the parameters may be used to calibrate the initial set of parameters including theBS 318,OVG 320,FF 322, andWALK 324. - The
BS 318 and WALK 324 are parameters that define the directional behavior of thedrill bit 114, while theOVG 320 andFF 322 are parameters representing additional factors that affect the directional behaviors of a system in a given rock formation. As discussed previously in relation toFIG. 2 , the directional behavior of a system can be quantified by the build or drop rate and the turn rate of the system. The directional behavior of thedrill bit 114 may be characterized by its walk tendency (WALK) and bit steerability (BS). - The
BS 318 corresponds to the ability of thedrill bit 114 to initiate a lateral deviation, taking into account the lateral and axial forces placed on thedrill bit 114. TheBS 318 can be defined as the ratio of lateral vs. axial drillability -
B s =D lat /D ax (1) - where Dlat represents the lateral drillability, defined as the lateral displacement per bit revolution versus the side force. Dax represents the axial drillability, which is the axial penetration per bit revolution versus the WOB. The
BS 318, which may be equivalent to the bit anisotropic index, may fall generally in the range of 0.02 to 0.4 for various embodiments of thedrill bit 114. The value of theBS 318 may depend on the cutting profile, gauge cutters, gauge pad characteristics, and rock hardness (UCS). A high BS value (high steerability) for a drill bit implies a strong propensity for lateral deviation, which may enable maximum dogleg potential. - The
WALK 324 may be further quantified by a walk angle which is the angle measured in a plane perpendicular to the drill bit axis, between the direction of the side force applied to thebit 114 and that of the lateral displacement of thebit 114. The walk angle quantifies the intrinsic azimuth behavior of thebit 114. - The
FF 322 is a value ranging generally from 0.1 to 0.5, and represents the ratio between the force necessary to move the tubular or downhole tools through the borehole and the pressure between the surfaces of the tubular or downhole tools and the borehole. TheFF 322 has an influence on the directional behavior of the system, especially the turn rate of the system; theFF 322 may depend on the type of drilling fluid and type of rock. - During the process of drilling a wellbore path, a resulting borehole size may be slightly higher than the nominal size of the
drill bit 114, which in turn may create an overgauge (OVG) borehole. In several embodiments, the overgauge may range generally from 0 to 2 inches over the nominal size, and the OVG has an impact on the deflection and contact forces of theBHA 116, and thus on the build/drop rate of the system. - The four parameters including the
BS 318,OVG 320,FF 322, and WALK 324 have a value in each segment of the reconstructedactual path 210. A segment of the reconstructedactual path 210 is a portion between two survey points. The survey points are identified by X's. While predicted survey points are identified by O's. For example, insegment 310, the values of the fourparameters BS 318,OVG 320,FF 322, and WALK 324 are plotted insection 312. In thesubsequent segment 314 of theactual path 210, the fourparameters BS 306,OVG 308,FF 310, and WALK 312 are recalibrated and thus have different values in thesegment 314. - In the
segment 316, a future wellbore path is predicted. The values of the fourparameters BS 318,OVG 320,FF 322, and WALK 324 are chosen based on their values in theprevious segment 314. An uncertainty level may be defined to provide uncertainty about the prediction, where the uncertainty level is based on previous variation of the calibratedparameters BS 318,OVG 320,FF 322, andWALK 324. Various embodiments of a method that may be used to generate the values of the fourparameters BS 318,OVG 320,FF 322, and WALK 324 are discussed next. - Turning now to
FIG. 4 , a method that may be used to reconstruct anactual wellbore path 210 and a plurality offuture trajectories borehole path estimator 126. In the flow diagram, blocks 402, 404, and 406 represent steps in which various data are collected to the drill model inblock 408. At block 402, a computer system may receive various data such as BHA data, a set of operating parameters, and a set of rock formation data. The BHA data may include both data corresponding to thedrill bit 114 as well as theBHA 116/string data. - Operating parameters may include data such as mud weight, WOB, differential pressure, TFO, activation level, RPM and flow rate. The BHA data are generally received from the directional drilling company through a report stating all elements starting from the drill bit, with all length internal and external dimensions, weight, etc. Operating parameters may be received from the
