US2020912A - Form tie - Google Patents

Form tie Download PDF

Info

Publication number
US2020912A
US2020912A US728225A US72822534A US2020912A US 2020912 A US2020912 A US 2020912A US 728225 A US728225 A US 728225A US 72822534 A US72822534 A US 72822534A US 2020912 A US2020912 A US 2020912A
Authority
US
United States
Prior art keywords
rod
break
points
form tie
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US728225A
Inventor
Tamis C Schenk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Richmond Screw Anchor Co Inc
Original Assignee
Richmond Screw Anchor Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=24925939&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=US2020912(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Richmond Screw Anchor Co Inc filed Critical Richmond Screw Anchor Co Inc
Priority to US728225A priority Critical patent/US2020912A/en
Application granted granted Critical
Publication of US2020912A publication Critical patent/US2020912A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0707One-piece elements
    • E04G17/0721One-piece elements remaining completely or partially embedded in the cast material

Definitions

  • 'I'his invention relates to an improvement in form ties for concrete construction, and has for its objectv to provide a simple form tie which will be cheap to construct, easy to use, and entirely satisfactory in service.
  • the invention comprises a form tie made from a metal rod and provided with weakened points which are located within the concrete structure after the wall has been poured, the rod being then broken oii at these weakened points with the portion of the rod between the weakened points remaining Within the wall and covered by the concrete after the wall has been pointed.
  • the primary object of the invention is to provide means for suitably spacing the form boards and aiding in the breaking off of the form tie at the proper weakened points.
  • Fig. 1 is a plan view, with parts in section, of a wall form showing one of the form ties in position
  • Fig. 2 is a side elevation of the structure shown in Fig. l, after the wall has been poured
  • Fig. 3 is a sectional view of a part .of a wall showing the broken section of the form tie remaining in the wall
  • Fig. 4 is an enlarged view, in section, of a part of the form tie.
  • the improved formtie is adapted for use with any suitable concrete. form, which may consist of longitudinally extending boards 5, re-enforced by horizontal beams 6 and uprights 1, all of which may be used in the conventional manner.
  • the form tie 8 consists of a section of metal rod provided with short, spaced cross-bars 9 welded to it. Located adjacent to the welded bars 9 are notches I0 which weaken the body of the rod and form break-Dif points located within the concrete structure after the wall has been poured.
  • the rod is also provided with spaced collars II, each of which forms a fixed stop against which a washer I2 abuts, and is held by the pressure of the form boards 5.
  • the form tie is provided with an enlarged head or washer I3 against which a wedge I4 is employed to draw together the parts of the form.
  • the pressure of A the two wedges I4 holds the form parts in position and presses the form boards 5 against the washers I2, holding the washers. firmly against the collars II.
  • the collars Il are integrally formed on the rod 8 by distorting the body of the rod through the use of suitable dies. 'The form boards are perforated at I5 to permit the passage of the form tie, as is clearly shown in Figs. 1 and 2.
  • the projecting portions of the form tie are broken oi by being engaged by a suitable tool and twisted.
  • the breakage of the rod occurs at the weakened points Ill located within the concrete structure. 5
  • the bars 9 secured to the rod 8 prevent rotation or turning of the portion of the rod located within the concrete structure while the ends of the rod are being'twisted to break them off. After the ends of the rod are broken off, the openings 10 I'I in the wall are filled with concrete.
  • 'I'he washers I2 are freely movable upon the rod 8 and while they constitute a i'lrm abutment for the form boards 5 and accurately position the form boards, they may rotate independently of 15 the form tie and consequently do not impede the twisting movement of the ends of the form tie applied to the ends of the form tie during the breaking off of these ends.
  • the integral formation of the collars or xed stop elements II on 20 the rod 8 thickens or materially increases the strength of the rod and its resistance to fracture adjacent the outer surface of the wall structure thus preventing breakage of the rod 8 at these re-enforced points and increasing the tendency of the rod to break oii at the notches I0,' where it is desired that the breakage occur.
  • the form tie is readily set up and as soon as the concrete is sufciently hard, the form tie is easily broken by twisting the ends of the rod 30 to cause the breakage of the rod to take place at the notches I0.
  • the recesses I'I in the wall are then lled.
  • a form tie consisting of a rod provided with 35 spaced weakened break-off points arranged to lie within the body of the concrete structure through which the form tie extends, the rod having porvtions which extend outwardly from the break-01T points beyond the faces of the concrete structure shaped to permit them to be rotatively twisted within the concrete structure to break them ofi at the break-ofi points a pair of spaced collars integrally formed on the rod and positioned to lie adjacent to the opposite faces of the concrete structure, said collars acting to increase the thickness and strength of the rod in those portions of the rod where they are located' and serving to increase the tendency of the rod to break off at the weakened points upon twisting movement of the ends of the rod.
  • a form tie consisting of a rod provided with spaced weakened break-off points arranged to lie within the body of the concrete structure through which the form tie extends, said rod b5 having end portions capable of being twisted by rotative movement in the concrete structure to break them off at the break-oi! points a pair of spaced stops integrally formed on the rod and positioned' as to lie adjacent to the opposite faces of the concrete structure, said stops acting to increase the thickness and strength of the rod in those portions of the rod where they are located and serving to' increase the tendency of the rod to break off at the weakened points upon twisting movement of the ends of the rod, and washers freely rotatable on the rodand abutting :against the stops under pressure of the form boards.
  • A. form tie consisting of a rod having weakened break-olli points, the rod being provided with end portions extending from said break-off points adaptedto be broken oiI by twisting movement about the longitudinal axis of the rod, stops on said end portions consisting of parts formed by enlargement of the diameter of the body of the rod without weakening said rod, and washers adapted to be held against said stops.
  • the end spaced, weakened break-oi! points arranged to lie 5 within the body of the concrete structure through which the form tie extends, the rod having portionswhlch extend outwardly vfrom the breakoff points to the faces of the concrete structure shaped to permitfthem to be rotatively twisted to 10 cause them to break oi at the break-oi!
  • each of said stop elements consisting of a collar formed by enlargement of the diameter of the body of the rod without weakening 15 the rod and a washer on the rod adapted to be pressed against the collar, those portions of the rod adapted to be broken oiI by twisting movement being movable within the washer during such twisting movement.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

Patented Nov. 12, 1 935 UNTED STATES PATENT OFFICE 2,020,912 Foam 'rm Application May 31, 1934, Serial No. 728,225
4 Claims.
'I'his invention relates to an improvement in form ties for concrete construction, and has for its objectv to provide a simple form tie which will be cheap to construct, easy to use, and entirely satisfactory in service.
More particularly, the invention comprises a form tie made from a metal rod and provided with weakened points which are located within the concrete structure after the wall has been poured, the rod being then broken oii at these weakened points with the portion of the rod between the weakened points remaining Within the wall and covered by the concrete after the wall has been pointed.
The primary object of the invention is to provide means for suitably spacing the form boards and aiding in the breaking off of the form tie at the proper weakened points.
In the accompanying drawing, wherein the preferred embodiment of the invention is shown, Fig. 1 is a plan view, with parts in section, of a wall form showing one of the form ties in position; Fig. 2 is a side elevation of the structure shown in Fig. l, after the wall has been poured; Fig. 3 is a sectional view of a part .of a wall showing the broken section of the form tie remaining in the wall; and Fig. 4 is an enlarged view, in section, of a part of the form tie.
The improved formtie is adapted for use with any suitable concrete. form, which may consist of longitudinally extending boards 5, re-enforced by horizontal beams 6 and uprights 1, all of which may be used in the conventional manner. The form tie 8 consists of a section of metal rod provided with short, spaced cross-bars 9 welded to it. Located adjacent to the welded bars 9 are notches I0 which weaken the body of the rod and form break-Dif points located within the concrete structure after the wall has been poured. The rod is also provided with spaced collars II, each of which forms a fixed stop against which a washer I2 abuts, and is held by the pressure of the form boards 5. At each of its ends, the form tie is provided with an enlarged head or washer I3 against which a wedge I4 is employed to draw together the parts of the form. The pressure of A the two wedges I4 holds the form parts in position and presses the form boards 5 against the washers I2, holding the washers. firmly against the collars II. The collars Il are integrally formed on the rod 8 by distorting the body of the rod through the use of suitable dies. 'The form boards are perforated at I5 to permit the passage of the form tie, as is clearly shown in Figs. 1 and 2.
After the concrete wall structure, indicated at IB in Figs. 2 and 3, has been poured, the projecting portions of the form tie are broken oi by being engaged by a suitable tool and twisted. The breakage of the rod occurs at the weakened points Ill located within the concrete structure. 5 The bars 9 secured to the rod 8 prevent rotation or turning of the portion of the rod located within the concrete structure while the ends of the rod are being'twisted to break them off. After the ends of the rod are broken off, the openings 10 I'I in the wall are filled with concrete.
'I'he washers I2 are freely movable upon the rod 8 and while they constitute a i'lrm abutment for the form boards 5 and accurately position the form boards, they may rotate independently of 15 the form tie and consequently do not impede the twisting movement of the ends of the form tie applied to the ends of the form tie during the breaking off of these ends. The integral formation of the collars or xed stop elements II on 20 the rod 8 thickens or materially increases the strength of the rod and its resistance to fracture adjacent the outer surface of the wall structure thus preventing breakage of the rod 8 at these re-enforced points and increasing the tendency of the rod to break oii at the notches I0,' where it is desired that the breakage occur.
In use, the form tie is readily set up and as soon as the concrete is sufciently hard, the form tie is easily broken by twisting the ends of the rod 30 to cause the breakage of the rod to take place at the notches I0. The recesses I'I in the wall are then lled.
What I claim is:
l. A form tie consisting of a rod provided with 35 spaced weakened break-off points arranged to lie within the body of the concrete structure through which the form tie extends, the rod having porvtions which extend outwardly from the break-01T points beyond the faces of the concrete structure shaped to permit them to be rotatively twisted within the concrete structure to break them ofi at the break-ofi points a pair of spaced collars integrally formed on the rod and positioned to lie adjacent to the opposite faces of the concrete structure, said collars acting to increase the thickness and strength of the rod in those portions of the rod where they are located' and serving to increase the tendency of the rod to break off at the weakened points upon twisting movement of the ends of the rod.
2. A form tie consisting of a rod provided with spaced weakened break-off points arranged to lie within the body of the concrete structure through which the form tie extends, said rod b5 having end portions capable of being twisted by rotative movement in the concrete structure to break them off at the break-oi! points a pair of spaced stops integrally formed on the rod and positioned' as to lie adjacent to the opposite faces of the concrete structure, said stops acting to increase the thickness and strength of the rod in those portions of the rod where they are located and serving to' increase the tendency of the rod to break off at the weakened points upon twisting movement of the ends of the rod, and washers freely rotatable on the rodand abutting :against the stops under pressure of the form boards.
3. A. form tie consisting of a rod having weakened break-olli points, the rod being provided with end portions extending from said break-off points adaptedto be broken oiI by twisting movement about the longitudinal axis of the rod, stops on said end portions consisting of parts formed by enlargement of the diameter of the body of the rod without weakening said rod, and washers adapted to be held against said stops. the end spaced, weakened break-oi! points arranged to lie 5 within the body of the concrete structure through which the form tie extends, the rod having portionswhlch extend outwardly vfrom the breakoff points to the faces of the concrete structure shaped to permitfthem to be rotatively twisted to 10 cause them to break oi at the break-oi! points within the concrete structureand movable stop elements, each of said stop elements consisting of a collar formed by enlargement of the diameter of the body of the rod without weakening 15 the rod and a washer on the rod adapted to be pressed against the collar, those portions of the rod adapted to be broken oiI by twisting movement being movable within the washer during such twisting movement. 2o
TAMS C. SCHENK.
US728225A 1934-05-31 1934-05-31 Form tie Expired - Lifetime US2020912A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US728225A US2020912A (en) 1934-05-31 1934-05-31 Form tie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US728225A US2020912A (en) 1934-05-31 1934-05-31 Form tie

Publications (1)

Publication Number Publication Date
US2020912A true US2020912A (en) 1935-11-12

Family

ID=24925939

Family Applications (1)

Application Number Title Priority Date Filing Date
US728225A Expired - Lifetime US2020912A (en) 1934-05-31 1934-05-31 Form tie

Country Status (1)

Country Link
US (1) US2020912A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2618039A (en) * 1947-10-17 1952-11-18 Hyre Warren Form for casting concrete walls
US2618038A (en) * 1951-11-17 1952-11-18 Stanley Ball Paving dowel supporting structure
US2657449A (en) * 1949-03-02 1953-11-03 Superior Concrete Accessories Tie rod for concrete wall forms
US2859503A (en) * 1953-03-16 1958-11-11 Victor E O Hennig Concrete form tie-tensioning means
US2887758A (en) * 1956-12-04 1959-05-26 Waco Mfg Company Tie rod for concrete wall forms
US3035321A (en) * 1953-03-16 1962-05-22 Victor E O Hennig Demountable concrete form

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2618039A (en) * 1947-10-17 1952-11-18 Hyre Warren Form for casting concrete walls
US2657449A (en) * 1949-03-02 1953-11-03 Superior Concrete Accessories Tie rod for concrete wall forms
US2618038A (en) * 1951-11-17 1952-11-18 Stanley Ball Paving dowel supporting structure
US2859503A (en) * 1953-03-16 1958-11-11 Victor E O Hennig Concrete form tie-tensioning means
US3035321A (en) * 1953-03-16 1962-05-22 Victor E O Hennig Demountable concrete form
US2887758A (en) * 1956-12-04 1959-05-26 Waco Mfg Company Tie rod for concrete wall forms

Similar Documents

Publication Publication Date Title
DE2612733A1 (en) OPENING PLUG FOR A TENSION ANCHOR
US2020912A (en) Form tie
US2190700A (en) Spreader for concrete forms
US2193078A (en) Method of making form ties
US2171120A (en) Tie wire apparatus
US2075239A (en) Concrete form clamp
US2218099A (en) Form tie
US1850462A (en) Tie for wall forms
US2281833A (en) Form wall tie
US2166444A (en) Wedge for use with wall ties
US1514806A (en) Reenforcing bar for concrete construction
DE1159221B (en) Concrete pipe with reinforcement through longitudinally prestressed steel wires
US1311036A (en) Concrete-work fastener
US1919751A (en) Wedge for form ties
US2928170A (en) Method for making form ties
DE827634C (en) Iron cap for longwall mining
US2323705A (en) Wall form tie
US1715507A (en) Insulator mounting
DE570369C (en) Rail fastening on a base plate by means of clamping plates that span the rail foot
US1706481A (en) Swivel socket
DE755072C (en) Suspension or tension insulator
DE354580C (en) Suspension and guy insulator
US1343901A (en) Rail-bond punch
SU19278A1 (en) Electrical insulator
DE827787C (en) Cutting device for drill bits and interchangeable spigot ends on drill rods