US20190281545A1 - Scheduling Profile for UE Power Savings - Google Patents

Scheduling Profile for UE Power Savings Download PDF

Info

Publication number
US20190281545A1
US20190281545A1 US16/295,230 US201916295230A US2019281545A1 US 20190281545 A1 US20190281545 A1 US 20190281545A1 US 201916295230 A US201916295230 A US 201916295230A US 2019281545 A1 US2019281545 A1 US 2019281545A1
Authority
US
United States
Prior art keywords
profile
scheduling
slot
base station
pdcch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US16/295,230
Other versions
US11589305B2 (en
Inventor
Yuchul Kim
Wei Zhang
Sami M. Almalfouh
Junsung Lim
Haitong Sun
Wei Zeng
Dawei Zhang
Zhu Ji
Yang Li
Johnson O. Sebeni
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Apple Inc
Original Assignee
Apple Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Apple Inc filed Critical Apple Inc
Priority to US16/295,230 priority Critical patent/US11589305B2/en
Assigned to APPLE INC. reassignment APPLE INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ZHANG, DAWEI, KIM, YUCHUL, SUN, HAITONG, ZENG, WEI, ALMALFOUH, Sami M., LI, YANG, JI, Zhu, LIM, JUNSUNG, SEBENI, JOHNSON O., ZHANG, WEI
Priority to DE102019203357.1A priority patent/DE102019203357A1/en
Priority to CN202211570885.XA priority patent/CN116209039A/en
Priority to CN201910183822.0A priority patent/CN110267330B/en
Publication of US20190281545A1 publication Critical patent/US20190281545A1/en
Priority to US18/083,968 priority patent/US20230118771A1/en
Application granted granted Critical
Publication of US11589305B2 publication Critical patent/US11589305B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0212Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0212Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
    • H04W52/0216Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave using a pre-established activity schedule, e.g. traffic indication frame
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0225Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
    • H04W52/0229Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal where the received signal is a wanted signal
    • H04W72/042
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0473Wireless resource allocation based on the type of the allocated resource the resource being transmission power
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • the present application relates to wireless devices, and more particularly to apparatus, systems, and methods for a wireless device to communicate a scheduling profile, such as a scheduling-power profile, for power savings to a network.
  • a scheduling profile such as a scheduling-power profile
  • Wireless communication systems are rapidly growing in usage.
  • wireless devices such as smart phones and tablet computers have become increasingly sophisticated.
  • many mobile devices now provide access to the internet, email, text messaging, and navigation using the global positioning system (GPS), and are capable of operating sophisticated applications that utilize these functionalities.
  • GPS global positioning system
  • LTE Long Term Evolution
  • DL downlink
  • MAC media access control
  • UL uplink
  • LTE defines a Physical Downlink Shared Channel (PDSCH) as a DL transport channel.
  • the PDSCH is the main data-bearing channel allocated to users on a dynamic and opportunistic basis.
  • the PDSCH carries data in Transport Blocks (TB) corresponding to a MAC protocol data unit (PDU), passed from the MAC layer to the physical (PHY) layer once per Transmission Time Interval (TTI).
  • TB Transport Blocks
  • PDU MAC protocol data unit
  • TTI Transmission Time Interval
  • the PDSCH is also used to transmit broadcast information such as System Information Blocks (SIB) and paging messages.
  • SIB System Information Blocks
  • LTE defines a Physical Downlink Control Channel (PDCCH) as a DL control channel that carries the resource assignment for UEs that are contained in a Downlink Control Information (DCI) message.
  • PDCCH Physical Downlink Control Channel
  • DCI Downlink Control Information
  • Multiple PDCCHs can be transmitted in the same subframe using Control Channel Elements (CCE), each of which is a nine set of four resource elements known as Resource Element Groups (REG).
  • CCE Control Channel Elements
  • the PDCCH employs quadrature phase-shift keying (QPSK) modulation, with four QPSK symbols mapped to each REG.
  • QPSK quadrature phase-shift keying
  • 1, 2, 4, or 8 CCEs can be used for a UE, depending on channel conditions, to ensure sufficient robustness.
  • LTE defines a Physical Uplink Shared Channel (PUSCH) as a UL channel shared by all devices (user equipment, UE) in a radio cell to transmit user data to the network.
  • the scheduling for all UEs is under control of the LTE base station (enhanced Node B, or eNB).
  • the eNB uses the uplink scheduling grant (DCI format 0) to inform the UE about resource block (RB) assignment, and the modulation and coding scheme to be used.
  • PUSCH typically supports QPSK and quadrature amplitude modulation (QAM).
  • QAM quadrature amplitude modulation
  • the PUSCH also carries any control information necessary to decode the information, such as transport format indicators and multiple-in multiple-out (MIMO) parameters. Control data is multiplexed with information data prior to digital Fourier transform (DFT) spreading.
  • DFT digital Fourier transform
  • 5th generation mobile networks or 5th generation wireless systems is called 5th generation mobile networks or 5th generation wireless systems, or 5G for short (otherwise known as 5G-NR for 5G New Radio, also simply referred to as NR).
  • 5G-NR proposes a higher capacity for a higher density of mobile broadband users, also supporting device-to-device, ultra-reliable, and massive machine communications, as well as lower latency and lower battery consumption, than current LTE standards.
  • the 5G-NR standard may allow for less restrictive UE scheduling as compared to current LTE standards. Consequently, efforts are being made in ongoing developments of 5G-NR to take advantage of the less restrictive UE scheduling in order to further leverage power savings opportunities.
  • Embodiments relate to apparatuses, systems, and methods to schedule a user equipment device (UE) based on a scheduling-power profile.
  • UE user equipment device
  • a user equipment device may be configured to perform a method to constrain UE communication behavior.
  • the method may include the UE exchanging communications with a base station to determine one or more scheduling profiles, such as one or more scheduling-power profiles.
  • the communications with the base station to determine the one or more scheduling-power profiles may include exchange of one or more radio resource control (RRC) signal messages.
  • RRC radio resource control
  • the one or more scheduling-power profiles may not conflict with one another.
  • a scheduling-power profile may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications.
  • the method may include the UE receiving a slot configuration schedule from the base station. The slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles. Further, the method may include the UE performing communications with the base station based on the at least one scheduling-power profile.
  • the one or more scheduling-power profiles may include a profile that may constrain the base station to schedule transmission of an acknowledgment of data received on the PDCCH to a slot immediately preceding a slot scheduled for PDCCH monitoring. In some embodiments, the one or more scheduling-power profiles may include a profile that constrains the base station to schedule transmission on the PUSCH to a slot immediately preceding a slot scheduled for PDCCH monitoring. In some embodiments, the one or more scheduling-power profiles may include a profile that constrains the base station to cross-slot schedule transmission of an ACK of a PDCCH and a reception on the PDSCH to a slot immediately preceding a slot scheduled for PDCCH monitoring.
  • the techniques described herein may be implemented in and/or used with a number of different types of devices, including but not limited to cellular phones, tablet computers, wearable computing devices, portable media players, and any of various other computing devices.
  • FIG. 1 illustrates an example wireless communication system according to some embodiments.
  • FIG. 2 illustrates a base station (BS) in communication with a user equipment (UE) device according to some embodiments.
  • BS base station
  • UE user equipment
  • FIG. 3 illustrates an example block diagram of a UE according to some embodiments.
  • FIG. 4 illustrates an example block diagram of a BS according to some embodiments.
  • FIG. 5 illustrates an example block diagram of cellular communication circuitry, according to some embodiments.
  • FIG. 6A illustrates an example of connections between an EPC network, an LTE base station (eNB), and a 5G NR base station (gNB).
  • eNB LTE base station
  • gNB 5G NR base station
  • FIG. 6B illustrates an example of a protocol stack for an eNB and a gNB.
  • FIG. 7A illustrates an example of a 5G network architecture that incorporates both 3GPP (e.g., cellular) and non-3GPP (e.g., non-cellular) access to the 5G CN, according to some embodiments.
  • 3GPP e.g., cellular
  • non-3GPP e.g., non-cellular
  • FIG. 7B illustrates an example of a 5G network architecture that incorporates both dual 3GPP (e.g., LTE and 5G NR) access and non-3GPP access to the 5G CN, according to some embodiments.
  • dual 3GPP e.g., LTE and 5G NR
  • non-3GPP access to the 5G CN
  • FIG. 8 illustrates an example of a baseband processor architecture for a UE, according to some embodiments.
  • FIG. 9A illustrates an example of a PDCCH monitoring interval.
  • FIG. 9B illustrates an example of power consumption of a UE for multiple PDCCH monitoring slots.
  • FIGS. 10A-10C illustrate an example of power consumption of a UE for multiple transmissions during PDCCH monitoring.
  • FIG. 10D illustrates an example of power consumption of a UE for multiple transmissions during PDCCH monitoring, according to some embodiments.
  • FIGS. 11A-11C illustrate an example of power consumption of a UE for multiple receptions during PDCCH monitoring.
  • FIG. 11D illustrates an example of power consumption of a UE for multiple receptions during PDCCH monitoring, according to some embodiments.
  • FIGS. 12A-12C illustrate an example of power consumption of a UE for a transmission followed by a reception during PDCCH monitoring.
  • FIG. 12D illustrates an example of power consumption of a UE for a transmission followed by a reception during PDCCH monitoring, according to some embodiments.
  • FIGS. 13A-13C illustrate an example of power consumption of a UE for a reception followed by a transmission during PDCCH monitoring.
  • FIG. 13D illustrates an example of power consumption of a UE for a reception followed by a transmission during PDCCH monitoring, according to some embodiments.
  • FIG. 14 illustrates a block diagram of an example of a process for determining a scheduling profile for a UE, according to some embodiments.
  • FIG. 15 illustrates example profiles and correspond UE behaviors, according to some embodiments.
  • FIG. 16 illustrates example parameter sets for various profiles, according to some embodiments.
  • FIG. 17 illustrates an example of a delayed acknowledgement with following PDCCH monitoring, according to some embodiments.
  • FIG. 18 illustrates an example of a delayed PUSCH with following PDCCH monitoring, according to some embodiments.
  • FIG. 19 illustrates an example of delayed cross-slot scheduling with following PDCCH monitoring, according to some embodiments.
  • FIG. 20 illustrates an example of self-contained slot scheduling with following PDCCH monitoring, according to some embodiments.
  • Memory Medium Any of various types of non-transitory memory devices or storage devices.
  • the term “memory medium” is intended to include an installation medium, e.g., a CD-ROM, floppy disks, or tape device; a computer system memory or random access memory such as DRAM, DDR RAM, SRAM, EDO RAM, Rambus RAM, etc.; a non-volatile memory such as a Flash, magnetic media, e.g., a hard drive, or optical storage; registers, or other similar types of memory elements, etc.
  • the memory medium may include other types of non-transitory memory as well or combinations thereof.
  • the memory medium may be located in a first computer system in which the programs are executed, or may be located in a second different computer system which connects to the first computer system over a network, such as the Internet. In the latter instance, the second computer system may provide program instructions to the first computer for execution.
  • the term “memory medium” may include two or more memory mediums which may reside in different locations, e.g., in different computer systems that are connected over a network.
  • the memory medium may store program instructions (e.g., embodied as computer programs) that may be executed by one or more processors.
  • Carrier Medium a memory medium as described above, as well as a physical transmission medium, such as a bus, network, and/or other physical transmission medium that conveys signals such as electrical, electromagnetic, or digital signals.
  • Programmable Hardware Element includes various hardware devices comprising multiple programmable function blocks connected via a programmable interconnect. Examples include FPGAs (Field Programmable Gate Arrays), PLDs (Programmable Logic Devices), FPOAs (Field Programmable Object Arrays), and CPLDs (Complex PLDs).
  • the programmable function blocks may range from fine grained (combinatorial logic or look up tables) to coarse grained (arithmetic logic units or processor cores).
  • a programmable hardware element may also be referred to as “reconfigurable logic”.
  • Computer System any of various types of computing or processing systems, including a personal computer system (PC), mainframe computer system, workstation, network appliance, Internet appliance, personal digital assistant (PDA), television system, grid computing system, or other device or combinations of devices.
  • PC personal computer system
  • mainframe computer system workstation
  • network appliance Internet appliance
  • PDA personal digital assistant
  • television system grid computing system, or other device or combinations of devices.
  • computer system can be broadly defined to encompass any device (or combination of devices) having at least one processor that executes instructions from a memory medium.
  • UE User Equipment
  • UE Device any of various types of computer systems devices which are mobile or portable and which performs wireless communications.
  • UE devices include mobile telephones or smart phones (e.g., iPhoneTM, AndroidTM-based phones), portable gaming devices (e.g., Nintendo DSTM PlayStation PortableTM, Gameboy AdvanceTM, iPhoneTM), laptops, wearable devices (e.g. smart watch, smart glasses), PDAs, portable Internet devices, music players, data storage devices, or other handheld devices, etc.
  • the term “UE” or “UE device” can be broadly defined to encompass any electronic, computing, and/or telecommunications device (or combination of devices) which is easily transported by a user and capable of wireless communication.
  • Base Station has the full breadth of its ordinary meaning, and at least includes a wireless communication station installed at a fixed location and used to communicate as part of a wireless telephone system or radio system.
  • Processing Element refers to various elements or combinations of elements that are capable of performing a function in a device, such as a user equipment or a cellular network device.
  • Processing elements may include, for example: processors and associated memory, portions or circuits of individual processor cores, entire processor cores, processor arrays, circuits such as an ASIC (Application Specific Integrated Circuit), programmable hardware elements such as a field programmable gate array (FPGA), as well any of various combinations of the above.
  • ASIC Application Specific Integrated Circuit
  • FPGA field programmable gate array
  • Channel a medium used to convey information from a sender (transmitter) to a receiver.
  • channel widths may be variable (e.g., depending on device capability, band conditions, etc.).
  • LTE may support scalable channel bandwidths from 1.4 MHz to 20 MHz.
  • WLAN channels may be 22 MHz wide while Bluetooth channels may be 1 Mhz wide.
  • Other protocols and standards may include different definitions of channels.
  • some standards may define and use multiple types of channels, e.g., different channels for uplink or downlink and/or different channels for different uses such as data, control information, etc.
  • band has the full breadth of its ordinary meaning, and at least includes a section of spectrum (e.g., radio frequency spectrum) in which channels are used or set aside for the same purpose.
  • spectrum e.g., radio frequency spectrum
  • Automatically refers to an action or operation performed by a computer system (e.g., software executed by the computer system) or device (e.g., circuitry, programmable hardware elements, ASICs, etc.), without user input directly specifying or performing the action or operation.
  • a computer system e.g., software executed by the computer system
  • device e.g., circuitry, programmable hardware elements, ASICs, etc.
  • An automatic procedure may be initiated by input provided by the user, but the subsequent actions that are performed “automatically” are not specified by the user, i.e., are not performed “manually”, where the user specifies each action to perform.
  • a user filling out an electronic form by selecting each field and providing input specifying information is filling out the form manually, even though the computer system must update the form in response to the user actions.
  • the form may be automatically filled out by the computer system where the computer system (e.g., software executing on the computer system) analyzes the fields of the form and fills in the form without any user input specifying the answers to the fields.
  • the user may invoke the automatic filling of the form, but is not involved in the actual filling of the form (e.g., the user is not manually specifying answers to fields but rather they are being automatically completed).
  • the present specification provides various examples of operations being automatically performed in response to actions the user has taken.
  • Approximately refers to a value that is almost correct or exact. For example, approximately may refer to a value that is within 1 to 10 percent of the exact (or desired) value. It should be noted, however, that the actual threshold value (or tolerance) may be application dependent. For example, in some embodiments, “approximately” may mean within 0.1% of some specified or desired value, while in various other embodiments, the threshold may be, for example, 2%, 3%, 5%, and so forth, as desired or as required by the particular application.
  • Concurrent refers to parallel execution or performance, where tasks, processes, or programs are performed in an at least partially overlapping manner.
  • concurrency may be implemented using “strong” or strict parallelism, where tasks are performed (at least partially) in parallel on respective computational elements, or using “weak parallelism”, where the tasks are performed in an interleaved manner, e.g., by time multiplexing of execution threads.
  • Various components may be described as “configured to” perform a task or tasks.
  • “configured to” is a broad recitation generally meaning “having structure that” performs the task or tasks during operation. As such, the component can be configured to perform the task even when the component is not currently performing that task (e.g., a set of electrical conductors may be configured to electrically connect a module to another module, even when the two modules are not connected).
  • “configured to” may be a broad recitation of structure generally meaning “having circuitry that” performs the task or tasks during operation. As such, the component can be configured to perform the task even when the component is not currently on.
  • the circuitry that forms the structure corresponding to “configured to” may include hardware circuits.
  • FIGS. 1 and 2 Communication System
  • FIG. 1 illustrates a simplified example wireless communication system, according to some embodiments. It is noted that the system of FIG. 1 is merely one example of a possible system, and that features of this disclosure may be implemented in any of various systems, as desired.
  • the example wireless communication system includes a base station 102 A which communicates over a transmission medium with one or more user devices 106 A, 106 B, etc., through 106 N.
  • Each of the user devices may be referred to herein as a “user equipment” (UE).
  • UE user equipment
  • the user devices 106 are referred to as UEs or UE devices.
  • the base station (BS) 102 A may be a base transceiver station (BTS) or cell site (a “cellular base station”), and may include hardware that enables wireless communication with the UEs 106 A through 106 N.
  • BTS base transceiver station
  • cellular base station a base station
  • the communication area (or coverage area) of the base station may be referred to as a “cell.”
  • the base station 102 A and the UEs 106 may be configured to communicate over the transmission medium using any of various radio access technologies (RATs), also referred to as wireless communication technologies, or telecommunication standards, such as GSM, UMTS (associated with, for example, WCDMA or TD-SCDMA air interfaces), LTE, LTE-Advanced (LTE-A), 5G new radio (5G NR), HSPA, 3GPP2 CDMA2000 (e.g., 1 ⁇ RTT, 1 ⁇ EV-DO, HRPD, eHRPD), etc.
  • RATs radio access technologies
  • GSM Global System for Mobile communications
  • UMTS associated with, for example, WCDMA or TD-SCDMA air interfaces
  • LTE LTE-Advanced
  • 5G NR 5G new radio
  • 3GPP2 CDMA2000 e.g., 1 ⁇ RTT, 1 ⁇ EV-DO, HRPD,
  • the base station 102 A may alternately be referred to as an ‘eNodeB’ or ‘eNB’.
  • eNodeB evolved NodeB
  • gNodeB gNodeB
  • the base station 102 A may also be equipped to communicate with a network 100 (e.g., a core network of a cellular service provider, a telecommunication network such as a public switched telephone network (PSTN), and/or the Internet, among various possibilities).
  • a network 100 e.g., a core network of a cellular service provider, a telecommunication network such as a public switched telephone network (PSTN), and/or the Internet, among various possibilities.
  • PSTN public switched telephone network
  • the base station 102 A may facilitate communication between the user devices and/or between the user devices and the network 100 .
  • the cellular base station 102 A may provide UEs 106 with various telecommunication capabilities, such as voice, SMS and/or data services.
  • Base station 102 A and other similar base stations (such as base stations 102 B . . . 102 N) operating according to the same or a different cellular communication standard may thus be provided as a network of cells, which may provide continuous or nearly continuous overlapping service to UEs 106 A-N and similar devices over a geographic area via one or more cellular communication standards.
  • each UE 106 may also be capable of receiving signals from (and possibly within communication range of) one or more other cells (which might be provided by base stations 102 B-N and/or any other base stations), which may be referred to as “neighboring cells”. Such cells may also be capable of facilitating communication between user devices and/or between user devices and the network 100 . Such cells may include “macro” cells, “micro” cells, “pico” cells, and/or cells which provide any of various other granularities of service area size.
  • base stations 102 A-B illustrated in FIG. 1 might be macro cells, while base station 102 N might be a micro cell. Other configurations are also possible.
  • base station 102 A may be a next generation base station, e.g., a 5G New Radio (5G NR) base station, or “gNB”.
  • a gNB may be connected to a legacy evolved packet core (EPC) network and/or to a NR core (NRC) network.
  • EPC legacy evolved packet core
  • NRC NR core
  • a gNB cell may include one or more transition and reception points (TRPs).
  • TRPs transition and reception points
  • a UE capable of operating according to 5G NR may be connected to one or more TRPs within one or more gNBs.
  • a UE 106 may be capable of communicating using multiple wireless communication standards.
  • the UE 106 may be configured to communicate using a wireless networking (e.g., Wi-Fi) and/or peer-to-peer wireless communication protocol (e.g., Bluetooth, Wi-Fi peer-to-peer, etc.) in addition to at least one cellular communication protocol (e.g., GSM, UMTS (associated with, for example, WCDMA or TD-SCDMA air interfaces), LTE, LTE-A, 5G NR, HSPA, 3GPP2 CDMA2000 (e.g., 1 ⁇ RTT, 1 ⁇ EV-DO, HRPD, eHRPD), etc.).
  • GSM Global System for Mobile communications
  • UMTS associated with, for example, WCDMA or TD-SCDMA air interfaces
  • LTE Long Term Evolution
  • LTE-A Long Term Evolution
  • 5G NR Fifth Generation
  • HSPA High Speed Packet Access
  • 3GPP2 CDMA2000 e.g.
  • the UE 106 may also or alternatively be configured to communicate using one or more global navigational satellite systems (GNSS, e.g., GPS or GLONASS), one or more mobile television broadcasting standards (e.g., ATSC-M/H or DVB-H), and/or any other wireless communication protocol, if desired.
  • GNSS global navigational satellite systems
  • mobile television broadcasting standards e.g., ATSC-M/H or DVB-H
  • any other wireless communication protocol if desired.
  • Other combinations of wireless communication standards including more than two wireless communication standards are also possible.
  • FIG. 2 illustrates user equipment 106 (e.g., one of the devices 106 A through 106 N) in communication with a base station 102 , according to some embodiments.
  • the UE 106 may be a device with cellular communication capability such as a mobile phone, a hand-held device, a computer or a tablet, or virtually any type of wireless device.
  • the UE 106 may include a processor that is configured to execute program instructions stored in memory. The UE 106 may perform any of the method embodiments described herein by executing such stored instructions. Alternatively, or in addition, the UE 106 may include a programmable hardware element such as an FPGA (field-programmable gate array) that is configured to perform any of the method embodiments described herein, or any portion of any of the method embodiments described herein.
  • a programmable hardware element such as an FPGA (field-programmable gate array) that is configured to perform any of the method embodiments described herein, or any portion of any of the method embodiments described herein.
  • the UE 106 may include one or more antennas for communicating using one or more wireless communication protocols or technologies.
  • the UE 106 may be configured to communicate using, for example, CDMA2000 (1 ⁇ RTT/1 ⁇ EV-DO/HRPD/eHRPD) or LTE using a single shared radio and/or GSM or LTE using the single shared radio.
  • the shared radio may couple to a single antenna, or may couple to multiple antennas (e.g., for MIMO) for performing wireless communications.
  • a radio may include any combination of a baseband processor, analog RF signal processing circuitry (e.g., including filters, mixers, oscillators, amplifiers, etc.), or digital processing circuitry (e.g., for digital modulation as well as other digital processing).
  • the radio may implement one or more receive and transmit chains using the aforementioned hardware.
  • the UE 106 may share one or more parts of a receive and/or transmit chain between multiple wireless communication technologies, such as those discussed above.
  • the UE 106 may include separate transmit and/or receive chains (e.g., including separate antennas and other radio components) for each wireless communication protocol with which it is configured to communicate.
  • the UE 106 may include one or more radios which are shared between multiple wireless communication protocols, and one or more radios which are used exclusively by a single wireless communication protocol.
  • the UE 106 might include a shared radio for communicating using either of LTE or 5G NR (or LTE or 1 ⁇ RTT or LTE or GSM), and separate radios for communicating using each of Wi-Fi and Bluetooth. Other configurations are also possible.
  • FIG. 3 Block Diagram of a UE
  • FIG. 3 illustrates an example simplified block diagram of a communication device 106 , according to some embodiments. It is noted that the block diagram of the communication device of FIG. 3 is only one example of a possible communication device.
  • communication device 106 may be a user equipment (UE) device, a mobile device or mobile station, a wireless device or wireless station, a desktop computer or computing device, a mobile computing device (e.g., a laptop, notebook, or portable computing device), a tablet and/or a combination of devices, among other devices.
  • the communication device 106 may include a set of components 300 configured to perform core functions.
  • this set of components may be implemented as a system on chip (SOC), which may include portions for various purposes.
  • SOC system on chip
  • this set of components 300 may be implemented as separate components or groups of components for the various purposes.
  • the set of components 300 may be coupled (e.g., communicatively; directly or indirectly) to various other circuits of the communication device 106 .
  • the communication device 106 may include various types of memory (e.g., including NAND flash 310 ), an input/output interface such as connector I/F 320 (e.g., for connecting to a computer system; dock; charging station; input devices, such as a microphone, camera, keyboard; output devices, such as speakers; etc.), the display 360 , which may be integrated with or external to the communication device 106 , and cellular communication circuitry 330 such as for 5G NR, LTE, GSM, etc., and short to medium range wireless communication circuitry 329 (e.g., BluetoothTM and WLAN circuitry).
  • communication device 106 may include wired communication circuitry (not shown), such as a network interface card, e.g., for Ethernet.
  • the cellular communication circuitry 330 may couple (e.g., communicatively; directly or indirectly) to one or more antennas, such as antennas 335 and 336 as shown.
  • the short to medium range wireless communication circuitry 329 may also couple (e.g., communicatively; directly or indirectly) to one or more antennas, such as antennas 337 and 338 as shown.
  • the short to medium range wireless communication circuitry 329 may couple (e.g., communicatively; directly or indirectly) to the antennas 335 and 336 in addition to, or instead of, coupling (e.g., communicatively; directly or indirectly) to the antennas 337 and 338 .
  • the short to medium range wireless communication circuitry 329 and/or cellular communication circuitry 330 may include multiple receive chains and/or multiple transmit chains for receiving and/or transmitting multiple spatial streams, such as in a multiple-input multiple output (MIMO) configuration.
  • MIMO multiple-input multiple output
  • cellular communication circuitry 330 may include dedicated receive chains (including and/or coupled to, e.g., communicatively; directly or indirectly. dedicated processors and/or radios) for multiple RATs (e.g., a first receive chain for LTE and a second receive chain for 5G NR).
  • cellular communication circuitry 330 may include a single transmit chain that may be switched between radios dedicated to specific RATs.
  • a first radio may be dedicated to a first RAT, e.g., LTE, and may be in communication with a dedicated receive chain and a transmit chain shared with an additional radio, e.g., a second radio that may be dedicated to a second RAT, e.g., 5G NR, and may be in communication with a dedicated receive chain and the shared transmit chain.
  • a first RAT e.g., LTE
  • a second radio may be dedicated to a second RAT, e.g., 5G NR, and may be in communication with a dedicated receive chain and the shared transmit chain.
  • the communication device 106 may also include and/or be configured for use with one or more user interface elements.
  • the user interface elements may include any of various elements, such as display 360 (which may be a touchscreen display), a keyboard (which may be a discrete keyboard or may be implemented as part of a touchscreen display), a mouse, a microphone and/or speakers, one or more cameras, one or more buttons, and/or any of various other elements capable of providing information to a user and/or receiving or interpreting user input.
  • the communication device 106 may further include one or more smart cards 345 that include SIM (Subscriber Identity Module) functionality, such as one or more UICC(s) (Universal Integrated Circuit Card(s)) cards 345 .
  • SIM Subscriber Identity Module
  • UICC Universal Integrated Circuit Card
  • the SOC 300 may include processor(s) 302 , which may execute program instructions for the communication device 106 and display circuitry 304 , which may perform graphics processing and provide display signals to the display 360 .
  • the processor(s) 302 may also be coupled to memory management unit (MMU) 340 , which may be configured to receive addresses from the processor(s) 302 and translate those addresses to locations in memory (e.g., memory 306 , read only memory (ROM) 350 , NAND flash memory 310 ) and/or to other circuits or devices, such as the display circuitry 304 , short range wireless communication circuitry 229 , cellular communication circuitry 330 , connector I/F 320 , and/or display 360 .
  • the MMU 340 may be configured to perform memory protection and page table translation or set up. In some embodiments, the MMU 340 may be included as a portion of the processor(s) 302 .
  • the communication device 106 may be configured to communicate using wireless and/or wired communication circuitry.
  • the communication device 106 may be configured to perform a method including the communication device 106 exchanging communications with a base station to determine one or more scheduling-power profiles.
  • the communications with the base station to determine the one or more scheduling-power profiles may include exchange of one or more radio resource control (RRC) signal messages.
  • RRC radio resource control
  • the one or more scheduling-power profiles may not conflict with one another.
  • a scheduling-power profile may specify one or more parameters associated with communication device 106 communication behavior, e.g., one or more constraints on communication device 106 communication behavior and/or slot scheduling of communication device 106 communications.
  • the method may include the communication device 106 receiving a slot configuration schedule from the base station.
  • the slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles.
  • the method may include the communication device 106 performing communications with the base station based on the at least one scheduling-power profile.
  • the communication device 106 may include hardware and software components for implementing the above features for a communication device 106 to communicate a scheduling-power profile for power savings to a network.
  • the processor 302 of the communication device 106 may be configured to implement part or all of the features described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium).
  • processor 302 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit).
  • the processor 302 of the communication device 106 in conjunction with one or more of the other components 300 , 304 , 306 , 310 , 320 , 329 , 330 , 340 , 345 , 350 , 360 may be configured to implement part or all of the features described herein.
  • processor 302 may include one or more processing elements.
  • processor 302 may include one or more integrated circuits (ICs) that are configured to perform the functions of processor 302 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processor(s) 302 .
  • cellular communication circuitry 330 and short-range wireless communication circuitry 329 may each include one or more processing elements.
  • one or more processing elements may be included in cellular communication circuitry 330 and, similarly, one or more processing elements may be included in short range wireless communication circuitry 329 .
  • cellular communication circuitry 330 may include one or more integrated circuits (ICs) that are configured to perform the functions of cellular communication circuitry 330 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of cellular communication circuitry 230 .
  • the short-range wireless communication circuitry 329 may include one or more ICs that are configured to perform the functions of short-range wireless communication circuitry 32 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of short-range wireless communication circuitry 329 .
  • FIG. 4 Block Diagram of a Base Station
  • FIG. 4 illustrates an example block diagram of a base station 102 , according to some embodiments. It is noted that the base station of FIG. 4 is merely one example of a possible base station. As shown, the base station 102 may include processor(s) 404 which may execute program instructions for the base station 102 . The processor(s) 404 may also be coupled to memory management unit (MMU) 440 , which may be configured to receive addresses from the processor(s) 404 and translate those addresses to locations in memory (e.g., memory 460 and read only memory (ROM) 450 ) or to other circuits or devices.
  • MMU memory management unit
  • the base station 102 may include at least one network port 470 .
  • the network port 470 may be configured to couple to a telephone network and provide a plurality of devices, such as UE devices 106 , access to the telephone network as described above in FIGS. 1 and 2 .
  • the network port 470 may also or alternatively be configured to couple to a cellular network, e.g., a core network of a cellular service provider.
  • the core network may provide mobility related services and/or other services to a plurality of devices, such as UE devices 106 .
  • the network port 470 may couple to a telephone network via the core network, and/or the core network may provide a telephone network (e.g., among other UE devices serviced by the cellular service provider).
  • base station 102 may be a next generation base station, e.g., a 5G New Radio (5G NR) base station, or “gNB”.
  • base station 102 may be connected to a legacy evolved packet core (EPC) network and/or to a NR core (NRC) network.
  • EPC legacy evolved packet core
  • NRC NR core
  • base station 102 may be considered a 5G NR cell and may include one or more transition and reception points (TRPs).
  • TRPs transition and reception points
  • a UE capable of operating according to 5G NR may be connected to one or more TRPs within one or more gNB s.
  • the base station 102 may include at least one antenna 434 , and possibly multiple antennas.
  • the at least one antenna 434 may be configured to operate as a wireless transceiver and may be further configured to communicate with UE devices 106 via radio 430 .
  • the antenna 434 communicates with the radio 430 via communication chain 432 .
  • Communication chain 432 may be a receive chain, a transmit chain or both.
  • the radio 430 may be configured to communicate via various wireless communication standards, including, but not limited to, 5G NR, LTE, LTE-A, GSM, UMTS, CDMA2000, Wi-Fi, etc.
  • the base station 102 may be configured to communicate wirelessly using multiple wireless communication standards.
  • the base station 102 may include multiple radios, which may enable the base station 102 to communicate according to multiple wireless communication technologies.
  • the base station 102 may include an LTE radio for performing communication according to LTE as well as a 5G NR radio for performing communication according to 5G NR.
  • the base station 102 may be capable of operating as both an LTE base station and a 5G NR base station.
  • the base station 102 may include a multi-mode radio which is capable of performing communications according to any of multiple wireless communication technologies (e.g., 5G NR and Wi-Fi, LTE and Wi-Fi, LTE and UMTS, LTE and CDMA2000, UMTS and GSM, etc.).
  • multiple wireless communication technologies e.g., 5G NR and Wi-Fi, LTE and Wi-Fi, LTE and UMTS, LTE and CDMA2000, UMTS and GSM, etc.
  • the BS 102 may include hardware and software components for implementing or supporting implementation of features described herein.
  • the processor 404 of the base station 102 may be configured to implement or support implementation of part or all of the methods described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium).
  • the processor 404 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit), or a combination thereof.
  • the processor 404 of the BS 102 in conjunction with one or more of the other components 430 , 432 , 434 , 440 , 450 , 460 , 470 may be configured to implement or support implementation of part or all of the features described herein.
  • processor(s) 404 may be comprised of one or more processing elements. In other words, one or more processing elements may be included in processor(s) 404 .
  • processor(s) 404 may include one or more integrated circuits (ICs) that are configured to perform the functions of processor(s) 404 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processor(s) 404 .
  • radio 430 may be comprised of one or more processing elements.
  • one or more processing elements may be included in radio 430 .
  • radio 430 may include one or more integrated circuits (ICs) that are configured to perform the functions of radio 430 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of radio 430 .
  • FIG. 5 Block Diagram of Cellular Communication Circuitry
  • FIG. 5 illustrates an example simplified block diagram of cellular communication circuitry, according to some embodiments. It is noted that the block diagram of the cellular communication circuitry of FIG. 5 is only one example of a possible cellular communication circuit.
  • cellular communication circuitry 330 may be include in a communication device, such as communication device 106 described above.
  • communication device 106 may be a user equipment (UE) device, a mobile device or mobile station, a wireless device or wireless station, a desktop computer or computing device, a mobile computing device (e.g., a laptop, notebook, or portable computing device), a tablet and/or a combination of devices, among other devices.
  • UE user equipment
  • the cellular communication circuitry 330 may couple (e.g., communicatively; directly or indirectly) to one or more antennas, such as antennas 335 a - b and 336 as shown (in FIG. 3 ).
  • cellular communication circuitry 330 may include dedicated receive chains (including and/or coupled to, e.g., communicatively; directly or indirectly. dedicated processors and/or radios) for multiple RATs (e.g., a first receive chain for LTE and a second receive chain for 5G NR).
  • cellular communication circuitry 330 may include a modem 510 and a modem 520 .
  • Modem 510 may be configured for communications according to a first RAT, e.g., such as LTE or LTE-A, and modem 520 may be configured for communications according to a second RAT, e.g., such as 5G NR.
  • a first RAT e.g., such as LTE or LTE-A
  • modem 520 may be configured for communications according to a second RAT, e.g., such as 5G NR.
  • modem 510 may include one or more processors 512 and a memory 516 in communication with processors 512 .
  • Modem 510 may be in communication with a radio frequency (RF) front end 530 .
  • RF front end 530 may include circuitry for transmitting and receiving radio signals.
  • RF front end 530 may include receive circuitry (RX) 532 and transmit circuitry (TX) 534 .
  • receive circuitry 532 may be in communication with downlink (DL) front end 550 , which may include circuitry for receiving radio signals via antenna 335 a.
  • DL downlink
  • modem 520 may include one or more processors 522 and a memory 526 in communication with processors 522 .
  • Modem 520 may be in communication with an RF front end 540 .
  • RF front end 540 may include circuitry for transmitting and receiving radio signals.
  • RF front end 540 may include receive circuitry 542 and transmit circuitry 544 .
  • receive circuitry 542 may be in communication with DL front end 560 , which may include circuitry for receiving radio signals via antenna 335 b.
  • a switch 570 may couple transmit circuitry 534 to uplink (UL) front end 572 .
  • switch 570 may couple transmit circuitry 544 to UL front end 572 .
  • UL front end 572 may include circuitry for transmitting radio signals via antenna 336 .
  • switch 570 may be switched to a first state that allows modem 510 to transmit signals according to the first RAT (e.g., via a transmit chain that includes transmit circuitry 534 and UL front end 572 ).
  • switch 570 may be switched to a second state that allows modem 520 to transmit signals according to the second RAT (e.g., via a transmit chain that includes transmit circuitry 544 and UL front end 572 ).
  • the cellular communication circuitry 330 may be configured to perform a method including exchanging communications with a base station to determine one or more scheduling-power profiles.
  • the communications with the base station to determine the one or more scheduling-power profiles may include exchange of one or more radio resource control (RRC) signal messages.
  • RRC radio resource control
  • the one or more scheduling-power profiles may not conflict with one another.
  • a scheduling-power profile may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications.
  • the method may include receiving a slot configuration schedule from the base station. The slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles. Further, the method may include performing communications with the base station based on the at least one scheduling-power profile.
  • the modem 510 may include hardware and software components for implementing the above features or for time division multiplexing UL data for NSA NR operations, as well as the various other techniques described herein.
  • the processors 512 may be configured to implement part or all of the features described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium).
  • processor 512 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit).
  • processor 512 in conjunction with one or more of the other components 530 , 532 , 534 , 550 , 570 , 572 , 335 and 336 may be configured to implement part or all of the features described herein.
  • processors 512 may include one or more processing elements.
  • processors 512 may include one or more integrated circuits (ICs) that are configured to perform the functions of processors 512 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processors 512 .
  • the modem 520 may include hardware and software components for implementing the above features for communicating a scheduling-power profile for power savings to a network, as well as the various other techniques described herein.
  • the processors 522 may be configured to implement part or all of the features described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium).
  • processor 522 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit).
  • processor 522 in conjunction with one or more of the other components 540 , 542 , 544 , 550 , 570 , 572 , 335 and 336 may be configured to implement part or all of the features described herein.
  • processors 522 may include one or more processing elements.
  • processors 522 may include one or more integrated circuits (ICs) that are configured to perform the functions of processors 522 .
  • each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processors 522 .
  • fifth generation (5G) wireless communication will initially be deployed concurrently with current wireless communication standards (e.g., LTE).
  • current wireless communication standards e.g., LTE
  • dual connectivity between LTE and 5G new radio (5G NR or NR) has been specified as part of the initial deployment of NR.
  • EPC evolved packet core
  • eNB 602 may continue to communicate with current LTE base stations (e.g., eNB 602 ).
  • eNB 602 may be in communication with a 5G NR base station (e.g., gNB 604 ) and may pass data between the EPC network 600 and gNB 604 .
  • gNB 604 5G NR base station
  • EPC network 600 may be used (or reused) and gNB 604 may serve as extra capacity for UEs, e.g., for providing increased downlink throughput to UEs.
  • LTE may be used for control plane signaling and NR may be used for user plane signaling.
  • LTE may be used to establish connections to the network and NR may be used for data services.
  • FIG. 6B illustrates a proposed protocol stack for eNB 602 and gNB 604 .
  • eNB 602 may include a medium access control (MAC) layer 632 that interfaces with radio link control (RLC) layers 622 a - b .
  • RLC layer 622 a may also interface with packet data convergence protocol (PDCP) layer 612 a and RLC layer 622 b may interface with PDCP layer 612 b .
  • PDCP layer 612 a may interface via a master cell group (MCG) bearer to EPC network 600 whereas PDCP layer 612 b may interface via a split bearer with EPC network 600 .
  • MCG master cell group
  • gNB 604 may include a MAC layer 634 that interfaces with RLC layers 624 a - b .
  • RLC layer 624 a may interface with PDCP layer 612 b of eNB 602 via an X2 interface for information exchange and/or coordination (e.g., scheduling of a UE) between eNB 602 and gNB 604 .
  • RLC layer 624 b may interface with PDCP layer 614 . Similar to dual connectivity as specified in LTE-Advanced Release 12, PDCP layer 614 may interface with EPC network 600 via a secondary cell group (SCG) bearer.
  • SCG secondary cell group
  • eNB 602 may be considered a master node (MeNB) while gNB 604 may be considered a secondary node (SgNB).
  • a UE may be required to maintain a connection to both an MeNB and a SgNB.
  • the MeNB may be used to maintain a radio resource control (RRC) connection to an EPC while the SgNB may be used for capacity (e.g., additional downlink and/or uplink throughput).
  • RRC radio resource control
  • the 5G core network may be accessed via (or through) a cellular connection/interface (e.g., via a 3GPP communication architecture/protocol) and a non-cellular connection/interface (e.g., a non-3GPP access architecture/protocol such as Wi-Fi connection).
  • FIG. 7A illustrates an example of a 5G network architecture that incorporates both 3GPP (e.g., cellular) and non-3GPP (e.g., non-cellular) access to the 5G CN, according to some embodiments.
  • a user equipment device may access the 5G CN through both a radio access network (RAN, e.g., such as gNB or base station 604 ) and an access point, such as AP 112 .
  • the AP 112 may include a connection to the Internet 700 as well as a connection to a non-3GPP inter-working function (N3IWF) 702 network entity.
  • the N3IWF may include a connection to a core access and mobility management function (AMF) 704 of the 5G CN.
  • the AMF 704 may include an instance of a 5G mobility management (5G MM) function associated with the UE 106 .
  • 5G MM 5G mobility management
  • the RAN e.g., gNB 604
  • the 5G CN may support unified authentication over both connections as well as allow simultaneous registration for UE 106 access via both gNB 604 and AP 112 .
  • the AMF 704 may include one or more functional entities associated with the 5G CN (e.g., network slice selection function (NSSF) 720 , short message service function (SMSF) 722 , application function (AF) 724 , unified data management (UDM) 726 , policy control function (PCF) 728 , and/or authentication server function (AUSF) 730 ).
  • NSF network slice selection function
  • SMSF short message service function
  • AF application function
  • UDM unified data management
  • PCF policy control function
  • AUSF authentication server function
  • a session management function (SMF) 706 a and an SMF 706 b of the 5G CN may also be supported by a session management function (SMF) 706 a and an SMF 706 b of the 5G CN.
  • the AMF 706 may be connected to (or in communication with) the SMF 706 a .
  • the gNB 604 may in communication with (or connected to) a user plane function (UPF) 708 a that may also be communication with the SMF 706 a .
  • the N3IWF 702 may be communicating with a UPF 708 b that may also be communicating with the SMF 706 b . Both UPFs may be communicating with the data network (e.g., DN 710 a and 710 b ) and/or the Internet 700 and IMS core network 710 .
  • FIG. 7B illustrates an example of a 5G network architecture that incorporates both dual 3GPP (e.g., LTE and 5G NR) access and non-3GPP access to the 5G CN, according to some embodiments.
  • a user equipment device e.g., such as UE 106
  • the AP 112 may include a connection to the Internet 700 as well as a connection to the N3IWF 702 network entity.
  • the N3IWF may include a connection to the AMF 704 of the 5G CN.
  • the AMF 704 may include an instance of the 5G MM function associated with the UE 106 .
  • the RAN e.g., gNB 604
  • the 5G CN may support unified authentication over both connections as well as allow simultaneous registration for UE 106 access via both gNB 604 and AP 112 .
  • the 5G CN may support dual-registration of the UE on both a legacy network (e.g., LTE via base station 602 ) and a 5G network (e.g., via base station 604 ).
  • the base station 602 may have connections to a mobility management entity (MME) 742 and a serving gateway (SGW) 744 .
  • MME 742 may have connections to both the SGW 744 and the AMF 704 .
  • SGW 744 may have connections to both the SMF 706 a and the UPF 708 a .
  • the AMF 704 may include one or more functional entities associated with the 5G CN (e.g., NSSF 720 , SMSF 722 , AF 724 , UDM 726 , PCF 728 , and/or AUSF 730 ).
  • UDM 726 may also include a home subscriber server (HSS) function and the PCF may also include a policy and charging rules function (PCRF).
  • HSS home subscriber server
  • PCF policy and charging rules function
  • these functional entities may also be supported by the SMF 706 a and the SMF 706 b of the 5G CN.
  • the AMF 706 may be connected to (or in communication with) the SMF 706 a .
  • the gNB 604 may in communication with (or connected to) the UPF 708 a that may also be communication with the SMF 706 a .
  • the N3IWF 702 may be communicating with a UPF 708 b that may also be communicating with the SMF 706 b .
  • Both UPFs may be communicating with the data network (e.g., DN 710 a and 710 b ) and/or the Internet 700 and IMS core network 710 .
  • one or more of the above described network entities may be configured to perform methods to schedule a UE based on a scheduling-power profile that may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications, e.g., as further described herein.
  • FIG. 8 illustrates an example of a baseband processor architecture for a UE (e.g., such as UE 106 ), according to some embodiments.
  • the baseband processor architecture 800 described in FIG. 8 may be implemented on one or more radios (e.g., radios 329 and/or 330 described above) or modems (e.g., modems 510 and/or 520 ) as described above.
  • the non-access stratum (NAS) 810 may include a 5G NAS 820 and a legacy NAS 850 .
  • the legacy NAS 850 may include a communication connection with a legacy access stratum (AS) 870 .
  • AS legacy access stratum
  • the 5G NAS 820 may include communication connections with both a 5G AS 840 and a non-3GPP AS 830 and Wi-Fi AS 832 .
  • the 5G NAS 820 may include functional entities associated with both access stratums.
  • the 5G NAS 820 may include multiple 5G MM entities 826 and 828 and 5G session management (SM) entities 822 and 824 .
  • the legacy NAS 850 may include functional entities such as short message service (SMS) entity 852 , evolved packet system (EPS) session management (ESM) entity 854 , session management (SM) entity 856 , EPS mobility management (EMM) entity 858 , and mobility management (MM)/GPRS mobility management (GMM) entity 860 .
  • the legacy AS 870 may include functional entities such as LTE AS 872 , UMTS AS 874 , and/or GSM/GPRS AS 876 .
  • the baseband processor architecture 800 allows for a common 5G-NAS for both 5G cellular and non-cellular (e.g., non-3GPP access).
  • the 5G MM may maintain individual connection management and registration management state machines for each connection.
  • a device e.g., UE 106
  • PLMN e.g., 5G CN
  • 5G CN e.g., 5G CN
  • there may be common 5G-MM procedures e.g., registration, de-registration, identification, authentication, as so forth for both accesses.
  • one or more of the above described elements may be configured to perform methods schedule a UE based on a scheduling-power profile that may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications, e.g., as further described herein.
  • a UE may be configured to monitor the Physical Downlink Control Channel (PDCCH) periodically, e.g., as illustrated by FIG. 9A .
  • the UE may monitor the PDCCH every fifth slot 902 and, if the UE does not have any pending data, the UE may go into a low power mode to reduce power consumption when not monitoring the PDCCH in slots 904 .
  • a search space configuration may be enabled to allow the UE to monitor the PDCCH periodically. The power consumption of the UE during periodic monitoring of the PDCCH is illustrated by FIG. 9B .
  • the UE when no monitoring the PDCCH, the UE may have a very low power consumption; however, the power consumption may ramp up ahead of the monitoring period (e.g., power ramp 910 ), may remain at maximum power consumption for a period of time before, during, and after the monitoring period (e.g., maximum power level 912 ), and then may ramp down after the monitoring period is complete (e.g., power ramp 914 ).
  • the power consumption may ramp up ahead of the monitoring period (e.g., power ramp 910 ), may remain at maximum power consumption for a period of time before, during, and after the monitoring period (e.g., maximum power level 912 ), and then may ramp down after the monitoring period is complete (e.g., power ramp 914 ).
  • the UE receives data in a slot N (e.g., slot 906 of FIG. 9A )
  • the UE will wake up prior to (before) slot N to prepare for reception of the data.
  • the UE may consume power (e.g., power ramp 910 ) to prepare (or reinitialize/start) its clock, set its voltage configuration, warm up the UE's radio frequency integrated circuit (RFIC), phase lock loop (PLL) lock, and so forth.
  • power e.g., power ramp 910
  • RFIC radio frequency integrated circuit
  • PLL phase lock loop
  • a modem of the UE may perform decoding and a series of actions for signal decoding and shutting down elements of the UE to reduce power consumption.
  • the UE modem may shut down the RFIC, perform automatic gain control (AGC), update time tracking loops (TTL) and/or frequency tracking loops (FTL), perform channel estimation, and/or perform data decoding.
  • AGC automatic gain control
  • TTL update time tracking loops
  • FTL frequency tracking loops
  • the UE when the UE transmits data in a slot N (e.g., slot 906 of FIG. 9A ), the UE will wake up prior to (before) slot N to prepare for transmission of the data.
  • the UE may consume power (e.g., power ramp 910 ) to prepare (or reinitialize/start) its clock, warm up the UE's RFIC, phase lock loop (PLL) lock, encode the data, and so forth.
  • the UE may consume power (e.g., power ramp 914 ) shutting down the RFIC.
  • Embodiments described herein disclose systems and methods for reducing power consumption during wakeup and shut down associated with periodic monitoring of the PDCCH.
  • the UE may notify a base station (e.g., a gNB) of a scheduling constraint via a scheduling profile, such as a scheduling-power profile.
  • a scheduling profile such as a scheduling-power profile.
  • FIGS. 10D, 11D, 12D, and 13D illustrate power savings for various transmit and/or receive scenarios.
  • the UE may transmit an acknowledgement, transmit data on the PUSCH, and/or transmit other various data and/or control information.
  • the UE may receive data on the PDCCH and/or on the PDSCH.
  • FIG. 10D illustrates power savings across two transmissions as compared to current implementations as illustrated by FIGS. 10A-10C , according to some embodiments.
  • FIGS. 10A-10C illustrate the power consumed for a first transmission ( FIG. 10A ), the power consumed for a second transmission ( FIG. 10B ), and the total power consumed across the two transmissions ( FIG. 10C ).
  • the UE consumes power to prepare for the transmission, perform the transmission, and then power down after the transmission.
  • the UE may avoid the power consumed powering down after the first transmission and powering back up for the second transmission, thereby saving additional power as compared to current implementations.
  • FIG. 11D illustrates power savings across two receptions as compared to current implementations as illustrated by FIGS. 11A-11C , according to some embodiments.
  • FIGS. 11A-11C illustrate the power consumed for a first reception ( FIG. 11A ), the power consumed for a second reception ( FIG. 11B ), and the total power consumed across the two receptions ( FIG. 11C ).
  • the UE consumes power to prepare for the reception, perform the reception, and then power down after the reception.
  • the UE may avoid the power consumed powering down after the first reception and powering back up for the second reception, thereby saving additional power as compared to current implementations.
  • FIG. 12D illustrates power savings across a transmission followed by a reception as compared to current implementations as illustrated by FIGS. 12A-12C , according to some embodiments.
  • FIGS. 12A-12C illustrate the power consumed for a transmission ( FIG. 12A ), the power consumed for a reception ( FIG. 12B ), and the total power consumed across the transmission and reception ( FIG. 12C ).
  • the UE consumes power to prepare for the transmission/reception, perform the transmission/reception, and then power down after the transmission/reception.
  • the UE may avoid the power consumed powering down after the transmission and powering back up for the reception, thereby saving additional power as compared to current implementations.
  • FIG. 13D illustrates power savings across a reception followed by a transmission as compared to current implementations as illustrated by FIGS. 13A-13C , according to some embodiments.
  • FIGS. 13A-13C illustrate the power consumed for a reception ( FIG. 13A ), the power consumed for a transmission ( FIG. 13B ), and the total power consumed across the reception and transmission ( FIG. 13C ).
  • the UE consumes power to prepare for the transmission/reception, perform the transmission/reception, and then power down after the transmission/reception.
  • the UE may avoid the power consumed powering down after the reception and powering back up for the transmission, thereby saving additional power as compared to current implementations.
  • FIG. 14 illustrates a block diagram of an example of a process for determining a scheduling profile for a UE, according to some embodiments.
  • the process shown in FIG. 14 may be used in conjunction with any of the systems or devices shown in the above Figures, among other devices.
  • some of the process elements shown may be performed concurrently, in a different order than shown, or may be omitted. Additional process elements may also be performed as desired. As shown, this process may operate as follows.
  • a UE may propose one or more scheduling profiles, such as one or more scheduling-power profiles, to a base station, such as base station 102 (which may be configured as a gNB, such as gNB 604 ).
  • a base station such as base station 102 (which may be configured as a gNB, such as gNB 604 ).
  • the scheduling-power profiles may not conflict with one another.
  • the proposal may be communicated via radio resource control (RRC) signaling message.
  • RRC radio resource control
  • a scheduling-power profile may include one or more (or a set of) parameters and/or constraints for system configuration. The parameters (or constraints) may limit network scheduling to a particular configuration.
  • a scheduling-power profile may include a set of other scheduling-power profiles.
  • a scheduling-power profile may specify a particular UE behavior, or sets of behaviors.
  • a profile P1 may specify a profile for delayed acknowledgement (ACK) with PDCCH monitoring.
  • a profile P2 may specify a profile for delayed PUSCH scheduling with PDCCH monitoring.
  • a profile P3 may specify a profile for cross-slot scheduling with PDCCH monitoring; a profile P4 may specify a profile for large bandwidth part (BWP) for large data packet scheduling; a profile P5 may specify a profile for self-contained slot scheduling; a profile P10 may specify a profile for power savings, e.g., a set of profiles including any, some, or all of profiles P1, P2, and/or P3; a profile P11 may specify a profile for high throughput, e.g., a set of profiles including any, some, or all of profiles P1 and/or P4; a profile P14 may specify a profile for low latency, e.g., a set of profiles including at least profile P5; a profile P15 may specify a profile for high system capacity; a profile P14 may specify a profile for small data traffic, e.g., voice data and or SMS data; a profile P20 may specify a profile for PDCCH monitoring period.
  • BWP bandwidth part
  • a scheduling-power profile may include one or more parameters to specify the profile.
  • the parameters may include a set of values for search space monitoring periodicity.
  • the parameters may include a set of configurable values and/or constraints for K0, where K0 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for PDSCH.
  • the parameters may include a set of configurable values and/or constraints for K1, where K1 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDSCH and a slot scheduled for an acknowledgment.
  • the parameters may include a set of configurable values and/or constraints for K2, where K2 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for the PUSCH.
  • the parameters may include minimum and/or maximum bandwidth values and/or constraints in BWPs, a set of supported number of multiple-input-multiple-output (MIMO) layers, search space indices, control resource set (CORESET) indices, BWP indices, secondary cell (Scell) indices, maximum number of Scells, DRX configurations, and so forth.
  • differing profiles may include differing parameters and/or constraints.
  • a first profile may include a first combination of the above discussed parameters, among other parameters and a second profile may include a second combination of the above discussed parameters.
  • FIG. 16 illustrates example parameter sets for various profiles, according to some embodiments.
  • a profile P1 may include various parameters for supporting delayed ACK with following PDCCH monitoring, such as a first parameter, p, where p specifies search space monitoring periodicity, and a second parameter defining a relationship between K0, K1, and p.
  • a profile P2 may include various parameters for supporting delayed PUSCH with following PDCCH monitoring, such as a first parameter, p, where p specifies search space monitoring periodicity, and a second parameter defining a relationship between K2 and p.
  • a profile P3 may include various parameters for supporting delayed cross-slot scheduling with following PDCCH monitoring, such as a first parameter, p, where p specifies search space monitoring periodicity, and a second parameter defining a relationship between K0, and p, and a third parameter specifying a value of K1.
  • a profile P4 may include various parameters for supporting a low traffic rate, such as supported BWPs, supported search space indices, supported MIMO layers, supported values of K0, K1, and K2, supported Scell indices, supported number of S cells, and so forth.
  • the base station may determine whether to accept the scheduling proposal (e.g., the one or more scheduling-power profiles proposed by the UE at 1402 ). The determination may be based, at least in part, on network scheduling constraints such as whether the base station has pending data for the UE, whether the base station has previously accepted scheduling proposals (from the UE and/or from other UEs served by the base station) that conflict with the UE's proposal, channel conditions, and so forth. If the base station accepts the scheduling proposal the process may continue at 1410 . Alternatively, if the base station does not accept the scheduling proposal, the process may continue at 1406 .
  • the scheduling proposal e.g., the one or more scheduling-power profiles proposed by the UE at 1402 . The determination may be based, at least in part, on network scheduling constraints such as whether the base station has pending data for the UE, whether the base station has previously accepted scheduling proposals (from the UE and/or from other UEs served by the base station) that conflict with the UE's proposal, channel conditions,
  • the base station may communicate a counter proposal to the UE.
  • the base station and UE may negotiate (e.g., via an exchange of one or more additional proposals) to determine a scheduling-power profile (or scheduling-power profiles) for UE communications.
  • the UE and the base station may agree on more than one scheduling-power profile so long as the multiple profiles do not conflict with one another.
  • the base station may configure the UE with multiple profiles.
  • one or more scheduling-power profiles may be active, where an active profile may be a profile currently being used between the base station and the UE.
  • the UE and base station may communicate based on at least one of the agreed upon scheduling-power profiles (e.g., active profiles). For example, if a first profile specifies UE behavior when transmitting an acknowledgment (ACK) while performing PDCCH monitoring, the base station may schedule the ACK in a slot consecutive to the PDCCH monitoring based on a search space monitoring periodicity included in the first profile, e.g., as further described below in reference to FIG. 17 .
  • the agreed upon scheduling-power profiles e.g., active profiles.
  • the base station may schedule the ACK in a slot consecutive to the PDCCH monitoring based on a search space monitoring periodicity included in the first profile, e.g., as further described below in reference to FIG. 17 .
  • a second profile specifies UE behavior when transmitting on the PUSCH while performing PDCCH monitoring
  • the base station may schedule the PUSCH transmission in a slot consecutive to the PDCCH monitoring based on a search space monitoring periodicity included in the second profile, e.g., as further described below in reference to FIG. 18 .
  • a third profile specifies UE behavior for cross-slot scheduling while performing PDCCH monitoring
  • the base station may schedule the UE transmissions and receptions based on parameters included in a third profile, e.g., as further described below in reference to FIG. 19 .
  • a fourth profile specifies a self-contained slot
  • the base station may schedule the UE transmissions and receptions based on parameters included in a fourth profile, e.g., as further described below in reference to FIG. 20 .
  • FIG. 17 illustrates an example of a delayed acknowledgement with following PDCCH monitoring, according to some embodiments.
  • a UE such as UE 106
  • the network e.g., base station 102 , gNB 604
  • may schedule e.g., based in part on an agreed upon scheduling-power profile
  • the ACK transmission 1708 just before scheduled PDCCH monitoring 1702 occurs such that UE transmit and UE receive may occur in consecutive (e.g., back-to-back) time slots.
  • Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after transmitting the ACK) and a ramp up (e.g., before scheduled PDCCH monitoring 1702 ).
  • the UE may be configured to monitor the PDCCH every 5 time slots, thus, if the UE receives PDSCH in slot n (e.g., scheduling the PDSCH to the UE at 1706 ), the UE would typically transmit a corresponding ACK in slot n+1.
  • a scheduling-power profile may delay the corresponding ACK until slot n+4, as shown, thereby allowing the UE to save power by avoiding an RFIC ramp down and an RFIC ramp up.
  • the UE may not monitor the PDCCH at slots 1704 .
  • the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint.
  • the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring and p is greater than 1.
  • the UE constraint may be back-to-back (or consecutive) or very close (e.g., one slot gap) ACK and PDCCH monitoring.
  • an ACK for a PDSCH may be scheduled one time slot ahead of the PDCCH monitoring, e.g., time slot n ⁇ 1, such that the transmission (ACK) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between.
  • a scheduling-power profile e.g., an RRC parameter PS_ACK_Schedule is set to “true” or “1”
  • the network may make scheduling decisions (e.g., such as ACK transmission timing) to satisfy the UE constraint.
  • FIG. 18 illustrates an example of a delayed PUSCH with following PDCCH monitoring, according to some embodiments.
  • the network e.g., base station 102 , gNB 604
  • may schedule e.g., based in part on an agreed upon scheduling-power profile
  • the PUSCH 1808 may be transmitted in a time slot immediately preceding a scheduled PDCCH monitoring time slot 1802 such that the UE may transmit and receive in consecutive (back to back) time slots.
  • Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after transmitting on the PUSCH) and a ramp up (e.g., before scheduled PDCCH monitoring).
  • the UE may be configured to monitor the PDCCH every 5 time slots, thus, if the UE is scheduled to transmit PUSCH in slot n+4 and monitor PDCCH in the next slot (e.g., in slot n+5), then the UE may save power by avoiding an RFIC ramp down and an RFIC ramp up. Note that the UE may not monitor the PDCCH at slots 1804 .
  • the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint.
  • the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring andp is greater than 1.
  • the UE constraint may be back-to-back (or consecutive) PUSCH transmission and PDCCH monitoring.
  • a PUSCH transmission may be scheduled one time slot ahead of the PDCCH monitoring, e.g., time slot n ⁇ 1, such that the transmission (PUSCH) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between.
  • a scheduling-power profile e.g., an RRC parameter PS_PUSCH_Schedule is set to “true” or “1”
  • the network may make scheduling decisions (e.g., such as PUSCH transmission timing) to satisfy the UE constraint.
  • FIG. 19 illustrates an example of delayed cross-slot scheduling with following PDCCH monitoring, according to some embodiments.
  • the network e.g., base station 102 , gNB 604
  • may schedule e.g., based in part on an agreed upon scheduling-power profile
  • Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after transmitting on the PUSCH) and a ramp up (e.g., before scheduled PDCCH monitoring). Note that the UE may not monitor the PDCCH at slots 1904 . Note further that when the UE receives on the PDCCH only, the UE may use a narrow band (NB), however, if the UE also receives on the PDSCH, the UE may open up its radio frequency bandwidth to a wider bandwidth (WB) to receive data on the PDSCH.
  • WB wider bandwidth
  • PDSCH and ACK may be scheduled in a time slot immediately preceding scheduled PDCCH monitoring. As shown in FIG.
  • the UE may be configured to monitor the PDCCH every 3 time slots, thus, if the UE is scheduled to receive on the PDSCH in slot n+2 and an ACK of the PDCCH monitoring is delayed to slot n+2, then the UE may monitor PDCCH in the next slot (e.g., in slot n+3), thereby allowing the UE to save power by avoiding an RFIC ramp down and an RFIC ramp up while also taking advantage of bandwidth adaptation.
  • the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint.
  • the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring and p is greater than 1, and cross-slot scheduling may be enabled.
  • K0 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for
  • a PDSCH reception and ACK transmission may be scheduled one time slot ahead of the PDCCH monitoring, e.g., time slot n ⁇ 1, such that the reception (PDSCH)/transmission (ACK) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between.
  • a scheduling-power profile e.g., an RRC parameter PS_K1_equal_0 is set to “true” or “1”
  • the network may make scheduling decisions (e.g., such as ACK transmission timing and PDSCH reception) to satisfy the UE constraint.
  • FIG. 20 illustrates an example of self-contained slot scheduling with following PDCCH monitoring, according to some embodiments.
  • the network e.g., base station 102 , gNB 604
  • may schedule e.g., based in part on an agreed upon scheduling-power profile
  • Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after receiving on the PDCCH and after receiving PDSCH) and a ramp up (e.g., before receiving scheduled PDSCH and before sending ACK).
  • the UE may be configured to monitor the PDCCH every 3 time slots, thus, if the UE is scheduled to receive on the PDSCH in slot n, then an ACK of the PDSCH are also scheduled in slot n.
  • Such a scheme may allow the UE to save power by avoiding an RFIC ramp down and an RFIC ramp up. Note that the UE may not monitor the PDCCH at slots 2004 .
  • the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint.
  • the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring and p is greater than 1, and same slot scheduling may be enabled.
  • K0 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for PDSCH
  • K1 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDSCH and a slot scheduled for an acknowledgment.
  • a PDSCH reception and ACK transmission may be scheduled in a single slot with the PDCCH monitoring, e.g., time slot n, such that the reception (PDSCH)/transmission (ACK) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between.
  • the network may make scheduling decisions (e.g., such as ACK transmission timing and PDSCH reception) to satisfy the UE constraint.
  • one or multiple profiles may be active (e.g., configured for use) for data transfer between a UE, such as UE 106 , and a base station (network), such as base station 102 , gNB 604 .
  • profiles may be dynamically changed (or switched), e.g., in response to traffic arrival rate increases and/or decreases, traffic delay requirement changes, power consumption requirement changes, and so forth.
  • the dynamic change may be triggered via explicit signaling between the network and UE. For example, the network may send an explicit signal to the UE to change an active profile to be used for a data transfer.
  • the UE may send an explicit signal to the network to request change of an active profile to be used for a data transfer.
  • the dynamic change may be triggered (additionally and/or alternatively) based on a timer.
  • an active profile to be used for a data transfer may change based on a timer operation.
  • the network may indicate a profile to use to a UE, such as UE 106 via signaling using downlink control information (DCI), a medium access control (MAC) control element (CE), and/or radio resource control (RRC) signaling.
  • DCI downlink control information
  • MAC medium access control
  • RRC radio resource control
  • the network may send (transmit) a signal (e.g., an indication included in DCI, a MAC CE, and/or in RRC signaling) that may indicate to the UE to use a high throughput profile when there is a large amount of data to deliver to the UE.
  • the network may send (transmit) a signal (e.g., an indication included in DCI, a MAC CE, and/or in RRC signaling) that may indicate to the UE to use a power saving profile when traffic arrival rate decreases below a threshold.
  • a signal e.g., an indication included in DCI, a MAC CE, and/or in RRC signaling
  • the network may send (transmit) a layer 1 (L1) to indicate to the UE to use a low latency profile when supported traffic requires low latency.
  • L1 layer 1
  • the UE may send (transmit) a profile change request signal to the network. For example, when a UE knows that a downlink file transfer has been finished and may want to switch to a power saving profile. In other words, in response to completion of a downlink file transfer, the UE may request a profile change to a power saving profile.
  • a profile change may be based, at least in part, on a timer operation.
  • a timer e.g., a ProfileActiveTimer timer
  • the timer may be started, restarted, and/or reset when the network activates a new set of profiles.
  • the timer may be reset based on a condition obtaining.
  • the condition may include data arrival rate exceeding a threshold, a number of PDSCH slots scheduled for a specified number of slots exceeds a threshold, and so forth.
  • a current active profile may be deactivated (disabled) and a default profile may be activated (enabled).
  • the default profile may be updated periodically, e.g., via the network.
  • a method may include a user equipment device, such as UE 106 :
  • a scheduling-power profile specifies one or more parameters and/or constraints on UE communication behavior
  • the communications with the base station to determine the one or more scheduling-power profiles may include (comprise) radio resource control (RRC) signal message exchanges.
  • RRC radio resource control
  • the one or more scheduling-power profiles may not conflict with one another.
  • the one or more scheduling-power profiles may include (comprise) one or more of:
  • ACK delayed acknowledgement
  • PDCCH physical downlink control channel
  • PUSCH physical uplink shared channel
  • BWP large bandwidth part
  • a profile for small data traffic and/or a profile for PDCCH monitoring period.
  • the one or more parameters and/or constraints may include (comprise) one or more of:
  • a first parameter defining a set of values for search space monitoring periodicity
  • a second parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
  • a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment
  • a fourth parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for transmission on the PUSCH;
  • a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
  • the one or more scheduling-power profiles may include (comprise) a first profile constraining the base station to schedule transmission of an acknowledgment of data received on the PDCCH to a first slot immediately preceding a second slot scheduled for PDCCH monitoring.
  • the first profile may be indicated via a PS_ACK_Schedule RRC parameter.
  • the one or more scheduling-power profiles may include (comprise) a second profile constraining the base station to schedule transmission on the PUSCH to a third slot immediately preceding a fourth slot scheduled for PDCCH monitoring.
  • the second profile may be indicated via a PS_PUSCH_Schedule RRC parameter.
  • the one or more scheduling-power profiles may include (comprise) a third profile constraining the base station to cross-slot schedule transmission of an ACK of a PDCCH and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring.
  • the third profile is indicated via a PS_K1_equal_0 RRC parameter.
  • a method may include a base station, such as gNB 604 and/or base station 102 :
  • a scheduling-power profile specifies one or more parameters and/or constraints on UE communication behavior
  • the communications with the UE to determine the one or more scheduling-power profiles may include (comprise) radio resource control (RRC) signal message exchanges.
  • RRC radio resource control
  • the one or more scheduling-power profiles may not conflict with one another.
  • the one or more scheduling-power profiles may include (comprise) one or more of:
  • ACK delayed acknowledgement
  • PDCCH physical downlink control channel
  • PUSCH physical uplink shared channel
  • BWP large bandwidth part
  • a profile for small data traffic and/or a profile for PDCCH monitoring period.
  • the one or more parameters and/or constraints may include (comprise) one or more of:
  • a first parameter defining a set of values for search space monitoring periodicity
  • a second parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
  • a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment
  • a fourth parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for transmission on the PUSCH;
  • a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
  • the one or more scheduling-power profiles may include (comprise) a first profile constraining the base station to schedule transmission of an acknowledgment of data received on the PDCCH to a first slot immediately preceding a second slot scheduled for PDCCH monitoring.
  • the first profile may be indicated via a PS_ACK_Schedule RRC parameter.
  • the one or more scheduling-power profiles may include (comprise) a second profile constraining the base station to schedule transmission on the PUSCH to a third slot immediately preceding a fourth slot scheduled for PDCCH monitoring.
  • the second profile may be indicated via a PS_PUSCH_Schedule RRC parameter.
  • the one or more scheduling-power profiles may include (comprise) a third profile constraining the base station to cross-slot schedule transmission of an ACK of a PDCCH and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring.
  • the third profile may be indicated via a PS_K1_equal_0 RRC parameter.
  • personally identifiable information should follow privacy policies and practices that are generally recognized as meeting or exceeding industry or governmental requirements for maintaining the privacy of users.
  • personally identifiable information data should be managed and handled so as to minimize risks of unintentional or unauthorized access or use, and the nature of authorized use should be clearly indicated to users.
  • Embodiments of the present disclosure may be realized in any of various forms. For example, some embodiments may be realized as a computer-implemented method, a computer-readable memory medium, or a computer system. Other embodiments may be realized using one or more custom-designed hardware devices such as ASICs. Still other embodiments may be realized using one or more programmable hardware elements such as FPGAs.
  • a non-transitory computer-readable memory medium may be configured so that it stores program instructions and/or data, where the program instructions, if executed by a computer system, cause the computer system to perform a method, e.g., any of the method embodiments described herein, or, any combination of the method embodiments described herein, or, any subset of any of the method embodiments described herein, or, any combination of such subsets.
  • a device e.g., a UE 106
  • a device may be configured to include a processor (or a set of processors) and a memory medium, where the memory medium stores program instructions, where the processor is configured to read and execute the program instructions from the memory medium, where the program instructions are executable to implement any of the various method embodiments described herein (or, any combination of the method embodiments described herein, or, any subset of any of the method embodiments described herein, or, any combination of such subsets).
  • the device may be realized in any of various forms.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Apparatuses, systems, and methods for a wireless device to perform a method including a user equipment device (UE) exchanging communications with a base station to determine one or more scheduling profiles, such as one or more scheduling-power profiles, where a scheduling-power profile may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications. In addition, the method may include the UE receiving a slot configuration schedule from the base station. The slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles. Further, the method may include the UE performing communications with the base station based on the at least one scheduling-power profile.

Description

    PRIORITY DATA
  • This application claims benefit of priority to U.S. Provisional Application Ser. No. 62/641,564, titled “Scheduling Profile for UE Power Savings”, filed Mar. 12, 2018, which is hereby incorporated by reference in its entirety as though fully and completely set forth herein.
  • FIELD
  • The present application relates to wireless devices, and more particularly to apparatus, systems, and methods for a wireless device to communicate a scheduling profile, such as a scheduling-power profile, for power savings to a network.
  • DESCRIPTION OF THE RELATED ART
  • Wireless communication systems are rapidly growing in usage. In recent years, wireless devices such as smart phones and tablet computers have become increasingly sophisticated. In addition to supporting telephone calls, many mobile devices now provide access to the internet, email, text messaging, and navigation using the global positioning system (GPS), and are capable of operating sophisticated applications that utilize these functionalities.
  • Long Term Evolution (LTE) has become the technology of choice for the majority of wireless network operators worldwide, providing mobile broadband data and high-speed Internet access to their subscriber base. LTE defines a number of downlink (DL) physical channels, categorized as transport or control channels, to carry information blocks received from media access control (MAC) and higher layers. LTE also defines a number of physical layer channels for the uplink (UL).
  • For example, LTE defines a Physical Downlink Shared Channel (PDSCH) as a DL transport channel. The PDSCH is the main data-bearing channel allocated to users on a dynamic and opportunistic basis. The PDSCH carries data in Transport Blocks (TB) corresponding to a MAC protocol data unit (PDU), passed from the MAC layer to the physical (PHY) layer once per Transmission Time Interval (TTI). The PDSCH is also used to transmit broadcast information such as System Information Blocks (SIB) and paging messages.
  • As another example, LTE defines a Physical Downlink Control Channel (PDCCH) as a DL control channel that carries the resource assignment for UEs that are contained in a Downlink Control Information (DCI) message. Multiple PDCCHs can be transmitted in the same subframe using Control Channel Elements (CCE), each of which is a nine set of four resource elements known as Resource Element Groups (REG). The PDCCH employs quadrature phase-shift keying (QPSK) modulation, with four QPSK symbols mapped to each REG. Furthermore, 1, 2, 4, or 8 CCEs can be used for a UE, depending on channel conditions, to ensure sufficient robustness.
  • Additionally, LTE defines a Physical Uplink Shared Channel (PUSCH) as a UL channel shared by all devices (user equipment, UE) in a radio cell to transmit user data to the network. The scheduling for all UEs is under control of the LTE base station (enhanced Node B, or eNB). The eNB uses the uplink scheduling grant (DCI format 0) to inform the UE about resource block (RB) assignment, and the modulation and coding scheme to be used. PUSCH typically supports QPSK and quadrature amplitude modulation (QAM). In addition to user data, the PUSCH also carries any control information necessary to decode the information, such as transport format indicators and multiple-in multiple-out (MIMO) parameters. Control data is multiplexed with information data prior to digital Fourier transform (DFT) spreading.
  • A proposed next telecommunications standard moving beyond the current International Mobile Telecommunications-Advanced (IMT-Advanced) Standards is called 5th generation mobile networks or 5th generation wireless systems, or 5G for short (otherwise known as 5G-NR for 5G New Radio, also simply referred to as NR). 5G-NR proposes a higher capacity for a higher density of mobile broadband users, also supporting device-to-device, ultra-reliable, and massive machine communications, as well as lower latency and lower battery consumption, than current LTE standards. Further, the 5G-NR standard may allow for less restrictive UE scheduling as compared to current LTE standards. Consequently, efforts are being made in ongoing developments of 5G-NR to take advantage of the less restrictive UE scheduling in order to further leverage power savings opportunities.
  • SUMMARY
  • Embodiments relate to apparatuses, systems, and methods to schedule a user equipment device (UE) based on a scheduling-power profile.
  • In some embodiments, a user equipment device may be configured to perform a method to constrain UE communication behavior. The method may include the UE exchanging communications with a base station to determine one or more scheduling profiles, such as one or more scheduling-power profiles. In some embodiments, the communications with the base station to determine the one or more scheduling-power profiles may include exchange of one or more radio resource control (RRC) signal messages. In some embodiments, the one or more scheduling-power profiles may not conflict with one another. In some embodiments, a scheduling-power profile may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications. In addition, the method may include the UE receiving a slot configuration schedule from the base station. The slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles. Further, the method may include the UE performing communications with the base station based on the at least one scheduling-power profile.
  • In some embodiments, the one or more scheduling-power profiles may include a profile that may constrain the base station to schedule transmission of an acknowledgment of data received on the PDCCH to a slot immediately preceding a slot scheduled for PDCCH monitoring. In some embodiments, the one or more scheduling-power profiles may include a profile that constrains the base station to schedule transmission on the PUSCH to a slot immediately preceding a slot scheduled for PDCCH monitoring. In some embodiments, the one or more scheduling-power profiles may include a profile that constrains the base station to cross-slot schedule transmission of an ACK of a PDCCH and a reception on the PDSCH to a slot immediately preceding a slot scheduled for PDCCH monitoring.
  • The techniques described herein may be implemented in and/or used with a number of different types of devices, including but not limited to cellular phones, tablet computers, wearable computing devices, portable media players, and any of various other computing devices.
  • This Summary is intended to provide a brief overview of some of the subject matter described in this document. Accordingly, it will be appreciated that the above-described features are merely examples and should not be construed to narrow the scope or spirit of the subject matter described herein in any way. Other features, aspects, and advantages of the subject matter described herein will become apparent from the following Detailed Description, Figures, and Claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • A better understanding of the present subject matter can be obtained when the following detailed description of various embodiments is considered in conjunction with the following drawings, in which:
  • FIG. 1 illustrates an example wireless communication system according to some embodiments.
  • FIG. 2 illustrates a base station (BS) in communication with a user equipment (UE) device according to some embodiments.
  • FIG. 3 illustrates an example block diagram of a UE according to some embodiments.
  • FIG. 4 illustrates an example block diagram of a BS according to some embodiments.
  • FIG. 5 illustrates an example block diagram of cellular communication circuitry, according to some embodiments.
  • FIG. 6A illustrates an example of connections between an EPC network, an LTE base station (eNB), and a 5G NR base station (gNB).
  • FIG. 6B illustrates an example of a protocol stack for an eNB and a gNB.
  • FIG. 7A illustrates an example of a 5G network architecture that incorporates both 3GPP (e.g., cellular) and non-3GPP (e.g., non-cellular) access to the 5G CN, according to some embodiments.
  • FIG. 7B illustrates an example of a 5G network architecture that incorporates both dual 3GPP (e.g., LTE and 5G NR) access and non-3GPP access to the 5G CN, according to some embodiments.
  • FIG. 8 illustrates an example of a baseband processor architecture for a UE, according to some embodiments.
  • FIG. 9A illustrates an example of a PDCCH monitoring interval.
  • FIG. 9B illustrates an example of power consumption of a UE for multiple PDCCH monitoring slots.
  • FIGS. 10A-10C illustrate an example of power consumption of a UE for multiple transmissions during PDCCH monitoring.
  • FIG. 10D illustrates an example of power consumption of a UE for multiple transmissions during PDCCH monitoring, according to some embodiments.
  • FIGS. 11A-11C illustrate an example of power consumption of a UE for multiple receptions during PDCCH monitoring.
  • FIG. 11D illustrates an example of power consumption of a UE for multiple receptions during PDCCH monitoring, according to some embodiments.
  • FIGS. 12A-12C illustrate an example of power consumption of a UE for a transmission followed by a reception during PDCCH monitoring.
  • FIG. 12D illustrates an example of power consumption of a UE for a transmission followed by a reception during PDCCH monitoring, according to some embodiments.
  • FIGS. 13A-13C illustrate an example of power consumption of a UE for a reception followed by a transmission during PDCCH monitoring.
  • FIG. 13D illustrates an example of power consumption of a UE for a reception followed by a transmission during PDCCH monitoring, according to some embodiments.
  • FIG. 14 illustrates a block diagram of an example of a process for determining a scheduling profile for a UE, according to some embodiments.
  • FIG. 15 illustrates example profiles and correspond UE behaviors, according to some embodiments.
  • FIG. 16 illustrates example parameter sets for various profiles, according to some embodiments.
  • FIG. 17 illustrates an example of a delayed acknowledgement with following PDCCH monitoring, according to some embodiments.
  • FIG. 18 illustrates an example of a delayed PUSCH with following PDCCH monitoring, according to some embodiments.
  • FIG. 19 illustrates an example of delayed cross-slot scheduling with following PDCCH monitoring, according to some embodiments.
  • FIG. 20 illustrates an example of self-contained slot scheduling with following PDCCH monitoring, according to some embodiments.
  • While the features described herein may be susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and are herein described in detail. It should be understood, however, that the drawings and detailed description thereto are not intended to be limiting to the particular form disclosed, but on the contrary, the intention is to cover all modifications, equivalents and alternatives falling within the spirit and scope of the subject matter as defined by the appended claims.
  • DETAILED DESCRIPTION Terms
  • The following is a glossary of terms used in this disclosure:
  • Memory Medium—Any of various types of non-transitory memory devices or storage devices. The term “memory medium” is intended to include an installation medium, e.g., a CD-ROM, floppy disks, or tape device; a computer system memory or random access memory such as DRAM, DDR RAM, SRAM, EDO RAM, Rambus RAM, etc.; a non-volatile memory such as a Flash, magnetic media, e.g., a hard drive, or optical storage; registers, or other similar types of memory elements, etc. The memory medium may include other types of non-transitory memory as well or combinations thereof. In addition, the memory medium may be located in a first computer system in which the programs are executed, or may be located in a second different computer system which connects to the first computer system over a network, such as the Internet. In the latter instance, the second computer system may provide program instructions to the first computer for execution. The term “memory medium” may include two or more memory mediums which may reside in different locations, e.g., in different computer systems that are connected over a network. The memory medium may store program instructions (e.g., embodied as computer programs) that may be executed by one or more processors.
  • Carrier Medium—a memory medium as described above, as well as a physical transmission medium, such as a bus, network, and/or other physical transmission medium that conveys signals such as electrical, electromagnetic, or digital signals.
  • Programmable Hardware Element—includes various hardware devices comprising multiple programmable function blocks connected via a programmable interconnect. Examples include FPGAs (Field Programmable Gate Arrays), PLDs (Programmable Logic Devices), FPOAs (Field Programmable Object Arrays), and CPLDs (Complex PLDs). The programmable function blocks may range from fine grained (combinatorial logic or look up tables) to coarse grained (arithmetic logic units or processor cores). A programmable hardware element may also be referred to as “reconfigurable logic”.
  • Computer System—any of various types of computing or processing systems, including a personal computer system (PC), mainframe computer system, workstation, network appliance, Internet appliance, personal digital assistant (PDA), television system, grid computing system, or other device or combinations of devices. In general, the term “computer system” can be broadly defined to encompass any device (or combination of devices) having at least one processor that executes instructions from a memory medium.
  • User Equipment (UE) (or “UE Device”)—any of various types of computer systems devices which are mobile or portable and which performs wireless communications. Examples of UE devices include mobile telephones or smart phones (e.g., iPhone™, Android™-based phones), portable gaming devices (e.g., Nintendo DS™ PlayStation Portable™, Gameboy Advance™, iPhone™), laptops, wearable devices (e.g. smart watch, smart glasses), PDAs, portable Internet devices, music players, data storage devices, or other handheld devices, etc. In general, the term “UE” or “UE device” can be broadly defined to encompass any electronic, computing, and/or telecommunications device (or combination of devices) which is easily transported by a user and capable of wireless communication.
  • Base Station—The term “Base Station” has the full breadth of its ordinary meaning, and at least includes a wireless communication station installed at a fixed location and used to communicate as part of a wireless telephone system or radio system.
  • Processing Element—refers to various elements or combinations of elements that are capable of performing a function in a device, such as a user equipment or a cellular network device. Processing elements may include, for example: processors and associated memory, portions or circuits of individual processor cores, entire processor cores, processor arrays, circuits such as an ASIC (Application Specific Integrated Circuit), programmable hardware elements such as a field programmable gate array (FPGA), as well any of various combinations of the above.
  • Channel—a medium used to convey information from a sender (transmitter) to a receiver. It should be noted that since characteristics of the term “channel” may differ according to different wireless protocols, the term “channel” as used herein may be considered as being used in a manner that is consistent with the standard of the type of device with reference to which the term is used. In some standards, channel widths may be variable (e.g., depending on device capability, band conditions, etc.). For example, LTE may support scalable channel bandwidths from 1.4 MHz to 20 MHz. In contrast, WLAN channels may be 22 MHz wide while Bluetooth channels may be 1 Mhz wide. Other protocols and standards may include different definitions of channels. Furthermore, some standards may define and use multiple types of channels, e.g., different channels for uplink or downlink and/or different channels for different uses such as data, control information, etc.
  • Band—The term “band” has the full breadth of its ordinary meaning, and at least includes a section of spectrum (e.g., radio frequency spectrum) in which channels are used or set aside for the same purpose.
  • Automatically—refers to an action or operation performed by a computer system (e.g., software executed by the computer system) or device (e.g., circuitry, programmable hardware elements, ASICs, etc.), without user input directly specifying or performing the action or operation. Thus the term “automatically” is in contrast to an operation being manually performed or specified by the user, where the user provides input to directly perform the operation. An automatic procedure may be initiated by input provided by the user, but the subsequent actions that are performed “automatically” are not specified by the user, i.e., are not performed “manually”, where the user specifies each action to perform. For example, a user filling out an electronic form by selecting each field and providing input specifying information (e.g., by typing information, selecting check boxes, radio selections, etc.) is filling out the form manually, even though the computer system must update the form in response to the user actions. The form may be automatically filled out by the computer system where the computer system (e.g., software executing on the computer system) analyzes the fields of the form and fills in the form without any user input specifying the answers to the fields. As indicated above, the user may invoke the automatic filling of the form, but is not involved in the actual filling of the form (e.g., the user is not manually specifying answers to fields but rather they are being automatically completed). The present specification provides various examples of operations being automatically performed in response to actions the user has taken.
  • Approximately—refers to a value that is almost correct or exact. For example, approximately may refer to a value that is within 1 to 10 percent of the exact (or desired) value. It should be noted, however, that the actual threshold value (or tolerance) may be application dependent. For example, in some embodiments, “approximately” may mean within 0.1% of some specified or desired value, while in various other embodiments, the threshold may be, for example, 2%, 3%, 5%, and so forth, as desired or as required by the particular application.
  • Concurrent—refers to parallel execution or performance, where tasks, processes, or programs are performed in an at least partially overlapping manner. For example, concurrency may be implemented using “strong” or strict parallelism, where tasks are performed (at least partially) in parallel on respective computational elements, or using “weak parallelism”, where the tasks are performed in an interleaved manner, e.g., by time multiplexing of execution threads.
  • Various components may be described as “configured to” perform a task or tasks. In such contexts, “configured to” is a broad recitation generally meaning “having structure that” performs the task or tasks during operation. As such, the component can be configured to perform the task even when the component is not currently performing that task (e.g., a set of electrical conductors may be configured to electrically connect a module to another module, even when the two modules are not connected). In some contexts, “configured to” may be a broad recitation of structure generally meaning “having circuitry that” performs the task or tasks during operation. As such, the component can be configured to perform the task even when the component is not currently on. In general, the circuitry that forms the structure corresponding to “configured to” may include hardware circuits.
  • Various components may be described as performing a task or tasks, for convenience in the description. Such descriptions should be interpreted as including the phrase “configured to.” Reciting a component that is configured to perform one or more tasks is expressly intended not to invoke 35 U.S.C. § 112(f) interpretation for that component.
  • FIGS. 1 and 2—Communication System
  • FIG. 1 illustrates a simplified example wireless communication system, according to some embodiments. It is noted that the system of FIG. 1 is merely one example of a possible system, and that features of this disclosure may be implemented in any of various systems, as desired.
  • As shown, the example wireless communication system includes a base station 102A which communicates over a transmission medium with one or more user devices 106A, 106B, etc., through 106N. Each of the user devices may be referred to herein as a “user equipment” (UE). Thus, the user devices 106 are referred to as UEs or UE devices.
  • The base station (BS) 102A may be a base transceiver station (BTS) or cell site (a “cellular base station”), and may include hardware that enables wireless communication with the UEs 106A through 106N.
  • The communication area (or coverage area) of the base station may be referred to as a “cell.” The base station 102A and the UEs 106 may be configured to communicate over the transmission medium using any of various radio access technologies (RATs), also referred to as wireless communication technologies, or telecommunication standards, such as GSM, UMTS (associated with, for example, WCDMA or TD-SCDMA air interfaces), LTE, LTE-Advanced (LTE-A), 5G new radio (5G NR), HSPA, 3GPP2 CDMA2000 (e.g., 1×RTT, 1×EV-DO, HRPD, eHRPD), etc. Note that if the base station 102A is implemented in the context of LTE, it may alternately be referred to as an ‘eNodeB’ or ‘eNB’. Note that if the base station 102A is implemented in the context of 5G NR, it may alternately be referred to as ‘gNodeB’ or ‘gNB’.
  • As shown, the base station 102A may also be equipped to communicate with a network 100 (e.g., a core network of a cellular service provider, a telecommunication network such as a public switched telephone network (PSTN), and/or the Internet, among various possibilities). Thus, the base station 102A may facilitate communication between the user devices and/or between the user devices and the network 100. In particular, the cellular base station 102A may provide UEs 106 with various telecommunication capabilities, such as voice, SMS and/or data services.
  • Base station 102A and other similar base stations (such as base stations 102B . . . 102N) operating according to the same or a different cellular communication standard may thus be provided as a network of cells, which may provide continuous or nearly continuous overlapping service to UEs 106A-N and similar devices over a geographic area via one or more cellular communication standards.
  • Thus, while base station 102A may act as a “serving cell” for UEs 106A-N as illustrated in FIG. 1, each UE 106 may also be capable of receiving signals from (and possibly within communication range of) one or more other cells (which might be provided by base stations 102B-N and/or any other base stations), which may be referred to as “neighboring cells”. Such cells may also be capable of facilitating communication between user devices and/or between user devices and the network 100. Such cells may include “macro” cells, “micro” cells, “pico” cells, and/or cells which provide any of various other granularities of service area size. For example, base stations 102A-B illustrated in FIG. 1 might be macro cells, while base station 102N might be a micro cell. Other configurations are also possible.
  • In some embodiments, base station 102A may be a next generation base station, e.g., a 5G New Radio (5G NR) base station, or “gNB”. In some embodiments, a gNB may be connected to a legacy evolved packet core (EPC) network and/or to a NR core (NRC) network. In addition, a gNB cell may include one or more transition and reception points (TRPs). In addition, a UE capable of operating according to 5G NR may be connected to one or more TRPs within one or more gNBs.
  • Note that a UE 106 may be capable of communicating using multiple wireless communication standards. For example, the UE 106 may be configured to communicate using a wireless networking (e.g., Wi-Fi) and/or peer-to-peer wireless communication protocol (e.g., Bluetooth, Wi-Fi peer-to-peer, etc.) in addition to at least one cellular communication protocol (e.g., GSM, UMTS (associated with, for example, WCDMA or TD-SCDMA air interfaces), LTE, LTE-A, 5G NR, HSPA, 3GPP2 CDMA2000 (e.g., 1×RTT, 1×EV-DO, HRPD, eHRPD), etc.). The UE 106 may also or alternatively be configured to communicate using one or more global navigational satellite systems (GNSS, e.g., GPS or GLONASS), one or more mobile television broadcasting standards (e.g., ATSC-M/H or DVB-H), and/or any other wireless communication protocol, if desired. Other combinations of wireless communication standards (including more than two wireless communication standards) are also possible.
  • FIG. 2 illustrates user equipment 106 (e.g., one of the devices 106A through 106N) in communication with a base station 102, according to some embodiments. The UE 106 may be a device with cellular communication capability such as a mobile phone, a hand-held device, a computer or a tablet, or virtually any type of wireless device.
  • The UE 106 may include a processor that is configured to execute program instructions stored in memory. The UE 106 may perform any of the method embodiments described herein by executing such stored instructions. Alternatively, or in addition, the UE 106 may include a programmable hardware element such as an FPGA (field-programmable gate array) that is configured to perform any of the method embodiments described herein, or any portion of any of the method embodiments described herein.
  • The UE 106 may include one or more antennas for communicating using one or more wireless communication protocols or technologies. In some embodiments, the UE 106 may be configured to communicate using, for example, CDMA2000 (1×RTT/1×EV-DO/HRPD/eHRPD) or LTE using a single shared radio and/or GSM or LTE using the single shared radio. The shared radio may couple to a single antenna, or may couple to multiple antennas (e.g., for MIMO) for performing wireless communications. In general, a radio may include any combination of a baseband processor, analog RF signal processing circuitry (e.g., including filters, mixers, oscillators, amplifiers, etc.), or digital processing circuitry (e.g., for digital modulation as well as other digital processing). Similarly, the radio may implement one or more receive and transmit chains using the aforementioned hardware. For example, the UE 106 may share one or more parts of a receive and/or transmit chain between multiple wireless communication technologies, such as those discussed above.
  • In some embodiments, the UE 106 may include separate transmit and/or receive chains (e.g., including separate antennas and other radio components) for each wireless communication protocol with which it is configured to communicate. As a further possibility, the UE 106 may include one or more radios which are shared between multiple wireless communication protocols, and one or more radios which are used exclusively by a single wireless communication protocol. For example, the UE 106 might include a shared radio for communicating using either of LTE or 5G NR (or LTE or 1×RTT or LTE or GSM), and separate radios for communicating using each of Wi-Fi and Bluetooth. Other configurations are also possible.
  • FIG. 3—Block Diagram of a UE
  • FIG. 3 illustrates an example simplified block diagram of a communication device 106, according to some embodiments. It is noted that the block diagram of the communication device of FIG. 3 is only one example of a possible communication device. According to embodiments, communication device 106 may be a user equipment (UE) device, a mobile device or mobile station, a wireless device or wireless station, a desktop computer or computing device, a mobile computing device (e.g., a laptop, notebook, or portable computing device), a tablet and/or a combination of devices, among other devices. As shown, the communication device 106 may include a set of components 300 configured to perform core functions. For example, this set of components may be implemented as a system on chip (SOC), which may include portions for various purposes. Alternatively, this set of components 300 may be implemented as separate components or groups of components for the various purposes. The set of components 300 may be coupled (e.g., communicatively; directly or indirectly) to various other circuits of the communication device 106.
  • For example, the communication device 106 may include various types of memory (e.g., including NAND flash 310), an input/output interface such as connector I/F 320 (e.g., for connecting to a computer system; dock; charging station; input devices, such as a microphone, camera, keyboard; output devices, such as speakers; etc.), the display 360, which may be integrated with or external to the communication device 106, and cellular communication circuitry 330 such as for 5G NR, LTE, GSM, etc., and short to medium range wireless communication circuitry 329 (e.g., Bluetooth™ and WLAN circuitry). In some embodiments, communication device 106 may include wired communication circuitry (not shown), such as a network interface card, e.g., for Ethernet.
  • The cellular communication circuitry 330 may couple (e.g., communicatively; directly or indirectly) to one or more antennas, such as antennas 335 and 336 as shown. The short to medium range wireless communication circuitry 329 may also couple (e.g., communicatively; directly or indirectly) to one or more antennas, such as antennas 337 and 338 as shown. Alternatively, the short to medium range wireless communication circuitry 329 may couple (e.g., communicatively; directly or indirectly) to the antennas 335 and 336 in addition to, or instead of, coupling (e.g., communicatively; directly or indirectly) to the antennas 337 and 338. The short to medium range wireless communication circuitry 329 and/or cellular communication circuitry 330 may include multiple receive chains and/or multiple transmit chains for receiving and/or transmitting multiple spatial streams, such as in a multiple-input multiple output (MIMO) configuration.
  • In some embodiments, as further described below, cellular communication circuitry 330 may include dedicated receive chains (including and/or coupled to, e.g., communicatively; directly or indirectly. dedicated processors and/or radios) for multiple RATs (e.g., a first receive chain for LTE and a second receive chain for 5G NR). In addition, in some embodiments, cellular communication circuitry 330 may include a single transmit chain that may be switched between radios dedicated to specific RATs. For example, a first radio may be dedicated to a first RAT, e.g., LTE, and may be in communication with a dedicated receive chain and a transmit chain shared with an additional radio, e.g., a second radio that may be dedicated to a second RAT, e.g., 5G NR, and may be in communication with a dedicated receive chain and the shared transmit chain.
  • The communication device 106 may also include and/or be configured for use with one or more user interface elements. The user interface elements may include any of various elements, such as display 360 (which may be a touchscreen display), a keyboard (which may be a discrete keyboard or may be implemented as part of a touchscreen display), a mouse, a microphone and/or speakers, one or more cameras, one or more buttons, and/or any of various other elements capable of providing information to a user and/or receiving or interpreting user input.
  • The communication device 106 may further include one or more smart cards 345 that include SIM (Subscriber Identity Module) functionality, such as one or more UICC(s) (Universal Integrated Circuit Card(s)) cards 345.
  • As shown, the SOC 300 may include processor(s) 302, which may execute program instructions for the communication device 106 and display circuitry 304, which may perform graphics processing and provide display signals to the display 360. The processor(s) 302 may also be coupled to memory management unit (MMU) 340, which may be configured to receive addresses from the processor(s) 302 and translate those addresses to locations in memory (e.g., memory 306, read only memory (ROM) 350, NAND flash memory 310) and/or to other circuits or devices, such as the display circuitry 304, short range wireless communication circuitry 229, cellular communication circuitry 330, connector I/F 320, and/or display 360. The MMU 340 may be configured to perform memory protection and page table translation or set up. In some embodiments, the MMU 340 may be included as a portion of the processor(s) 302.
  • As noted above, the communication device 106 may be configured to communicate using wireless and/or wired communication circuitry. The communication device 106 may be configured to perform a method including the communication device 106 exchanging communications with a base station to determine one or more scheduling-power profiles. In some embodiments, the communications with the base station to determine the one or more scheduling-power profiles may include exchange of one or more radio resource control (RRC) signal messages. In some embodiments, the one or more scheduling-power profiles may not conflict with one another. In some embodiments, a scheduling-power profile may specify one or more parameters associated with communication device 106 communication behavior, e.g., one or more constraints on communication device 106 communication behavior and/or slot scheduling of communication device 106 communications. In addition, the method may include the communication device 106 receiving a slot configuration schedule from the base station. The slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles. Further, the method may include the communication device 106 performing communications with the base station based on the at least one scheduling-power profile.
  • As described herein, the communication device 106 may include hardware and software components for implementing the above features for a communication device 106 to communicate a scheduling-power profile for power savings to a network. The processor 302 of the communication device 106 may be configured to implement part or all of the features described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium). Alternatively (or in addition), processor 302 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit). Alternatively (or in addition) the processor 302 of the communication device 106, in conjunction with one or more of the other components 300, 304, 306, 310, 320, 329, 330, 340, 345, 350, 360 may be configured to implement part or all of the features described herein.
  • In addition, as described herein, processor 302 may include one or more processing elements. Thus, processor 302 may include one or more integrated circuits (ICs) that are configured to perform the functions of processor 302. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processor(s) 302.
  • Further, as described herein, cellular communication circuitry 330 and short-range wireless communication circuitry 329 may each include one or more processing elements. In other words, one or more processing elements may be included in cellular communication circuitry 330 and, similarly, one or more processing elements may be included in short range wireless communication circuitry 329. Thus, cellular communication circuitry 330 may include one or more integrated circuits (ICs) that are configured to perform the functions of cellular communication circuitry 330. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of cellular communication circuitry 230. Similarly, the short-range wireless communication circuitry 329 may include one or more ICs that are configured to perform the functions of short-range wireless communication circuitry 32. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of short-range wireless communication circuitry 329.
  • FIG. 4—Block Diagram of a Base Station
  • FIG. 4 illustrates an example block diagram of a base station 102, according to some embodiments. It is noted that the base station of FIG. 4 is merely one example of a possible base station. As shown, the base station 102 may include processor(s) 404 which may execute program instructions for the base station 102. The processor(s) 404 may also be coupled to memory management unit (MMU) 440, which may be configured to receive addresses from the processor(s) 404 and translate those addresses to locations in memory (e.g., memory 460 and read only memory (ROM) 450) or to other circuits or devices.
  • The base station 102 may include at least one network port 470. The network port 470 may be configured to couple to a telephone network and provide a plurality of devices, such as UE devices 106, access to the telephone network as described above in FIGS. 1 and 2.
  • The network port 470 (or an additional network port) may also or alternatively be configured to couple to a cellular network, e.g., a core network of a cellular service provider. The core network may provide mobility related services and/or other services to a plurality of devices, such as UE devices 106. In some cases, the network port 470 may couple to a telephone network via the core network, and/or the core network may provide a telephone network (e.g., among other UE devices serviced by the cellular service provider).
  • In some embodiments, base station 102 may be a next generation base station, e.g., a 5G New Radio (5G NR) base station, or “gNB”. In such embodiments, base station 102 may be connected to a legacy evolved packet core (EPC) network and/or to a NR core (NRC) network. In addition, base station 102 may be considered a 5G NR cell and may include one or more transition and reception points (TRPs). In addition, a UE capable of operating according to 5G NR may be connected to one or more TRPs within one or more gNB s.
  • The base station 102 may include at least one antenna 434, and possibly multiple antennas. The at least one antenna 434 may be configured to operate as a wireless transceiver and may be further configured to communicate with UE devices 106 via radio 430. The antenna 434 communicates with the radio 430 via communication chain 432. Communication chain 432 may be a receive chain, a transmit chain or both. The radio 430 may be configured to communicate via various wireless communication standards, including, but not limited to, 5G NR, LTE, LTE-A, GSM, UMTS, CDMA2000, Wi-Fi, etc.
  • The base station 102 may be configured to communicate wirelessly using multiple wireless communication standards. In some instances, the base station 102 may include multiple radios, which may enable the base station 102 to communicate according to multiple wireless communication technologies. For example, as one possibility, the base station 102 may include an LTE radio for performing communication according to LTE as well as a 5G NR radio for performing communication according to 5G NR. In such a case, the base station 102 may be capable of operating as both an LTE base station and a 5G NR base station. As another possibility, the base station 102 may include a multi-mode radio which is capable of performing communications according to any of multiple wireless communication technologies (e.g., 5G NR and Wi-Fi, LTE and Wi-Fi, LTE and UMTS, LTE and CDMA2000, UMTS and GSM, etc.).
  • As described further subsequently herein, the BS 102 may include hardware and software components for implementing or supporting implementation of features described herein. The processor 404 of the base station 102 may be configured to implement or support implementation of part or all of the methods described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium). Alternatively, the processor 404 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit), or a combination thereof. Alternatively (or in addition) the processor 404 of the BS 102, in conjunction with one or more of the other components 430, 432, 434, 440, 450, 460, 470 may be configured to implement or support implementation of part or all of the features described herein.
  • In addition, as described herein, processor(s) 404 may be comprised of one or more processing elements. In other words, one or more processing elements may be included in processor(s) 404. Thus, processor(s) 404 may include one or more integrated circuits (ICs) that are configured to perform the functions of processor(s) 404. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processor(s) 404.
  • Further, as described herein, radio 430 may be comprised of one or more processing elements. In other words, one or more processing elements may be included in radio 430. Thus, radio 430 may include one or more integrated circuits (ICs) that are configured to perform the functions of radio 430. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of radio 430.
  • FIG. 5: Block Diagram of Cellular Communication Circuitry
  • FIG. 5 illustrates an example simplified block diagram of cellular communication circuitry, according to some embodiments. It is noted that the block diagram of the cellular communication circuitry of FIG. 5 is only one example of a possible cellular communication circuit. According to embodiments, cellular communication circuitry 330 may be include in a communication device, such as communication device 106 described above. As noted above, communication device 106 may be a user equipment (UE) device, a mobile device or mobile station, a wireless device or wireless station, a desktop computer or computing device, a mobile computing device (e.g., a laptop, notebook, or portable computing device), a tablet and/or a combination of devices, among other devices.
  • The cellular communication circuitry 330 may couple (e.g., communicatively; directly or indirectly) to one or more antennas, such as antennas 335 a-b and 336 as shown (in FIG. 3). In some embodiments, cellular communication circuitry 330 may include dedicated receive chains (including and/or coupled to, e.g., communicatively; directly or indirectly. dedicated processors and/or radios) for multiple RATs (e.g., a first receive chain for LTE and a second receive chain for 5G NR). For example, as shown in FIG. 5, cellular communication circuitry 330 may include a modem 510 and a modem 520. Modem 510 may be configured for communications according to a first RAT, e.g., such as LTE or LTE-A, and modem 520 may be configured for communications according to a second RAT, e.g., such as 5G NR.
  • As shown, modem 510 may include one or more processors 512 and a memory 516 in communication with processors 512. Modem 510 may be in communication with a radio frequency (RF) front end 530. RF front end 530 may include circuitry for transmitting and receiving radio signals. For example, RF front end 530 may include receive circuitry (RX) 532 and transmit circuitry (TX) 534. In some embodiments, receive circuitry 532 may be in communication with downlink (DL) front end 550, which may include circuitry for receiving radio signals via antenna 335 a.
  • Similarly, modem 520 may include one or more processors 522 and a memory 526 in communication with processors 522. Modem 520 may be in communication with an RF front end 540. RF front end 540 may include circuitry for transmitting and receiving radio signals. For example, RF front end 540 may include receive circuitry 542 and transmit circuitry 544. In some embodiments, receive circuitry 542 may be in communication with DL front end 560, which may include circuitry for receiving radio signals via antenna 335 b.
  • In some embodiments, a switch 570 may couple transmit circuitry 534 to uplink (UL) front end 572. In addition, switch 570 may couple transmit circuitry 544 to UL front end 572. UL front end 572 may include circuitry for transmitting radio signals via antenna 336. Thus, when cellular communication circuitry 330 receives instructions to transmit according to the first RAT (e.g., as supported via modem 510), switch 570 may be switched to a first state that allows modem 510 to transmit signals according to the first RAT (e.g., via a transmit chain that includes transmit circuitry 534 and UL front end 572). Similarly, when cellular communication circuitry 330 receives instructions to transmit according to the second RAT (e.g., as supported via modem 520), switch 570 may be switched to a second state that allows modem 520 to transmit signals according to the second RAT (e.g., via a transmit chain that includes transmit circuitry 544 and UL front end 572).
  • In some embodiments, the cellular communication circuitry 330 may be configured to perform a method including exchanging communications with a base station to determine one or more scheduling-power profiles. In some embodiments, the communications with the base station to determine the one or more scheduling-power profiles may include exchange of one or more radio resource control (RRC) signal messages. In some embodiments, the one or more scheduling-power profiles may not conflict with one another. In some embodiments, a scheduling-power profile may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications. In addition, the method may include receiving a slot configuration schedule from the base station. The slot configuration schedule may be based on at least one scheduling-power profile of the one or more scheduling-power profiles. Further, the method may include performing communications with the base station based on the at least one scheduling-power profile.
  • As described herein, the modem 510 may include hardware and software components for implementing the above features or for time division multiplexing UL data for NSA NR operations, as well as the various other techniques described herein. The processors 512 may be configured to implement part or all of the features described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium). Alternatively (or in addition), processor 512 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit). Alternatively (or in addition) the processor 512, in conjunction with one or more of the other components 530, 532, 534, 550, 570, 572, 335 and 336 may be configured to implement part or all of the features described herein.
  • In addition, as described herein, processors 512 may include one or more processing elements. Thus, processors 512 may include one or more integrated circuits (ICs) that are configured to perform the functions of processors 512. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processors 512.
  • As described herein, the modem 520 may include hardware and software components for implementing the above features for communicating a scheduling-power profile for power savings to a network, as well as the various other techniques described herein. The processors 522 may be configured to implement part or all of the features described herein, e.g., by executing program instructions stored on a memory medium (e.g., a non-transitory computer-readable memory medium). Alternatively (or in addition), processor 522 may be configured as a programmable hardware element, such as an FPGA (Field Programmable Gate Array), or as an ASIC (Application Specific Integrated Circuit). Alternatively (or in addition) the processor 522, in conjunction with one or more of the other components 540, 542, 544, 550, 570, 572, 335 and 336 may be configured to implement part or all of the features described herein.
  • In addition, as described herein, processors 522 may include one or more processing elements. Thus, processors 522 may include one or more integrated circuits (ICs) that are configured to perform the functions of processors 522. In addition, each integrated circuit may include circuitry (e.g., first circuitry, second circuitry, etc.) configured to perform the functions of processors 522.
  • 5G NR Architecture with LTE
  • In some implementations, fifth generation (5G) wireless communication will initially be deployed concurrently with current wireless communication standards (e.g., LTE). For example, dual connectivity between LTE and 5G new radio (5G NR or NR) has been specified as part of the initial deployment of NR. Thus, as illustrated in FIGS. 6A-B, evolved packet core (EPC) network 600 may continue to communicate with current LTE base stations (e.g., eNB 602). In addition, eNB 602 may be in communication with a 5G NR base station (e.g., gNB 604) and may pass data between the EPC network 600 and gNB 604. Thus, EPC network 600 may be used (or reused) and gNB 604 may serve as extra capacity for UEs, e.g., for providing increased downlink throughput to UEs. In other words, LTE may be used for control plane signaling and NR may be used for user plane signaling. Thus, LTE may be used to establish connections to the network and NR may be used for data services.
  • FIG. 6B illustrates a proposed protocol stack for eNB 602 and gNB 604. As shown, eNB 602 may include a medium access control (MAC) layer 632 that interfaces with radio link control (RLC) layers 622 a-b. RLC layer 622 a may also interface with packet data convergence protocol (PDCP) layer 612 a and RLC layer 622 b may interface with PDCP layer 612 b. Similar to dual connectivity as specified in LTE-Advanced Release 12, PDCP layer 612 a may interface via a master cell group (MCG) bearer to EPC network 600 whereas PDCP layer 612 b may interface via a split bearer with EPC network 600.
  • Additionally, as shown, gNB 604 may include a MAC layer 634 that interfaces with RLC layers 624 a-b. RLC layer 624 a may interface with PDCP layer 612 b of eNB 602 via an X2 interface for information exchange and/or coordination (e.g., scheduling of a UE) between eNB 602 and gNB 604. In addition, RLC layer 624 b may interface with PDCP layer 614. Similar to dual connectivity as specified in LTE-Advanced Release 12, PDCP layer 614 may interface with EPC network 600 via a secondary cell group (SCG) bearer. Thus, eNB 602 may be considered a master node (MeNB) while gNB 604 may be considered a secondary node (SgNB). In some scenarios, a UE may be required to maintain a connection to both an MeNB and a SgNB. In such scenarios, the MeNB may be used to maintain a radio resource control (RRC) connection to an EPC while the SgNB may be used for capacity (e.g., additional downlink and/or uplink throughput).
  • 5G Core Network Architecture—Interworking with Wi-Fi
  • In some embodiments, the 5G core network (CN) may be accessed via (or through) a cellular connection/interface (e.g., via a 3GPP communication architecture/protocol) and a non-cellular connection/interface (e.g., a non-3GPP access architecture/protocol such as Wi-Fi connection). FIG. 7A illustrates an example of a 5G network architecture that incorporates both 3GPP (e.g., cellular) and non-3GPP (e.g., non-cellular) access to the 5G CN, according to some embodiments. As shown, a user equipment device (e.g., such as UE 106) may access the 5G CN through both a radio access network (RAN, e.g., such as gNB or base station 604) and an access point, such as AP 112. The AP 112 may include a connection to the Internet 700 as well as a connection to a non-3GPP inter-working function (N3IWF) 702 network entity. The N3IWF may include a connection to a core access and mobility management function (AMF) 704 of the 5G CN. The AMF 704 may include an instance of a 5G mobility management (5G MM) function associated with the UE 106. In addition, the RAN (e.g., gNB 604) may also have a connection to the AMF 704. Thus, the 5G CN may support unified authentication over both connections as well as allow simultaneous registration for UE 106 access via both gNB 604 and AP 112. As shown, the AMF 704 may include one or more functional entities associated with the 5G CN (e.g., network slice selection function (NSSF) 720, short message service function (SMSF) 722, application function (AF) 724, unified data management (UDM) 726, policy control function (PCF) 728, and/or authentication server function (AUSF) 730). Note that these functional entities may also be supported by a session management function (SMF) 706 a and an SMF 706 b of the 5G CN. The AMF 706 may be connected to (or in communication with) the SMF 706 a. Further, the gNB 604 may in communication with (or connected to) a user plane function (UPF) 708 a that may also be communication with the SMF 706 a. Similarly, the N3IWF 702 may be communicating with a UPF 708 b that may also be communicating with the SMF 706 b. Both UPFs may be communicating with the data network (e.g., DN 710 a and 710 b) and/or the Internet 700 and IMS core network 710.
  • FIG. 7B illustrates an example of a 5G network architecture that incorporates both dual 3GPP (e.g., LTE and 5G NR) access and non-3GPP access to the 5G CN, according to some embodiments. As shown, a user equipment device (e.g., such as UE 106) may access the 5G CN through both a radio access network (RAN, e.g., such as gNB or base station 604 or eNB or base station 602) and an access point, such as AP 112. The AP 112 may include a connection to the Internet 700 as well as a connection to the N3IWF 702 network entity. The N3IWF may include a connection to the AMF 704 of the 5G CN. The AMF 704 may include an instance of the 5G MM function associated with the UE 106. In addition, the RAN (e.g., gNB 604) may also have a connection to the AMF 704. Thus, the 5G CN may support unified authentication over both connections as well as allow simultaneous registration for UE 106 access via both gNB 604 and AP 112. In addition, the 5G CN may support dual-registration of the UE on both a legacy network (e.g., LTE via base station 602) and a 5G network (e.g., via base station 604). As shown, the base station 602 may have connections to a mobility management entity (MME) 742 and a serving gateway (SGW) 744. The MME 742 may have connections to both the SGW 744 and the AMF 704. In addition, the SGW 744 may have connections to both the SMF 706 a and the UPF 708 a. As shown, the AMF 704 may include one or more functional entities associated with the 5G CN (e.g., NSSF 720, SMSF 722, AF 724, UDM 726, PCF 728, and/or AUSF 730). Note that UDM 726 may also include a home subscriber server (HSS) function and the PCF may also include a policy and charging rules function (PCRF). Note further that these functional entities may also be supported by the SMF706 a and the SMF 706 b of the 5G CN. The AMF 706 may be connected to (or in communication with) the SMF 706 a. Further, the gNB 604 may in communication with (or connected to) the UPF 708 a that may also be communication with the SMF 706 a. Similarly, the N3IWF 702 may be communicating with a UPF 708 b that may also be communicating with the SMF 706 b. Both UPFs may be communicating with the data network (e.g., DN 710 a and 710 b) and/or the Internet 700 and IMS core network 710.
  • Note that in various embodiments, one or more of the above described network entities may be configured to perform methods to schedule a UE based on a scheduling-power profile that may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications, e.g., as further described herein.
  • FIG. 8 illustrates an example of a baseband processor architecture for a UE (e.g., such as UE 106), according to some embodiments. The baseband processor architecture 800 described in FIG. 8 may be implemented on one or more radios (e.g., radios 329 and/or 330 described above) or modems (e.g., modems 510 and/or 520) as described above. As shown, the non-access stratum (NAS) 810 may include a 5G NAS 820 and a legacy NAS 850. The legacy NAS 850 may include a communication connection with a legacy access stratum (AS) 870. The 5G NAS 820 may include communication connections with both a 5G AS 840 and a non-3GPP AS 830 and Wi-Fi AS 832. The 5G NAS 820 may include functional entities associated with both access stratums. Thus, the 5G NAS 820 may include multiple 5G MM entities 826 and 828 and 5G session management (SM) entities 822 and 824. The legacy NAS 850 may include functional entities such as short message service (SMS) entity 852, evolved packet system (EPS) session management (ESM) entity 854, session management (SM) entity 856, EPS mobility management (EMM) entity 858, and mobility management (MM)/GPRS mobility management (GMM) entity 860. In addition, the legacy AS 870 may include functional entities such as LTE AS 872, UMTS AS 874, and/or GSM/GPRS AS 876.
  • Thus, the baseband processor architecture 800 allows for a common 5G-NAS for both 5G cellular and non-cellular (e.g., non-3GPP access). Note that as shown, the 5G MM may maintain individual connection management and registration management state machines for each connection. Additionally, a device (e.g., UE 106) may register to a single PLMN (e.g., 5G CN) using 5G cellular access as well as non-cellular access. Further, it may be possible for the device to be in a connected state in one access and an idle state in another access and vice versa. Finally, there may be common 5G-MM procedures (e.g., registration, de-registration, identification, authentication, as so forth) for both accesses.
  • Note that in various embodiments, one or more of the above described elements may be configured to perform methods schedule a UE based on a scheduling-power profile that may specify one or more parameters associated with UE communication behavior, e.g., one or more constraints on UE communication behavior and/or slot scheduling of UE communications, e.g., as further described herein.
  • UE Scheduling-Power Profile
  • In current implementations of the 5G New Radio (5G NR) standard, a UE may be configured to monitor the Physical Downlink Control Channel (PDCCH) periodically, e.g., as illustrated by FIG. 9A. As shown, the UE may monitor the PDCCH every fifth slot 902 and, if the UE does not have any pending data, the UE may go into a low power mode to reduce power consumption when not monitoring the PDCCH in slots 904. In some implementations, a search space configuration may be enabled to allow the UE to monitor the PDCCH periodically. The power consumption of the UE during periodic monitoring of the PDCCH is illustrated by FIG. 9B. As shown, when no monitoring the PDCCH, the UE may have a very low power consumption; however, the power consumption may ramp up ahead of the monitoring period (e.g., power ramp 910), may remain at maximum power consumption for a period of time before, during, and after the monitoring period (e.g., maximum power level 912), and then may ramp down after the monitoring period is complete (e.g., power ramp 914). For example, when the UE receives data in a slot N (e.g., slot 906 of FIG. 9A), the UE will wake up prior to (before) slot N to prepare for reception of the data. During the wake up, the UE may consume power (e.g., power ramp 910) to prepare (or reinitialize/start) its clock, set its voltage configuration, warm up the UE's radio frequency integrated circuit (RFIC), phase lock loop (PLL) lock, and so forth. After receiving the data in slot N, a modem of the UE may perform decoding and a series of actions for signal decoding and shutting down elements of the UE to reduce power consumption. For example, the UE modem may shut down the RFIC, perform automatic gain control (AGC), update time tracking loops (TTL) and/or frequency tracking loops (FTL), perform channel estimation, and/or perform data decoding. As another example, when the UE transmits data in a slot N (e.g., slot 906 of FIG. 9A), the UE will wake up prior to (before) slot N to prepare for transmission of the data. During the wake up, similar to when the UE is preparing to receive data, the UE may consume power (e.g., power ramp 910) to prepare (or reinitialize/start) its clock, warm up the UE's RFIC, phase lock loop (PLL) lock, encode the data, and so forth. After slot N, the UE may consume power (e.g., power ramp 914) shutting down the RFIC. Thus, turning components on and off for receiving and/or sending data consumes power (especially RFIC ramp up and ramp down).
  • Embodiments described herein disclose systems and methods for reducing power consumption during wakeup and shut down associated with periodic monitoring of the PDCCH. For example, in some embodiments, the UE may notify a base station (e.g., a gNB) of a scheduling constraint via a scheduling profile, such as a scheduling-power profile. For example, FIGS. 10D, 11D, 12D, and 13D illustrate power savings for various transmit and/or receive scenarios. In some embodiments, the UE may transmit an acknowledgement, transmit data on the PUSCH, and/or transmit other various data and/or control information. In some embodiments, the UE may receive data on the PDCCH and/or on the PDSCH.
  • FIG. 10D illustrates power savings across two transmissions as compared to current implementations as illustrated by FIGS. 10A-10C, according to some embodiments. In particular, FIGS. 10A-10C illustrate the power consumed for a first transmission (FIG. 10A), the power consumed for a second transmission (FIG. 10B), and the total power consumed across the two transmissions (FIG. 10C). As shown, for each transmission, the UE consumes power to prepare for the transmission, perform the transmission, and then power down after the transmission. However, according to some embodiments and as illustrated by FIG. 10D, when the UE can schedule the transmissions back to back, the UE may avoid the power consumed powering down after the first transmission and powering back up for the second transmission, thereby saving additional power as compared to current implementations.
  • FIG. 11D illustrates power savings across two receptions as compared to current implementations as illustrated by FIGS. 11A-11C, according to some embodiments. In particular, FIGS. 11A-11C illustrate the power consumed for a first reception (FIG. 11A), the power consumed for a second reception (FIG. 11B), and the total power consumed across the two receptions (FIG. 11C). As shown, for each reception, the UE consumes power to prepare for the reception, perform the reception, and then power down after the reception. However, according to some embodiments and as illustrated by FIG. 11D, when the UE can schedule the receptions back to back, the UE may avoid the power consumed powering down after the first reception and powering back up for the second reception, thereby saving additional power as compared to current implementations.
  • FIG. 12D illustrates power savings across a transmission followed by a reception as compared to current implementations as illustrated by FIGS. 12A-12C, according to some embodiments. In particular, FIGS. 12A-12C illustrate the power consumed for a transmission (FIG. 12A), the power consumed for a reception (FIG. 12B), and the total power consumed across the transmission and reception (FIG. 12C). As shown, for both the transmission and the reception, the UE consumes power to prepare for the transmission/reception, perform the transmission/reception, and then power down after the transmission/reception. However, according to some embodiments and as illustrated by FIG. 12D, when the UE can schedule the transmission and reception back to back, the UE may avoid the power consumed powering down after the transmission and powering back up for the reception, thereby saving additional power as compared to current implementations.
  • FIG. 13D illustrates power savings across a reception followed by a transmission as compared to current implementations as illustrated by FIGS. 13A-13C, according to some embodiments. In particular, FIGS. 13A-13C illustrate the power consumed for a reception (FIG. 13A), the power consumed for a transmission (FIG. 13B), and the total power consumed across the reception and transmission (FIG. 13C). As shown, for both the transmission and the reception, the UE consumes power to prepare for the transmission/reception, perform the transmission/reception, and then power down after the transmission/reception. However, according to some embodiments and as illustrated by FIG. 13D, when the UE can schedule the reception and transmission back to back, the UE may avoid the power consumed powering down after the reception and powering back up for the transmission, thereby saving additional power as compared to current implementations.
  • FIG. 14 illustrates a block diagram of an example of a process for determining a scheduling profile for a UE, according to some embodiments. The process shown in FIG. 14 may be used in conjunction with any of the systems or devices shown in the above Figures, among other devices. In various embodiments, some of the process elements shown may be performed concurrently, in a different order than shown, or may be omitted. Additional process elements may also be performed as desired. As shown, this process may operate as follows.
  • At 1402, a UE, such as UE 106, may propose one or more scheduling profiles, such as one or more scheduling-power profiles, to a base station, such as base station 102 (which may be configured as a gNB, such as gNB 604). Note that if the UE proposes more than one scheduling-power profile, the scheduling-power profiles may not conflict with one another. In some embodiments, the proposal may be communicated via radio resource control (RRC) signaling message. In some embodiments, a scheduling-power profile may include one or more (or a set of) parameters and/or constraints for system configuration. The parameters (or constraints) may limit network scheduling to a particular configuration. In some embodiments, a scheduling-power profile may include a set of other scheduling-power profiles. In some embodiments, as illustrated by FIG. 15, a scheduling-power profile may specify a particular UE behavior, or sets of behaviors. For example, as shown by FIG. 15, a profile P1 may specify a profile for delayed acknowledgement (ACK) with PDCCH monitoring. As another example, a profile P2 may specify a profile for delayed PUSCH scheduling with PDCCH monitoring. As further example, a profile P3 may specify a profile for cross-slot scheduling with PDCCH monitoring; a profile P4 may specify a profile for large bandwidth part (BWP) for large data packet scheduling; a profile P5 may specify a profile for self-contained slot scheduling; a profile P10 may specify a profile for power savings, e.g., a set of profiles including any, some, or all of profiles P1, P2, and/or P3; a profile P11 may specify a profile for high throughput, e.g., a set of profiles including any, some, or all of profiles P1 and/or P4; a profile P14 may specify a profile for low latency, e.g., a set of profiles including at least profile P5; a profile P15 may specify a profile for high system capacity; a profile P14 may specify a profile for small data traffic, e.g., voice data and or SMS data; a profile P20 may specify a profile for PDCCH monitoring period.
  • In some embodiments, a scheduling-power profile may include one or more parameters to specify the profile. For example, the parameters may include a set of values for search space monitoring periodicity. As another example, the parameters may include a set of configurable values and/or constraints for K0, where K0 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for PDSCH. As a further example, the parameters may include a set of configurable values and/or constraints for K1, where K1 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDSCH and a slot scheduled for an acknowledgment. As yet another example, the parameters may include a set of configurable values and/or constraints for K2, where K2 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for the PUSCH. In addition, the parameters may include minimum and/or maximum bandwidth values and/or constraints in BWPs, a set of supported number of multiple-input-multiple-output (MIMO) layers, search space indices, control resource set (CORESET) indices, BWP indices, secondary cell (Scell) indices, maximum number of Scells, DRX configurations, and so forth. Note that in some embodiments, differing profiles may include differing parameters and/or constraints. In other words, a first profile may include a first combination of the above discussed parameters, among other parameters and a second profile may include a second combination of the above discussed parameters.
  • FIG. 16 illustrates example parameter sets for various profiles, according to some embodiments. As shown, a profile P1 may include various parameters for supporting delayed ACK with following PDCCH monitoring, such as a first parameter, p, where p specifies search space monitoring periodicity, and a second parameter defining a relationship between K0, K1, and p. In addition, a profile P2 may include various parameters for supporting delayed PUSCH with following PDCCH monitoring, such as a first parameter, p, where p specifies search space monitoring periodicity, and a second parameter defining a relationship between K2 and p. Further, a profile P3 may include various parameters for supporting delayed cross-slot scheduling with following PDCCH monitoring, such as a first parameter, p, where p specifies search space monitoring periodicity, and a second parameter defining a relationship between K0, and p, and a third parameter specifying a value of K1. Additionally, a profile P4 may include various parameters for supporting a low traffic rate, such as supported BWPs, supported search space indices, supported MIMO layers, supported values of K0, K1, and K2, supported Scell indices, supported number of S cells, and so forth.
  • Returning to FIG. 14, at 1404, the base station may determine whether to accept the scheduling proposal (e.g., the one or more scheduling-power profiles proposed by the UE at 1402). The determination may be based, at least in part, on network scheduling constraints such as whether the base station has pending data for the UE, whether the base station has previously accepted scheduling proposals (from the UE and/or from other UEs served by the base station) that conflict with the UE's proposal, channel conditions, and so forth. If the base station accepts the scheduling proposal the process may continue at 1410. Alternatively, if the base station does not accept the scheduling proposal, the process may continue at 1406.
  • At 1406, if the base station determines to not accept the scheduling proposal, the base station may communicate a counter proposal to the UE. In response, at 1408, the base station and UE may negotiate (e.g., via an exchange of one or more additional proposals) to determine a scheduling-power profile (or scheduling-power profiles) for UE communications. Note that the UE and the base station may agree on more than one scheduling-power profile so long as the multiple profiles do not conflict with one another. In other words, in some embodiments, the base station (network) may configure the UE with multiple profiles. In some embodiments, one or more scheduling-power profiles may be active, where an active profile may be a profile currently being used between the base station and the UE.
  • At 1410, the UE and base station may communicate based on at least one of the agreed upon scheduling-power profiles (e.g., active profiles). For example, if a first profile specifies UE behavior when transmitting an acknowledgment (ACK) while performing PDCCH monitoring, the base station may schedule the ACK in a slot consecutive to the PDCCH monitoring based on a search space monitoring periodicity included in the first profile, e.g., as further described below in reference to FIG. 17. Similarly, if a second profile specifies UE behavior when transmitting on the PUSCH while performing PDCCH monitoring, the base station may schedule the PUSCH transmission in a slot consecutive to the PDCCH monitoring based on a search space monitoring periodicity included in the second profile, e.g., as further described below in reference to FIG. 18. Further, if a third profile specifies UE behavior for cross-slot scheduling while performing PDCCH monitoring, the base station may schedule the UE transmissions and receptions based on parameters included in a third profile, e.g., as further described below in reference to FIG. 19. Further, if a fourth profile specifies a self-contained slot, the base station may schedule the UE transmissions and receptions based on parameters included in a fourth profile, e.g., as further described below in reference to FIG. 20.
  • FIG. 17 illustrates an example of a delayed acknowledgement with following PDCCH monitoring, according to some embodiments. For example, if a UE, such as UE 106, is supposed to transmit an acknowledgement (ACK) in uplink (UL) and monitor PDCCH in similar timing, then the network (e.g., base station 102, gNB 604) may schedule (e.g., based in part on an agreed upon scheduling-power profile) the ACK transmission 1708 just before scheduled PDCCH monitoring 1702 occurs such that UE transmit and UE receive may occur in consecutive (e.g., back-to-back) time slots. Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after transmitting the ACK) and a ramp up (e.g., before scheduled PDCCH monitoring 1702). As shown in FIG. 17, the UE may be configured to monitor the PDCCH every 5 time slots, thus, if the UE receives PDSCH in slot n (e.g., scheduling the PDSCH to the UE at 1706), the UE would typically transmit a corresponding ACK in slot n+1. However, in some embodiments, a scheduling-power profile may delay the corresponding ACK until slot n+4, as shown, thereby allowing the UE to save power by avoiding an RFIC ramp down and an RFIC ramp up. Note that the UE may not monitor the PDCCH at slots 1704. Note further that the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint. Thus, according to the example of FIG. 17, the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring and p is greater than 1. The UE constraint may be back-to-back (or consecutive) or very close (e.g., one slot gap) ACK and PDCCH monitoring. In other words, when the UE is configured to monitor PDCCH in slot n, an ACK for a PDSCH may be scheduled one time slot ahead of the PDCCH monitoring, e.g., time slot n−1, such that the transmission (ACK) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between. Hence, if such a scheduling-power profile is enabled (e.g., an RRC parameter PS_ACK_Schedule is set to “true” or “1”), then the network may make scheduling decisions (e.g., such as ACK transmission timing) to satisfy the UE constraint.
  • FIG. 18 illustrates an example of a delayed PUSCH with following PDCCH monitoring, according to some embodiments. For example, if a UE, such as UE 106, is supposed to transmit PUSCH while performing PDCCH monitoring, then the network (e.g., base station 102, gNB 604) may schedule (e.g., based in part on an agreed upon scheduling-power profile) the PUSCH 1808 to be transmitted in a time slot immediately preceding a scheduled PDCCH monitoring time slot 1802 such that the UE may transmit and receive in consecutive (back to back) time slots. Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after transmitting on the PUSCH) and a ramp up (e.g., before scheduled PDCCH monitoring). As shown in FIG. 18, the UE may be configured to monitor the PDCCH every 5 time slots, thus, if the UE is scheduled to transmit PUSCH in slot n+4 and monitor PDCCH in the next slot (e.g., in slot n+5), then the UE may save power by avoiding an RFIC ramp down and an RFIC ramp up. Note that the UE may not monitor the PDCCH at slots 1804. Note further that the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint. Thus, according to the example of FIG. 18, the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring andp is greater than 1. The UE constraint may be back-to-back (or consecutive) PUSCH transmission and PDCCH monitoring. In other words, when the UE is configured to monitor PDCCH in slot n, a PUSCH transmission may be scheduled one time slot ahead of the PDCCH monitoring, e.g., time slot n−1, such that the transmission (PUSCH) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between. Hence, if such a scheduling-power profile is enabled (e.g., an RRC parameter PS_PUSCH_Schedule is set to “true” or “1”), then the network may make scheduling decisions (e.g., such as PUSCH transmission timing) to satisfy the UE constraint.
  • FIG. 19 illustrates an example of delayed cross-slot scheduling with following PDCCH monitoring, according to some embodiments. For example, if a UE, such as UE 106, is supposed to receive on the PDSCH while performing PDCCH monitoring 1902, then the network (e.g., base station 102, gNB 604) may schedule (e.g., based in part on an agreed upon scheduling-power profile) the PDSCH reception 1906 and an ACK transmission 1908 in a time slot immediately preceding a scheduled PDCCH monitoring time slot 1902 such that the UE may transmit and receive in consecutive (back to back) time slots. Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after transmitting on the PUSCH) and a ramp up (e.g., before scheduled PDCCH monitoring). Note that the UE may not monitor the PDCCH at slots 1904. Note further that when the UE receives on the PDCCH only, the UE may use a narrow band (NB), however, if the UE also receives on the PDSCH, the UE may open up its radio frequency bandwidth to a wider bandwidth (WB) to receive data on the PDSCH. Thus, to take advantage of bandwidth adaptation with transmit-receive alignment, PDSCH and ACK may be scheduled in a time slot immediately preceding scheduled PDCCH monitoring. As shown in FIG. 19, the UE may be configured to monitor the PDCCH every 3 time slots, thus, if the UE is scheduled to receive on the PDSCH in slot n+2 and an ACK of the PDCCH monitoring is delayed to slot n+2, then the UE may monitor PDCCH in the next slot (e.g., in slot n+3), thereby allowing the UE to save power by avoiding an RFIC ramp down and an RFIC ramp up while also taking advantage of bandwidth adaptation. Note that the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint. Thus, according to the example of FIG. 19, the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring and p is greater than 1, and cross-slot scheduling may be enabled. The UE constraint may be K0 greater than 0 (which may allow the UE to monitor PDCCH with narrow BWP and receive PDSCH with wide BWP) and K1=0 (which may ensure PDSCH reception and ACK transmission occur in a common (same) time slot), where K0 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for PDSCH and K1 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDSCH and a slot scheduled for an acknowledgment. In other words, when the UE is configured to monitor PDCCH in slot n, a PDSCH reception and ACK transmission may be scheduled one time slot ahead of the PDCCH monitoring, e.g., time slot n−1, such that the reception (PDSCH)/transmission (ACK) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between. Hence, if such a scheduling-power profile is enabled (e.g., an RRC parameter PS_K1_equal_0 is set to “true” or “1”), then the network may make scheduling decisions (e.g., such as ACK transmission timing and PDSCH reception) to satisfy the UE constraint.
  • FIG. 20 illustrates an example of self-contained slot scheduling with following PDCCH monitoring, according to some embodiments. For example, if a UE, such as UE 106, is supposed to receive on the PDSCH while performing PDCCH monitoring 2002, then the network (e.g., base station 102, gNB 604) may schedule (e.g., based in part on an agreed upon scheduling-power profile) the PDSCH reception 2006 and an ACK transmission 2008 in a time slot with a scheduled PDCCH monitoring time slot 2002 such that the UE may transmit and receive in a single time slot. Such a scheduling scheme may allow the UE to save power by avoiding a ramp down (e.g., after receiving on the PDCCH and after receiving PDSCH) and a ramp up (e.g., before receiving scheduled PDSCH and before sending ACK). As shown in FIG. 20, the UE may be configured to monitor the PDCCH every 3 time slots, thus, if the UE is scheduled to receive on the PDSCH in slot n, then an ACK of the PDSCH are also scheduled in slot n. Such a scheme may allow the UE to save power by avoiding an RFIC ramp down and an RFIC ramp up. Note that the UE may not monitor the PDCCH at slots 2004. Note further that the scheduling-power profile may be determined based, at least in part, on a communication configuration condition and/or a UE constraint. Thus, according to the example of FIG. 20, the communication configuration condition may include that the UE is configured with at least a PDCCH monitoring period of p, where p defines a number of time slots between PDCCH monitoring and p is greater than 1, and same slot scheduling may be enabled. The UE constraint may be K0=0 (which may allow the UE to monitor PDCCH with narrow BWP and receive PDSCH with wide BWP) and K1=0 (which may ensure PDSCH reception and ACK transmission occur in a common (same) time slot), where K0 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDCCH and a slot scheduled for PDSCH and K1 defines a number of slots (e.g., from 0 to n) between a slot scheduled for the PDSCH and a slot scheduled for an acknowledgment. In other words, when the UE is configured to monitor PDCCH in slot n, a PDSCH reception and ACK transmission may be scheduled in a single slot with the PDCCH monitoring, e.g., time slot n, such that the reception (PDSCH)/transmission (ACK) and reception (PDCCH monitoring) may occur without an RFIC ramp down and an RFIC ramp up in between. Hence, if such a scheduling-power profile is enabled (e.g., an RRC parameter K0 K1 equal_0 is set to “true” or “1”), then the network may make scheduling decisions (e.g., such as ACK transmission timing and PDSCH reception) to satisfy the UE constraint.
  • As discussed above, in some embodiments, one or multiple profiles may be active (e.g., configured for use) for data transfer between a UE, such as UE 106, and a base station (network), such as base station 102, gNB 604. In some embodiments, profiles may be dynamically changed (or switched), e.g., in response to traffic arrival rate increases and/or decreases, traffic delay requirement changes, power consumption requirement changes, and so forth. In some embodiments, the dynamic change may be triggered via explicit signaling between the network and UE. For example, the network may send an explicit signal to the UE to change an active profile to be used for a data transfer. As another example, the UE may send an explicit signal to the network to request change of an active profile to be used for a data transfer. In some embodiments, the dynamic change may be triggered (additionally and/or alternatively) based on a timer. For example, an active profile to be used for a data transfer may change based on a timer operation.
  • In some embodiments, the network (e.g., gNB 604, base station 102) may indicate a profile to use to a UE, such as UE 106 via signaling using downlink control information (DCI), a medium access control (MAC) control element (CE), and/or radio resource control (RRC) signaling. For example, the network may send (transmit) a signal (e.g., an indication included in DCI, a MAC CE, and/or in RRC signaling) that may indicate to the UE to use a high throughput profile when there is a large amount of data to deliver to the UE. As another example, the network may send (transmit) a signal (e.g., an indication included in DCI, a MAC CE, and/or in RRC signaling) that may indicate to the UE to use a power saving profile when traffic arrival rate decreases below a threshold. As a further example, the network may send (transmit) a layer 1 (L1) to indicate to the UE to use a low latency profile when supported traffic requires low latency.
  • In some embodiments, the UE may send (transmit) a profile change request signal to the network. For example, when a UE knows that a downlink file transfer has been finished and may want to switch to a power saving profile. In other words, in response to completion of a downlink file transfer, the UE may request a profile change to a power saving profile.
  • In some embodiments, a profile change may be based, at least in part, on a timer operation. For example, a default profile may be configured. In addition, a timer (e.g., a ProfileActiveTimer timer) may be defined. The timer may be started, restarted, and/or reset when the network activates a new set of profiles. Additionally, the timer may be reset based on a condition obtaining. For example, in some embodiments, the condition may include data arrival rate exceeding a threshold, a number of PDSCH slots scheduled for a specified number of slots exceeds a threshold, and so forth. In some embodiments, upon timer expiration, a current active profile may be deactivated (disabled) and a default profile may be activated (enabled). In some embodiments, the default profile may be updated periodically, e.g., via the network.
  • Further Embodiments
  • In some embodiments, a method may include a user equipment device, such as UE 106:
  • exchanging communications with a base station to determine one or more scheduling profiles, such as one or more scheduling-power profiles, wherein a scheduling-power profile specifies one or more parameters and/or constraints on UE communication behavior;
  • receiving a slot configuration schedule based on at least one scheduling-power profile of the one or more scheduling-power profiles; and
  • performing communications with the base station based on the at least one scheduling-power profile.
  • In some embodiments, the communications with the base station to determine the one or more scheduling-power profiles may include (comprise) radio resource control (RRC) signal message exchanges.
  • In some embodiments, the one or more scheduling-power profiles may not conflict with one another.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) one or more of:
  • a profile for delayed acknowledgement (ACK) with physical downlink control channel (PDCCH) monitoring;
  • a profile for delayed physical uplink shared channel (PUSCH) scheduling with PDCCH monitoring;
  • a profile for cross-slot scheduling with PDCCH monitoring;
  • a profile for large bandwidth part (BWP) for large data packet scheduling;
  • a profile for self-contained slot scheduling;
  • a profile for power savings;
  • a profile for high throughput;
  • a profile for low latency;
  • a profile for high system capacity;
  • a profile for small data traffic; and/or a profile for PDCCH monitoring period.
  • In some embodiments, the one or more parameters and/or constraints may include (comprise) one or more of:
  • a first parameter defining a set of values for search space monitoring periodicity;
  • a second parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
  • a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment;
  • a fourth parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for transmission on the PUSCH;
  • a fifth parameter defining minimum and/or maximum bandwidth values and/or constraints in BWPs; and/or
  • a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) a first profile constraining the base station to schedule transmission of an acknowledgment of data received on the PDCCH to a first slot immediately preceding a second slot scheduled for PDCCH monitoring. In some embodiments, the first profile may be indicated via a PS_ACK_Schedule RRC parameter.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) a second profile constraining the base station to schedule transmission on the PUSCH to a third slot immediately preceding a fourth slot scheduled for PDCCH monitoring. In some embodiments, the second profile may be indicated via a PS_PUSCH_Schedule RRC parameter.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) a third profile constraining the base station to cross-slot schedule transmission of an ACK of a PDCCH and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring. In some embodiments, the third profile is indicated via a PS_K1_equal_0 RRC parameter.
  • In some embodiments, a method may include a base station, such as gNB 604 and/or base station 102:
  • exchanging communications with a user equipment device (UE) to determine one or more scheduling profile, such as one or more scheduling-power profiles, wherein a scheduling-power profile specifies one or more parameters and/or constraints on UE communication behavior;
  • transmitting, to the UE, a slot configuration schedule based on at least one scheduling-power profile of the one or more scheduling-power profiles; and
  • performing communications with the UE based on the at least one scheduling-power profile.
  • In some embodiments, the communications with the UE to determine the one or more scheduling-power profiles may include (comprise) radio resource control (RRC) signal message exchanges.
  • In some embodiments, the one or more scheduling-power profiles may not conflict with one another.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) one or more of:
  • a profile for delayed acknowledgement (ACK) with physical downlink control channel (PDCCH) monitoring;
  • a profile for delayed physical uplink shared channel (PUSCH) scheduling with PDCCH monitoring;
  • a profile for cross-slot scheduling with PDCCH monitoring;
  • a profile for large bandwidth part (BWP) for large data packet scheduling;
  • a profile for self-contained slot scheduling;
  • a profile for power savings;
  • a profile for high throughput;
  • a profile for low latency;
  • a profile for high system capacity;
  • a profile for small data traffic; and/or a profile for PDCCH monitoring period.
  • In some embodiments, the one or more parameters and/or constraints may include (comprise) one or more of:
  • a first parameter defining a set of values for search space monitoring periodicity;
  • a second parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
  • a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment;
  • a fourth parameter defining a number of slots between a slot scheduled for reception on the PDCCH and a slot scheduled for transmission on the PUSCH;
  • a fifth parameter defining minimum and/or maximum bandwidth values and/or constraints in BWPs; and/or
  • a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) a first profile constraining the base station to schedule transmission of an acknowledgment of data received on the PDCCH to a first slot immediately preceding a second slot scheduled for PDCCH monitoring.
  • In some embodiments, the first profile may be indicated via a PS_ACK_Schedule RRC parameter.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) a second profile constraining the base station to schedule transmission on the PUSCH to a third slot immediately preceding a fourth slot scheduled for PDCCH monitoring. In some embodiments, the second profile may be indicated via a PS_PUSCH_Schedule RRC parameter.
  • In some embodiments, the one or more scheduling-power profiles may include (comprise) a third profile constraining the base station to cross-slot schedule transmission of an ACK of a PDCCH and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring. In some embodiments, the third profile may be indicated via a PS_K1_equal_0 RRC parameter.
  • It is well understood that the use of personally identifiable information should follow privacy policies and practices that are generally recognized as meeting or exceeding industry or governmental requirements for maintaining the privacy of users. In particular, personally identifiable information data should be managed and handled so as to minimize risks of unintentional or unauthorized access or use, and the nature of authorized use should be clearly indicated to users.
  • Embodiments of the present disclosure may be realized in any of various forms. For example, some embodiments may be realized as a computer-implemented method, a computer-readable memory medium, or a computer system. Other embodiments may be realized using one or more custom-designed hardware devices such as ASICs. Still other embodiments may be realized using one or more programmable hardware elements such as FPGAs.
  • In some embodiments, a non-transitory computer-readable memory medium may be configured so that it stores program instructions and/or data, where the program instructions, if executed by a computer system, cause the computer system to perform a method, e.g., any of the method embodiments described herein, or, any combination of the method embodiments described herein, or, any subset of any of the method embodiments described herein, or, any combination of such subsets.
  • In some embodiments, a device (e.g., a UE 106) may be configured to include a processor (or a set of processors) and a memory medium, where the memory medium stores program instructions, where the processor is configured to read and execute the program instructions from the memory medium, where the program instructions are executable to implement any of the various method embodiments described herein (or, any combination of the method embodiments described herein, or, any subset of any of the method embodiments described herein, or, any combination of such subsets). The device may be realized in any of various forms.
  • Although the embodiments above have been described in considerable detail, numerous variations and modifications will become apparent to those skilled in the art once the above disclosure is fully appreciated. It is intended that the following claims be interpreted to embrace all such variations and modifications.

Claims (20)

What is claimed is:
1. A user equipment device (UE), comprising:
at least one antenna;
at least one radio coupled to the antenna; and
a processing element coupled to the at least one radio, wherein the process element is configured to cause the UE to:
exchange communications with a base station to determine one or more scheduling-power profiles, wherein a scheduling-power profile specifies one or more parameters and one or more constraints on UE communication behavior;
receive a slot configuration schedule based on at least one scheduling-power profile of the one or more scheduling-power profiles; and
perform communications with the base station based on the at least one scheduling-power profile.
2. The UE of claim 1,
wherein the communications with the base station to determine the one or more scheduling-power profiles include radio resource control (RRC) signal message exchanges.
3. The UE of claim 1,
wherein the one or more scheduling-power profiles do not conflict with one another.
4. The UE of claim 1,
wherein the one or more scheduling-power profiles include one or more of:
a profile for delayed acknowledgement (ACK) with physical downlink control channel (PDCCH) monitoring;
a profile for delayed physical uplink shared channel (PUSCH) scheduling with PDCCH monitoring;
a profile for cross-slot scheduling with PDCCH monitoring;
a profile for large bandwidth part (BWP) for large data packet scheduling;
a profile for self-contained slot scheduling;
a profile for power savings;
a profile for high throughput;
a profile for low latency;
a profile for high system capacity;
a profile for small data traffic; or
a profile for PDCCH monitoring period.
5. The UE of claim 1,
wherein the one or more parameters include one or more of:
a first parameter defining a set of values for search space monitoring periodicity;
a second parameter defining a number of slots between a slot scheduled for reception on the physical downlink control channel (PDCCH) and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment;
a fourth parameter defining a number of slots between a slot scheduled for reception on the physical downlink control channel (PDCCH) and a slot scheduled for transmission on the physical uplink shared channel (PUSCH);
a fifth parameter defining minimum and/or maximum bandwidth values and/or constraints in large bandwidth parts (BWPs); or
a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
6. The UE of claim 1,
wherein the one or more scheduling-power profiles comprise a profile constraining the base station to schedule transmission of an acknowledgment of data received on the physical downlink control channel (PDCCH) to a first slot immediately preceding a second slot scheduled for PDCCH monitoring,
and wherein the profile is indicated via a PS_ACK_Schedule radio resource control parameter.
7. The UE of claim 1,
wherein the one or more scheduling-power profiles include a profile constraining the base station to schedule transmission on the physical uplink shared channel (PUSCH) to a third slot immediately preceding a fourth slot scheduled for the physical downlink control channel (PDCCH) monitoring, and wherein the profile is indicated via a PS_PUSCH_Schedule radio resource control (RRC) parameter.
8. The UE of claim 1,
wherein the one or more scheduling-power profiles include a profile constraining the base station to cross-slot schedule transmission of an acknowledgement (ACK) of a physical downlink control channel (PDCCH) and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring, and wherein the profile is indicated via a PS_K1_equal_0 radio resource control (RRC) parameter.
9. An apparatus, comprising:
a memory; and
at least one processor in communication with the memory;
wherein the at least one processor is configured to:
exchange radio resource control (RRC) messages with a base station to determine one or more scheduling profiles, wherein a scheduling profile specifies one or more parameters and one or more constraints on communication behavior;
receive a slot configuration schedule based on at least one scheduling profile of the one or more scheduling profiles; and
perform, based on the at least one scheduling profile, communications with the base station.
10. The apparatus of claim 9,
wherein the one or more scheduling profiles do not conflict with one another.
11. The apparatus of claim 9,
wherein the one or more scheduling profiles include three or more of:
a profile for delayed acknowledgement (ACK) with physical downlink control channel (PDCCH) monitoring;
a profile for delayed physical uplink shared channel (PUSCH) scheduling with PDCCH monitoring;
a profile for cross-slot scheduling with PDCCH monitoring;
a profile for large bandwidth part (BWP) for large data packet scheduling;
a profile for self-contained slot scheduling;
a profile for power savings;
a profile for high throughput;
a profile for low latency;
a profile for high system capacity;
a profile for small data traffic; or
a profile for PDCCH monitoring period.
12. The apparatus of claim 9,
wherein the one or more parameters include three or more of:
a first parameter defining a set of values for search space monitoring periodicity;
a second parameter defining a number of slots between a slot scheduled for reception on the physical downlink control channel (PDCCH) and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment;
a fourth parameter defining a number of slots between a slot scheduled for reception on the physical downlink control channel (PDCCH) and a slot scheduled for transmission on the physical uplink shared channel (PUSCH);
a fifth parameter defining minimum and/or maximum bandwidth values and/or constraints in large bandwidth parts (BWPs); or
a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
13. The apparatus of claim 9,
wherein the one or more scheduling profiles include:
a first profile constraining the base station to schedule transmission of an acknowledgment of data received on the physical downlink control channel (PDCCH) to a first slot immediately preceding a second slot scheduled for PDCCH monitoring;
a second profile constraining the base station to schedule transmission on the physical uplink shared channel (PUSCH) to a third slot immediately preceding a fourth slot scheduled for the physical downlink control channel (PDCCH) monitoring; and
a third profile constraining the base station to cross-slot schedule transmission of an acknowledgement (ACK) of a physical downlink control channel (PDCCH) and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring
14. The apparatus of claim 13,
wherein the first profile is indicated via a PS_ACK_Schedule radio resource control (RRC) parameter, wherein the second profile is indicated via a PS_PUSCH_Schedule RRC parameter, and wherein the third profile is indicated via a PS_K1_equal_0_RRC parameter.
15. A non-transitory memory medium comprising program instructions that, when executed by processing circuitry of a user equipment device (UE), cause the UE to:
transmit a proposal of scheduling-power profiles to a base station, wherein a scheduling-power profile specifies one or more parameters and one or more constraints on UE communication behavior;
receive, from the base station, a counter proposal of scheduling-power profiles;
exchange one or more additional communications with the base station to determine a scheduling-power profile for communications with the base station;
receive, from the base station, a slot configuration schedule based on the determined scheduling-power profile; and
perform communications with the base station based on the determined scheduling-power profile.
16. The non-transitory memory medium of claim 15,
wherein the communications with the base station to determine the one or more scheduling-power profiles include radio resource control (RRC) signal message exchanges.
17. The non-transitory memory medium of claim 15,
wherein the scheduling-power profiles include two or more of:
a profile for delayed acknowledgement (ACK) with physical downlink control channel (PDCCH) monitoring;
a profile for delayed physical uplink shared channel (PUSCH) scheduling with PDCCH monitoring;
a profile for cross-slot scheduling with PDCCH monitoring;
a profile for large bandwidth part (BWP) for large data packet scheduling;
a profile for self-contained slot scheduling;
a profile for power savings;
a profile for high throughput;
a profile for low latency;
a profile for high system capacity;
a profile for small data traffic; or
a profile for PDCCH monitoring period.
18. The non-transitory memory medium of claim 15,
wherein the one or more parameters include three or more of:
a first parameter defining a set of values for search space monitoring periodicity;
a second parameter defining a number of slots between a slot scheduled for reception on the physical downlink control channel (PDCCH) and a slot scheduled for reception on the physical downlink shared channel (PDSCH);
a third parameter defining a number of slots between a slot scheduled for reception on the PDSCH and a slot scheduled for an acknowledgment;
a fourth parameter defining a number of slots between a slot scheduled for reception on the physical downlink control channel (PDCCH) and a slot scheduled for transmission on the physical uplink shared channel (PUSCH);
a fifth parameter defining minimum and/or maximum bandwidth values and/or constraints in large bandwidth parts (BWPs); or
a sixth parameter defining a set of supported number of multiple-input-multiple-output (MIMO) layers.
19. The non-transitory memory medium of claim 15,
wherein the more scheduling-power profiles include at least one of:
a first profile constraining the base station to schedule transmission of an acknowledgment of data received on the physical downlink control channel (PDCCH) to a first slot immediately preceding a second slot scheduled for PDCCH monitoring;
a second profile constraining the base station to schedule transmission on the physical uplink shared channel (PUSCH) to a third slot immediately preceding a fourth slot scheduled for the physical downlink control channel (PDCCH) monitoring; or
a third profile constraining the base station to cross-slot schedule transmission of an acknowledgement (ACK) of a physical downlink control channel (PDCCH) and a reception on the physical downlink shared channel (PDSCH) to a fifth slot immediately preceding a sixth slot scheduled for PDCCH monitoring
20. The non-transitory memory medium of claim 19,
wherein the first profile is indicated via a PS_ACK_Schedule radio resource control (RRC) parameter, wherein the second profile is indicated via a PS_PUSCH_Schedule RRC parameter, and wherein the third profile is indicated via a PS_K1_equal_0 RRC parameter.
US16/295,230 2018-03-12 2019-03-07 Scheduling profile for UE power savings Active 2040-02-01 US11589305B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US16/295,230 US11589305B2 (en) 2018-03-12 2019-03-07 Scheduling profile for UE power savings
DE102019203357.1A DE102019203357A1 (en) 2018-03-12 2019-03-12 Energy planning profile for power saving in user equipment devices (UE)
CN202211570885.XA CN116209039A (en) 2018-03-12 2019-03-12 Apparatus, system, and method for scheduling power profiles for UE power saving
CN201910183822.0A CN110267330B (en) 2018-03-12 2019-03-12 Apparatus, system, and method for scheduling power profiles for UE power savings
US18/083,968 US20230118771A1 (en) 2018-03-12 2022-12-19 Scheduling-Power Profile for UE Power Savings

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201862641564P 2018-03-12 2018-03-12
US16/295,230 US11589305B2 (en) 2018-03-12 2019-03-07 Scheduling profile for UE power savings

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/083,968 Continuation US20230118771A1 (en) 2018-03-12 2022-12-19 Scheduling-Power Profile for UE Power Savings

Publications (2)

Publication Number Publication Date
US20190281545A1 true US20190281545A1 (en) 2019-09-12
US11589305B2 US11589305B2 (en) 2023-02-21

Family

ID=67842267

Family Applications (1)

Application Number Title Priority Date Filing Date
US16/295,230 Active 2040-02-01 US11589305B2 (en) 2018-03-12 2019-03-07 Scheduling profile for UE power savings

Country Status (2)

Country Link
US (1) US11589305B2 (en)
CN (1) CN110267330B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190059054A1 (en) * 2017-08-18 2019-02-21 Qualcomm Incorporated Advanced grant indicator and aperiodic tracking reference signal in discontinuous reception
CN111247841A (en) * 2018-09-28 2020-06-05 联发科技股份有限公司 User equipment power consumption characteristics and traffic adaptation
WO2021154943A1 (en) * 2020-01-31 2021-08-05 Qualcomm Incorporated Slot position offsets associated with a downlink control information in a physical downlink shared channel
US11324066B2 (en) * 2018-04-23 2022-05-03 Qualcomm Incorporated Dynamic downlink monitoring techniques for communication systems
US20220279373A1 (en) * 2018-10-19 2022-09-01 Mediatek Inc. Adaptation framework for ue power saving
US11483767B2 (en) * 2019-02-15 2022-10-25 Mediatek Inc. Cross-slot scheduling for power saving in mobile communications
US20230116936A1 (en) * 2021-10-15 2023-04-20 Qualcomm Incorporated Dynamic network power mode switching and timeline
US20230124762A1 (en) * 2021-10-15 2023-04-20 Qualcomm Incorporated Network power mode pattern and switching configuration
US11765660B2 (en) * 2018-04-16 2023-09-19 Samsung Electronics Co., Ltd. Method and apparatus for reducing power consumption of terminal in wireless communication system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113900595B (en) * 2021-11-10 2023-12-15 哲库科技(北京)有限公司 DDR access method, device, electronic equipment and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120213139A1 (en) * 2009-10-22 2012-08-23 Telefonaktiebolaget L M Ericsson (Publ) Methods and Arrangements for Scheduling Based on Power Consumption
US20150085728A1 (en) * 2013-09-25 2015-03-26 Apple Inc. Uplink and Downlink Semi-Persistent Scheduling Alignment
US20190150187A1 (en) * 2016-05-10 2019-05-16 Lg Electronics Inc. Method for receiving data in wireless communication system, and apparatus therefor
US20190261405A1 (en) * 2018-02-16 2019-08-22 Qualcomm Incorporated Downlink control information signaling schemes for bandwidth part switching

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MY129851A (en) 1999-03-22 2007-05-31 Interdigital Tech Corp Weighted open loop power control in a time division duplex communication system
US8965440B2 (en) 2005-05-31 2015-02-24 Alcatel Lucent Method of estimating a current channel condition in a wireless communications network
US20080039128A1 (en) 2006-08-09 2008-02-14 Telefonaktiebolaget Lm Ericsson (Publ) Propagation delay based transmit power control
US20110018346A1 (en) 2009-07-27 2011-01-27 Dixon Ryan G Location-Based Power Profiles
US20130107727A1 (en) 2011-10-27 2013-05-02 Nokia Corporation Apparatus and Method for the Management of Reception Parameters in a Communication System
US9674886B2 (en) 2013-01-07 2017-06-06 Lg Electronics Inc. Method and apparatus for transmitting signals to a plurality of transmission points
US9467944B2 (en) 2013-06-21 2016-10-11 Apple Inc. Power consumption reduction for cellular broadcast
US9820225B2 (en) 2014-05-13 2017-11-14 Qualcomm Incorporated Techniques for managing power consumption of a mobile device
US10405278B2 (en) * 2014-10-31 2019-09-03 Qualcomm Incorporated Low power scheduling
US10182426B2 (en) 2015-03-13 2019-01-15 Qualcomm Incorporated Scheduling of downlink transmissions based on exchanges of pre-scheduling and scheduling messages
KR20180018421A (en) 2016-08-10 2018-02-21 아서스테크 컴퓨터 인코포레이션 Method and apparatus for pathloss derivation for beam operation in a wireless communication system
WO2018031623A1 (en) 2016-08-11 2018-02-15 Intel Corporation Flexible transmission time interval and on slot aggregation for data transmission for new radio
CN110235464B (en) * 2017-02-03 2023-04-25 夏普株式会社 Base station device, terminal device, and communication method therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120213139A1 (en) * 2009-10-22 2012-08-23 Telefonaktiebolaget L M Ericsson (Publ) Methods and Arrangements for Scheduling Based on Power Consumption
US20150085728A1 (en) * 2013-09-25 2015-03-26 Apple Inc. Uplink and Downlink Semi-Persistent Scheduling Alignment
US20190150187A1 (en) * 2016-05-10 2019-05-16 Lg Electronics Inc. Method for receiving data in wireless communication system, and apparatus therefor
US20190261405A1 (en) * 2018-02-16 2019-08-22 Qualcomm Incorporated Downlink control information signaling schemes for bandwidth part switching

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190059054A1 (en) * 2017-08-18 2019-02-21 Qualcomm Incorporated Advanced grant indicator and aperiodic tracking reference signal in discontinuous reception
US10750444B2 (en) * 2017-08-18 2020-08-18 Qualcomm Incorporated Advanced grant indicator and aperiodic tracking reference signal in discontinuous reception
US11765660B2 (en) * 2018-04-16 2023-09-19 Samsung Electronics Co., Ltd. Method and apparatus for reducing power consumption of terminal in wireless communication system
US11324066B2 (en) * 2018-04-23 2022-05-03 Qualcomm Incorporated Dynamic downlink monitoring techniques for communication systems
CN111247841A (en) * 2018-09-28 2020-06-05 联发科技股份有限公司 User equipment power consumption characteristics and traffic adaptation
US11659430B2 (en) * 2018-10-19 2023-05-23 Mediatek Inc. Adaptation framework for UE power saving
US20220279373A1 (en) * 2018-10-19 2022-09-01 Mediatek Inc. Adaptation framework for ue power saving
US11483767B2 (en) * 2019-02-15 2022-10-25 Mediatek Inc. Cross-slot scheduling for power saving in mobile communications
CN115004768A (en) * 2020-01-31 2022-09-02 高通股份有限公司 Slot position offset associated with downlink control information in physical downlink shared channel
US11737094B2 (en) 2020-01-31 2023-08-22 Qualcomm Incorporated Slot position offsets associated with a downlink control information in a physical downlink shared channel
WO2021154943A1 (en) * 2020-01-31 2021-08-05 Qualcomm Incorporated Slot position offsets associated with a downlink control information in a physical downlink shared channel
US20230116936A1 (en) * 2021-10-15 2023-04-20 Qualcomm Incorporated Dynamic network power mode switching and timeline
US20230124762A1 (en) * 2021-10-15 2023-04-20 Qualcomm Incorporated Network power mode pattern and switching configuration
WO2023064306A1 (en) * 2021-10-15 2023-04-20 Qualcomm Incorporated Dynamic network power mode switching and timeline
WO2023064300A1 (en) * 2021-10-15 2023-04-20 Qualcomm Incorporated Network power mode pattern and switching configuration
US11856513B2 (en) * 2021-10-15 2023-12-26 Qualcomm Incorporated Network power mode pattern and switching configuration
US12003446B2 (en) * 2021-10-15 2024-06-04 Qualcomm Incorporated Dynamic network power mode switching and timeline

Also Published As

Publication number Publication date
CN110267330A (en) 2019-09-20
CN110267330B (en) 2022-12-16
US11589305B2 (en) 2023-02-21

Similar Documents

Publication Publication Date Title
US11589305B2 (en) Scheduling profile for UE power savings
US20200053830A1 (en) 5G New Radio NAS Notification Procedures
US11564167B2 (en) Configurable power saving signal with multiple functionalities in 5G NR
US11357003B2 (en) Self-contained slot and slot duration configuration in NR systems
US20220256353A1 (en) 5G New Radio Unlicensed Band Cell Access
US11864278B2 (en) 5G NR FR2 beam management enhancements
US11722250B2 (en) Uplink repetition enhancement
US11356151B2 (en) MIMO enhancement capability design
US20230155660A1 (en) UE Uplink Panel Selection Framework
US20220304038A1 (en) Radio Resource Management Signal Reception
US20230354212A1 (en) Default PUCCH and SRS Beam Determination
US20230156485A1 (en) Overhead Reduction for Multi-carrier Beam Selection and Power Control
US20230239795A1 (en) Enhanced Wake-Up Signal Based Power Saving for a Wireless Device
US20210051748A1 (en) Intra-UE Coexistence between Non-Stand-alone and Stand-alone Mode
US20220312400A1 (en) Symbol Level Beam Sweeping Configuration
US20230118771A1 (en) Scheduling-Power Profile for UE Power Savings
WO2021102787A1 (en) Uci multiplexing enhancements
EP3780883B1 (en) Intra-ue coexistence between non-stand-alone and stand-alone mode
US20220312233A1 (en) Symbol Level Beam Sweeping Capability Reporting

Legal Events

Date Code Title Description
AS Assignment

Owner name: APPLE INC., CALIFORNIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KIM, YUCHUL;ZHANG, WEI;ALMALFOUH, SAMI M.;AND OTHERS;SIGNING DATES FROM 20190227 TO 20190306;REEL/FRAME:048528/0825

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STCV Information on status: appeal procedure

Free format text: NOTICE OF APPEAL FILED

STCV Information on status: appeal procedure

Free format text: APPEAL BRIEF (OR SUPPLEMENTAL BRIEF) ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STCF Information on status: patent grant

Free format text: PATENTED CASE

CC Certificate of correction