US20180340702A9 - Systems and methods for monitoring and controlling an energy plant - Google Patents
Systems and methods for monitoring and controlling an energy plant Download PDFInfo
- Publication number
- US20180340702A9 US20180340702A9 US15/939,238 US201815939238A US2018340702A9 US 20180340702 A9 US20180340702 A9 US 20180340702A9 US 201815939238 A US201815939238 A US 201815939238A US 2018340702 A9 US2018340702 A9 US 2018340702A9
- Authority
- US
- United States
- Prior art keywords
- subplant
- loads
- equipment
- recommended
- subplants
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 86
- 238000012544 monitoring process Methods 0.000 title claims description 27
- 238000004519 manufacturing process Methods 0.000 claims abstract description 108
- 230000005611 electricity Effects 0.000 claims abstract description 70
- 238000004146 energy storage Methods 0.000 claims description 22
- 238000012261 overproduction Methods 0.000 claims description 8
- 238000005457 optimization Methods 0.000 description 77
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 70
- 238000001816 cooling Methods 0.000 description 56
- 230000008569 process Effects 0.000 description 54
- 238000010438 heat treatment Methods 0.000 description 32
- 238000010586 diagram Methods 0.000 description 28
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 24
- 230000006870 function Effects 0.000 description 23
- 239000012530 fluid Substances 0.000 description 15
- 238000004891 communication Methods 0.000 description 12
- 239000007789 gas Substances 0.000 description 12
- 239000003345 natural gas Substances 0.000 description 12
- 238000003860 storage Methods 0.000 description 11
- 238000002485 combustion reaction Methods 0.000 description 9
- 238000005265 energy consumption Methods 0.000 description 9
- 238000012545 processing Methods 0.000 description 9
- 230000008859 change Effects 0.000 description 7
- 238000011084 recovery Methods 0.000 description 7
- 230000008901 benefit Effects 0.000 description 6
- 238000009826 distribution Methods 0.000 description 6
- 238000012550 audit Methods 0.000 description 5
- 230000004044 response Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- -1 electricity Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- LYCAIKOWRPUZTN-UHFFFAOYSA-N Ethylene glycol Chemical compound OCCO LYCAIKOWRPUZTN-UHFFFAOYSA-N 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 238000013439 planning Methods 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000003491 array Methods 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- WGCNASOHLSPBMP-UHFFFAOYSA-N hydroxyacetaldehyde Natural products OCC=O WGCNASOHLSPBMP-UHFFFAOYSA-N 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000012417 linear regression Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- 230000001953 sensory effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/46—Improving electric energy efficiency or saving
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/54—Control or safety arrangements characterised by user interfaces or communication using one central controller connected to several sub-controllers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/58—Remote control using Internet communication
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0484—Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
- G06F3/04847—Interaction techniques to control parameter settings, e.g. interaction with sliders or dials
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/46—Improving electric energy efficiency or saving
- F24F11/47—Responding to energy costs
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/52—Indication arrangements, e.g. displays
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2110/00—Control inputs relating to air properties
- F24F2110/10—Temperature
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2110/00—Control inputs relating to air properties
- F24F2110/20—Humidity
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2110/00—Control inputs relating to air properties
- F24F2110/40—Pressure, e.g. wind pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2140/00—Control inputs relating to system states
- F24F2140/50—Load
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/54—Heating and cooling, simultaneously or alternatively
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/25—Pc structure of the system
- G05B2219/25011—Domotique, I-O bus, home automation, building automation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
Definitions
- the present disclosure relates generally to an plant that includes multiple subplants configured to serve the energy loads of a building or campus.
- the present disclosure relates more particularly to systems and methods for monitoring and controlling multiple subplants and the equipment within each of the subplants.
- An energy plant may include a number of subplants configured to serve the heating, cooling, electric, and other energy loads of a building or campus.
- the energy plant may include a heater subplant, a chiller subplant, a heat recovery chiller subplant, a cogeneration subplant, a steam subplant, a hot thermal energy storage (TES) subplant, and/or a cold TES subplant.
- the subplants may include a variety of HVAC equipment configured to serve heating, cooling, and electric loads (e.g., heaters, boilers, chillers, heat recovery chillers, electric generators, cooling towers, etc.).
- the energy plant may be controlled by an energy plant controller that distributes a requested or predicted energy load (e.g., a heating load, a cooling load, an electric load, etc.) across the plurality of subplants. It can be difficult and challenging to monitor and control the operation of an energy plant.
- a requested or predicted energy load e.g., a heating load, a cooling load, an electric load, etc.
- the energy plant includes a plurality of subplants, a high level optimizer, a low level optimizer, and a controller.
- the plurality of subplants are configured to serve energy loads of a campus and include a cogeneration subplant and a chiller subplant.
- the cogeneration subplant is configured to generate steam and electricity.
- the chiller subplant is electrically coupled to the cogeneration subplant and configured to consume the electricity generated by the cogeneration subplant.
- the high level optimizer is configured to determine recommended subplant loads for each of the plurality of subplants.
- the recommended subplant loads include a rate of steam production and a rate of electricity production of the cogeneration subplant and a rate of electricity consumption of the chiller subplant.
- the low level optimizer is configured to determine recommended equipment setpoints for equipment of the plurality of subplants based on the recommended subplant loads.
- the controller is configured to operate the equipment of the plurality of subplants based on the recommended equipment setpoints.
- the chiller subplant is fluidly coupled to the cogeneration subplant and configured to chill the steam generated by the cogeneration subplant.
- the recommended subplant loads may include a rate of steam consumption and a rate of chilled steam production of the chiller subplant.
- the energy plant includes a user interface configured to receive manual subplant loads specified by a user.
- the low level optimizer can be configured to determine the recommended equipment setpoints for the equipment of the plurality of subplants based on the manual subplant loads.
- the energy plant includes a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI and present the dispatch GUI via the user interface.
- GUI graphical user interface
- the dispatch GUI may include the recommended subplant loads and the manual subplant loads.
- the dispatch GUI includes an operating mode selector configured to display a plurality of operating modes and to receive a user selection of one of the operating modes.
- the plurality of operating modes may include an automatic operating mode, an advisory operating mode, and a manual operating mode.
- the low level optimizer is configured to operate in (1) an automatic operating mode in which the low level optimizer determines a first set of recommended equipment setpoints to achieve the recommended subplant loads and (2) a manual operating mode in which the low level optimizer determines a second set of recommended equipment setpoints to achieve the manual subplant loads.
- the high level optimizer is configured to determine an amount of overproduction or underproduction resulting from the manual subplant loads by comparing the manual subplant loads to a campus energy load.
- the plurality of subplants include an energy storage subplant.
- the user interface may include an indication of an amount of time until the energy storage subplant is (1) fully depleted based on the amount of underproduction or (2) filled to capacity based on the amount of overproduction.
- the energy plant includes a subplant monitor configured to monitor the energy plant and identify actual subplant loads for each of the plurality of subplants.
- the energy plant includes a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI comprising the recommended subplant loads and the actual subplant loads.
- GUI graphical user interface
- Another implementation of the present disclosure is a method for monitoring and controlling an energy plant including a plurality of subplants that operate to serve energy loads of a campus.
- the method includes operating a cogeneration subplant of the plurality of subplants to generate steam and electricity, operating a chiller subplant of the plurality of subplants to consume the electricity generated by the cogeneration subplant, and determining recommended subplant loads for each of the plurality of subplants.
- the recommended subplant loads include a rate of steam production and a rate of electricity production of the cogeneration subplant and a rate of electricity consumption of the chiller subplant.
- the method includes determining recommended equipment setpoints for equipment of the plurality of subplants based on the recommended subplant loads and operating the equipment of the plurality of subplants based on the recommended equipment setpoints.
- the method includes operating the chiller subplant to chill the steam generated by the cogeneration subplant.
- the recommended subplant loads may include a rate of steam consumption and a rate of chilled steam production of the chiller subplant.
- the method includes receiving manual subplant loads specified by a user via a user interface and determining the recommended equipment setpoints for the equipment of the plurality of subplants based on the manual subplant loads.
- the method includes generating a dispatch GUI and presenting the dispatch GUI via the user interface.
- the dispatch GUI may include the recommended subplant loads and the manual subplant loads.
- the method includes receiving a user selection of one of a plurality of operating modes via an operating mode selector of the dispatch GUI.
- the plurality of operating modes may include an automatic operating mode, an advisory operating mode, and a manual operating mode.
- the method includes operating in an automatic operating mode to determine a first set of recommended equipment setpoints to achieve the recommended subplant loads and operating in a manual operating mode to determine a second set of recommended equipment setpoints to achieve the manual subplant loads.
- the method includes determining an amount of overproduction or underproduction resulting from the manual subplant loads by comparing the manual subplant loads to a campus energy load.
- the plurality of subplants include an energy storage subplant.
- the user interface may include an indication of an amount of time until the energy storage subplant is (1) fully depleted based on the amount of underproduction or (2) filled to capacity based on the amount of overproduction.
- the method includes monitoring the energy plant to identify actual subplant loads for each of the plurality of subplants. In some embodiments, the method includes generating a dispatch GUI comprising the recommended subplant loads and the actual subplant loads.
- FIG. 1 is a drawing of a building equipped with a building automation system and served by an energy plant, according to an exemplary embodiment.
- FIG. 2 is a schematic diagram of an energy plant including a number of subplants configured to serve the energy loads of the building of FIG. 1 , according to an exemplary embodiment.
- FIG. 3 is a block diagram of an energy optimization system (EOS) configured to monitor and control the energy plant of FIG. 2 , according to an exemplary embodiment.
- EOS energy optimization system
- FIG. 4 is a block diagram of a plant system illustrating a cascaded optimization process which may be performed by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 5 is a block diagram illustrating the operation of the EOS of FIG. 3 in an automatic operating mode, according to an exemplary embodiment.
- FIG. 6 is a flow diagram illustrating the operation of the EOS of FIG. 3 in the automatic operating mode, according to an exemplary embodiment.
- FIG. 7 is a block diagram illustrating the operation of the EOS of FIG. 3 in an advisory operating mode, according to an exemplary embodiment.
- FIG. 8 is a flow diagram illustrating the operation of the EOS of FIG. 3 in the advisory operating mode, according to an exemplary embodiment.
- FIG. 9 is a block diagram illustrating the operation of the EOS of FIG. 3 in a manual operating mode, according to an exemplary embodiment.
- FIG. 10 is a flow diagram illustrating the operation of the EOS of FIG. 3 in the manual operating mode, according to an exemplary embodiment.
- FIG. 11 is a drawing of a site summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 12 is a drawing of a chilled water loop summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 13 is a drawing of another chilled water loop summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 14 is a drawing of an equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 15 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 16 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 17 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 18 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 19 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 20 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 21 is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 22A is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 22B is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 22C is a drawing of another equipment summary interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 23A is a drawing of a dispatch schedule interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 23B is a drawing of another dispatch schedule interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 23C is a drawing of another dispatch schedule interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 24 is a drawing of a dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 25 is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 26A is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 26B is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 27A is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 27B is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 28A is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 28B is a drawing of another dispatch chart interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 29 is a drawing of a weather forecast input interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 30 is a drawing of a dry bulb temperature forecast input interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 31 is a drawing of an override interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 32 is a drawing of a utility pricing forecast input interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 33 is a drawing of an out-of-service schedule interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 34 is a drawing of a campus schedule interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 35A is a drawing of a reporting interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 35B is a drawing of another reporting interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIGS. 36A and 36B are drawings of a site summary report which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- FIG. 37 is a drawing of an audit log interface which may be generated by the EOS of FIG. 3 , according to an exemplary embodiment.
- the energy plant may include a plurality of subplants configured to serve the heating, cooling, and electric loads of a building or campus.
- the energy plant may include a heater subplant, one or more chiller subplants, a heat recovery chiller subplant, a cogeneration subplant, a steam subplant, a hot thermal energy storage (TES) subplant, and/or a cold TES subplant.
- the subplants may be located within the same building or distributed across multiple buildings.
- the energy plant may be controlled by an energy optimization system (EOS) that distributes a requested or predicted energy load (e.g., a heating load, a cooling load, an electric load, etc.) across the plurality of subplants.
- EOS energy optimization system
- the EOS performs an optimization process to determine an optimal load distribution across the plurality of subplants for each of a plurality of time steps within a prediction window.
- the EOS may predict the loads on each of the subplants throughout the prediction window.
- the predicted subplant loads include a heating load served by the heating subplant, a heating load served by the heat recovery chiller subplant, a heating load served by the steam subplant, a cooling load served by the heat recovery chiller subplant, a cooling load served by the chiller subplant(s), an electric load served by the cogeneration subplant, a heating load served or stored by the hot TES subplant (e.g., a predicted rate at which the hot TES subplant will be charging or discharging), and/or a cooling load served or stored by the cold TES subplant (e.g., a predicted rate at which the cold TES subplant will be charging or discharging).
- the EOS predicts a charge state for the TES subplants defining an amount of thermal energy stored in each of the TES subplants during each of the dispatch intervals.
- the predicted subplant loads and TES charge states for each of the future time steps may be stored in a subplant utilization database.
- the actual operation of the energy plant may be monitored to determine the actual subplant loads and TES charge stages during each of the time steps.
- the actual subplant loads and TES charge states may be stored in the subplant utilization database for each of the past and current dispatch intervals.
- a dispatch graphical user interface (GUI) generator may access the data stored in the subplant utilization database and use the stored data to generate a dispatch GUI.
- the dispatch GUI may be a graph or chart that illustrates the actual subplant utilization data (e.g., past and current subplant loads) and the predicted subplant utilization data (e.g., future subplant loads) in a graphical format.
- the dispatch GUI indicates the actual and predicted subplant loads for each of the subplants at each of the dispatch intervals represented in the dispatch GUI.
- the dispatch GUI may be configured to receive manual subplant loads specified by a user.
- the dispatch GUI generator may provide the dispatch GUI to a user interface of a client device (e.g., a computer terminal, a workstation, a laptop, a tablet, a smartphone, etc.).
- the dispatch GUI generator is a component of the energy plant controller.
- the dispatch GUI generator may be a component of the client device.
- the dispatch GUI generator may be a web browser or a specialized application running on the client device.
- the dispatch GUI is rendered using specialized viewing software (e.g., an energy plant monitoring application) installed on the client device.
- the dispatch GUI is provided via a web interface which allows the dispatch GUI to be rendered and viewed using a web browser without requiring any specialized applications or software to be installed on the client device.
- the dispatch GUI may present recommended (i.e., optimal) subplant loads, manual subplant loads, and actual subplant loads in a variety of visual formats (e.g., diagrams, charts, graphs, etc.) that illustrate the operation of the energy plant.
- the dispatch GUI may include a first set of recommended equipment setpoints that result from the recommended subplant loads, a second set of recommended equipment setpoints that result from the manual subplant loads, and the actual equipment setpoints to provide details regarding the operation of each subplant.
- the dispatch GUI may include past dispatch data (e.g., past subplant loads, past equipment setpoints) and current dispatch data (e.g., current subplant loads, current equipment setpoints) to allow a user to view a history of energy plant operations.
- the dispatch GUI may also include future dispatch data (e.g., planned subplant loads, planned equipment setpoints) to allow the user to view planned energy plant operations into the future. Additional features and advantages of the dispatch GUI are described in detail below.
- the dispatch GUI generator and/or the dispatch GUI include some or all of the features described in U.S. Design patent application No. 29/515,801 filed Jan. 27, 2015, U.S. Provisional Patent Application No. 62/286,287 filed Jan. 22, 2017, and/or U.S. patent application Ser. No. 15/387,512 filed Dec. 21, 2016. The entire disclosure of each of these patent applications is incorporated by reference herein.
- a BAS is, in general, a system of devices configured to control, monitor, and manage equipment in or around a building or building area.
- a BAS can include, for example, a HVAC system, a security system, a lighting system, a fire alerting system, any other system that is capable of managing building functions or devices, or any combination thereof.
- HVAC system 100 may include a plurality of HVAC devices (e.g., heaters, chillers, air handling units, pumps, fans, thermal energy storage, etc.) configured to provide heating, cooling, ventilation, or other services for building 10 .
- HVAC system 100 is shown to include a waterside system 120 and an airside system 130 .
- Waterside system 120 may provide a heated or chilled fluid to an air handling unit of airside system 130 .
- Airside system 130 may use the heated or chilled fluid to heat or cool an airflow provided to building 10 .
- waterside system 120 is replaced with a central energy plant such as energy plant 200 , described with reference to FIG. 2 .
- HVAC system 100 is shown to include a chiller 102 , a boiler 104 , and a rooftop air handling unit (AHU) 106 .
- Waterside system 120 may use boiler 104 and chiller 102 to heat or cool a working fluid (e.g., water, glycol, etc.) and may circulate the working fluid to AHU 106 .
- the HVAC devices of waterside system 120 may be located in or around building 10 (as shown in FIG. 1 ) or at an offsite location such as an energy plant (e.g., a chiller plant, a steam plant, a heat plant, etc.).
- the working fluid may be heated in boiler 104 or cooled in chiller 102 , depending on whether heating or cooling is required in building 10 .
- Boiler 104 may add heat to the circulated fluid, for example, by burning a combustible material (e.g., natural gas) or using an electric heating element.
- Chiller 102 may place the circulated fluid in a heat exchange relationship with another fluid (e.g., a refrigerant) in a heat exchanger (e.g., an evaporator) to absorb heat from the circulated fluid.
- the working fluid from chiller 102 and/or boiler 104 may be transported to AHU 106 via piping 108 .
- AHU 106 may place the working fluid in a heat exchange relationship with an airflow passing through AHU 106 (e.g., via one or more stages of cooling coils and/or heating coils).
- the airflow may be, for example, outside air, return air from within building 10 , or a combination of both.
- AHU 106 may transfer heat between the airflow and the working fluid to provide heating or cooling for the airflow.
- AHU 106 may include one or more fans or blowers configured to pass the airflow over or through a heat exchanger containing the working fluid. The working fluid may then return to chiller 102 or boiler 104 via piping 110 .
- Airside system 130 may deliver the airflow supplied by AHU 106 (i.e., the supply airflow) to building 10 via air supply ducts 112 and may provide return air from building 10 to AHU 106 via air return ducts 114 .
- airside system 130 includes multiple variable air volume (VAV) units 116 .
- VAV variable air volume
- airside system 130 is shown to include a separate VAV unit 116 on each floor or zone of building 10 .
- VAV units 116 may include dampers or other flow control elements that can be operated to control an amount of the supply airflow provided to individual zones of building 10 .
- airside system 130 delivers the supply airflow into one or more zones of building 10 (e.g., via air supply ducts 112 ) without using intermediate VAV units 116 or other flow control elements.
- AHU 106 may include various sensors (e.g., temperature sensors, pressure sensors, etc.) configured to measure attributes of the supply airflow.
- AHU 106 may receive input from sensors located within AHU 106 and/or within the building zone and may adjust the flow rate, temperature, or other attributes of the supply airflow through AHU 106 to achieve setpoint conditions for the building zone.
- energy plant 200 may include various types of equipment configured to serve the thermal and electrical energy loads of a building or campus (i.e., a system of buildings).
- energy plant 200 may include heaters, chillers, heat recovery chillers, cooling towers, or other types of equipment configured to serve the heating and/or cooling loads of a building or campus.
- Energy plant 200 may consume resources from a utility (e.g., electricity, water, natural gas, etc.) to heat or cool a working fluid that is circulated to one or more buildings or stored for later use (e.g., in thermal energy storage tanks) to provide heating or cooling for the buildings.
- energy plant 200 may supplement or replace waterside system 120 in building 10 or may be implemented separate from building 10 (e.g., at an offsite location, distributed across multiple buildings, etc.).
- Energy plant 200 is shown to include a plurality of subplants 202 - 210 including a first chiller subplant 202 , a second chiller subplant 204 , a third chiller subplant 206 , a steam subplant 208 , and a cogeneration subplant 210 .
- Subplants 202 - 210 consume resources from utilities to serve the thermal and electrical energy loads (e.g., hot water, cold water, heating, cooling, steam, electricity, etc.) of a building or campus.
- chiller subplants 202 - 206 may be configured to chill water in a cold water loop that circulates the cold water between chiller subplants 202 - 206 campus 216 .
- Steam subplant 208 may be configured to generate steam and circulate the steam in a steam loop between steam subplant 208 and campus 216 .
- Cogeneration subplant 210 can be configured to cogenerate both steam and electricity (e.g., by operating one or more combustion turbines 230 ).
- Each of subplants 202 - 210 may include a variety of equipment configured to facilitate the functions of the subplant.
- chiller subplants 202 - 206 are shown to include a plurality of electric chillers 218 , 222 , and 226 and steam chillers 220 , 224 , and 228 .
- Electric chillers 218 , 222 , and 226 can be configured to remove heat from the cold water in the cold water loop
- steam chillers 220 , 224 , and 228 can be configured to cool the steam generated by boilers 232 and/or combustion turbines 230 .
- Steam subplant 208 may include one or more boilers 232 configured to boil water to produce steam.
- Cogeneration subplant 210 may include one or more combustion turbines 230 configured to generate both steam and electricity.
- steam subplant 208 burns gas from a gas supply 214 .
- Chiller subplants 202 - 206 may consume electricity from an electricity supply 212 to generate the chilled water.
- System 300 is shown to include an energy optimization system (EOS) 302 , a building automation system (BAS) 308 , and a plurality of subplants 202 - 210 .
- Subplants 202 - 210 may be the same as previously described with reference to FIG. 2 .
- subplants 202 - 210 are shown to include a first chiller subplant 202 , a second chiller subplant 204 , a third chiller subplant 206 , a steam subplant 208 , and a cogeneration subplant 210 .
- Each of subplants 202 - 210 is shown to include equipment 340 that can be controlled by EOS 302 and/or building automation system 308 to optimize the performance of energy plant 200 .
- Equipment 340 may include, for example, heating devices, chillers, heat recovery heat exchangers, cooling towers, thermal energy storage devices, pumps, valves, and/or other devices of subplants 202 - 210 (e.g., electric chillers 218 , 222 , and 226 , steam chillers 220 , 224 , and 228 , combustion turbines 230 , and/or boilers 232 ).
- Individual devices of equipment 340 can be turned on or off to adjust the thermal or electrical energy load served by each of subplants 202 - 210 .
- individual devices of equipment 340 can be operated at variable capacities (e.g., operating a chiller at 10% capacity or 60% capacity) according to an operating setpoint received from EOS 302 .
- one or more of subplants 202 - 210 includes a subplant level controller configured to control the equipment 340 of the corresponding subplant.
- EOS 302 may determine an on/off configuration and global operating setpoints for equipment 340 .
- the subplant controllers may turn individual devices of equipment 340 on or off, and implement specific operating setpoints (e.g., damper position, vane position, fan speed, pump speed, etc.) to reach or maintain the global operating setpoints.
- the subplant level controllers receive subplant load setpoints from EOS 302 .
- Each subplant level controller may use the subplant load setpoint for the corresponding subplant to select one or more devices of the equipment 340 within the subplant to activate or deactivate in order to meet the subplant load setpoint in an energy-efficient manner.
- the equipment selection and staging decisions i.e., deciding which devices to turn on/off are performed by a low level optimizer 332 within EOS 302 .
- BAS 308 may be configured to monitor conditions within a controlled building or building zone.
- BAS 308 may receive input from various sensors (e.g., temperature sensors, humidity sensors, airflow sensors, voltage sensors, etc.) distributed throughout the building and may report building conditions to EOS 302 .
- Building conditions may include, for example, a temperature of the building or a zone of the building, a power consumption (e.g., electric load) of the building, a state of one or more actuators configured to affect a controlled state within the building, or other types of information relating to the controlled building.
- BAS 308 may operate subplants 202 - 210 to affect the monitored conditions within the building and/or to serve the thermal/electrical energy loads of the building.
- BAS 308 may receive control signals from EOS 302 specifying on/off states and/or setpoints for equipment 340 .
- BAS 308 may control equipment 340 (e.g., via actuators, power relays, etc.) in accordance with the control signals provided by EOS 302 .
- BAS 308 may operate equipment 340 using closed loop control to achieve the setpoints specified by EOS 302 .
- BAS 308 may be combined with EOS 302 or may be part of a separate building automation system.
- BAS 308 is a METASYS® brand building automation system, as sold by Johnson Controls, Inc.
- BAS 308 is a controller that operates to control equipment 340 and/or operates equipment 340 to achieve the setpoints specified by EOS 302 (i.e., the setpoints generated by low level optimizer 332 ).
- EOS 302 may monitor the status of the controlled building using information received from BAS 308 .
- EOS 302 may be configured to predict the thermal/electrical energy loads (e.g., heating loads, cooling loads, electric, etc.) of the building for plurality of time steps in a prediction window (e.g., using weather forecasts from a weather service 324 ).
- EOS 302 may generate on/off decisions and/or setpoints for equipment 340 to minimize the cost of energy consumed by subplants 202 - 210 to serve the predicted heating and/or cooling loads for the duration of the prediction window.
- EOS 302 may be integrated within a single computer (e.g., one server, one housing, etc.) or distributed across multiple servers or computers.
- EOS 302 is integrated with a smart building manager that manages multiple building systems and/or combined with BAS 308 .
- EOS 302 may be configured to operate in multiple different operating modes including an automatic mode, an advisory mode, and a manual mode.
- EOS 302 may automatically control energy plant 200 .
- EOS 302 may automatically determine optimal subplant loads for each of subplants 202 - 210 .
- EOS 302 may use the optimal subplant loads to determine optimal on/off decisions and operating setpoints for individual devices of equipment 340 .
- EOS 302 may provide the control signals to BAS 308 and/or equipment 340 to control equipment 340 without requiring user intervention or input.
- BAS 308 may relay the control signals to subplants 202 - 210 or may be bypassed entirely.
- EOS 302 may automatically control energy plant 200 in accordance with the optimized load setpoints and/or equipment setpoints when operated in the automatic mode.
- the automatic mode is described in greater detail with reference to FIGS. 5-6 .
- BAS 308 may control energy plant 200 , whereas EOS 302 may provide advice.
- EOS 302 may still determine optimal subplant loads for each of subplants 202 - 210 and optimal on/off decisions and operating setpoints for equipment 340 .
- the optimal values determined by EOS 302 may be provided to BAS 308 as recommended subplant loads and recommended setpoints.
- the recommended loads and setpoints may also be presented to a user via a user interface.
- BAS 308 may determine whether to use the recommended loads and setpoints to control energy plant 200 .
- BAS 308 uses input from a user to determine whether to apply the recommended loads and setpoints provided by EOS 302 .
- EOS 302 displays the recommended loads/setpoints to a user and the user enters the recommended loads/setpoints as an input to BAS 308 .
- BAS 308 receives the recommended loads/setpoints directly from EOS 302 .
- the advisory mode is described in greater detail with reference to FIGS. 7-8 .
- EOS 302 may control energy plant 200 based on user input. Similar to the advisory mode, EOS 302 may determine optimal subplant loads for each of subplants 202 - 210 and optimal on/off decisions and operating setpoints for equipment 340 . The optimal values determined by EOS 302 may be presented to a user (e.g., via a user interface) as recommended subplant loads and recommended setpoints. A user can accept the optimized values or enter user-defined (i.e., “manual”) values for the subplant loads, equipment on/off decisions, and/or operating setpoints via the user interface. In some embodiments, the user-defined values override the optimized values when EOS 302 is operated in the manual mode.
- user-defined values i.e., “manual”
- EOS 302 may determine on/off decisions and control setpoints for equipment 340 based on the user-defined load setpoints for each of subplants 302 - 312 .
- the manual mode is described in greater detail with reference to FIGS. 9-10 .
- EOS 302 is shown to include a communications interface 304 and a processing circuit 306 .
- Communications interface 304 may include wired or wireless interfaces (e.g., jacks, antennas, transmitters, receivers, transceivers, wire terminals, etc.) for conducting data communications with various systems, devices, or networks.
- communications interface 304 may include an Ethernet card and port for sending and receiving data via an Ethernet-based communications network and/or a Wi-Fi transceiver for communicating via a wireless communications network.
- Communications interface 304 may be configured to communicate via local area networks or wide area networks (e.g., the Internet, a building WAN, etc.) and may use a variety of communications protocols (e.g., BACnet, IP, LON, etc.).
- Communications interface 304 may be a network interface configured to facilitate electronic data communications between EOS 302 and various external systems or devices (e.g., BAS 308 , subplants 202 - 210 , etc.).
- EOS 302 may receive information from BAS 308 indicating one or more measured states of the controlled building (e.g., temperature, humidity, electric loads, etc.) and one or more states of subplants 202 - 210 (e.g., equipment status, power consumption, equipment availability, etc.).
- Communications interface 304 may receive inputs from BAS 308 and/or subplants 202 - 210 and may provide operating parameters (e.g., on/off decisions, setpoints, etc.) to subplants 202 - 210 via BAS 308 .
- the operating parameters may cause subplants 202 - 210 to activate, deactivate, or adjust a setpoint for various devices of equipment 340 .
- processing circuit 306 is shown to include a processor 310 and memory 312 .
- Processor 310 may be a general purpose or specific purpose processor, an application specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGAs), a group of processing components, or other suitable processing components.
- ASIC application specific integrated circuit
- FPGAs field programmable gate arrays
- Processor 310 may be configured to execute computer code or instructions stored in memory 312 or received from other computer readable media (e.g., CDROM, network storage, a remote server, etc.).
- Memory 312 may include one or more devices (e.g., memory units, memory devices, storage devices, etc.) for storing data and/or computer code for completing and/or facilitating the various processes described in the present disclosure.
- Memory 312 may include random access memory (RAM), read-only memory (ROM), hard drive storage, temporary storage, non-volatile memory, flash memory, optical memory, or any other suitable memory for storing software objects and/or computer instructions.
- Memory 312 may include database components, object code components, script components, or any other type of information structure for supporting the various activities and information structures described in the present disclosure.
- Memory 312 may be communicably connected to processor 310 via processing circuit 306 and may include computer code for executing (e.g., by processor 310 ) one or more processes described herein.
- memory 312 is shown to include a building status monitor 334 .
- EOS 302 may receive data regarding the overall building or building space to be heated or cooled with energy plant 200 via building status monitor 334 .
- building status monitor 334 may include a graphical user interface component configured to provide graphical user interfaces to a user for selecting building requirements (e.g., overall temperature parameters, selecting schedules for the building, selecting different temperature levels for different building zones, etc.).
- EOS 302 may determine on/off configurations and operating setpoints to satisfy the building requirements received from building status monitor 334 .
- building status monitor 334 receives, collects, stores, and/or transmits cooling load requirements, building temperature setpoints, occupancy data, weather data, energy data, schedule data, and other building parameters.
- building status monitor 334 stores data regarding energy costs, such as pricing information available from utilities 326 (energy charge, demand charge, etc.).
- memory 312 is shown to include a load/rate predictor 322 .
- Load/rate predictor 322 is shown receiving weather forecasts from a weather service 324 .
- load/rate predictor 322 predicts the energy loads ⁇ circumflex over (l) ⁇ k as a function of the weather forecasts.
- load/rate predictor 322 uses feedback from BAS 308 to predict loads ⁇ circumflex over (l) ⁇ k .
- Feedback from BAS 308 may include various types of sensory inputs (e.g., temperature, flow, humidity, enthalpy, etc.) or other data relating to the controlled building (e.g., inputs from a HVAC system, a lighting control system, a security system, a water system, etc.).
- sensory inputs e.g., temperature, flow, humidity, enthalpy, etc.
- other data relating to the controlled building e.g., inputs from a HVAC system, a lighting control system, a security system, a water system, etc.
- load/rate predictor 322 receives a measured electric load and/or previous measured load data from BAS 308 (e.g., via building status monitor 334 ).
- Load/rate predictor 322 may predict loads ⁇ circumflex over (l) ⁇ k as a function of a given weather forecast ( ⁇ circumflex over ( ⁇ ) ⁇ w ), a day type (day), the time of day (t), and previous measured load data (Y k-1 ).
- ⁇ circumflex over (l) ⁇ k may be used as a function of a given weather forecast ( ⁇ circumflex over ( ⁇ ) ⁇ w ), a day type (day), the time of day (t), and previous measured load data (Y k-1 ).
- load/rate predictor 322 uses a deterministic plus stochastic model trained from historical load data to predict loads ⁇ circumflex over (l) ⁇ k .
- Load/rate predictor 322 may use any of a variety of prediction methods to predict loads ⁇ circumflex over (l) ⁇ k (e.g., linear regression for the deterministic portion and an AR model for the stochastic portion).
- Load/rate predictor 322 may predict one or more different types of loads for the building or campus. For example, load/rate predictor 322 may predict a hot water load ⁇ circumflex over (l) ⁇ Hot,k and a cold water load ⁇ circumflex over (l) ⁇ Cold,k for each time step k within the prediction window.
- Load/rate predictor 322 is shown receiving utility rates from utilities 326 .
- Utility rates may indicate a cost or price per unit of a resource (e.g., electricity, natural gas, water, etc.) provided by utilities 326 at each time step k in the prediction window.
- the utility rates are time-variable rates.
- the price of electricity may be higher at certain times of day or days of the week (e.g., during high demand periods) and lower at other times of day or days of the week (e.g., during low demand periods).
- the utility rates may define various time periods and a cost per unit of a resource during each time period.
- Utility rates may be actual rates received from utilities 326 or predicted utility rates estimated by load/rate predictor 322 .
- the utility rates include demand charges for one or more resources provided by utilities 326 .
- a demand charge may define a separate cost imposed by utilities 326 based on the maximum usage of a particular resource (e.g., maximum energy consumption) during a demand charge period.
- the utility rates may define various demand charge periods and one or more demand charges associated with each demand charge period. In some instances, demand charge periods may overlap partially or completely with each other and/or with the prediction window.
- energy plant optimizer 328 may be configured to account for demand charges in the high level optimization process performed by high level optimizer 330 .
- Utilities 326 may be defined by time-variable (e.g., hourly) prices, a maximum service level (e.g., a maximum rate of consumption allowed by the physical infrastructure or by contract) and, in the case of electricity, a demand charge or a charge for the peak rate of consumption within a certain period.
- time-variable e.g., hourly
- maximum service level e.g., a maximum rate of consumption allowed by the physical infrastructure or by contract
- electricity e.g., a demand charge or a charge for the peak rate of consumption within a certain period.
- Load/rate predictor 322 may store the predicted loads ⁇ circumflex over (l) ⁇ k and the utility rates in memory 312 and/or provide the predicted loads ⁇ circumflex over (l) ⁇ k and the utility rates to energy plant optimizer 328 .
- Energy plant optimizer 328 may use the predicted loads ⁇ circumflex over (l) ⁇ k and the utility rates to determine an optimal load distribution for subplants 202 - 210 and to generate on/off decisions and setpoints for equipment 340 .
- memory 312 is shown to include an energy plant optimizer 328 .
- Energy plant optimizer 328 may perform a cascaded optimization process to optimize the performance of energy plant 200 .
- energy plant optimizer 328 is shown to include a high level optimizer 330 and a low level optimizer 332 .
- High level optimizer 330 may control an outer (e.g., subplant level) loop of the cascaded optimization.
- High level optimizer 330 may determine an optimal distribution of energy loads across subplants 202 - 210 for each time step in the prediction window in order to optimize (e.g., minimize) the cost of energy consumed by subplants 202 - 210 .
- Low level optimizer 332 may control an inner (e.g., equipment level) loop of the cascaded optimization.
- Low level optimizer 332 may determine how to best run each subplant at the load setpoint determined by high level optimizer 330 .
- low level optimizer 332 may determine on/off states and/or operating setpoints for various devices of equipment 340 in order to optimize (e.g., minimize) the energy consumption of each subplant while meeting the energy load setpoint for the subplant.
- the cascaded optimization process is described in greater detail with reference to FIG. 4 .
- memory 312 is shown to include a subplant monitor 338 .
- Subplant monitor 338 may collect and store information regarding the past, current, and future (e.g., planned) utilization of subplants 202 - 210 .
- subplant monitor 338 may receive actual utilization data from BAS 308 and/or energy plant 200 indicating the actual energy loads served by subplants 202 - 210 .
- the actual utilization data may be current utilization data (e.g., the actual energy loads currently being served) or past utilization data (e.g., the actual energy loads served at a previous time).
- the actual utilization data indicates a total heating load and/or a total cooling load requested to be served by energy plant 200 at a past or current time.
- the actual utilization data may also indicate any unmet heating and/or cooling load that is requested but not met by energy plant 200 at a past or current time.
- the actual utilization data indicates a past or current rate of utility consumption (e.g., water consumption, electricity consumption, natural gas consumption, photovoltaic energy consumption, etc.).
- the actual utilization data may be provided at various levels of granularity.
- the actual utilization data for a given subplant e.g., chiller subplant 202
- the actual utilization data may be provided for each of the individual devices within subplants 202 - 210 (e.g., the cooling load served by each of the chillers individually).
- subplant monitor 338 receives the actual utilization data as a continuous data signal. In other embodiments, subplant monitor 338 receives the actual utilization data at regular intervals (e.g., every minute, every fifteen minutes, every hour, etc.). Subplant monitor 338 may store the actual utilization data in memory 312 or in a separate subplant utilization database. In some embodiments, subplant monitor 338 stores the actual utilization data at regular intervals such that the stored utilization data represents a history of the relevant operating information for energy plant 200 over time.
- Subplant monitor 338 may receive predicted future utilization data indicating the thermal and electrical energy loads to be served by subplants 202 - 210 at a future time.
- the predicted utilization data for subplants 202 - 210 is generated by energy plant optimizer 328 for multiple time steps during a prediction window.
- the predicted utilization data may include the optimal subplant loads predicted by high level optimizer 330 and/or the optimal equipment on/off states predicted by low level optimizer 332 for each time step during the prediction window.
- the predicted utilization data indicates a total heating load and/or a total cooling load predicted by load/rate predictor 322 .
- the predicted utilization data may also indicate any unmet heating and/or cooling load that is predicted to be requested but not met by energy plant 200 .
- the predicted utilization data indicates a predicted rate of utility consumption (e.g., water consumption, electricity consumption, natural gas consumption, photovoltaic energy consumption, etc.).
- the predicted utilization data may be provided at various levels of granularity.
- the predicted utilization data for a given subplant e.g., chiller subplant 202
- the predicted utilization data may be provided for each of the individual devices within subplants 202 - 210 (e.g., the predicted cooling load served by each of the chillers individually).
- subplant monitor 338 receives the predicted utilization data for each of a plurality of time steps during a prediction window.
- energy plant optimizer 328 may perform an optimization process (described in greater detail with reference to FIG. 4 ) to generate subplant load values for each time step during a prediction window that extends from the current time to a predetermined prediction horizon.
- Each time step may have a defined duration (e.g., fifteen minutes, one hour, etc.).
- the predicted subplant load values may be updated each time the optimization process is performed.
- Subplant monitor 338 may store the predicted utilization data in memory 312 or in a separate subplant utilization database. In some embodiments, subplant monitor 338 stores the predicted utilization data at regular intervals (e.g., hourly intervals) such that the stored utilization data represents a planned dispatch schedule for energy plant 200 over time.
- Monitoring and reporting applications 336 may be configured to generate real time system health dashboards that can be viewed and navigated by a user (e.g., an energy plant engineer).
- monitoring and reporting applications 336 may include a web-based monitoring application with several graphical user interface (GUI) elements (e.g., widgets, dashboard controls, windows, etc.) for displaying key performance indicators (KPI) or other information to users of a GUI.
- GUI graphical user interface
- the GUI elements include a chart or graph (e.g., a dispatch bar chart) that represents the actual and predicted utilization data provided by subplant monitor 338 .
- GUI elements or reports may be generated and shown based on actual and predicted utilization data that allow users to monitor the performance of subplants 202 - 210 and energy plant 200 as a whole using a single screen.
- An exemplary dispatch GUI that may be generated by monitoring and reporting applications 336 is described in greater detail with reference to FIGS. 11-37 .
- EOS 302 may include one or more GUI servers, web services 314 , or GUI engines 316 to support monitoring and reporting applications 336 .
- applications 336 , web services 314 , and GUI engine 316 may be provided as separate components outside of EOS 302 (e.g., as part of a smart building manager).
- EOS 302 may be configured to maintain detailed historical databases (e.g., relational databases, XML databases, etc.) of relevant data and includes computer code modules that continuously, frequently, or infrequently query, aggregate, transform, search, or otherwise process the data maintained in the detailed databases.
- EOS 302 may be configured to provide the results of any such processing to other databases, tables, XML files, or other data structures for further querying, calculation, or access by, for example, external monitoring and reporting applications.
- EOS 302 is shown to include configuration tools 318 .
- Configuration tools 318 can allow a user to define (e.g., via graphical user interfaces, via prompt-driven wizards, etc.) how EOS 302 should react to changing conditions in the energy plant subsystems.
- configuration tools 318 allow a user to build and store condition-response scenarios that can cross multiple energy plant devices, multiple building systems, and multiple enterprise control applications (e.g., work order management system applications, entity resource planning applications, etc.).
- configuration tools 318 can provide the user with the ability to combine data (e.g., from subsystems, from event histories) using a variety of conditional logic.
- conditional logic can range from simple logical operators between conditions (e.g., AND, OR, XOR, etc.) to pseudo-code constructs or complex programming language functions (allowing for more complex interactions, conditional statements, loops, etc.).
- Configuration tools 318 can present user interfaces for building such conditional logic.
- the user interfaces may allow users to define policies and responses graphically.
- the user interfaces may allow a user to select a pre-stored or pre-constructed policy and adapt it or enable it for use with their system.
- FIG. 4 a block diagram illustrating a portion of energy plant system 300 in greater detail is shown, according to an exemplary embodiment.
- FIG. 4 illustrates the cascaded optimization process performed by energy plant optimizer 328 to optimize the performance of energy plant 200 .
- high level optimizer 330 performs a subplant level optimization that determines an optimal distribution of thermal and electrical energy loads across subplants 202 - 210 for each time step in the prediction window in order to minimize the cost of energy consumed by subplants 202 - 210 .
- Low level optimizer 332 performs an equipment level optimization that determines how to best run each subplant at the subplant load setpoint determined by high level optimizer 330 .
- low level optimizer 332 may determine on/off states and/or operating setpoints for various devices of equipment 340 in order to optimize the energy consumption of each subplant while meeting the thermal and/or electrical energy load setpoint for the subplant.
- One advantage of the cascaded optimization process performed by energy plant optimizer 328 is the optimal use of computational time.
- the subplant level optimization performed by high level optimizer 330 may use a relatively long time horizon due to the operation of the thermal energy storage.
- the equipment level optimization performed by low level optimizer 332 may use a much shorter time horizon or no time horizon at all since the low level system dynamics are relatively fast (compared to the dynamics of the thermal energy storage) and the low level control of equipment 340 may be handled by BAS 308 .
- Such an optimal use of computational time makes it possible for energy plant optimizer 328 to perform the energy plant optimization in a short amount of time, allowing for real-time predictive control.
- the short computational time enables energy plant optimizer 328 to be implemented in a real-time planning tool with interactive feedback.
- the cascaded configuration provides a layer of abstraction that allows high level optimizer 330 to distribute the energy loads across subplants 202 - 210 without requiring high level optimizer 330 to know or use any details regarding the particular equipment configuration within each subplant.
- the interconnections between equipment 340 within each subplant may be hidden from high level optimizer 330 and handled by low level optimizer 332 .
- each subplant may be completely defined by one or more subplant curves 342 .
- Low level optimizer 332 may generate and provide subplant curves 342 to high level optimizer 330 .
- Subplant curves 342 may indicate the rate of utility use by each of subplants 202 - 210 (e.g., electricity use measured in kW, water use measured in L/s, etc.) as a function of the subplant load.
- low level optimizer 332 generates subplant curves 342 based on equipment models 320 (e.g., by combining equipment models 320 for individual devices into an aggregate curve for the subplant).
- Low level optimizer 332 may generate subplant curves 342 by running the low level optimization process for several different loads and weather conditions to generate multiple data points.
- Low level optimizer 332 may fit a curve to the data points to generate subplant curves 342 .
- low level optimizer 332 provides the data points to high level optimizer 330 and high level optimizer 330 generates the subplant curves using the data points.
- High level optimizer 330 may receive the load and rate predictions from load/rate predictor 322 and the subplant curves 342 from low level optimizer 332 .
- the load predictions may be based on weather forecasts from weather service 324 and/or information from building automation system 308 (e.g., a current electric load of the building, measurements from the building, a history of previous loads, a setpoint trajectory, etc.).
- the utility rate predictions may be based on utility rates received from utilities 326 and/or utility prices from another data source.
- High level optimizer 330 may determine the optimal load distribution for subplants 202 - 210 (e.g., a subplant load for each subplant) for each time step the prediction window and may provide the subplant loads as setpoints to low level optimizer 332 .
- high level optimizer 330 determines the subplant loads by minimizing the total operating cost of energy plant 200 over the prediction window. In other words, given a predicted load and utility rate information from load/rate predictor 322 , high level optimizer 330 may distribute the predicted load across subplants 202 - 210 over the optimization period to minimize operating cost.
- the optimal load distribution may include using thermal energy storage to store thermal energy during a first time step for use during a later time step.
- Thermal energy storage may advantageously allow thermal energy to be produced and stored during a first time period when energy prices are relatively low and subsequently retrieved and used during a second time period when energy proves are relatively high.
- the high level optimization may be different from the low level optimization in that the high level optimization has a longer time constant due to the thermal energy storage provided by thermal energy storage.
- the high level optimization may be described by the following equation:
- ⁇ HL * arg ⁇ ⁇ min ⁇ HL ⁇ J HL ⁇ ( ⁇ HL )
- ⁇ * HL contains the optimal high level decisions (e.g., the optimal load for each of subplants 202 - 210 ) for the entire optimization period and J HL is the high level cost function.
- high level optimizer 330 may minimize the high level cost function J HL .
- the high level cost function J HL may be the sum of the economic (e.g., monetary) costs of each utility consumed by each of subplants 202 - 210 for the duration of the optimization period.
- the high level cost function J HL may be described using the following equation:
- n h is the number of time steps k in the optimization period
- n s is the number of subplants
- t s is the duration of a time step
- c jk is the economic cost of utility j at a time step k of the optimization period
- u jik is the rate of use of utility j by subplant i at time step k.
- the cost function J HL includes an additional demand charge term such as:
- the high level cost function J HL may be described by the equation:
- the decision vector ⁇ HL may be subject to several constraints.
- the constraints may require that the subplants not operate at more than their total capacity, that the thermal storage not charge or discharge too quickly or under/over flow for the tank, and that the energy loads for the building or campus are met. These restrictions may lead to both equality and inequality constraints on the high level optimization problem.
- the high level optimization performed by high level optimizer 330 is the same or similar to the high level optimization process described in U.S. patent application Ser. No. 14/634,609 filed Feb. 27, 2015 and titled “High Level Energy plant Optimization,” the entire disclosure of which is incorporated by reference herein.
- High level optimizer 330 may include some or all of the features and/or functionality of the high level optimization module described in U.S. patent application Ser. No. 14/634,609.
- low level optimizer 332 may use the subplant loads determined by high level optimizer 330 to determine optimal low level decisions ⁇ * LL (e.g. binary on/off decisions, flow setpoints, temperature setpoints, etc.) for equipment 340 .
- the low level optimization process may be performed for each of subplants 202 - 210 .
- the low level optimization process may be performed by centralized low level optimizer 332 that performs a separate low level optimization for each of subplants 202 - 210 or by a set of subplant level controllers that operate within each subplant (e.g., each subplant controller running an instance of low level optimizer 332 ).
- Low level optimizer 332 may be responsible for determining which devices of the subplant to use and/or the operating setpoints for such devices that will achieve the subplant load setpoint while minimizing energy consumption.
- the low level optimization may be described using the following equation:
- ⁇ LL * arg ⁇ ⁇ min ⁇ LL ⁇ J LL ⁇ ( ⁇ LL )
- low level optimizer 332 may minimize the low level cost function J LL .
- the low level cost function J LL may represent the total energy consumption for all of equipment 340 in the applicable subplant.
- the low level cost function J LL may be described using the following equation:
- N is the number of devices of equipment 340 in the subplant
- t s is the duration of a time step
- u j is the energy used by device j as a function of the setpoint ⁇ LL .
- Each device may have continuous variables which can be changed to determine the lowest possible energy consumption for the overall input conditions.
- Low level optimizer 332 may minimize the low level cost function J LL subject to inequality constraints based on the capacities of equipment 340 and equality constraints based on energy and mass balances.
- the optimal low level decisions ⁇ * LL are constrained by switching constraints defining a short horizon for maintaining a device in an on or off state after a binary on/off switch. The switching constraints may prevent devices from being rapidly cycled on and off.
- low level optimizer 332 performs the equipment level optimization without considering system dynamics. The optimization process may be slow enough to safely assume that the equipment control has reached its steady-state. Thus, low level optimizer 332 may determine the optimal low level decisions ⁇ * LL at an instance of time rather than over a long horizon.
- the optimal low level decisions ⁇ * LL are constrained by an equipment staging coordinator 344 that prevents two or more of subplants 202 - 210 from reacting to a change in the subplant load too quickly after a change in another of subplants 202 - 210 has occurred.
- equipment staging coordinator 344 is shown receiving equipment status information from BAS 308 .
- Equipment staging coordinator 344 may use the equipment status information to determine when the equipment 340 within a given subplant has been staged (e.g., turned on/off).
- Equipment staging coordinator 344 may prevent multiple subplants from staging their equipment 340 simultaneously or within a predetermined time period after another subplant has staged its equipment 340 .
- this functionality reduces the peak energy consumption for energy plant 200 at any instant in time and results in a lower demand charge.
- equipment staging coordinator 344 causes low level optimizer 332 to halt its efficiency calculations and hold the optimal low level decisions ⁇ * LL for a given subplant at previously-determined values shortly after the equipment 340 for another subplant has been staged (e.g., by providing a freeze signal to low level optimizer 332 ). Once a threshold time has passed since the equipment 340 for the other subplant has been staged, equipment staging coordinator 344 may allow low level optimizer 332 to resume its efficiency calculations and to determine new values for the optimal low level decisions ⁇ * LL (e.g., by withdrawing the freeze signal).
- Low level optimizer 332 may determine optimum operating statuses (e.g., on or off) for a plurality of devices of equipment 340 .
- the on/off combinations may be determined using binary optimization and quadratic compensation.
- Binary optimization may minimize a cost function representing the power consumption of devices in the applicable subplant.
- non-exhaustive (i.e., not all potential combinations of devices are considered) binary optimization is used.
- Quadratic compensation may be used in considering devices whose power consumption is quadratic (and not linear).
- Low level optimizer 332 may also determine optimum operating setpoints for equipment using nonlinear optimization. Nonlinear optimization may identify operating setpoints that further minimize the low level cost function J LL .
- Low level optimizer 332 may provide the on/off decisions and setpoints to building automation system 308 for use in controlling the energy plant equipment 340 .
- the low level optimization performed by low level optimizer 332 is the same or similar to the low level optimization process described in U.S. patent application Ser. No. 14/634,615 filed Feb. 27, 2015 and titled “Low Level Energy plant Optimization,” the entire disclosure of which is incorporated by reference herein.
- Low level optimizer 332 may include some or all of the features and/or functionality of the low level optimization module described in U.S. patent application Ser. No. 14/634,615.
- EOS 302 may determine optimal subplant loads and optimal equipment setpoints in each of the operating modes.
- EOS 302 may provide the optimal equipment setpoints to energy plant 200 .
- EOS 302 may provide the optimal subplant loads and equipment setpoints to a user interface as recommended setpoints for energy plant 200 .
- a user may view the recommended setpoints and provide user-defined setpoints for building automation system 308 , which may or may not be based on the recommended setpoints.
- EOS 302 may control energy plant 200 based on manual (i.e., user-defined) subplant loads received via a user interface of EOS 302 .
- EOS 302 may use the manual subplant loads to generate recommended equipment setpoints and equipment control signals that achieve the manual subplant loads. The equipment control signals may then be provided to energy plant 200 .
- Each of these operating modes is discussed in greater detail below.
- EOS 302 automatically determines optimal subplant loads for each of subplants 202 - 210 and optimal equipment setpoints for the energy plant equipment 340 .
- EOS 302 provides the optimal equipment setpoints to energy plant 200 , which uses the optimal equipment setpoints to control the energy plant equipment 340 .
- EOS 302 monitors actual subplant utilization via subplant monitor 338 and stores planned and actual subplant utilization data in a subplant utilization database 502 .
- a dispatch GUI generator 506 uses the planned and actual subplant utilization data to generate a dispatch GUI 902 .
- Dispatch GUI 902 may be presented to a user via a user interface 504 to allow the user to monitor the operation of energy plant 200 .
- System 500 is shown to include high level optimizer 330 , low level optimizer 332 , and energy plant 200 , which may be the same or similar as described with reference to FIGS. 2-4 .
- high level optimizer 330 may perform an optimization process to generate a set of optimal subplant loads for each of subplants 202 - 210 .
- the optimal subplant loads include a total cold requested load and a total hot requested load.
- the optimal subplant loads include an unmet heating load and/or an unmet cooling load.
- the unmet heating load may be defined as the amount by which the total requested heating load exceeds the sum of the heating loads produced by subplants 202 - 210 .
- the unmet cooling load may be defined as the amount by which the total requested cooling load exceeds the sum of the cooling loads produced by subplants 202 - 210 .
- the optimal subplant loads include an optimal amount of one or more resources (e.g., water, electricity, natural gas, etc.) consumed by subplants 202 - 210 to generate the optimal subplant loads.
- High level optimizer 330 may determine the optimal subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.). The optimal subplant loads may be updated with each iteration of the high level optimization process. High level optimizer 330 may provide the optimal subplant loads to low level optimizer 332 and to subplant monitor 338 . Subplant monitor 338 may store the optimal subplant loads as planned subplant utilization data in a subplant utilization database 502 .
- Low level optimizer 332 may use the optimal subplant loads to generate a set of optimal equipment setpoints for the equipment of subplants 202 - 210 .
- the optimal equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202 - 210 .
- the optimal equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the optimal subplant load.
- low level optimizer 332 performs an optimization process to generate the optimal equipment setpoints. Low level optimizer 332 may provide the optimal equipment setpoints to energy plant 200 and to subplant monitor 338 .
- Subplant monitor 338 may store the optimal equipment setpoints as planned subplant utilization data in subplant utilization database 502 .
- subplant utilization database 502 may be a component of EOS 302 (e.g., memory 312 ) or a separate database outside EOS 302 .
- Energy plant 200 may use the optimal equipment setpoints to operate the equipment of subplants 202 - 210 .
- Energy plant 200 may monitor the utilization of subplants 202 - 210 and generate a set of actual subplant utilization data.
- the actual subplant utilization data may include actual values (rather than optimal values) for each of the subplant loads optimized by high level optimizer 330 .
- the actual subplant utilization data include a total cold requested load and a total hot requested load.
- the actual subplant utilization data include an actual unmet heating load and/or unmet cooling load.
- the actual subplant utilization data include an actual amount of one or more resources (e.g., water, electricity, natural gas, etc.) consumed by subplants 202 - 210 to generate the actual subplant loads.
- Energy plant 200 may report the actual subplant utilization data to subplant monitor 338 .
- energy plant 200 reports the actual subplant utilization data at regular intervals (e.g., once every fifteen minutes, once per hour, etc.)
- Subplant monitor 338 may store the actual subplant utilization data in subplant utilization database 502 .
- subplant monitor 338 overwrites or replaces the planned subplant utilization data for a given time step with the actual subplant utilization data for the time step once the actual subplant utilization data for the time step is available (e.g., once the current time advances to the time step).
- subplant monitor 338 may overwrite or replace the planned subplant data for a given time step with an updated optimal value for the time step each time a new set of optimal subplant utilization data is generated by high level optimizer 330 .
- subplant monitor 338 supplements the existing planned subplant utilization data with the updated optimal subplant utilization data and/or the actual subplant utilization data without replacing or overwriting the exiting subplant utilization data.
- the existing subplant utilization data may be stored as a first version of the subplant utilization data and the updated subplant utilization data may be stored as a second version of the subplant utilization data.
- system 500 is shown to include a dispatch GUI generator 506 .
- Dispatch GUI generator 506 may access the data stored in subplant utilization database 502 and use the stored data to generate a dispatch GUI.
- Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the planned subplant utilization data (e.g., future subplant loads) in a graphical format.
- Exemplary dispatch GUIs which may be generated by dispatch GUI generator 506 are described in greater detail with reference to FIGS. 11-37 .
- Dispatch GUI generator 506 may provide dispatch GUI 902 to a user interface 504 for presentation to a user.
- dispatch GUI generator 506 and user interface 504 may be components of BAS 308 or components of EOS 302 (e.g., monitoring and reporting applications 336 ).
- Dispatch GUI generator 506 may generate dispatch GUI 902 and provide dispatch GUI 902 to user interface 504 via a communications network.
- dispatch GUI generator 506 and user interface 504 are components of a user device (e.g., a computer terminal, a workstation, a laptop, a tablet, a smartphone, etc.).
- dispatch GUI generator 506 may be a web browser or a specialized application running on the user device.
- dispatch GUI 902 is rendered using specialized viewing software (e.g., an energy plant monitoring application) installed on the user device.
- dispatch GUI 902 is provided via a web interface which allows dispatch GUI 902 to be rendered and viewed using a web browser without requiring any specialized applications or software to be installed on the user device.
- Process 600 may be performed by one or more components of energy plant system 300 and/or system 500 as previously described.
- process 600 may be performed by EOS 302 , BAS 308 , dispatch GUI generator 506 , and/or other devices of energy plant system 300 or system 500 .
- Process 600 is shown to include determining optimal subplant loads for a plurality of subplants of an energy plant (step 602 ).
- Step 602 may be performed by high level optimizer 330 .
- Step 602 may include determining the optimal subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).
- the optimal subplant loads may be updated with each iteration of the high level optimization process.
- High level optimizer 330 may provide the optimal subplant loads to low level optimizer 332 and to subplant monitor 338 .
- Subplant monitor 338 may store the optimal subplant loads as planned subplant utilization data in a subplant utilization database 502 .
- Process 600 is shown to include determining optimal setpoints for equipment of each subplant to achieve the optimal subplant loads (step 604 ).
- Step 604 may be performed by low level optimizer 332 .
- the optimal equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202 - 210 .
- the optimal equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the optimal subplant load.
- Low level optimizer 332 may provide the optimal equipment setpoints to energy plant 200 and to subplant monitor 338 .
- Subplant monitor 338 may store the optimal equipment setpoints as planned subplant utilization data in subplant utilization database 502 .
- Process 600 is shown to include automatically providing the optimal equipment setpoints to the energy plant to control the equipment (step 606 ).
- Step 606 may include providing the optimal equipment setpoints from low level optimizer 332 to energy plant 200 .
- Energy plant 200 may use the optimal equipment setpoints as control inputs for individual devices within each subplant (e.g., individual chillers, individual hot water generators, individual thermal energy storage tanks, etc.).
- energy plant 200 may operate controllable devices within energy plant 200 (e.g., equipment 340 ) in accordance with the optimal equipment setpoints.
- energy plant 200 may activate a device, deactivate a device, change a setpoint for a device, or otherwise control individual devices of the energy plant equipment 340 based on the optimal equipment setpoints.
- Energy plant 200 may provide actual subplant utilization data to subplant monitor 338 .
- Subplant monitor 338 may store the actual subplant utilization data in subplant utilization database 502 .
- Process 600 is shown to include presenting planned and actual subplant utilization data to a user via a graphical user interface (step 608 ).
- Step 608 may be performed by dispatch GUI generator 506 .
- step 608 includes accessing the data stored in subplant utilization database 502 and using the stored data to generate a dispatch GUI.
- Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the planned subplant utilization data (e.g., future subplant loads) in a graphical format.
- Dispatch GUI generator 506 may provide dispatch GUI 902 to a user interface 504 for presentation to a user.
- the optimal subplant loads and equipment setpoints are used to control energy plant 200 .
- the optimal values determined by EOS 302 may be automatically provided as inputs to energy plant 200 .
- low level optimizer 332 is shown providing the optimal equipment setpoints directly to energy plant 200 .
- the optimal equipment setpoints may be provided to BAS 308 , which may use the optimal equipment setpoints to generate control signals for the energy plant equipment 340 .
- the automatic operating mode allows EOS 302 to control energy plant 200 without requiring user intervention by automatically providing the optimal equipment setpoints to energy plant 200 .
- EOS 302 determines recommended subplant loads for each of subplants 202 - 210 and recommended equipment setpoints for the energy plant equipment 340 .
- the recommended subplant loads and recommended equipment setpoints may be the same or similar to the optimal subplant loads and optimal equipment setpoints as previously described.
- EOS 302 does not automatically provide the recommended equipment setpoints as control inputs to energy plant 200 .
- energy plant 200 receives equipment control signals from BAS 308 , which may generate the equipment control signals based in part on user-defined setpoints received from a user 702 via a BAS user interface 309 .
- System 700 is shown to include high level optimizer 330 , low level optimizer 332 , energy plant 200 , subplant monitor 338 , subplant utilization database 502 , dispatch GUI generator 506 , and BAS 308 , which may be the same or similar as described with reference to FIGS. 2-6 .
- high level optimizer 330 may perform an optimization process to generate a set of recommended subplant loads for each of subplants 202 - 210 .
- High level optimizer 330 may determine the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).
- High level optimizer 330 may provide the recommended subplant loads to low level optimizer 332 and to subplant monitor 338 .
- Subplant monitor 338 may store the recommended subplant loads as recommended subplant utilization data in a subplant utilization database 502 .
- Low level optimizer 332 may use the recommended subplant loads to generate a set of recommended equipment setpoints for the equipment of subplants 202 - 210 .
- the recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of subplants 202 - 210 .
- the recommended equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the recommended subplant load.
- low level optimizer 332 performs an optimization process to generate the recommended equipment setpoints.
- Low level optimizer 332 may provide the recommended equipment setpoints to subplant monitor 338 .
- Subplant monitor 338 may store the recommended equipment setpoints as recommended subplant utilization data in subplant utilization database 502 .
- Energy plant 200 may monitor the utilization of subplants 202 - 210 and generate a set of actual subplant utilization data.
- the actual subplant utilization data may include actual values (rather than recommended values) for each of the subplant loads produced by subplants 202 - 210 .
- the actual subplant utilization data may also include actual equipment operating states (e.g., on/off states, load production, operating capacities, etc.) for individual devices of energy plant equipment 340 .
- Energy plant 200 may report the actual subplant utilization data to subplant monitor 338 . In some embodiments, energy plant 200 reports the actual subplant utilization data at regular intervals (e.g., once every fifteen minutes, once per hour, etc.)
- Subplant monitor 338 may store the actual subplant utilization data in subplant utilization database 502 .
- Dispatch GUI generator 506 may access the data stored in subplant utilization database 502 and use the stored data to generate a dispatch GUI.
- Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the recommended subplant utilization data (e.g., future subplant loads) in a graphical format.
- Dispatch GUI generator 506 may provide dispatch GUI 902 to EOS user interface 704 for presentation to a user 702 .
- EOS 302 and energy plant 200 may be decoupled such that the output of EOS 302 (i.e., recommended subplant loads and equipment setpoints) is not automatically provided as an input to energy plant 200 .
- User 702 can view the recommended setpoints (e.g., recommended subplant load setpoints, recommended equipment setpoints, etc.) and monitor actual subplant operation via EOS user interface 704 .
- user 702 may use the recommended setpoints to generate the user-defined setpoints provided to BAS 308 ; however, such use is not automatic or required when EOS 302 is operated in the advisory operating mode. Instead, EOS 302 may provide the recommended setpoints as suggestions or advice, which the user 702 can choose to accept or reject when generating the user-defined setpoints.
- Process 800 may be performed by one or more components of energy plant system 300 and/or system 700 as previously described.
- process 800 may be performed by EOS 302 , BAS 308 , dispatch GUI generator 506 , and/or other devices of energy plant system 300 or system 700 .
- Process 800 is shown to include determining recommended subplant loads for a plurality of subplants of an energy plant (step 802 ).
- Step 802 may be performed by high level optimizer 330 .
- Step 802 may include determining the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).
- the recommended subplant loads may be updated with each iteration of the high level optimization process.
- High level optimizer 330 may provide the recommended subplant loads to low level optimizer 332 and to subplant monitor 338 .
- Subplant monitor 338 may store the recommended subplant loads as planned subplant utilization data in a subplant utilization database 502 .
- Process 800 is shown to include determining recommended setpoints for equipment of each subplant to achieve the recommended subplant loads (step 804 ).
- Step 804 may be performed by low level optimizer 332 .
- the recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202 - 210 .
- the recommended equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the recommended subplant load.
- Low level optimizer 332 may provide the recommended equipment setpoints to energy plant 200 and to subplant monitor 338 .
- Subplant monitor 338 may store the recommended equipment setpoints as planned subplant utilization data in subplant utilization database 502 .
- Process 800 is shown to include presenting recommended and actual subplant utilization data to a user via an EOS user interface (e.g., EOS user interface 704 ) (step 806 ).
- Step 806 may be performed by dispatch GUI generator 506 and/or EOS user interface 704 .
- the recommended subplant utilization data may include the recommended subplant loads generated by high level optimizer 330 and/or the recommended equipment setpoints generated by low level optimizer 332 .
- the actual subplant utilization data may include data describing the actual operation of energy plant 200 (e.g., actual subplant loads, actual equipment setpoints, etc.), which may be collected by subplant monitor 338 and stored in subplant utilization database 502 .
- step 806 includes accessing the data stored in subplant utilization database 502 and using the stored data to generate a dispatch GUI.
- Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the planned subplant utilization data (e.g., future subplant loads) in a graphical format.
- Dispatch GUI generator 506 may provide dispatch GUI 902 to EOS user interface 704 for presentation to a user 702 .
- Process 800 is shown to include receiving user-defined setpoints at a BAS user interface (e.g., BAS user interface 309 ) (step 808 ) and generating control signals for the subplant equipment based on the user-defined setpoints (step 810 ).
- BAS user interface 309 is separate and distinct from EOS user interface 704 .
- EOS user interface 704 may be coupled to EOS 302 and configured to present information stored in subplant utilization database 502
- BAS user interface 309 may be coupled to BAS 308 and configured to allow user 702 to provide control inputs to BAS 308 .
- user 702 is the only link between EOS user interface 704 and BAS user interface 309 .
- user 702 may view the recommended setpoints provided via EOS user interface 704 and generate the user-defined setpoints provided to BAS user interface 309 based on the recommended setpoints. In other instances, user 702 may generate the user-defined setpoints independent of the recommended setpoints.
- the advisory mode allows user 702 to exercise a greater level of control over energy plant 200 relative to the automatic mode by allowing user 702 to choose whether to use the recommended setpoints to control energy plant 200 or provide different user-defined setpoints.
- EOS 302 determines recommended subplant loads for each of subplants 202 - 210 and recommended equipment setpoints for the energy plant equipment 340 .
- the recommended subplant loads and recommended equipment setpoints may be the same or similar to the optimal subplant loads and optimal equipment setpoints as previously described.
- EOS 302 does not automatically provide the recommended equipment setpoints as control inputs to energy plant 200 when operating in the manual mode. Instead, EOS 302 receives manual (i.e., user-defined) subplant loads from a user via EOS user interface 704 .
- EOS 302 uses the manual subplant loads to determine recommended (e.g., optimal) equipment setpoints to achieve the manual subplant loads.
- EOS 302 may generate equipment control signals for subplant equipment 340 based on the recommended equipment setpoints to achieve the manual subplant loads.
- System 900 is shown to include high level optimizer 330 , low level optimizer 332 , energy plant 200 , subplant monitor 338 , subplant utilization database 502 , dispatch GUI generator 506 , EOS user interface 704 , and BAS 308 , which may be the same or similar as described with reference to FIGS. 2-8 .
- high level optimizer 330 may perform an optimization process to generate a set of recommended subplant loads for each of subplants 202 - 210 .
- High level optimizer 330 may determine the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).
- High level optimizer 330 may provide the recommended subplant loads to low level optimizer 332 and to subplant monitor 338 .
- Subplant monitor 338 may store the recommended subplant loads as recommended subplant utilization data in a subplant utilization database 502 .
- Low level optimizer 332 may use the recommended subplant loads to generate a first set of recommended equipment setpoints for the equipment of subplants 202 - 210 .
- the first set of recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of subplants 202 - 210 .
- the first set of recommended equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the recommended subplant load.
- low level optimizer 332 performs an optimization process to generate the first set of recommended equipment setpoints.
- Low level optimizer 332 may provide the first set of recommended equipment setpoints to subplant monitor 338 .
- Subplant monitor 338 may store the first set of recommended equipment setpoints as recommended subplant utilization data in subplant utilization database 502 .
- Low level optimizer 332 may also receive manual subplant loads from EOS user interface 704 .
- the manual subplant loads may include user-defined loads for each of subplants 202 - 210 .
- a user can specify the manual subplant loads via EOS user interface 704 (e.g., by entering values for the manual subplant loads, by adjusting sliders or dials, etc.).
- the manual subplant loads may be provided from EOS user interface 704 to low level optimizer 332 .
- the manual subplant loads may also be provided to subplant monitor 338 .
- Subplant monitor 338 may store the manual subplant loads as manual subplant utilization data in subplant utilization database 502 .
- Low level optimizer 332 may use the manual subplant loads to generate a second set of recommended equipment setpoints for the equipment of subplants 202 - 210 .
- the second set of recommended equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the manual subplant load.
- low level optimizer 332 performs an optimization process to generate the second set of recommended equipment setpoints.
- Low level optimizer 332 may provide the second set of recommended equipment setpoints to subplant monitor 338 .
- Subplant monitor 338 may store the recommended equipment setpoints as manual subplant utilization data in subplant utilization database 502 .
- low level optimizer 332 uses the second set of recommended equipment setpoints to generate equipment control signals for energy plant 200 .
- the equipment control signals may include on/off signals, load production signals, power consumption signals, or other types of control signals which may be used to control individual devices of subplant equipment 340 .
- the equipment control signals may cause each of subplants 202 - 210 to operate the individual devices of the subplant in a manner that achieves the manual subplant load for the subplant.
- the equipment control signals for a chiller subplant may specify that a first chiller of the subplant operate at 75% capacity, a second chiller of the subplant operate at 40% capacity, and a third chiller of the subplant operate at 60% capacity.
- the equipment control signals are provided directly from low level optimizer 332 to energy plant 200 (as shown in FIG. 9 ). In other embodiments, the equipment control signals may be provided to energy plant 200 via BAS 308 or generated by BAS 308 based on the second set of recommended equipment setpoints.
- Energy plant 200 may monitor the utilization of subplants 202 - 210 and generate a set of actual subplant utilization data.
- the actual subplant utilization data may include actual values (rather than recommended values) for each of the subplant loads produced by subplants 202 - 210 .
- the actual subplant utilization data may also include actual equipment operating states (e.g., on/off states, load production, operating capacities, etc.) for individual devices of energy plant equipment 340 .
- Energy plant 200 may report the actual subplant utilization data to subplant monitor 338 . In some embodiments, energy plant 200 reports the actual subplant utilization data at regular intervals (e.g., once every fifteen minutes, once per hour, etc.)
- Subplant monitor 338 may store the actual subplant utilization data in subplant utilization database 502 .
- Dispatch GUI generator 506 may access the data stored in subplant utilization database 502 and use the stored data to generate a dispatch GUI.
- Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the recommended subplant utilization data (e.g., recommended subplant loads and the first set of recommended equipment setpoints, etc.) manual subplant utilization data (e.g., manual subplant loads and the second set of recommended equipment setpoints), and actual subplant utilization data (e.g., actual subplant loads and actual equipment setpoints) in a graphical format.
- Dispatch GUI generator 506 may provide dispatch GUI 902 to EOS user interface 704 for presentation to a user 702 .
- a user can view dispatch GUI 902 and provide the manual subplant loads via EOS user interface 704 .
- EOS user interface 704 is a comprehensive monitoring and control interface that allows the user to monitor the operation of energy plant 200 and provide control inputs (e.g., manual subplant loads) that affect the operation of energy plant 200 .
- EOS user interface 704 may be configured to receive input from the user via dispatch GUI 902 .
- dispatch GUI 902 presented via user interface 504 may include interface options that allow a user to change the load setpoints for subplants 202 - 210 , change the on/off states or operating setpoints for equipment 340 , activate or deactivate entire subplants or individual devices of equipment 340 , adjust the configuration of BAS 308 or energy plant 200 , or otherwise monitor and control the operation of energy plant 200 and/or equipment 340 .
- EOS 302 may control energy plant 200 and/or equipment 340 (e.g., via actuators, power relays, etc.) in accordance with the user input received via EOS user interface 704 .
- the user input received via EOS user interface 704 overrides automated control decisions made by EOS 302 .
- the manual subplant loads provided via EOS user interface 704 may override the recommended subplant loads determined by high level optimizer 330 .
- EOS 302 determines whether the manual subplant loads would cause EOS 302 to violate an optimization constraint (e.g., building temperature out of range, thermal energy storage tank fully depleted or filled to capacity, etc.). If the manual subplant loads would not cause EOS 302 to violate an optimization constraint, EOS 302 may override the recommended subplant loads determined by high level optimizer 330 with the manual subplant loads.
- an optimization constraint e.g., building temperature out of range, thermal energy storage tank fully depleted or filled to capacity, etc.
- EOS 302 may not override the recommended subplant loads determined by high level optimizer 330 .
- EOS 302 causes dispatch GUI 902 to display a warning for the user if the manual subplant loads would cause EOS 302 to violate an optimization constraint within a predetermined time window. The user can then choose to override the recommended subplant loads and violate the optimization constraint or use the recommended subplant loads and satisfy the optimization constraint.
- dispatch GUI generator 506 updates dispatch GUI 902 based on the manual subplant loads before the manual subplant loads are used to affect the operation of energy plant 200 .
- dispatch GUI generator 506 may display the second set of recommended equipment setpoints that would result from the manual subplant loads before the manual subplant loads are used to generate the equipment control signals.
- EOS 302 uses the manual subplant loads to calculate an amount of time before the manual subplant loads would cause EOS 302 to violate an optimization constraint (e.g., time until thermal energy storage tanks are filled or depleted).
- an optimization constraint e.g., time until thermal energy storage tanks are filled or depleted.
- this allows the user to view the predicted effects of the manual subplant loads before the manual subplant loads take effect.
- Process 1000 may be performed by one or more components of energy plant system 300 and/or system 900 as previously described.
- process 1000 may be performed by EOS 302 , BAS 308 , dispatch GUI generator 506 , and/or other devices of energy plant system 300 or system 900 .
- Process 1000 is shown to include determining recommended subplant loads for a plurality of subplants of an energy plant (step 1002 ).
- Step 1002 may be performed by high level optimizer 330 .
- Step 802 may include determining the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).
- the recommended subplant loads may be updated with each iteration of the high level optimization process.
- High level optimizer 330 may provide the recommended subplant loads to low level optimizer 332 and to subplant monitor 338 .
- Subplant monitor 338 may store the recommended subplant loads as planned subplant utilization data in a subplant utilization database 502 .
- Process 1000 is shown to include determining recommended setpoints for equipment of each subplant to achieve the recommended subplant loads (step 1004 ).
- Step 1004 may be performed by low level optimizer 332 .
- the recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202 - 210 .
- the recommended equipment setpoints may include setpoints for individual devices of subplants 202 - 210 in order for each subplant to meet the recommended subplant load.
- Low level optimizer 332 may provide the recommended equipment setpoints to energy plant 200 and to subplant monitor 338 .
- Subplant monitor 338 may store the recommended equipment setpoints as planned subplant utilization data in subplant utilization database 502 .
- Process 1000 is shown to include presenting recommended and actual subplant utilization data to a user via an EOS user interface (e.g., EOS user interface 704 ) (step 1006 ).
- Step 1006 may be performed by dispatch GUI generator 506 and/or EOS user interface 704 .
- the recommended subplant utilization data may include the recommended subplant loads generated by high level optimizer 330 and/or the first set of recommended equipment setpoints generated by low level optimizer 332 .
- the actual subplant utilization data may include data describing the actual operation of energy plant 200 (e.g., actual subplant loads, actual equipment setpoints, etc.), which may be collected by subplant monitor 338 and stored in subplant utilization database 502 .
- step 1006 includes accessing the data stored in subplant utilization database 502 and using the stored data to generate a dispatch GUI.
- Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data and the recommended subplant utilization data in a graphical format.
- Dispatch GUI generator 506 may provide dispatch GUI 902 to EOS user interface 704 for presentation to a user 702 .
- Process 1000 is shown to include receiving manual subplant loads at the EOS user interface (step 1008 ) and determining recommended setpoints for equipment of each subplant to achieve the manual subplant loads (step 1010 ).
- the manual subplant loads may be user-specified subplant loads and may override the recommended subplant loads determined by high level optimizer 330 .
- Step 1010 may be the same or similar to step 1004 , with the exception that the manual subplant loads are used instead of the recommended subplant loads to determine the recommended setpoints for the subplant equipment.
- dispatch GUI 902 is updated to include the manual subplant loads and the set of recommended setpoints that result from the manual load setpoints.
- Process 1000 is shown to include generating control signals for the subplant equipment based on the recommended setpoints to achieve the manual subplant loads (step 1012 ).
- the equipment control signals may include on/off signals, load production signals, power consumption signals, or other types of control signals which may be used to control individual devices of subplant equipment 340 .
- the equipment control signals may cause each of subplants 202 - 210 to operate the individual devices of the subplant in a manner that achieves the manual subplant load for the subplant.
- the equipment control signals are provided directly from low level optimizer 332 to energy plant 200 .
- the equipment control signals may be provided to energy plant 200 via BAS 308 or generated by BAS 308 based on the recommended equipment setpoints determined in step 1010 .
- Dispatch GUI 902 may present the recommended (i.e., optimal) subplant loads, manual subplant loads, and actual subplant loads in a variety of visual formats (e.g., diagrams, charts, graphs, etc.) that illustrate the operation of energy plant 200 .
- Dispatch GUI 902 may also present the first set of recommended equipment setpoints (i.e., the setpoints that result from the recommended subplant loads), the second set of recommended equipment setpoints (i.e., the setpoints that result from the manual subplant loads), and the actual equipment setpoints to provide details regarding the operation of each subplant.
- Dispatch GUI 902 may include past dispatch data (e.g., past subplant loads, past equipment setpoints) and current dispatch data (e.g., current subplant loads, current equipment setpoints) to allow a user to view a history of energy plant operations.
- Dispatch GUI 902 may also include future dispatch data (e.g., planned subplant loads, planned equipment setpoints) to allow the user to view planned energy plant operations into the future.
- Plant summary interface 1100 may include graphics depicting each of the subplants within energy plant 200 .
- plant summary interface 1100 is shown to include a plurality of chilled water loops 1102 - 1106 (i.e., Loop A 1102 , Loop B 1104 , and Loop C 1106 ).
- Chilled water loops 1102 - 1106 are configured to provide cold thermal energy (e.g., measured in tons) to satisfy the cooling load of campus 1108 .
- the steam subplant 1111 within plant B is configured to provide steam (measured in KPPH) to satisfy the heating load of campus 1108 .
- the cogeneration subplant 1110 within plant B can be configured to provide electricity (measured in MW) to satisfy the electric load of campus 1108 .
- Plant summary interface 1100 is shown to include paths 1112 - 1120 connecting each of the chilled water loops 1102 - 1106 and subplants 1110 - 1111 to campus 1108 . If a subplant or chilled water loop is currently providing energy to campus 1108 , the path connecting the subplant or chilled water loop to campus 1108 may be highlighted or otherwise marked to indicate the flow of energy along the path. For example, path 1120 may be colored red to indicate the flow of steam along path 1120 , whereas paths 1112 - 1116 may be colored blue to indicate the flow of cold thermal energy along paths 1112 - 1116 , path 1118 may be colored orange to indicate the flow of electricity along path 1118 , or a path may be colored green to indicate the flow of gas along the path.
- paths 1112 - 1120 are animated to indicate the flow of thermal energy.
- the arrows along each of paths 1112 - 1120 may move along each path 1112 - 1120 to indicate the flow of thermal energy.
- plant summary interface 1100 is shown to include paths 1122 - 1124 connecting electricity supply 1126 and gas supply 1128 to campus 1108 .
- paths 1122 - 1124 may be highlighted or otherwise marked to indicate the flow of electricity or gas energy along each path.
- the values below each of paths 1112 - 1124 within campus 1108 indicate the amount of each resource (i.e., electricity, chilled water, steam, and gas) being provided to campus 1108 by the corresponding subplant or supply.
- Percentage indicators next to subplants 1110 - 1111 and chilled water loops 1102 - 1106 indicate the percentage of utilization for each subplant 1110 - 1111 or chilled water loop 1102 - 1106 (i.e., the percentage of the total subplant or chilled water loop capacity being utilized).
- FIG. 11 is shown to include a 37% indicator next to Loop A 1102 , a 37% indicator next to Loop B 1104 , a 37% indicator next to the Loop C 1106 , a 37% indicator next to the plant B cogeneration subplant 1110 , and a 37% indicator next to the plant B steam subplant 1111 . This indicates that each subplant and chilled water loop is being utilized at 37% of its maximum capacity.
- the utilization rings associated with each subplant and chilled water loop may be filled to visually indicate the utilization percentage.
- a chilled water loop summary interface 1200 for Loop B 1104 is shown, according to an exemplary embodiment.
- Interface 1200 illustrates the percent utilization of each chilled water subplant within Loop B (e.g., chilled water subplant 1202 , chilled water subplant 1204 , and chilled water subplant 1206 ) as well as the utilized capacity for the entire Loop B 1104 .
- the values below each of the paths 1208 , 1210 , and 1212 connecting chilled water subplants 1202 - 1206 to campus 1108 indicate the chilled water production of each chilled water subplant 1202 - 1206 .
- Interface 1300 illustrates the percent utilization of each chilled water subplant within Loop A (e.g., chilled water subplant 1302 , chilled water subplant 1304 , and chilled water subplant 1306 ) as well as the utilized capacity for the entire Loop A 1102 .
- the values below each of the paths 1308 , 1310 , and 1312 connecting chilled water subplants 1302 - 1306 to campus 1108 indicate the chilled water production of each chilled water subplant 1302 - 1306 .
- Interface 1400 illustrates the equipment within Loop C 1106 and provides key performance indicators (KPIs) for each of the equipment.
- KPIs key performance indicators
- interface 1400 is shown to include a plurality of electric chillers (i.e., electric chiller 1 , electric chiller 2 , electric chiller 3 , and steam chiller 1 ).
- the KPIs may include efficiency (e.g., COP, kW/ton, etc.), cooling production (tons), and rate of electric consumption (kW).
- Interface 1400 may display the percent utilization and cooling production of each device within Loop C 1106 as well as the overall percent utilization and cooling production of Loop C 1106 . In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 1500 illustrates the equipment within Plant F and provides KPIs for each of the equipment.
- interface 1500 is shown to include a plurality of steam chillers (i.e., steam chiller 1 and steam chiller 2 ).
- the KPIs may include efficiency (e.g., COP, KPPH/ton, etc.), cooling production (tons), and rate of steam consumption (KPPH).
- Interface 1500 may display the percent utilization and cooling production of each device within Plant F as well as the overall percent utilization and cooling production of Plant F. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 1600 illustrates the equipment within Plant E and provides KPIs for each of the equipment.
- interface 1600 is shown to include a plurality of electric chillers (i.e., electric chiller 1 and electric chiller 2 ).
- the KPIs may include efficiency (e.g., COP, kW/ton, etc.), cooling production (tons), and rate of electric consumption (kW).
- Interface may display the percent utilization and cooling production of each device within Plant E as well as the overall percent utilization and cooling production of Plant E. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 1700 illustrates the equipment within Plant D and provides KPIs for each of the equipment.
- interface 1700 is shown to include a plurality of chillers (i.e., electric chiller 1 and steam chiller 1 ).
- the KPIs may include efficiency (e.g., COP, kW/ton, KPPH/ton, etc.), cooling production (tons), rate of electric consumption (kW), and rate of steam consumption (KPPH).
- Interface 1700 may display the percent utilization and cooling production of each device within Plant D as well as the overall percent utilization and cooling production of Plant D. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 1800 illustrates the equipment within Plant A and provides KPIs for each of the equipment.
- interface 1800 is shown to include a steam chiller (i.e., steam chiller 1 ).
- the KPIs may include efficiency (e.g., COP, KPPH/ton, etc.), cooling production (tons), and rate of steam consumption (KPPH).
- Interface 1800 may display the percent utilization and cooling production of each device within Plant A as well as the overall percent utilization and cooling production of Plant A. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 1900 illustrates the equipment within Plant C and provides KPIs for each of the equipment.
- interface 1900 is shown to include an electric chiller (i.e., electric chiller 1 ).
- the KPIs may include efficiency (e.g., COP, kW/ton, etc.), cooling production (tons), and rate of electric consumption (kW).
- Interface 1900 may display the percent utilization and cooling production of each device within Plant C as well as the overall percent utilization and cooling production of Plant C. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 2000 illustrates the equipment within Plant B and provides KPIs for each of the equipment.
- interface 2000 is shown to include a plurality of chillers (i.e., electric chiller 1 , electric chiller 2 , and steam chiller 1 ).
- the KPIs may include efficiency (e.g., COP, kW/ton, KPPH/ton, etc.), cooling production (tons), rate of electric consumption (kW), and rate of steam consumption (KPPH).
- Interface 2000 may display the percent utilization and cooling production of each device within Plant B as well as the overall percent utilization and cooling production of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 2100 illustrates the steam equipment within Plant B and provides KPIs for each of the equipment.
- interface 2100 is shown to include a plurality of boilers (i.e., boiler 4 , boiler 5 , boiler 6 , and boiler 7 ).
- the KPIs may include steam production (KPPH), rate of natural gas consumption (MMBtu), and rate of electric consumption (kW).
- Interface 2100 may display the percent utilization and steam production of each steam production device within Plant B as well as the overall percent utilization and steam production of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 2200 illustrates the electric equipment within Plant B and provides KPIs for each of the equipment.
- interface 2200 is shown to include a plurality of combustion turbines (i.e., combustion turbine 1 and combustion turbine 2 ).
- the KPIs may include efficiency (e.g., COP, kW/kW), electric production (MW), and rate of electric consumption (kW).
- Interface 2200 may display the percent utilization and electricity production of each electricity production device within Plant B as well as the overall percent utilization and electricity production of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 2210 illustrates the electric equipment within Plant B and provides KPIs for each of the equipment.
- interface 2210 is shown to include a plurality of gas turbines (i.e., gas turbine 1 and gas turbine 2 ).
- the KPIs may include efficiency (e.g., COP, kW/kW), electric production (MW), and rate of natural gas consumption (mcf/hr).
- Interface 2210 may display the percent utilization and electricity production of each electricity production device within Plant B as well as the overall percent utilization, electricity production, heat rate, and electricity import of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Interface 2220 illustrates the electric equipment within Plant B and provides KPIs for each of the equipment.
- interface 2220 is shown to include a plurality of gas turbines (i.e., gas turbine 1 and gas turbine 2 ).
- the KPIs may include efficiency (e.g., COP, kW/kW), electric production (MW), and rate of natural gas consumption (mcf/hr). Both the actual and target values of the electricity production and rate of natural gas consumption may be indicated when operating in the automatic mode.
- Interface 2220 may display the percent utilization and electricity production of each electricity production device within Plant B as well as the overall percent utilization, electricity production, heat rate, and electricity import of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service.
- Dispatch schedule interface 2300 which may be generated by dispatch GUI generator 506 is shown, according to an exemplary embodiment.
- Dispatch schedule interface 2300 may include detailed dispatch information for each of the subplants within energy plant 200 .
- dispatch schedule interface 2300 may include detailed dispatch information for each chiller subplant 202 - 206 , steam subplant 208 , and cogeneration subplant 210 .
- Dispatch schedule interface 2300 may also include detailed dispatch information for each of the individual devices within each subplant 202 - 210 .
- dispatch schedule interface 2300 may include detailed dispatch information 2302 for each of chillers 218 - 228 within each chiller subplant 202 - 206 , each of boilers 232 within steam subplant 208 , and each of combustion turbines 230 within cogeneration subplant 210 .
- Detailed dispatch information 2302 for each chiller may include the chiller's status (e.g., on or off), the amount of cooling energy (i.e., “Cooling Q”) produced by the chiller (measured in tons), the power consumption of each chiller (measured in kW), the temperature of the cold water produced by each chiller, the flow rate of the cold water produced by each chiller, and the dispatched condenser flow setpoint for each chiller.
- the chiller's status e.g., on or off
- the amount of cooling energy i.e., “Cooling Q”
- Detailed dispatch information 2302 for each boiler may include the boiler's status (e.g., on or off), the amount of heating energy (i.e., “Heating Q”) produced by the boiler (measured in mmBTU/h), the amount of fuel usage of each boiler (measured in mmBTU/h), the power consumption of each boiler (measured in kW), and the temperature of the hot water or steam produced by each boiler.
- Detailed dispatch information 2302 for the cogeneration subplant may include the amount of electricity produced by each of the combustion turbines.
- dispatch schedule interface 2300 includes multiple values for each of the variables included in detailed dispatch information 2302 .
- dispatch schedule interface 2300 may include an optimal value 2304 for each variable (i.e., the “EOS” value), a building automation system (BAS) value 2306 for each variable (i.e., the “BAS” value), and an actual value 2308 for each variable.
- Optimal values 2304 may be determined by EOS 302 as previously described. In some instances, optimal values 2304 are based on the optimal or recommended subplant loads determined by high level optimizer 330 . In other instances, optimal values 2304 may be based on the manual subplant loads received via EOS user interface 704 .
- optimal values 2304 may be the same as the BAS values 2306 since optimal values 2304 are automatically provided as inputs to the BAS. However, when EOS 302 is operated in the advisory mode, optimal values 2304 may be different from BAS values 2306 since optimal values 2304 are provided as recommendations but not automatically applied as inputs to the BAS.
- Actual values 2308 may represent measured or observed values of the variables obtained from energy plant 200 , as indicated by the actual subplant utilization data collected by subplant monitor 338 .
- dispatch schedule interface 2300 presents snapshots of detailed dispatch information 2302 for multiple different dispatch intervals.
- FIG. 23A shows a snapshot of detailed dispatch information 2302 for the present dispatch interval 2310 .
- Other pages of dispatch schedule interface 2300 may show snapshots of detailed dispatch information 2302 for a past dispatch interval or a future dispatch interval.
- a user can navigate between the past, present, and future dispatch intervals by selecting arrows 2312 - 2314 located on the sides of each window. For example, clicking arrow 2312 may cause dispatch schedule interface 2300 to transition from displaying the snapshot for the present dispatch interval 2310 to the snapshot for the past dispatch interval.
- clicking arrow 2314 may cause dispatch schedule interface 2300 to transition from displaying the snapshot for the present dispatch interval 2310 to the snapshot for the future dispatch interval.
- this allows a user to navigate between past, present, and future snapshots of detailed dispatch information 2302 to view subplant loads and equipment setpoints for a series of dispatch intervals.
- dispatch schedule interface 2350 which may be generated by dispatch GUI generator 506 is shown, according to an exemplary embodiment.
- Dispatch schedule interface 2350 is shown displaying dispatch information for several devices of equipment.
- the equipment are grouped into corresponding plants and/or loops in dispatch schedule interface 2350 .
- a user can expand or collapse various sections of dispatch schedule interface 2350 to show or hide information for equipment of each plant and/or loop.
- dispatch schedule interface 2350 may indicate whether EOS 302 is on or off, whether the device is out of service, and whether no dispatch is provided for each time interval. These status indications may be provided in the form of colored bars, where each color represents a different status indication.
- dispatch chart interfaces 2400 - 2850 which may be generated by dispatch GUI generator 506 is shown, according to an exemplary embodiment.
- Dispatch chart interfaces 2400 - 2850 show high-level energy flows for past, present and future dispatch schedules in stacked bar charts 2410 , 2510 , 2610 , 2660 , 2710 , 2760 , 2810 , and 2860 .
- the lines 2402 , 2502 , 2602 , 2652 , 2702 , 2752 , 2802 , and 2852 that span vertically across each chart 2410 , 2510 , 2610 , 2660 , 2710 , 2760 , 2810 , and 2860 represent the last dispatch time.
- each chart 2410 , 2510 , 2610 , 2660 , 2710 , 2760 , 2810 , and 2860 is updated and shifted to the left.
- a user can click the checkboxes 2404 , 2504 , 2604 , 2654 , 2704 , 2754 , 2804 , and 2854 in the legends 2406 , 2506 , 2606 , 2656 , 2706 , 2756 , 2806 , and 2856 .
- a user can click a point on charts 2410 , 2510 , 2610 , 2660 , 2710 , 2760 , 2810 , and 2860 and drag to the right.
- the chart 2410 , 2510 , 2610 , 2660 , 2710 , 2760 , 2810 , and 2860 then zooms in on the selected range.
- the user can continue zooming in until the desired area of focus is reached.
- To pan the user can use chart controls 2408 , 2508 , 2608 , 2658 , 2708 , 2758 , 2808 , and 2858 below each chart.
- dispatch chart interfaces 2400 - 2850 include some or all of the features described in U.S. patent application Ser. No. 14/815,845 filed Jul. 31, 2015, and titled “Systems and Methods for Visualizing Equipment Utilization in an energy plant.” The entire disclosure of U.S. patent application Ser. No. 14/815,845 is incorporated by reference herein.
- dispatch chart interface 2400 is shown displaying the chilled water production for Loop B.
- the total chilled water production of Loop B consists of the production 2412 of the Plant A, the production 2414 of Plant B, and the production 2416 of Plant C.
- the chilled water production of each plant at each time step is indicated by the height of the corresponding stacked bar in stacked bar chart 2410 .
- the total height of the stacked bars at each time step indicate the total chilled water production of Loop B at that time step.
- dispatch chart interface 2500 is shown displaying the chilled water production for Loop A.
- the total chilled water production of Loop A consists of the production 2512 of Plant D, the production 2514 of Plant E, and the production 2516 of Plant F.
- the chilled water production of each plant at each time step is indicated by the height of the corresponding stacked bar in stacked bar chart 2510 .
- the total height of the stacked bars at each time step indicate the total chilled water production of Loop A at that time step.
- dispatch chart interface 2600 is shown displaying the chilled water production for Loop C.
- the total chilled water production of Loop C consists of only the production 2612 of Plant G.
- the chilled water production of Plant G at each time step is indicated by the height of the stacked bar in stacked bar chart 2610 , which is equal to the total chilled water production of Loop A at that time step.
- dispatch chart interface 2650 is shown displaying the production and storage of Loop C at each time step.
- the total production of Loop C consists of the production 2662 of electricity and steam within Loop C and the amount of electricity and steam discharged from storage within Loop C.
- Line 2664 indicates the load on Loop C.
- the difference between the total production of Loop C and the load on Loop C signifies the unmet load.
- the storage of Loop C consists of the amount of return water stored within Loop C at each time step, designated by line 2666 .
- dispatch chart interface 2700 is shown displaying the total steam production and consumption for energy plant 200 .
- the total steam production of energy plant 200 consists of the production 2712 of the boilers of Plant B and the production 2714 of the cogenerators of Plant B.
- the total height of the stacked bars 2712 and 2714 above the horizontal axis at each time step indicate the total steam production at that time step.
- the total steam consumption of energy plant 200 consists of the consumption of Plant A, campus 1108 , Plant F, Plant G, Plant B, and Plant D.
- the total height of the stacked bars 2716 - 2726 below the horizontal axis at each time step indicate the total steam consumption at that time step.
- dispatch chart interface 2750 is shown displaying the total steam production and consumption of Plant B at each time step within a selected time period.
- the total steam production of Plant B consists of the production 2762 of the boilers of Plant B, the production 2764 of a first set of cogenerators of Plant B, and the production 2766 of a second set of cogenerators of Plant B.
- the steam production of each of the boilers and the cogenerators at each time step is indicated by the height of the corresponding stacked bars 2762 - 2766 above the horizontal axis in stacked bar chart 2760 .
- the total height of the stacked bars 2762 - 2766 above the horizontal axis at each time step indicate the total steam production at that time step.
- Line 2768 represents the total load on Plant B.
- the difference between the total load on Plant B and the total production of Plant B represents the unmet load.
- the total steam consumption of Plant B consists of the consumption 2770 of Building A, the consumption 2772 of Building B, the consumption 2774 of Building C, the consumption 2776 of the chillers within Plant B, and the consumption 2778 of Building D.
- the steam consumption of each of the buildings and chillers at each time step is indicated by the height of the corresponding stacked bars 2770 - 2778 below the horizontal axis in stacked bar chart 2760 .
- the total height of the stacked bars 2770 - 2770 below the horizontal axis at each time step indicate the total steam consumption at that time step.
- dispatch chart interface 2800 is shown displaying the total electricity production and consumption for energy plant 200 .
- the total electricity production of energy plant 200 consists of the production 2812 of Plant B.
- the total electricity consumption of energy plant 200 consists of the consumption 2814 of Plant A, the consumption 2816 of campus 1108 , the consumption 2818 of Plant F, the consumption 2820 of Plant G, the consumption 2822 of Plant C, the consumption 2824 of Plant E, the consumption 2826 of the cooling equipment of Plant B, the consumption 2828 of the electric equipment of Plant B, the consumption 2830 of the steam equipment of Plant B, and the consumption 2832 of Plant D.
- the total height of stacked bars 2814 - 2832 below the horizontal axis at each time step indicate the total electricity consumption at that time step.
- dispatch chart interface 2850 is shown displaying the total electricity production and consumption of Plant B at each time step within a selected time period.
- the total electricity production of Plant B consists of the production 2862 of a first set of cogenerators of Plant B, the production 2864 of a second set of cogenerators of Plant B, and amount 2866 of electricity imported by Plant B.
- the electricity production of each of the cogenerators and the amount of electricity imported at each time step is indicated by the height of the corresponding stacked bars 2862 - 2866 above the horizontal axis in stacked bar chart 2860 .
- the total height of the stacked bars 2862 - 2866 above the horizontal axis at each time step indicate the total electricity production at that time step.
- Line 2768 represents the total load on Plant B.
- Line 2868 represents the total electric load on Plant B.
- the difference between the total electric load on Plant B and the total production of Plant B represents the unmet load.
- the total electric consumption of Plant B consists of the consumption 2870 of Building A, the consumption 2872 of Building B, the consumption 2874 of Building C, the consumption 2876 of Building D, the consumption 2878 of Building E, the consumption 2880 of the chillers within Plant B, the consumption 2882 of the steam generators within Plant B, and the consumption 2884 of Building F.
- the electric consumption of each of the buildings, chillers, and steam generators at each time step is indicated by the height of the corresponding stacked bars 2870 - 2884 below the horizontal axis in stacked bar chart 2760 .
- the total height of the stacked bars 2870 - 2884 below the horizontal axis at each time step indicate the total electric consumption at that time step.
- input data interfaces 2900 - 3400 which may be generated by dispatch GUI generator 506 is shown, according to an exemplary embodiment.
- input data interfaces 2900 - 3400 allow a user to manage inputs used by high level optimizer 330 .
- Such inputs can include, for example, campus electric and thermal energy load forecasts, utility pricing forecasts, weather forecasts, campus schedules, equipment out-of-service schedules, and manual utility pricing.
- Manual inputs can be maintained solely by the user, whereas forecast inputs give the user the ability to override weather, pricing, loads, etc. forecasted by EOS 302 .
- weather forecast input interface 2900 is shown, according to an exemplary embodiment.
- the weather forecast inputs may predict the weather in the geographic region in which the building or campus 1108 is located for each of the plurality of time steps.
- Weather forecasts may include, for example, cloud coverage, dry bulb temperature, wet bulb temperature, humidity, precipitation, wind, or any other type of weather forecast.
- weather forecast input interface 2900 includes a graph 2902 , 2904 , and 2906 for each of the weather variables. Each graph 2902 - 2906 may illustrate the predicted values for the corresponding weather variable over time.
- Weather forecasts can be predicted for the duration of the optimization period.
- EOS 302 uses the weather forecasts to predict the thermal and electric energy loads of campus 1108 .
- Dry bulb temperature forecast input interface 3000 is shown, according to an exemplary embodiment.
- Dry bulb temperature forecast input interface 3000 is shown to include a graph 3002 of the predicted dry bulb temperature as a function of time.
- Interface 3000 is also shown to include a table 3004 of the predicted dry bulb temperature values.
- Table 3004 may include a cell for each hour of the optimization period.
- table 3004 is shown to include a row for each day and a column for each hour. The cells at the intersections of the rows and columns contain the predicted dry bulb temperature values for the corresponding days and hours.
- Override interface 3100 may be displayed in response to a user clicking override button 3006 in forecast input interface 3000 .
- a user can override the predicted values by selecting override button 3006 and entering a manual value for the corresponding variable.
- the manual override can be applied to a user-defined time period beginning at a start time/date and ending at an end time/date.
- the forecasted values can be changed by a user defined offset (e.g., increased or decrease by a user-defined amount) or set to a specific user-defined value.
- override interface 3100 prompts the user to specify a reason for the override.
- Utility pricing forecast input interface 3200 may include a forecast of utility prices for each time step of the optimization period.
- the forecasted utility prices can be defined for electricity (e.g., $/kWh), natural gas ($/mmBtu), water ($/L), or any other resource consumed by energy plant 200 .
- utility pricing forecast input interface 3200 allows a user to define one or more utility pricing rates by selecting add rate button 3202 and specifying the rate 3204 and time period 3206 during which the rate 3202 applies.
- EOS 302 uses the utility pricing forecasts to predict the cost associated with resource purchases over the optimization period.
- Equipment out-of-service interface 3300 allows a user to define the time periods during which each of the subplants and/or the pieces of equipment within each subplant will be out-of-service.
- EOS 302 may exclude that subplant/equipment from the dispatches.
- Campus schedule interface 3400 allows a user to define the holiday and out-of-season calendar 3402 for campus 1108 . During holidays, the occupancy of campus 1108 may be lower than usual, which can affect the load forecast. In some embodiments, EOS 302 uses the campus schedule to generate the load forecasts.
- FIG. 35A is a drawing of a reporting landing page 3500 .
- Reporting landing page 3500 shows high level KPIs 3502 - 3510 to provide the most relevant performance data to the user.
- reporting landing page 3500 is shown to include the total utility cost 3502 , the peak demand 3504 , the performance 3506 , the unmet chilled water load 3508 , and the system efficiency 3510 .
- KPIs 3502 - 3510 can include the data for the current week, day, month, or any other time period.
- KPIs 3502 - 3510 indicate a percent change relative to the previous time period (e.g., 14% decrease this week, 9% increase this week) for each of KPIs 3502 - 3510 .
- reporting landing page 3500 allows a user to generate and/or view detailed reports for various dispatch schedules, performance monitoring, and a site summary.
- FIG. 35B is a drawing of a performance monitoring interface 3550 .
- Performance monitoring interface 3550 allows a user to visualize various performance measurements over time.
- the user can select a performance measurement via dropdown menu 3552 (e.g., consumption, production, etc.), a type of energy via dropdown 3554 (e.g., steam, electricity, hot water, cold water, etc.), and a type of equipment via dropdown 3556 .
- the user can specify a start date 3558 and an end date 3560 and click the “Generate Chart” button 3562 to create a chart 3570 or 3580 that plots the selected performance metric for the selected energy type and equipment for the specified date range.
- Each of the lines in chart 3570 represents the value of the steam consumption performance metric for the equipment of campus 1108 , Loop A 1102 , Loop B 1104 , or Loop C 1106 .
- Each of the lines in chart 3580 represents the value of the electricity consumption performance metric for the equipment of campus 108 , Plant C, Plant B, or Loop B 1104 .
- Site summary report 3600 may provide information such as utility cost; economic load demand response (ELDR) revenue; production by site, loop, plant, or equipment; and consumption by site, loop, plant, or equipment. Such information can be provided for a user-defined time period.
- ELDR economic load demand response
- the audit log is a running list of user edits and changes to operating mode used by EOS 302 .
- User edits can include, for example, overrides to forecasted inputs, manual input entries, schedule changes, and other manual overrides.
- Changes to the operating mode used by EOS 302 can include manually switching among the advisory mode, the automatic mode, and the manual mode.
- each edit requires the user to log a reason for their change. Each of these edits and the reason for the edit can be displayed in the audit report.
- the present disclosure contemplates methods, systems and program products on any machine-readable media for accomplishing various operations.
- the embodiments of the present disclosure may be implemented using existing computer processors, or by a special purpose computer processor for an appropriate system, incorporated for this or another purpose, or by a hardwired system.
- Embodiments within the scope of the present disclosure include program products comprising machine-readable media for carrying or having machine-executable instructions or data structures stored thereon.
- Such machine-readable media can be any available media that can be accessed by a general purpose or special purpose computer or other machine with a processor.
- machine-readable media can comprise RAM, ROM, EPROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to carry or store desired program code in the form of machine-executable instructions or data structures and which can be accessed by a general purpose or special purpose computer or other machine with a processor. Combinations of the above are also included within the scope of machine-readable media.
- Machine-executable instructions include, for example, instructions and data which cause a general purpose computer, special purpose computer, or special purpose processing machines to perform a certain function or group of functions.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Signal Processing (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
- This application is a continuation-in-part of U.S. patent application Ser. No. 15/387,512 filed Dec. 21, 2016, which claims the benefit of and priority to U.S. Provisional Patent Application No. 62/286,287 filed Jan. 22, 2016. This application also claims the benefit of and priority to U.S. Provisional Patent Application No. 62/476,510 filed Mar. 24, 2017. The entire disclosures of each of these patent applications are incorporated by reference herein.
- The present disclosure relates generally to an plant that includes multiple subplants configured to serve the energy loads of a building or campus. The present disclosure relates more particularly to systems and methods for monitoring and controlling multiple subplants and the equipment within each of the subplants.
- An energy plant may include a number of subplants configured to serve the heating, cooling, electric, and other energy loads of a building or campus. For example, the energy plant may include a heater subplant, a chiller subplant, a heat recovery chiller subplant, a cogeneration subplant, a steam subplant, a hot thermal energy storage (TES) subplant, and/or a cold TES subplant. The subplants may include a variety of HVAC equipment configured to serve heating, cooling, and electric loads (e.g., heaters, boilers, chillers, heat recovery chillers, electric generators, cooling towers, etc.). The energy plant may be controlled by an energy plant controller that distributes a requested or predicted energy load (e.g., a heating load, a cooling load, an electric load, etc.) across the plurality of subplants. It can be difficult and challenging to monitor and control the operation of an energy plant.
- One implementation of the present disclosure is an energy plant. The energy plant includes a plurality of subplants, a high level optimizer, a low level optimizer, and a controller. The plurality of subplants are configured to serve energy loads of a campus and include a cogeneration subplant and a chiller subplant. The cogeneration subplant is configured to generate steam and electricity. The chiller subplant is electrically coupled to the cogeneration subplant and configured to consume the electricity generated by the cogeneration subplant. The high level optimizer is configured to determine recommended subplant loads for each of the plurality of subplants. The recommended subplant loads include a rate of steam production and a rate of electricity production of the cogeneration subplant and a rate of electricity consumption of the chiller subplant. The low level optimizer is configured to determine recommended equipment setpoints for equipment of the plurality of subplants based on the recommended subplant loads. The controller is configured to operate the equipment of the plurality of subplants based on the recommended equipment setpoints.
- In some embodiments, the chiller subplant is fluidly coupled to the cogeneration subplant and configured to chill the steam generated by the cogeneration subplant. The recommended subplant loads may include a rate of steam consumption and a rate of chilled steam production of the chiller subplant.
- In some embodiments, the energy plant includes a user interface configured to receive manual subplant loads specified by a user. The low level optimizer can be configured to determine the recommended equipment setpoints for the equipment of the plurality of subplants based on the manual subplant loads.
- In some embodiments, the energy plant includes a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI and present the dispatch GUI via the user interface. The dispatch GUI may include the recommended subplant loads and the manual subplant loads.
- In some embodiments, the dispatch GUI includes an operating mode selector configured to display a plurality of operating modes and to receive a user selection of one of the operating modes. The plurality of operating modes may include an automatic operating mode, an advisory operating mode, and a manual operating mode.
- In some embodiments, the low level optimizer is configured to operate in (1) an automatic operating mode in which the low level optimizer determines a first set of recommended equipment setpoints to achieve the recommended subplant loads and (2) a manual operating mode in which the low level optimizer determines a second set of recommended equipment setpoints to achieve the manual subplant loads.
- In some embodiments, the high level optimizer is configured to determine an amount of overproduction or underproduction resulting from the manual subplant loads by comparing the manual subplant loads to a campus energy load.
- In some embodiments, the plurality of subplants include an energy storage subplant. The user interface may include an indication of an amount of time until the energy storage subplant is (1) fully depleted based on the amount of underproduction or (2) filled to capacity based on the amount of overproduction.
- In some embodiments, the energy plant includes a subplant monitor configured to monitor the energy plant and identify actual subplant loads for each of the plurality of subplants. In some embodiments, the energy plant includes a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI comprising the recommended subplant loads and the actual subplant loads.
- Another implementation of the present disclosure is a method for monitoring and controlling an energy plant including a plurality of subplants that operate to serve energy loads of a campus. The method includes operating a cogeneration subplant of the plurality of subplants to generate steam and electricity, operating a chiller subplant of the plurality of subplants to consume the electricity generated by the cogeneration subplant, and determining recommended subplant loads for each of the plurality of subplants. The recommended subplant loads include a rate of steam production and a rate of electricity production of the cogeneration subplant and a rate of electricity consumption of the chiller subplant. The method includes determining recommended equipment setpoints for equipment of the plurality of subplants based on the recommended subplant loads and operating the equipment of the plurality of subplants based on the recommended equipment setpoints.
- In some embodiments, the method includes operating the chiller subplant to chill the steam generated by the cogeneration subplant. The recommended subplant loads may include a rate of steam consumption and a rate of chilled steam production of the chiller subplant.
- In some embodiments, the method includes receiving manual subplant loads specified by a user via a user interface and determining the recommended equipment setpoints for the equipment of the plurality of subplants based on the manual subplant loads.
- In some embodiments, the method includes generating a dispatch GUI and presenting the dispatch GUI via the user interface. The dispatch GUI may include the recommended subplant loads and the manual subplant loads.
- In some embodiments, the method includes receiving a user selection of one of a plurality of operating modes via an operating mode selector of the dispatch GUI. The plurality of operating modes may include an automatic operating mode, an advisory operating mode, and a manual operating mode.
- In some embodiments, the method includes operating in an automatic operating mode to determine a first set of recommended equipment setpoints to achieve the recommended subplant loads and operating in a manual operating mode to determine a second set of recommended equipment setpoints to achieve the manual subplant loads.
- In some embodiments, the method includes determining an amount of overproduction or underproduction resulting from the manual subplant loads by comparing the manual subplant loads to a campus energy load.
- In some embodiments, the plurality of subplants include an energy storage subplant. The user interface may include an indication of an amount of time until the energy storage subplant is (1) fully depleted based on the amount of underproduction or (2) filled to capacity based on the amount of overproduction.
- In some embodiments, the method includes monitoring the energy plant to identify actual subplant loads for each of the plurality of subplants. In some embodiments, the method includes generating a dispatch GUI comprising the recommended subplant loads and the actual subplant loads.
- Those skilled in the art will appreciate that the summary is illustrative only and is not intended to be in any way limiting. Other aspects, inventive features, and advantages of the devices and/or processes described herein, as defined solely by the claims, will become apparent in the detailed description set forth herein and taken in conjunction with the accompanying drawings.
-
FIG. 1 is a drawing of a building equipped with a building automation system and served by an energy plant, according to an exemplary embodiment. -
FIG. 2 is a schematic diagram of an energy plant including a number of subplants configured to serve the energy loads of the building ofFIG. 1 , according to an exemplary embodiment. -
FIG. 3 is a block diagram of an energy optimization system (EOS) configured to monitor and control the energy plant ofFIG. 2 , according to an exemplary embodiment. -
FIG. 4 is a block diagram of a plant system illustrating a cascaded optimization process which may be performed by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 5 is a block diagram illustrating the operation of the EOS ofFIG. 3 in an automatic operating mode, according to an exemplary embodiment. -
FIG. 6 is a flow diagram illustrating the operation of the EOS ofFIG. 3 in the automatic operating mode, according to an exemplary embodiment. -
FIG. 7 is a block diagram illustrating the operation of the EOS ofFIG. 3 in an advisory operating mode, according to an exemplary embodiment. -
FIG. 8 is a flow diagram illustrating the operation of the EOS ofFIG. 3 in the advisory operating mode, according to an exemplary embodiment. -
FIG. 9 is a block diagram illustrating the operation of the EOS ofFIG. 3 in a manual operating mode, according to an exemplary embodiment. -
FIG. 10 is a flow diagram illustrating the operation of the EOS ofFIG. 3 in the manual operating mode, according to an exemplary embodiment. -
FIG. 11 is a drawing of a site summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 12 is a drawing of a chilled water loop summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 13 is a drawing of another chilled water loop summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 14 is a drawing of an equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 15 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 16 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 17 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 18 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 19 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 20 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 21 is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 22A is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 22B is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 22C is a drawing of another equipment summary interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 23A is a drawing of a dispatch schedule interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 23B is a drawing of another dispatch schedule interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 23C is a drawing of another dispatch schedule interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 24 is a drawing of a dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 25 is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 26A is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 26B is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 27A is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 27B is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 28A is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 28B is a drawing of another dispatch chart interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 29 is a drawing of a weather forecast input interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 30 is a drawing of a dry bulb temperature forecast input interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 31 is a drawing of an override interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 32 is a drawing of a utility pricing forecast input interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 33 is a drawing of an out-of-service schedule interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 34 is a drawing of a campus schedule interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 35A is a drawing of a reporting interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 35B is a drawing of another reporting interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIGS. 36A and 36B are drawings of a site summary report which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. -
FIG. 37 is a drawing of an audit log interface which may be generated by the EOS ofFIG. 3 , according to an exemplary embodiment. - Referring generally to the FIGURES, systems and methods for monitoring and controlling an energy plant are shown, according to an exemplary embodiment. The energy plant may include a plurality of subplants configured to serve the heating, cooling, and electric loads of a building or campus. For example, the energy plant may include a heater subplant, one or more chiller subplants, a heat recovery chiller subplant, a cogeneration subplant, a steam subplant, a hot thermal energy storage (TES) subplant, and/or a cold TES subplant. The subplants may be located within the same building or distributed across multiple buildings. The energy plant may be controlled by an energy optimization system (EOS) that distributes a requested or predicted energy load (e.g., a heating load, a cooling load, an electric load, etc.) across the plurality of subplants. In some embodiments, the EOS performs an optimization process to determine an optimal load distribution across the plurality of subplants for each of a plurality of time steps within a prediction window.
- The EOS may predict the loads on each of the subplants throughout the prediction window. In some embodiments, the predicted subplant loads include a heating load served by the heating subplant, a heating load served by the heat recovery chiller subplant, a heating load served by the steam subplant, a cooling load served by the heat recovery chiller subplant, a cooling load served by the chiller subplant(s), an electric load served by the cogeneration subplant, a heating load served or stored by the hot TES subplant (e.g., a predicted rate at which the hot TES subplant will be charging or discharging), and/or a cooling load served or stored by the cold TES subplant (e.g., a predicted rate at which the cold TES subplant will be charging or discharging). In some embodiments, the EOS predicts a charge state for the TES subplants defining an amount of thermal energy stored in each of the TES subplants during each of the dispatch intervals. The predicted subplant loads and TES charge states for each of the future time steps may be stored in a subplant utilization database. The actual operation of the energy plant may be monitored to determine the actual subplant loads and TES charge stages during each of the time steps. The actual subplant loads and TES charge states may be stored in the subplant utilization database for each of the past and current dispatch intervals.
- A dispatch graphical user interface (GUI) generator may access the data stored in the subplant utilization database and use the stored data to generate a dispatch GUI. The dispatch GUI may be a graph or chart that illustrates the actual subplant utilization data (e.g., past and current subplant loads) and the predicted subplant utilization data (e.g., future subplant loads) in a graphical format. In some embodiments, the dispatch GUI indicates the actual and predicted subplant loads for each of the subplants at each of the dispatch intervals represented in the dispatch GUI. The dispatch GUI may be configured to receive manual subplant loads specified by a user.
- The dispatch GUI generator may provide the dispatch GUI to a user interface of a client device (e.g., a computer terminal, a workstation, a laptop, a tablet, a smartphone, etc.). In some embodiments, the dispatch GUI generator is a component of the energy plant controller. In other embodiments, the dispatch GUI generator may be a component of the client device. For example, the dispatch GUI generator may be a web browser or a specialized application running on the client device. In some embodiments, the dispatch GUI is rendered using specialized viewing software (e.g., an energy plant monitoring application) installed on the client device. In other embodiments, the dispatch GUI is provided via a web interface which allows the dispatch GUI to be rendered and viewed using a web browser without requiring any specialized applications or software to be installed on the client device.
- The dispatch GUI may present recommended (i.e., optimal) subplant loads, manual subplant loads, and actual subplant loads in a variety of visual formats (e.g., diagrams, charts, graphs, etc.) that illustrate the operation of the energy plant. The dispatch GUI may include a first set of recommended equipment setpoints that result from the recommended subplant loads, a second set of recommended equipment setpoints that result from the manual subplant loads, and the actual equipment setpoints to provide details regarding the operation of each subplant. The dispatch GUI may include past dispatch data (e.g., past subplant loads, past equipment setpoints) and current dispatch data (e.g., current subplant loads, current equipment setpoints) to allow a user to view a history of energy plant operations. The dispatch GUI may also include future dispatch data (e.g., planned subplant loads, planned equipment setpoints) to allow the user to view planned energy plant operations into the future. Additional features and advantages of the dispatch GUI are described in detail below.
- In some embodiments, the dispatch GUI generator and/or the dispatch GUI include some or all of the features described in U.S. Design patent application No. 29/515,801 filed Jan. 27, 2015, U.S. Provisional Patent Application No. 62/286,287 filed Jan. 22, 2017, and/or U.S. patent application Ser. No. 15/387,512 filed Dec. 21, 2016. The entire disclosure of each of these patent applications is incorporated by reference herein.
- Building with HVAC System
- Referring now to
FIG. 1 , a perspective view of abuilding 10 is shown.Building 10 is served by a building automation system (BAS). A BAS is, in general, a system of devices configured to control, monitor, and manage equipment in or around a building or building area. A BAS can include, for example, a HVAC system, a security system, a lighting system, a fire alerting system, any other system that is capable of managing building functions or devices, or any combination thereof. - The BAS that serves building 10 includes an
HVAC system 100.HVAC system 100 may include a plurality of HVAC devices (e.g., heaters, chillers, air handling units, pumps, fans, thermal energy storage, etc.) configured to provide heating, cooling, ventilation, or other services for building 10. For example,HVAC system 100 is shown to include awaterside system 120 and anairside system 130.Waterside system 120 may provide a heated or chilled fluid to an air handling unit ofairside system 130.Airside system 130 may use the heated or chilled fluid to heat or cool an airflow provided to building 10. In some embodiments,waterside system 120 is replaced with a central energy plant such asenergy plant 200, described with reference toFIG. 2 . - Still referring to
FIG. 1 ,HVAC system 100 is shown to include achiller 102, aboiler 104, and a rooftop air handling unit (AHU) 106.Waterside system 120 may useboiler 104 andchiller 102 to heat or cool a working fluid (e.g., water, glycol, etc.) and may circulate the working fluid toAHU 106. In various embodiments, the HVAC devices ofwaterside system 120 may be located in or around building 10 (as shown inFIG. 1 ) or at an offsite location such as an energy plant (e.g., a chiller plant, a steam plant, a heat plant, etc.). The working fluid may be heated inboiler 104 or cooled inchiller 102, depending on whether heating or cooling is required in building 10.Boiler 104 may add heat to the circulated fluid, for example, by burning a combustible material (e.g., natural gas) or using an electric heating element.Chiller 102 may place the circulated fluid in a heat exchange relationship with another fluid (e.g., a refrigerant) in a heat exchanger (e.g., an evaporator) to absorb heat from the circulated fluid. The working fluid fromchiller 102 and/orboiler 104 may be transported toAHU 106 viapiping 108. -
AHU 106 may place the working fluid in a heat exchange relationship with an airflow passing through AHU 106 (e.g., via one or more stages of cooling coils and/or heating coils). The airflow may be, for example, outside air, return air from within building 10, or a combination of both.AHU 106 may transfer heat between the airflow and the working fluid to provide heating or cooling for the airflow. For example,AHU 106 may include one or more fans or blowers configured to pass the airflow over or through a heat exchanger containing the working fluid. The working fluid may then return tochiller 102 orboiler 104 viapiping 110. -
Airside system 130 may deliver the airflow supplied by AHU 106 (i.e., the supply airflow) to building 10 viaair supply ducts 112 and may provide return air from building 10 toAHU 106 viaair return ducts 114. In some embodiments,airside system 130 includes multiple variable air volume (VAV)units 116. For example,airside system 130 is shown to include aseparate VAV unit 116 on each floor or zone of building 10.VAV units 116 may include dampers or other flow control elements that can be operated to control an amount of the supply airflow provided to individual zones of building 10. In other embodiments,airside system 130 delivers the supply airflow into one or more zones of building 10 (e.g., via air supply ducts 112) without usingintermediate VAV units 116 or other flow control elements.AHU 106 may include various sensors (e.g., temperature sensors, pressure sensors, etc.) configured to measure attributes of the supply airflow.AHU 106 may receive input from sensors located withinAHU 106 and/or within the building zone and may adjust the flow rate, temperature, or other attributes of the supply airflow throughAHU 106 to achieve setpoint conditions for the building zone. - Referring now to
FIG. 2 , a block diagram of anenergy plant 200 is shown, according to an exemplary embodiment. In brief overview,energy plant 200 may include various types of equipment configured to serve the thermal and electrical energy loads of a building or campus (i.e., a system of buildings). For example,energy plant 200 may include heaters, chillers, heat recovery chillers, cooling towers, or other types of equipment configured to serve the heating and/or cooling loads of a building or campus.Energy plant 200 may consume resources from a utility (e.g., electricity, water, natural gas, etc.) to heat or cool a working fluid that is circulated to one or more buildings or stored for later use (e.g., in thermal energy storage tanks) to provide heating or cooling for the buildings. In various embodiments,energy plant 200 may supplement or replacewaterside system 120 in building 10 or may be implemented separate from building 10 (e.g., at an offsite location, distributed across multiple buildings, etc.). -
Energy plant 200 is shown to include a plurality of subplants 202-210 including afirst chiller subplant 202, asecond chiller subplant 204, athird chiller subplant 206, asteam subplant 208, and acogeneration subplant 210. Subplants 202-210 consume resources from utilities to serve the thermal and electrical energy loads (e.g., hot water, cold water, heating, cooling, steam, electricity, etc.) of a building or campus. For example, chiller subplants 202-206 may be configured to chill water in a cold water loop that circulates the cold water between chiller subplants 202-206campus 216.Steam subplant 208 may be configured to generate steam and circulate the steam in a steam loop between steam subplant 208 andcampus 216.Cogeneration subplant 210 can be configured to cogenerate both steam and electricity (e.g., by operating one or more combustion turbines 230). - Each of subplants 202-210 may include a variety of equipment configured to facilitate the functions of the subplant. For example, chiller subplants 202-206 are shown to include a plurality of
electric chillers steam chillers Electric chillers steam chillers boilers 232 and/orcombustion turbines 230.Steam subplant 208 may include one ormore boilers 232 configured to boil water to produce steam.Cogeneration subplant 210 may include one ormore combustion turbines 230 configured to generate both steam and electricity. In some embodiments,steam subplant 208 burns gas from agas supply 214. Chiller subplants 202-206 may consume electricity from anelectricity supply 212 to generate the chilled water. - Referring now to
FIG. 3 , a block diagram illustrating anenergy plant system 300 is shown, according to an exemplary embodiment.System 300 is shown to include an energy optimization system (EOS) 302, a building automation system (BAS) 308, and a plurality of subplants 202-210. Subplants 202-210 may be the same as previously described with reference toFIG. 2 . For example, subplants 202-210 are shown to include afirst chiller subplant 202, asecond chiller subplant 204, athird chiller subplant 206, asteam subplant 208, and acogeneration subplant 210. - Each of subplants 202-210 is shown to include
equipment 340 that can be controlled byEOS 302 and/orbuilding automation system 308 to optimize the performance ofenergy plant 200.Equipment 340 may include, for example, heating devices, chillers, heat recovery heat exchangers, cooling towers, thermal energy storage devices, pumps, valves, and/or other devices of subplants 202-210 (e.g.,electric chillers steam chillers combustion turbines 230, and/or boilers 232). Individual devices ofequipment 340 can be turned on or off to adjust the thermal or electrical energy load served by each of subplants 202-210. In some embodiments, individual devices ofequipment 340 can be operated at variable capacities (e.g., operating a chiller at 10% capacity or 60% capacity) according to an operating setpoint received fromEOS 302. - In some embodiments, one or more of subplants 202-210 includes a subplant level controller configured to control the
equipment 340 of the corresponding subplant. For example,EOS 302 may determine an on/off configuration and global operating setpoints forequipment 340. In response to the on/off configuration and received global operating setpoints, the subplant controllers may turn individual devices ofequipment 340 on or off, and implement specific operating setpoints (e.g., damper position, vane position, fan speed, pump speed, etc.) to reach or maintain the global operating setpoints. - In some embodiments, the subplant level controllers receive subplant load setpoints from
EOS 302. Each subplant level controller may use the subplant load setpoint for the corresponding subplant to select one or more devices of theequipment 340 within the subplant to activate or deactivate in order to meet the subplant load setpoint in an energy-efficient manner. In other embodiments, the equipment selection and staging decisions (i.e., deciding which devices to turn on/off) are performed by alow level optimizer 332 withinEOS 302. -
BAS 308 may be configured to monitor conditions within a controlled building or building zone. For example,BAS 308 may receive input from various sensors (e.g., temperature sensors, humidity sensors, airflow sensors, voltage sensors, etc.) distributed throughout the building and may report building conditions toEOS 302. Building conditions may include, for example, a temperature of the building or a zone of the building, a power consumption (e.g., electric load) of the building, a state of one or more actuators configured to affect a controlled state within the building, or other types of information relating to the controlled building.BAS 308 may operate subplants 202-210 to affect the monitored conditions within the building and/or to serve the thermal/electrical energy loads of the building. -
BAS 308 may receive control signals fromEOS 302 specifying on/off states and/or setpoints forequipment 340.BAS 308 may control equipment 340 (e.g., via actuators, power relays, etc.) in accordance with the control signals provided byEOS 302. For example,BAS 308 may operateequipment 340 using closed loop control to achieve the setpoints specified byEOS 302. In various embodiments,BAS 308 may be combined withEOS 302 or may be part of a separate building automation system. According to an exemplary embodiment,BAS 308 is a METASYS® brand building automation system, as sold by Johnson Controls, Inc. In some embodiments,BAS 308 is a controller that operates to controlequipment 340 and/or operatesequipment 340 to achieve the setpoints specified by EOS 302 (i.e., the setpoints generated by low level optimizer 332). -
EOS 302 may monitor the status of the controlled building using information received fromBAS 308.EOS 302 may be configured to predict the thermal/electrical energy loads (e.g., heating loads, cooling loads, electric, etc.) of the building for plurality of time steps in a prediction window (e.g., using weather forecasts from a weather service 324).EOS 302 may generate on/off decisions and/or setpoints forequipment 340 to minimize the cost of energy consumed by subplants 202-210 to serve the predicted heating and/or cooling loads for the duration of the prediction window. In various embodiments,EOS 302 may be integrated within a single computer (e.g., one server, one housing, etc.) or distributed across multiple servers or computers. In some embodiments,EOS 302 is integrated with a smart building manager that manages multiple building systems and/or combined withBAS 308. -
EOS 302 may be configured to operate in multiple different operating modes including an automatic mode, an advisory mode, and a manual mode. In the automatic mode,EOS 302 may automatically controlenergy plant 200. For example,EOS 302 may automatically determine optimal subplant loads for each of subplants 202-210.EOS 302 may use the optimal subplant loads to determine optimal on/off decisions and operating setpoints for individual devices ofequipment 340. In the automatic mode,EOS 302 may provide the control signals toBAS 308 and/orequipment 340 to controlequipment 340 without requiring user intervention or input.BAS 308 may relay the control signals to subplants 202-210 or may be bypassed entirely. In other words,EOS 302 may automatically controlenergy plant 200 in accordance with the optimized load setpoints and/or equipment setpoints when operated in the automatic mode. The automatic mode is described in greater detail with reference toFIGS. 5-6 . - In the advisory mode,
BAS 308 may controlenergy plant 200, whereasEOS 302 may provide advice.EOS 302 may still determine optimal subplant loads for each of subplants 202-210 and optimal on/off decisions and operating setpoints forequipment 340. However, the optimal values determined byEOS 302 may be provided toBAS 308 as recommended subplant loads and recommended setpoints. The recommended loads and setpoints may also be presented to a user via a user interface.BAS 308 may determine whether to use the recommended loads and setpoints to controlenergy plant 200. In some embodiments,BAS 308 uses input from a user to determine whether to apply the recommended loads and setpoints provided byEOS 302. In some embodiments,EOS 302 displays the recommended loads/setpoints to a user and the user enters the recommended loads/setpoints as an input toBAS 308. In other embodiments,BAS 308 receives the recommended loads/setpoints directly fromEOS 302. The advisory mode is described in greater detail with reference toFIGS. 7-8 . - In the manual mode,
EOS 302 may controlenergy plant 200 based on user input. Similar to the advisory mode,EOS 302 may determine optimal subplant loads for each of subplants 202-210 and optimal on/off decisions and operating setpoints forequipment 340. The optimal values determined byEOS 302 may be presented to a user (e.g., via a user interface) as recommended subplant loads and recommended setpoints. A user can accept the optimized values or enter user-defined (i.e., “manual”) values for the subplant loads, equipment on/off decisions, and/or operating setpoints via the user interface. In some embodiments, the user-defined values override the optimized values whenEOS 302 is operated in the manual mode. For example,EOS 302 may determine on/off decisions and control setpoints forequipment 340 based on the user-defined load setpoints for each of subplants 302-312. The manual mode is described in greater detail with reference toFIGS. 9-10 . - Still referring to
FIG. 3 ,EOS 302 is shown to include acommunications interface 304 and aprocessing circuit 306. Communications interface 304 may include wired or wireless interfaces (e.g., jacks, antennas, transmitters, receivers, transceivers, wire terminals, etc.) for conducting data communications with various systems, devices, or networks. For example,communications interface 304 may include an Ethernet card and port for sending and receiving data via an Ethernet-based communications network and/or a Wi-Fi transceiver for communicating via a wireless communications network. Communications interface 304 may be configured to communicate via local area networks or wide area networks (e.g., the Internet, a building WAN, etc.) and may use a variety of communications protocols (e.g., BACnet, IP, LON, etc.). - Communications interface 304 may be a network interface configured to facilitate electronic data communications between
EOS 302 and various external systems or devices (e.g.,BAS 308, subplants 202-210, etc.). For example,EOS 302 may receive information fromBAS 308 indicating one or more measured states of the controlled building (e.g., temperature, humidity, electric loads, etc.) and one or more states of subplants 202-210 (e.g., equipment status, power consumption, equipment availability, etc.). Communications interface 304 may receive inputs fromBAS 308 and/or subplants 202-210 and may provide operating parameters (e.g., on/off decisions, setpoints, etc.) to subplants 202-210 viaBAS 308. The operating parameters may cause subplants 202-210 to activate, deactivate, or adjust a setpoint for various devices ofequipment 340. - Still referring to
FIG. 3 ,processing circuit 306 is shown to include aprocessor 310 andmemory 312.Processor 310 may be a general purpose or specific purpose processor, an application specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGAs), a group of processing components, or other suitable processing components.Processor 310 may be configured to execute computer code or instructions stored inmemory 312 or received from other computer readable media (e.g., CDROM, network storage, a remote server, etc.). -
Memory 312 may include one or more devices (e.g., memory units, memory devices, storage devices, etc.) for storing data and/or computer code for completing and/or facilitating the various processes described in the present disclosure.Memory 312 may include random access memory (RAM), read-only memory (ROM), hard drive storage, temporary storage, non-volatile memory, flash memory, optical memory, or any other suitable memory for storing software objects and/or computer instructions.Memory 312 may include database components, object code components, script components, or any other type of information structure for supporting the various activities and information structures described in the present disclosure.Memory 312 may be communicably connected toprocessor 310 viaprocessing circuit 306 and may include computer code for executing (e.g., by processor 310) one or more processes described herein. - Still referring to
FIG. 3 ,memory 312 is shown to include abuilding status monitor 334.EOS 302 may receive data regarding the overall building or building space to be heated or cooled withenergy plant 200 viabuilding status monitor 334. In an exemplary embodiment, building status monitor 334 may include a graphical user interface component configured to provide graphical user interfaces to a user for selecting building requirements (e.g., overall temperature parameters, selecting schedules for the building, selecting different temperature levels for different building zones, etc.). -
EOS 302 may determine on/off configurations and operating setpoints to satisfy the building requirements received from buildingstatus monitor 334. In some embodiments, building status monitor 334 receives, collects, stores, and/or transmits cooling load requirements, building temperature setpoints, occupancy data, weather data, energy data, schedule data, and other building parameters. In some embodiments, building status monitor 334 stores data regarding energy costs, such as pricing information available from utilities 326 (energy charge, demand charge, etc.). - Still referring to
FIG. 3 ,memory 312 is shown to include a load/rate predictor 322. Load/rate predictor 322 may be configured to predict the energy loads ({circumflex over (l)}k) of the building or campus for each time step k (e.g., k=1 . . . n) of an optimization period. Load/rate predictor 322 is shown receiving weather forecasts from aweather service 324. In some embodiments, load/rate predictor 322 predicts the energy loads {circumflex over (l)}k as a function of the weather forecasts. In some embodiments, load/rate predictor 322 uses feedback fromBAS 308 to predict loads {circumflex over (l)}k. Feedback fromBAS 308 may include various types of sensory inputs (e.g., temperature, flow, humidity, enthalpy, etc.) or other data relating to the controlled building (e.g., inputs from a HVAC system, a lighting control system, a security system, a water system, etc.). - In some embodiments, load/
rate predictor 322 receives a measured electric load and/or previous measured load data from BAS 308 (e.g., via building status monitor 334). Load/rate predictor 322 may predict loads {circumflex over (l)}k as a function of a given weather forecast ({circumflex over (ϕ)}w), a day type (day), the time of day (t), and previous measured load data (Yk-1). Such a relationship is expressed in the following equation: -
{circumflex over (l)} k =f({circumflex over (ϕ)}w,day,t|Y k-1) - In some embodiments, load/
rate predictor 322 uses a deterministic plus stochastic model trained from historical load data to predict loads {circumflex over (l)}k. Load/rate predictor 322 may use any of a variety of prediction methods to predict loads {circumflex over (l)}k (e.g., linear regression for the deterministic portion and an AR model for the stochastic portion). Load/rate predictor 322 may predict one or more different types of loads for the building or campus. For example, load/rate predictor 322 may predict a hot water load {circumflex over (l)}Hot,k and a cold water load {circumflex over (l)}Cold,k for each time step k within the prediction window. - Load/
rate predictor 322 is shown receiving utility rates fromutilities 326. Utility rates may indicate a cost or price per unit of a resource (e.g., electricity, natural gas, water, etc.) provided byutilities 326 at each time step k in the prediction window. In some embodiments, the utility rates are time-variable rates. For example, the price of electricity may be higher at certain times of day or days of the week (e.g., during high demand periods) and lower at other times of day or days of the week (e.g., during low demand periods). The utility rates may define various time periods and a cost per unit of a resource during each time period. Utility rates may be actual rates received fromutilities 326 or predicted utility rates estimated by load/rate predictor 322. - In some embodiments, the utility rates include demand charges for one or more resources provided by
utilities 326. A demand charge may define a separate cost imposed byutilities 326 based on the maximum usage of a particular resource (e.g., maximum energy consumption) during a demand charge period. The utility rates may define various demand charge periods and one or more demand charges associated with each demand charge period. In some instances, demand charge periods may overlap partially or completely with each other and/or with the prediction window. Advantageously,energy plant optimizer 328 may be configured to account for demand charges in the high level optimization process performed byhigh level optimizer 330.Utilities 326 may be defined by time-variable (e.g., hourly) prices, a maximum service level (e.g., a maximum rate of consumption allowed by the physical infrastructure or by contract) and, in the case of electricity, a demand charge or a charge for the peak rate of consumption within a certain period. - Load/
rate predictor 322 may store the predicted loads {circumflex over (l)}k and the utility rates inmemory 312 and/or provide the predicted loads {circumflex over (l)}k and the utility rates toenergy plant optimizer 328.Energy plant optimizer 328 may use the predicted loads {circumflex over (l)}k and the utility rates to determine an optimal load distribution for subplants 202-210 and to generate on/off decisions and setpoints forequipment 340. - Still referring to
FIG. 3 ,memory 312 is shown to include anenergy plant optimizer 328.Energy plant optimizer 328 may perform a cascaded optimization process to optimize the performance ofenergy plant 200. For example,energy plant optimizer 328 is shown to include ahigh level optimizer 330 and alow level optimizer 332.High level optimizer 330 may control an outer (e.g., subplant level) loop of the cascaded optimization.High level optimizer 330 may determine an optimal distribution of energy loads across subplants 202-210 for each time step in the prediction window in order to optimize (e.g., minimize) the cost of energy consumed by subplants 202-210.Low level optimizer 332 may control an inner (e.g., equipment level) loop of the cascaded optimization.Low level optimizer 332 may determine how to best run each subplant at the load setpoint determined byhigh level optimizer 330. For example,low level optimizer 332 may determine on/off states and/or operating setpoints for various devices ofequipment 340 in order to optimize (e.g., minimize) the energy consumption of each subplant while meeting the energy load setpoint for the subplant. The cascaded optimization process is described in greater detail with reference toFIG. 4 . - Still referring to
FIG. 3 ,memory 312 is shown to include asubplant monitor 338. Subplant monitor 338 may collect and store information regarding the past, current, and future (e.g., planned) utilization of subplants 202-210. For example,subplant monitor 338 may receive actual utilization data fromBAS 308 and/orenergy plant 200 indicating the actual energy loads served by subplants 202-210. The actual utilization data may be current utilization data (e.g., the actual energy loads currently being served) or past utilization data (e.g., the actual energy loads served at a previous time). In some embodiments, the actual utilization data indicates a total heating load and/or a total cooling load requested to be served byenergy plant 200 at a past or current time. The actual utilization data may also indicate any unmet heating and/or cooling load that is requested but not met byenergy plant 200 at a past or current time. In some embodiments, the actual utilization data indicates a past or current rate of utility consumption (e.g., water consumption, electricity consumption, natural gas consumption, photovoltaic energy consumption, etc.). - The actual utilization data may be provided at various levels of granularity. For example, the actual utilization data for a given subplant (e.g., chiller subplant 202) may include an aggregate value that represents the total energy load served by the subplant (e.g., the total load served by all of the chillers). In other embodiments, the actual utilization data may be provided for each of the individual devices within subplants 202-210 (e.g., the cooling load served by each of the chillers individually).
- In some embodiments,
subplant monitor 338 receives the actual utilization data as a continuous data signal. In other embodiments,subplant monitor 338 receives the actual utilization data at regular intervals (e.g., every minute, every fifteen minutes, every hour, etc.). Subplant monitor 338 may store the actual utilization data inmemory 312 or in a separate subplant utilization database. In some embodiments, subplant monitor 338 stores the actual utilization data at regular intervals such that the stored utilization data represents a history of the relevant operating information forenergy plant 200 over time. - Subplant monitor 338 may receive predicted future utilization data indicating the thermal and electrical energy loads to be served by subplants 202-210 at a future time. In some embodiments, the predicted utilization data for subplants 202-210 is generated by
energy plant optimizer 328 for multiple time steps during a prediction window. For example, the predicted utilization data may include the optimal subplant loads predicted byhigh level optimizer 330 and/or the optimal equipment on/off states predicted bylow level optimizer 332 for each time step during the prediction window. - In some embodiments, the predicted utilization data indicates a total heating load and/or a total cooling load predicted by load/
rate predictor 322. The predicted utilization data may also indicate any unmet heating and/or cooling load that is predicted to be requested but not met byenergy plant 200. In some embodiments, the predicted utilization data indicates a predicted rate of utility consumption (e.g., water consumption, electricity consumption, natural gas consumption, photovoltaic energy consumption, etc.). - The predicted utilization data may be provided at various levels of granularity. For example, the predicted utilization data for a given subplant (e.g., chiller subplant 202) may include an aggregate value that represents the total energy load estimated to be served by the subplant (e.g., the total predicted load served by all of the chillers). In other embodiments, the predicted utilization data may be provided for each of the individual devices within subplants 202-210 (e.g., the predicted cooling load served by each of the chillers individually).
- In some embodiments,
subplant monitor 338 receives the predicted utilization data for each of a plurality of time steps during a prediction window. For example,energy plant optimizer 328 may perform an optimization process (described in greater detail with reference toFIG. 4 ) to generate subplant load values for each time step during a prediction window that extends from the current time to a predetermined prediction horizon. Each time step may have a defined duration (e.g., fifteen minutes, one hour, etc.). The predicted subplant load values may be updated each time the optimization process is performed. Subplant monitor 338 may store the predicted utilization data inmemory 312 or in a separate subplant utilization database. In some embodiments, subplant monitor 338 stores the predicted utilization data at regular intervals (e.g., hourly intervals) such that the stored utilization data represents a planned dispatch schedule forenergy plant 200 over time. - Data and processing results from
energy plant optimizer 328,subplant monitor 338, or other modules ofEOS 302 may be accessed by (or pushed to) monitoring andreporting applications 336. Monitoring andreporting applications 336 may be configured to generate real time system health dashboards that can be viewed and navigated by a user (e.g., an energy plant engineer). For example, monitoring andreporting applications 336 may include a web-based monitoring application with several graphical user interface (GUI) elements (e.g., widgets, dashboard controls, windows, etc.) for displaying key performance indicators (KPI) or other information to users of a GUI. In some embodiments, the GUI elements include a chart or graph (e.g., a dispatch bar chart) that represents the actual and predicted utilization data provided bysubplant monitor 338. GUI elements or reports may be generated and shown based on actual and predicted utilization data that allow users to monitor the performance of subplants 202-210 andenergy plant 200 as a whole using a single screen. An exemplary dispatch GUI that may be generated by monitoring andreporting applications 336 is described in greater detail with reference toFIGS. 11-37 . - Still referring to
FIG. 3 ,EOS 302 may include one or more GUI servers,web services 314, orGUI engines 316 to support monitoring andreporting applications 336. In various embodiments,applications 336,web services 314, andGUI engine 316 may be provided as separate components outside of EOS 302 (e.g., as part of a smart building manager).EOS 302 may be configured to maintain detailed historical databases (e.g., relational databases, XML databases, etc.) of relevant data and includes computer code modules that continuously, frequently, or infrequently query, aggregate, transform, search, or otherwise process the data maintained in the detailed databases.EOS 302 may be configured to provide the results of any such processing to other databases, tables, XML files, or other data structures for further querying, calculation, or access by, for example, external monitoring and reporting applications. -
EOS 302 is shown to includeconfiguration tools 318.Configuration tools 318 can allow a user to define (e.g., via graphical user interfaces, via prompt-driven wizards, etc.) howEOS 302 should react to changing conditions in the energy plant subsystems. In an exemplary embodiment,configuration tools 318 allow a user to build and store condition-response scenarios that can cross multiple energy plant devices, multiple building systems, and multiple enterprise control applications (e.g., work order management system applications, entity resource planning applications, etc.). For example,configuration tools 318 can provide the user with the ability to combine data (e.g., from subsystems, from event histories) using a variety of conditional logic. In varying exemplary embodiments, the conditional logic can range from simple logical operators between conditions (e.g., AND, OR, XOR, etc.) to pseudo-code constructs or complex programming language functions (allowing for more complex interactions, conditional statements, loops, etc.).Configuration tools 318 can present user interfaces for building such conditional logic. The user interfaces may allow users to define policies and responses graphically. In some embodiments, the user interfaces may allow a user to select a pre-stored or pre-constructed policy and adapt it or enable it for use with their system. - Referring now to
FIG. 4 , a block diagram illustrating a portion ofenergy plant system 300 in greater detail is shown, according to an exemplary embodiment.FIG. 4 illustrates the cascaded optimization process performed byenergy plant optimizer 328 to optimize the performance ofenergy plant 200. In the cascaded optimization process,high level optimizer 330 performs a subplant level optimization that determines an optimal distribution of thermal and electrical energy loads across subplants 202-210 for each time step in the prediction window in order to minimize the cost of energy consumed by subplants 202-210.Low level optimizer 332 performs an equipment level optimization that determines how to best run each subplant at the subplant load setpoint determined byhigh level optimizer 330. For example,low level optimizer 332 may determine on/off states and/or operating setpoints for various devices ofequipment 340 in order to optimize the energy consumption of each subplant while meeting the thermal and/or electrical energy load setpoint for the subplant. - One advantage of the cascaded optimization process performed by
energy plant optimizer 328 is the optimal use of computational time. For example, the subplant level optimization performed byhigh level optimizer 330 may use a relatively long time horizon due to the operation of the thermal energy storage. However, the equipment level optimization performed bylow level optimizer 332 may use a much shorter time horizon or no time horizon at all since the low level system dynamics are relatively fast (compared to the dynamics of the thermal energy storage) and the low level control ofequipment 340 may be handled byBAS 308. Such an optimal use of computational time makes it possible forenergy plant optimizer 328 to perform the energy plant optimization in a short amount of time, allowing for real-time predictive control. For example, the short computational time enablesenergy plant optimizer 328 to be implemented in a real-time planning tool with interactive feedback. - Another advantage of the cascaded optimization performed by
energy plant optimizer 328 is that the energy plant optimization problem can be split into two cascaded subproblems. The cascaded configuration provides a layer of abstraction that allowshigh level optimizer 330 to distribute the energy loads across subplants 202-210 without requiringhigh level optimizer 330 to know or use any details regarding the particular equipment configuration within each subplant. The interconnections betweenequipment 340 within each subplant may be hidden fromhigh level optimizer 330 and handled bylow level optimizer 332. For purposes of the subplant level optimization performed byhigh level optimizer 330, each subplant may be completely defined by one or more subplant curves 342. -
Low level optimizer 332 may generate and providesubplant curves 342 tohigh level optimizer 330. Subplant curves 342 may indicate the rate of utility use by each of subplants 202-210 (e.g., electricity use measured in kW, water use measured in L/s, etc.) as a function of the subplant load. In some embodiments,low level optimizer 332 generatessubplant curves 342 based on equipment models 320 (e.g., by combiningequipment models 320 for individual devices into an aggregate curve for the subplant).Low level optimizer 332 may generatesubplant curves 342 by running the low level optimization process for several different loads and weather conditions to generate multiple data points.Low level optimizer 332 may fit a curve to the data points to generate subplant curves 342. In other embodiments,low level optimizer 332 provides the data points tohigh level optimizer 330 andhigh level optimizer 330 generates the subplant curves using the data points. -
High level optimizer 330 may receive the load and rate predictions from load/rate predictor 322 and the subplant curves 342 fromlow level optimizer 332. The load predictions may be based on weather forecasts fromweather service 324 and/or information from building automation system 308 (e.g., a current electric load of the building, measurements from the building, a history of previous loads, a setpoint trajectory, etc.). The utility rate predictions may be based on utility rates received fromutilities 326 and/or utility prices from another data source.High level optimizer 330 may determine the optimal load distribution for subplants 202-210 (e.g., a subplant load for each subplant) for each time step the prediction window and may provide the subplant loads as setpoints tolow level optimizer 332. In some embodiments,high level optimizer 330 determines the subplant loads by minimizing the total operating cost ofenergy plant 200 over the prediction window. In other words, given a predicted load and utility rate information from load/rate predictor 322,high level optimizer 330 may distribute the predicted load across subplants 202-210 over the optimization period to minimize operating cost. - In some instances, the optimal load distribution may include using thermal energy storage to store thermal energy during a first time step for use during a later time step. Thermal energy storage may advantageously allow thermal energy to be produced and stored during a first time period when energy prices are relatively low and subsequently retrieved and used during a second time period when energy proves are relatively high. The high level optimization may be different from the low level optimization in that the high level optimization has a longer time constant due to the thermal energy storage provided by thermal energy storage. The high level optimization may be described by the following equation:
-
- where θ*HL contains the optimal high level decisions (e.g., the optimal load for each of subplants 202-210) for the entire optimization period and JHL is the high level cost function.
- To find the optimal high level decisions θ*HL,
high level optimizer 330 may minimize the high level cost function JHL. The high level cost function JHL may be the sum of the economic (e.g., monetary) costs of each utility consumed by each of subplants 202-210 for the duration of the optimization period. In some embodiments, the high level cost function JHL may be described using the following equation: -
- where nh is the number of time steps k in the optimization period, ns is the number of subplants, ts is the duration of a time step, cjk is the economic cost of utility j at a time step k of the optimization period, and ujik is the rate of use of utility j by subplant i at time step k.
- In some embodiments, the cost function JHL includes an additional demand charge term such as:
-
- where wd is a weighting term, cdemand is the demand cost, and the max( ) term selects the peak electricity use during the applicable demand charge period. Accordingly, the high level cost function JHL may be described by the equation:
-
- The decision vector θHL may be subject to several constraints. For example, the constraints may require that the subplants not operate at more than their total capacity, that the thermal storage not charge or discharge too quickly or under/over flow for the tank, and that the energy loads for the building or campus are met. These restrictions may lead to both equality and inequality constraints on the high level optimization problem.
- In some embodiments, the high level optimization performed by
high level optimizer 330 is the same or similar to the high level optimization process described in U.S. patent application Ser. No. 14/634,609 filed Feb. 27, 2015 and titled “High Level Energy plant Optimization,” the entire disclosure of which is incorporated by reference herein.High level optimizer 330 may include some or all of the features and/or functionality of the high level optimization module described in U.S. patent application Ser. No. 14/634,609. - Still referring to
FIG. 4 ,low level optimizer 332 may use the subplant loads determined byhigh level optimizer 330 to determine optimal low level decisions θ*LL (e.g. binary on/off decisions, flow setpoints, temperature setpoints, etc.) forequipment 340. The low level optimization process may be performed for each of subplants 202-210. In various embodiments, the low level optimization process may be performed by centralizedlow level optimizer 332 that performs a separate low level optimization for each of subplants 202-210 or by a set of subplant level controllers that operate within each subplant (e.g., each subplant controller running an instance of low level optimizer 332).Low level optimizer 332 may be responsible for determining which devices of the subplant to use and/or the operating setpoints for such devices that will achieve the subplant load setpoint while minimizing energy consumption. The low level optimization may be described using the following equation: -
- where θ*LL contains the optimal low level decisions and JLL is the low level cost function.
- To find the optimal low level decisions θ*LL,
low level optimizer 332 may minimize the low level cost function JLL. The low level cost function JLL may represent the total energy consumption for all ofequipment 340 in the applicable subplant. The low level cost function JLL may be described using the following equation: -
- where N is the number of devices of
equipment 340 in the subplant, ts is the duration of a time step, bj is a binary on/off decision (e.g., 0=off, 1=on), and uj is the energy used by device j as a function of the setpoint θLL. Each device may have continuous variables which can be changed to determine the lowest possible energy consumption for the overall input conditions. -
Low level optimizer 332 may minimize the low level cost function JLL subject to inequality constraints based on the capacities ofequipment 340 and equality constraints based on energy and mass balances. In some embodiments, the optimal low level decisions θ*LL are constrained by switching constraints defining a short horizon for maintaining a device in an on or off state after a binary on/off switch. The switching constraints may prevent devices from being rapidly cycled on and off. In some embodiments,low level optimizer 332 performs the equipment level optimization without considering system dynamics. The optimization process may be slow enough to safely assume that the equipment control has reached its steady-state. Thus,low level optimizer 332 may determine the optimal low level decisions θ*LL at an instance of time rather than over a long horizon. - In some embodiments, the optimal low level decisions θ*LL are constrained by an
equipment staging coordinator 344 that prevents two or more of subplants 202-210 from reacting to a change in the subplant load too quickly after a change in another of subplants 202-210 has occurred. For example,equipment staging coordinator 344 is shown receiving equipment status information fromBAS 308.Equipment staging coordinator 344 may use the equipment status information to determine when theequipment 340 within a given subplant has been staged (e.g., turned on/off).Equipment staging coordinator 344 may prevent multiple subplants from staging theirequipment 340 simultaneously or within a predetermined time period after another subplant has staged itsequipment 340. Advantageously, this functionality reduces the peak energy consumption forenergy plant 200 at any instant in time and results in a lower demand charge. - In some embodiments,
equipment staging coordinator 344 causeslow level optimizer 332 to halt its efficiency calculations and hold the optimal low level decisions θ*LL for a given subplant at previously-determined values shortly after theequipment 340 for another subplant has been staged (e.g., by providing a freeze signal to low level optimizer 332). Once a threshold time has passed since theequipment 340 for the other subplant has been staged,equipment staging coordinator 344 may allowlow level optimizer 332 to resume its efficiency calculations and to determine new values for the optimal low level decisions θ*LL (e.g., by withdrawing the freeze signal). -
Low level optimizer 332 may determine optimum operating statuses (e.g., on or off) for a plurality of devices ofequipment 340. According to an exemplary embodiment, the on/off combinations may be determined using binary optimization and quadratic compensation. Binary optimization may minimize a cost function representing the power consumption of devices in the applicable subplant. In some embodiments, non-exhaustive (i.e., not all potential combinations of devices are considered) binary optimization is used. Quadratic compensation may be used in considering devices whose power consumption is quadratic (and not linear).Low level optimizer 332 may also determine optimum operating setpoints for equipment using nonlinear optimization. Nonlinear optimization may identify operating setpoints that further minimize the low level cost function JLL.Low level optimizer 332 may provide the on/off decisions and setpoints tobuilding automation system 308 for use in controlling theenergy plant equipment 340. - In some embodiments, the low level optimization performed by
low level optimizer 332 is the same or similar to the low level optimization process described in U.S. patent application Ser. No. 14/634,615 filed Feb. 27, 2015 and titled “Low Level Energy plant Optimization,” the entire disclosure of which is incorporated by reference herein.Low level optimizer 332 may include some or all of the features and/or functionality of the low level optimization module described in U.S. patent application Ser. No. 14/634,615. - Referring now to
FIGS. 5-10 , several block diagrams and flow diagrams illustrating the operation of energy optimization system (EOS) 302 in an automatic operating mode (FIGS. 5-6 ), advisory operating mode (FIGS. 7-8 ), and manual operating mode (FIGS. 9-10 ) are shown, according to an exemplary embodiment. In brief overview,EOS 302 may determine optimal subplant loads and optimal equipment setpoints in each of the operating modes. In the automatic operating mode,EOS 302 may provide the optimal equipment setpoints toenergy plant 200. In the advisory operating mode,EOS 302 may provide the optimal subplant loads and equipment setpoints to a user interface as recommended setpoints forenergy plant 200. A user may view the recommended setpoints and provide user-defined setpoints for buildingautomation system 308, which may or may not be based on the recommended setpoints. In the manual operating mode,EOS 302 may controlenergy plant 200 based on manual (i.e., user-defined) subplant loads received via a user interface ofEOS 302.EOS 302 may use the manual subplant loads to generate recommended equipment setpoints and equipment control signals that achieve the manual subplant loads. The equipment control signals may then be provided toenergy plant 200. Each of these operating modes is discussed in greater detail below. - Referring now to
FIG. 5 , a block diagram illustrating asystem 500 for monitoring and controlling an energy plant in an automatic operating mode is shown, according to an exemplary embodiment. In the automatic operating mode,EOS 302 automatically determines optimal subplant loads for each of subplants 202-210 and optimal equipment setpoints for theenergy plant equipment 340.EOS 302 provides the optimal equipment setpoints toenergy plant 200, which uses the optimal equipment setpoints to control theenergy plant equipment 340.EOS 302 monitors actual subplant utilization viasubplant monitor 338 and stores planned and actual subplant utilization data in asubplant utilization database 502. Adispatch GUI generator 506 uses the planned and actual subplant utilization data to generate adispatch GUI 902.Dispatch GUI 902 may be presented to a user via auser interface 504 to allow the user to monitor the operation ofenergy plant 200. -
System 500 is shown to includehigh level optimizer 330,low level optimizer 332, andenergy plant 200, which may be the same or similar as described with reference toFIGS. 2-4 . For example,high level optimizer 330 may perform an optimization process to generate a set of optimal subplant loads for each of subplants 202-210. In some embodiments, the optimal subplant loads include a total cold requested load and a total hot requested load. In some embodiments, the optimal subplant loads include an unmet heating load and/or an unmet cooling load. The unmet heating load may be defined as the amount by which the total requested heating load exceeds the sum of the heating loads produced by subplants 202-210. Similarly, the unmet cooling load may be defined as the amount by which the total requested cooling load exceeds the sum of the cooling loads produced by subplants 202-210. In some embodiments, the optimal subplant loads include an optimal amount of one or more resources (e.g., water, electricity, natural gas, etc.) consumed by subplants 202-210 to generate the optimal subplant loads. -
High level optimizer 330 may determine the optimal subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.). The optimal subplant loads may be updated with each iteration of the high level optimization process.High level optimizer 330 may provide the optimal subplant loads tolow level optimizer 332 and to subplant monitor 338. Subplant monitor 338 may store the optimal subplant loads as planned subplant utilization data in asubplant utilization database 502. -
Low level optimizer 332 may use the optimal subplant loads to generate a set of optimal equipment setpoints for the equipment of subplants 202-210. The optimal equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202-210. The optimal equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the optimal subplant load. In some embodiments,low level optimizer 332 performs an optimization process to generate the optimal equipment setpoints.Low level optimizer 332 may provide the optimal equipment setpoints toenergy plant 200 and to subplant monitor 338. Subplant monitor 338 may store the optimal equipment setpoints as planned subplant utilization data insubplant utilization database 502. In various embodiments,subplant utilization database 502 may be a component of EOS 302 (e.g., memory 312) or a separate database outsideEOS 302. -
Energy plant 200 may use the optimal equipment setpoints to operate the equipment of subplants 202-210.Energy plant 200 may monitor the utilization of subplants 202-210 and generate a set of actual subplant utilization data. The actual subplant utilization data may include actual values (rather than optimal values) for each of the subplant loads optimized byhigh level optimizer 330. In some embodiments, the actual subplant utilization data include a total cold requested load and a total hot requested load. In some embodiments, the actual subplant utilization data include an actual unmet heating load and/or unmet cooling load. In some embodiments, the actual subplant utilization data include an actual amount of one or more resources (e.g., water, electricity, natural gas, etc.) consumed by subplants 202-210 to generate the actual subplant loads. -
Energy plant 200 may report the actual subplant utilization data to subplant monitor 338. In some embodiments,energy plant 200 reports the actual subplant utilization data at regular intervals (e.g., once every fifteen minutes, once per hour, etc.) Subplant monitor 338 may store the actual subplant utilization data insubplant utilization database 502. In some embodiments, subplant monitor 338 overwrites or replaces the planned subplant utilization data for a given time step with the actual subplant utilization data for the time step once the actual subplant utilization data for the time step is available (e.g., once the current time advances to the time step). Similarly,subplant monitor 338 may overwrite or replace the planned subplant data for a given time step with an updated optimal value for the time step each time a new set of optimal subplant utilization data is generated byhigh level optimizer 330. In other embodiments, subplant monitor 338 supplements the existing planned subplant utilization data with the updated optimal subplant utilization data and/or the actual subplant utilization data without replacing or overwriting the exiting subplant utilization data. For example, the existing subplant utilization data may be stored as a first version of the subplant utilization data and the updated subplant utilization data may be stored as a second version of the subplant utilization data. - Still referring to
FIG. 5 ,system 500 is shown to include adispatch GUI generator 506.Dispatch GUI generator 506 may access the data stored insubplant utilization database 502 and use the stored data to generate a dispatch GUI.Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the planned subplant utilization data (e.g., future subplant loads) in a graphical format. Exemplary dispatch GUIs which may be generated bydispatch GUI generator 506 are described in greater detail with reference toFIGS. 11-37 .Dispatch GUI generator 506 may providedispatch GUI 902 to auser interface 504 for presentation to a user. - In various embodiments,
dispatch GUI generator 506 anduser interface 504 may be components ofBAS 308 or components of EOS 302 (e.g., monitoring and reporting applications 336).Dispatch GUI generator 506 may generatedispatch GUI 902 and providedispatch GUI 902 touser interface 504 via a communications network. In other embodiments,dispatch GUI generator 506 anduser interface 504 are components of a user device (e.g., a computer terminal, a workstation, a laptop, a tablet, a smartphone, etc.). For example,dispatch GUI generator 506 may be a web browser or a specialized application running on the user device. In some embodiments, dispatchGUI 902 is rendered using specialized viewing software (e.g., an energy plant monitoring application) installed on the user device. In other embodiments, dispatchGUI 902 is provided via a web interface which allowsdispatch GUI 902 to be rendered and viewed using a web browser without requiring any specialized applications or software to be installed on the user device. - Referring now to
FIG. 6 , a flow diagram illustrating aprocess 600 for monitoring and controlling an energy plant in the automatic operating mode is shown, according to an exemplary embodiment.Process 600 may be performed by one or more components ofenergy plant system 300 and/orsystem 500 as previously described. For example,process 600 may be performed byEOS 302,BAS 308,dispatch GUI generator 506, and/or other devices ofenergy plant system 300 orsystem 500. -
Process 600 is shown to include determining optimal subplant loads for a plurality of subplants of an energy plant (step 602). Step 602 may be performed byhigh level optimizer 330. Step 602 may include determining the optimal subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.). The optimal subplant loads may be updated with each iteration of the high level optimization process.High level optimizer 330 may provide the optimal subplant loads tolow level optimizer 332 and to subplant monitor 338. Subplant monitor 338 may store the optimal subplant loads as planned subplant utilization data in asubplant utilization database 502. -
Process 600 is shown to include determining optimal setpoints for equipment of each subplant to achieve the optimal subplant loads (step 604). Step 604 may be performed bylow level optimizer 332. The optimal equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202-210. The optimal equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the optimal subplant load.Low level optimizer 332 may provide the optimal equipment setpoints toenergy plant 200 and to subplant monitor 338. Subplant monitor 338 may store the optimal equipment setpoints as planned subplant utilization data insubplant utilization database 502. -
Process 600 is shown to include automatically providing the optimal equipment setpoints to the energy plant to control the equipment (step 606). Step 606 may include providing the optimal equipment setpoints fromlow level optimizer 332 toenergy plant 200.Energy plant 200 may use the optimal equipment setpoints as control inputs for individual devices within each subplant (e.g., individual chillers, individual hot water generators, individual thermal energy storage tanks, etc.). In other words,energy plant 200 may operate controllable devices within energy plant 200 (e.g., equipment 340) in accordance with the optimal equipment setpoints. For example,energy plant 200 may activate a device, deactivate a device, change a setpoint for a device, or otherwise control individual devices of theenergy plant equipment 340 based on the optimal equipment setpoints.Energy plant 200 may provide actual subplant utilization data to subplant monitor 338. Subplant monitor 338 may store the actual subplant utilization data insubplant utilization database 502. -
Process 600 is shown to include presenting planned and actual subplant utilization data to a user via a graphical user interface (step 608). Step 608 may be performed bydispatch GUI generator 506. In some embodiments,step 608 includes accessing the data stored insubplant utilization database 502 and using the stored data to generate a dispatch GUI.Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the planned subplant utilization data (e.g., future subplant loads) in a graphical format.Dispatch GUI generator 506 may providedispatch GUI 902 to auser interface 504 for presentation to a user. - In the automatic operating mode, the optimal subplant loads and equipment setpoints are used to control
energy plant 200. The optimal values determined byEOS 302 may be automatically provided as inputs toenergy plant 200. For example,low level optimizer 332 is shown providing the optimal equipment setpoints directly toenergy plant 200. In other embodiments, the optimal equipment setpoints may be provided toBAS 308, which may use the optimal equipment setpoints to generate control signals for theenergy plant equipment 340. Advantageously, the automatic operating mode allowsEOS 302 to controlenergy plant 200 without requiring user intervention by automatically providing the optimal equipment setpoints toenergy plant 200. - Referring now to
FIG. 7 , a block diagram illustrating asystem 700 for monitoring and controlling an energy plant in an advisory operating mode is shown, according to an exemplary embodiment. In the advisory operating mode,EOS 302 determines recommended subplant loads for each of subplants 202-210 and recommended equipment setpoints for theenergy plant equipment 340. The recommended subplant loads and recommended equipment setpoints may be the same or similar to the optimal subplant loads and optimal equipment setpoints as previously described. However, unlike the automatic operating mode,EOS 302 does not automatically provide the recommended equipment setpoints as control inputs toenergy plant 200. Instead,energy plant 200 receives equipment control signals fromBAS 308, which may generate the equipment control signals based in part on user-defined setpoints received from auser 702 via aBAS user interface 309. -
System 700 is shown to includehigh level optimizer 330,low level optimizer 332,energy plant 200,subplant monitor 338,subplant utilization database 502,dispatch GUI generator 506, andBAS 308, which may be the same or similar as described with reference toFIGS. 2-6 . For example,high level optimizer 330 may perform an optimization process to generate a set of recommended subplant loads for each of subplants 202-210.High level optimizer 330 may determine the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).High level optimizer 330 may provide the recommended subplant loads tolow level optimizer 332 and to subplant monitor 338. Subplant monitor 338 may store the recommended subplant loads as recommended subplant utilization data in asubplant utilization database 502. -
Low level optimizer 332 may use the recommended subplant loads to generate a set of recommended equipment setpoints for the equipment of subplants 202-210. The recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of subplants 202-210. The recommended equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the recommended subplant load. In some embodiments,low level optimizer 332 performs an optimization process to generate the recommended equipment setpoints.Low level optimizer 332 may provide the recommended equipment setpoints to subplant monitor 338. Subplant monitor 338 may store the recommended equipment setpoints as recommended subplant utilization data insubplant utilization database 502. -
Energy plant 200 may monitor the utilization of subplants 202-210 and generate a set of actual subplant utilization data. The actual subplant utilization data may include actual values (rather than recommended values) for each of the subplant loads produced by subplants 202-210. The actual subplant utilization data may also include actual equipment operating states (e.g., on/off states, load production, operating capacities, etc.) for individual devices ofenergy plant equipment 340.Energy plant 200 may report the actual subplant utilization data to subplant monitor 338. In some embodiments,energy plant 200 reports the actual subplant utilization data at regular intervals (e.g., once every fifteen minutes, once per hour, etc.) Subplant monitor 338 may store the actual subplant utilization data insubplant utilization database 502. -
Dispatch GUI generator 506 may access the data stored insubplant utilization database 502 and use the stored data to generate a dispatch GUI.Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the recommended subplant utilization data (e.g., future subplant loads) in a graphical format.Dispatch GUI generator 506 may providedispatch GUI 902 toEOS user interface 704 for presentation to auser 702. - In
system 700,EOS 302 andenergy plant 200 may be decoupled such that the output of EOS 302 (i.e., recommended subplant loads and equipment setpoints) is not automatically provided as an input toenergy plant 200.User 702 can view the recommended setpoints (e.g., recommended subplant load setpoints, recommended equipment setpoints, etc.) and monitor actual subplant operation viaEOS user interface 704. In some instances,user 702 may use the recommended setpoints to generate the user-defined setpoints provided toBAS 308; however, such use is not automatic or required whenEOS 302 is operated in the advisory operating mode. Instead,EOS 302 may provide the recommended setpoints as suggestions or advice, which theuser 702 can choose to accept or reject when generating the user-defined setpoints. - Referring now to
FIG. 8 , a flow diagram illustrating aprocess 800 for monitoring and controlling an energy plant in the advisory operating mode is shown, according to an exemplary embodiment.Process 800 may be performed by one or more components ofenergy plant system 300 and/orsystem 700 as previously described. For example,process 800 may be performed byEOS 302,BAS 308,dispatch GUI generator 506, and/or other devices ofenergy plant system 300 orsystem 700. -
Process 800 is shown to include determining recommended subplant loads for a plurality of subplants of an energy plant (step 802). Step 802 may be performed byhigh level optimizer 330. Step 802 may include determining the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.). The recommended subplant loads may be updated with each iteration of the high level optimization process.High level optimizer 330 may provide the recommended subplant loads tolow level optimizer 332 and to subplant monitor 338. Subplant monitor 338 may store the recommended subplant loads as planned subplant utilization data in asubplant utilization database 502. -
Process 800 is shown to include determining recommended setpoints for equipment of each subplant to achieve the recommended subplant loads (step 804). Step 804 may be performed bylow level optimizer 332. The recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202-210. The recommended equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the recommended subplant load.Low level optimizer 332 may provide the recommended equipment setpoints toenergy plant 200 and to subplant monitor 338. Subplant monitor 338 may store the recommended equipment setpoints as planned subplant utilization data insubplant utilization database 502. -
Process 800 is shown to include presenting recommended and actual subplant utilization data to a user via an EOS user interface (e.g., EOS user interface 704) (step 806). Step 806 may be performed bydispatch GUI generator 506 and/orEOS user interface 704. The recommended subplant utilization data may include the recommended subplant loads generated byhigh level optimizer 330 and/or the recommended equipment setpoints generated bylow level optimizer 332. The actual subplant utilization data may include data describing the actual operation of energy plant 200 (e.g., actual subplant loads, actual equipment setpoints, etc.), which may be collected bysubplant monitor 338 and stored insubplant utilization database 502. - In some embodiments,
step 806 includes accessing the data stored insubplant utilization database 502 and using the stored data to generate a dispatch GUI.Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data (e.g., past and current subplant loads) and the planned subplant utilization data (e.g., future subplant loads) in a graphical format.Dispatch GUI generator 506 may providedispatch GUI 902 toEOS user interface 704 for presentation to auser 702. -
Process 800 is shown to include receiving user-defined setpoints at a BAS user interface (e.g., BAS user interface 309) (step 808) and generating control signals for the subplant equipment based on the user-defined setpoints (step 810). In some embodiments,BAS user interface 309 is separate and distinct fromEOS user interface 704. For example,EOS user interface 704 may be coupled toEOS 302 and configured to present information stored insubplant utilization database 502, whereasBAS user interface 309 may be coupled to BAS 308 and configured to allowuser 702 to provide control inputs toBAS 308. In some embodiments,user 702 is the only link betweenEOS user interface 704 andBAS user interface 309. - In some instances,
user 702 may view the recommended setpoints provided viaEOS user interface 704 and generate the user-defined setpoints provided toBAS user interface 309 based on the recommended setpoints. In other instances,user 702 may generate the user-defined setpoints independent of the recommended setpoints. Advantageously, the advisory mode allowsuser 702 to exercise a greater level of control overenergy plant 200 relative to the automatic mode by allowinguser 702 to choose whether to use the recommended setpoints to controlenergy plant 200 or provide different user-defined setpoints. - Referring now to
FIG. 9 , a block diagram illustrating asystem 900 for monitoring and controlling an energy plant in a manual operating mode is shown, according to an exemplary embodiment. In the manual operating mode,EOS 302 determines recommended subplant loads for each of subplants 202-210 and recommended equipment setpoints for theenergy plant equipment 340. The recommended subplant loads and recommended equipment setpoints may be the same or similar to the optimal subplant loads and optimal equipment setpoints as previously described. However,EOS 302 does not automatically provide the recommended equipment setpoints as control inputs toenergy plant 200 when operating in the manual mode. Instead,EOS 302 receives manual (i.e., user-defined) subplant loads from a user viaEOS user interface 704.EOS 302 uses the manual subplant loads to determine recommended (e.g., optimal) equipment setpoints to achieve the manual subplant loads.EOS 302 may generate equipment control signals forsubplant equipment 340 based on the recommended equipment setpoints to achieve the manual subplant loads. -
System 900 is shown to includehigh level optimizer 330,low level optimizer 332,energy plant 200,subplant monitor 338,subplant utilization database 502,dispatch GUI generator 506,EOS user interface 704, andBAS 308, which may be the same or similar as described with reference toFIGS. 2-8 . For example,high level optimizer 330 may perform an optimization process to generate a set of recommended subplant loads for each of subplants 202-210.High level optimizer 330 may determine the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.).High level optimizer 330 may provide the recommended subplant loads tolow level optimizer 332 and to subplant monitor 338. Subplant monitor 338 may store the recommended subplant loads as recommended subplant utilization data in asubplant utilization database 502. -
Low level optimizer 332 may use the recommended subplant loads to generate a first set of recommended equipment setpoints for the equipment of subplants 202-210. The first set of recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of subplants 202-210. The first set of recommended equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the recommended subplant load. In some embodiments,low level optimizer 332 performs an optimization process to generate the first set of recommended equipment setpoints.Low level optimizer 332 may provide the first set of recommended equipment setpoints to subplant monitor 338. Subplant monitor 338 may store the first set of recommended equipment setpoints as recommended subplant utilization data insubplant utilization database 502. -
Low level optimizer 332 may also receive manual subplant loads fromEOS user interface 704. The manual subplant loads may include user-defined loads for each of subplants 202-210. A user can specify the manual subplant loads via EOS user interface 704 (e.g., by entering values for the manual subplant loads, by adjusting sliders or dials, etc.). The manual subplant loads may be provided fromEOS user interface 704 tolow level optimizer 332. The manual subplant loads may also be provided to subplant monitor 338. Subplant monitor 338 may store the manual subplant loads as manual subplant utilization data insubplant utilization database 502. -
Low level optimizer 332 may use the manual subplant loads to generate a second set of recommended equipment setpoints for the equipment of subplants 202-210. The second set of recommended equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the manual subplant load. In some embodiments,low level optimizer 332 performs an optimization process to generate the second set of recommended equipment setpoints.Low level optimizer 332 may provide the second set of recommended equipment setpoints to subplant monitor 338. Subplant monitor 338 may store the recommended equipment setpoints as manual subplant utilization data insubplant utilization database 502. - In some embodiments,
low level optimizer 332 uses the second set of recommended equipment setpoints to generate equipment control signals forenergy plant 200. The equipment control signals may include on/off signals, load production signals, power consumption signals, or other types of control signals which may be used to control individual devices ofsubplant equipment 340. The equipment control signals may cause each of subplants 202-210 to operate the individual devices of the subplant in a manner that achieves the manual subplant load for the subplant. For example, the equipment control signals for a chiller subplant may specify that a first chiller of the subplant operate at 75% capacity, a second chiller of the subplant operate at 40% capacity, and a third chiller of the subplant operate at 60% capacity. In some embodiments, the equipment control signals are provided directly fromlow level optimizer 332 to energy plant 200 (as shown inFIG. 9 ). In other embodiments, the equipment control signals may be provided toenergy plant 200 viaBAS 308 or generated byBAS 308 based on the second set of recommended equipment setpoints. -
Energy plant 200 may monitor the utilization of subplants 202-210 and generate a set of actual subplant utilization data. The actual subplant utilization data may include actual values (rather than recommended values) for each of the subplant loads produced by subplants 202-210. The actual subplant utilization data may also include actual equipment operating states (e.g., on/off states, load production, operating capacities, etc.) for individual devices ofenergy plant equipment 340.Energy plant 200 may report the actual subplant utilization data to subplant monitor 338. In some embodiments,energy plant 200 reports the actual subplant utilization data at regular intervals (e.g., once every fifteen minutes, once per hour, etc.) Subplant monitor 338 may store the actual subplant utilization data insubplant utilization database 502. -
Dispatch GUI generator 506 may access the data stored insubplant utilization database 502 and use the stored data to generate a dispatch GUI.Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the recommended subplant utilization data (e.g., recommended subplant loads and the first set of recommended equipment setpoints, etc.) manual subplant utilization data (e.g., manual subplant loads and the second set of recommended equipment setpoints), and actual subplant utilization data (e.g., actual subplant loads and actual equipment setpoints) in a graphical format.Dispatch GUI generator 506 may providedispatch GUI 902 toEOS user interface 704 for presentation to auser 702. A user can viewdispatch GUI 902 and provide the manual subplant loads viaEOS user interface 704. - In some embodiments,
EOS user interface 704 is a comprehensive monitoring and control interface that allows the user to monitor the operation ofenergy plant 200 and provide control inputs (e.g., manual subplant loads) that affect the operation ofenergy plant 200. In addition to displayingdispatch GUI 902 generated bydispatch GUI generator 506,EOS user interface 704 may be configured to receive input from the user viadispatch GUI 902. For example, dispatchGUI 902 presented viauser interface 504 may include interface options that allow a user to change the load setpoints for subplants 202-210, change the on/off states or operating setpoints forequipment 340, activate or deactivate entire subplants or individual devices ofequipment 340, adjust the configuration ofBAS 308 orenergy plant 200, or otherwise monitor and control the operation ofenergy plant 200 and/orequipment 340.EOS 302 may controlenergy plant 200 and/or equipment 340 (e.g., via actuators, power relays, etc.) in accordance with the user input received viaEOS user interface 704. - In some embodiments, the user input received via
EOS user interface 704 overrides automated control decisions made byEOS 302. For example, the manual subplant loads provided viaEOS user interface 704 may override the recommended subplant loads determined byhigh level optimizer 330. In some embodiments,EOS 302 determines whether the manual subplant loads would causeEOS 302 to violate an optimization constraint (e.g., building temperature out of range, thermal energy storage tank fully depleted or filled to capacity, etc.). If the manual subplant loads would not causeEOS 302 to violate an optimization constraint,EOS 302 may override the recommended subplant loads determined byhigh level optimizer 330 with the manual subplant loads. However, if the manual subplant loads would causeEOS 302 to violate an optimization constraint,EOS 302 may not override the recommended subplant loads determined byhigh level optimizer 330. In some embodiments,EOS 302 causesdispatch GUI 902 to display a warning for the user if the manual subplant loads would causeEOS 302 to violate an optimization constraint within a predetermined time window. The user can then choose to override the recommended subplant loads and violate the optimization constraint or use the recommended subplant loads and satisfy the optimization constraint. - In some embodiments,
dispatch GUI generator 506 updates dispatchGUI 902 based on the manual subplant loads before the manual subplant loads are used to affect the operation ofenergy plant 200. For example,dispatch GUI generator 506 may display the second set of recommended equipment setpoints that would result from the manual subplant loads before the manual subplant loads are used to generate the equipment control signals. In some embodiments,EOS 302 uses the manual subplant loads to calculate an amount of time before the manual subplant loads would causeEOS 302 to violate an optimization constraint (e.g., time until thermal energy storage tanks are filled or depleted). Advantageously, this allows the user to view the predicted effects of the manual subplant loads before the manual subplant loads take effect. - Referring now to
FIG. 10 , a flow diagram illustrating aprocess 1000 for monitoring and controlling an energy plant in the manual operating mode is shown, according to an exemplary embodiment.Process 1000 may be performed by one or more components ofenergy plant system 300 and/orsystem 900 as previously described. For example,process 1000 may be performed byEOS 302,BAS 308,dispatch GUI generator 506, and/or other devices ofenergy plant system 300 orsystem 900. -
Process 1000 is shown to include determining recommended subplant loads for a plurality of subplants of an energy plant (step 1002).Step 1002 may be performed byhigh level optimizer 330. Step 802 may include determining the recommended subplant loads for a plurality of time steps between the current time and a future time horizon. Each of the time steps may have a defined or predetermined duration (e.g., fifteen minutes, one hour, etc.). The recommended subplant loads may be updated with each iteration of the high level optimization process.High level optimizer 330 may provide the recommended subplant loads tolow level optimizer 332 and to subplant monitor 338. Subplant monitor 338 may store the recommended subplant loads as planned subplant utilization data in asubplant utilization database 502. -
Process 1000 is shown to include determining recommended setpoints for equipment of each subplant to achieve the recommended subplant loads (step 1004).Step 1004 may be performed bylow level optimizer 332. The recommended equipment setpoints may include on/off states, operating setpoints, and/or other setpoints defining the utilization of individual devices of the subplants 202-210. The recommended equipment setpoints may include setpoints for individual devices of subplants 202-210 in order for each subplant to meet the recommended subplant load.Low level optimizer 332 may provide the recommended equipment setpoints toenergy plant 200 and to subplant monitor 338. Subplant monitor 338 may store the recommended equipment setpoints as planned subplant utilization data insubplant utilization database 502. -
Process 1000 is shown to include presenting recommended and actual subplant utilization data to a user via an EOS user interface (e.g., EOS user interface 704) (step 1006).Step 1006 may be performed bydispatch GUI generator 506 and/orEOS user interface 704. The recommended subplant utilization data may include the recommended subplant loads generated byhigh level optimizer 330 and/or the first set of recommended equipment setpoints generated bylow level optimizer 332. The actual subplant utilization data may include data describing the actual operation of energy plant 200 (e.g., actual subplant loads, actual equipment setpoints, etc.), which may be collected bysubplant monitor 338 and stored insubplant utilization database 502. - In some embodiments,
step 1006 includes accessing the data stored insubplant utilization database 502 and using the stored data to generate a dispatch GUI.Dispatch GUI 902 may include various graphics (e.g., graphs, charts, flow diagrams, etc.) that illustrate the actual subplant utilization data and the recommended subplant utilization data in a graphical format.Dispatch GUI generator 506 may providedispatch GUI 902 toEOS user interface 704 for presentation to auser 702. -
Process 1000 is shown to include receiving manual subplant loads at the EOS user interface (step 1008) and determining recommended setpoints for equipment of each subplant to achieve the manual subplant loads (step 1010). The manual subplant loads may be user-specified subplant loads and may override the recommended subplant loads determined byhigh level optimizer 330.Step 1010 may be the same or similar to step 1004, with the exception that the manual subplant loads are used instead of the recommended subplant loads to determine the recommended setpoints for the subplant equipment. In some embodiments, dispatchGUI 902 is updated to include the manual subplant loads and the set of recommended setpoints that result from the manual load setpoints. -
Process 1000 is shown to include generating control signals for the subplant equipment based on the recommended setpoints to achieve the manual subplant loads (step 1012). The equipment control signals may include on/off signals, load production signals, power consumption signals, or other types of control signals which may be used to control individual devices ofsubplant equipment 340. The equipment control signals may cause each of subplants 202-210 to operate the individual devices of the subplant in a manner that achieves the manual subplant load for the subplant. In some embodiments, the equipment control signals are provided directly fromlow level optimizer 332 toenergy plant 200. In other embodiments, the equipment control signals may be provided toenergy plant 200 viaBAS 308 or generated byBAS 308 based on the recommended equipment setpoints determined instep 1010. - Referring now to
FIGS. 11-37 several drawings of adispatch GUI 902 which may be generated bydispatch GUI generator 506 are shown, according to an exemplary embodiment.Dispatch GUI 902 may present the recommended (i.e., optimal) subplant loads, manual subplant loads, and actual subplant loads in a variety of visual formats (e.g., diagrams, charts, graphs, etc.) that illustrate the operation ofenergy plant 200.Dispatch GUI 902 may also present the first set of recommended equipment setpoints (i.e., the setpoints that result from the recommended subplant loads), the second set of recommended equipment setpoints (i.e., the setpoints that result from the manual subplant loads), and the actual equipment setpoints to provide details regarding the operation of each subplant.Dispatch GUI 902 may include past dispatch data (e.g., past subplant loads, past equipment setpoints) and current dispatch data (e.g., current subplant loads, current equipment setpoints) to allow a user to view a history of energy plant operations.Dispatch GUI 902 may also include future dispatch data (e.g., planned subplant loads, planned equipment setpoints) to allow the user to view planned energy plant operations into the future. - Referring particularly to
FIG. 11 , aplant summary interface 1100 is shown, according to an exemplary embodiment.Plant summary interface 1100 may include graphics depicting each of the subplants withinenergy plant 200. For example,plant summary interface 1100 is shown to include a plurality of chilled water loops 1102-1106 (i.e.,Loop A 1102,Loop B 1104, and Loop C 1106). Chilled water loops 1102-1106 are configured to provide cold thermal energy (e.g., measured in tons) to satisfy the cooling load ofcampus 1108. Similarly, the steam subplant 1111 within plant B is configured to provide steam (measured in KPPH) to satisfy the heating load ofcampus 1108. The cogeneration subplant 1110 within plant B can be configured to provide electricity (measured in MW) to satisfy the electric load ofcampus 1108. -
Plant summary interface 1100 is shown to include paths 1112-1120 connecting each of the chilled water loops 1102-1106 and subplants 1110-1111 tocampus 1108. If a subplant or chilled water loop is currently providing energy tocampus 1108, the path connecting the subplant or chilled water loop tocampus 1108 may be highlighted or otherwise marked to indicate the flow of energy along the path. For example,path 1120 may be colored red to indicate the flow of steam alongpath 1120, whereas paths 1112-1116 may be colored blue to indicate the flow of cold thermal energy along paths 1112-1116,path 1118 may be colored orange to indicate the flow of electricity alongpath 1118, or a path may be colored green to indicate the flow of gas along the path. In some embodiments, paths 1112-1120 are animated to indicate the flow of thermal energy. For example, the arrows along each of paths 1112-1120 may move along each path 1112-1120 to indicate the flow of thermal energy. Similarly,plant summary interface 1100 is shown to include paths 1122-1124 connectingelectricity supply 1126 andgas supply 1128 tocampus 1108. Like paths 1112-1120 connecting the subplants tocampus 1108, paths 1122-1124 may be highlighted or otherwise marked to indicate the flow of electricity or gas energy along each path. The values below each of paths 1112-1124 withincampus 1108 indicate the amount of each resource (i.e., electricity, chilled water, steam, and gas) being provided tocampus 1108 by the corresponding subplant or supply. - Percentage indicators next to subplants 1110-1111 and chilled water loops 1102-1106 indicate the percentage of utilization for each subplant 1110-1111 or chilled water loop 1102-1106 (i.e., the percentage of the total subplant or chilled water loop capacity being utilized). For example,
FIG. 11 is shown to include a 37% indicator next toLoop A 1102, a 37% indicator next toLoop B 1104, a 37% indicator next to theLoop C 1106, a 37% indicator next to the plantB cogeneration subplant 1110, and a 37% indicator next to the plant B steam subplant 1111. This indicates that each subplant and chilled water loop is being utilized at 37% of its maximum capacity. The utilization rings associated with each subplant and chilled water loop may be filled to visually indicate the utilization percentage. - Referring now to
FIG. 12 , a chilled waterloop summary interface 1200 forLoop B 1104 is shown, according to an exemplary embodiment.Interface 1200 illustrates the percent utilization of each chilled water subplant within Loop B (e.g.,chilled water subplant 1202, chilledwater subplant 1204, and chilled water subplant 1206) as well as the utilized capacity for theentire Loop B 1104. The values below each of thepaths campus 1108 indicate the chilled water production of each chilled water subplant 1202-1206. - Referring now to
FIG. 13 , a chilled waterloop summary interface 1300 forLoop A 1102 is shown, according to an exemplary embodiment.Interface 1300 illustrates the percent utilization of each chilled water subplant within Loop A (e.g.,chilled water subplant 1302, chilledwater subplant 1304, and chilled water subplant 1306) as well as the utilized capacity for theentire Loop A 1102. The values below each of thepaths campus 1108 indicate the chilled water production of each chilled water subplant 1302-1306. - Referring now to
FIG. 14 , aplant summary interface 1400 forLoop C 1106 is shown, according to an exemplary embodiment.Interface 1400 illustrates the equipment withinLoop C 1106 and provides key performance indicators (KPIs) for each of the equipment. For example,interface 1400 is shown to include a plurality of electric chillers (i.e.,electric chiller 1,electric chiller 2,electric chiller 3, and steam chiller 1). The KPIs may include efficiency (e.g., COP, kW/ton, etc.), cooling production (tons), and rate of electric consumption (kW).Interface 1400 may display the percent utilization and cooling production of each device withinLoop C 1106 as well as the overall percent utilization and cooling production ofLoop C 1106. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 15 , anequipment information page 1500 for the equipment of Plant F withinLoop A 1102 is shown, according to an exemplary embodiment.Interface 1500 illustrates the equipment within Plant F and provides KPIs for each of the equipment. For example,interface 1500 is shown to include a plurality of steam chillers (i.e.,steam chiller 1 and steam chiller 2). The KPIs may include efficiency (e.g., COP, KPPH/ton, etc.), cooling production (tons), and rate of steam consumption (KPPH).Interface 1500 may display the percent utilization and cooling production of each device within Plant F as well as the overall percent utilization and cooling production of Plant F. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 16 , anequipment information page 1600 for the equipment of Plant E withinLoop B 1104 is shown, according to an exemplary embodiment.Interface 1600 illustrates the equipment within Plant E and provides KPIs for each of the equipment. For example,interface 1600 is shown to include a plurality of electric chillers (i.e.,electric chiller 1 and electric chiller 2). The KPIs may include efficiency (e.g., COP, kW/ton, etc.), cooling production (tons), and rate of electric consumption (kW). Interface may display the percent utilization and cooling production of each device within Plant E as well as the overall percent utilization and cooling production of Plant E. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 17 , anequipment information page 1700 for the equipment of Plant D withinLoop A 1102 is shown, according to an exemplary embodiment.Interface 1700 illustrates the equipment within Plant D and provides KPIs for each of the equipment. For example,interface 1700 is shown to include a plurality of chillers (i.e.,electric chiller 1 and steam chiller 1). The KPIs may include efficiency (e.g., COP, kW/ton, KPPH/ton, etc.), cooling production (tons), rate of electric consumption (kW), and rate of steam consumption (KPPH).Interface 1700 may display the percent utilization and cooling production of each device within Plant D as well as the overall percent utilization and cooling production of Plant D. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 18 , anequipment information page 1800 for the equipment of Plant A withinLoop B 1104 is shown, according to an exemplary embodiment.Interface 1800 illustrates the equipment within Plant A and provides KPIs for each of the equipment. For example,interface 1800 is shown to include a steam chiller (i.e., steam chiller 1). The KPIs may include efficiency (e.g., COP, KPPH/ton, etc.), cooling production (tons), and rate of steam consumption (KPPH).Interface 1800 may display the percent utilization and cooling production of each device within Plant A as well as the overall percent utilization and cooling production of Plant A. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 19 , anequipment information page 1900 for the equipment of Plant C withinLoop B 1104 is shown, according to an exemplary embodiment.Interface 1900 illustrates the equipment within Plant C and provides KPIs for each of the equipment. For example,interface 1900 is shown to include an electric chiller (i.e., electric chiller 1). The KPIs may include efficiency (e.g., COP, kW/ton, etc.), cooling production (tons), and rate of electric consumption (kW).Interface 1900 may display the percent utilization and cooling production of each device within Plant C as well as the overall percent utilization and cooling production of Plant C. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 20 , anequipment information page 2000 for the equipment of Plant B withinLoop B 1104 is shown, according to an exemplary embodiment.Interface 2000 illustrates the equipment within Plant B and provides KPIs for each of the equipment. For example,interface 2000 is shown to include a plurality of chillers (i.e.,electric chiller 1,electric chiller 2, and steam chiller 1). The KPIs may include efficiency (e.g., COP, kW/ton, KPPH/ton, etc.), cooling production (tons), rate of electric consumption (kW), and rate of steam consumption (KPPH).Interface 2000 may display the percent utilization and cooling production of each device within Plant B as well as the overall percent utilization and cooling production of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 21 , anequipment information page 2100 for the steam equipment of Plant B is shown, according to an exemplary embodiment.Interface 2100 illustrates the steam equipment within Plant B and provides KPIs for each of the equipment. For example,interface 2100 is shown to include a plurality of boilers (i.e.,boiler 4,boiler 5,boiler 6, and boiler 7). The KPIs may include steam production (KPPH), rate of natural gas consumption (MMBtu), and rate of electric consumption (kW).Interface 2100 may display the percent utilization and steam production of each steam production device within Plant B as well as the overall percent utilization and steam production of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 22A , anequipment information page 2200 for the electric equipment of Plant B is shown, according to an exemplary embodiment.Interface 2200 illustrates the electric equipment within Plant B and provides KPIs for each of the equipment. For example,interface 2200 is shown to include a plurality of combustion turbines (i.e.,combustion turbine 1 and combustion turbine 2). The KPIs may include efficiency (e.g., COP, kW/kW), electric production (MW), and rate of electric consumption (kW).Interface 2200 may display the percent utilization and electricity production of each electricity production device within Plant B as well as the overall percent utilization and electricity production of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 22B , anotherequipment information page 2210 for the electric equipment of Plant B is shown, according to an exemplary embodiment.Interface 2210 illustrates the electric equipment within Plant B and provides KPIs for each of the equipment. For example,interface 2210 is shown to include a plurality of gas turbines (i.e.,gas turbine 1 and gas turbine 2). The KPIs may include efficiency (e.g., COP, kW/kW), electric production (MW), and rate of natural gas consumption (mcf/hr).Interface 2210 may display the percent utilization and electricity production of each electricity production device within Plant B as well as the overall percent utilization, electricity production, heat rate, and electricity import of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIG. 22C , anotherequipment information page 2220 for the electric equipment of Plant B is shown, according to an exemplary embodiment.Interface 2220 illustrates the electric equipment within Plant B and provides KPIs for each of the equipment. For example,interface 2220 is shown to include a plurality of gas turbines (i.e.,gas turbine 1 and gas turbine 2). The KPIs may include efficiency (e.g., COP, kW/kW), electric production (MW), and rate of natural gas consumption (mcf/hr). Both the actual and target values of the electricity production and rate of natural gas consumption may be indicated when operating in the automatic mode.Interface 2220 may display the percent utilization and electricity production of each electricity production device within Plant B as well as the overall percent utilization, electricity production, heat rate, and electricity import of Plant B. In some embodiments, the equipment images will appear dimmed if the equipment is out of service. - Referring now to
FIGS. 23A-23B , adispatch schedule interface 2300 which may be generated bydispatch GUI generator 506 is shown, according to an exemplary embodiment.Dispatch schedule interface 2300 may include detailed dispatch information for each of the subplants withinenergy plant 200. For example,dispatch schedule interface 2300 may include detailed dispatch information for each chiller subplant 202-206,steam subplant 208, andcogeneration subplant 210.Dispatch schedule interface 2300 may also include detailed dispatch information for each of the individual devices within each subplant 202-210. For example,dispatch schedule interface 2300 may includedetailed dispatch information 2302 for each of chillers 218-228 within each chiller subplant 202-206, each ofboilers 232 withinsteam subplant 208, and each ofcombustion turbines 230 withincogeneration subplant 210. -
Detailed dispatch information 2302 for each chiller may include the chiller's status (e.g., on or off), the amount of cooling energy (i.e., “Cooling Q”) produced by the chiller (measured in tons), the power consumption of each chiller (measured in kW), the temperature of the cold water produced by each chiller, the flow rate of the cold water produced by each chiller, and the dispatched condenser flow setpoint for each chiller.Detailed dispatch information 2302 for each boiler may include the boiler's status (e.g., on or off), the amount of heating energy (i.e., “Heating Q”) produced by the boiler (measured in mmBTU/h), the amount of fuel usage of each boiler (measured in mmBTU/h), the power consumption of each boiler (measured in kW), and the temperature of the hot water or steam produced by each boiler.Detailed dispatch information 2302 for the cogeneration subplant may include the amount of electricity produced by each of the combustion turbines. - In some embodiments,
dispatch schedule interface 2300 includes multiple values for each of the variables included indetailed dispatch information 2302. For example,dispatch schedule interface 2300 may include anoptimal value 2304 for each variable (i.e., the “EOS” value), a building automation system (BAS)value 2306 for each variable (i.e., the “BAS” value), and anactual value 2308 for each variable.Optimal values 2304 may be determined byEOS 302 as previously described. In some instances,optimal values 2304 are based on the optimal or recommended subplant loads determined byhigh level optimizer 330. In other instances,optimal values 2304 may be based on the manual subplant loads received viaEOS user interface 704. WhenEOS 302 is operated in the automatic mode,optimal values 2304 may be the same as the BAS values 2306 sinceoptimal values 2304 are automatically provided as inputs to the BAS. However, whenEOS 302 is operated in the advisory mode,optimal values 2304 may be different fromBAS values 2306 sinceoptimal values 2304 are provided as recommendations but not automatically applied as inputs to the BAS.Actual values 2308 may represent measured or observed values of the variables obtained fromenergy plant 200, as indicated by the actual subplant utilization data collected bysubplant monitor 338. - In some embodiments,
dispatch schedule interface 2300 presents snapshots ofdetailed dispatch information 2302 for multiple different dispatch intervals. For example,FIG. 23A shows a snapshot ofdetailed dispatch information 2302 for thepresent dispatch interval 2310. Other pages ofdispatch schedule interface 2300 may show snapshots ofdetailed dispatch information 2302 for a past dispatch interval or a future dispatch interval. A user can navigate between the past, present, and future dispatch intervals by selecting arrows 2312-2314 located on the sides of each window. For example, clickingarrow 2312 may causedispatch schedule interface 2300 to transition from displaying the snapshot for thepresent dispatch interval 2310 to the snapshot for the past dispatch interval. Similarly, clickingarrow 2314 may causedispatch schedule interface 2300 to transition from displaying the snapshot for thepresent dispatch interval 2310 to the snapshot for the future dispatch interval. Advantageously, this allows a user to navigate between past, present, and future snapshots ofdetailed dispatch information 2302 to view subplant loads and equipment setpoints for a series of dispatch intervals. - Referring now to
FIG. 23C , anotherdispatch schedule interface 2350 which may be generated bydispatch GUI generator 506 is shown, according to an exemplary embodiment.Dispatch schedule interface 2350 is shown displaying dispatch information for several devices of equipment. In some embodiments, the equipment are grouped into corresponding plants and/or loops indispatch schedule interface 2350. A user can expand or collapse various sections ofdispatch schedule interface 2350 to show or hide information for equipment of each plant and/or loop. For each device of equipment,dispatch schedule interface 2350 may indicate whetherEOS 302 is on or off, whether the device is out of service, and whether no dispatch is provided for each time interval. These status indications may be provided in the form of colored bars, where each color represents a different status indication. - Referring now to
FIGS. 24-28B , several dispatch chart interfaces 2400-2850 which may be generated bydispatch GUI generator 506 is shown, according to an exemplary embodiment. Dispatch chart interfaces 2400-2850 show high-level energy flows for past, present and future dispatch schedules in stackedbar charts lines chart chart - To hide or unhide specific data on each
chart checkboxes legends charts chart chart controls - In some embodiments, dispatch chart interfaces 2400-2850 include some or all of the features described in U.S. patent application Ser. No. 14/815,845 filed Jul. 31, 2015, and titled “Systems and Methods for Visualizing Equipment Utilization in an energy plant.” The entire disclosure of U.S. patent application Ser. No. 14/815,845 is incorporated by reference herein.
- Referring particularly to
FIG. 24 ,dispatch chart interface 2400 is shown displaying the chilled water production for Loop B. The total chilled water production of Loop B consists of theproduction 2412 of the Plant A, theproduction 2414 of Plant B, and theproduction 2416 of Plant C. The chilled water production of each plant at each time step is indicated by the height of the corresponding stacked bar in stackedbar chart 2410. The total height of the stacked bars at each time step indicate the total chilled water production of Loop B at that time step. - Referring now to
FIG. 25 ,dispatch chart interface 2500 is shown displaying the chilled water production for Loop A. The total chilled water production of Loop A consists of theproduction 2512 of Plant D, theproduction 2514 of Plant E, and theproduction 2516 of Plant F. The chilled water production of each plant at each time step is indicated by the height of the corresponding stacked bar in stackedbar chart 2510. The total height of the stacked bars at each time step indicate the total chilled water production of Loop A at that time step. - Referring now to
FIG. 26A ,dispatch chart interface 2600 is shown displaying the chilled water production for Loop C. The total chilled water production of Loop C consists of only theproduction 2612 of Plant G. The chilled water production of Plant G at each time step is indicated by the height of the stacked bar in stackedbar chart 2610, which is equal to the total chilled water production of Loop A at that time step. - Referring now to
FIG. 26B ,dispatch chart interface 2650 is shown displaying the production and storage of Loop C at each time step. The total production of Loop C consists of theproduction 2662 of electricity and steam within Loop C and the amount of electricity and steam discharged from storage withinLoop C. Line 2664 indicates the load on Loop C. The difference between the total production of Loop C and the load on Loop C signifies the unmet load. The storage of Loop C consists of the amount of return water stored within Loop C at each time step, designated by line 2666. - Referring now to
FIG. 27A ,dispatch chart interface 2700 is shown displaying the total steam production and consumption forenergy plant 200. The total steam production ofenergy plant 200 consists of theproduction 2712 of the boilers of Plant B and theproduction 2714 of the cogenerators of Plant B. The steam production of each of the boilers and the cogenerators at each time step is indicated by the height of the correspondingstacked bars bar chart 2710. The total height of thestacked bars - The total steam consumption of
energy plant 200 consists of the consumption of Plant A,campus 1108, Plant F, Plant G, Plant B, and Plant D. The steam consumption of each of the plants at each time step is indicated by the height of the correspondingstacked bars - Referring now to
FIG. 27B ,dispatch chart interface 2750 is shown displaying the total steam production and consumption of Plant B at each time step within a selected time period. The total steam production of Plant B consists of theproduction 2762 of the boilers of Plant B, theproduction 2764 of a first set of cogenerators of Plant B, and theproduction 2766 of a second set of cogenerators of Plant B. The steam production of each of the boilers and the cogenerators at each time step is indicated by the height of the corresponding stacked bars 2762-2766 above the horizontal axis in stackedbar chart 2760. The total height of the stacked bars 2762-2766 above the horizontal axis at each time step indicate the total steam production at that time step. Line 2768 represents the total load on Plant B. The difference between the total load on Plant B and the total production of Plant B represents the unmet load. - The total steam consumption of Plant B consists of the
consumption 2770 of Building A, theconsumption 2772 of Building B, theconsumption 2774 of Building C, theconsumption 2776 of the chillers within Plant B, and theconsumption 2778 of Building D. The steam consumption of each of the buildings and chillers at each time step is indicated by the height of the corresponding stacked bars 2770-2778 below the horizontal axis in stackedbar chart 2760. The total height of the stacked bars 2770-2770 below the horizontal axis at each time step indicate the total steam consumption at that time step. - Referring now to
FIG. 28A ,dispatch chart interface 2800 is shown displaying the total electricity production and consumption forenergy plant 200. The total electricity production ofenergy plant 200 consists of theproduction 2812 of Plant B. The electricity production at each time step is indicated by the height of the corresponding stackedbar 2812 above the horizontal axis (i.e., KPPH=0) in stackedbar chart 2810. - The total electricity consumption of
energy plant 200 consists of theconsumption 2814 of Plant A, theconsumption 2816 ofcampus 1108, theconsumption 2818 of Plant F, theconsumption 2820 of Plant G, theconsumption 2822 of Plant C, theconsumption 2824 of Plant E, theconsumption 2826 of the cooling equipment of Plant B, theconsumption 2828 of the electric equipment of Plant B, theconsumption 2830 of the steam equipment of Plant B, and theconsumption 2832 of Plant D. The electricity consumption of each of the plants at each time step is indicated by the height of the corresponding stacked bars 2814-2832 below the horizontal axis (i.e., KPPH=0) in stackedbar chart 2810. The total height of stacked bars 2814-2832 below the horizontal axis at each time step indicate the total electricity consumption at that time step. - Referring now to
FIG. 28B ,dispatch chart interface 2850 is shown displaying the total electricity production and consumption of Plant B at each time step within a selected time period. The total electricity production of Plant B consists of theproduction 2862 of a first set of cogenerators of Plant B, theproduction 2864 of a second set of cogenerators of Plant B, andamount 2866 of electricity imported by Plant B. The electricity production of each of the cogenerators and the amount of electricity imported at each time step is indicated by the height of the corresponding stacked bars 2862-2866 above the horizontal axis in stackedbar chart 2860. The total height of the stacked bars 2862-2866 above the horizontal axis at each time step indicate the total electricity production at that time step. Line 2768 represents the total load onPlant B. Line 2868 represents the total electric load on Plant B. The difference between the total electric load on Plant B and the total production of Plant B represents the unmet load. - The total electric consumption of Plant B consists of the
consumption 2870 of Building A, theconsumption 2872 of Building B, theconsumption 2874 of Building C, theconsumption 2876 of Building D, theconsumption 2878 of Building E, theconsumption 2880 of the chillers within Plant B, theconsumption 2882 of the steam generators within Plant B, and theconsumption 2884 of Building F. The electric consumption of each of the buildings, chillers, and steam generators at each time step is indicated by the height of the corresponding stacked bars 2870-2884 below the horizontal axis in stackedbar chart 2760. The total height of the stacked bars 2870-2884 below the horizontal axis at each time step indicate the total electric consumption at that time step. - Referring now to
FIGS. 29-34 , several input data interfaces 2900-3400 which may be generated bydispatch GUI generator 506 is shown, according to an exemplary embodiment. In some embodiments, input data interfaces 2900-3400 allow a user to manage inputs used byhigh level optimizer 330. Such inputs can include, for example, campus electric and thermal energy load forecasts, utility pricing forecasts, weather forecasts, campus schedules, equipment out-of-service schedules, and manual utility pricing. Manual inputs can be maintained solely by the user, whereas forecast inputs give the user the ability to override weather, pricing, loads, etc. forecasted byEOS 302. - Referring particularly to
FIG. 29 , a weatherforecast input interface 2900 is shown, according to an exemplary embodiment. The weather forecast inputs may predict the weather in the geographic region in which the building orcampus 1108 is located for each of the plurality of time steps. Weather forecasts may include, for example, cloud coverage, dry bulb temperature, wet bulb temperature, humidity, precipitation, wind, or any other type of weather forecast. In some embodiments, weatherforecast input interface 2900 includes agraph EOS 302 uses the weather forecasts to predict the thermal and electric energy loads ofcampus 1108. - Referring now to
FIG. 30 , a dry bulb temperatureforecast input interface 3000 is shown, according to an exemplary embodiment. Dry bulb temperatureforecast input interface 3000 is shown to include agraph 3002 of the predicted dry bulb temperature as a function of time.Interface 3000 is also shown to include a table 3004 of the predicted dry bulb temperature values. Table 3004 may include a cell for each hour of the optimization period. For example, table 3004 is shown to include a row for each day and a column for each hour. The cells at the intersections of the rows and columns contain the predicted dry bulb temperature values for the corresponding days and hours. - Referring now to
FIG. 31 , an override interface 3100 is shown, according to an exemplary embodiment. Override interface 3100 may be displayed in response to a user clickingoverride button 3006 inforecast input interface 3000. In some embodiments, a user can override the predicted values by selectingoverride button 3006 and entering a manual value for the corresponding variable. The manual override can be applied to a user-defined time period beginning at a start time/date and ending at an end time/date. The forecasted values can be changed by a user defined offset (e.g., increased or decrease by a user-defined amount) or set to a specific user-defined value. In some embodiments, override interface 3100 prompts the user to specify a reason for the override. - Referring now to
FIG. 32 , a utility pricing forecast input interface 3200 is shown, according to an exemplary embodiment. Utility pricing forecast input interface 3200 may include a forecast of utility prices for each time step of the optimization period. The forecasted utility prices can be defined for electricity (e.g., $/kWh), natural gas ($/mmBtu), water ($/L), or any other resource consumed byenergy plant 200. In some embodiments, utility pricing forecast input interface 3200 allows a user to define one or more utility pricing rates by selecting add rate button 3202 and specifying the rate 3204 and time period 3206 during which the rate 3202 applies. In some embodiments,EOS 302 uses the utility pricing forecasts to predict the cost associated with resource purchases over the optimization period. - Referring now to
FIG. 33 , an equipment out-of-service interface 3300 is shown, according to an exemplary embodiment. Equipment out-of-service interface 3300 allows a user to define the time periods during which each of the subplants and/or the pieces of equipment within each subplant will be out-of-service. When a subplant or piece equipment is out-of-service,EOS 302 may exclude that subplant/equipment from the dispatches. - Referring now to
FIG. 34 , acampus schedule interface 3400 is shown, according to an exemplary embodiment.Campus schedule interface 3400 allows a user to define the holiday and out-of-season calendar 3402 forcampus 1108. During holidays, the occupancy ofcampus 1108 may be lower than usual, which can affect the load forecast. In some embodiments,EOS 302 uses the campus schedule to generate the load forecasts. - Referring now to
FIGS. 35A-36B , several reporting interfaces which may be generated bydispatch GUI generator 506 is shown, according to an exemplary embodiment.FIG. 35A is a drawing of areporting landing page 3500.Reporting landing page 3500 shows high level KPIs 3502-3510 to provide the most relevant performance data to the user. For example, reportinglanding page 3500 is shown to include thetotal utility cost 3502, thepeak demand 3504, theperformance 3506, the unmetchilled water load 3508, and thesystem efficiency 3510. KPIs 3502-3510 can include the data for the current week, day, month, or any other time period. In some embodiments, KPIs 3502-3510 indicate a percent change relative to the previous time period (e.g., 14% decrease this week, 9% increase this week) for each of KPIs 3502-3510. In some embodiments, reportinglanding page 3500 allows a user to generate and/or view detailed reports for various dispatch schedules, performance monitoring, and a site summary. -
FIG. 35B is a drawing of aperformance monitoring interface 3550.Performance monitoring interface 3550 allows a user to visualize various performance measurements over time. The user can select a performance measurement via dropdown menu 3552 (e.g., consumption, production, etc.), a type of energy via dropdown 3554 (e.g., steam, electricity, hot water, cold water, etc.), and a type of equipment via dropdown 3556. The user can specify astart date 3558 and anend date 3560 and click the “Generate Chart”button 3562 to create achart chart 3570 represents the value of the steam consumption performance metric for the equipment ofcampus 1108,Loop A 1102,Loop B 1104, orLoop C 1106. Each of the lines inchart 3580 represents the value of the electricity consumption performance metric for the equipment ofcampus 108, Plant C, Plant B, orLoop B 1104. - Referring now to
FIGS. 36A-36B , an example of asite summary report 3600 which can be accessed via the reporting interfaces is shown.Site summary report 3600 may provide information such as utility cost; economic load demand response (ELDR) revenue; production by site, loop, plant, or equipment; and consumption by site, loop, plant, or equipment. Such information can be provided for a user-defined time period. - Referring now to
FIG. 37 , anaudit log interface 3700 which may be generated bydispatch GUI generator 506 is shown, according to an exemplary embodiment. The audit log is a running list of user edits and changes to operating mode used byEOS 302. User edits can include, for example, overrides to forecasted inputs, manual input entries, schedule changes, and other manual overrides. Changes to the operating mode used byEOS 302 can include manually switching among the advisory mode, the automatic mode, and the manual mode. In some embodiments, each edit requires the user to log a reason for their change. Each of these edits and the reason for the edit can be displayed in the audit report. - The construction and arrangement of the systems and methods as shown in the various exemplary embodiments are illustrative only. Although only a few embodiments have been described in detail in this disclosure, many modifications are possible (e.g., variations in sizes, dimensions, structures, shapes and proportions of the various elements, values of parameters, mounting arrangements, use of materials, colors, orientations, etc.). For example, the position of elements may be reversed or otherwise varied and the nature or number of discrete elements or positions may be altered or varied. Accordingly, all such modifications are intended to be included within the scope of the present disclosure. The order or sequence of any process or method steps may be varied or re-sequenced according to alternative embodiments. Other substitutions, modifications, changes, and omissions may be made in the design, operating conditions and arrangement of the exemplary embodiments without departing from the scope of the present disclosure.
- The present disclosure contemplates methods, systems and program products on any machine-readable media for accomplishing various operations. The embodiments of the present disclosure may be implemented using existing computer processors, or by a special purpose computer processor for an appropriate system, incorporated for this or another purpose, or by a hardwired system. Embodiments within the scope of the present disclosure include program products comprising machine-readable media for carrying or having machine-executable instructions or data structures stored thereon. Such machine-readable media can be any available media that can be accessed by a general purpose or special purpose computer or other machine with a processor. By way of example, such machine-readable media can comprise RAM, ROM, EPROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to carry or store desired program code in the form of machine-executable instructions or data structures and which can be accessed by a general purpose or special purpose computer or other machine with a processor. Combinations of the above are also included within the scope of machine-readable media. Machine-executable instructions include, for example, instructions and data which cause a general purpose computer, special purpose computer, or special purpose processing machines to perform a certain function or group of functions.
- Although the figures show a specific order of method steps, the order of the steps may differ from what is depicted. Also two or more steps may be performed concurrently or with partial concurrence. Such variation will depend on the software and hardware systems chosen and on designer choice. All such variations are within the scope of the disclosure. Likewise, software implementations could be accomplished with standard programming techniques with rule based logic and other logic to accomplish the various connection steps, processing steps, comparison steps and decision steps.
Claims (20)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/939,238 US20180340702A9 (en) | 2016-01-22 | 2018-03-28 | Systems and methods for monitoring and controlling an energy plant |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201662286287P | 2016-01-22 | 2016-01-22 | |
US15/387,512 US11181875B2 (en) | 2016-01-22 | 2016-12-21 | Systems and methods for monitoring and controlling a central plant |
US201762476510P | 2017-03-24 | 2017-03-24 | |
US15/939,238 US20180340702A9 (en) | 2016-01-22 | 2018-03-28 | Systems and methods for monitoring and controlling an energy plant |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/387,512 Continuation-In-Part US11181875B2 (en) | 2016-01-22 | 2016-12-21 | Systems and methods for monitoring and controlling a central plant |
Publications (2)
Publication Number | Publication Date |
---|---|
US20180216842A1 US20180216842A1 (en) | 2018-08-02 |
US20180340702A9 true US20180340702A9 (en) | 2018-11-29 |
Family
ID=62977355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/939,238 Pending US20180340702A9 (en) | 2016-01-22 | 2018-03-28 | Systems and methods for monitoring and controlling an energy plant |
Country Status (1)
Country | Link |
---|---|
US (1) | US20180340702A9 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210231103A1 (en) * | 2018-06-08 | 2021-07-29 | Siemens Gamesa Renewable Energy A/S | Controlling wind turbines in presence of wake interactions |
US11221156B2 (en) | 2018-04-24 | 2022-01-11 | Johnson Controls Tyco IP Holdings LLP | Central plant control system with decaying capacity adjustment |
US11774923B2 (en) | 2017-08-03 | 2023-10-03 | Johnson Controls Tyco IP Holdings LLP | Augmented deep learning using combined regression and artificial neural network modeling |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10162340B2 (en) * | 2015-09-30 | 2018-12-25 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method and system for lot-tool assignment |
EP3279755B1 (en) * | 2016-08-02 | 2021-09-29 | ABB Schweiz AG | Method of monitoring a modular process plant complex with a plurality of interconnected process modules |
US11514202B2 (en) * | 2019-11-18 | 2022-11-29 | Rockwell Automation Technologies, Inc. | Systems and methods for generating base designs using client data |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6026784A (en) * | 1998-03-30 | 2000-02-22 | Detroit Diesel Corporation | Method and system for engine control to provide driver reward of increased allowable speed |
US7885820B1 (en) * | 2000-07-19 | 2011-02-08 | Convergys Cmg Utah, Inc. | Expert system supported interactive product selection and recommendation |
US7444532B2 (en) * | 2001-12-03 | 2008-10-28 | Dell Products L.P. | System and method for autonomous power sequencing |
US20060137018A1 (en) * | 2004-11-29 | 2006-06-22 | Interdigital Technology Corporation | Method and apparatus to provide secured surveillance data to authorized entities |
US8396572B2 (en) * | 2009-09-11 | 2013-03-12 | Siemens Corporation | System and method for energy plant optimization using mixed integer-linear programming |
JP2011163858A (en) * | 2010-02-08 | 2011-08-25 | Toyota Motor Corp | Energy display system |
US9093840B2 (en) * | 2010-07-02 | 2015-07-28 | Alstom Technology Ltd. | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20130307702A1 (en) * | 2011-01-13 | 2013-11-21 | Tata Consultancy Services Limited | Method and system for effective management of energy consumption by household appliances |
US9201431B2 (en) * | 2011-05-09 | 2015-12-01 | Chicago Controls Thermostats, Inc. | Tamper proof thermostat that limits temperature controls |
US8880226B2 (en) * | 2011-05-17 | 2014-11-04 | Honeywell International Inc. | System and method to predict optimized energy consumption |
EP2806520A1 (en) * | 2013-05-22 | 2014-11-26 | Vito NV | Power supply network control system and method |
US20150234409A1 (en) * | 2014-02-18 | 2015-08-20 | Powerit Solutions, Llc | System for analyzing opportunities for power demand control |
KR20160043402A (en) * | 2014-10-13 | 2016-04-21 | 엘지전자 주식회사 | Controller for a chiller and method for controlling a chiller |
US10185345B2 (en) * | 2015-06-22 | 2019-01-22 | Solarcity Corporation | Systems and methods of home efficiency modeling |
US9588831B2 (en) * | 2015-01-16 | 2017-03-07 | Lenovo Enterprise Solutions (Singapore) Pte. Ltd. | Preventing recurrence of deterministic failures |
US9623562B1 (en) * | 2015-04-10 | 2017-04-18 | X Development Llc | Adjusting robot safety limits based on network connectivity |
US9762587B2 (en) * | 2015-12-14 | 2017-09-12 | Sap Se | Grouping access control violations for process-aware systems |
US10139895B2 (en) * | 2015-12-23 | 2018-11-27 | Intel Corporation | Techniques to maintain power for a fundamental function on a device |
-
2018
- 2018-03-28 US US15/939,238 patent/US20180340702A9/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11774923B2 (en) | 2017-08-03 | 2023-10-03 | Johnson Controls Tyco IP Holdings LLP | Augmented deep learning using combined regression and artificial neural network modeling |
US11221156B2 (en) | 2018-04-24 | 2022-01-11 | Johnson Controls Tyco IP Holdings LLP | Central plant control system with decaying capacity adjustment |
US20210231103A1 (en) * | 2018-06-08 | 2021-07-29 | Siemens Gamesa Renewable Energy A/S | Controlling wind turbines in presence of wake interactions |
Also Published As
Publication number | Publication date |
---|---|
US20180216842A1 (en) | 2018-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11181875B2 (en) | Systems and methods for monitoring and controlling a central plant | |
US11900287B2 (en) | Model predictive maintenance system with budgetary constraints | |
US11747800B2 (en) | Model predictive maintenance system with automatic service work order generation | |
US11847617B2 (en) | Model predictive maintenance system with financial analysis functionality | |
US11073976B2 (en) | Building system with a building graph | |
US10890904B2 (en) | Model predictive maintenance system for building equipment | |
US20170031962A1 (en) | Systems and methods for visualizing equipment utilization in a central plant | |
US11636429B2 (en) | Model predictive maintenance systems and methods with automatic parts resupply | |
US10527306B2 (en) | Building energy management system with energy analytics | |
US11275363B2 (en) | Central plant control system with plug and play EMPC | |
US20180340702A9 (en) | Systems and methods for monitoring and controlling an energy plant | |
US11268732B2 (en) | Building energy management system with energy analytics | |
US20190302157A1 (en) | Building energy management system with virtual audit metrics | |
US10838440B2 (en) | Multistage HVAC system with discrete device selection prioritization | |
WO2017127373A1 (en) | Building energy management system with energy analytics and ad hoc dashboard | |
US11530833B2 (en) | Systems and methods for controlling and predicting heat load disturbances | |
US10838441B2 (en) | Multistage HVAC system with modulating device demand control | |
US20200379418A1 (en) | Building control system with central plant model generation | |
US11549709B2 (en) | Quantitative monthly visual indicator to determine data availability for utility rates | |
US11226600B2 (en) | Building control system with load curtailment optimization | |
US20220229945A1 (en) | Central plant optimization system with scalable asset models | |
US20230350390A1 (en) | Building equipment control system with dynamic flow bounds | |
US20230176534A1 (en) | Control system for building equipment with optimization search reduction based on equipment models and parameters | |
US20230350387A1 (en) | Building management system with sustainability improvement | |
US20210152388A1 (en) | Central plant control system with asset allocation override |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: JOHNSON CONTROLS TECHNOLOGY COMPANY, MICHIGAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TURNEY, ROBERT D.;VALENTINE, TRICIA J.;MADISON, NICOLE A.;AND OTHERS;SIGNING DATES FROM 20180316 TO 20180418;REEL/FRAME:045623/0368 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: NOTICE OF APPEAL FILED |
|
STCV | Information on status: appeal procedure |
Free format text: APPEAL BRIEF (OR SUPPLEMENTAL BRIEF) ENTERED AND FORWARDED TO EXAMINER |
|
STCV | Information on status: appeal procedure |
Free format text: EXAMINER'S ANSWER TO APPEAL BRIEF MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: ON APPEAL -- AWAITING DECISION BY THE BOARD OF APPEALS |
|
AS | Assignment |
Owner name: JOHNSON CONTROLS TYCO IP HOLDINGS LLP, WISCONSIN Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNOR:JOHNSON CONTROLS TECHNOLOGY COMPANY;REEL/FRAME:058959/0764 Effective date: 20210806 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
AS | Assignment |
Owner name: TYCO FIRE & SECURITY GMBH, SWITZERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JOHNSON CONTROLS TYCO IP HOLDINGS LLP;REEL/FRAME:067056/0552 Effective date: 20240201 |