EDR 124, which in turn received the data from thedrilling rig 108. Additionally, rock formation data may include hardness of the rock defined as the Unconfined or Confined Compressive Strength (UCS/CCS) values, dip/strike, and gamma ray (GR). In some embodiments, the rock formation data may be received from an acoustic logger. An acoustic logger may measure characteristics of sound waves propagated through a wellbore environment. In some embodiments, the acoustic logging may be done in offset wells that have previously been drilled in the wellbore environment. Several parameters may be taken or inferred from an acoustic log including density, elastic properties, hardness of the rock, etc. - At
block 404, the first set of parameters includes initial values of BS, OVG, FF, and WALK. In various embodiments, planned and initial values for the BS, OVG, FF, and WALK may be predetermined for the entire segment to drill and may be based on directional drilling, planning, rock formation, and drill bit characteristics. The initial values BS, OVG, FF, and WALK will be calibrated during drilling based on actual data collected during the drilling. - At
block 406, data corresponding to a measured depth (MD), azimuth, and inclination may be collected from a prior survey. For example, the prior survey may be a survey at the beginning of a respective segment of the wellbore path. For example when reconstructing an actual path of the wellbore such as segment 310 (FIG. 3 ), the MD, azimuth, and inclination data inblock 406 may come fromsurvey 118 a (FIG. 3 ). Atdecision block 410, a determination is made regarding whether a rock formation change has occurred since the prior survey. In various embodiments, actual rock formation data may be collected from an acoustic logger, where the acoustic logger collects data in an offset well located in the area where the segment of the wellbore path being reconstructed is located. - A determination may be made that a difference between the set of rock formation data received in block 402 and the actual rock formation data is above a predetermined threshold, and thus accordingly a rock formation change has occurred. Changes in rock formation may include a change in hardness. A detection of a change in rock formation may occur when drilling in rock with anisotropic characteristics, where various properties of the rock are directionally dependent. Upon a determination that a rock formation change has occurred, the flow proceeds to block 412, where a rock formation correction may be applied to the measured depth, inclination and azimuth data. The rock formation correction may include applying an external side force at the bit due to the rock anisotropy as known by drillers when drilling rock formations that present bedding planes, or interbedded layers (from hard to soft rocks, or vice versa), as described in publication SPE14764 (1987).
- If a determination is made that no rock formation changes have occurred, the flow does not apply a rock formation correction and instead provides the MD, inclination, and azimuth data (406) to the drill model in
block 408. - Upon collecting data in
blocks block 408. The drill model may be any type of known 3D-rock-bit-BHA model known in the art used to model the directional behavior of a drilling system. Atblock 408, the drill model is run to generate an output including a calculated BUR, calculated TR, calculated inclination, and calculated azimuth. The results including the calculated BUR, TR, inclination, and azimuth may be presented numerically and plotted to predict the next future trajectory (e.g., 220 a). - An initial plot of the actual path of the wellbore may be reconstructed by the drill model every foot or so (reconstructed survey), using the calculated BUR, TR, inclination, and azimuth. At
block 416, the four parameters, BS, OVG, FF, and WALK, may be calibrated based on received data corresponding to an actual BUR and TR. More specifically, calibrating the four parameters, BS, OVG, FF, and WALK, may entail minimizing an error between the actual and reconstructed surveys at a given depth using the four parameters and rock formation effects. More specifically, the difference between a measured and calculated inclination and azimuth may be minimized such that the difference could be between +/−0.05 degree accuracy, for example. - Any mathematical or computing technique may be used that varies the four parameters within an admissible range until a solution is found that minimizes the error or difference between the actual and reconstructed surveys. For example the drill model may use artificial intelligence, machine learning techniques such as neural network techniques, or any other known techniques for calibration, adjustment, and minimization.
- In generating a final reconstructed actual path, the flow proceeds to block 418 where a sag correction may be applied, or any other survey correction, such as but not limited to pipe stretch correction, thermal effects, magnetic interference, multi-station correction, etc. The sag corresponds to the difference in angle between the borehole axis and the measurement tool axis. Upon application of the sag correction to the initial plot of the actual path, the final reconstructed actual path is generated in
block 420. Atblock 422, the drill model may use the calibrated four parameters (416) to generate one or more future trajectories as well. In various embodiments, the one or more future trajectories are based on operating parameters selected by the operator including drilling mode (sliding/rotating), and system parameters such as rotary steerable system (RSS), steerable mud motor, TFO, WOB, and differential pressure. - In one example of performing the method described in
FIG. 4 , an operator may plan to drill a particular, first segment that is 100 feet long. Thedrilling control system 128 may have a visual interface generated by the drill model, similar to the one described inFIG. 2 . The visual interface allows the operator to visualize, in 2-D or 3-D, and in real-time the predicted future trajectory based on operating parameters selected by the operator, by way ofbuttons 222. The drill model can enable an operator to achieve drilling goals such as remaining as close as possible to a planned trajectory, minimizing dog legs, and maximizing a rate of penetration (ROP). - A predictive and desired trajectory may be estimated by the drill model based on a calculated BUR and calculated TR for a given BS, FF, OVG, and WALK. The calculated BUR and TR are generated by the 3-D rock-bit-BHA model. At the end of drilling the first segment, a survey is taken and the four parameters BS, FF, OVG, and WALK are calibrated to match an actual BUR and TR achieved during the drilling of the first segment. These calibrated four parameters are then used to reconstruct the actual path of the wellbore in the first segment and the inclination and azimuth are calculated every foot or so during the reconstruction of the actual path. The calibrated four parameters, as well as possible rock formation change corrections, are fine-tuned and used to predict future trajectories in the next segment to be drilled. A steering mode or various operating parameters of the
drilling system 122 andBHA 116 may be determined or altered based on the predicted future trajectories. In generating the actual path, a sag correction may also be applied to produce a more accurate representation of the reconstructed actual path. This process may be repeated for all subsequent sections that are to be drilled. -
FIG. 5 , shows acomputer system 500 which is illustrative of a computer system that may perform method steps in accordance with the method discussed inFIG. 4 . Thecomputer system 500 may be illustrative of, for example, a laptop, a desktop computer, a computer within a node of several computers, or any other computing system that may be connected to a network of computers. Thecomputer system 500 comprises aprocessor 502, and amain memory 504 coupled toprocessor 502. Additionally,processor 502 andmain memory 504 may be coupled tostorage device 506, and anetwork interface device 508. - Programs, such as the
borehole path estimator 126, executable by theprocessor 502 may be stored on the storage device 506 (e.g., a hard drive, solid state disk, memory stick, optical disc), and accessed when needed by theprocessor 502. Programs stored on thestorage device 506, such as theborehole path estimator 126, may comprise programs to implement various processes on thecomputer system 500, including method steps in accordance with the method discussed above inFIG. 4 . In some cases, the programs are copied from thestorage device 506 to themain memory 504, and the programs are executed from themain memory 504. Thus, both themain memory 504 andstorage device 506 shall be considered computer-readable storage mediums. - In various embodiments,
network interface device 508 may allowcomputer system 500 to exchange data over a wireless or wired network. For example, where thecomputer system 500 is representative ofcomputer system 120 b, thenetwork interface device 508 may allowcomputer system 120 b to exchange data over a wireless or wired network with database 120 a. In some embodiments thecomputer system 500 may be connected to a plurality of other computers within a shared network. Thus, while many aspects of the method discussed inFIG. 4 may be performed serially, various embodiments enable parallel processing to speed up the overall processing time. Performing the method described inFIG. 4 may comprise major computational elements, however these procedures may be performed in parallel processes. - The
borehole path estimator 126 may control thedrilling control system 128. Thedrilling control system 128 may be communicatively coupled toBHA 116 ordrilling rig 108 where thedrilling control system 128 controls various operating parameters of the drill to keep the wellbore path on target. Thedrilling control system 128 may receive signals from theborehole path estimator 126 which determine the specifics of operating the drill. - From the description provided herein, those skilled in the art are readily able to combine software with appropriate general-purpose or special-purpose computer hardware to create a computer system and/or computer sub-components in accordance with the various embodiments and methods, for example, as discussed with regards to method 300.
- References to “one embodiment,” “an embodiment,” “some embodiments,” “various embodiments,” or the like indicate that a particular element or characteristic is included in at least one embodiment of the invention. Although the phrases may appear in various places, the phrases do not necessarily refer to the same embodiment or example.
- The above discussion is meant to be illustrative of the principles and various embodiments of the present invention. Numerous variations and modifications will become apparent to those skilled in the art once the above disclosure is fully appreciated. It is intended that the following claims be interpreted to embrace all such variations and modifications.
Claims (20)
1. A computer-implemented method of modeling a wellbore path, the method comprising:
generating, by a computer system, a representation of a first portion of a wellbore path responsive to a first set of parameters and one or more of:
bottom hole assembly (BHA) data;
operating parameters data; or
rock formation data;
generating, by the computer system, responsive to data received from a survey corresponding to the first portion of the wellbore path for the first set of parameters, a second set of parameters; and
generating, by the computer system, a representation of a second portion of the wellbore path responsive to the second set of parameters.
2. The computer-implemented method of claim 1 , wherein the first set of parameters comprises one or more of:
quantifying bit steerability;
walk;
a coefficient of friction; or
overgauge borehole information.
3. The computer-implemented method of claim 1 , wherein generating the representation of the second portion of the wellbore path further comprises:
generating a reconstructed trajectory of the wellbore path based on a calculated build up rate (BUR) and calculated turn rate (TR) of a drill string; and
generating a reconstructed actual trajectory of the wellbore path based on an actual BUR and actual TR of the drill string.
4. The computer-implemented method of claim 3 , wherein:
generating the reconstructed trajectory of the wellbore path further comprises calculating the calculated BUR and calculated TR based on the first set of parameters; and
generating the reconstructed actual trajectory of the wellbore path further comprises:
receiving actual BUR and actual TR corresponding to the first portion of the wellbore path;
calibrating the first set of parameters based on the actual BUR and the actual TR to generate the second set of parameters; and
modifying a predicted trajectory based on the second set of parameters to generate the actual trajectory.
5. The computer-implemented method of claim 3 , wherein generating the reconstructed actual trajectory of the wellbore path further comprises:
calculating a sag correction; and
applying the sag correction to the representation of the wellbore path; and
generating a calibrated wellbore path in response to applying the sag correction.
6. The computer-implemented method of claim 1 , wherein generating the representation of the second portion of the wellbore path further comprises:
receiving actual build up rate (BUR) and actual turn rate (TR) corresponding to the first portion of the wellbore path;
calibrating the first set of parameters based on the actual BUR and the actual TR to generate the second set of parameters; and
generating the representation of the second portion of the wellbore path based on the second set of parameters.
7. The computer-implemented method of claim 6 , wherein generating the representation of the second portion of the wellbore path further comprises:
receiving measured depth, inclination, and azimuth data from a survey, corresponding to the first portion of the wellbore path;
receiving, from an acoustic logger, actual rock formation data corresponding to the first portion of the wellbore path;
calibrating the second set of parameters based on the actual rock formation data to generate a third set of parameters; and
generating the representation of the second portion of the wellbore path based on the third set of parameters.
8. A drilling system comprising:
a computer system comprising a processor; and a memory coupled to the processor, the memory storing a program that, when executed by the processor, causes the processor to:
generate a representation of a first portion of a wellbore path responsive to a first set of parameters and one or more of:
bottom hole assembly (BHA) data received from the BHA;
operating parameters data; or
rock formation data;
generate, responsive to data received from a survey corresponding to the first portion of the wellbore path for the first set of parameters, a second set of parameters; and
generate, responsive to the second set of parameters, a representation of a second portion of the wellbore path.
9. The drilling system of claim 8 , wherein the first set of parameters comprises one or more of:
quantifying bit steerability;
walk;
a coefficient of friction; or
overgauge borehole information.
10. The drilling system of claim 8 , wherein the program for generating the representation of the second portion of the wellbore path further causes the processor to:
modify, based on data received from the survey, the first set of parameters to generate the second set of parameters; and
generating the actual trajectory of the wellbore path in the first portion of the wellbore path by applying the second set of parameters.
11. The drilling system of claim 10 , wherein the program further causes the processor to:
receive, from an acoustic logger, actual rock formation data corresponding to the first portion of the wellbore path;
determine that a difference between the rock formation data and the actual rock formation data is above a predetermined threshold;
calibrate the second set of parameters based on the actual rock formation data to generate a third set of parameters; and
generate the representation of the second portion of the wellbore path by applying the third set of parameters.
12. The drilling system of claim 11 further comprising:
a display device coupled to the computer system; and
wherein the program further causes the processor to render for display on the display device, the actual trajectory of the first portion of the wellbore path and the second portion of the wellbore path.
13. The drilling system of claim 8 , wherein the program for generating the representation of the second portion of the wellbore path further causes the processor to:
calibrate the first set of parameters based on an actual build up rate (BUR) and turn rate (TR) to generate a second set of parameters;
calculate a sag correction; and
apply the sag correction and second set of parameters to the representation of the wellbore path to generate a calibrated wellbore path.
14. The drilling system of claim 13 , further comprising:
a display device coupled to the computer system,
wherein the program further causes the processor to render for display on the display device, the calibrated wellbore path.
15. The drilling system of claim 13 , wherein the program further causes the processor to:
generate a second portion of the wellbore path by applying the second set of parameters.
16. A directional drilling system configured to steer a bottom hole assembly (BHA) comprising:
a processor; and
a memory coupled to the processor, the memory storing a program that, when executed by the processor, causes the processor to:
generate a representation of a first portion of a wellbore path responsive to a first set of parameters and one or more of:
bottom hole assembly (BHA) data received from the BHA;
operating parameters data; or
rock formation data;
generate, responsive to data received from a survey corresponding to the first portion of the wellbore path for the first set of parameters, a second set of parameters; and
generate, responsive to the second set of parameters, a representation of a second portion of the wellbore path.
17. The directional drilling system of claim 16 , wherein the first set of parameters comprises one or more of:
quantifying bit steerability;
walk;
a coefficient of friction; or
overgauge borehole information.
18. The directional drilling system of claim 17 , wherein responsive to the processor generating the representation of the second portion of the wellbore path, the program further causes the processor to:
generate a reconstructed trajectory of the wellbore path based on a calculated build up rate (BUR), a calculated turn rate (TR) of a drill string; and the first set of parameters;
receive actual BUR and actual TR corresponding to the first portion of the wellbore path;
calibrate the first set of parameters based on the actual BUR and the actual TR; and
modify the reconstructed trajectory of the wellbore path based on the second set of parameters to generate an actual trajectory.
19. The directional drilling system of claim 18 , wherein responsive to the processor generating a second portion of the wellbore path, the program further causes the processor to:
receive, from an acoustic logger, actual rock formation data corresponding to the first portion of the wellbore path;
determine that a difference between the rock formation data and the actual rock formation is above a predetermined threshold;
calibrate the second set of parameters based on the actual rock formation data to generate a third set of parameters; and
generate a second portion of the wellbore path based on the third set of parameters.
20. The directional drilling system of claim 18 , wherein responsive to the processor generating the reconstructed trajectory of the wellbore path, the program further causes the processor to:
calculate a sag correction;
apply the sag correction to the representation of the wellbore path; and
generate a calibrated wellbore path in response to applying the sag correction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/812,794 US20220349297A1 (en) | 2017-06-15 | 2022-07-15 | Generating drilling paths using a drill model |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201762520287P | 2017-06-15 | 2017-06-15 | |
PCT/US2018/031176 WO2018231363A1 (en) | 2017-06-15 | 2018-05-04 | Generating drilling paths using a drill model |
US201916619381A | 2019-12-04 | 2019-12-04 | |
US17/812,794 US20220349297A1 (en) | 2017-06-15 | 2022-07-15 | Generating drilling paths using a drill model |
Related Parent Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/619,381 Continuation US11454106B2 (en) | 2017-06-15 | 2018-05-04 | Generating drilling paths using a drill model |
PCT/US2018/031176 Continuation WO2018231363A1 (en) | 2017-06-15 | 2018-05-04 | Generating drilling paths using a drill model |
Publications (1)
Publication Number | Publication Date |
---|---|
US20220349297A1 true US20220349297A1 (en) | 2022-11-03 |
Family
ID=64659195
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/619,381 Active 2039-04-12 US11454106B2 (en) | 2017-06-15 | 2018-05-04 | Generating drilling paths using a drill model |
US17/812,794 Pending US20220349297A1 (en) | 2017-06-15 | 2022-07-15 | Generating drilling paths using a drill model |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/619,381 Active 2039-04-12 US11454106B2 (en) | 2017-06-15 | 2018-05-04 | Generating drilling paths using a drill model |
Country Status (5)
Country | Link |
---|---|
US (2) | US11454106B2 (en) |
EP (1) | EP3638875A4 (en) |
AU (2) | AU2018286423B2 (en) |
CA (1) | CA3066610A1 (en) |
WO (1) | WO2018231363A1 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020198194A1 (en) * | 2019-03-26 | 2020-10-01 | Drilling Info, Inc. | Determining a landing zone in a subterranean formation |
CN110500081B (en) * | 2019-08-31 | 2022-09-16 | 中国石油集团川庆钻探工程有限公司 | Automatic drilling method based on deep learning |
US11640012B2 (en) * | 2020-02-13 | 2023-05-02 | Schlumberger Technology Corporation | Virtual high-density well survey |
US11408228B2 (en) * | 2020-08-13 | 2022-08-09 | Nabors Drilling Technologies Usa, Inc. | Methods and systems for improving confidence in automated steering guidance |
CN112502613B (en) * | 2020-11-27 | 2022-01-07 | 中国科学院地质与地球物理研究所 | Well drilling method and device |
CN112855113A (en) * | 2021-01-28 | 2021-05-28 | 北京三一智造科技有限公司 | Automatic drilling method and controller of rotary drilling rig, storage medium and electronic equipment |
US20240068350A1 (en) * | 2022-08-25 | 2024-02-29 | Landmark Graphics Corporation | Trajectory tracking and optimization for drilling automation |
CN116012545B (en) * | 2023-03-22 | 2023-06-30 | 中国石油大学(华东) | Multi-scale digital core modeling method, system, storage medium and application |
Family Cites Families (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7032689B2 (en) | 1996-03-25 | 2006-04-25 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system of a given formation |
US9482055B2 (en) | 2000-10-11 | 2016-11-01 | Smith International, Inc. | Methods for modeling, designing, and optimizing the performance of drilling tool assemblies |
US6382331B1 (en) | 2000-04-17 | 2002-05-07 | Noble Drilling Services, Inc. | Method of and system for optimizing rate of penetration based upon control variable correlation |
US6568593B2 (en) | 2000-07-14 | 2003-05-27 | Trumpf Gmbh + Co. | System and method for identification of tools and parts of tools for a fabricating machine |
GB2403044A (en) | 2003-06-20 | 2004-12-22 | Smith International | Performance analysis tool |
DE112006002134T5 (en) | 2005-08-08 | 2008-06-26 | Halliburton Energy Services, Inc., Houston | Methods and systems for constructing and / or selecting drilling equipment using forecasts of the gear of the rotary drill bit |
US7602963B2 (en) | 2006-01-10 | 2009-10-13 | General Electric Company | Method and apparatus for finding anomalies in finished parts and/or assemblies |
US7866413B2 (en) | 2006-04-14 | 2011-01-11 | Baker Hughes Incorporated | Methods for designing and fabricating earth-boring rotary drill bits having predictable walk characteristics and drill bits configured to exhibit predicted walk characteristics |
US7957946B2 (en) * | 2007-06-29 | 2011-06-07 | Schlumberger Technology Corporation | Method of automatically controlling the trajectory of a drilled well |
WO2009024758A1 (en) | 2007-08-17 | 2009-02-26 | Renishaw Plc | Non-contact probe |
US8824731B2 (en) | 2007-10-31 | 2014-09-02 | The Boeing Comapny | Image processing of apparatus condition |
US7886844B2 (en) * | 2007-11-12 | 2011-02-15 | Schlumberger Technology Corporation | Borehole survey method and apparatus |
EP2231992A4 (en) | 2007-12-05 | 2016-06-01 | Halliburton Energy Services Inc | Method and apparatus to improve design, manufacture, performance and/or use of well tools |
DE102008045470A1 (en) | 2008-09-03 | 2010-03-04 | Wirtgen Gmbh | Method for determining the state of wear |
US8210283B1 (en) | 2011-12-22 | 2012-07-03 | Hunt Energy Enterprises, L.L.C. | System and method for surface steerable drilling |
US8596385B2 (en) | 2011-12-22 | 2013-12-03 | Hunt Advanced Drilling Technologies, L.L.C. | System and method for determining incremental progression between survey points while drilling |
US9022140B2 (en) | 2012-10-31 | 2015-05-05 | Resource Energy Solutions Inc. | Methods and systems for improved drilling operations using real-time and historical drilling data |
US8818729B1 (en) | 2013-06-24 | 2014-08-26 | Hunt Advanced Drilling Technologies, LLC | System and method for formation detection and evaluation |
US8996396B2 (en) | 2013-06-26 | 2015-03-31 | Hunt Advanced Drilling Technologies, LLC | System and method for defining a drilling path based on cost |
GB2531225B (en) * | 2013-08-30 | 2020-09-30 | Landmark Graphics Corp | Estimating and predicting wellbore tortuosity |
CA2926786C (en) | 2013-11-08 | 2019-11-26 | Halliburton Energy Services, Inc. | Dynamic wear prediction for fixed cutter drill bits |
WO2015112160A1 (en) * | 2014-01-24 | 2015-07-30 | Halliburton Energy Services, Inc. | Method and criteria for trajectory control |
US20150308191A1 (en) | 2014-04-29 | 2015-10-29 | Sinopec Tech Houston, LLC. | System and method for monitoring drilling systems |
US11106185B2 (en) | 2014-06-25 | 2021-08-31 | Motive Drilling Technologies, Inc. | System and method for surface steerable drilling to provide formation mechanical analysis |
US20160076357A1 (en) | 2014-09-11 | 2016-03-17 | Schlumberger Technology Corporation | Methods for selecting and optimizing drilling systems |
US10094209B2 (en) | 2014-11-26 | 2018-10-09 | Nabors Drilling Technologies Usa, Inc. | Drill pipe oscillation regime for slide drilling |
CA2961347C (en) | 2014-12-31 | 2021-03-30 | Halliburton Energy Services, Inc. | Automated optimal path design for directional drilling |
US20170030166A1 (en) | 2015-07-27 | 2017-02-02 | Schlumberger Technology Corporation | Shock and vibration tool modeling |
JP6423769B2 (en) | 2015-08-31 | 2018-11-14 | ファナック株式会社 | Machining system with machining accuracy maintenance function |
US10672154B2 (en) | 2016-02-24 | 2020-06-02 | Nabors Drilling Technologies Usa, Inc. | 3D toolface wellbore steering visualization |
CN108628661B (en) | 2017-03-24 | 2021-11-26 | 郑芳田 | Automatic establishment method of cloud manufacturing service and cloud manufacturing system |
US10508530B2 (en) | 2017-09-11 | 2019-12-17 | Nabors Drilling Technologies Usa, Inc. | Systems, devices, and methods for generating an adjusted ideal drilling path |
US11125022B2 (en) | 2017-11-13 | 2021-09-21 | Pioneer Natural Resources Usa, Inc. | Method for predicting drill bit wear |
-
2018
- 2018-05-04 EP EP18817860.2A patent/EP3638875A4/en active Pending
- 2018-05-04 US US16/619,381 patent/US11454106B2/en active Active
- 2018-05-04 AU AU2018286423A patent/AU2018286423B2/en active Active
- 2018-05-04 WO PCT/US2018/031176 patent/WO2018231363A1/en unknown
- 2018-05-04 CA CA3066610A patent/CA3066610A1/en active Pending
-
2022
- 2022-07-15 US US17/812,794 patent/US20220349297A1/en active Pending
-
2023
- 2023-01-27 AU AU2023200452A patent/AU2023200452A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
EP3638875A4 (en) | 2021-03-24 |
WO2018231363A1 (en) | 2018-12-20 |
CA3066610A1 (en) | 2018-12-20 |
AU2018286423A1 (en) | 2020-02-06 |
EP3638875A1 (en) | 2020-04-22 |
AU2018286423B2 (en) | 2022-10-27 |
US20200149386A1 (en) | 2020-05-14 |
AU2023200452A1 (en) | 2023-03-02 |
US11454106B2 (en) | 2022-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220349297A1 (en) | Generating drilling paths using a drill model | |
CA3051279C (en) | Multi-level learning scheme for calibrating wellbore trajectory models for directional drilling | |
US9938815B2 (en) | Estimating and predicting wellbore tortuosity | |
US8676558B2 (en) | Method of automatically controlling the trajectory of a drilled well | |
US6438495B1 (en) | Method for predicting the directional tendency of a drilling assembly in real-time | |
US10801314B2 (en) | Real-time trajectory control during drilling operations | |
US20170183952A1 (en) | Formation dip geo-steering method | |
AU2014415573B2 (en) | Continuous locating while drilling | |
US10612358B2 (en) | Directional drilling with stochastic path optimization of operating parameters | |
US10883360B2 (en) | Estimation of wellbore dogleg from tool bending moment measurements | |
CA3051759C (en) | Tool-specific steering optimization to hit a target | |
US9970284B2 (en) | Downlink path finding for controlling the trajectory while drilling a well | |
Mills et al. | Micro Dogleg Detection with Continuous Inclination Measurements and Advanced BHA Modeling | |
Sugiura et al. | Improved continuous azimuth and inclination measurement by use of a rotary-steerable system enhances downhole-steering automation and kickoff capabilities near vertical | |
Khadisov | Directional Drilling: Trajectory Design and Position Uncertainty Study for a Laboratory Drilling Rig. | |
GB2384567A (en) | Filtering of Data for Tendency Control of a Drillstring | |
Nour et al. | Picking the optimum directional drilling technology (RSS vs PDM): A machine learning-based model | |
Ayodele | Optimization of well placement and/or borehole trajectory for minimum drilling cost (a critical review of field case studies) | |
Wilson | Continuous Inclination Measurements and BHA Modeling Help Detect Microdoglegs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |