US20210078676A1 - Off Vessel Tensioning System and Method - Google Patents

Off Vessel Tensioning System and Method Download PDF

Info

Publication number
US20210078676A1
US20210078676A1 US17/025,778 US202017025778A US2021078676A1 US 20210078676 A1 US20210078676 A1 US 20210078676A1 US 202017025778 A US202017025778 A US 202017025778A US 2021078676 A1 US2021078676 A1 US 2021078676A1
Authority
US
United States
Prior art keywords
mooring line
vessel
mooring
line assembly
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
US17/025,778
Inventor
Dillon Shuler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Delmar Systems Inc
Original Assignee
Delmar Systems Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Delmar Systems Inc filed Critical Delmar Systems Inc
Priority to US17/025,778 priority Critical patent/US20210078676A1/en
Publication of US20210078676A1 publication Critical patent/US20210078676A1/en
Assigned to DELMAR SYSTEMS, INC. reassignment DELMAR SYSTEMS, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: Shuler, Dillon
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/18Stoppers for anchor chains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B2021/003Mooring or anchoring equipment, not otherwise provided for
    • B63B2021/007Remotely controlled subsea assistance tools, or related methods for handling of anchors or mooring lines, e.g. using remotely operated underwater vehicles for connecting mooring lines to anchors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/505Methods for installation or mooring of floating offshore platforms on site

Definitions

  • This invention relates to a system and method for tensioning mooring lines, typically used to connect floating vessels and/or structures to an anchor on or in the sea floor.
  • the off vessel tensioning system and method embodying the principles of the present invention comprises a method that utilizes existing mooring-related apparatus in a novel and non-obvious manner.
  • the method(s) and related apparatus are described below.
  • FIGS. 1-10 illustrate the steps of connecting a pre-set mooring line to a floating vessel, and tensioning the mooring line to a desired deployed length and design pre-tension without the use of a vessel-mounted tensioning device.
  • FIG. 10A shows an alternative placement of the underwater fairlead chain stopper (hereinafter usually referred to as UFCS 80 ).
  • FIGS. 11-20 illustrate the steps of replacing a mooring component segment in a mooring line assembly, similar to disconnecting a floating vessel or structure from its tensioned mooring line assembly, in substance nearly a reverse of the steps illustrated in FIGS. 1-10 .
  • system and method herein described may be used in connection with any form of floating vessel or structure, including but not limited to offshore oil and gas drilling and/or production/processing facilities, floating wind turbines, or any other floating vessel or structure.
  • the exemplary anchor and mooring line assembly comprises an anchor 10 (a suction pile anchor shown, but any type of anchor could be used), attached to a mooring line assembly 20 comprising a pile forerunner 22 ; a mooring line segment 28 ; and a top chain 30 , also preferably comprising a tri-plate 40 and a shackle 42 .
  • anchor 10 and mooring line assembly 20 may be installed at a mooring location well before the floating vessel or structure 50 arrives on location, with mooring line assembly 20 run out along the ocean floor.
  • An anchor handling tug supply (AHTS) vessel 60 referred to as AHTS 60 , has picked up mooring line assembly 20 (typically by ROV assistance).
  • AHTS 60 has moved to a position close to floating vessel or structure 50 , for example 25 meters away or so.
  • FIG. 2 a line, namely an outer messenger line 70 , has been transferred to AHTS 60 from floating vessel or structure 50 .
  • FIG. 3A additional detail of outer messenger line 70 deployed to AHTS 60 is shown. Note that outer messenger line 70 typically includes chain segment 72 .
  • FIG. 3B this is a top view of the setting shown in FIG. 3A .
  • Outer messenger line 70 has been connected to top chain segment 30 , thereby connecting floating vessel or structure 50 to the mooring line assembly 20 .
  • Abandonment and retrieval (“A&R”) rigging 74 connects a winch line on AHTS 60 to mooring line assembly 20 , for example at the junction between chain segment 30 and outer messenger line 70 .
  • FIG. 4 this illustrates the next step in the sequence of lowering mooring line assembly 20 from AHTS 60 , via A&R rigging 74 , and the weight of the mooring line has been transferred to the vessel and or structure.
  • FIG. 5 the inner messenger line 76 has been transferred to AHTS 60 by a crane or similar means. It is understood that inner messenger line 76 is a line typically separated from outer messenger line 70 by a chain segment 72 , to allow the weight of the mooring line to be assumed by the vessel and or structure.
  • FIG. 5 shows chain segment 72 passing through underwater fairlead chain stopper (hereinafter usually referred to as “UFCS”) 80 on floating vessel or structure 50 . It is understood that UFCS 80 is positioned below the fairlead wheel, and may be locked (or alternatively has a ratchet type mechanism), to prevent movement of chain segment 72 outwardly therethrough, effectively locking chain segment 72 to floating vessel or structure 50 .
  • UFCS underwater fairlead chain stopper
  • FIG. 6 AHTS 60 moves away from floating vessel or structure 50 a suitable distance, so as to place the stern of AHTS 60 substantially vertically over a connection point 100 in mooring line assembly 20 , preferably over a connection point 100 in the top chain.
  • a hold-back line 90 is lowered from AHTS 60 , and connected to connection point 100 , typically with ROV assistance.
  • AHTS winch line 92 connected to inner messenger line 76 , is paid out as required to position AHTS 60 as needed.
  • FIG. 7 hold-back line 90 is pulled in by a winch on AHTS 60 .
  • Inner messenger line 76 is also tensioned and/or pulled into AHTS 60 by a winch on AHTS 60 , as needed. It is understood that hold back line 90 is tensioned minimally or not at all by bollard pull from AHTS 60 , but predominantly by vessel buoyancy and a winch on AHTS 60 .
  • FIG. 8 hold-back line 90 continues to be pulled in by a winch on AHTS 60 . It is understood that generally some slack is thereby created in the section of the mooring line assembly between connection point 100 and floating vessel or structure 50 . Outer messenger line 70 is then pulled into AHTS 60 by a winch, typically a sufficient amount that top chain 30 passes through UFCS 80 .
  • top chain 30 When the desired length of top chain 30 is pulled through UFCS 80 (which may be indicated by a marked link of top chain 30 ), UFCS 80 is then locked (it being understood that a ratcheting mechanism may serve to permit chain passage in one direction but lock in the other), so that top chain 30 is fixed to floating vessel or structure 50 ; effectively, a fixed length of mooring line assembly is thereby created between floating vessel or structure 50 and anchor 10 , to yield the desired tension in mooring line assembly 20 .
  • UFCS 80 which may be indicated by a marked link of top chain 30
  • UFCS 80 is then locked (it being understood that a ratcheting mechanism may serve to permit chain passage in one direction but lock in the other), so that top chain 30 is fixed to floating vessel or structure 50 ; effectively, a fixed length of mooring line assembly is thereby created between floating vessel or structure 50 and anchor 10 , to yield the desired tension in mooring line assembly 20 .
  • bollard pull is limited to only the magnitude necessary to keep AHTS 60 in a desired position.
  • mooring line tension calculations are performed to determine the appropriate tension to be placed on the mooring line assembly by hold-back line 90 , and to determine the appropriate length of mooring line assembly 20 to be created from floating vessel or structure 50 .
  • FIGS. 9A and 9B show additional detail of the step of FIG. 8 .
  • FIG. 10 with top chain 30 locked to prevent outward chain movement through UFCS 80 , AHTS 60 slacks off on hold-back line 90 to relieve tension therefrom; by ROV or similar means hold-back line 90 can then be disconnected from mooring line assembly 20 , as shown in FIG. 10 .
  • Inner messenger line 76 is transferred back to floating vessel or structure 50 to serve as platform (floating vessel) hang off rigging. Alternatively, excess top chain is either cut/removed and/or prepared for hang-off on the vessel/structure, or deployed in the water to free hang.
  • FIG. 10A shows an alternative placement of UFCS 80 .
  • UFCS 80 is not mounted on floating vessel or structure 50 , but is positioned in-line in the mooring line assembly 20 and utilized in the same manner.
  • FIGS. 11-20 generally shows a reverse of the tensioning sequence described above. It is to be understood that the following exemplary description is directed toward de-tensioning to allow replacement of a mooring line segment, but that the same general steps would apply to simply decommissioning of a mooring line assembly from a floating vessel or structure.
  • FIG. 11 AHTS 60 moves into position proximal floating vessel or structure 50 , so that the top chain hang-off rigging can be moved to AHTS 60 and attached to a disconnection messenger line 102 .
  • FIG. 11A shows detail of some of the rigging on the deck of AHTS 60 .
  • disconnection messenger line 102 is either installed previously or installed by AHTS 60 to facilitate in disconnecting the mooring line.
  • FIG. 12 AHTS 60 moves to a position generally vertically above the holdback line 90 connection point 100 , paying out disconnection messenger line 102 as needed.
  • Holdback line 90 is connected to mooring line assembly 20 at connection point 100 , typically by ROV assistance.
  • UFCS 80 is opened or unlocked, permitting top chain 30 to pay out.
  • FIG. 13 AHTS 60 continues to pay out disconnection messenger line 102 until chain segment 72 is positioned in UFCS 80 , where it is secured.
  • FIG. 14 AHTS 60 slackens disconnect messenger line 102 and ultimately disconnects same and passes it to floating vessel or structure 50 for hang off.
  • FIG. 15 AHTS 60 moves away from floating vessel or structure 50 , positioning its stern generally vertically over a connection point 100 in mooring line assembly 20 , and connects to same, usually with ROV assistance.
  • FIG. 16 A&R rigging 74 is winched in by AHTS 60 , bringing top chain 30 and mooring component 28 on deck.
  • FIGS. 17-19 top chain 30 and old mooring component 28 are brought onto the deck of AHTS 60 , and a new mooring component installed, if required.
  • FIG. 20 shows mooring line assembly being lowered by A&R rigging 74 . It is understood that the tensioning method described above in connection with FIGS. 1-10 may be used to tension mooring line assembly.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Floating vessels or structures are moored to the sea floor by mooring line assemblies connecting the floating vessels to anchors fixed the seafloor. Disclosed is a method of tensioning the mooring line assemblies to a desired tension, without applying tension forces from the vessel or structure being moored.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This United States non-provisional patent application claims priority to U.S. provisional patent application Ser. 62/902,195, filed Sep. 18, 2019, for all purposes. The disclosure of that provisional patent application is incorporated herein, to the extent same is not inconsistent with this disclosure.
  • BACKGROUND—FIELD OF THE INVENTION
  • This invention relates to a system and method for tensioning mooring lines, typically used to connect floating vessels and/or structures to an anchor on or in the sea floor.
  • As is known in the relevant art the various mooring lines in a mooring line installation must be brought to a desired deployed length and design pre-tension. Prior art systems and methods used tensioners mounted on the floating vessel. Such tensioners may be cost prohibitive and exhibit problematic maintenance routines and cost throughout the life of the asset.
  • Use of known vessel-mounted tensioners and related methods all present various issues, giving rise to a desire for an improved mooring line tensioning system and method that addresses these issues.
  • SUMMARY OF THE INVENTION
  • The off vessel tensioning system and method embodying the principles of the present invention comprises a method that utilizes existing mooring-related apparatus in a novel and non-obvious manner. The method(s) and related apparatus are described below.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIGS. 1-10 illustrate the steps of connecting a pre-set mooring line to a floating vessel, and tensioning the mooring line to a desired deployed length and design pre-tension without the use of a vessel-mounted tensioning device. FIG. 10A shows an alternative placement of the underwater fairlead chain stopper (hereinafter usually referred to as UFCS 80).
  • FIGS. 11-20 illustrate the steps of replacing a mooring component segment in a mooring line assembly, similar to disconnecting a floating vessel or structure from its tensioned mooring line assembly, in substance nearly a reverse of the steps illustrated in FIGS. 1-10.
  • DESCRIPTION OF THE PRESENTLY PREFERRED EMBODIMENT(S)
  • While various mooring line tensioning systems and methods can embody the principles of the present invention, with reference to the drawings some of the presently preferred embodiments can be described.
  • It is understood that the system and method herein described may be used in connection with any form of floating vessel or structure, including but not limited to offshore oil and gas drilling and/or production/processing facilities, floating wind turbines, or any other floating vessel or structure.
  • Installation and Tensioning of the Mooring Line(s)
  • Referring to FIG. 1: a pre-set mooring line assembly and anchor has been installed. The exemplary anchor and mooring line assembly comprises an anchor 10 (a suction pile anchor shown, but any type of anchor could be used), attached to a mooring line assembly 20 comprising a pile forerunner 22; a mooring line segment 28; and a top chain 30, also preferably comprising a tri-plate 40 and a shackle 42. As known in the art, anchor 10 and mooring line assembly 20 may be installed at a mooring location well before the floating vessel or structure 50 arrives on location, with mooring line assembly 20 run out along the ocean floor.
  • It is understood that the various segments of mooring line assembly 20 described above are by way of example only; the number of segments and the materials from which same are made may be varied to suit the particular installation.
  • An anchor handling tug supply (AHTS) vessel 60, referred to as AHTS 60, has picked up mooring line assembly 20 (typically by ROV assistance). In FIG. 1, AHTS 60 has moved to a position close to floating vessel or structure 50, for example 25 meters away or so.
  • FIG. 2: a line, namely an outer messenger line 70, has been transferred to AHTS 60 from floating vessel or structure 50.
  • FIG. 3A: additional detail of outer messenger line 70 deployed to AHTS 60 is shown. Note that outer messenger line 70 typically includes chain segment 72.
  • FIG. 3B: this is a top view of the setting shown in FIG. 3A. Outer messenger line 70 has been connected to top chain segment 30, thereby connecting floating vessel or structure 50 to the mooring line assembly 20. Abandonment and retrieval (“A&R”) rigging 74 connects a winch line on AHTS 60 to mooring line assembly 20, for example at the junction between chain segment 30 and outer messenger line 70.
  • FIG. 4: this illustrates the next step in the sequence of lowering mooring line assembly 20 from AHTS 60, via A&R rigging 74, and the weight of the mooring line has been transferred to the vessel and or structure.
  • FIG. 5: the inner messenger line 76 has been transferred to AHTS 60 by a crane or similar means. It is understood that inner messenger line 76 is a line typically separated from outer messenger line 70 by a chain segment 72, to allow the weight of the mooring line to be assumed by the vessel and or structure. FIG. 5 shows chain segment 72 passing through underwater fairlead chain stopper (hereinafter usually referred to as “UFCS”) 80 on floating vessel or structure 50. It is understood that UFCS 80 is positioned below the fairlead wheel, and may be locked (or alternatively has a ratchet type mechanism), to prevent movement of chain segment 72 outwardly therethrough, effectively locking chain segment 72 to floating vessel or structure 50.
  • It is understood that the system and method described herein, in a preferred embodiment, requires use of an underwater fairlead chain stopper or underwater stopper/hard point (padeye).
  • FIG. 6: AHTS 60 moves away from floating vessel or structure 50 a suitable distance, so as to place the stern of AHTS 60 substantially vertically over a connection point 100 in mooring line assembly 20, preferably over a connection point 100 in the top chain. A hold-back line 90 is lowered from AHTS 60, and connected to connection point 100, typically with ROV assistance. AHTS winch line 92, connected to inner messenger line 76, is paid out as required to position AHTS 60 as needed.
  • FIG. 7: hold-back line 90 is pulled in by a winch on AHTS 60. Inner messenger line 76 is also tensioned and/or pulled into AHTS 60 by a winch on AHTS 60, as needed. It is understood that hold back line 90 is tensioned minimally or not at all by bollard pull from AHTS 60, but predominantly by vessel buoyancy and a winch on AHTS 60.
  • FIG. 8: hold-back line 90 continues to be pulled in by a winch on AHTS 60. It is understood that generally some slack is thereby created in the section of the mooring line assembly between connection point 100 and floating vessel or structure 50. Outer messenger line 70 is then pulled into AHTS 60 by a winch, typically a sufficient amount that top chain 30 passes through UFCS 80. When the desired length of top chain 30 is pulled through UFCS 80 (which may be indicated by a marked link of top chain 30), UFCS 80 is then locked (it being understood that a ratcheting mechanism may serve to permit chain passage in one direction but lock in the other), so that top chain 30 is fixed to floating vessel or structure 50; effectively, a fixed length of mooring line assembly is thereby created between floating vessel or structure 50 and anchor 10, to yield the desired tension in mooring line assembly 20.
  • It is understood that the desired tension is predominantly placed in mooring line assembly 20 not by bollard pull by AHTS 60 on holdback line 90 (bollard pull force being necessarily limited in magnitude); but by vessel buoyancy and a winch on AHTS 60 pulling on hold-back line 90. In a preferred implementation of this system, bollard pull is limited to only the magnitude necessary to keep AHTS 60 in a desired position.
  • It is understood that mooring line tension calculations are performed to determine the appropriate tension to be placed on the mooring line assembly by hold-back line 90, and to determine the appropriate length of mooring line assembly 20 to be created from floating vessel or structure 50.
  • FIGS. 9A and 9B show additional detail of the step of FIG. 8.
  • FIG. 10: with top chain 30 locked to prevent outward chain movement through UFCS 80, AHTS 60 slacks off on hold-back line 90 to relieve tension therefrom; by ROV or similar means hold-back line 90 can then be disconnected from mooring line assembly 20, as shown in FIG. 10. Inner messenger line 76 is transferred back to floating vessel or structure 50 to serve as platform (floating vessel) hang off rigging. Alternatively, excess top chain is either cut/removed and/or prepared for hang-off on the vessel/structure, or deployed in the water to free hang.
  • FIG. 10A shows an alternative placement of UFCS 80. In this embodiment, UFCS 80 is not mounted on floating vessel or structure 50, but is positioned in-line in the mooring line assembly 20 and utilized in the same manner.
  • Replacement of Mooring Line Segment/Reversal of Tensioning Sequence
  • FIGS. 11-20 generally shows a reverse of the tensioning sequence described above. It is to be understood that the following exemplary description is directed toward de-tensioning to allow replacement of a mooring line segment, but that the same general steps would apply to simply decommissioning of a mooring line assembly from a floating vessel or structure.
  • FIG. 11: AHTS 60 moves into position proximal floating vessel or structure 50, so that the top chain hang-off rigging can be moved to AHTS 60 and attached to a disconnection messenger line 102. FIG. 11A shows detail of some of the rigging on the deck of AHTS 60. Preferably, disconnection messenger line 102 is either installed previously or installed by AHTS 60 to facilitate in disconnecting the mooring line.
  • FIG. 12: AHTS 60 moves to a position generally vertically above the holdback line 90 connection point 100, paying out disconnection messenger line 102 as needed. Holdback line 90 is connected to mooring line assembly 20 at connection point 100, typically by ROV assistance. UFCS 80 is opened or unlocked, permitting top chain 30 to pay out.
  • FIG. 13: AHTS 60 continues to pay out disconnection messenger line 102 until chain segment 72 is positioned in UFCS 80, where it is secured.
  • FIG. 14: AHTS 60 slackens disconnect messenger line 102 and ultimately disconnects same and passes it to floating vessel or structure 50 for hang off.
  • FIG. 15: AHTS 60 moves away from floating vessel or structure 50, positioning its stern generally vertically over a connection point 100 in mooring line assembly 20, and connects to same, usually with ROV assistance.
  • FIG. 16: A&R rigging 74 is winched in by AHTS 60, bringing top chain 30 and mooring component 28 on deck.
  • FIGS. 17-19: top chain 30 and old mooring component 28 are brought onto the deck of AHTS 60, and a new mooring component installed, if required.
  • FIG. 20 shows mooring line assembly being lowered by A&R rigging 74. It is understood that the tensioning method described above in connection with FIGS. 1-10 may be used to tension mooring line assembly.
  • If it is desired to decommission the mooring line assembly, it can be readily understood that a reversal of the tensioning method described above in connection with FIGS. 1-10, along with elements of the method described above in connection with FIGS. 11-20, may be employed.
  • CONCLUSION
  • While the preceding description contains many specificities, it is to be understood that same are presented only to describe some of the presently preferred embodiments of the invention, and not by way of limitation. Changes can be made to various aspects of the invention, without departing from the scope thereof.
  • Therefore, the scope of the invention is to be determined not by the illustrative examples set forth above, but by the appended claims and their legal equivalents.

Claims (1)

I claim:
1. A method, comprising the steps of:
a) providing a mooring line assembly attached to an anchor, said anchor fixed to an ocean floor and said mooring line assembly run out on said ocean floor;
b) connecting an anchor handling vessel to said mooring line, said anchor handling vessel taking on at least a portion of a weight of said mooring line assembly;
c) positioning said anchor handling vessel proximal a floating vessel or structure to be moored, connecting said floating vessel or structure to said mooring line, and transferring said portion of said mooring line weight assembly to said floating vessel or structure;
d) moving said anchor handling vessel away from said floating vessel or structure to be moored, while the anchor handling vessel remains connected to the floating vessel or structure to be moored by a line, said anchor handling vessel moving to a selected position over mooring line assembly;
e) connecting the anchor handling vessel to said mooring line assembly by a hold-back line, said connection made at a point on said mooring line assembly between floating vessel or structure to be moored and said anchor;
f) tensioning said hold-back line from the anchor handling vessel, thereby applying a desired tension to said mooring line assembly;
g) connecting said mooring line assembly to said floating vessel or structure to be moored, so as to maintain said desired tension in said mooring line assembly;
h) slacking off of said hold-back line from said anchor handling vessel; and
i) disconnecting said hold-back line from said mooring line assembly.
US17/025,778 2019-09-18 2020-09-18 Off Vessel Tensioning System and Method Pending US20210078676A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17/025,778 US20210078676A1 (en) 2019-09-18 2020-09-18 Off Vessel Tensioning System and Method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201962902195P 2019-09-18 2019-09-18
US17/025,778 US20210078676A1 (en) 2019-09-18 2020-09-18 Off Vessel Tensioning System and Method

Publications (1)

Publication Number Publication Date
US20210078676A1 true US20210078676A1 (en) 2021-03-18

Family

ID=74868312

Family Applications (1)

Application Number Title Priority Date Filing Date
US17/025,778 Pending US20210078676A1 (en) 2019-09-18 2020-09-18 Off Vessel Tensioning System and Method

Country Status (1)

Country Link
US (1) US20210078676A1 (en)

Similar Documents

Publication Publication Date Title
US9340261B2 (en) Anchor line tensioning method
US6983714B2 (en) Method of and apparatus for offshore mooring
AU2012298371B2 (en) Mooring system and connector assembly
US20170349243A1 (en) Mooring pulley tensioning system
AU2014260519B2 (en) Subsea remotely operated chain tensioning and slacking system
US20080282955A1 (en) Pull In - Pay Out Mooring System
US8347804B2 (en) Mooring system
US6435124B1 (en) Mooring and flowline system
US6893190B2 (en) Method and structure for connecting a floating structure with rope anchor lines to the seabed
EP1318072A2 (en) Mooring systems
US5065687A (en) Mooring system
AU2001291717A1 (en) Method and structure for connecting a floating structure with rope anchor lines to the seabed
US20210078676A1 (en) Off Vessel Tensioning System and Method
US8690483B2 (en) Method for assembling tendons
WO1999030963A1 (en) Submerged disconnectable anchor buoy and ship
US6685519B1 (en) System for transferring fluids and methods for installing, modifying and operating system
Li et al. Installation of STP mooring system and FPSO hookup in south china Sea
Jatar et al. The planning and installation of the red hawk spar and polyester mooring system
Bensimon et al. Deepwater Installation of a Large Capacity FPSO with Large Number of Risers in the Marlim Field
Couch et al. Independence installation
WO2023170006A1 (en) Seawater intake riser
GB2500904A (en) Device for connection of a mooring line to a floating structure
Li et al. Horizontal Installation of TLP Tendons
NZ561697A (en) Screw in ship anchor with adjustable mooring collar
Wilkinson et al. Installation of Mooring and Riser Systems for Floating Production Vessels

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

AS Assignment

Owner name: DELMAR SYSTEMS, INC., LOUISIANA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SHULER, DILLON;REEL/FRAME:057564/0113

Effective date: 20190918

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED