US20220172132A1 US17/436,461 US202017436461A US2022172132A1 US 20220172132 A1 US20220172132 A1 US 20220172132A1 US 202017436461 A US202017436461 A US 202017436461A US 2022172132 A1 US2022172132 A1 US 2022172132A1
Authority
US
United States
Prior art keywords
information
transport vehicle
payload
loading machine
weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US17/436,461
Inventor
Tsuyoshi Fujita
Eiji Egawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Assigned to HITACHI CONSTRUCTION MACHINERY CO., LTD. reassignment HITACHI CONSTRUCTION MACHINERY CO., LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: EGAWA, EIJI, FUJITA, TSUYOSHI
Publication of US20220172132A1 publication Critical patent/US20220172132A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • G01G19/083Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles lift truck scale
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2054Fleet management
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G3/00Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances
    • G01G3/12Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances wherein the weighing element is in the form of a solid body stressed by pressure or tension during weighing
    • G01G3/14Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances wherein the weighing element is in the form of a solid body stressed by pressure or tension during weighing measuring variations of electrical resistance
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/13Receivers
    • G01S19/14Receivers specially adapted for specific applications
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y10/00Economic sectors
    • G16Y10/30Construction
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y20/00Information sensed or collected by the things
    • G16Y20/10Information sensed or collected by the things relating to the environment, e.g. temperature; relating to location
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y20/00Information sensed or collected by the things
    • G16Y20/20Information sensed or collected by the things relating to the thing itself
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/10Detection; Monitoring
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/60Positioning; Navigation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/029Location-based management or tracking services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present disclosure relates to a construction management system.
  • a construction management system which is provided with an emitter, a portable terminal, a receiving unit, a detecting unit, a specific data acquiring unit, and a work managing unit (see claim 1 of Patent Literature 1 indicated below, for example).
  • the emitter is disposed on a transport vehicle and emits radio waves including specific data of the transport vehicle.
  • the portable terminal is disposed on a loading machine.
  • the receiving unit is provided in the portable terminal and receives the radio waves from the emitter.
  • the detecting unit is provided in the portable terminal and detects the intensity of the radio waves received by the receiving unit.
  • the specific data acquiring unit is provided in the portable terminal and acquires the specific data from the radio waves received by the receiving unit.
  • the work managing unit generates actual performance data indicating that the transport vehicle has approached the loading machine, based on the intensity detected by the detecting unit and the specific data acquired by the specific data acquiring unit.
  • the work managing unit determines that the loading machine is performing a loading work for loading a load onto the transport vehicle if the intensity of the radio waves received by the receiving unit is a value greater than or equal to a threshold value (see claim 3 of the literature, for example). Further, the work managing unit determines that the transport vehicle has started a transport work for transporting the load if the intensity of the radio waves received by the receiving unit has changed from a value greater than or equal to the threshold value to a value lower than the threshold value (see claim 4 of the literature, for example).
  • Patent Literature 1 WO 2015/156018
  • the conventional construction system by utilizing a change in the intensity of the radio waves received by the receiving unit in accordance with the distance from the emitter, makes a determination for implementing the loading work and a determination for starting the transport work based on a threshold value of the intensity of the radio waves (see claims 3-4 and paragraph 0022, for example, of the patent literature). Further, the total amount of load transported from the construction site is calculated based on the maximum payload capacity data of the transport vehicle and at least one of data on the number of times of approach and data on the number of withdrawals (see paragraph 0084 of the patent literature, for example). However, even when the loading machine and the transport vehicle have approached each other and the intensity of the radio waves has become greater than or equal to the threshold value, no loading work may be actually implemented. This leads to the problem that the total amount of load transported from the construction site cannot be accurately ascertained.
  • the present disclosure provides a construction management system with which it is possible to ascertain information about a construction site more accurately than before.
  • a construction management system includes a transport vehicle position detection device which detects position information about a transport vehicle for transporting a payload, a loading machine position detection device which detects position information about a loading machine for loading the payload onto the transport vehicle, a weight detection device which detects weight information about the payload held by the loading machine, and an information management controller which, based on chronological information of the position information about the transport vehicle, chronological information of the position information about the loading machine, and chronological information of the weight information, calculates a load weight of the payload loaded onto the transport vehicle.
  • FIG. 1 is a schematic block diagram illustrating an embodiment of a construction management system of the present disclosure.
  • FIG. 2 is a side view illustrating an example of a transport vehicle of FIG. 1 .
  • FIG. 3 is a side view illustrating an example of a loading machine of FIG. 1 .
  • FIG. 4 is a time chart illustrating the operation of a position information server and a weight information server of FIG. 1 .
  • FIG. 5 is a flowchart showing the flow of processing of the weight information server of FIG. 1 .
  • FIG. 6 is a flowchart showing the flow of processing of the position information server of FIG. 1 .
  • FIG. 7 is a flowchart showing the details of processing for determining the approach of a transport vehicle of FIG. 6 .
  • FIG. 8 illustrates an example of an operation daily report output by a user server of FIG. 1 .
  • FIG. 1 is a schematic block diagram illustrating an embodiment of the construction management system of the present disclosure.
  • a construction management system 100 of the present embodiment is a system that constitutes an Internet of Things (IoT) construction solution utilizing a mobile terminal, such as a smartphone, at a construction site, for example.
  • the construction management system 100 of the present embodiment realizes a site where machinery and humans are connected by IoT technology, and contributes to improvements in productivity and safety.
  • IoT Internet of Things
  • the construction management system 100 is provided with a position detection module 110 , a weight detection device 120 , and an information management controller 130 .
  • the position detection module 110 includes a position sensor 16 a as a transport vehicle position detection device for detecting position information about a transport vehicle 10 that transports a payload, and a position sensor 26 as a loading machine position detection device for detecting position information about a loading machine 20 that loads a payload onto the transport vehicle 10 .
  • the weight detection device 120 detects weight information about a payload held by the loading machine 20 .
  • the information management controller 130 calculates the load weight of the payload loaded onto the transport vehicle 10 , based on chronological information of the position information about the transport vehicle 10 , chronological information of the position information about the loading machine 20 , and chronological information of the weight information.
  • the configuration of the elements of the construction management system 100 of the present embodiment will be described in detail.
  • FIG. 1 as an example, three transport vehicles 10 and one loading machine 20 are illustrated.
  • the number of the transport vehicles 10 and loading the number of the machines 20 are not particularly limited. That is, the construction management system 100 may implement construction management for one or a plurality of transport vehicles 10 and one or a plurality of loading machines 20 .
  • FIG. 2 is a side view illustrating an example of the transport vehicles 10 of FIG. 1 .
  • the transport vehicle 10 is a dump truck, for example.
  • the transport vehicle 10 has a vehicle body frame 11 , left and right front wheels 12 F, left and right rear wheels 12 R, left and right front wheel-side suspension devices 13 F, left and right rear wheel-side suspension devices 13 R, a bed 14 , left and right hoist cylinders 15 , a cab 16 , a travel drive device 17 , and a housing 18 , for example.
  • the payload which is loaded onto the bed 14 of the transport vehicle 10 by the loading machine 20 is not particularly limited. Examples are earth, crushed rock, and mineral resources.
  • each transport vehicle 10 may be provided with a position sensor 16 a for detecting the position of each transport vehicle 10 using the Global Navigation Satellite System (GNSS), for example, and a communication device 16 b for transmitting the position information output from the position sensor 16 a to the information management controller 130 .
  • the position sensor 16 a and the communication device 16 b need not be necessarily installed on the transport vehicle 10 , and may instead be mounted on a mobile terminal, such as a smartphone, carried by an operator riding in the cab 16 of the transport vehicle 10 .
  • FIG. 3 is a side view illustrating an example of the loading machine 20 of FIG. 1 .
  • the loading machine 20 is a hydraulic excavator, for example.
  • the loading machine 20 is provided with, for example, an upper slewing structure 21 , a lower travel structure 22 , a work assembly 23 , attitude sensors 23 s for determining the attitude of the work assembly 23 , a slewing mechanism 24 , hydraulic cylinders 25 a, 25 b, 25 c, a position sensor 26 , a control unit 27 , and a hydraulic device which is not shown.
  • the loading machine 20 is not limited to a hydraulic excavator and may include other work machines, such as a wheel loader and a crane.
  • the work assembly 23 is provided in front of the upper slewing structure 21 , for example, and is driven by the hydraulic cylinders 25 a, 25 b, 25 c to perform work, such as an excavation work or a loading work.
  • the work assembly 23 includes a boom 23 a, an arm 23 b, and a bucket 23 c, for example.
  • the boom 23 a is pivotally supported on the upper slewing structure 21 via a boom pin.
  • the arm 23 b is supported movably with respect to the boom 23 a via an arm pin.
  • the bucket 23 c is supported pivotally with respect to the arm 23 b via a bucket pin.
  • the attitude sensors 23 s are angle sensors provided for each of the boom pin, the arm pin, and the bucket pin, for example.
  • the attitude sensors 23 s detect a rotational angle of the boom 23 a relative to the upper slewing structure 21 , a rotational angle of the arm 23 b relative to the boom 23 a, and a rotational angle of the bucket 23 c relative to the arm 23 b.
  • the attitude sensors 23 s are not limited to angle sensors.
  • other sensors capable of detecting the attitude of the work assembly 23 such as an acceleration sensor and a gyro sensor, may be used as the attitude sensors 23 s.
  • the hydraulic cylinders 25 a, 25 b, 25 c are each provided with a hydraulic sensor 25 s (see FIG. 1 ) for measuring an oil pressure in the cylinder tube.
  • the hydraulic sensor 25 s may be provided at least for the hydraulic cylinder 25 a driving the boom 23 a relative to the upper slewing structure 21 , and may not be provided for the other hydraulic cylinders 25 b, 25 c.
  • the hydraulic sensor 25 s for example, measures the oil pressure in the cylinder tubes of the hydraulic cylinders 25 a, 25 b, 25 c, and outputs hydraulic information corresponding to the measured oil pressure to the control unit 27 .
  • the position sensor 26 is configured using GNSS or the like, and detects the position of each loading machine 20 .
  • the control unit 27 is composed of, for example, a microcontroller or firmware installed on the loading machine 20 , and is provided with a processing device 27 a such as a CPU, a storage device 27 b such as a RAM and a hard disk, and a communication device 27 c for transmitting information to the outside.
  • the position sensor 26 and the control unit 27 need not be necessarily installed on the loading machine 20 , and may be mounted on, for example, a mobile terminal, such as a smartphone, carried by an operator riding in a cab 21 a of the loading machine 20 .
  • the processing device 27 a receives an input of position information about the loading machine 20 output from the position sensor 26 , via a wireless communication line or a wired communication line.
  • the processing device 27 a also receives an input of information about the attitude of the work assembly 23 output from the attitude sensors 23 s and hydraulic information output from the hydraulic sensor 25 s, via a wireless communication line or a wired communication line.
  • the processing device 27 a processes the input information and causes the information to be stored in the storage device 27 b on a predetermined periodic basis.
  • the storage device 27 b stores chronological information of the information input from the processing device 27 a, a computer program, data, and other information, for example.
  • the communication device 27 c transmits the information input from the processing device 27 a to the information management controller 130 via a wireless communication line.
  • the processing device 27 a may be configured to calculate the weight of a payload held by the work assembly 23 , based on the attitude of the work assembly 23 measured by the attitude sensors 23 s and the oil pressure measured by the hydraulic sensor 25 s, for example. More specifically, for example, in order to load payload onto the bed 14 of the transport vehicle 10 using the loading machine 20 , the work assembly 23 is driven by the hydraulic cylinders 25 a, 25 b, 25 c and payload on the ground is scooped up by the bucket 23 c of the work assembly 23 .
  • the processing device 27 a executes the computer program stored in the storage device 27 b and, based on the information about the attitude of the work assembly 23 input from the attitude sensors 23 s and the hydraulic information input from the hydraulic sensor 25 s, calculates the weight of the payload collected in the bucket 23 c of the work assembly 23 . Calculation of the weight of the payload may be performed by the information management controller 130 as will be described later.
  • the position detection module 110 detects position information about each transport vehicle 10 that transports payload, and position information about the loading machine 20 that loads payload onto the transport vehicle 10 .
  • the position detection module 110 includes the position sensor 16 a (transport vehicle position detection device) and the communication device 16 b mounted on the transport vehicle 10 , and the position sensor 26 (loading machine position detection device) and the communication device 27 c mounted on the loading machine 20 , for example.
  • the position sensor 16 a mounted on the transport vehicle 10 detects the position of the transport vehicle 10 on a predetermined periodic basis, and outputs position information about the transport vehicle 10 including the detected position and the time of detection of the position to the communication device 16 b.
  • the communication device 16 b transmits the position information input from the position sensor 16 a to the information management controller 130 via a wireless communication line, for example.
  • the position sensor 26 mounted on the loading machine 20 detects the position of the loading machine 20 on a predetermined periodic basis, and outputs position information about the loading machine 20 including the detected position and the time of detection of the position to the control unit 27 .
  • the communication device 27 c of the control unit 27 transmits the position information about the loading machine 20 that has been input from the position sensor 26 via the processing device 27 a, to the information management controller 130 via a wireless communication line, for example.
  • the weight detection device 120 detects weight information about the payload held by the loading machine 20 .
  • the weight detection device 120 for example, includes the hydraulic sensor 25 s, the attitude sensors 23 s, the processing device 27 a, and the communication device 27 c of the loading machine 20 .
  • the hydraulic sensor 25 s of the loading machine 20 detects the oil pressure in the cylinder tube of the hydraulic cylinder 25 a on a predetermined periodic basis, and outputs hydraulic information including the oil pressure and the time of detection of the oil pressure to the processing device 27 a .
  • the attitude sensors 23 s of the loading machine 20 sense the attitude of the work assembly 23 , including the angle of the boom 23 a relative to the upper slewing structure 21 , the angle of the arm 23 b relative to the boom 23 a, and the angle of the bucket 23 c relative to the arm 23 b on a predetermined periodic basis. The attitude sensors 23 s then outputs attitude information including the attitude and the time of sensing of the attitude to the processing device 27 a.
  • the processing device 27 a calculates the weight of the payload held by the work assembly 23 , based on the hydraulic information and the attitude information input from the hydraulic sensor 25 s and the attitude sensors 23 s. More specifically, the storage device 27 b, for example, stores dimension information about various parts of the work assembly 23 and a computer program for computing the weight of the payload held by the work assembly 23 based on the dimensions and attitudes of the various parts of the work assembly 23 and the oil pressure of the hydraulic cylinder 25 a.
  • the processing device 27 a executes the program stored in the storage device 27 b and, based on the dimension information, attitude information, and hydraulic information described above, calculates the weight of the payload collected in the bucket 23 c and held by the work assembly 23 .
  • the processing device 27 a further outputs weight information including the calculated weight and the time of detection of the weight to the communication device 27 c.
  • the communication device 27 c transmits the weight information input from the processing device 27 a to the information management controller 130 via a wireless communication line, for example.
  • the information management controller 130 calculates the load weight of the payload of each transport vehicle 10 , based on chronological information of the position information about the transport vehicle 10 , chronological information of the position information about the loading machine 20 , and chronological information of the weight information about the payload held by the work assembly 23 of the loading machine 20 .
  • the information management controller 130 includes a position information server 131 , a weight information server 132 , and a user server 133 .
  • the weight information server 132 receives the weight information transmitted from the communication device 27 c of each loading machine 20 .
  • the weight information server 132 for example, is provided with a receiving device 132 a, a processing device 132 b, a storage device 132 c, and a transmitting device 132 d.
  • the receiving device 132 a receives the weight information transmitted from the communication device 27 c of the loading machine 20 , and outputs the weight information to the processing device 132 b.
  • the processing device 132 b causes the weight information input from the receiving device 132 a to be stored in the storage device 132 c as chronological information. Further, the processing device 132 b, for example, reads the chronological information of the weight information stored in the storage device 132 c, and outputs the chronological information to the transmitting device 132 d.
  • the transmitting device 132 d transmits the chronological information of the weight data input from the processing device 132 b to the position information server 131 via a wireless communication line or a wired communication line, for example.
  • the control unit 27 mounted on each loading machine 20 may not calculate the weight of the payload held by the work assembly 23 of the loading machine 20 .
  • the processing device 27 a of the control unit 27 mounted on each loading machine 20 outputs the attitude information and hydraulic information that are based on the attitude and oil pressure comprising the inputs from the attitude sensors 23 s and the hydraulic sensor 25 s, to the communication device 27 c.
  • the communication device 27 c outputs the attitude information and hydraulic information input from the processing device 27 a to the weight information server 132 of the information management controller 130 .
  • the weight information server 132 may be configured to detect the weight information about the payload held by the work assembly 23 of each loading machine 20 , based on the attitude information and hydraulic information received from the communication device 27 c of each loading machine 20 .
  • the receiving device 132 a of the weight information server 132 receives the attitude information and weight information transmitted from the communication device 27 c of the loading machine 20 , and outputs the attitude information and weight information to the processing device 132 b.
  • the processing device 132 b calculates the weight of the payload held by the work assembly 23 of each loading machine 20 . Further, the processing device 132 b causes weight information including the calculated weight and the time of detection of the weight to be stored in the storage device 132 c as chronological information. Also, the processing device 132 b reads the chronological information of the weight information stored in the storage device 132 c, and outputs the chronological information to the transmitting device 132 d . The transmitting device 132 d transmits the chronological information of the weight information input from the processing device 132 b to the position information server 131 .
  • the position information server 131 receives from the position detection module 110 position information about the transport vehicles 10 and position information about the loading machine 20 . More specifically, the position information server 131 includes a receiving device 131 a, a processing device 131 b , a storage device 131 c, and a transmitting device 131 d, for example.
  • the receiving device 131 a receives the position information about each transport vehicle 10 transmitted from the communication device 16 b of each transport vehicle 10 , and also receives the position information about each loading machine 20 transmitted from the communication device 27 c of each loading machine 20 . Further, the receiving device 131 a receives from the weight information server 132 the weight data of the payload held by the work assembly 23 of each loading machine 20 , for example. Further, the receiving device 131 a outputs the received information to the processing device 131 b.
  • the processing device 131 b processes the information input from the processing device 131 b and causes the resultant information to be stored in the storage device 131 c as chronological information.
  • the storage device 131 c stores, for example, threshold values of distances between the loading machine 20 and the transport vehicles 10 at which the loading machine 20 can load payload onto the bed 14 of the transport vehicles 10 using the work assembly 23 .
  • the processing device 131 b calculates the weight of the payload loaded onto each transport vehicle 10 , i.e., the load weight of the transport vehicle 10 , based on the chronological information of the position information about each transport vehicle 10 , the chronological information of the position information about each loading machine 20 , and the chronological information of the weight information about the payload held by each loading machine 20 stored in the storage device 131 c.
  • the processing device 131 b causes the calculated weight of the payload of each transport vehicle 10 to be stored in the storage device 132 c as load weight information. Further, the processing device 131 b reads the position information and load weight information about each transport vehicle 10 stored in the storage device 131 c, and outputs the information to the transmitting device 131 d. The transmitting device 131 d transmits the information input from the processing device 131 b to the user server 133 , for example.
  • the user server 133 creates an operation daily report based on the information received from the position information server 131 , for example.
  • the user server 133 is provided with a receiving device 133 a, a processing device 133 b , a storage device 133 c, and an output device 133 d, for example.
  • the receiving device 133 a receives the information transmitted from the transmitting device 131 d of the position information server 131 and outputs the information to the processing device 133 b.
  • the processing device 133 b causes the information input from the receiving device 133 a to be stored in the storage device 133 c.
  • the processing device 133 b may, based on the chronological information of the position information about the transport vehicle 10 , the chronological information of the position information about the loading machine 20 , and the chronological information of the weight information stored in the storage device 133 c, calculate the load weight of the payload loaded onto each transport vehicle 10 and cause the load weight to be stored in the storage device 133 c.
  • the processing device 133 b based on the information stored in the storage device 133 c, calculates operation daily report data and outputs the data to the output device 133 d.
  • the storage device 133 c stores position information about a collection site where the payload transported by the transport vehicle 10 is unloaded or dumped.
  • the processing device 133 b for example, based on the position information about the collection site and the chronological information of the position information about each transport vehicle 10 as well as the load weight information thereof, calculates, as operation daily report data, an integrated value of the weight of the payload that each transport vehicle 10 unloaded in the collection site.
  • the processing device 133 b calculates, as operation daily report data, the travelling time of the transport vehicle 10 from a loading position where the payload was loaded onto each transport vehicle 10 to the collection site.
  • the processing device 133 b calculates, as operation daily report data, the number of times of movement of each transport vehicle 10 from the loading position where the payload was loaded onto the transport vehicle 10 to the collection site.
  • the processing device 133 b calculates, as operation daily report data, an operating time at each collection site, the number of times of movement of the transport vehicle 10 from the loading position where the payload was loaded onto each transport vehicle 10 to each collection site, and a total weight of the payload unloaded at each collection site.
  • the processing device 133 b causes the calculated operation daily report data to be stored in the storage device 133 c, and also outputs the data to the output device 133 d.
  • the output device 133 d includes a display device and software or a printer, for example.
  • the display device outputs, in the form of an image, an operation daily report based on the operation daily report data input from the processing device 133 b.
  • the operation daily report may be output in the form of an electronic file by the software, or may be printed on paper and output by the printer.
  • FIG. 4 shows a time chart illustrating an example of the operation of the construction management system 100 of FIG. 1 .
  • FIG. 5 shows a flowchart illustrating the flow of a process of the weight detection device 120 included in the construction management system 100 of FIG. 1 .
  • the temporal changes in the distance between one loading machine 20 and the three transport vehicles 10 are indicated by the interval between straight lines. For instance, at time t 1 , the distance between the loading machine 20 and the transport vehicle 10 closest to the loading machine 20 is D 1 . Further, at time t 1 , the distance between the transport vehicle 10 closest to the loading machine 20 and the transport vehicle 10 second closest to the loading machine 20 is D 2 . Further, the distance between the transport vehicle 10 second closest to the loading machine 20 and the transport vehicle 10 third closest to the loading machine 20 is D 3 .
  • FIG. 4 shows a threshold value DS of a distance between the loading machine 20 and the transport vehicles 10 at which the loading machine 20 , using the work assembly 23 , can load the payload onto the bed 14 of the transport vehicles 10 .
  • FIG. 4 shows the timing of operation of the position information server 131 and the weight information server 132 of the information management controller 130 .
  • the construction management system 100 does not start the process illustrated in FIG. 5 until the distance between at least one loading machine 20 and at least one transport vehicle 10 becomes less than or equal to the threshold value DS.
  • the construction management system 100 starts the process illustrated in FIG. 5 .
  • the construction management system 100 initially performs a process P 11 for acquiring sensor information.
  • the construction management system 100 detects and acquires, using the position detection module 110 described above, the position information about each transport vehicle 10 and the position information about each loading machine 20 .
  • the construction management system 100 using the weight detection device 120 described above, detects and acquires the weight information about the payload held by each loading machine 20 .
  • the position detection module 110 detects, using the position sensor 16 a, which is the transport vehicle position detection device, the position information about each transport vehicle 10 , and also detects, using the position sensor 26 , which is the loading machine position detection device, the position information about the loading machine 20 .
  • the position information about the transport vehicle 10 and the position information about the loading machine 20 detected by the position sensor 16 a and the position sensor 26 are transmitted by the communication device 27 c to the information management controller 130 .
  • the weight detection device 120 measures, using the hydraulic sensor 25 s of the loading machine 20 , the oil pressure of the hydraulic cylinder 25 a that drives the work assembly 23 , and also detects, using the attitude sensors 23 s of the loading machine 20 , the attitude of the work assembly 23 .
  • the information management controller 130 calculates the weight of the payload held by the work assembly 23 .
  • the construction management system 100 performs a process P 12 for calculating the weight of the payload held by the work assembly 23 of the loading machine 20 .
  • the weight detection device 120 calculates the weight of the payload held by the work assembly 23 , based on the information about the oil pressure and attitude detected by the hydraulic sensor 25 s and the attitude sensors 23 s, i.e., the hydraulic information and the attitude information.
  • the construction management system 100 performs a process P 13 for transmitting information about the calculated weight, i.e., the weight information.
  • the communication device 27 c of the control unit 27 mounted on the loading machine 20 transmits the weight information calculated by the processing device 27 a to the information management controller 130 .
  • the weight information server 132 of the information management controller 130 performs a process P 14 for receiving the weight information, using the receiving device 132 a.
  • the weight information server 132 performs a process P 15 for recording the weight information in the storage device 132 c, using the processing device 132 b.
  • the process P 12 for calculating the weight of the payload held by the work assembly 23 may be performed by, for example, the processing device 132 b of the weight information server 132 .
  • the processing device 132 b of the weight information server 132 based on the hydraulic information and attitude information transmitted from the communication device 27 c of the loading machine 20 and received by the receiving device 132 a, calculates the weight of the payload held by the work assembly 23 .
  • the process P 13 for transmitting the weight information and the process P 14 for receiving the weight information are omitted, and the process P 15 for recording the weight information calculated by the processing device 132 b in the process P 12 in the storage device 132 c is performed.
  • the weight information server 132 performs the process P 16 for determining whether the distance between the loading machine 20 and the transport vehicle 10 closest to the loading machine 20 is greater than the threshold value DS.
  • the weight information server 132 for example, based on the position information about the transport vehicle 10 and the position information about the loading machine 20 received via the receiving device 132 a , calculates, using the processing device 132 b, the distance between the loading machine 20 and the transport vehicle 10 closest to the loading machine 20 .
  • the processing device 132 b compares the calculated distance and the threshold value DS, and if the calculated distance is greater than the threshold value DS (YES), the construction management system 100 ends the process illustrated in FIG. 5 . On the other hand, if the calculated distance is less than or equal to the threshold value DS (NO), the construction management system 100 repeatedly performs the process P 11 to the process P 16 on a predetermined periodic basis, and records the weight information about the payload held by the loading machine 20 in the storage device 132 c of the weight information server 132 on a predetermined periodic basis.
  • the loading machine 20 before time t 3 , for example, is in a state in which the payload has been scooped up by the bucket 23 c of the work assembly 23 and is being held by the work assembly 23 .
  • the loading machine 20 moves toward the transport vehicle 10 so that the distance between the loading machine 20 and the transport vehicle 10 is the shortest.
  • the loading machine 20 for example, dumps the payload in the bucket 23 c of the work assembly 23 onto the bed 14 of the nearest transport vehicle 10 , thus loading the payload onto the transport vehicle 10 .
  • the loading machine 20 repeatedly performs, a plurality of times, the work of moving a little away from the transport vehicle 10 , scooping up the payload using the bucket 23 c of the work assembly 23 , again approaching the transport vehicle 10 , and loading the payload in the work assembly 23 onto the bed 14 of the transport vehicle 10 .
  • the construction management system 100 repeatedly performs the process P 11 to the process P 16 described above, wherein the weight information about the payload held by the work assembly 23 is transmitted from the loading machine 20 to the weight information server 132 , and the chronological information of the weight information is stored in the storage device 132 c.
  • the transport vehicle 10 with the payload loaded thereon moves away from the loading machine 20 so that the distance between the loading machine 20 and the transport vehicle 10 is greater than the threshold value DS.
  • the construction management system 100 performs a process illustrated in FIG. 6 .
  • FIG. 6 is a flow diagram illustrating the flow of a process of the position information server 131 of the information management controller 130 included in the construction management system 100 of FIG. 1 .
  • the position information server 131 receives the weight information transmitted from the transmitting device 132 d of the weight information server 132 , using the receiving device 131 a.
  • the construction management system 100 performs, using the processing device 131 b of the position information server 131 , for example, a process P 22 for recording information for each loading machine 20 .
  • the processing device 131 b of the position information server 131 causes the weight information input from the receiving device 131 a to be stored in the storage device 131 c as chronological information of the weight information about each loading machine 20 , together with identifying information (ID), such as a user name, of the loading machine 20 and the time of measurement of weight.
  • ID identifying information
  • the construction management system 100 performs a data processing loop P 23 for weight information.
  • the processing device 131 b initially determines whether, as an ending condition, the processing of the weight information about all the loading machines 20 stored in the storage device 131 c is completed. If the processing of the weight information about all the loading machines 20 stored in the storage device 131 c is completed, the processing device 131 b ends the process illustrated in FIG. 6 . If the processing is not completed with respect to any of the weight information stored in the storage device 131 c, the processing device 131 b performs a process P 24 for searching for the position information about the loading machine 20 stored in the storage device 131 c.
  • the processing device 131 b searches for the position information about the loading machine 20 stored in the storage device 131 c. If, as a result of the search in the process P 24 , there is no position information about the loading machine 20 within a predetermined range of time (NO), the processing device 131 b again performs the data processing loop P 23 for the weight information. On the other hand, if, as a result of the search in the process P 24 , there is position information about a loading machine 20 within the predetermined time, a process P 25 for determining loading onto the transport vehicles 10 by the loading machine 20 is performed.
  • FIG. 7 is a flow diagram illustrating the details of the loading determination process P 25 of FIG. 6 .
  • the processing device 131 b reads from the storage device 131 c the chronological information of the position information about the loading machine 20 and the chronological information of the position information about the transport vehicles 10 .
  • the processing device 131 b searches for the position information about the transport vehicles 10 in a predetermined range of time.
  • the processing device 131 b ends the process P 25 and returns to the end determination of the data processing loop P 23 of FIG. 6 .
  • the processing device 131 b performs a process P 253 .
  • the processing device 131 b calculates the distance between the loading machine 20 and the transport vehicles 10 at each time. Further, the processing device 131 b determines whether the calculated distance is less than or equal to a set distance, such as the distance threshold value DS. If, as a result of the determination, the calculated distance is greater than the set distance (NO), the processing device 131 b ends the process P 25 and returns to the end determination of the data processing loop P 23 of FIG. 6 . On the other hand, if, as a result of the determination, the calculated distance is less than or equal to the set distance (YES), the processing device 131 b performs a process P 254 .
  • a set distance such as the distance threshold value DS.
  • the processing device 131 b associates, as the transport vehicle 10 for loading, the transport vehicle 10 of which the distance from the loading machine 20 is less than or equal to the set distance, i.e., the threshold value DS, with the position information about the loading machine 20 .
  • the processing device 131 b then ends the process P 25 and performs a process P 26 of FIG. 6 .
  • the processing device 131 b determines whether, as a result of the process P 25 , a plurality of transport vehicles 10 are associated as the transport vehicle 10 for loading by the loading machine 20 . If, as a result of the determination, a plurality of transport vehicles 10 are associated as the object for loading by one loading machine 20 (YES), the processing device 131 b performs a process P 27 for recording in the storage device 131 c the transport vehicle 10 closest to the loading machine 20 as the object for loading and the other transport vehicles 10 as not the object for loading. After the end of the process P 27 , the processing device 131 b performs a process P 28 . On the other hand, if, as a result of the determination in the process P 26 , one transport vehicle 10 is associated as the object for loading by the one loading machine 20 (NO), the processing device 131 b performs the process P 28 .
  • the processing device 131 b based on a positive determination result (YES) in the process P 26 , proceeds to the process P 27 , associates one closest transport vehicle 10 as the object for loading by the loading machine 20 , and proceeds to the process P 28 .
  • the processing device 131 b records in the storage device 131 c the transport vehicle 10 that has been associated as the object for loading by the loading machine 20 , in association with the weight information about the loading machine 20 . Thereafter, the processing device 131 b repeatedly performs the data processing loop P 23 until data processing of all weight information stored in the storage device 131 c ends. When the data processing of all the weight information stored in the storage device 131 c ends, the processing device 131 b ends the process of FIG. 6 .
  • FIG. 8 illustrates an example of the operation daily report output by the user server 133 illustrated in FIG. 1 .
  • the weight information about the loading machine 20 associated with the transport vehicle 10 for loading in the position information server 131 is transmitted to the user server 133 via the transmitting device 131 d, and received by the receiving device 133 a of the user server 133 .
  • the receiving device 133 a outputs the received information to the processing device 131 b.
  • the processing device 131 b calculates operation daily report data based on the information input from the receiving device 133 a and the information stored in the storage device 133 c, and outputs the calculated data to the output device 133 d.
  • the output device 133 d outputs the operation daily report as illustrated in FIG. 8 , based on the operation daily report data input from the processing device 133 b.
  • the construction management system 100 of the present embodiment is provided with the position sensor 16 a as a transport vehicle position detection device, the position sensor 26 as a loading machine position detection device, the weight detection device 120 , and the information management controller 130 .
  • the position sensor 16 a detects the position information about the transport vehicle 10 that transports a payload.
  • the position sensor 26 detects the position information about the loading machine 20 that loads the payload onto the transport vehicle 10 .
  • the weight detection device 120 detects the weight information about the payload held by the loading machine 20 .
  • the information management controller 130 calculates the load weight of the payload loaded onto the transport vehicle 10 .
  • the weight information about the payload held by the loading machine 20 is detected when the payload is loaded onto the transport vehicle 10 . Further, in the construction management system 100 of the present embodiment, the load weight of the payload loaded onto the transport vehicle 10 is calculated based on the chronological information of the position information about the transport vehicle 10 , the chronological information of the position information about the loading machine 20 , and the chronological information of the weight information. Thus, even if no loading work has been performed although the transport vehicle 10 and the loading machine 20 approached each other, that fact can be accurately ascertained, so that the total amount of load transported from the construction site by the transport vehicle 10 can be more accurately ascertained.
  • the information management controller 130 based on the position information about the collection site where the payload transported by each transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10 , and the load weight, the integrated value of the weight of the payload unloaded by the transport vehicle 10 onto the collection site is calculated.
  • This configuration facilitates the creation of the operation daily report including the integrated value of the weight of the payload unloaded by the transport vehicle 10 onto the collection site, thus reducing a burden on the user.
  • the information management controller 130 based on the position information about the collection site where the payload transported by the transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10 , and the load weight, the travelling time of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site is calculated.
  • This configuration facilitates the creation of the operation daily report including the travelling time of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site, thus reducing a burden on the user.
  • the information management controller 130 based on the position information about the collection site where the payload transported by each transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10 , and the load weight, the number of times of movement of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site is calculated.
  • This configuration facilitates the creation of the operation daily report including the number of times of movement of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site, thus reducing a burden on the user.
  • the information management controller 130 based on the information about the position of a plurality of collection sites where the payload transported by each transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10 , and the load weight, calculates the operating time at each collection site, the number of times of movement of the transport vehicle from the loading position where the payload is loaded onto the transport vehicle to each collection site, and the total weight of the payload unloaded at each collection site.
  • This configuration facilitates the creation of the operation daily report including the operating time at each collection site, the number of times of movement of the transport vehicle from the loading position where the payload is loaded onto the transport vehicle to each collection site, and the total weight of the payload unloaded at each collection site, thus reducing a burden on the user.
  • the position detection module 110 includes the position sensor 16 a as a transport vehicle position detection device, the position sensor 26 as a loading machine position detection device, and the communication device 16 b and the communication device 27 c.
  • the position sensor 16 a detects the position information about each transport vehicle 10 .
  • the position sensor 26 detects the position information about the loading machine 20 .
  • the communication device 16 b transmits the position information about the transport vehicle 10 detected by the position sensor 16 a to the information management controller 130 .
  • the communication device 27 c transmits the position information about the loading machine 20 detected by the position sensor 26 to the information management controller 130 .
  • This configuration allows the information management controller 130 to acquire the chronological information of the position information about each transport vehicle 10 and the chronological information of the position information about each loading machine 20 .
  • the weight detection device 120 includes the hydraulic sensor 25 s, the attitude sensors 23 s, the processing device 27 a, and the communication device 27 c .
  • the hydraulic sensor 25 s measures the oil pressure of the hydraulic cylinder 25 a for driving the work assembly 23 of the loading machine 20 .
  • the attitude sensors 23 s detect the attitude of the work assembly 23 .
  • the processing device 27 a based on the oil pressure and attitude detected by the hydraulic sensor 25 s and the attitude sensors 23 s, calculates the weight of the payload held by the work assembly 23 .
  • the communication device 27 c transmits weight information that is the information about the weight calculated by the processing device 27 a to the information management controller 130 . This configuration allows the information management controller 130 to receive the weight information from each loading machine 20 and to acquire the chronological information of the weight information about each loading machine 20 .
  • the information management controller 130 includes the position information server 131 , the weight information server 132 , the storage device 131 c , and the processing device 133 b.
  • the position information server 131 receives the position information about each transport vehicle 10 and the position information about the transport vehicles 10 from the position detection module 110 .
  • the weight information server 132 receives the weight information from the weight detection device 120 .
  • the storage device 131 c stores the position information about the transport vehicles 10 , the position information about the loading machine 20 , and the weight information.
  • the processing device 133 b calculates the load weight of the transport vehicle 10 . This configuration allows the construction management system 100 to ascertain information about the construction site more accurately than before.
  • the construction management system 100 capable of ascertaining information about a construction site more accurately than before.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computing Systems (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Primary Health Care (AREA)
  • Remote Sensing (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Accounting & Taxation (AREA)
  • Environmental & Geological Engineering (AREA)
  • Toxicology (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Signal Processing (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

The present disclosure provides a construction management system capable of ascertaining information about a construction site more accurately than before. A construction management system 100 comprises: a position sensor 16 a detecting position information about a transport vehicle 10 that transports payload; a position sensor 26 detecting position information about a loading machine 20 that loads payload onto the transport vehicle 10; a weight detection device 120 detecting weight information about the payload held by the loading machine 20; and an information management controller 130 which, based on chronological information of the position information about the transport vehicle 10, chronological information of the position information about the loading machine, and chronological information of the weight information, calculates the load weight of the payload loaded onto the transport vehicle 10.

Description

    TECHNICAL FIELD
  • The present disclosure relates to a construction management system.
  • BACKGROUND ART
  • Conventionally, a construction management system is known which is provided with an emitter, a portable terminal, a receiving unit, a detecting unit, a specific data acquiring unit, and a work managing unit (see claim 1 of Patent Literature 1 indicated below, for example). The emitter is disposed on a transport vehicle and emits radio waves including specific data of the transport vehicle. The portable terminal is disposed on a loading machine. The receiving unit is provided in the portable terminal and receives the radio waves from the emitter.
  • The detecting unit is provided in the portable terminal and detects the intensity of the radio waves received by the receiving unit. The specific data acquiring unit is provided in the portable terminal and acquires the specific data from the radio waves received by the receiving unit. The work managing unit generates actual performance data indicating that the transport vehicle has approached the loading machine, based on the intensity detected by the detecting unit and the specific data acquired by the specific data acquiring unit.
  • Further, the work managing unit determines that the loading machine is performing a loading work for loading a load onto the transport vehicle if the intensity of the radio waves received by the receiving unit is a value greater than or equal to a threshold value (see claim 3 of the literature, for example). Further, the work managing unit determines that the transport vehicle has started a transport work for transporting the load if the intensity of the radio waves received by the receiving unit has changed from a value greater than or equal to the threshold value to a value lower than the threshold value (see claim 4 of the literature, for example).
  • CITATION LIST Patent Literature
  • Patent Literature 1: WO 2015/156018
  • SUMMARY OF INVENTION Technical Problem
  • The conventional construction system, by utilizing a change in the intensity of the radio waves received by the receiving unit in accordance with the distance from the emitter, makes a determination for implementing the loading work and a determination for starting the transport work based on a threshold value of the intensity of the radio waves (see claims 3-4 and paragraph 0022, for example, of the patent literature). Further, the total amount of load transported from the construction site is calculated based on the maximum payload capacity data of the transport vehicle and at least one of data on the number of times of approach and data on the number of withdrawals (see paragraph 0084 of the patent literature, for example). However, even when the loading machine and the transport vehicle have approached each other and the intensity of the radio waves has become greater than or equal to the threshold value, no loading work may be actually implemented. This leads to the problem that the total amount of load transported from the construction site cannot be accurately ascertained.
  • The present disclosure provides a construction management system with which it is possible to ascertain information about a construction site more accurately than before.
  • Solution to Problem
  • According to an embodiment of the present disclosure, a construction management system includes a transport vehicle position detection device which detects position information about a transport vehicle for transporting a payload, a loading machine position detection device which detects position information about a loading machine for loading the payload onto the transport vehicle, a weight detection device which detects weight information about the payload held by the loading machine, and an information management controller which, based on chronological information of the position information about the transport vehicle, chronological information of the position information about the loading machine, and chronological information of the weight information, calculates a load weight of the payload loaded onto the transport vehicle.
  • Advantageous Effects of Invention
  • According to the present disclosure, it is possible to provide a construction management system capable of ascertaining information about a construction site more accurately than before.
  • BRIEF DESCRIPTION OF DRAWINGS
  • FIG. 1 is a schematic block diagram illustrating an embodiment of a construction management system of the present disclosure.
  • FIG. 2 is a side view illustrating an example of a transport vehicle of FIG. 1.
  • FIG. 3 is a side view illustrating an example of a loading machine of FIG. 1.
  • FIG. 4 is a time chart illustrating the operation of a position information server and a weight information server of FIG. 1.
  • FIG. 5 is a flowchart showing the flow of processing of the weight information server of FIG. 1.
  • FIG. 6 is a flowchart showing the flow of processing of the position information server of FIG. 1.
  • FIG. 7 is a flowchart showing the details of processing for determining the approach of a transport vehicle of FIG. 6.
  • FIG. 8 illustrates an example of an operation daily report output by a user server of FIG. 1.
  • DESCRIPTION OF EMBODIMENTS
  • In the following, an embodiment of a construction management system of the present disclosure will be described with reference to the drawings.
  • FIG. 1 is a schematic block diagram illustrating an embodiment of the construction management system of the present disclosure. A construction management system 100 of the present embodiment is a system that constitutes an Internet of Things (IoT) construction solution utilizing a mobile terminal, such as a smartphone, at a construction site, for example. The construction management system 100 of the present embodiment realizes a site where machinery and humans are connected by IoT technology, and contributes to improvements in productivity and safety.
  • While the details will be described later, the construction management system 100 of the present embodiment have the following major features. The construction management system 100 is provided with a position detection module 110, a weight detection device 120, and an information management controller 130. The position detection module 110 includes a position sensor 16 a as a transport vehicle position detection device for detecting position information about a transport vehicle 10 that transports a payload, and a position sensor 26 as a loading machine position detection device for detecting position information about a loading machine 20 that loads a payload onto the transport vehicle 10. The weight detection device 120 detects weight information about a payload held by the loading machine 20. The information management controller 130 calculates the load weight of the payload loaded onto the transport vehicle 10, based on chronological information of the position information about the transport vehicle 10, chronological information of the position information about the loading machine 20, and chronological information of the weight information. In the following, the configuration of the elements of the construction management system 100 of the present embodiment will be described in detail.
  • In FIG. 1, as an example, three transport vehicles 10 and one loading machine 20 are illustrated. However, the number of the transport vehicles 10 and loading the number of the machines 20 are not particularly limited. That is, the construction management system 100 may implement construction management for one or a plurality of transport vehicles 10 and one or a plurality of loading machines 20.
  • FIG. 2 is a side view illustrating an example of the transport vehicles 10 of FIG. 1. The transport vehicle 10 is a dump truck, for example. The transport vehicle 10 has a vehicle body frame 11, left and right front wheels 12F, left and right rear wheels 12R, left and right front wheel-side suspension devices 13F, left and right rear wheel-side suspension devices 13R, a bed 14, left and right hoist cylinders 15, a cab 16, a travel drive device 17, and a housing 18, for example. The payload which is loaded onto the bed 14 of the transport vehicle 10 by the loading machine 20 is not particularly limited. Examples are earth, crushed rock, and mineral resources.
  • As illustrated in FIG. 1, each transport vehicle 10 may be provided with a position sensor 16 a for detecting the position of each transport vehicle 10 using the Global Navigation Satellite System (GNSS), for example, and a communication device 16 b for transmitting the position information output from the position sensor 16 a to the information management controller 130. The position sensor 16 a and the communication device 16 b need not be necessarily installed on the transport vehicle 10, and may instead be mounted on a mobile terminal, such as a smartphone, carried by an operator riding in the cab 16 of the transport vehicle 10.
  • FIG. 3 is a side view illustrating an example of the loading machine 20 of FIG. 1. The loading machine 20 is a hydraulic excavator, for example. The loading machine 20 is provided with, for example, an upper slewing structure 21, a lower travel structure 22, a work assembly 23, attitude sensors 23 s for determining the attitude of the work assembly 23, a slewing mechanism 24, hydraulic cylinders 25 a, 25 b, 25 c, a position sensor 26, a control unit 27, and a hydraulic device which is not shown. The loading machine 20 is not limited to a hydraulic excavator and may include other work machines, such as a wheel loader and a crane.
  • The work assembly 23 is provided in front of the upper slewing structure 21, for example, and is driven by the hydraulic cylinders 25 a, 25 b, 25 c to perform work, such as an excavation work or a loading work. The work assembly 23 includes a boom 23 a, an arm 23 b, and a bucket 23 c, for example. The boom 23 a is pivotally supported on the upper slewing structure 21 via a boom pin. The arm 23 b is supported movably with respect to the boom 23 a via an arm pin. The bucket 23 c is supported pivotally with respect to the arm 23 b via a bucket pin.
  • The attitude sensors 23 s are angle sensors provided for each of the boom pin, the arm pin, and the bucket pin, for example. The attitude sensors 23 s, for example, detect a rotational angle of the boom 23 a relative to the upper slewing structure 21, a rotational angle of the arm 23 b relative to the boom 23 a, and a rotational angle of the bucket 23 c relative to the arm 23 b. The attitude sensors 23 s are not limited to angle sensors. For example, other sensors capable of detecting the attitude of the work assembly 23, such as an acceleration sensor and a gyro sensor, may be used as the attitude sensors 23 s.
  • While not illustrated in FIG. 3, the hydraulic cylinders 25 a, 25 b, 25 c are each provided with a hydraulic sensor 25 s (see FIG. 1) for measuring an oil pressure in the cylinder tube. The hydraulic sensor 25 s may be provided at least for the hydraulic cylinder 25 a driving the boom 23 a relative to the upper slewing structure 21, and may not be provided for the other hydraulic cylinders 25 b, 25 c. The hydraulic sensor 25 s, for example, measures the oil pressure in the cylinder tubes of the hydraulic cylinders 25 a, 25 b, 25 c, and outputs hydraulic information corresponding to the measured oil pressure to the control unit 27.
  • The position sensor 26 is configured using GNSS or the like, and detects the position of each loading machine 20. The control unit 27 is composed of, for example, a microcontroller or firmware installed on the loading machine 20, and is provided with a processing device 27 a such as a CPU, a storage device 27 b such as a RAM and a hard disk, and a communication device 27 c for transmitting information to the outside. The position sensor 26 and the control unit 27 need not be necessarily installed on the loading machine 20, and may be mounted on, for example, a mobile terminal, such as a smartphone, carried by an operator riding in a cab 21 a of the loading machine 20.
  • The processing device 27 a receives an input of position information about the loading machine 20 output from the position sensor 26, via a wireless communication line or a wired communication line. The processing device 27 a also receives an input of information about the attitude of the work assembly 23 output from the attitude sensors 23 s and hydraulic information output from the hydraulic sensor 25 s, via a wireless communication line or a wired communication line. The processing device 27 a processes the input information and causes the information to be stored in the storage device 27 b on a predetermined periodic basis.
  • The storage device 27 b stores chronological information of the information input from the processing device 27 a, a computer program, data, and other information, for example. The communication device 27 c, for example, transmits the information input from the processing device 27 a to the information management controller 130 via a wireless communication line.
  • Further, the processing device 27 a may be configured to calculate the weight of a payload held by the work assembly 23, based on the attitude of the work assembly 23 measured by the attitude sensors 23 s and the oil pressure measured by the hydraulic sensor 25 s, for example. More specifically, for example, in order to load payload onto the bed 14 of the transport vehicle 10 using the loading machine 20, the work assembly 23 is driven by the hydraulic cylinders 25 a, 25 b, 25 c and payload on the ground is scooped up by the bucket 23 c of the work assembly 23.
  • At this time, the processing device 27 a, for example, executes the computer program stored in the storage device 27 b and, based on the information about the attitude of the work assembly 23 input from the attitude sensors 23 s and the hydraulic information input from the hydraulic sensor 25 s, calculates the weight of the payload collected in the bucket 23 c of the work assembly 23. Calculation of the weight of the payload may be performed by the information management controller 130 as will be described later.
  • The position detection module 110, as mentioned above, detects position information about each transport vehicle 10 that transports payload, and position information about the loading machine 20 that loads payload onto the transport vehicle 10. The position detection module 110 includes the position sensor 16 a (transport vehicle position detection device) and the communication device 16 b mounted on the transport vehicle 10, and the position sensor 26 (loading machine position detection device) and the communication device 27 c mounted on the loading machine 20, for example.
  • The position sensor 16 a mounted on the transport vehicle 10 detects the position of the transport vehicle 10 on a predetermined periodic basis, and outputs position information about the transport vehicle 10 including the detected position and the time of detection of the position to the communication device 16 b. The communication device 16 b transmits the position information input from the position sensor 16 a to the information management controller 130 via a wireless communication line, for example.
  • Similarly, the position sensor 26 mounted on the loading machine 20 detects the position of the loading machine 20 on a predetermined periodic basis, and outputs position information about the loading machine 20 including the detected position and the time of detection of the position to the control unit 27. The communication device 27 c of the control unit 27 transmits the position information about the loading machine 20 that has been input from the position sensor 26 via the processing device 27 a, to the information management controller 130 via a wireless communication line, for example.
  • The weight detection device 120, as mentioned above, detects weight information about the payload held by the loading machine 20. The weight detection device 120, for example, includes the hydraulic sensor 25 s, the attitude sensors 23 s, the processing device 27 a, and the communication device 27 c of the loading machine 20.
  • The hydraulic sensor 25 s of the loading machine 20, for example, detects the oil pressure in the cylinder tube of the hydraulic cylinder 25 a on a predetermined periodic basis, and outputs hydraulic information including the oil pressure and the time of detection of the oil pressure to the processing device 27 a. The attitude sensors 23 s of the loading machine 20, for example, sense the attitude of the work assembly 23, including the angle of the boom 23 a relative to the upper slewing structure 21, the angle of the arm 23 b relative to the boom 23 a, and the angle of the bucket 23 c relative to the arm 23 b on a predetermined periodic basis. The attitude sensors 23 s then outputs attitude information including the attitude and the time of sensing of the attitude to the processing device 27 a.
  • The processing device 27 a calculates the weight of the payload held by the work assembly 23, based on the hydraulic information and the attitude information input from the hydraulic sensor 25 s and the attitude sensors 23 s. More specifically, the storage device 27 b, for example, stores dimension information about various parts of the work assembly 23 and a computer program for computing the weight of the payload held by the work assembly 23 based on the dimensions and attitudes of the various parts of the work assembly 23 and the oil pressure of the hydraulic cylinder 25 a.
  • The processing device 27 a executes the program stored in the storage device 27 b and, based on the dimension information, attitude information, and hydraulic information described above, calculates the weight of the payload collected in the bucket 23 c and held by the work assembly 23. The processing device 27 a further outputs weight information including the calculated weight and the time of detection of the weight to the communication device 27 c. The communication device 27 c transmits the weight information input from the processing device 27 a to the information management controller 130 via a wireless communication line, for example.
  • The information management controller 130, as mentioned above, calculates the load weight of the payload of each transport vehicle 10, based on chronological information of the position information about the transport vehicle 10, chronological information of the position information about the loading machine 20, and chronological information of the weight information about the payload held by the work assembly 23 of the loading machine 20. The information management controller 130, for example, includes a position information server 131, a weight information server 132, and a user server 133.
  • The weight information server 132, for example, receives the weight information transmitted from the communication device 27 c of each loading machine 20. The weight information server 132, for example, is provided with a receiving device 132 a, a processing device 132 b, a storage device 132 c, and a transmitting device 132 d.
  • The receiving device 132 a, for example, receives the weight information transmitted from the communication device 27 c of the loading machine 20, and outputs the weight information to the processing device 132 b. The processing device 132 b, for example, causes the weight information input from the receiving device 132 a to be stored in the storage device 132 c as chronological information. Further, the processing device 132 b, for example, reads the chronological information of the weight information stored in the storage device 132 c, and outputs the chronological information to the transmitting device 132 d. The transmitting device 132 d transmits the chronological information of the weight data input from the processing device 132 b to the position information server 131 via a wireless communication line or a wired communication line, for example.
  • The control unit 27 mounted on each loading machine 20 may not calculate the weight of the payload held by the work assembly 23 of the loading machine 20. In this case, the processing device 27 a of the control unit 27 mounted on each loading machine 20 outputs the attitude information and hydraulic information that are based on the attitude and oil pressure comprising the inputs from the attitude sensors 23 s and the hydraulic sensor 25 s, to the communication device 27 c. The communication device 27 c outputs the attitude information and hydraulic information input from the processing device 27 a to the weight information server 132 of the information management controller 130.
  • In this case, for example, the weight information server 132 may be configured to detect the weight information about the payload held by the work assembly 23 of each loading machine 20, based on the attitude information and hydraulic information received from the communication device 27 c of each loading machine 20. Specifically, for example, the receiving device 132 a of the weight information server 132 receives the attitude information and weight information transmitted from the communication device 27 c of the loading machine 20, and outputs the attitude information and weight information to the processing device 132 b.
  • The processing device 132 b, based on the attitude information and weight information input from the receiving device 132 a, calculates the weight of the payload held by the work assembly 23 of each loading machine 20. Further, the processing device 132 b causes weight information including the calculated weight and the time of detection of the weight to be stored in the storage device 132 c as chronological information. Also, the processing device 132 b reads the chronological information of the weight information stored in the storage device 132 c, and outputs the chronological information to the transmitting device 132 d. The transmitting device 132 d transmits the chronological information of the weight information input from the processing device 132 b to the position information server 131.
  • The position information server 131 receives from the position detection module 110 position information about the transport vehicles 10 and position information about the loading machine 20. More specifically, the position information server 131 includes a receiving device 131 a, a processing device 131 b, a storage device 131 c, and a transmitting device 131 d, for example.
  • The receiving device 131 a receives the position information about each transport vehicle 10 transmitted from the communication device 16 b of each transport vehicle 10, and also receives the position information about each loading machine 20 transmitted from the communication device 27 c of each loading machine 20. Further, the receiving device 131 a receives from the weight information server 132 the weight data of the payload held by the work assembly 23 of each loading machine 20, for example. Further, the receiving device 131 a outputs the received information to the processing device 131 b.
  • The processing device 131 b processes the information input from the processing device 131 b and causes the resultant information to be stored in the storage device 131 c as chronological information. The storage device 131 c stores, for example, threshold values of distances between the loading machine 20 and the transport vehicles 10 at which the loading machine 20 can load payload onto the bed 14 of the transport vehicles 10 using the work assembly 23. Further, the processing device 131 b, for example, calculates the weight of the payload loaded onto each transport vehicle 10, i.e., the load weight of the transport vehicle 10, based on the chronological information of the position information about each transport vehicle 10, the chronological information of the position information about each loading machine 20, and the chronological information of the weight information about the payload held by each loading machine 20 stored in the storage device 131 c.
  • In addition, the processing device 131 b causes the calculated weight of the payload of each transport vehicle 10 to be stored in the storage device 132 c as load weight information. Further, the processing device 131 b reads the position information and load weight information about each transport vehicle 10 stored in the storage device 131 c, and outputs the information to the transmitting device 131 d. The transmitting device 131 d transmits the information input from the processing device 131 b to the user server 133, for example.
  • The user server 133 creates an operation daily report based on the information received from the position information server 131, for example. The user server 133 is provided with a receiving device 133 a, a processing device 133 b, a storage device 133 c, and an output device 133 d, for example.
  • The receiving device 133 a receives the information transmitted from the transmitting device 131 d of the position information server 131 and outputs the information to the processing device 133 b. The processing device 133 b causes the information input from the receiving device 133 a to be stored in the storage device 133 c. In an example, the processing device 133 b may, based on the chronological information of the position information about the transport vehicle 10, the chronological information of the position information about the loading machine 20, and the chronological information of the weight information stored in the storage device 133 c, calculate the load weight of the payload loaded onto each transport vehicle 10 and cause the load weight to be stored in the storage device 133 c. Further, the processing device 133 b, based on the information stored in the storage device 133 c, calculates operation daily report data and outputs the data to the output device 133 d.
  • More specifically, the storage device 133 c, for example, stores position information about a collection site where the payload transported by the transport vehicle 10 is unloaded or dumped. The processing device 133 b, for example, based on the position information about the collection site and the chronological information of the position information about each transport vehicle 10 as well as the load weight information thereof, calculates, as operation daily report data, an integrated value of the weight of the payload that each transport vehicle 10 unloaded in the collection site. Further, the processing device 133 b, for example, based on the position information about the collection site, the chronological information of the position information about each transport vehicle 10, and the load weight information, calculates, as operation daily report data, the travelling time of the transport vehicle 10 from a loading position where the payload was loaded onto each transport vehicle 10 to the collection site.
  • In addition, the processing device 133 b, for example, based on the position information about the collection site and the chronological information of the position information about each transport vehicle 10 as well as the load weight thereof, calculates, as operation daily report data, the number of times of movement of each transport vehicle 10 from the loading position where the payload was loaded onto the transport vehicle 10 to the collection site. Further, the processing device 133 b, for example, based on the position information about each collection site and the chronological information of the position information about each transport vehicle 10 as well as the load weight information thereof, calculates, as operation daily report data, an operating time at each collection site, the number of times of movement of the transport vehicle 10 from the loading position where the payload was loaded onto each transport vehicle 10 to each collection site, and a total weight of the payload unloaded at each collection site.
  • The processing device 133 b causes the calculated operation daily report data to be stored in the storage device 133 c, and also outputs the data to the output device 133 d. The output device 133 d includes a display device and software or a printer, for example. The display device outputs, in the form of an image, an operation daily report based on the operation daily report data input from the processing device 133 b. The operation daily report may be output in the form of an electronic file by the software, or may be printed on paper and output by the printer.
  • In the following, with reference to FIG. 4 to FIG. 8, operation of the construction management system 100 of the present embodiment is described. FIG. 4 shows a time chart illustrating an example of the operation of the construction management system 100 of FIG. 1. FIG. 5 shows a flowchart illustrating the flow of a process of the weight detection device 120 included in the construction management system 100 of FIG. 1.
  • In FIG. 4, the temporal changes in the distance between one loading machine 20 and the three transport vehicles 10 are indicated by the interval between straight lines. For instance, at time t1, the distance between the loading machine 20 and the transport vehicle 10 closest to the loading machine 20 is D1. Further, at time t1, the distance between the transport vehicle 10 closest to the loading machine 20 and the transport vehicle 10 second closest to the loading machine 20 is D2. Further, the distance between the transport vehicle 10 second closest to the loading machine 20 and the transport vehicle 10 third closest to the loading machine 20 is D3.
  • Moreover, FIG. 4 shows a threshold value DS of a distance between the loading machine 20 and the transport vehicles 10 at which the loading machine 20, using the work assembly 23, can load the payload onto the bed 14 of the transport vehicles 10. In addition, FIG. 4 shows the timing of operation of the position information server 131 and the weight information server 132 of the information management controller 130.
  • In the example illustrated in FIG. 4, at time t1, the distances (D1, D1+D2, D1+D2+D3) between one loading machine 20 and the three transport vehicles 10 are greater than the threshold value DS. In this case, the construction management system 100, for example, does not start the process illustrated in FIG. 5 until the distance between at least one loading machine 20 and at least one transport vehicle 10 becomes less than or equal to the threshold value DS. For example, at time t2, when the distance between one loading machine 20 and one transport vehicle 10 becomes less than or equal to the threshold value DS, the construction management system 100 starts the process illustrated in FIG. 5.
  • As illustrated in FIG. 5, the construction management system 100 initially performs a process P11 for acquiring sensor information. In the process P11, the construction management system 100 detects and acquires, using the position detection module 110 described above, the position information about each transport vehicle 10 and the position information about each loading machine 20. Further, the construction management system 100, using the weight detection device 120 described above, detects and acquires the weight information about the payload held by each loading machine 20.
  • More specifically, in the process P11, the position detection module 110 detects, using the position sensor 16 a, which is the transport vehicle position detection device, the position information about each transport vehicle 10, and also detects, using the position sensor 26, which is the loading machine position detection device, the position information about the loading machine 20. The position information about the transport vehicle 10 and the position information about the loading machine 20 detected by the position sensor 16 a and the position sensor 26 are transmitted by the communication device 27 c to the information management controller 130.
  • Also, in the process P11, the weight detection device 120 measures, using the hydraulic sensor 25 s of the loading machine 20, the oil pressure of the hydraulic cylinder 25 a that drives the work assembly 23, and also detects, using the attitude sensors 23 s of the loading machine 20, the attitude of the work assembly 23. When the weight of the payload held by the work assembly 23 is calculated by the information management controller 130, the information about oil pressure and attitude detected by the hydraulic sensor 25 s and attitude sensors 23 s, i.e., the hydraulic information and the attitude information are transmitted by the communication device 27 c to the information management controller 130. After the end of the process P11, the construction management system 100 performs a process P12 for calculating the weight of the payload held by the work assembly 23 of the loading machine 20.
  • In the process P12, the weight detection device 120, for example, using the processing device 27 a of the control unit 27 mounted on the loading machine 20, calculates the weight of the payload held by the work assembly 23, based on the information about the oil pressure and attitude detected by the hydraulic sensor 25 s and the attitude sensors 23 s, i.e., the hydraulic information and the attitude information. After the end of the process P12, the construction management system 100 performs a process P13 for transmitting information about the calculated weight, i.e., the weight information.
  • In the process P13, the communication device 27 c of the control unit 27 mounted on the loading machine 20, for example, transmits the weight information calculated by the processing device 27 a to the information management controller 130. Then, the weight information server 132 of the information management controller 130 performs a process P14 for receiving the weight information, using the receiving device 132 a. Then, the weight information server 132 performs a process P15 for recording the weight information in the storage device 132 c, using the processing device 132 b.
  • The process P12 for calculating the weight of the payload held by the work assembly 23 may be performed by, for example, the processing device 132 b of the weight information server 132. In this case, the processing device 132 b of the weight information server 132, based on the hydraulic information and attitude information transmitted from the communication device 27 c of the loading machine 20 and received by the receiving device 132 a, calculates the weight of the payload held by the work assembly 23. In this case, the process P13 for transmitting the weight information and the process P14 for receiving the weight information are omitted, and the process P15 for recording the weight information calculated by the processing device 132 b in the process P12 in the storage device 132 c is performed.
  • Then, the weight information server 132, for example, performs the process P16 for determining whether the distance between the loading machine 20 and the transport vehicle 10 closest to the loading machine 20 is greater than the threshold value DS. In the process P16, the weight information server 132, for example, based on the position information about the transport vehicle 10 and the position information about the loading machine 20 received via the receiving device 132 a, calculates, using the processing device 132 b, the distance between the loading machine 20 and the transport vehicle 10 closest to the loading machine 20.
  • Further, in the process P16, the processing device 132 b compares the calculated distance and the threshold value DS, and if the calculated distance is greater than the threshold value DS (YES), the construction management system 100 ends the process illustrated in FIG. 5. On the other hand, if the calculated distance is less than or equal to the threshold value DS (NO), the construction management system 100 repeatedly performs the process P11 to the process P16 on a predetermined periodic basis, and records the weight information about the payload held by the loading machine 20 in the storage device 132 c of the weight information server 132 on a predetermined periodic basis.
  • In the example illustrated in FIG. 4, the loading machine 20, before time t3, for example, is in a state in which the payload has been scooped up by the bucket 23 c of the work assembly 23 and is being held by the work assembly 23. After time t3, the loading machine 20 moves toward the transport vehicle 10 so that the distance between the loading machine 20 and the transport vehicle 10 is the shortest. Then, between time t3 and time t4, the loading machine 20, for example, dumps the payload in the bucket 23 c of the work assembly 23 onto the bed 14 of the nearest transport vehicle 10, thus loading the payload onto the transport vehicle 10.
  • Further, between time t4 and time t5, the loading machine 20 repeatedly performs, a plurality of times, the work of moving a little away from the transport vehicle 10, scooping up the payload using the bucket 23 c of the work assembly 23, again approaching the transport vehicle 10, and loading the payload in the work assembly 23 onto the bed 14 of the transport vehicle 10. At this time, the construction management system 100 repeatedly performs the process P11 to the process P16 described above, wherein the weight information about the payload held by the work assembly 23 is transmitted from the loading machine 20 to the weight information server 132, and the chronological information of the weight information is stored in the storage device 132 c.
  • Thereafter, at time t6, the transport vehicle 10 with the payload loaded thereon moves away from the loading machine 20 so that the distance between the loading machine 20 and the transport vehicle 10 is greater than the threshold value DS. Thus, at time t7 after time t6, the construction management system 100 performs a process illustrated in FIG. 6.
  • FIG. 6 is a flow diagram illustrating the flow of a process of the position information server 131 of the information management controller 130 included in the construction management system 100 of FIG. 1. In a process P21, the position information server 131, for example, receives the weight information transmitted from the transmitting device 132 d of the weight information server 132, using the receiving device 131 a. Then, the construction management system 100 performs, using the processing device 131 b of the position information server 131, for example, a process P22 for recording information for each loading machine 20.
  • In the process P22, the processing device 131 b of the position information server 131, for example, causes the weight information input from the receiving device 131 a to be stored in the storage device 131 c as chronological information of the weight information about each loading machine 20, together with identifying information (ID), such as a user name, of the loading machine 20 and the time of measurement of weight. After the end of the process P22, the construction management system 100 performs a data processing loop P23 for weight information.
  • In the data processing loop P23, the processing device 131 b initially determines whether, as an ending condition, the processing of the weight information about all the loading machines 20 stored in the storage device 131 c is completed. If the processing of the weight information about all the loading machines 20 stored in the storage device 131 c is completed, the processing device 131 b ends the process illustrated in FIG. 6. If the processing is not completed with respect to any of the weight information stored in the storage device 131 c, the processing device 131 b performs a process P24 for searching for the position information about the loading machine 20 stored in the storage device 131 c.
  • In the process P24, the processing device 131 b searches for the position information about the loading machine 20 stored in the storage device 131 c. If, as a result of the search in the process P24, there is no position information about the loading machine 20 within a predetermined range of time (NO), the processing device 131 b again performs the data processing loop P23 for the weight information. On the other hand, if, as a result of the search in the process P24, there is position information about a loading machine 20 within the predetermined time, a process P25 for determining loading onto the transport vehicles 10 by the loading machine 20 is performed.
  • FIG. 7 is a flow diagram illustrating the details of the loading determination process P25 of FIG. 6. First, in a process P251, the processing device 131 b reads from the storage device 131 c the chronological information of the position information about the loading machine 20 and the chronological information of the position information about the transport vehicles 10. Then, in a process P252, the processing device 131 b searches for the position information about the transport vehicles 10 in a predetermined range of time. In the process P252, if there is no position information about the transport vehicles 10 (NO), the processing device 131 b ends the process P25 and returns to the end determination of the data processing loop P23 of FIG. 6. On the other hand, if there is the position information about the transport vehicles 10 in the process P252 (YES), the processing device 131 b performs a process P253.
  • In the process P253, the processing device 131 b, based on the chronological information of the position information about the loading machine 20 and the chronological information of the position information about the transport vehicles 10, calculates the distance between the loading machine 20 and the transport vehicles 10 at each time. Further, the processing device 131 b determines whether the calculated distance is less than or equal to a set distance, such as the distance threshold value DS. If, as a result of the determination, the calculated distance is greater than the set distance (NO), the processing device 131 b ends the process P25 and returns to the end determination of the data processing loop P23 of FIG. 6. On the other hand, if, as a result of the determination, the calculated distance is less than or equal to the set distance (YES), the processing device 131 b performs a process P254.
  • In the process P254, the processing device 131 b associates, as the transport vehicle 10 for loading, the transport vehicle 10 of which the distance from the loading machine 20 is less than or equal to the set distance, i.e., the threshold value DS, with the position information about the loading machine 20. The processing device 131 b then ends the process P25 and performs a process P26 of FIG. 6.
  • In the process P26, the processing device 131 b determines whether, as a result of the process P25, a plurality of transport vehicles 10 are associated as the transport vehicle 10 for loading by the loading machine 20. If, as a result of the determination, a plurality of transport vehicles 10 are associated as the object for loading by one loading machine 20 (YES), the processing device 131 b performs a process P27 for recording in the storage device 131 c the transport vehicle 10 closest to the loading machine 20 as the object for loading and the other transport vehicles 10 as not the object for loading. After the end of the process P27, the processing device 131 b performs a process P28. On the other hand, if, as a result of the determination in the process P26, one transport vehicle 10 is associated as the object for loading by the one loading machine 20 (NO), the processing device 131 b performs the process P28.
  • With reference now to FIG. 4, from time t2 to time t6, one transport vehicle 10 has approached one loading machine 20 at a distance less than or equal to the threshold value DS. Thus, in the process of the position information server 131 at time t7, the processing device 131 b, based on a negative determination result (NO) in the process P26, proceeds to the process P28. Meanwhile, between time t8 and time t10, two transport vehicles 10 have approached at distances less than or equal to the threshold value DS after time t9. Accordingly, in the process of the position information server 131 at time t11, the processing device 131 b, based on a positive determination result (YES) in the process P26, proceeds to the process P27, associates one closest transport vehicle 10 as the object for loading by the loading machine 20, and proceeds to the process P28.
  • In the process P28, the processing device 131 b records in the storage device 131 c the transport vehicle 10 that has been associated as the object for loading by the loading machine 20, in association with the weight information about the loading machine 20. Thereafter, the processing device 131 b repeatedly performs the data processing loop P23 until data processing of all weight information stored in the storage device 131 c ends. When the data processing of all the weight information stored in the storage device 131 c ends, the processing device 131 b ends the process of FIG. 6.
  • FIG. 8 illustrates an example of the operation daily report output by the user server 133 illustrated in FIG. 1. As illustrated in FIG. 1, the weight information about the loading machine 20 associated with the transport vehicle 10 for loading in the position information server 131 is transmitted to the user server 133 via the transmitting device 131 d, and received by the receiving device 133 a of the user server 133. The receiving device 133 a outputs the received information to the processing device 131 b. The processing device 131 b calculates operation daily report data based on the information input from the receiving device 133 a and the information stored in the storage device 133 c, and outputs the calculated data to the output device 133 d. The output device 133 d outputs the operation daily report as illustrated in FIG. 8, based on the operation daily report data input from the processing device 133 b.
  • As described above, the construction management system 100 of the present embodiment is provided with the position sensor 16 a as a transport vehicle position detection device, the position sensor 26 as a loading machine position detection device, the weight detection device 120, and the information management controller 130. The position sensor 16 a detects the position information about the transport vehicle 10 that transports a payload. The position sensor 26 detects the position information about the loading machine 20 that loads the payload onto the transport vehicle 10. The weight detection device 120 detects the weight information about the payload held by the loading machine 20. The information management controller 130, based on the chronological information of the position information about the transport vehicle 10, the chronological information of the position information about the loading machine 20, and the chronological information of the weight information, calculates the load weight of the payload loaded onto the transport vehicle 10.
  • This configuration makes it possible for the construction management system 100 to ascertain information about the construction site more accurately than before. Specifically, in the case of the conventional construction system described in Patent Literature 1, the total amount of load transported from the construction site cannot be accurately ascertained because no loading work may be actually performed even when the loading machine and the transport vehicle have approached each other.
  • In contrast, in the construction management system 100 of the present embodiment, the weight information about the payload held by the loading machine 20 is detected when the payload is loaded onto the transport vehicle 10. Further, in the construction management system 100 of the present embodiment, the load weight of the payload loaded onto the transport vehicle 10 is calculated based on the chronological information of the position information about the transport vehicle 10, the chronological information of the position information about the loading machine 20, and the chronological information of the weight information. Thus, even if no loading work has been performed although the transport vehicle 10 and the loading machine 20 approached each other, that fact can be accurately ascertained, so that the total amount of load transported from the construction site by the transport vehicle 10 can be more accurately ascertained.
  • Further, in the construction management system 100 of the present embodiment, the information management controller 130, based on the position information about the collection site where the payload transported by each transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10, and the load weight, the integrated value of the weight of the payload unloaded by the transport vehicle 10 onto the collection site is calculated. This configuration facilitates the creation of the operation daily report including the integrated value of the weight of the payload unloaded by the transport vehicle 10 onto the collection site, thus reducing a burden on the user.
  • Further, in the construction management system 100 of the present embodiment, the information management controller 130, based on the position information about the collection site where the payload transported by the transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10, and the load weight, the travelling time of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site is calculated. This configuration facilitates the creation of the operation daily report including the travelling time of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site, thus reducing a burden on the user.
  • Moreover, in the construction management system 100 of the present embodiment, the information management controller 130, based on the position information about the collection site where the payload transported by each transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10, and the load weight, the number of times of movement of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site is calculated. This configuration facilitates the creation of the operation daily report including the number of times of movement of the transport vehicle 10 from the loading position where the payload is loaded onto the transport vehicle 10 to the collection site, thus reducing a burden on the user.
  • Further, in the construction management system 100 of the present embodiment, the information management controller 130, based on the information about the position of a plurality of collection sites where the payload transported by each transport vehicle 10 is unloaded or dumped, the chronological information of the position information about the transport vehicle 10, and the load weight, calculates the operating time at each collection site, the number of times of movement of the transport vehicle from the loading position where the payload is loaded onto the transport vehicle to each collection site, and the total weight of the payload unloaded at each collection site. This configuration facilitates the creation of the operation daily report including the operating time at each collection site, the number of times of movement of the transport vehicle from the loading position where the payload is loaded onto the transport vehicle to each collection site, and the total weight of the payload unloaded at each collection site, thus reducing a burden on the user.
  • Further, in the construction management system 100 of the present embodiment, the position detection module 110 includes the position sensor 16 a as a transport vehicle position detection device, the position sensor 26 as a loading machine position detection device, and the communication device 16 b and the communication device 27 c. The position sensor 16 a detects the position information about each transport vehicle 10. The position sensor 26 detects the position information about the loading machine 20. The communication device 16 b transmits the position information about the transport vehicle 10 detected by the position sensor 16 a to the information management controller 130. The communication device 27 c transmits the position information about the loading machine 20 detected by the position sensor 26 to the information management controller 130. This configuration allows the information management controller 130 to acquire the chronological information of the position information about each transport vehicle 10 and the chronological information of the position information about each loading machine 20.
  • Further, in the construction management system 100 of the present embodiment, the weight detection device 120 includes the hydraulic sensor 25 s, the attitude sensors 23 s, the processing device 27 a, and the communication device 27 c. The hydraulic sensor 25 s measures the oil pressure of the hydraulic cylinder 25 a for driving the work assembly 23 of the loading machine 20. The attitude sensors 23 s detect the attitude of the work assembly 23. The processing device 27 a, based on the oil pressure and attitude detected by the hydraulic sensor 25 s and the attitude sensors 23 s, calculates the weight of the payload held by the work assembly 23. The communication device 27 c transmits weight information that is the information about the weight calculated by the processing device 27 a to the information management controller 130. This configuration allows the information management controller 130 to receive the weight information from each loading machine 20 and to acquire the chronological information of the weight information about each loading machine 20.
  • Further, in the construction management system 100 of the present embodiment, the information management controller 130 includes the position information server 131, the weight information server 132, the storage device 131 c, and the processing device 133 b. The position information server 131 receives the position information about each transport vehicle 10 and the position information about the transport vehicles 10 from the position detection module 110. The weight information server 132 receives the weight information from the weight detection device 120. The storage device 131 c stores the position information about the transport vehicles 10, the position information about the loading machine 20, and the weight information. The processing device 133 b calculates the load weight of the transport vehicle 10. This configuration allows the construction management system 100 to ascertain information about the construction site more accurately than before.
  • As described above, according to the present embodiment, it is possible to provide the construction management system 100 capable of ascertaining information about a construction site more accurately than before.
  • While an embodiment of the construction management system according to the present disclosure has been described in detail with reference to the drawings, concrete configurations of the construction management system are not limited to the embodiment, and any design changes and the like within the spirit and scope of the present disclosure are included in the present disclosure.
  • REFERENCE SIGNS LIST
    • 10 Transport vehicle
    • 16 a Position sensor (transport vehicle position detection device)
    • 16 b Communication device
    • 20 Loading machine
    • 23 Work assembly
    • 23 s Attitude sensor
    • 25 a Hydraulic cylinder
    • 25 s Hydraulic sensor
    • 26 Position sensor (loading machine position detection device)
    • 27 a Processing device
    • 27 c Communication device
    • 100 Construction management system
    • 120 Weight detection device
    • 130 Information management controller
    • 131 Position information server
    • 131 c Storage device
    • 132 Weight information server
    • 133 b Processing device

Claims (5)

1. A construction management system comprising:
a transport vehicle position detection device which detects position information about a transport vehicle for transporting a payload;
a loading machine position detection device which detects position information about a loading machine for loading the payload onto the transport vehicle;
a weight detection device which detects weight information about the payload held by the loading machine; and
an information management controller which, based on chronological information of the position information about the transport vehicle, chronological information of the position information about the loading machine, and chronological information of the weight information, calculates a load weight of the payload loaded onto the transport vehicle.
2. The construction management system according to claim 1, wherein the information management controller, based on position information about a collection site where the payload transported by the transport vehicle is dumped, the chronological information of the position information about the transport vehicle, and the load weight calculated by the information management controller, calculates an integrated value of the weight of the payload dumped by the transport vehicle at the collection site.
3. The construction management system according to claim 1, wherein the information management controller, based on position information about a collection site where the payload transported by the transport vehicle is dumped, the chronological information of the position information about the transport vehicle, and the load weight calculated by the information management controller, calculates a moving time of the transport vehicle from a loading position where the payload is loaded onto the transport vehicle to the collection site.
4. The construction management system according to claim 1, wherein the information management controller, based on position information about a collection site where the payload transported by the transport vehicle is dumped, the chronological information of the position information about the transport vehicle, and the load weight calculated by the information management controller, calculates a number of times of movement of the transport vehicle from a loading position where the payload is loaded onto the transport vehicle to the collection site.
5. The construction management system according to claim 1, wherein the information management controller, based on position information about a plurality of collection sites where the payload transported by the transport vehicle is dumped, the chronological information of the position information about the transport vehicle, and the load weight calculated by the information management controller, calculates an operating time at each of the collection sites, a number of times of movement of the transport vehicle from a loading position where the payload is loaded onto the transport vehicle to each of the collection sites, and a total weight of the payload dumped at each of the collection sites.
US17/436,461 2019-09-30 2020-08-11 Work management system Abandoned US20220172132A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2019-178197 2019-09-30
JP2019178197A JP7219196B2 (en) 2019-09-30 2019-09-30 Construction management system
PCT/JP2020/030535 WO2021065209A1 (en) 2019-09-30 2020-08-11 Work management system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/030535 A-371-Of-International WO2021065209A1 (en) 2019-09-30 2020-08-11 Work management system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/585,149 Continuation US20240193500A1 (en) 2019-09-30 2024-02-23 Work management system

Publications (1)

Publication Number Publication Date
US20220172132A1 true US20220172132A1 (en) 2022-06-02

Family

ID=75270758

Family Applications (2)

Application Number Title Priority Date Filing Date
US17/436,461 Abandoned US20220172132A1 (en) 2019-09-30 2020-08-11 Work management system
US18/585,149 Pending US20240193500A1 (en) 2019-09-30 2024-02-23 Work management system

Family Applications After (1)

Application Number Title Priority Date Filing Date
US18/585,149 Pending US20240193500A1 (en) 2019-09-30 2024-02-23 Work management system

Country Status (6)

Country Link
US (2) US20220172132A1 (en)
EP (1) EP3920124A4 (en)
JP (1) JP7219196B2 (en)
KR (1) KR20210124427A (en)
CN (1) CN113544730A (en)
WO (1) WO2021065209A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140088820A1 (en) * 2012-09-24 2014-03-27 Caterpillar Inc. Location Services in Mining Vehicle Operations
US20160247395A1 (en) * 2013-08-30 2016-08-25 Komatsu Ltd. Management system and management method for mining machine
US20160292619A1 (en) * 2015-03-31 2016-10-06 TAC Insight, LLC System for Tracking Hauling Operations
US20190180627A1 (en) * 2017-12-11 2019-06-13 Caterpillar Inc. System and method for detection of load and dump locations
US20190370725A1 (en) * 2018-06-05 2019-12-05 Caterpillar Inc. Managing material handling productivity

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001163405A (en) * 1999-12-08 2001-06-19 Nippon Telegr & Teleph Corp <Ntt> Waste transportation monitoring method and system
JP5006119B2 (en) * 2007-06-25 2012-08-22 株式会社キック Unloading work management system
US8386134B2 (en) * 2007-09-28 2013-02-26 Caterpillar Inc. Machine to-machine communication system for payload control
US8090560B2 (en) * 2007-12-14 2012-01-03 Caterpillar Inc. Systems and methods for haul road management based on greenhouse gas emissions
JP5275658B2 (en) * 2008-03-27 2013-08-28 株式会社小松製作所 Work vehicle work amount estimation system and work vehicle
DE102009041661A1 (en) * 2009-09-16 2011-03-24 Liebherr-Werk Nenzing Gmbh, Nenzing System for the automatic detection of load cycles of a machine for handling loads
JP5596661B2 (en) * 2011-11-11 2014-09-24 株式会社小松製作所 Mining machine management system and mining machine management system management method
JP5809710B2 (en) * 2013-08-20 2015-11-11 株式会社小松製作所 Management system and management method
US9701312B2 (en) * 2013-12-11 2017-07-11 Caterpillar Inc. Idle reduction engine shutdown and restart system for a machine
JP6382688B2 (en) * 2014-11-06 2018-08-29 日立建機株式会社 Map generator
CN105229692A (en) 2015-01-30 2016-01-06 株式会社小松制作所 Construction management system
JP6506205B2 (en) * 2016-03-31 2019-04-24 日立建機株式会社 Construction machinery
JP6716358B2 (en) * 2016-06-21 2020-07-01 株式会社小松製作所 Work vehicle, work management system, and work vehicle control method
US20180179732A1 (en) * 2016-12-22 2018-06-28 Caterpillar Inc. Realtime payload mapping for loader/hauler system optimization
US11131576B2 (en) * 2016-12-28 2021-09-28 Komatsu Ltd. Work vehicle, server device, load weight management system, and load weight management method
JP6805883B2 (en) * 2017-02-28 2020-12-23 コベルコ建機株式会社 Construction machinery
EP3666982B1 (en) * 2017-08-08 2023-07-19 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Excavator and excavator assist device
JP6782270B2 (en) * 2018-03-12 2020-11-11 日立建機株式会社 Construction management system and work machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140088820A1 (en) * 2012-09-24 2014-03-27 Caterpillar Inc. Location Services in Mining Vehicle Operations
US20160247395A1 (en) * 2013-08-30 2016-08-25 Komatsu Ltd. Management system and management method for mining machine
US20160292619A1 (en) * 2015-03-31 2016-10-06 TAC Insight, LLC System for Tracking Hauling Operations
US20190180627A1 (en) * 2017-12-11 2019-06-13 Caterpillar Inc. System and method for detection of load and dump locations
US20190370725A1 (en) * 2018-06-05 2019-12-05 Caterpillar Inc. Managing material handling productivity

Also Published As

Publication number Publication date
WO2021065209A1 (en) 2021-04-08
KR20210124427A (en) 2021-10-14
CN113544730A (en) 2021-10-22
JP2021056688A (en) 2021-04-08
EP3920124A1 (en) 2021-12-08
EP3920124A4 (en) 2022-10-26
JP7219196B2 (en) 2023-02-07
US20240193500A1 (en) 2024-06-13

Similar Documents

Publication Publication Date Title
US11131576B2 (en) Work vehicle, server device, load weight management system, and load weight management method
US9302859B2 (en) Vehicle loading and unloading detection
US10024710B2 (en) Payload monitoring system
AU2015344388A1 (en) Map creation device
US20170169626A1 (en) Operation monitoring system for machine and method thereof
JP7204366B2 (en) Systems and methods for controlling work machines
AU2017378140B2 (en) System and method for monitoring payload distribution and machine including same
AU2017378136B2 (en) System and method for monitoring machine hauling conditions at work site and machine including same
WO2019092965A1 (en) Information provision device, loading work assistance system, and information provision method
CN111757963A (en) System and method for controlling a work machine
JP7199864B2 (en) Systems and methods for controlling work machines
US20240193500A1 (en) Work management system
US20220259815A1 (en) System for determining content of work performed by construction machine and method for determining work
US10636225B2 (en) Method and system for load management in machines
US20230260343A1 (en) Method for determining a recommended load for a vehicle to be operated along a predefined route
WO2020054206A1 (en) Terminal, operation information acquisition system, operation information acquisition method, and program
WO2024096764A1 (en) Automated road maintenance prediction

Legal Events

Date Code Title Description
AS Assignment

Owner name: HITACHI CONSTRUCTION MACHINERY CO., LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FUJITA, TSUYOSHI;EGAWA, EIJI;REEL/FRAME:057385/0124

Effective date: 20210726

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED