US20190123650A1 - Control Method for Buck-Boost Power Converters - Google Patents

Control Method for Buck-Boost Power Converters Download PDF

Info

Publication number
US20190123650A1
US20190123650A1 US16/212,943 US201816212943A US2019123650A1 US 20190123650 A1 US20190123650 A1 US 20190123650A1 US 201816212943 A US201816212943 A US 201816212943A US 2019123650 A1 US2019123650 A1 US 2019123650A1
Authority
US
United States
Prior art keywords
buck
converter
boost
ramp
boost converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US16/212,943
Other versions
US10554130B2 (en
Inventor
Liming Ye
Jinbo HUANG
Heping Dai
Dianbo Fu
Daoshen Chen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Digital Power Technologies Co Ltd
Original Assignee
FutureWei Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FutureWei Technologies Inc filed Critical FutureWei Technologies Inc
Priority to US16/212,943 priority Critical patent/US10554130B2/en
Publication of US20190123650A1 publication Critical patent/US20190123650A1/en
Application granted granted Critical
Publication of US10554130B2 publication Critical patent/US10554130B2/en
Assigned to Huawei Digital Power Technologies Co., Ltd. reassignment Huawei Digital Power Technologies Co., Ltd. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FUTUREWEI TECHNOLOGIES, INC.
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • H02M3/10Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M3/145Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M3/155Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/156Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators
    • H02M3/158Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators including plural semiconductor devices as final control devices for a single load
    • H02M3/1582Buck-boost converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0003Details of control, feedback or regulation circuits
    • H02M1/0025Arrangements for modifying reference values, feedback values or error values in the control loop of a converter
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0003Details of control, feedback or regulation circuits
    • H02M1/0032Control circuits allowing low power mode operation, e.g. in standby mode
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0048Circuits or arrangements for reducing losses
    • H02M1/0054Transistor switching losses
    • H02M1/0058Transistor switching losses by employing soft switching techniques, i.e. commutation of transistors when applied voltage is zero or when current flow is zero
    • H02M2001/0058
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/10Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes
    • Y02B70/1425

Definitions

  • the present invention relates to a power converter, and, in particular embodiments, to control mechanisms for buck-boost converters.
  • a power converter transforms an input voltage into a regulated output voltage and supplies a current required by an external load such as integrated circuits and the like.
  • switching power converters can be divided into two categories, namely isolated power converters and non-isolated power converters.
  • Isolated power converters can be implemented by using different power topologies, such as flyback converters, forward converters, half bridge converters, full bridge converters, push-pull converters, inductor-inductor-capacitor (LLC) resonant converters and the like.
  • non-isolated power converters can be implemented by using different power topologies such as buck converters, boost converters, buck-boost converters, linear regulators, any combinations thereof.
  • Buck-boost converters have emerged as an effective power conversion scheme to deliver a tightly regulated output voltage from a wide range input voltage.
  • a buck-boost converter can produce an output voltage that is either greater than or less than an input voltage through using different operating modes such as buck and boost conversion modes.
  • the buck-boost converter operates in a buck mode when the input voltage is higher than the output voltage, in a boost mode when the input voltage is lower than the output voltage.
  • a method comprises generating a first ramp signal for controlling a first portion of a converter, generating a second ramp signal for controlling a second portion of the converter, controlling a state of a first switch of the first portion through comparing the first ramp signal to a control signal and a state of a first switch of the second portion through comparing the second ramp signal to the control signal and determining a switching cycle of the converter through comparing a current flowing through an inductor of the converter to a threshold.
  • a method comprises controlling a turn-off of a first switch of a buck portion of a buck-boost converter through comparing a first ramp signal to a control signal, controlling a turn-off of a first switch of a boost portion of the buck-boost converter through comparing a second ramp signal to the control signal, controlling a turn-off of a second switch of the buck portion of the buck-boost converter through comparing a current flowing through an inductor of the buck-boost converter to a current threshold and controlling a turn-off of a second switch of the boost portion of the buck-boost converter through comparing the current flowing through the inductor of the buck-boost converter to the current threshold.
  • a converter comprises a buck converter portion, an inductor and a boost converter portion connected in cascade and a controller configured to compare a current flowing through the inductor to a current threshold and determining a switching cycle of the converter through comparing the current flowing through the inductor to the current threshold.
  • An advantage of a preferred embodiment of the present invention is the efficiency of a buck-boost converter may be improved by employing multiple operating modes.
  • FIG. 1 illustrates a schematic diagram of a buck-boost converter in accordance with various embodiments of the present disclosure
  • FIG. 2 illustrates timing diagrams associated with a boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure
  • FIG. 3 illustrates timing diagrams associated with a light-load boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure
  • FIG. 4 illustrates timing diagrams associated with a buck-boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure
  • FIG. 5 illustrates timing diagrams associated with a buck operating mode under the first control mechanism in accordance with various embodiments of the present disclosure
  • FIG. 6 illustrate timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure
  • FIG. 7 illustrates timing diagrams associated with a light-load buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure
  • FIG. 8 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is approximately equal to the input voltage in accordance with various embodiments of the present disclosure
  • FIG. 9 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the input voltage is greater than the output voltage in accordance with various embodiments of the present disclosure
  • FIG. 10 illustrates timing diagrams associated with the third control mechanism in accordance with various embodiments of the present disclosure
  • FIG. 11 illustrates timing diagrams associated with a buck operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure
  • FIG. 12 illustrates timing diagrams associated with a buck-boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure.
  • FIG. 13 illustrates timing diagrams associated with a boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure.
  • FIG. 1 illustrates a schematic diagram of a buck-boost converter in accordance with various embodiments of the present disclosure.
  • the buck-boost converter 100 comprises a first high-side switch Q 1 , a first low-side switch Q 2 , a second high-side switch Q 3 , a second low-side switch Q 4 and an inductor L 1 .
  • the first high-side switch Q 1 and the first low-side switch Q 2 are connected in series between the positive terminal and the negative terminal of an input capacitor CIN.
  • the second high-side switch Q 3 and the second low-side switch Q 4 are connected in series between the positive terminal and the negative terminal of an output capacitor Co.
  • the inductor L 1 is coupled between the common node of the first high-side switch Q 1 and the first low-side switch Q 2 , and the common node of the second high-side switch Q 3 and the second low-side switch Q 4 .
  • the buck-boost converter 100 may further comprise a controller 110 .
  • the controller 110 may detect the input voltage Vin and the output voltage Vo, and generate a plurality of gate drive signals for driving switches Q 1 , Q 2 , Q 3 and Q 4 accordingly.
  • the controller 110 may be a PWM controller.
  • the controller 110 may be implemented as a digital controller such as a micro-controller, a digital signal processor and/or the like.
  • the buck-boost converter 100 may have many variations, alternatives, and modifications.
  • the controller 110 may detect other necessary signals such as the input and/or output current of the buck-boost converter 100 .
  • the buck-boost converter 100 and the controller 110 illustrated herein is limited solely for the purpose of clearly illustrating the inventive aspects of the various embodiments. The present invention is not limited to any particular power topology.
  • the buck-boost converter 100 may be divided into two portions, namely a buck converter portion and a boost converter portion.
  • the buck converter portion may comprise the first high-side switch Q 1 and the first low-side switch Q 2 .
  • the buck converter portion and the inductor L 1 may function as a step-down converter.
  • the boost converter portion may comprise the second high-side switch Q 3 and second low-side switch Q 4 .
  • the boost converter portion and the inductor L 1 may function as a step-up converter.
  • the buck converter portion, the inductor L 1 and the boost converter portion are connected in cascade between the input capacitor CIN and the output capacitor Co.
  • the switches may be implemented as n-type metal oxide semiconductor (NMOS) transistors.
  • the switches may be implemented as other suitable controllable devices such as metal oxide semiconductor field effect transistor (MOSFET) devices, bipolar junction transistor (BJT) devices, super junction transistor (SJT) devices, insulated gate bipolar transistor (IGBT) devices, gallium nitride (GaN) based power devices and/or the like.
  • MOSFET metal oxide semiconductor field effect transistor
  • BJT bipolar junction transistor
  • SJT super junction transistor
  • IGBT insulated gate bipolar transistor
  • GaN gallium nitride
  • FIG. 1 illustrates four switches Q 1 , Q 2 , Q 3 , and Q 4
  • various embodiments of the present disclosure may include other variations, modifications and alternatives.
  • the low-side switch Q 2 may be replaced by a freewheeling diode and/or the like.
  • the high-side switch Q 3 may be replaced by a rectifier diode and/or the like.
  • the buck-boost converter 100 is configured to operate in three different operating modes, namely a buck operating mode, a boost operating mode and a buck-boost operating mode.
  • the detailed operating principles of the first control mechanism will be described below with respect to FIGS. 2-5 .
  • the buck-boost converter 100 is configured to operate in a buck-boost operating mode.
  • the buck converter portion includes switches Q 1 and Q 2 .
  • Q 1 and Q 2 are controlled by complementary gate drive signals with appropriate switching dead times in the same manner as in a convention buck converter.
  • the boost converter portion includes switches Q 3 and Q 4 .
  • Q 3 and Q 4 are controlled by complementary gate drive signals with appropriate switching dead times in the same manner as in a convention boost converter.
  • the buck-boost converter 100 is configured to operate in three different operating modes, namely a buck operating mode, a boost operating mode and a buck-boost operating mode.
  • the detailed operating principles of the third control mechanism will be described below with respect to FIG. 10-13 .
  • the three control mechanisms described above are based upon boundary current mode (BCM) control.
  • BCM boundary current mode
  • the BCM control technique may help the buck-boost converter 100 achieve zero voltage switching (ZVS) in different operating modes (e.g., buck operating modes, boost operating modes and buck-boost operating modes).
  • ZVS zero voltage switching
  • the ZVS operation of the buck-boost converter 100 may reduce the switching losses and improve the efficiency of the buck-boost converter 100 .
  • FIG. 2 illustrates timing diagrams associated with a boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure.
  • the horizontal axis of FIG. 2 represents intervals of time. There are five vertical axes.
  • the first vertical axis Y 1 represents the ramps for controlling the buck-boost converter 100 .
  • the second vertical axis Y 2 represents the current flowing through the inductor L 1 of the buck-boost converter 100 .
  • the third vertical axis Y 3 represents the gate drive signals of switches Q 1 and Q 2 .
  • the fourth vertical axis Y 4 represents the gate drive signals of switches Q 3 and Q 4 .
  • the fifth vertical axis Y 5 represents a corresponding control scheme in the digital domain.
  • each new switching cycle starts at the time instant t 0 .
  • both the high-side switch Q 1 of the buck converter portion and the low-side switch Q 4 of the boost converter portion are turned on.
  • a first ramp S 1 is employed to control the operation of the buck converter portion and a second ramp S 2 is employed to control the operation of the boost converter portion.
  • the first ramp S 1 starts from t 0 and ramps up until at the end of the switching cycle.
  • the first ramp S 1 is reset at t 3 .
  • t 3 is the end of the switching cycle.
  • the operation of the high-side switch Q 1 is controlled by the first ramp S 1 .
  • the high-side switch Q 1 is turned on at t 0 and remains on until the peak value of the first ramp S 1 is equal to an error amplifier output voltage Vc.
  • the error amplifier (not shown) has a first input coupled to the output voltage Vo of the buck-boost converter 100 and a second input connected to a reference voltage.
  • the output voltage Vo is greater than the input voltage Vin.
  • the intersection point (e.g., t 2 ) of the first ramp S 1 and Vc is far beyond the end of the switching cycle determined by the inductor current. Since the first ramp S 1 is reset to zero at t 3 and never reaches Vc as indicated by the dashed line portion of S 1 , the high-side switch Q 1 is not turned off and stays always on during the boost operating mode.
  • the second ramp S 2 includes an offset Vc 0 , which is a predetermined value.
  • Vc 0 is a predetermined value.
  • the second ramp S 2 starts to ramp up from Vc 0 and the low-side switch Q 4 of the boost converter portion is turned on.
  • the low-side switch Q 4 of the boost converter portion remains on until the second ramp S 2 crosses the error amplifier output voltage Vc.
  • the low-side switch Q 4 is turned off and the second ramp S 2 is reset to Vc 0 .
  • the input voltage Vin of the buck-boost converter 100 is applied to the inductor L 1 .
  • the inductor current ramps up from a negative value to a peak current from t 0 to t 1 .
  • the ramp-up slope of the inductor current is equal to the input voltage Vin divided by the inductance of L 1 .
  • the current threshold iLth 2 is a predetermined value. Depending on different applications and design needs, iLth 2 may vary. In some embodiments, iLth 2 is a negative value as shown in FIG. 2 . Furthermore, iLth 2 may be set to a low enough value to ensure the boost converter portion of the buck-boost converter 100 achieves ZVS at t 3 and the buck converter portion of the buck-boost converter 100 achieves ZVS at the beginning of the next switching cycle. It should be noted the ZVS operation shown in FIG. 2 is merely an example. There may be alternatives, variations and modifications.
  • the ZVS operation can be achieved over different line and load conditions.
  • the error amplifier output voltage Vc is implemented as Yn.
  • Yn is in a range from 0 to 1.
  • the offset Vc 0 is implemented as Yn 0 ;
  • S 1 and S 2 are PWM ramp slopes generated by a digital power controller.
  • Ts is the switching period of the buck-boost converter 100 ;
  • ta is equal to Yn divided by S 1 ;
  • the ratio of Vo to Vin is equal to the ratio of ta to tb;
  • tc is equal to the difference of Yn and Yn 0 divided by S 2 .
  • Yn is greater than Yn 0 ; ta is equal to t 2 ; tb is equal to the difference of t 3 and t 1 ; ta is equal to Ts; the sum of tb and tc is equal to Ts.
  • feed-forward control mechanisms may be employed to further improve the performance (e.g., transient response) of the boost operating mode.
  • the input voltage Vin and/or the output voltage Vo may be added into the slopes.
  • S 1 is equal to k 1 divided by Vin where k 1 is a first predetermined constant.
  • S 2 is equal to k 2 divided by Vin where k 2 is a second predetermined constant.
  • FIG. 3 illustrates timing diagrams associated with a light-load boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure.
  • the timing diagrams shown in FIG. 3 are similar to those shown in FIG. 2 except that the buck-boost converter 100 operates in a light load condition.
  • the light load is defined as a load less than 10% of the full load of the buck-boost converter 100 . Since the ramp-up current slope and the ramp-down current slope shown in FIG. 3 are the same as those shown in FIG. 2 , the switching period under the light load condition shown in FIG. 3 is shorter in comparison with that shown in FIG. 2 in order to achieve a lower average current flowing through the inductor L 1 . As a result, the effective switching frequency of the buck-boost converter 100 may be relatively high for light load.
  • a predetermined minimum switching period Tsmin may be implemented to limit the light load switching frequency.
  • the second ramp S 2 does not start to ramp until Tsmin.
  • it is a delay time td in which Q 4 is on and remains the on state until the second ramp S 2 reaches the error amplifier output voltage Vc.
  • td the delay time td in which Q 4 is on and remains the on state until the second ramp S 2 reaches the error amplifier output voltage Vc.
  • Q 2 and Q 4 are both turned on and the inductor current freewheels in a loop formed by L 1 , Q 2 and Q 4 .
  • the delay time td shown in FIG. 3 is applicable to the operating mode shown in FIG. 2 .
  • a delay time may be added at t 3 .
  • both the buck ramp and the boost ramp may not ramp up at t 3 .
  • a new switching period starts at the end of the delay time td.
  • control mechanism shown in FIG. 3 is similar to that shown in FIG. 2 , and hence is not discussed in further detail herein to avoid unnecessary repetition.
  • FIG. 4 illustrates timing diagrams associated with a buck-boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure.
  • the first ramp S 1 starts from t 0 and ramps up until the first ramp S 1 reaches the error amplifier output voltage Vc at t 2 .
  • the first ramp S 1 is reset at t 2 and starts to ramp up at the beginning of the next cycle at t 3 .
  • the operation of the high-side switch Q 1 is controlled by the first ramp S 1 .
  • the high-side switch Q 1 is turned on at t 0 and remains on until the peak value of the first ramp S 1 is equal to the error amplifier output voltage Vc at t 2 .
  • the low-side switch Q 2 is turned on at t 2 and remains on until the end of the cycle at t 3 .
  • the second ramp S 2 includes the offset Vc 0 .
  • the second ramp S 2 starts to ramp up and the low-side switch Q 4 of the boost converter portion is turned on.
  • the low-side switch Q 4 of the boost converter portion remains on until the peak value of the second ramp S 2 is equal to the error amplifier output voltage Vc.
  • the low-side switch Q 4 is turned off and the second ramp S 2 is reset to Vc 0 .
  • the high-side switch Q 3 is turned on and remains on until the end of the cycle at t 3 . It should be noted that there is a dead time between the turn-off of Q 4 and the turn-on of Q 3 .
  • the buck stage of the buck-boost converter 100 may not achieve zero voltage switching if Q 1 is turned off within the non-ZVS turn-off zone shown in FIG. 4 .
  • the range of the non-ZVS turn-off zone is determined by a current threshold iLth 1 , which is a predetermined value.
  • a delay time td may be added as shown in FIG. 4 .
  • the delay time td may be added at t 3 .
  • both the buck ramp and the boost ramp may not ramp up at t 3 .
  • the buck ramp and the boost ramp may start at the end of the delay time td.
  • td may vary.
  • a variable td may help the buck-boost converter 100 achieve a fixed switching frequency.
  • control mechanism shown in FIG. 4 is similar to that shown in FIG. 2 except that Ts is greater than to as shown in FIG. 4 .
  • the detailed operating principle of the buck-boost operating mode in the digital control domain is not discussed herein to avoid repetition.
  • FIG. 5 illustrates timing diagrams associated with a buck operating mode under the first control mechanism in accordance with various embodiments of the present disclosure.
  • each new switching cycle starts at the time instant t 0 .
  • the high-side switch Q 1 of the buck converter portion is turned on.
  • a first ramp S 1 is employed to control the operation of the buck converter portion and a second ramp S 2 is employed to control the operation of the boost converter portion.
  • the second ramp S 2 is a horizontal line with no slope since this ramp is constantly being reset to Vc 0 .
  • the Y 1 -axis value of the horizontal line is equal to Vc 0 .
  • the first ramp S 1 starts from t 0 and ramps up until it is reset at t 2 .
  • the operation of the high-side switch Q 1 is controlled by the first ramp S 1 .
  • the high-side switch Q 1 is turned on at t 0 and remains on until the peak value of the first ramp S 1 is equal to an error amplifier output voltage Vc.
  • Q 1 is turned off and Q 2 is turned on as shown in FIG. 5 .
  • Vc 0 is greater than Vc.
  • the second ramp S 2 never reaches Vc during the buck operating mode. Since the second ramp S 2 never reaches Vc, the low side-switch Q 4 of the boost converter portion is never on and the high-side switch Q 3 of the boost converter portion stays always on during the buck operating mode.
  • the inductor current ramps up from a negative value to a peak current from t 0 to t 2 .
  • the ramp-up slope of the inductor current is equal to the difference of the input voltage Vin and the output voltage Vo divided by the inductance of L 1 .
  • a delay time td may be added as shown in FIG. 5 .
  • the delay time td may be added at t 3 .
  • the buck ramp may not ramp up at t 3 . Instead, the buck ramp may start at the end of the delay time td.
  • the control mechanism shown in FIG. 5 is similar to that shown in FIG. 2 except that Yn 0 is greater than Yn; Ts is greater than ta; Ts is equal to tb; tc is equal to zero.
  • Yn 0 is greater than Yn; Ts is greater than ta; Ts is equal to tb; tc is equal to zero.
  • the detailed operating principle of the buck operating mode in the digital control domain is not discussed herein to avoid repetition.
  • t 3 the horizontal axis value of the intersection point of the inductor current and iLth 2 is t 3 .
  • t 3 can be the turn-off time of the high-side switch Q 3 of the boost converter portion and/or the turn-off time of the low-side switch Q 2 of the buck converter portion, or the turn-off time of the high-side switch Q 1 of the buck converter portion.
  • the delay time td is inserted between t 3 and the beginning of the following switching cycle.
  • td is set to zero.
  • t 3 is the end of the switching period.
  • the minimum switching period is greater than t 3 .
  • td is employed to ensure the actual switching period is greater than the minimum switching period.
  • the minimum switching period is a predetermined value and may vary depending on different applications and design needs.
  • the switching frequency of the buck-boost converter 100 may vary depending on different line and load conditions.
  • the delay time td may also be employed to achieve a fixed switching frequency under different line and load conditions.
  • the transition between the buck operating mode and the buck-boost operating mode, and the transition between the boost operating mode and the buck-boost operating mode, are automatically controlled by the control loop which determines Vc, and a smooth transition can be achieved by setting appropriate values for ramps S 1 , S 2 and Vc 0 .
  • the operating mode transitions can be determined by comparing the input voltage Vin and the output voltage Vo. For example, according to a predetermined lookup table, the buck-boost converter 100 should enter a buck-boost operating mode when the ratio of the input voltage Vin to the output voltage Vo is equal to a value in the lookup table. At the same time, the control loop's output indicates the buck-boost converter 100 should enter a buck operating mode.
  • the control scheme based upon the lookup table overrides the control scheme based upon the control loop.
  • FIG. 6 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure.
  • the horizontal axis of FIG. 6 represents intervals of time. There are five vertical axes.
  • the first vertical axis Y 1 represents the ramps for controlling the buck-boost converter 100 .
  • the second vertical axis Y 2 represents the current flowing through the inductor L 1 of the buck-boost converter 100 .
  • the third vertical axis Y 3 represents the gate drive signals of switches Q 1 and Q 2 .
  • the fourth vertical axis Y 4 represents the gate drive signals of switches Q 3 and Q 4 .
  • the fifth vertical axis Y 5 represents a corresponding control scheme in the digital domain.
  • each new switching cycle starts at the time instant t 0 .
  • both the high-side switch Q 1 of the buck converter portion and the low-side switch Q 4 of the boost converter portion are turned on.
  • a first ramp S 1 is employed to control the operation of the buck converter portion and a second ramp S 2 is employed to control the operation of the boost converter portion.
  • the first ramp S 1 includes an offset Vc 0 , which is a predetermined value.
  • the first ramp S 1 starts from t 0 and ramps up until the first ramp S 1 reaches the error amplifier output voltage Vc at t 2 .
  • the first ramp S 1 is reset at t 2 and starts to ramp up at the beginning of the next cycle.
  • the operation of the high-side switch Q 1 is controlled by the first ramp S 1 .
  • the high side switch Q 1 is turned on at t 0 and remains on until the peak value of the first ramp S 1 is equal to the error amplifier output voltage Vc at t 2 .
  • the low-side switch Q 2 is turned on at t 2 and remains on until the end of the switching period at t 3 .
  • the second ramp S 2 does not include an offset and starts from zero as shown in FIG. 6 .
  • the second ramp S 2 starts to ramp up and the low-side switch Q 4 of the boost converter portion is turned on.
  • the low-side switch Q 4 of the boost converter portion remains on until the peak value of the second ramp S 2 is equal to the error amplifier output voltage Vc.
  • the low-side switch Q 4 is turned off and the second ramp S 2 is reset to zero.
  • the high-side switch Q 3 is turned on and remains on until the end of the cycle at t 3 .
  • the input voltage Vin is applied to the inductor L 1 .
  • the inductor current ramps up from a negative value to a peak current from t 0 to t 1 .
  • the slope of the inductor current is equal to the input voltage Vin divided by the inductance of L 1 .
  • a delay time td may be added as shown in FIG. 6 .
  • the delay time td may be added at t 3 .
  • both the buck ramp and the boost ramp may not ramp up at t 3 .
  • the buck ramp and the boost ramp may start at the end of the delay time td.
  • control mechanism shown in FIG. 6 is similar to that shown in FIG. 4 except that tc is equal to Yn divided by S 2 and to is equal the difference of Yn and Yn 0 divided by S 1 .
  • FIG. 6 illustrates a non-ZVS turn-off zone for Q 1 .
  • the non-ZVS turn-off zone for Q 1 shown in FIG. 6 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • FIG. 7 illustrates timing diagrams associated with a light-load buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure.
  • the timing diagrams shown in FIG. 7 are similar to those shown in FIG. 6 except that the buck-boost converter 100 operates in a light load condition. Since the inductor current ramp-up slope and the inductor current ramp-down slope are the same as those shown in FIG. 6 , the switching period under the light load condition is short in comparison with that shown in FIG. 6 in order to achieve a lower average current flowing through the inductor L 1 . As a result, the effective switching frequency of the buck-boost converter 100 is relatively high.
  • a minimum switching period Tsmin may be employed. As shown in FIG. 7 , the second ramp S 2 does not start to ramp until Tsmin. During the period from t 3 to Tsmin, it is a delay time td in which Q 2 and Q 4 are on and remain the on state until the end of the switching cycle.
  • control mechanism shown in FIG. 7 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • the non-ZVS turn-off zone for Q 1 shown in FIG. 7 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • FIG. 8 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is approximately equal to the input voltage in accordance with various embodiments of the present disclosure.
  • each new switching cycle starts at the time instant t 0 .
  • both the high-side switch Q 1 of the buck converter portion and the low-side switch Q 4 of the boost converter portion are turned on.
  • the first ramp S 1 ramps up from Vc 0 until the first ramp S 1 reaches the error amplifier output voltage Vc at t 2 .
  • the first ramp S 1 is reset at t 2 and starts to ramp up at the beginning of the next cycle at t 3 .
  • the operation of the high-side switch Q 1 is controlled by the first ramp S 1 .
  • the high-side switch Q 1 is turned on at t 0 and remains on until the peak value of the first ramp S 1 is equal to an error amplifier output voltage Vc at t 2 .
  • the low-side switch Q 2 is turned on at t 2 and remains on until the end of the cycle at t 3 .
  • the second ramp S 2 does not include an offset and starts from zero as shown in FIG. 8 .
  • the second ramp S 2 starts to ramp up and the low-side switch Q 4 of the boost converter portion is turned on.
  • the low-side switch Q 4 of the boost converter portion remains on until the peak value of the second ramp S 2 is equal to the error amplifier output voltage Vc.
  • the low-side switch Q 4 is turned off and the second ramp S 2 is reset to zero.
  • the high-side switch Q 3 is turned on and remains on until the end of the cycle at t 3 .
  • the input voltage Vin is applied to the inductor L 1 .
  • the inductor current ramps up from a negative value to a peak current from t 0 to t 1 .
  • the slope of the inductor current is equal to the input voltage Vin divided by the inductance of L 1 .
  • a delay time td may be added as shown in FIG. 8 .
  • the delay time td may be added at t 3 .
  • both the buck ramp and the boost ramp may not ramp up at t 3 .
  • the buck ramp and the boost ramp may start at the end of the delay time td.
  • control mechanism shown in FIG. 8 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • the non-ZVS turn-off zone for Q 1 shown in FIG. 8 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • FIG. 9 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the input voltage is greater than the output voltage in accordance with various embodiments of the present disclosure.
  • each new switching cycle starts at the time instant t 0 .
  • both the high-side switch Q 1 of the buck converter portion and the low-side switch Q 4 of the boost converter are turned on.
  • the first ramp S 1 ramps up from Vc 0 until the first ramp S 1 reaches the error amplifier output voltage Vc at t 2 .
  • the first ramp S 1 is reset to Vc 0 at t 2 and starts to ramp up at the beginning of the next cycle.
  • the operation of the high-side switch Q 1 is controlled by the first ramp S 1 .
  • the high-side switch Q 1 is turned on at t 0 and remains on until the peak value of the first ramp S 1 is equal to the error amplifier output voltage Vc at t 2 .
  • the low-side switch Q 2 is turned on at t 2 and remains on until the end of the cycle at t 3 .
  • the second ramp S 2 does not include an offset and starts from zero as shown in FIG. 9 .
  • the second ramp S 2 starts to ramp up and the low-side switch Q 4 of the boost converter portion is turned on.
  • the low-side switch Q 4 of the boost converter remains on until the peak value of the second ramp S 2 is equal to the error amplifier output voltage Vc.
  • the low-side switch Q 4 is turned off and the second ramp S 2 is reset to zero.
  • the high side switch Q 3 is turned on and remains on until the end of the cycle at t 3 .
  • the input voltage Vin is applied to the inductor L 1 .
  • the inductor current ramps up from a negative value to a peak current from t 0 to t 1 .
  • the slope of the inductor current is equal to the input voltage Vin divided by the inductance of L 1 .
  • a delay time td may be added as shown in FIG. 9 .
  • the delay time td may be added at t 3 .
  • both the buck ramp and the boost ramp may not ramp up at t 3 .
  • the buck ramp and the boost ramp may start at the end of the delay time td.
  • control mechanism shown in FIG. 9 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • the non-ZVS turn-off zone for Q 1 shown in FIG. 9 is similar to that shown in FIG. 4 , and hence is not discussed herein to avoid repetition.
  • FIG. 10 illustrates timing diagrams associated with the third control mechanism in accordance with various embodiments of the present disclosure.
  • the first vertical axis Y 1 represents three operating phases of the buck-boost converter 100 .
  • the second vertical axis Y 2 represents the duty cycle of the buck converter portion of the buck-boost converter 100 .
  • the third vertical axis Y 3 represents the boost converter portion of the buck-boost converter 100 .
  • both the high-side switch Q 1 of the buck converter portion and the low-side switch Q 4 of the boost converter portion are turned on.
  • the slope of the inductor current is equal to the input voltage Vin divided by the inductance of L 1 .
  • both the high-side switch Q 1 of the buck converter portion and the high-side switch Q 3 of the boost converter portion are turned on.
  • the slope of the inductor current is equal to the difference of the input voltage Vin and output voltage Vo divided by the inductance of L 1 .
  • both the low-side switch Q 2 of the buck converter portion and the high-side switch Q 3 of the boost converter portion are turned on.
  • the slope of the inductor current is equal to the output voltage Vo divided by the inductance of L 1 .
  • the turning point of the first phase P 1 and the second phase P 2 is t 1 .
  • the turning point of the second phase P 2 and the third phase P 3 is t 2 .
  • the duty cycle of the buck converter portion is equal to t 2 divided by Ts where Ts is the switching period of the buck-boost converter 100 .
  • the duty cycle of the boost converter portion is equal to t 1 divided by Ts. Ts is determined by the inductor current crossing a predetermined threshold (e.g., iLth 2 ).
  • FIG. 11 illustrates timing diagrams associated with a buck operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure.
  • the boost converter portion operates in a fixed duty cycle mode.
  • the time of the first phase P 1 is equal to the minimum on-time of the low-side switch Q 4 of the boost converter portion.
  • the minimum on-time Tmin_on of the low-side switch Q 4 is equal to 100 ns.
  • the duty cycle of the buck converter portion is determined by the intersection point of a buck ramp S 1 and an error amplifier output voltage Vc. As shown in FIG. 11 , when the buck ramp S 1 reaches Vc, the turn-on of Q 1 of the buck converter portion terminates.
  • the duty cycle of the buck converter portion is adjustable through varying the error amplifier output voltage Vc as shown in FIG. 11 .
  • FIG. 12 illustrates timing diagrams associated with a buck-boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure.
  • the duty cycle of the boost converter portion is determined by the intersection point of a boost ramp S 2 and the error amplifier output voltage Vc. As shown in FIG. 12 , when the boost ramp S 2 reaches Vc, the turn-on of the low-side switch Q 4 of the boost converter portion terminates.
  • the duty cycle of the boost converter portion is adjustable through varying the error amplifier output voltage Vc as shown in FIG. 12 .
  • the duty cycle of the buck converter portion is determined by a buck ramp S 1 and the error amplifier output voltage Vc. As shown in FIG. 12 , when the buck ramp S 1 reaches Vc, the turn-on of the high-side switch Q 1 of the buck converter portion terminates.
  • FIG. 13 illustrates timing diagrams associated with a boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure.
  • the duty cycle of the boost converter portion is determined by a boost ramp S 2 and the error amplifier output voltage Vc. As shown in FIG. 13 , when the boost ramp S 2 reaches Vc, the turn-on of the low-side switch Q 3 of the boost converter portion terminates.
  • the duty cycle of the boost converter portion is adjustable through varying the error amplifier output voltage Vc as shown in FIG. 13 .
  • the buck ramp S 1 never reaches the error amplifier output voltage Vc before the switching cycle ends. Therefore, as shown in FIG. 13 , the high-side switch Q 1 of the buck converter portion is always on.
  • the error amplifier output voltage Vc shown in FIGS. 11-13 is implemented as Yn.
  • Yn is in a range from 0 to 1.
  • Ts is the switching cycle of the buck-boost converter 100 .
  • a mode selection threshold Yth is predetermined. In some embodiments, the mode selection threshold Yth is set to 0.4.
  • the buck-boost converter 100 when Yn is in a range from 0 to Yth, the buck-boost converter 100 operates in the buck operating mode as shown in FIG. 11 .
  • the time of the first phase P 1 is equal to the minimum on-time Tmin_on of the low-side switch Q 4 of the boost converter portion.
  • the time of the second phase P 2 is determined by the following equation:
  • Tsmax is the possible maximum switching period.
  • Tsmax is the maximum on time.
  • Tsmax is a fixed value, which is large enough to cover all operation conditions the buck-boost converter 100 may operate.
  • the buck-boost converter 100 When Yn is in a range from Yth to 1, the buck-boost converter 100 operates in the buck-boost operating mode shown in FIG. 12 .
  • the total time of P 1 and P 2 is a fixed value.
  • P 1 and P 2 is determined by the following equation:
  • Ton_min is a minimum on-time of the low-side switch Q 4 of the boost converter portion.
  • Ton_min is the minimum on-time of the low-side switch Q 4 of the boost converter portion.
  • the buck-boost converter 100 When Yn goes even higher in the range from Yth to 1, the buck-boost converter 100 will move into the boost operating mode shown in FIG. 13 .
  • the output voltage Vo of the buck-boost converter 100 is much greater than the input voltage Vin of the buck-boost converter 100
  • the current flowing through the inductor L 1 drops much quicker to the negative current threshold and a new switching cycle begins before the second phase P 2 finishes.
  • the third phase P 3 does not exist as shown in FIG. 13 .
  • the buck-boost converter 100 operates in the boost operating mode.
  • the buck-boost converter 100 operates in the buck-boost operating mode.
  • the buck converter portion operates at a duty defined by Equation (2).

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Dc-Dc Converters (AREA)

Abstract

A method includes generating a first ramp signal for controlling a first portion of a converter, generating a second ramp signal for controlling a second portion of the converter, controlling a state of a first switch of the first portion through comparing the first ramp signal to a control signal and a state of a first switch of the second portion through comparing the second ramp signal to the control signal and determining a switching cycle of the converter through comparing a current flowing through an inductor of the converter to a threshold.

Description

    PRIORITY CLAIM AND CROSS-REFERENCE
  • This application is a continuation of U.S. application Ser. No. 14/739,827, filed on Jun. 15, 2015, entitled “Control Method for Buck-Boost Power Converters”, which application is hereby incorporated herein by reference.
  • TECHNICAL FIELD
  • The present invention relates to a power converter, and, in particular embodiments, to control mechanisms for buck-boost converters.
  • BACKGROUND
  • A power converter transforms an input voltage into a regulated output voltage and supplies a current required by an external load such as integrated circuits and the like. Depending on whether a transformer is incorporated into a power converter, switching power converters can be divided into two categories, namely isolated power converters and non-isolated power converters. Isolated power converters can be implemented by using different power topologies, such as flyback converters, forward converters, half bridge converters, full bridge converters, push-pull converters, inductor-inductor-capacitor (LLC) resonant converters and the like. Likewise, non-isolated power converters can be implemented by using different power topologies such as buck converters, boost converters, buck-boost converters, linear regulators, any combinations thereof.
  • As the demand for battery based power applications has grown recently, there has grown a need for developing a converter capable of generating a regulated output voltage from an input voltage, which may be larger than, equal to, or smaller than the output voltage. For example, in a battery based power application, when a battery is fresh, it may supply a voltage higher than the output voltage of the converter. On the other hand, when the battery is depleted, it may supply a voltage lower than the output voltage of the converter.
  • Buck-boost converters have emerged as an effective power conversion scheme to deliver a tightly regulated output voltage from a wide range input voltage. A buck-boost converter can produce an output voltage that is either greater than or less than an input voltage through using different operating modes such as buck and boost conversion modes. In particular, the buck-boost converter operates in a buck mode when the input voltage is higher than the output voltage, in a boost mode when the input voltage is lower than the output voltage.
  • SUMMARY OF THE INVENTION
  • These and other problems are generally solved or circumvented, and technical advantages are generally achieved, by preferred embodiments of the present invention which provide a method for achieving a high efficiency non-isolated power converter.
  • In accordance with an embodiment, a method comprises generating a first ramp signal for controlling a first portion of a converter, generating a second ramp signal for controlling a second portion of the converter, controlling a state of a first switch of the first portion through comparing the first ramp signal to a control signal and a state of a first switch of the second portion through comparing the second ramp signal to the control signal and determining a switching cycle of the converter through comparing a current flowing through an inductor of the converter to a threshold.
  • In accordance with another embodiment, a method comprises controlling a turn-off of a first switch of a buck portion of a buck-boost converter through comparing a first ramp signal to a control signal, controlling a turn-off of a first switch of a boost portion of the buck-boost converter through comparing a second ramp signal to the control signal, controlling a turn-off of a second switch of the buck portion of the buck-boost converter through comparing a current flowing through an inductor of the buck-boost converter to a current threshold and controlling a turn-off of a second switch of the boost portion of the buck-boost converter through comparing the current flowing through the inductor of the buck-boost converter to the current threshold.
  • In accordance with yet another embodiment, a converter comprises a buck converter portion, an inductor and a boost converter portion connected in cascade and a controller configured to compare a current flowing through the inductor to a current threshold and determining a switching cycle of the converter through comparing the current flowing through the inductor to the current threshold.
  • An advantage of a preferred embodiment of the present invention is the efficiency of a buck-boost converter may be improved by employing multiple operating modes.
  • The foregoing has outlined rather broadly the features and technical advantages of the present invention in order that the detailed description of the invention that follows may be better understood. Additional features and advantages of the invention will be described hereinafter which form the subject of the claims of the invention. It should be appreciated by those skilled in the art that the conception and specific embodiment disclosed may be readily utilized as a basis for modifying or designing other structures or processes for carrying out the same purposes of the present invention. It should also be realized by those skilled in the art that such equivalent constructions do not depart from the spirit and scope of the invention as set forth in the appended claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • For a more complete understanding of the present invention, and the advantages thereof, reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which:
  • FIG. 1 illustrates a schematic diagram of a buck-boost converter in accordance with various embodiments of the present disclosure;
  • FIG. 2 illustrates timing diagrams associated with a boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure;
  • FIG. 3 illustrates timing diagrams associated with a light-load boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure;
  • FIG. 4 illustrates timing diagrams associated with a buck-boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure;
  • FIG. 5 illustrates timing diagrams associated with a buck operating mode under the first control mechanism in accordance with various embodiments of the present disclosure;
  • FIG. 6 illustrate timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure;
  • FIG. 7 illustrates timing diagrams associated with a light-load buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure;
  • FIG. 8 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is approximately equal to the input voltage in accordance with various embodiments of the present disclosure;
  • FIG. 9 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the input voltage is greater than the output voltage in accordance with various embodiments of the present disclosure;
  • FIG. 10 illustrates timing diagrams associated with the third control mechanism in accordance with various embodiments of the present disclosure;
  • FIG. 11 illustrates timing diagrams associated with a buck operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure;
  • FIG. 12 illustrates timing diagrams associated with a buck-boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure; and
  • FIG. 13 illustrates timing diagrams associated with a boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure.
  • Corresponding numerals and symbols in the different figures generally refer to corresponding parts unless otherwise indicated. The figures are drawn to clearly illustrate the relevant aspects of the various embodiments and are not necessarily drawn to scale.
  • DETAILED DESCRIPTION OF ILLUSTRATIVE EMBODIMENTS
  • The making and using of the presently preferred embodiments are discussed in detail below. It should be appreciated, however, that the present invention provides many applicable inventive concepts that can be embodied in a wide variety of specific contexts. The specific embodiments discussed are merely illustrative of specific ways to make and use the invention, and do not limit the scope of the invention.
  • The present invention will be described with respect to preferred embodiments in a specific context, namely control methods for a high efficiency buck-boost converter. Hereinafter, various embodiments will be explained in detail with reference to the accompanying drawings.
  • FIG. 1 illustrates a schematic diagram of a buck-boost converter in accordance with various embodiments of the present disclosure. The buck-boost converter 100 comprises a first high-side switch Q1, a first low-side switch Q2, a second high-side switch Q3, a second low-side switch Q4 and an inductor L1. The first high-side switch Q1 and the first low-side switch Q2 are connected in series between the positive terminal and the negative terminal of an input capacitor CIN. The second high-side switch Q3 and the second low-side switch Q4 are connected in series between the positive terminal and the negative terminal of an output capacitor Co. The inductor L1 is coupled between the common node of the first high-side switch Q1 and the first low-side switch Q2, and the common node of the second high-side switch Q3 and the second low-side switch Q4.
  • The buck-boost converter 100 may further comprise a controller 110. As shown in FIG. 1, the controller 110 may detect the input voltage Vin and the output voltage Vo, and generate a plurality of gate drive signals for driving switches Q1, Q2, Q3 and Q4 accordingly. The controller 110 may be a PWM controller. Alternatively, the controller 110 may be implemented as a digital controller such as a micro-controller, a digital signal processor and/or the like.
  • It should be noted that while the example throughout the description is based upon a buck-boost converter and a controller configured to generate gate drive signal for the buck-boost converter (e.g., buck-boost converter shown in FIG. 1), the buck-boost converter 100 as well as the controller 110 shown in FIG. 1 may have many variations, alternatives, and modifications. For example, the controller 110 may detect other necessary signals such as the input and/or output current of the buck-boost converter 100. Furthermore, there may be one dedicated driver or multiple dedicated drivers coupled between the controller 110 and the switches Q1, Q2, Q3 and Q4. In sum, the buck-boost converter 100 and the controller 110 illustrated herein is limited solely for the purpose of clearly illustrating the inventive aspects of the various embodiments. The present invention is not limited to any particular power topology.
  • The buck-boost converter 100 may be divided into two portions, namely a buck converter portion and a boost converter portion. The buck converter portion may comprise the first high-side switch Q1 and the first low-side switch Q2. The buck converter portion and the inductor L1 may function as a step-down converter. On the other hand, the boost converter portion may comprise the second high-side switch Q3 and second low-side switch Q4. The boost converter portion and the inductor L1 may function as a step-up converter. The buck converter portion, the inductor L1 and the boost converter portion are connected in cascade between the input capacitor CIN and the output capacitor Co.
  • The switches (e.g., the first high-side switch Q1) shown in FIG. 1 may be implemented as n-type metal oxide semiconductor (NMOS) transistors. Alternatively, the switches may be implemented as other suitable controllable devices such as metal oxide semiconductor field effect transistor (MOSFET) devices, bipolar junction transistor (BJT) devices, super junction transistor (SJT) devices, insulated gate bipolar transistor (IGBT) devices, gallium nitride (GaN) based power devices and/or the like.
  • It should further be noted that while FIG. 1 illustrates four switches Q1, Q2, Q3, and Q4, various embodiments of the present disclosure may include other variations, modifications and alternatives. For example, the low-side switch Q2 may be replaced by a freewheeling diode and/or the like. The high-side switch Q3 may be replaced by a rectifier diode and/or the like.
  • Based upon different design needs, three control mechanisms may be employed to operate the buck-boost converter 100. In a first control mechanism, depending on different input voltages, the buck-boost converter 100 is configured to operate in three different operating modes, namely a buck operating mode, a boost operating mode and a buck-boost operating mode. The detailed operating principles of the first control mechanism will be described below with respect to FIGS. 2-5.
  • In a second control mechanism, the buck-boost converter 100 is configured to operate in a buck-boost operating mode. The buck converter portion includes switches Q1 and Q2. In the buck-boost operating mode under the second control mechanism, Q1 and Q2 are controlled by complementary gate drive signals with appropriate switching dead times in the same manner as in a convention buck converter. The boost converter portion includes switches Q3 and Q4. In the buck-boost operating mode under the second control mechanism, Q3 and Q4 are controlled by complementary gate drive signals with appropriate switching dead times in the same manner as in a convention boost converter. The detailed operating principles of the second control mechanism will be described below with respect to FIGS. 6-9.
  • In a third control mechanism, the buck-boost converter 100 is configured to operate in three different operating modes, namely a buck operating mode, a boost operating mode and a buck-boost operating mode. The detailed operating principles of the third control mechanism will be described below with respect to FIG. 10-13.
  • The three control mechanisms described above are based upon boundary current mode (BCM) control. The BCM control technique may help the buck-boost converter 100 achieve zero voltage switching (ZVS) in different operating modes (e.g., buck operating modes, boost operating modes and buck-boost operating modes). The ZVS operation of the buck-boost converter 100 may reduce the switching losses and improve the efficiency of the buck-boost converter 100.
  • FIG. 2 illustrates timing diagrams associated with a boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure. The horizontal axis of FIG. 2 represents intervals of time. There are five vertical axes. The first vertical axis Y1 represents the ramps for controlling the buck-boost converter 100. The second vertical axis Y2 represents the current flowing through the inductor L1 of the buck-boost converter 100. The third vertical axis Y3 represents the gate drive signals of switches Q1 and Q2. The fourth vertical axis Y4 represents the gate drive signals of switches Q3 and Q4. The fifth vertical axis Y5 represents a corresponding control scheme in the digital domain.
  • The boost operating mode is employed when the output voltage (e.g., Vo=74 V) of the buck-boost converter 100 is greater the input voltage (e.g., Vin=36 V) of the buck-boost converter 100. In operation, each new switching cycle starts at the time instant t0. At t0, both the high-side switch Q1 of the buck converter portion and the low-side switch Q4 of the boost converter portion are turned on. A first ramp S1 is employed to control the operation of the buck converter portion and a second ramp S2 is employed to control the operation of the boost converter portion.
  • As shown in FIG. 2, at the beginning of a switching cycle, the first ramp S1 starts from t0 and ramps up until at the end of the switching cycle. The first ramp S1 is reset at t3. In some embodiments, t3 is the end of the switching cycle. The operation of the high-side switch Q1 is controlled by the first ramp S1. In particular, the high-side switch Q1 is turned on at t0 and remains on until the peak value of the first ramp S1 is equal to an error amplifier output voltage Vc. In some embodiments, the error amplifier (not shown) has a first input coupled to the output voltage Vo of the buck-boost converter 100 and a second input connected to a reference voltage.
  • In the boost operating mode, the output voltage Vo is greater than the input voltage Vin. The intersection point (e.g., t2) of the first ramp S1 and Vc is far beyond the end of the switching cycle determined by the inductor current. Since the first ramp S1 is reset to zero at t3 and never reaches Vc as indicated by the dashed line portion of S1, the high-side switch Q1 is not turned off and stays always on during the boost operating mode.
  • The second ramp S2 includes an offset Vc0, which is a predetermined value. At the beginning of each switching cycle, the second ramp S2 starts to ramp up from Vc0 and the low-side switch Q4 of the boost converter portion is turned on. The low-side switch Q4 of the boost converter portion remains on until the second ramp S2 crosses the error amplifier output voltage Vc. As shown in FIG. 2, at t1, the low-side switch Q4 is turned off and the second ramp S2 is reset to Vc0.
  • From t0 to t1, since both Q1 and Q4 are turned on, the input voltage Vin of the buck-boost converter 100 is applied to the inductor L1. As a result, the inductor current ramps up from a negative value to a peak current from t0 to t1. The ramp-up slope of the inductor current is equal to the input voltage Vin divided by the inductance of L1.
  • During the period from t1 to t3, Q4 is turned off and Q3 is turned on. Since both Q1 and Q3 are on, the voltage difference between Vo and Vin is applied to the inductor L1. Since the buck-boost converter 100 operates in the boost operating mode during t1 to t3, the output voltage Vo is greater than the input voltage Vin. As a result, during the period from t1 to t3, a negative voltage is applied to the inductor L1 and the inductor current ramps down accordingly as shown in FIG. 2. The ramp-down slope of the inductor current is equal to the difference of the input voltage Vin and the output voltage Vo divided by the inductance of L1. At the time instant t3, the inductor current drops to a current threshold iLth2. Q3 is turned off and Q4 is turned on.
  • In some embodiments, the current threshold iLth2 is a predetermined value. Depending on different applications and design needs, iLth2 may vary. In some embodiments, iLth2 is a negative value as shown in FIG. 2. Furthermore, iLth2 may be set to a low enough value to ensure the boost converter portion of the buck-boost converter 100 achieves ZVS at t3 and the buck converter portion of the buck-boost converter 100 achieves ZVS at the beginning of the next switching cycle. It should be noted the ZVS operation shown in FIG. 2 is merely an example. There may be alternatives, variations and modifications. For example, by monitoring the switching node voltage directly or indirectly (e.g., using an auxiliary voltage sense winding on L1) inside a short time window during which Q3 is turned off and Q4 is turned on around t3, and Q2 is turned off and Q1 is turned on around the end of the switching cycle. Furthermore, by varying the switching period, the ZVS operation can be achieved over different line and load conditions.
  • In the digital control domain, as shown in FIG. 2, the error amplifier output voltage Vc is implemented as Yn. Yn is in a range from 0 to 1. The offset Vc0 is implemented as Yn0; S1 and S2 are PWM ramp slopes generated by a digital power controller. In some embodiments, Ts is the switching period of the buck-boost converter 100; ta is equal to Yn divided by S1; the ratio of Vo to Vin is equal to the ratio of ta to tb; tc is equal to the difference of Yn and Yn0 divided by S2.
  • As shown in FIG. 2, when the buck-boost converter 100 operates in the boost operating mode, Yn is greater than Yn0; ta is equal to t2; tb is equal to the difference of t3 and t1; ta is equal to Ts; the sum of tb and tc is equal to Ts.
  • It should be noted that some feed-forward control mechanisms may be employed to further improve the performance (e.g., transient response) of the boost operating mode. In particular, the input voltage Vin and/or the output voltage Vo may be added into the slopes. For example, S1 is equal to k1 divided by Vin where k1 is a first predetermined constant. S2 is equal to k2 divided by Vin where k2 is a second predetermined constant.
  • FIG. 3 illustrates timing diagrams associated with a light-load boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure. The timing diagrams shown in FIG. 3 are similar to those shown in FIG. 2 except that the buck-boost converter 100 operates in a light load condition. In some embodiments, the light load is defined as a load less than 10% of the full load of the buck-boost converter 100. Since the ramp-up current slope and the ramp-down current slope shown in FIG. 3 are the same as those shown in FIG. 2, the switching period under the light load condition shown in FIG. 3 is shorter in comparison with that shown in FIG. 2 in order to achieve a lower average current flowing through the inductor L1. As a result, the effective switching frequency of the buck-boost converter 100 may be relatively high for light load.
  • In order to control the range of the switching frequency of the buck-boost converter 100, a predetermined minimum switching period Tsmin may be implemented to limit the light load switching frequency. As shown in FIG. 3, the second ramp S2 does not start to ramp until Tsmin. During the period from t3 to Tsmin, it is a delay time td in which Q4 is on and remains the on state until the second ramp S2 reaches the error amplifier output voltage Vc. During td, Q2 and Q4 are both turned on and the inductor current freewheels in a loop formed by L1, Q2 and Q4.
  • It should be noted the delay time td shown in FIG. 3 is applicable to the operating mode shown in FIG. 2. For example, in order to have a fixed switching frequency, a delay time may be added at t3. In other words, both the buck ramp and the boost ramp may not ramp up at t3. A new switching period starts at the end of the delay time td.
  • In the digital control domain, the control mechanism shown in FIG. 3 is similar to that shown in FIG. 2, and hence is not discussed in further detail herein to avoid unnecessary repetition.
  • FIG. 4 illustrates timing diagrams associated with a buck-boost operating mode under the first control mechanism in accordance with various embodiments of the present disclosure. The buck-boost operating mode is employed when the input voltage (e.g., Vin=48 V) of the buck-boost converter 100 is approximately equal to the output voltage (e.g., Vo=48 V) of the buck-boost converter 100. In operation, each new switching cycle starts at the time instant t0. At t0, both the high-side switch Q1 of the buck converter portion and the low-side switch Q4 of the boost converter portion are turned on.
  • As shown in FIG. 4, at the beginning of each switching cycle, the first ramp S1 starts from t0 and ramps up until the first ramp S1 reaches the error amplifier output voltage Vc at t2. The first ramp S1 is reset at t2 and starts to ramp up at the beginning of the next cycle at t3. The operation of the high-side switch Q1 is controlled by the first ramp S1. In particular, the high-side switch Q1 is turned on at t0 and remains on until the peak value of the first ramp S1 is equal to the error amplifier output voltage Vc at t2. The low-side switch Q2 is turned on at t2 and remains on until the end of the cycle at t3.
  • The second ramp S2 includes the offset Vc0. At the beginning of each switching cycle, the second ramp S2 starts to ramp up and the low-side switch Q4 of the boost converter portion is turned on. The low-side switch Q4 of the boost converter portion remains on until the peak value of the second ramp S2 is equal to the error amplifier output voltage Vc. As shown in FIG. 4, at t1, the low-side switch Q4 is turned off and the second ramp S2 is reset to Vc0. At t1, the high-side switch Q3 is turned on and remains on until the end of the cycle at t3. It should be noted that there is a dead time between the turn-off of Q4 and the turn-on of Q3.
  • From t0 to t1, since both Q1 and Q4 are turned on, the input voltage Vin is applied to the inductor L1. As a result, the inductor current ramps up from a negative value to a peak current from t0 to t1. The ramp-up slope of the inductor current is equal to the input voltage Vin divided by the inductance of L1. During the period from t1 to t2, Q4 is turned off and Q3 is turned on. Since both Q1 and Q3 are on, the voltage difference between Vo and Vin is applied to the inductor L1. Since the input voltage of the buck-boost converter 100 is approximately equal to the output voltage of the buck-boost converter 100, the inductor current remains relatively flat during the period from t1 to t2 as shown in FIG. 4.
  • During the period from t2 to t3, Q1 is turned off and Q2 is turned on. Since both Q2 and Q3 are on, the voltage Vo is applied to the inductor L1. As a result, the inductor current ramps down. The ramp-down slope of the inductor current is equal to the output voltage Vo divided by the inductance of L1. At time instant t3, the inductor current drops to the current threshold iLth2. Q3 is turned off and Q4 is turned on.
  • It should be noted that the buck stage of the buck-boost converter 100 may not achieve zero voltage switching if Q1 is turned off within the non-ZVS turn-off zone shown in FIG. 4. The range of the non-ZVS turn-off zone is determined by a current threshold iLth1, which is a predetermined value.
  • It should be noted a delay time td may be added as shown in FIG. 4. For example, in order to have a fixed switching frequency, the delay time td may be added at t3. In other words, both the buck ramp and the boost ramp may not ramp up at t3. Instead, the buck ramp and the boost ramp may start at the end of the delay time td. Depending on different applications and design needs, td may vary. For example, a variable td may help the buck-boost converter 100 achieve a fixed switching frequency.
  • In the digital control domain, the control mechanism shown in FIG. 4 is similar to that shown in FIG. 2 except that Ts is greater than to as shown in FIG. 4. The detailed operating principle of the buck-boost operating mode in the digital control domain is not discussed herein to avoid repetition.
  • FIG. 5 illustrates timing diagrams associated with a buck operating mode under the first control mechanism in accordance with various embodiments of the present disclosure. The buck operating mode is employed when the input voltage (e.g., Vin=60 V) of the buck-boost converter 100 is greater than the output voltage (e.g., Vo=8 V) of the buck-boost converter 100. In operation, each new switching cycle starts at the time instant t0. At t0, the high-side switch Q1 of the buck converter portion is turned on.
  • A first ramp S1 is employed to control the operation of the buck converter portion and a second ramp S2 is employed to control the operation of the boost converter portion. In the buck operating mode, the second ramp S2 is a horizontal line with no slope since this ramp is constantly being reset to Vc0. As shown in FIG. 5, the Y1-axis value of the horizontal line is equal to Vc0.
  • At the beginning of each switching cycle, the first ramp S1 starts from t0 and ramps up until it is reset at t2. The operation of the high-side switch Q1 is controlled by the first ramp S1. In particular, the high-side switch Q1 is turned on at t0 and remains on until the peak value of the first ramp S1 is equal to an error amplifier output voltage Vc. At t2, Q1 is turned off and Q2 is turned on as shown in FIG. 5.
  • As shown in FIG. 5, in the buck operating mode, Vc0 is greater than Vc. In other words, the second ramp S2 never reaches Vc during the buck operating mode. Since the second ramp S2 never reaches Vc, the low side-switch Q4 of the boost converter portion is never on and the high-side switch Q3 of the boost converter portion stays always on during the buck operating mode.
  • From t0 to t2, since both Q1 and Q3 are turned on, the difference of the input voltage Vin and the output voltage Vo is applied to the inductor L1. Since the input voltage Vin is greater than the output voltage Vo during the buck operating mode, the inductor current ramps up from a negative value to a peak current from t0 to t2. The ramp-up slope of the inductor current is equal to the difference of the input voltage Vin and the output voltage Vo divided by the inductance of L1.
  • During the period from t2 to t3, Q1 is turned off and Q2 is turned on. Since both Q2 and Q3 are on, the voltage Vo is applied to the inductor L1. As a result, the inductor current ramps down. The ramp-down slope of the inductor current is equal to the output voltage Vo divided by the inductance of L1. At time instant t3, the inductor current drops to the current threshold iLth2. Q2 is turned off and Q1 is turned on.
  • It should be noted a delay time td may be added as shown in FIG. 5. For example, in order to have a fixed switching frequency, the delay time td may be added at t3. In other words, the buck ramp may not ramp up at t3. Instead, the buck ramp may start at the end of the delay time td.
  • In the digital control domain, the control mechanism shown in FIG. 5 is similar to that shown in FIG. 2 except that Yn0 is greater than Yn; Ts is greater than ta; Ts is equal to tb; tc is equal to zero. The detailed operating principle of the buck operating mode in the digital control domain is not discussed herein to avoid repetition.
  • In FIGS. 3-5, the horizontal axis value of the intersection point of the inductor current and iLth2 is t3. Depending on different operating modes, t3 can be the turn-off time of the high-side switch Q3 of the boost converter portion and/or the turn-off time of the low-side switch Q2 of the buck converter portion, or the turn-off time of the high-side switch Q1 of the buck converter portion.
  • In some embodiments, the delay time td is inserted between t3 and the beginning of the following switching cycle. When the switching period is greater than the minimum switching period, td is set to zero. As a result, t3 is the end of the switching period. On the other hand, when the buck-boost converter 100 operates under a light load condition, the minimum switching period is greater than t3. td is employed to ensure the actual switching period is greater than the minimum switching period. The minimum switching period is a predetermined value and may vary depending on different applications and design needs. In addition, under BCM control, the switching frequency of the buck-boost converter 100 may vary depending on different line and load conditions. The delay time td may also be employed to achieve a fixed switching frequency under different line and load conditions.
  • The transition between the buck operating mode and the buck-boost operating mode, and the transition between the boost operating mode and the buck-boost operating mode, are automatically controlled by the control loop which determines Vc, and a smooth transition can be achieved by setting appropriate values for ramps S1, S2 and Vc0. In alternative embodiments, the operating mode transitions can be determined by comparing the input voltage Vin and the output voltage Vo. For example, according to a predetermined lookup table, the buck-boost converter 100 should enter a buck-boost operating mode when the ratio of the input voltage Vin to the output voltage Vo is equal to a value in the lookup table. At the same time, the control loop's output indicates the buck-boost converter 100 should enter a buck operating mode. The control scheme based upon the lookup table overrides the control scheme based upon the control loop.
  • FIG. 6 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure. The horizontal axis of FIG. 6 represents intervals of time. There are five vertical axes. The first vertical axis Y1 represents the ramps for controlling the buck-boost converter 100. The second vertical axis Y2 represents the current flowing through the inductor L1 of the buck-boost converter 100. The third vertical axis Y3 represents the gate drive signals of switches Q1 and Q2. The fourth vertical axis Y4 represents the gate drive signals of switches Q3 and Q4. The fifth vertical axis Y5 represents a corresponding control scheme in the digital domain.
  • In operation, each new switching cycle starts at the time instant t0. At t0, both the high-side switch Q1 of the buck converter portion and the low-side switch Q4 of the boost converter portion are turned on. A first ramp S1 is employed to control the operation of the buck converter portion and a second ramp S2 is employed to control the operation of the boost converter portion. The first ramp S1 includes an offset Vc0, which is a predetermined value.
  • As shown in FIG. 6, at the beginning of each switching cycle, the first ramp S1 starts from t0 and ramps up until the first ramp S1 reaches the error amplifier output voltage Vc at t2. The first ramp S1 is reset at t2 and starts to ramp up at the beginning of the next cycle. The operation of the high-side switch Q1 is controlled by the first ramp S1. In particular, the high side switch Q1 is turned on at t0 and remains on until the peak value of the first ramp S1 is equal to the error amplifier output voltage Vc at t2. The low-side switch Q2 is turned on at t2 and remains on until the end of the switching period at t3.
  • The second ramp S2 does not include an offset and starts from zero as shown in FIG. 6. At the beginning of each switching cycle, the second ramp S2 starts to ramp up and the low-side switch Q4 of the boost converter portion is turned on. The low-side switch Q4 of the boost converter portion remains on until the peak value of the second ramp S2 is equal to the error amplifier output voltage Vc. As shown in FIG. 6, at t1, the low-side switch Q4 is turned off and the second ramp S2 is reset to zero. At t1, the high-side switch Q3 is turned on and remains on until the end of the cycle at t3.
  • From t0 to t1, since both Q1 and Q4 are turned on, the input voltage Vin is applied to the inductor L1. As a result, the inductor current ramps up from a negative value to a peak current from t0 to t1. The slope of the inductor current is equal to the input voltage Vin divided by the inductance of L1.
  • During the period from t1 to t2, Q4 is turned off and Q3 is turned on. Since both Q1 and Q3 are on, the voltage difference between Vo and Vin is applied to the inductor L1. Since the output voltage of the buck-boost converter 100 is greater than the input voltage of the buck-boost converter 100, the inductor current ramps down during the period from t1 to t2 as shown in FIG. 6.
  • During the period from t2 to t3, Q1 is turned off and Q2 is turned on. Since both Q2 and Q3 are on, the output voltage Vo is applied to the inductor L1. As a result, the inductor current ramps down. The ramp-down slope of the inductor current is equal to the output voltage Vo divided by the inductance of L1. At time instant t3, the inductor current drops to the current threshold iLth2. Q3 is turned off and Q4 is turned on.
  • It should be noted a delay time td may be added as shown in FIG. 6. For example, in order to have a fixed switching frequency, the delay time td may be added at t3. In other words, both the buck ramp and the boost ramp may not ramp up at t3. Instead, the buck ramp and the boost ramp may start at the end of the delay time td.
  • In the digital control domain, the control mechanism shown in FIG. 6 is similar to that shown in FIG. 4 except that tc is equal to Yn divided by S2 and to is equal the difference of Yn and Yn0 divided by S1.
  • It should be noted FIG. 6 illustrates a non-ZVS turn-off zone for Q1. The non-ZVS turn-off zone for Q1 shown in FIG. 6 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition.
  • FIG. 7 illustrates timing diagrams associated with a light-load buck-boost operating mode under the second control mechanism when the output voltage is greater than the input voltage in accordance with various embodiments of the present disclosure. The timing diagrams shown in FIG. 7 are similar to those shown in FIG. 6 except that the buck-boost converter 100 operates in a light load condition. Since the inductor current ramp-up slope and the inductor current ramp-down slope are the same as those shown in FIG. 6, the switching period under the light load condition is short in comparison with that shown in FIG. 6 in order to achieve a lower average current flowing through the inductor L1. As a result, the effective switching frequency of the buck-boost converter 100 is relatively high.
  • In order to control the range of the switching frequency, a minimum switching period Tsmin may be employed. As shown in FIG. 7, the second ramp S2 does not start to ramp until Tsmin. During the period from t3 to Tsmin, it is a delay time td in which Q2 and Q4 are on and remain the on state until the end of the switching cycle.
  • In the digital control domain, the control mechanism shown in FIG. 7 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition. The non-ZVS turn-off zone for Q1 shown in FIG. 7 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition.
  • FIG. 8 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the output voltage is approximately equal to the input voltage in accordance with various embodiments of the present disclosure. In operation, each new switching cycle starts at the time instant t0. At t0, both the high-side switch Q1 of the buck converter portion and the low-side switch Q4 of the boost converter portion are turned on. As shown in FIG. 8, at the beginning of each switching cycle, the first ramp S1 ramps up from Vc0 until the first ramp S1 reaches the error amplifier output voltage Vc at t2. The first ramp S1 is reset at t2 and starts to ramp up at the beginning of the next cycle at t3.
  • The operation of the high-side switch Q1 is controlled by the first ramp S1. In particular, the high-side switch Q1 is turned on at t0 and remains on until the peak value of the first ramp S1 is equal to an error amplifier output voltage Vc at t2. The low-side switch Q2 is turned on at t2 and remains on until the end of the cycle at t3.
  • The second ramp S2 does not include an offset and starts from zero as shown in FIG. 8. At the beginning of each switching cycle, the second ramp S2 starts to ramp up and the low-side switch Q4 of the boost converter portion is turned on. The low-side switch Q4 of the boost converter portion remains on until the peak value of the second ramp S2 is equal to the error amplifier output voltage Vc. As shown in FIG. 8, at t1, the low-side switch Q4 is turned off and the second ramp S2 is reset to zero. At t1, the high-side switch Q3 is turned on and remains on until the end of the cycle at t3.
  • From t0 to t1, since both Q1 and Q4 are turned on, the input voltage Vin is applied to the inductor L1. As a result, the inductor current ramps up from a negative value to a peak current from t0 to t1. The slope of the inductor current is equal to the input voltage Vin divided by the inductance of L1.
  • During the period from t1 to t2, Q4 is turned off and Q3 is turned on. Since both Q1 and Q3 are on, the voltage difference between Vo and Vin is applied to the inductor L1. Since the input voltage of the buck-boost converter is approximately equal to the output voltage of the buck-boost converter, the inductor current remains relatively flat during the period from t1 to t2 as shown in FIG. 8.
  • During the period from t2 to t3, Q1 is turned off and Q2 is turned on. Since both Q2 and Q3 are on, the voltage Vo is applied to the inductor L1. As a result, the inductor current ramps down. The ramp-down slope of the inductor current is equal to the output voltage Vo divided by the inductance of L1. At time instant t3, the inductor current drops to the current threshold iLth2. Q3 is turned off and Q4 is turned on.
  • It should be noted a delay time td may be added as shown in FIG. 8. For example, in order to have a fixed switching frequency, the delay time td may be added at t3. In other words, both the buck ramp and the boost ramp may not ramp up at t3. Instead, the buck ramp and the boost ramp may start at the end of the delay time td.
  • In the digital control domain, the control mechanism shown in FIG. 8 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition. The non-ZVS turn-off zone for Q1 shown in FIG. 8 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition.
  • FIG. 9 illustrates timing diagrams associated with a buck-boost operating mode under the second control mechanism when the input voltage is greater than the output voltage in accordance with various embodiments of the present disclosure. In operation, each new switching cycle starts at the time instant t0. At t0, both the high-side switch Q1 of the buck converter portion and the low-side switch Q4 of the boost converter are turned on. As shown in FIG. 9, at the beginning of each switching cycle, the first ramp S1 ramps up from Vc0 until the first ramp S1 reaches the error amplifier output voltage Vc at t2. The first ramp S1 is reset to Vc0 at t2 and starts to ramp up at the beginning of the next cycle. The operation of the high-side switch Q1 is controlled by the first ramp S1. In particular, the high-side switch Q1 is turned on at t0 and remains on until the peak value of the first ramp S1 is equal to the error amplifier output voltage Vc at t2. The low-side switch Q2 is turned on at t2 and remains on until the end of the cycle at t3.
  • The second ramp S2 does not include an offset and starts from zero as shown in FIG. 9. At the beginning of each switching cycle, the second ramp S2 starts to ramp up and the low-side switch Q4 of the boost converter portion is turned on. The low-side switch Q4 of the boost converter remains on until the peak value of the second ramp S2 is equal to the error amplifier output voltage Vc. As shown in FIG. 9, at t1, the low-side switch Q4 is turned off and the second ramp S2 is reset to zero. At t1, the high side switch Q3 is turned on and remains on until the end of the cycle at t3.
  • From t0 to t1, since both Q1 and Q4 are turned on, the input voltage Vin is applied to the inductor L1. As a result, the inductor current ramps up from a negative value to a peak current from t0 to t1. The slope of the inductor current is equal to the input voltage Vin divided by the inductance of L1.
  • During the period from t1 to t2, Q4 is turned off and Q3 is turned on. Since both Q1 and Q3 are on, the voltage difference between Vo and Vin is applied to the inductor L1. Since the input voltage is greater than the output voltage of the buck-boost converter 100, the inductor current keeps ramping up with a lower slope value during the period from t1 to t2 as shown in FIG. 9.
  • During the period from t2 to t3, Q1 is turned off and Q2 is turned on. Since both Q2 and Q3 are on, the voltage Vo is applied to the inductor L1. As a result, the inductor current ramps down. The ramp-down slope of the inductor current is equal to the output voltage Vo divided by the inductance of L1. At time instant t3, the inductor current drops to the current threshold iLth2. Q3 is turned off and Q4 is turned on, and a new switching cycle begins.
  • It should be noted a delay time td may be added as shown in FIG. 9. For example, in order to have a fixed switching frequency, the delay time td may be added at t3. In other words, both the buck ramp and the boost ramp may not ramp up at t3. Instead, the buck ramp and the boost ramp may start at the end of the delay time td.
  • In the digital control domain, the control mechanism shown in FIG. 9 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition. The non-ZVS turn-off zone for Q1 shown in FIG. 9 is similar to that shown in FIG. 4, and hence is not discussed herein to avoid repetition.
  • FIG. 10 illustrates timing diagrams associated with the third control mechanism in accordance with various embodiments of the present disclosure. There are three vertical axes. The first vertical axis Y1 represents three operating phases of the buck-boost converter 100. The second vertical axis Y2 represents the duty cycle of the buck converter portion of the buck-boost converter 100. The third vertical axis Y3 represents the boost converter portion of the buck-boost converter 100.
  • In the first phase P1, both the high-side switch Q1 of the buck converter portion and the low-side switch Q4 of the boost converter portion are turned on. The slope of the inductor current is equal to the input voltage Vin divided by the inductance of L1.
  • In the second phase P2, both the high-side switch Q1 of the buck converter portion and the high-side switch Q3 of the boost converter portion are turned on. The slope of the inductor current is equal to the difference of the input voltage Vin and output voltage Vo divided by the inductance of L1.
  • In the third phase P3, both the low-side switch Q2 of the buck converter portion and the high-side switch Q3 of the boost converter portion are turned on. The slope of the inductor current is equal to the output voltage Vo divided by the inductance of L1.
  • As shown in FIG. 10, the turning point of the first phase P1 and the second phase P2 is t1. The turning point of the second phase P2 and the third phase P3 is t2. The duty cycle of the buck converter portion is equal to t2 divided by Ts where Ts is the switching period of the buck-boost converter 100. The duty cycle of the boost converter portion is equal to t1 divided by Ts. Ts is determined by the inductor current crossing a predetermined threshold (e.g., iLth2).
  • FIG. 11 illustrates timing diagrams associated with a buck operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure. During the buck operating mode, the boost converter portion operates in a fixed duty cycle mode. The time of the first phase P1 is equal to the minimum on-time of the low-side switch Q4 of the boost converter portion. In some embodiments, the minimum on-time Tmin_on of the low-side switch Q4 is equal to 100 ns.
  • The duty cycle of the buck converter portion is determined by the intersection point of a buck ramp S1 and an error amplifier output voltage Vc. As shown in FIG. 11, when the buck ramp S1 reaches Vc, the turn-on of Q1 of the buck converter portion terminates. The duty cycle of the buck converter portion is adjustable through varying the error amplifier output voltage Vc as shown in FIG. 11.
  • FIG. 12 illustrates timing diagrams associated with a buck-boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure. During the buck-boost operating mode, the duty cycle of the boost converter portion is determined by the intersection point of a boost ramp S2 and the error amplifier output voltage Vc. As shown in FIG. 12, when the boost ramp S2 reaches Vc, the turn-on of the low-side switch Q4 of the boost converter portion terminates. The duty cycle of the boost converter portion is adjustable through varying the error amplifier output voltage Vc as shown in FIG. 12.
  • The duty cycle of the buck converter portion is determined by a buck ramp S1 and the error amplifier output voltage Vc. As shown in FIG. 12, when the buck ramp S1 reaches Vc, the turn-on of the high-side switch Q1 of the buck converter portion terminates.
  • FIG. 13 illustrates timing diagrams associated with a boost operating mode under the third control mechanism shown in FIG. 10 in accordance with various embodiments of the present disclosure. During the boost operating mode, the duty cycle of the boost converter portion is determined by a boost ramp S2 and the error amplifier output voltage Vc. As shown in FIG. 13, when the boost ramp S2 reaches Vc, the turn-on of the low-side switch Q3 of the boost converter portion terminates. The duty cycle of the boost converter portion is adjustable through varying the error amplifier output voltage Vc as shown in FIG. 13.
  • The buck ramp S1 never reaches the error amplifier output voltage Vc before the switching cycle ends. Therefore, as shown in FIG. 13, the high-side switch Q1 of the buck converter portion is always on.
  • In the digital control domain, the error amplifier output voltage Vc shown in FIGS. 11-13 is implemented as Yn. Yn is in a range from 0 to 1. Ts is the switching cycle of the buck-boost converter 100. Depending on different applications and design needs, a mode selection threshold Yth is predetermined. In some embodiments, the mode selection threshold Yth is set to 0.4.
  • In some embodiments, when Yn is in a range from 0 to Yth, the buck-boost converter 100 operates in the buck operating mode as shown in FIG. 11. The time of the first phase P1 is equal to the minimum on-time Tmin_on of the low-side switch Q4 of the boost converter portion. The time of the second phase P2 is determined by the following equation:

  • P2=kYn·Ts max   (1)
  • where k1 is a predetermined constant and Tsmax is the possible maximum switching period. Tsmax is the maximum on time. Tsmax is a fixed value, which is large enough to cover all operation conditions the buck-boost converter 100 may operate.
  • When Yn is in a range from Yth to 1, the buck-boost converter 100 operates in the buck-boost operating mode shown in FIG. 12. The total time of P1 and P2 is a fixed value. P1 and P2 is determined by the following equation:

  • P1+P2=Ton_min+kYth·Ts max   (2)
  • where Ton_min is a minimum on-time of the low-side switch Q4 of the boost converter portion.
  • P1 is controlled by the following equation:

  • P1=Ton_min+k2·(Yn−YthTs max   (3)
  • where k2 is a predetermined constant and Ton_min is the minimum on-time of the low-side switch Q4 of the boost converter portion.
  • When Yn goes even higher in the range from Yth to 1, the buck-boost converter 100 will move into the boost operating mode shown in FIG. 13. In particular, when the output voltage Vo of the buck-boost converter 100 is much greater than the input voltage Vin of the buck-boost converter 100, the current flowing through the inductor L1 drops much quicker to the negative current threshold and a new switching cycle begins before the second phase P2 finishes. As a result, the third phase P3 does not exist as shown in FIG. 13. In other words, the buck-boost converter 100 operates in the boost operating mode. On the other hand, when the output voltage Vo of the buck-boost converter 100 is approximately equal to the input voltage Vin of the buck-boost converter 100, the current flowing through the inductor L1 does not reach the negative current threshold during the second phase P2. As a result, the third phase P3 exists as shown in FIG. 12. Thus, the buck-boost converter 100 operates in the buck-boost operating mode. During the buck-boost operating mode, the buck converter portion operates at a duty defined by Equation (2).
  • Although embodiments of the present invention and its advantages have been described in detail, it should be understood that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the invention as defined by the appended claims.
  • Moreover, the scope of the present application is not intended to be limited to the particular embodiments of the process, machine, manufacture, composition of matter, means, methods and steps described in the specification. As one of ordinary skill in the art will readily appreciate from the disclosure of the present invention, processes, machines, manufacture, compositions of matter, means, methods, or steps, presently existing or later to be developed, that perform substantially the same function or achieve substantially the same result as the corresponding embodiments described herein may be utilized according to the present invention. Accordingly, the appended claims are intended to include within their scope such processes, machines, manufacture, compositions of matter, means, methods, or steps.

Claims (20)

What is claimed is:
1. A method comprising:
generating a first ramp signal for controlling a first portion of a converter;
generating a second ramp signal for controlling a second portion of the converter;
controlling a state of a first switch of the first portion through comparing the first ramp signal to a control signal, and a state of a first switch of the second portion through comparing the second ramp signal to the control signal; and
determining a switching cycle of the converter through comparing a current flowing through an inductor of the converter to a threshold.
2. The method of claim 1, wherein:
the threshold is a current threshold having a negative value.
3. The method of claim 1, wherein:
the converter is a four-switch buck-boost converter;
the first portion is a buck portion; and
the second portion is a boost portion.
4. The method of claim 1, further comprising:
generating the control signal through comparing an output voltage of the converter to a reference.
5. The method of claim 1, further comprising:
after the current flowing through the inductor of the converter reaches the threshold, adding a delay time to adjust a switching frequency of the converter.
6. The method of claim 1, further comprising:
adding an offset into at least one of the first ramp signal and the second ramp signal.
7. The method of claim 1, further comprising:
determining an operation mode transition based upon a ratio of an input voltage of the converter to an output voltage of the converter.
8. The method of claim 7, further comprising:
configuring the converter to operate in a buck mode in response to a ratio greater than a first predetermined threshold;
configuring the converter to operate in a boost mode in response to a ratio less than a second predetermined threshold; and
configuring the converter to operate in a buck-boost mode in response to a ratio between the first predetermined threshold and the second predetermined threshold.
9. The method of claim 1, wherein the converter comprises:
the first portion comprising a first high-side switch and a first low-side switch connected in series across an input capacitor;
the second portion comprising a second high-side switch and a second low-side switch connected in series across an output capacitor; and
the inductor coupled between a common node of the first high-side switch and the first low-side switch, and a common node of the second high-side switch and the second low-side switch.
10. The method of claim 1, further comprising:
under a light load operating condition, adding a delay time to a switching cycle of the converter to keep a switching frequency of the converter in a predetermined range.
11. A method comprising:
controlling a turn-off of a first switch of a buck portion of a buck-boost converter through comparing a first ramp signal to a control signal;
controlling a turn-off of a first switch of a boost portion of the buck-boost converter through comparing a second ramp signal to the control signal;
controlling a turn-off of a second switch of the buck portion of the buck-boost converter through comparing a current flowing through an inductor of the buck-boost converter to a current threshold; and
controlling a turn-off of a second switch of the boost portion of the buck-boost converter through comparing the current flowing through the inductor of the buck-boost converter to the current threshold.
12. The method of claim 11, further comprising:
adding an offset into the first ramp signal; and
configuring the buck-boost converter to operate in a buck-boost mode.
13. The method of claim 12, wherein:
in a switching cycle, each switch is configured to have at least one on/off operation.
14. The method of claim 11, wherein:
the current threshold has a negative value; and
the current flowing through the inductor of the buck-boost converter changes direction twice in a switching cycle.
15. The method of claim 11, further comprising:
adding a delay time to a switching cycle of the buck-boost converter to achieve a fixed switching frequency.
16. The method of claim 11, further comprising:
under a light load operating condition, adding a delay time to a switching cycle of the buck-boost converter; and
during the delay time, shorting the inductor.
17. The method of claim 11, wherein:
an initial value of the first ramp signal is greater than an initial value of the second ramp signal.
18. The method of claim 11, wherein:
the first ramp signal starts from an offset value; and
the second ramp signal starts from zero.
19. A converter comprising:
a buck converter portion, an inductor and a boost converter portion connected in cascade; and
a controller configured to compare a current flowing through the inductor to a current threshold and determine a switching cycle of the converter through comparing the current flowing through the inductor to the current threshold.
20. The converter of claim 19, wherein the controller is configured to:
generate a first ramp signal for controlling the buck converter portion;
generate a second ramp signal for controlling the boost converter portion; and
control a state of a first switch of the buck converter portion through comparing the first ramp signal to a control signal, and a state of a first switch of the boost converter portion through comparing the second ramp signal to the control signal, wherein the control signal is generated through comparing an output voltage of the converter to a reference.
US16/212,943 2015-06-15 2018-12-07 Control method for buck-boost power converters Active US10554130B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/212,943 US10554130B2 (en) 2015-06-15 2018-12-07 Control method for buck-boost power converters

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/739,827 US10177661B2 (en) 2015-06-15 2015-06-15 Control method for buck-boost power converters
US16/212,943 US10554130B2 (en) 2015-06-15 2018-12-07 Control method for buck-boost power converters

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US14/739,827 Continuation US10177661B2 (en) 2015-06-15 2015-06-15 Control method for buck-boost power converters

Publications (2)

Publication Number Publication Date
US20190123650A1 true US20190123650A1 (en) 2019-04-25
US10554130B2 US10554130B2 (en) 2020-02-04

Family

ID=57517340

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/739,827 Active 2035-08-05 US10177661B2 (en) 2015-06-15 2015-06-15 Control method for buck-boost power converters
US16/212,943 Active US10554130B2 (en) 2015-06-15 2018-12-07 Control method for buck-boost power converters

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US14/739,827 Active 2035-08-05 US10177661B2 (en) 2015-06-15 2015-06-15 Control method for buck-boost power converters

Country Status (4)

Country Link
US (2) US10177661B2 (en)
EP (1) EP3198710B1 (en)
CN (1) CN107534387B (en)
WO (1) WO2016202244A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110768528A (en) * 2019-11-13 2020-02-07 清华大学 Control method for smooth switching of working modes of non-reverse Buck-Boost circuit
US20220123654A1 (en) * 2019-02-26 2022-04-21 Hyosung Heavy Industries Corporation Direct current converter device
US20230128894A1 (en) * 2021-10-26 2023-04-27 Allegro Microsystems, Llc Commonly controlled buck-boost converter

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10454371B1 (en) * 2015-05-08 2019-10-22 Maxim Integrated Products, Inc. High efficiency buck-boost systems and methods
US10141845B2 (en) 2016-04-13 2018-11-27 Texas Instruments Incorporated DC-DC converter and control circuit with low-power clocked comparator referenced to switching node for zero voltage switching
US10177658B2 (en) * 2016-04-14 2019-01-08 Texas Instruments Incorporated Methods and apparatus for adaptive timing for zero voltage transition power converters
US10141846B2 (en) 2016-04-15 2018-11-27 Texas Instruments Incorporated Methods and apparatus for adaptive timing for zero voltage transition power converters
US20170373600A1 (en) * 2016-06-23 2017-12-28 Cirrus Logic International Semiconductor Ltd. Multi-mode switching power converter
US10826325B2 (en) * 2018-02-21 2020-11-03 X2 Power Technologies Limited Hybrid control apparatus and method
US10644600B2 (en) * 2018-03-25 2020-05-05 Richtek Technology Corporation Constant-time buck-boost switching regulator and control circuit and control method thereof
IT201800008221A1 (en) * 2018-08-29 2020-02-29 St Microelectronics Srl ELECTRONIC CONVERTER, INTEGRATED CIRCUIT AND OPERATING PROCEDURE OF A CORRESPONDING ELECTRONIC CONVERTER
US10840797B2 (en) 2018-11-26 2020-11-17 Texas Instruments Incorporated Load release detection circuit
US10958173B2 (en) * 2018-12-26 2021-03-23 Texas Instruments Incorporated Fixed frequency buck-boost power converter control
WO2020243891A1 (en) * 2019-06-04 2020-12-10 Abb Schweiz Ag Apparatus and method for power conversion
CN110071557A (en) * 2019-06-12 2019-07-30 海矽微(厦门)电子有限公司 A kind of battery charging rack structure
DE102019212351A1 (en) * 2019-08-19 2021-02-25 Robert Bosch Gmbh Battery system for a motor vehicle, method for operating a battery system and motor vehicle
US11682971B2 (en) 2019-09-20 2023-06-20 Texas Instruments Incorporated 4-phase buck-boost converter
CN111969877B (en) * 2020-06-23 2021-07-02 湖南大学 Control method and device of half-bridge inverter
US11522458B2 (en) * 2020-09-02 2022-12-06 Cypress Semiconductor Corporation Bootstrap voltage refresh for buck-boost converter
CN112583279B (en) * 2020-12-15 2022-03-01 武汉葆源新能科技有限公司 Control method and system suitable for bidirectional isolation type DCDC converter
US11682972B2 (en) * 2021-02-04 2023-06-20 Analog Devices, Inc. Peak current mode control for buck-boost regulators
CN112994452B (en) * 2021-04-26 2021-08-03 上海南芯半导体科技有限公司 Buck-boost converter control circuit with mode switching function
CN114221543B (en) * 2021-11-25 2024-05-24 西安领充创享新能源科技有限公司 Control method of H-bridge four-switch circuit and bidirectional charging and discharging device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7443147B2 (en) * 2005-03-02 2008-10-28 Fujitsu Limited DC-DC converter with step-up and step-down control capable of varying the offset voltage of the PWM triangle
US7518346B2 (en) * 2006-03-03 2009-04-14 Texas Instruments Deutschland Gmbh Buck-boost DC/DC converter with overlap control using ramp shift signal
US20110074373A1 (en) * 2009-09-29 2011-03-31 Richtek Technology Corp. Control circuit and method for a buck-boost power converter
US8319483B2 (en) * 2007-08-06 2012-11-27 Solaredge Technologies Ltd. Digital average input current control in power converter
US8334683B2 (en) * 2010-08-24 2012-12-18 Intersil Americas Inc. System and method for current limiting a DC-DC converter
US20140217996A1 (en) * 2013-02-06 2014-08-07 Microsemi Corporation Hysteretic current mode control converter with low, medium and high current thresholds
US8823340B2 (en) * 2010-12-09 2014-09-02 Richtek Technology Corporation Control circuit and method for a buck-boost switching converter

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6166527A (en) * 2000-03-27 2000-12-26 Linear Technology Corporation Control circuit and method for maintaining high efficiency in a buck-boost switching regulator
US6329801B1 (en) * 2000-04-24 2001-12-11 Volterra Semiconductor Corporation Switching regulator control system and method
US6984967B2 (en) * 2003-10-29 2006-01-10 Allegro Microsystems, Inc. Multi-mode switching regulator
US7157888B2 (en) * 2005-06-06 2007-01-02 Aimtron Technology Corp. Light loading control circuit for a buck-boost voltage converter
US7528587B2 (en) * 2005-12-27 2009-05-05 Linear Technology Corporation Switched converter with variable peak current and variable off-time control
US7453247B2 (en) * 2006-06-30 2008-11-18 Analog Devices, Inc. DC to DC voltage converter
JP2009027895A (en) 2007-07-24 2009-02-05 Hitachi Ltd Switching power supply
US8143865B2 (en) * 2008-08-22 2012-03-27 Active-Semi, Inc. Average current mode controlled converter having a buck mode, a boost mode, and a partial four-switch mode
EP2189870A1 (en) 2008-11-25 2010-05-26 St Microelectronics S.A. A switch-mode voltage regulator
KR101585958B1 (en) * 2008-12-29 2016-01-18 주식회사 동부하이텍 Reference voltage generation circuit
CN101944850B (en) 2009-07-06 2013-07-31 立锜科技股份有限公司 Voltage step-up and down switching power circuit as well as control circuit and method thereof
US8773084B2 (en) * 2009-08-24 2014-07-08 Micrel, Inc. Buck-boost converter using timers for mode transition control
US8330435B2 (en) 2009-10-15 2012-12-11 Intersil Americas Inc. Hysteretic controlled buck-boost converter
US8946937B2 (en) * 2010-08-18 2015-02-03 Volterra Semiconductor Corporation Switching circuits for extracting power from an electric power source and associated methods
US8957644B2 (en) 2010-08-25 2015-02-17 Futurewei Technologies, Inc. High efficiency high power density power architecture based on buck-boost regulators with a pass-through band
EP2466740B1 (en) * 2010-12-14 2020-02-05 Dialog Semiconductor GmbH Circuit of high efficient buck-boost switching regulator and control method thereof
CN102694469A (en) 2012-05-21 2012-09-26 成都芯源系统有限公司 DC-DC Voltage Converter
US8841895B2 (en) * 2012-06-04 2014-09-23 Texas Instruments Deutschland Gmbh Electronic device for average current mode DC-DC conversion
CN103280971B (en) 2013-05-28 2016-01-13 成都芯源系统有限公司 Buck-boost converter and controller and control method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7443147B2 (en) * 2005-03-02 2008-10-28 Fujitsu Limited DC-DC converter with step-up and step-down control capable of varying the offset voltage of the PWM triangle
US7518346B2 (en) * 2006-03-03 2009-04-14 Texas Instruments Deutschland Gmbh Buck-boost DC/DC converter with overlap control using ramp shift signal
US8319483B2 (en) * 2007-08-06 2012-11-27 Solaredge Technologies Ltd. Digital average input current control in power converter
US20110074373A1 (en) * 2009-09-29 2011-03-31 Richtek Technology Corp. Control circuit and method for a buck-boost power converter
US8334683B2 (en) * 2010-08-24 2012-12-18 Intersil Americas Inc. System and method for current limiting a DC-DC converter
US8754623B2 (en) * 2010-08-24 2014-06-17 Intersil Americas, Inc. System and method for current limiting a DC-DC converter
US8823340B2 (en) * 2010-12-09 2014-09-02 Richtek Technology Corporation Control circuit and method for a buck-boost switching converter
US20140217996A1 (en) * 2013-02-06 2014-08-07 Microsemi Corporation Hysteretic current mode control converter with low, medium and high current thresholds

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220123654A1 (en) * 2019-02-26 2022-04-21 Hyosung Heavy Industries Corporation Direct current converter device
CN110768528A (en) * 2019-11-13 2020-02-07 清华大学 Control method for smooth switching of working modes of non-reverse Buck-Boost circuit
US20230128894A1 (en) * 2021-10-26 2023-04-27 Allegro Microsystems, Llc Commonly controlled buck-boost converter
US11770072B2 (en) * 2021-10-26 2023-09-26 Allegro Microsystems, Llc Commonly controlled buck-boost converter

Also Published As

Publication number Publication date
CN107534387B (en) 2020-05-08
US10177661B2 (en) 2019-01-08
EP3198710A4 (en) 2017-10-25
EP3198710B1 (en) 2022-05-25
EP3198710A1 (en) 2017-08-02
US20160365790A1 (en) 2016-12-15
CN107534387A (en) 2018-01-02
WO2016202244A1 (en) 2016-12-22
US10554130B2 (en) 2020-02-04

Similar Documents

Publication Publication Date Title
US10554130B2 (en) Control method for buck-boost power converters
US9906147B2 (en) Adaptive dead time control apparatus and method for switching power converters
US7385833B2 (en) Snubber circuit for a power converter
US7579814B2 (en) Power converter with snubber
JP6634089B2 (en) Soft switching flyback converter
US9614447B2 (en) Control circuits and methods for active-clamp flyback power converters
US11870350B2 (en) Switched-mode power controller with multi-mode startup
US8488355B2 (en) Driver for a synchronous rectifier and power converter employing the same
TWI424673B (en) Synchronous rectifier control system and method for synchronous boost converter
US9793810B2 (en) Control method for zero voltage switching buck-boost power converters
US10476372B2 (en) Buck-boost power converter and method of operation thereof
EP3509203B1 (en) Converter with zvs
US9837920B2 (en) Commutation current steering method in a zero volt switching power converter using a synchronous rectifier
JP2008533959A (en) Switchable power converter and method of operating the same
US20180323713A1 (en) Soft-switching for high-frequency power conversion
CN107404229B (en) Method and apparatus for adaptive timing of zero voltage transition power converters
CN212572391U (en) Electronic circuit
US11075582B2 (en) Switching converter
US8228050B2 (en) Switching power supply
US9893609B1 (en) Method to operate a resonant converter at a characteristic frequency of the power stage
JP2017112790A (en) Switching power supply device

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD., CHINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FUTUREWEI TECHNOLOGIES, INC.;REEL/FRAME:058601/0723

Effective date: 20211230

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4