US20180298693A1 - A top drive well drilling installation - Google Patents
A top drive well drilling installation Download PDFInfo
- Publication number
- US20180298693A1 US20180298693A1 US15/765,436 US201615765436A US2018298693A1 US 20180298693 A1 US20180298693 A1 US 20180298693A1 US 201615765436 A US201615765436 A US 201615765436A US 2018298693 A1 US2018298693 A1 US 2018298693A1
- Authority
- US
- United States
- Prior art keywords
- pipe
- drill string
- headclamp
- rotating
- top drive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 57
- 238000009434 installation Methods 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 claims description 10
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 230000033001 locomotion Effects 0.000 description 20
- 238000010304 firing Methods 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
- E21B3/022—Top drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/04—Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/008—Winding units, specially adapted for drilling operations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/02—Rod or cable suspensions
- E21B19/06—Elevators, i.e. rod- or tube-gripping devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
- E21B19/084—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods with flexible drawing means, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/146—Carousel systems, i.e. rotating rack systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/16—Connecting or disconnecting pipe couplings or joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/03—Couplings; joints between drilling rod or pipe and drill motor or surface drive, e.g. between drilling rod and hammer
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/15—Racking of rods in horizontal position; Handling between horizontal and vertical position
- E21B19/155—Handling between horizontal and vertical position
Definitions
- the present invention relates to a top drive well drilling installation and methods for performing well operations.
- Pending application WO2014/178709 of the same applicant discloses a top drive well drilling installation comprising a drilling tower that is provided with vertical rails supported by the drilling tower. A trolley is guided along the vertical rails. The trolley is suspended from a travelling block of a hoisting device, commonly referred to as drawworks in the drilling industry.
- the hoisting device comprises a cable and a winch, as well as a crown block.
- the travelling block is suspended from the crown block by the cable. Operation of the winch allows to move the travelling block and the trolley up and down along the rails.
- the mentioned known installation further comprises a top drive unit and a rotatable tubular stem that is to be connected to the upper end of a drill string for rotation therewith about an axis of the drill string.
- the top drive unit further includes a motor adapted to rotate the tubular stem and thereby the connected drill string.
- the top drive unit is supported by the trolley, at least so as to absorb reaction torque from the motor of the top drive unit.
- the mentioned known installation comprises an elevator that is adapted to suspend the drill string there form, e.g. during tripping.
- the elevator is held by an elevator support assembly embodied as two pivotable arms, which at their upper end are pivotally connected to a suspension body that is in turn suspended on a shoulder formed on the rotatable tubular stem of the top drive unit.
- These arms or links as they are often called, are very robust as they are designed to absorb the load of the entire drill string during activities such as tripping.
- An actuator is provided that is operable to move the elevator between an operative position on the drill string axis and a retracted position away from the drill string axis.
- the elevator support assembly is embodied as a direct drill string load bearing connection between the elevator and the trolley, independent from the top drive unit.
- the present invention provides an installation according to the preamble of claim 1 , which is based on WO2014/178709, which is characterized in that the top drive well drilling installation further comprises:
- the inventive design allows, in embodiments, to achieve relevant advantages over the prior art designs.
- top drive unit now does not need to be designed to support the entire drill string, as even during drilling, when the pipe and the tubular stem are attached, the load of the suspended drill string is supported by the rotating headclamp, making its design less complex and costly.
- the rotating headclamp is provided with multiple mobile pipe retainers supported by the rotary body. Hence, the retainers, and the pipe they retain, are rotatable with the rotary body with respect to the support frame.
- the mobile pipe retainers are mobile so as to provide an operative and a non-operative position of the rotating headclamp. In the non-operative position the pipe retainers are adapted to allow passage of a pipe of the drill string through the pipe passage of the open-centered body, in particular in an upward direction. In the operative position the pipe retainers engage below a shoulder of a pipe of the drill string extending through the pipe passage so as to suspend said drill string therefrom.
- Such a type of clamp is often referred to as a collar-type clamp. It is noted that the shoulder may also be provided on a tool joint or a box member, connected to a pipe.
- the pipe retainers engage below the shoulder of a tool, e.g. a casing tool including an internal and/or external gripper assembly for gripping casing or a casing running tool.
- a tool e.g. a casing tool including an internal and/or external gripper assembly for gripping casing or a casing running tool.
- the mobile pipe retainers have a clamping jaw to engage on a pipe, which is preferably an exchangeable clamping jaw to be able to match the diameter and/ or shape to the type of pipe.
- a clamping jaw to engage on a pipe, which is preferably an exchangeable clamping jaw to be able to match the diameter and/ or shape to the type of pipe.
- two sets of multiple, e.g. three, mobile pipe retainers are provided, each set being adapted to retain a different type of pipe, e.g. each comprising a different type of clamping jaws, and wherein it is possible to have one set in the non-operative position and the other in the operative position. Accordingly, when a different type of pipe is to be handled, it is not necessary to replace the entire headclamp or the clamping jaws, but simply the other set of pipe retainers may be brought in the operative position.
- mobile pipe retainer is embodied as a lever comprising an arm and a fulcrum, which fulcrum is fixed to the rotary body and wherein one end of the arm is adapted to—in the operative position—engage on the pipe, and in the non-operative position has cleared the area in line with the pipe passage to allow the passage of a pipe of the drill string, and wherein the other end of the arm is operable by an actuator to move the opposite end of the arm between the operative and the non-operative position.
- a single actuator may be provided to operate multiple mobile pipe retainers.
- the rotating headclamp is supported by the support frame, such that the support frame absorbs the load of the suspended drill string.
- the support frame comprises a through-passage, wherein the through passage is provided in line with the open-centered body of the rotating headclamp.
- recesses are provided adjacent the through-passage, wherein in the recesses the thrust bearings are provided.
- the support frame comprises a through-passage in which a housing of the rotating headclamp can be provided.
- the housing is supported by the support frame.
- the housing of the rotating headclamp supports the thrust bearing.
- the thrust bearing is provided at an upper end of the rotary body.
- An additional bearing is advantageously provided at the bottom end of the rotary body. Possibly, these bearings are interconnected by a bearing connection.
- the thrust bearing may be a ball bearing, spherical roller bearing or any other suitable type of bearing.
- the rotating headclamp comprises an open-centered rotary body defining a pipe passage in line with a drill string axis to allow passage of a pipe of the drill string.
- the body should have a diameter which is sufficient for the largest type of pipe or pipe aid to be engaged by the tubular stem. It is noticed that pipe aids are available, having a smaller diameter than the pipe to be engaged by the tubular stem, and which are thus positioned between the tubular stem and the pipe with the large diameter.
- the pipe of the drill string is embodied as a lift sub, having a shoulder to be engaged by the pipe retainers of the rotating headclamp.
- the open-centered rotary body is embodied as a cylinder with a flanged top end, hence in cross-section T-shaped.
- the flanged top end is suitable for supporting the mobile pipe retainers.
- the thrust bearing support this flanged top end of the rotary body.
- the top drive unit is supported by the support frame, at least so as to absorb reaction torque from the motor of the top drive unit.
- a hoisting device is provided for moving the trolley up and down. It is equally conceivable that the trolley is suspended from the hoisting device, or that the support frame is suspended from the hoisting device, for example a travelling block. Hence, the support frame is suspended from the hoisting device, optionally via the trolley.
- the tubular stem is to be connected to the upper end of a drill string for rotation therewith about an axis of the drill string.
- the tubular stem is connected to or formed integral with the top drive unit.
- the tubular stem is directly connected to the support frame, in a manner allowing rotation of the tubular stem.
- the top drive unit is allowed to engage on the tubular stem to rotate the tubular stem and thereby the connected drill string to drill the well.
- At least the tubular stem is vertically movable relative to the rotating headclamp between an upper remote position allowing the engagement of a pipe by the rotating headclamp and a lower connection position allowing the attachment of the tubular stem with the pipe while the pipe and/or the drill string is supported by the rotating headclamp.
- the top drive unit with the tubular stem is movably supported in the support frame,
- a so-called splined stem is applied and the top drive unit is supported stationary, while the stem is vertically movable.
- the tubular stem is provided stationary and the rotating headclamp is vertically movable relative to the tubular stem.
- support frame is furthermore provided with a drive for moving the tubular stem vertically and relative to the rotating headclamp between the upper remote position and the lower connection position, e.g. including a rail and trolleys or alternatively including hydraulic pistons.
- the rotating headclamp is removable from the support frame. This is advantageous e.g. in view of maintenance of the rotating headclamp, or when a different type of rotating headclamp is required to match with the pipe that is to be engaged.
- the top drive unit is detachable from the support frame.
- the support frame supports a hook
- the top drive unit is provided with a bail so as to suspend the top drive unit from the hook.
- a detachable top drive unit enables the top drive unit to be removed from the support frame, whilst the rotating headclamp is still is fully functional. This may, e.g., be of use to conduct maintenance or repairs on the top drive unit during tripping of the drill string. The top drive unit can then simply be removed, and tripping can nonetheless be effected.
- a method can be carried out, comprising the following steps:
- the top drive unit includes a tubular stem and a motor. It is conceivable that not the entire top drive unit is removed or substituted, but only part thereof. For example, the motor can be removed/replaced, while remaining the tubular stem in place. This is in particular advantageous in embodiments wherein the tubular stem is supported by/connected to the support frame.
- the removal of the motor allows drilling to be followed by an operation including the use of mud hoses and the tubular stem, wherein the motor of the top drive unit has thus been removed.
- the support frame is embodied as a direct drill string load bearing connection between the rotating headclamp and the trolley, independent from the top drive unit. Hence, the rotating headclamp is supported by the trolley, while the top drive unit is also supported by the trolley.
- the support frame comprises a horizontal cross beam to support the rotating headclamp.
- the length of the horizontal cross beam exceeds that of the rotating headclamp, to provide one or more storage locations for drilling equipment, such as spare or alternative rotating headclamps or parts thereof.
- at least two storage locations are provided at opposite sides of the rotating headclamp.
- the rotating headclamp is translatably supported by the cross beam between an operative position in line with the drill string axis and a parking position.
- a wrench device is provided, which is e.g. connected to the top drive unit, for making and breaking connections between the tubular stem and the drill string.
- the wrench device is adapted for horizontal motion relative to the tubular stem.
- the support frame furthermore supports a centralizer below the rotating headclamp to centralize a pipe and/or the drill string, and advantageously align it with the pipe passage defined by the rotary body of the rotating headclamp.
- a hoisting device is provided for moving the trolley up and down.
- the hoisting device may be of a RamRig-type, or alternatively comprise a rack-and-pinion.
- the hoisting device comprises a cable and a winch, a crown block, and a travelling block suspended from the crown block by said cable, wherein the trolley is suspended from the travelling block so as to move up and down upon operation of the winch.
- a pipe positioning device e.g. embodied as a pipe positioning motion am is provided to pass a pipe of the drill string in a vertical orientation through the pipe passage of the rotating headclamp, and to position a shoulder of the pipe to allow engagement of the pipe of the drill string below the shoulder by the mobile pipe retainers in the operative position thereof, wherein in particular the pipe is embodied as a lift sub.
- the pipe positioning device is supported by the trolley. It is likewise conceivable that the pipe positioning device is supported by the drilling tower, i.e. as a motion arm assembly as disclosed in WO2014/182160.
- the pipe positioning device is adapted to lift 60,000 kilos.
- a pipe positioning motion arm is suitable to position a telescopic joint (60,000kg) or a bottom hole assembly (20,000kg) in the rotating headclamp.
- a robust pipe positioning device is supported by the trolley.
- Known motion arms supported by the tower are adapted to lift up to 7000kg.
- a pipe positioning device adapted to lift up to 60,000kg is supported by the tower.
- the pipe positioning device is adapted to receive a pipe of the drill string, in particular a lift sub, in a non-vertical orientation, in particular a horizontal orientation, e.g. from a catwalk device.
- the pipe positioning device comprises a gripper, adapted to engage on a pipe such as a lift sub, in particular below a shoulder of the pipe or lift sub.
- a lift sub is a pipe portion specially designed to be added to the drill string for lifting purposes.
- the lift sub is embodied with at least one shoulder.
- a two-shouldered lift sub comprising an upper shoulder adapted to be engaged by the pipe retainers of a rotating headclamp, and a lower shoulder adapted to be engaged by a gripper of a pipe positioning device.
- the two-shouldered lift sub further comprises a pin to be engaged in a box of a drill pipe.
- the pipe positioning device comprises a mutually connected articulating inner and outer boom, wherein a gripper is attached to the outer boom, the gripper being adapted to engage on a pipe such as a lift sub, in particular below a shoulder of the pipe or lift sub.
- the inner boom can e.g. be attached to the trolley or to the drilling tower.
- the pipe positioning motion arm comprises:
- the present invention further relates to a method for performing a well drilling operation, wherein use is made of the inventive installation according to the attached claims.
- the method comprises the steps of:
- the method comprises the steps of:
- the top drive unit is detachable from the support frame, and wherein a substitute top drive unit is provided, the method comprising the following steps:
- a mud connector is provided on the top drive unit.
- the support frame is provided with a frame connector for the mud hose.
- the advantage of a mud hose connector at the support frame is that the load of the mud hose is not only suspended from the top drive unit, but also, largely, from the support frame.
- the top drive unit is advantageously movably provided in the support frame, a portion of the mud hose between the top drive unit and the mud hose connector, also referred to as the mud hose connection, is slack to compensate for movements of the top drive unit.
- the rotating headclamp is e.g. adapted to suspend drill pipes, drill string, casings, liners, etc. etc.
- FIG. 1 shows an embodiment of a top drive well drilling installation in a perspective view
- FIG. 2 shows an exemplary trolley of a top drive well drilling installation in a perspective view
- FIG. 3 shows the trolley of FIG. 2 in a side view
- FIG. 4 shows an schematic trolley of a top drive well drilling installation with a portion of a drill string in a side view
- FIGS. 5 a and 5 b show an exemplary embodiment of a rotating headclamp in side view
- FIG. 6 a shows an embodiment of a rotating headclamp in top view
- FIG. 6 b shows the rotating headclamp of FIG. 6 a in a perspective top view
- FIG. 6 c shows the rotating headclamp of FIG. 6 a in a side view
- FIGS. 7 a and 7 b show respectively a front view and a side view of an embodiment of a trolley
- FIGS. 8 a -8 f show an embodiment of a pipe positioning motion arm supported by the trolley in various positions allowing the passage of a pipe of the drill string through the pipe passage of the rotating headclamp;
- FIG. 9 shows in a perspective view a trolley and top drive unit of an alternative embodiment of a top drive well drilling installation
- FIG. 10 shows in a side view the trolley and top drive unit of the installation of FIG. 9 .
- FIGS. 11 a -11 c shown an alternative embodiment of a pipe positioning device supported by the trolley in various positions allowing the passage of a pipe of the drill string through the pipe passage of the rotating headclamp.
- FIG. 1 a top drive well drilling installation 1 according to the present invention is shown in a perspective view.
- a drilling tower 10 as is known from the previous applications of the same applicant and as commercially available is shown.
- the drilling tower 10 supports two vertical rails 11 a , 11 b .
- a trolley 12 is guided along said vertical rails 11 a , 11 b , here via guide wheel sets 13 . This is shown in more detail in FIGS. 2-4 .
- the top drive well drilling installation 1 is furthermore provided with a top drive unit 30 including a tubular stem 31 to be connected to the upper end 51 of a drill string 50 , visible in FIGS. 4 and 5 for rotation therewith about an axis A of the drill string, and including a motor 32 adapted to rotate the tubular stem 31 and thereby the connected drill string.
- a top drive unit 30 including a tubular stem 31 to be connected to the upper end 51 of a drill string 50 , visible in FIGS. 4 and 5 for rotation therewith about an axis A of the drill string, and including a motor 32 adapted to rotate the tubular stem 31 and thereby the connected drill string.
- the trolley 12 is provided with a support frame 45 supporting the top drive unit, at least so as to absorb reaction torque from the motor of the top drive unit.
- the top drive unit 30 is movably supported in the support frame 45 in a direction D, via actuators 33 , between an upper remote position allowing the engagement of a pipe by a rotating headclamp 40 (explained below) and a lower connection position allowing the attachment of the tubular stem 31 with the pipe while the pipe and/or the drill string is supported by the rotating headclamp 40 .
- FIG. 4 schematically trolleys 33 a are visible, provided on top drive unit 30 , which may engage on rails provided in the support frame 45 to move the top drive unit 30 in direction D.
- the top drive unit 30 is movable upwards to such an extent that it is remote from the rotating headclamp 40 , wherein in this remote position of the top drive unit 30 the rotating headclamp 40 is removable from the support frame 45 .
- the top drive well drilling installation 1 is furthermore provided with a hoisting device 20 for moving the trolley 12 up and down.
- the hoisting device comprises a winch, not visible, and a cable 21 extending from the winch, via one or more pulleys 23 at the top of the drilling tower 10 to a crown block 24 and a travelling block 25 .
- the crown block comprises multiple sheaves, mounted on a common axle.
- the travelling block 25 is suspended from the crown block 24 by said cable 21 .
- the support frame 45 is suspended from the travelling block 25 via connectors at the ends of the travelling block so as to move up and down upon operation of the winch.
- the travelling block 25 is integrated into the support frame 45 .
- the support frame 45 is suspended from the crown block 24 so as to move up and down upon operation of the winch.
- the support frame 45 additionally supports a rotating headclamp 40 , shown in detail in FIGS. 5 a and 5 b .
- the rotating headclamp 40 comprises:
- the rotating headclamp comprises a housing 49 supporting the thrust bearing 43 , which housing is supported by the support frame 45 .
- the support frame 45 supports the rotating headclamp 40 directly, e.g. via the thrust bearing 43 . Either way, the support frame 45 absorbs the load of the suspended drill string.
- the support frame 45 is adapted to support more than one rotating headclamp, i.e. a substitute rotating headclamp.
- a rotating headclamp 40 is translatably supported in the support frame 45 between an operative position in line with the drill string axis A and a parking position.
- the drill string axis can be cleared of the rotating headclamp if so desired.
- a support frame 45 comprising two rotating headclamp which can be positioned in line with the drill string axis A as desired.
- the rotary body is embodied as a cylinder 41 b with a flanged top end 41 a supporting the mobile pipe retainers 42 .
- the thrust bearing 43 supports the flanged top end 41 a of the rotary body.
- an additional bearing 44 is provided at the bottom end of the rotary body 41 .
- a bearing connection 49 a which is a static frame part optionally integrated with housing 49 , connects the thrust bearing 43 at the upper side of the open-centred rotary body with bearing 44 at the bottom end thereof.
- the support frame furthermore supports a centralizer 52 below the rotating headclamp to centralize the drill string.
- a centralizer 52 below the rotating headclamp to centralize the drill string.
- the support frame supports a wrench device 56 , for making and breaking connections between the tubular stem 31 and the drill string 50 .
- Pipe retainers 42 are movable between a non-operative position and an operative position. In the non-operative position (not shown) the pipe retainers 42 allow passage of a pipe of the drill string through the pipe passage 41 a . In the operative position as shown in FIG. 5 a , the pipe retainers 42 engage below a shoulder 51 a at the upper end 51 of a pipe of the drill string 50 extending through the pipe passage 41 a so as to suspend said drill string therefrom.
- FIG. 5 b an operative position is shown in which the pipe retainers engage below a shoulder 151 a at the upper end 151 of a of a tool 150 , here a casing tool 150 , e.g. including an internal and/or external gripper assembly for gripping casing or a casing running tool.
- a casing tool 150 e.g. including an internal and/or external gripper assembly for gripping casing or a casing running tool.
- This tool is advantageously driven by the top drive.
- the tool is connected to the tubular stem 31 , which is also referred to as rotary stem or quill.
- casing tool 150 comprises a casing engaging part 152 to engage on casing 155 .
- the mobile pipe retainers 42 have a clamping jaw 42 a to engage on a pipe or tool, which is preferably an exchangeable clamping jaw to be able to match the diameter and/ or shape to the type of pipe or tool.
- FIG. 6 a possible embodiment of a rotating headclamp is shown in top view, a perspective top view and a side view respectively.
- This rotating headclamp is provided with two sets each three mobile pipe retainers 42 and 42 ′ respectively. Each set is adapted to retain a different type of pipe. This is advantageous as it is possible to have one set in the non-operative position and the other in the operative position.
- the mobile pipe retainers 42 , 42 ′ of FIGS. 5 a and 5 b and FIG. 6 are embodied as a lever comprising an arm and a fulcrum, which fulcrum 42 c is fixed to the rotary body, here flange 41 a .
- One end 42 a of the arm is adapted to—in the operative position—engage on the pipe.
- this end 42 a of the arm is provided with clamping jaws 42 d .
- In the non-operative position has cleared the area in line with the pipe passage to allow the passage of a pipe of the drill string.
- the other end 42 b of the arm is operable by an actuator 46 to move the opposite end of the arm between the operative and the non-operative position.
- the actuator 46 is embodied as a hydraulically operable finger engaging on the arm end 42 b.
- FIGS. 7 a and 7 b respectively a front view and a side view of an embodiment of a trolley 212 with frame 245 is shown. Same parts are given same reference numerals to which ‘200’ has been added.
- it is required to transfer mud via a mud hose 280 to the top drive unit 230 .
- a mud connector 282 is provided on the top drive unit 230 .
- Top drive unit 230 comprises a tubular stem 231 .
- a wrench device 254 is visible.
- mud hose 280 is connected to support frame 245 via a mud hose connector 281 .
- other supply lines for electronics, control signals and hydraulics may also be connected to support frame 245 alone, e.g. via a drag chain or the like.
- the electronics, control signals, hydraulics and/ or mud are subsequently transferred to the top drive unit 230 via a mud hose connection 238 .
- a mud hose connection 283 is shown, transferring mud from the mud hose 280 supported by the mud hose connector 281 on the support frame 245 to the conventional mud connector 282 on the top drive unit 230 .
- the weight of the mud hose (etc.) is no longer supported by the top drive unit, but by the support frame 245 .
- This mud hose connection 283 can be disconnected from the top drive unit 230 upon removal of the top drive unit 230 , while mud hose 280 remains connected to support frame 245 . This is advantageous e.g. during maintenance of the top drive unit, or when an alternative top drive unit is to be installed, or when the trolley and elevator are used for purposes not requiring a top drive unit.
- FIGS. 8 a - f an embodiment of a pipe positioning motion arm 60 supported by the trolley, in particular by support frame 45 , is shown in in various positions.
- a pipe positioning motion arm 60 is provided to allow a pipe of the drill string to pass in a vertical orientation through the pipe passage of the rotating headclamp, and to position the shoulder of the pipe to allow engagement of the pipe of the drill string below a shoulder by the mobile pipe retainers in the operative position thereof.
- FIG. 8 a an embodiment of a the pipe positioning motion arm 60 is shown per se.
- the pipe positioning motion arm 60 comprises an inner boom 61 , pivotally attached about a horizontal first pivot axis 62 to the support frame 45 , which inner boom is pivotable in a first rotation direction R 1 from an upwardly angled parking position, as visible in FIG. 8 a , to a substantially vertical downwardly angled position, as visible in FIG. 8 e.
- An outer boom 63 has one end which is pivotally attached to the inner boom 61 about a horizontal second pivot axis 64 , parallel to and spaced from the first pivot axis 62 .
- the outer boom 63 is pivotable in a second rotation direction, R 2 , opposite to the first rotation direction R 1 , between a parking position in which the outer boom and inner boom are essentially parallel, as visible in FIG. 8 a , and a position in which the inner boom 61 and outer boom 63 extend essentially in line with each other, as visible in FIG. 8 d . It is noted that ‘essentially in line’ is to be interpreted as including an angle of >90°.
- a pipe gripper 65 is provided which is adapted to grip a pipe, which pipe gripper 65 is pivotally attached to an opposed end of the outer boom 63 opposite the end attached to the inner boom 61 about a horizontal pipe gripper pivot axis 66 , parallel to the first pivot axis 62 and the second pivot axis 64 , in in a pipe gripper rotation direction R 3 corresponding to the first rotation direction R 1 .
- a first pivot drive here a hydraulic cylinder 71
- a second pivot drive here embodied as parallel hydraulic cylinders 72
- a pipe gripper drive here embodied as two parallel hydraulic cylinders 73
- the first pivot drive 71 , second pivot drive 72 and pipe gripper drive 73 are adapted to operate simultaneously.
- inner boom 61 is provided with an end stopper 68 against which the outer boom 63 is adapted to rest in the parking position, as visible in FIG. 8 a.
- the pipe positioning motion arm 60 has been actuated, allowing the gripper 65 to engage on a lift sub 81 , in particular below a shoulder 81 b of the lift sub, attached to a pipe 80 of a drill string, in a non-vertical orientation, in particular a horizontal orientation, e.g. from a catwalk device.
- Lift sub 81 is a pipe portion specially designed to be added to the drill string for lifting purposes.
- the lift sub is embodied with at least one shoulder.
- the lift sub is embodied as a two-shouldered lift sub, comprising an upper shoulder 81 adapted to be engaged by the pipe retainers of a rotating headclamp, and a lower shoulder 81 b adapted to be engaged by the gripper 65 of the pipe positioning motion arm 60 .
- the two-shouldered lift sub further comprises a pin which is engaged in a box 80 a of drill pipe 80 .
- An advantage of the shown pipe positioning motion arm 60 is that the vertical positioning of the lift sub 80 , as visible in FIG. 8 d , is carried out by a single drive, here the second pivot drive embodied as parallel hydraulic cylinders 72 .
- FIGS. 9 and 10 a trolley and top drive unit of an alternative embodiment of a top drive well drilling installation according to the invention is shown. It is envisaged that the depicted installation is part of an offshore drilling vessel for performing offshore drilling and/or other wellbore related activities, e.g. well intervention. It will be appreciated that, when desired, the invention is also applicable to land based drilling installations.
- the top drive well drilling installation comprises a drilling tower, not shown, which is e.g. embodied as a mast with a closed contoured steel structure with at least one firing line 5 outside of the mast itself.
- a drilling tower not shown, which is e.g. embodied as a mast with a closed contoured steel structure with at least one firing line 5 outside of the mast itself.
- the mast is arranged adjacent a moonpool of a drilling vessel, or over a larger moonpool with two firing lines along opposed outer faces of the mast as is known in the art.
- the drilling tower is embodied as a derrick with the firing line within the structure of derrick, e.g. the derrick having a lattice structure placed over the moonpool.
- the mast is provided at the side of the drill floor and is provided with two parallel vertical trolley rails 111 a , 111 b .
- a trolley 112 is guided along said trolley rails 111 a , 111 b.
- a top drive unit 130 is attached to the trolley 112 .
- the top drive unit 130 comprises in this example four electric top drive motors 132 a , 132 b , 132 c , 132 d which commonly drive, via gearbox or transmission housing 135 , a rotary stem or quill 131 .
- the quill 131 is connectable, e.g. via a threaded connection, e.g. via a saver sub, to the top end of a drilling tubular aligned with the firing line.
- the top drive unit 130 is able to impart rotary motion and drive torque to a drilling tubulars string.
- a main hoisting device 120 is provided that is adapted to move the trolley with the top drive unit up and down along the vertical trolley rails 111 a , 111 b .
- the trolley and hoisting device have sufficient strength and capacity to handle a load of 1000 tons or more in the firing line.
- the trolley 112 is provided with a rigid support frame 145 supporting the top drive unit 130 , at least so as to absorb reaction torque from the motor of the top drive unit.
- the rigid frame structure 45 with upper and lower trolley beams 145 a , 145 b that each have at each end thereof rollers engaging the respective trolley rail 111 a , 111 b on the mast.
- These beams 145 a , 145 b here have about a V-shape in top view.
- These beams 145 a , 145 b support here a single vertical rear frame member 145 c , that embodies sort of a spine of the trolley 112 and that spans the height between the beams 111 a , 111 b.
- This rear frame member 145 c is provided with one or more, here a pair of parallel, vertical guide rails 160 a, b .
- the top drive unit 130 is provided with a chassis 130 a with rollers 130 b or other guide members that cooperate with said guide rails 160 a, b.
- This rear frame member 145 c may be embodied as a box girder.
- a forward cantilevered frame member 145 d extends, away from the mast. At its forward end this frame member 145 d carries a transverse horizontal top frame member 145 e , generally in a transverse imaginary plane that encompasses the firing line (not shown).
- the top frame member 145 e is provided with connectors, here holes, for connecting thereto a series of cable sheaves 121 in a side by side arrangement.
- the hoisting device 120 as a crown block, is also provided with cable sheaves so that the trolley 112 is suspended by one or more winch driven cables in a multiple fall arrangement.
- the support frame 145 further comprises left and right frame members 145 x , 145 y which are suspended from the transverse horizontal top frame member in a transverse plane that encompasses the firing line. As depicted these left and right members 145 x , 145 y are directly and pivotally connected to the frame member 145 e , here pivotal about an axis perpendicular to said transverse plane. As is preferred each left and right member 145 x , 145 y has an upper eye, as here through two spaced apart tabs, with a pin being secured through said eye and through a hole in the frame member 145 e.
- a rotatable head clamp assembly carrier 161 is connected, as is preferred releasably, with hooks 161 b to lower ends of said left and right members 145 x , 145 y .
- the carrier 161 supports, here is integrated with, a rotatable head clamp assembly 162 of which an example is depicted in FIGS. 5, 6 a - c .
- the rotatable head clamp assembly 162 is designed to handle a firing line load of at least 1000 tons.
- the vertical guide rails 160 a , 160 b guide the top drive unit 130 as the rollers 130 a , 130 b of the chassis 130 a ride along said rails 160 a, b.
- the same guide rails 160 a,b also guide the carrier 161 , here a guidance portion 161 a thereof. Also, as preferred, the same guide rails 160 a, b guide a wrench and/or clamping device 190 , which will be discussed later.
- the one or more guide rails 160 a, b here serve the purpose of absorbing any reaction torque that is caused by operation of the installation on the respective component and transmit said torque to the frame 145 .
- top drive unit 130 Between the top drive unit 130 and the trolley frame 145 there are one or more vertical displacement actuators 140 so that the top drive unit 130 is vertically mobile relative to the frame by said one or more vertical displacement actuators, here adapted to perform controlled lowering and raising of the top drive unit during make up or breaking of the threaded connection between the quill or rotary stem on the one hand and the tool joint or box member of the tubular suspended from the rotatable head clamp assembly on the other hand.
- the trolley is provided with an auxiliary hoisting device 180 that is adapted to vertically move at least the top drive unit 130 , here also the device 190 , relative to the frame. It is depicted that the device 180 includes a chain hoist device, with a hook that can be coupled to either the top drive chassis 130 a or the device 190 as shown in FIG. 10 .
- Reference numeral 190 indicates a wrench and/or clamp device that allows to retain the tool joint or box member held by the assembly 162 when make-up or break-up of a threaded connection is performed.
- FIGS. 11 a -11 c an alternative embodiment of a pipe positioning device 260 is shown in various positions allowing the passage of a pipe of the drill string through the pipe passage of the rotating headclamp, shown in relation to the embodiment of FIGS. 9 and 10 .
- the pipe positioning device 260 is supported by the hooks 161 b of the carrier 161 , which are connected to lower ends of said left and right members 145 x , 145 y .
- the carrier 161 supports, here is integrated with, a rotatable head clamp assembly 162 .
- the pipe positioning device 260 is provided to allow a pipe 270 of the drill string to pass in a vertical orientation through the pipe passage of the rotating headclamp, and to position the shoulder of the pipe to allow engagement of the pipe of the drill string below a shoulder by the mobile pipe retainers in the operative position thereof.
- a lift sub 271 is attached to pipe 270 of the drill string.
- Lift sub 271 is a pipe portion specially designed to be added to the drill string for lifting purposes.
- the lift sub is embodied with at least one shoulder.
- the lift sub is embodied as a two-shouldered lift sub, comprising an upper shoulder 271 a adapted to be engaged by the pipe retainers of a rotating headclamp, and a lower shoulder 271 b adapted to be engaged by a gripper of the pipe positioning device.
- the pipe positioning device 260 of the shown embodiment comprises a pipe gripper 262 mounted pivotably about horizontal pivot axis 263 to support arms 261 a , 261 b .
- These support arms 261 a , 261 b are supported from transverse horizontal top frame member 145 e via cylinders 262 a , 262 b respectively, allowing a vertical motion of the pipe gripper 252 relative to the carrier 161 of the rotating headclamp 162 .
- the gripper 262 has engaged lift sub 271 , in particular below shoulder 271 b of the lift sub, in a non-vertical orientation, in particular a horizontal orientation, e.g. from a catwalk device.
- gripper 262 has rotated about pivot axis 263 to bring the pipe 270 with lift sub 271 to the vertical orientation, such that the pipe with lift sub is positioned in line with and below the rotating headclamp 162 .
- FIG. 11 c cylinders 262 a and 262 b have been actuated to establish a vertical movement of the gripper 262 with the pipe and lift sub.
- the pipe with lift sub is stabbed into the rotating headclamp, allowing with the pipe retainers in the non-operative position passage of the lift sub 271 through the pipe passage.
- the retainers engage below the shoulder 271 a of the lift sub 271 of the pipe of the drill string extending through the pipe passage so as to suspend said drill string therefrom.
Abstract
The present invention relates to a top drive well drilling installation comprising a trolley guided along one or more vertical rails along the drilling tower, which trolley is provided with a support frame supporting the top drive unit and a rotating head-clamp. The rotating headclamp comprises an open-centered rotary body defining a pipe passage; a thrust bearing supporting the rotary body; and multiple mobile pipe retainers supported by the rotary body providing an operative and a non-operative position allowing passage of a pipe and engagement below a shoulder of a pipe of the drill string so as to suspend said drill string therefrom. At least the tubular stem is vertically movable relative to the rotating headclamp between an upper remote position allowing the engagement of a pipe of the drill string by the rotating headclamp and a lower connection position allowing the attachment of the tubular stem with the pipe.
Description
- The present invention relates to a top drive well drilling installation and methods for performing well operations.
- Pending application WO2014/178709 of the same applicant discloses a top drive well drilling installation comprising a drilling tower that is provided with vertical rails supported by the drilling tower. A trolley is guided along the vertical rails. The trolley is suspended from a travelling block of a hoisting device, commonly referred to as drawworks in the drilling industry. The hoisting device comprises a cable and a winch, as well as a crown block. The travelling block is suspended from the crown block by the cable. Operation of the winch allows to move the travelling block and the trolley up and down along the rails.
- The mentioned known installation further comprises a top drive unit and a rotatable tubular stem that is to be connected to the upper end of a drill string for rotation therewith about an axis of the drill string. The top drive unit further includes a motor adapted to rotate the tubular stem and thereby the connected drill string. The top drive unit is supported by the trolley, at least so as to absorb reaction torque from the motor of the top drive unit.
- In order to suspend the drill string, e.g. when it is detached from the top drive unit, the mentioned known installation comprises an elevator that is adapted to suspend the drill string there form, e.g. during tripping.
- Commonly, the elevator is held by an elevator support assembly embodied as two pivotable arms, which at their upper end are pivotally connected to a suspension body that is in turn suspended on a shoulder formed on the rotatable tubular stem of the top drive unit. These arms or links as they are often called, are very robust as they are designed to absorb the load of the entire drill string during activities such as tripping. An actuator is provided that is operable to move the elevator between an operative position on the drill string axis and a retracted position away from the drill string axis.
- Alternatively, as disclosed in WO2014/178709, the elevator support assembly is embodied as a direct drill string load bearing connection between the elevator and the trolley, independent from the top drive unit.
- These known arrangements are not entirely satisfactory. It is therefore an object of the present invention to propose an improved installation or at least an alternative installation.
- The present invention provides an installation according to the preamble of claim 1, which is based on WO2014/178709, which is characterized in that the top drive well drilling installation further comprises:
-
- a rotating headclamp comprising:
- an open-centered rotary body defining a pipe passage in line with a drill string axis to allow passage of a pipe of the drill string;
- a thrust bearing supporting the rotary body, allowing rotation thereof;
- multiple mobile pipe retainers supported by the rotary body so as to provide an operative and a non-operative position of the rotating headclamp, the pipe retainers being adapted to—in a non-operative position—allow passage of a pipe of the drill string through the pipe passage and—in an operative position—engage below a shoulder of a pipe of the drill string extending through the pipe passage so as to suspend said drill string therefrom;
- the support frame also being adapted to support the rotating headclamp and absorb the load of the suspended drill string;
- wherein at least the tubular stem is vertically movable relative to the rotating headclamp (40) between an upper remote position allowing the engagement of a pipe by the rotating headclamp and a lower connection position allowing the attachment of the tubular stem with the pipe while the pipe is supported by the rotating headclamp.
- a rotating headclamp comprising:
- The inventive design allows, in embodiments, to achieve relevant advantages over the prior art designs.
- For example the top drive unit now does not need to be designed to support the entire drill string, as even during drilling, when the pipe and the tubular stem are attached, the load of the suspended drill string is supported by the rotating headclamp, making its design less complex and costly.
- The rotating headclamp is provided with multiple mobile pipe retainers supported by the rotary body. Hence, the retainers, and the pipe they retain, are rotatable with the rotary body with respect to the support frame. The mobile pipe retainers are mobile so as to provide an operative and a non-operative position of the rotating headclamp. In the non-operative position the pipe retainers are adapted to allow passage of a pipe of the drill string through the pipe passage of the open-centered body, in particular in an upward direction. In the operative position the pipe retainers engage below a shoulder of a pipe of the drill string extending through the pipe passage so as to suspend said drill string therefrom. Such a type of clamp is often referred to as a collar-type clamp. It is noted that the shoulder may also be provided on a tool joint or a box member, connected to a pipe.
- In embodiments, the pipe retainers engage below the shoulder of a tool, e.g. a casing tool including an internal and/or external gripper assembly for gripping casing or a casing running tool.
- Advantageously, the mobile pipe retainers have a clamping jaw to engage on a pipe, which is preferably an exchangeable clamping jaw to be able to match the diameter and/ or shape to the type of pipe. Hence, when a different type of pipe is to be handled, it is not necessary to replace the entire headclamp but only the clamping jaws.
- In a particular advantageous embodiment, two sets of multiple, e.g. three, mobile pipe retainers are provided, each set being adapted to retain a different type of pipe, e.g. each comprising a different type of clamping jaws, and wherein it is possible to have one set in the non-operative position and the other in the operative position. Accordingly, when a different type of pipe is to be handled, it is not necessary to replace the entire headclamp or the clamping jaws, but simply the other set of pipe retainers may be brought in the operative position.
- In embodiments in which the support frame allows the presence of a rotating headclamp and a spare rotating headclamp, it is thus possible to have pipe retainers for four different types of pipe readily available.
- Advantageously, mobile pipe retainer is embodied as a lever comprising an arm and a fulcrum, which fulcrum is fixed to the rotary body and wherein one end of the arm is adapted to—in the operative position—engage on the pipe, and in the non-operative position has cleared the area in line with the pipe passage to allow the passage of a pipe of the drill string, and wherein the other end of the arm is operable by an actuator to move the opposite end of the arm between the operative and the non-operative position. Advantageously, a single actuator may be provided to operate multiple mobile pipe retainers.
- The rotating headclamp is supported by the support frame, such that the support frame absorbs the load of the suspended drill string. Advantageously, the support frame comprises a through-passage, wherein the through passage is provided in line with the open-centered body of the rotating headclamp. Possibly, recesses are provided adjacent the through-passage, wherein in the recesses the thrust bearings are provided.
- In an alternative embodiment, the support frame comprises a through-passage in which a housing of the rotating headclamp can be provided. Hence, the housing is supported by the support frame. In such an embodiment, the housing of the rotating headclamp supports the thrust bearing.
- In embodiments, the thrust bearing is provided at an upper end of the rotary body. An additional bearing is advantageously provided at the bottom end of the rotary body. Possibly, these bearings are interconnected by a bearing connection. The thrust bearing may be a ball bearing, spherical roller bearing or any other suitable type of bearing.
- The rotating headclamp comprises an open-centered rotary body defining a pipe passage in line with a drill string axis to allow passage of a pipe of the drill string. Hence, the body should have a diameter which is sufficient for the largest type of pipe or pipe aid to be engaged by the tubular stem. It is noticed that pipe aids are available, having a smaller diameter than the pipe to be engaged by the tubular stem, and which are thus positioned between the tubular stem and the pipe with the large diameter.
- In embodiments, the pipe of the drill string is embodied as a lift sub, having a shoulder to be engaged by the pipe retainers of the rotating headclamp.
- In embodiments, the open-centered rotary body is embodied as a cylinder with a flanged top end, hence in cross-section T-shaped. The flanged top end is suitable for supporting the mobile pipe retainers. Advantageously, the thrust bearing support this flanged top end of the rotary body.
- The top drive unit is supported by the support frame, at least so as to absorb reaction torque from the motor of the top drive unit. A hoisting device is provided for moving the trolley up and down. It is equally conceivable that the trolley is suspended from the hoisting device, or that the support frame is suspended from the hoisting device, for example a travelling block. Hence, the support frame is suspended from the hoisting device, optionally via the trolley.
- The tubular stem is to be connected to the upper end of a drill string for rotation therewith about an axis of the drill string. In an embodiment, the tubular stem is connected to or formed integral with the top drive unit. In an alternative embodiment, the tubular stem is directly connected to the support frame, in a manner allowing rotation of the tubular stem. In both embodiments, the top drive unit is allowed to engage on the tubular stem to rotate the tubular stem and thereby the connected drill string to drill the well.
- At least the tubular stem is vertically movable relative to the rotating headclamp between an upper remote position allowing the engagement of a pipe by the rotating headclamp and a lower connection position allowing the attachment of the tubular stem with the pipe while the pipe and/or the drill string is supported by the rotating headclamp. In an embodiment, the top drive unit with the tubular stem is movably supported in the support frame, Alternatively, a so-called splined stem is applied and the top drive unit is supported stationary, while the stem is vertically movable. Yet alternatively, the tubular stem is provided stationary and the rotating headclamp is vertically movable relative to the tubular stem.
- In an embodiment, support frame is furthermore provided with a drive for moving the tubular stem vertically and relative to the rotating headclamp between the upper remote position and the lower connection position, e.g. including a rail and trolleys or alternatively including hydraulic pistons.
- Preferably, in the remote position of the tubular stem the rotating headclamp is removable from the support frame. This is advantageous e.g. in view of maintenance of the rotating headclamp, or when a different type of rotating headclamp is required to match with the pipe that is to be engaged.
- In embodiments, the top drive unit is detachable from the support frame. For example, in an embodiment, the support frame supports a hook, and the top drive unit is provided with a bail so as to suspend the top drive unit from the hook. Such a detachable top drive unit enables the top drive unit to be removed from the support frame, whilst the rotating headclamp is still is fully functional. This may, e.g., be of use to conduct maintenance or repairs on the top drive unit during tripping of the drill string. The top drive unit can then simply be removed, and tripping can nonetheless be effected. In addition, it is possible to provide a substitute top drive unit, and to allow the top drive well drilling installation of the invention for an exchange of the top drive units. In an embodiment, wherein the top drive unit is detachable from the support frame a method can be carried out, comprising the following steps:
-
- well drilling by the top drive unit,
- detaching the drill string from the top drive unit while remaining supported by the rotating headclamp,
- detaching the top drive unit from the support frame,
- tripping the drill string.
- Hence, such an installation allows for an easy replacement of a top drive unit, when required. It is conceivable that the step of detaching the top drive unit is not followed by the replacement of the top drive unit, but that alternative drilling operations may follow, not requiring a top drive unit.
- The top drive unit includes a tubular stem and a motor. It is conceivable that not the entire top drive unit is removed or substituted, but only part thereof. For example, the motor can be removed/replaced, while remaining the tubular stem in place. This is in particular advantageous in embodiments wherein the tubular stem is supported by/connected to the support frame.
- The removal of the motor allows drilling to be followed by an operation including the use of mud hoses and the tubular stem, wherein the motor of the top drive unit has thus been removed.
- The support frame is embodied as a direct drill string load bearing connection between the rotating headclamp and the trolley, independent from the top drive unit. Hence, the rotating headclamp is supported by the trolley, while the top drive unit is also supported by the trolley.
- In embodiments, the support frame comprises a horizontal cross beam to support the rotating headclamp. Advantageously the length of the horizontal cross beam exceeds that of the rotating headclamp, to provide one or more storage locations for drilling equipment, such as spare or alternative rotating headclamps or parts thereof. Preferably at least two storage locations are provided at opposite sides of the rotating headclamp. In embodiments, the rotating headclamp is translatably supported by the cross beam between an operative position in line with the drill string axis and a parking position.
- In an embodiment, a wrench device is provided, which is e.g. connected to the top drive unit, for making and breaking connections between the tubular stem and the drill string. Preferably, the wrench device is adapted for horizontal motion relative to the tubular stem.
- In embodiments, the support frame furthermore supports a centralizer below the rotating headclamp to centralize a pipe and/or the drill string, and advantageously align it with the pipe passage defined by the rotary body of the rotating headclamp.
- A hoisting device is provided for moving the trolley up and down. The hoisting device may be of a RamRig-type, or alternatively comprise a rack-and-pinion. In an embodiment, the hoisting device comprises a cable and a winch, a crown block, and a travelling block suspended from the crown block by said cable, wherein the trolley is suspended from the travelling block so as to move up and down upon operation of the winch.
- In embodiments, a pipe positioning device, e.g. embodied as a pipe positioning motion am is provided to pass a pipe of the drill string in a vertical orientation through the pipe passage of the rotating headclamp, and to position a shoulder of the pipe to allow engagement of the pipe of the drill string below the shoulder by the mobile pipe retainers in the operative position thereof, wherein in particular the pipe is embodied as a lift sub.
- It is conceivable that the pipe positioning device is supported by the trolley. It is likewise conceivable that the pipe positioning device is supported by the drilling tower, i.e. as a motion arm assembly as disclosed in WO2014/182160.
- In embodiments, the pipe positioning device is adapted to lift 60,000 kilos. Such a pipe positioning motion arm is suitable to position a telescopic joint (60,000kg) or a bottom hole assembly (20,000kg) in the rotating headclamp. Generally, such a robust pipe positioning device is supported by the trolley. Known motion arms supported by the tower are adapted to lift up to 7000kg. However, it is also conceivable that a pipe positioning device adapted to lift up to 60,000kg is supported by the tower.
- In embodiments, the pipe positioning device is adapted to receive a pipe of the drill string, in particular a lift sub, in a non-vertical orientation, in particular a horizontal orientation, e.g. from a catwalk device.
- In embodiments, the pipe positioning device comprises a gripper, adapted to engage on a pipe such as a lift sub, in particular below a shoulder of the pipe or lift sub. A lift sub is a pipe portion specially designed to be added to the drill string for lifting purposes. In embodiments, the lift sub is embodied with at least one shoulder.
- Advantageously, a two-shouldered lift sub is provided, comprising an upper shoulder adapted to be engaged by the pipe retainers of a rotating headclamp, and a lower shoulder adapted to be engaged by a gripper of a pipe positioning device. Preferably, the two-shouldered lift sub further comprises a pin to be engaged in a box of a drill pipe.
- In an embodiment, the pipe positioning device comprises a mutually connected articulating inner and outer boom, wherein a gripper is attached to the outer boom, the gripper being adapted to engage on a pipe such as a lift sub, in particular below a shoulder of the pipe or lift sub. The inner boom can e.g. be attached to the trolley or to the drilling tower.
- In a specific embodiment, the pipe positioning motion arm comprises:
-
- an inner boom, pivotally attached about a horizontal first pivot axis, e.g. to the support frame, which inner boom is pivotable in a first rotation direction from an upwardly angled parking position and a substantially vertical downwardly angled position;
- an outer boom having one end which is pivotally attached to the inner boom about a horizontal second pivot axis, parallel to and spaced from the first pivot axis, which outer boom is pivotable in a second rotation direction, opposite to the first rotation direction, between a parking position in which the outer boom and inner boom are essentially parallel and a position in which the inner boom and outer boom extend essentially in line with each other;
- a pipe gripper adapted to grip a pipe, pivotally attached to an opposed end of the outer boom opposite the end attached to the inner boom about a horizontal pipe gripper pivot axis, parallel to the first pivot axis and the second pivot axis, in in a pipe gripper rotation direction corresponding to the first rotation direction.
- The present invention further relates to a method for performing a well drilling operation, wherein use is made of the inventive installation according to the attached claims.
- In a possible embodiment, in particular for the assembly of a drill string, the method comprises the steps of:
-
- providing the top drive unit in the upper remote position;
- providing the mobile pipe retainers of the rotating headclamp in the non-operative position;
- providing a pipe of a drill string having a shoulder upwards through the pipe passage of the rotating headclamp;
- moving the pipe retainers to the operative position to engage below the shoulder of the pipe extending through the pipe passage, so as to suspend said pipe and/or drill string therefrom;
- lowering the top drive unit to the lower connection position and attaching the tubular stem with the pipe while the pipe and/or drill string is supported by the rotating headclamp.
- In a possible embodiment, in particular wherein a substitute rotating headclamp is provided, the method comprises the steps of:
-
- providing the top drive unit in the upper remote position;
- removing the rotating headclamp from the support frame;
- providing the substitute rotating headclamp in the support frame.
- In embodiments, the top drive unit is detachable from the support frame, and wherein a substitute top drive unit is provided, the method comprising the following steps:
-
- well drilling by the top drive unit,
- detaching the drill string from the top drive unit while remaining supported by the rotating headclamp,
- detaching the top drive unit from the support frame,
- replacing the top drive unit by the substitute top drive.
- In embodiments, it is required to transfer mud via a mud hose to the top drive unit. To this end, a mud connector is provided on the top drive unit. According to a possible embodiment, the support frame is provided with a frame connector for the mud hose. The advantage of a mud hose connector at the support frame is that the load of the mud hose is not only suspended from the top drive unit, but also, largely, from the support frame. As the top drive unit is advantageously movably provided in the support frame, a portion of the mud hose between the top drive unit and the mud hose connector, also referred to as the mud hose connection, is slack to compensate for movements of the top drive unit.
- Different types of pipes can be handled by the top drive well drilling installation of the invention. The rotating headclamp is e.g. adapted to suspend drill pipes, drill string, casings, liners, etc. etc.
- The invention is further explained in relation to the drawings, in which:
-
FIG. 1 shows an embodiment of a top drive well drilling installation in a perspective view; -
FIG. 2 shows an exemplary trolley of a top drive well drilling installation in a perspective view; -
FIG. 3 shows the trolley ofFIG. 2 in a side view; -
FIG. 4 shows an schematic trolley of a top drive well drilling installation with a portion of a drill string in a side view; -
FIGS. 5a and 5b show an exemplary embodiment of a rotating headclamp in side view; -
FIG. 6a shows an embodiment of a rotating headclamp in top view; -
FIG. 6b shows the rotating headclamp ofFIG. 6a in a perspective top view; -
FIG. 6c shows the rotating headclamp ofFIG. 6a in a side view; -
FIGS. 7a and 7b show respectively a front view and a side view of an embodiment of a trolley; -
FIGS. 8a-8f show an embodiment of a pipe positioning motion arm supported by the trolley in various positions allowing the passage of a pipe of the drill string through the pipe passage of the rotating headclamp; -
FIG. 9 shows in a perspective view a trolley and top drive unit of an alternative embodiment of a top drive well drilling installation, -
FIG. 10 shows in a side view the trolley and top drive unit of the installation ofFIG. 9 , -
FIGS. 11a-11c shown an alternative embodiment of a pipe positioning device supported by the trolley in various positions allowing the passage of a pipe of the drill string through the pipe passage of the rotating headclamp. - In
FIG. 1 a top drive well drilling installation 1 according to the present invention is shown in a perspective view. Adrilling tower 10 as is known from the previous applications of the same applicant and as commercially available is shown. Thedrilling tower 10 supports twovertical rails trolley 12 is guided along saidvertical rails FIGS. 2-4 . - The top drive well drilling installation 1 is furthermore provided with a
top drive unit 30 including atubular stem 31 to be connected to theupper end 51 of adrill string 50, visible inFIGS. 4 and 5 for rotation therewith about an axis A of the drill string, and including amotor 32 adapted to rotate thetubular stem 31 and thereby the connected drill string. - The
trolley 12 is provided with asupport frame 45 supporting the top drive unit, at least so as to absorb reaction torque from the motor of the top drive unit. In the shown embodiment, thetop drive unit 30 is movably supported in thesupport frame 45 in a direction D, viaactuators 33, between an upper remote position allowing the engagement of a pipe by a rotating headclamp 40 (explained below) and a lower connection position allowing the attachment of thetubular stem 31 with the pipe while the pipe and/or the drill string is supported by the rotatingheadclamp 40. InFIG. 4 , schematicallytrolleys 33 a are visible, provided ontop drive unit 30, which may engage on rails provided in thesupport frame 45 to move thetop drive unit 30 in direction D. - According to a preferred embodiment of the invention, the
top drive unit 30 is movable upwards to such an extent that it is remote from the rotatingheadclamp 40, wherein in this remote position of thetop drive unit 30 the rotatingheadclamp 40 is removable from thesupport frame 45. - The top drive well drilling installation 1 is furthermore provided with a
hoisting device 20 for moving thetrolley 12 up and down. The hoisting device comprises a winch, not visible, and acable 21 extending from the winch, via one ormore pulleys 23 at the top of thedrilling tower 10 to acrown block 24 and a travellingblock 25. The crown block comprises multiple sheaves, mounted on a common axle. The travellingblock 25 is suspended from thecrown block 24 by saidcable 21. In the embodiment shown inFIG. 1 , thesupport frame 45 is suspended from the travellingblock 25 via connectors at the ends of the travelling block so as to move up and down upon operation of the winch. In the embodiment ofFIGS. 2 and 3 , the travellingblock 25 is integrated into thesupport frame 45. Hence, thesupport frame 45 is suspended from thecrown block 24 so as to move up and down upon operation of the winch. - The
support frame 45 additionally supports arotating headclamp 40, shown in detail inFIGS. 5a and 5b . The rotatingheadclamp 40 comprises: -
- an open-centered
rotary body 41 defining apipe passage 41 a in line with a drill string axis A to allow passage of a pipe of the drill string; - a
thrust bearing 43 supporting therotary body 41, allowing rotation thereof; - multiple
mobile pipe retainers 42 supported by therotary body 41 so as to provide an operative and a non-operative position of the rotating headclamp.
- an open-centered
- In the shown embodiment, the rotating headclamp comprises a
housing 49 supporting thethrust bearing 43, which housing is supported by thesupport frame 45. Alternatively, thesupport frame 45 supports the rotatingheadclamp 40 directly, e.g. via thethrust bearing 43. Either way, thesupport frame 45 absorbs the load of the suspended drill string. - Possibly, the
support frame 45 is adapted to support more than one rotating headclamp, i.e. a substitute rotating headclamp. - Possibly, a rotating
headclamp 40 is translatably supported in thesupport frame 45 between an operative position in line with the drill string axis A and a parking position. Thus, the drill string axis can be cleared of the rotating headclamp if so desired. In addition, it is possible to have asupport frame 45 comprising two rotating headclamp which can be positioned in line with the drill string axis A as desired. - Here, the rotary body is embodied as a
cylinder 41 b with a flangedtop end 41 a supporting themobile pipe retainers 42. Thethrust bearing 43 supports the flangedtop end 41 a of the rotary body. - Furthermore, in the shown embodiment, an additional bearing 44 is provided at the bottom end of the
rotary body 41. Abearing connection 49 a, which is a static frame part optionally integrated withhousing 49, connects the thrust bearing 43 at the upper side of the open-centred rotary body with bearing 44 at the bottom end thereof. - In the shown embodiment, the support frame furthermore supports a
centralizer 52 below the rotating headclamp to centralize the drill string. Such centralizers are known in the art. - Furthermore, the support frame supports a
wrench device 56, for making and breaking connections between thetubular stem 31 and thedrill string 50. -
Pipe retainers 42 are movable between a non-operative position and an operative position. In the non-operative position (not shown) thepipe retainers 42 allow passage of a pipe of the drill string through thepipe passage 41 a. In the operative position as shown inFIG. 5a , thepipe retainers 42 engage below ashoulder 51 a at theupper end 51 of a pipe of thedrill string 50 extending through thepipe passage 41 a so as to suspend said drill string therefrom. - In
FIG. 5b , an operative position is shown in which the pipe retainers engage below ashoulder 151 a at the upper end 151 of a of atool 150, here acasing tool 150, e.g. including an internal and/or external gripper assembly for gripping casing or a casing running tool. This tool is advantageously driven by the top drive. In the shown embodiment, the tool is connected to thetubular stem 31, which is also referred to as rotary stem or quill. At the bottom end,casing tool 150 comprises acasing engaging part 152 to engage oncasing 155. - In the shown embodiment, the
mobile pipe retainers 42 have a clampingjaw 42 a to engage on a pipe or tool, which is preferably an exchangeable clamping jaw to be able to match the diameter and/ or shape to the type of pipe or tool. - In
FIG. 6 a possible embodiment of a rotating headclamp is shown in top view, a perspective top view and a side view respectively. This rotating headclamp is provided with two sets each threemobile pipe retainers - The
mobile pipe retainers FIGS. 5a and 5b andFIG. 6 are embodied as a lever comprising an arm and a fulcrum, whichfulcrum 42c is fixed to the rotary body, here flange 41 a. Oneend 42 a of the arm is adapted to—in the operative position—engage on the pipe. Here, thisend 42 a of the arm is provided with clampingjaws 42 d. In the non-operative position has cleared the area in line with the pipe passage to allow the passage of a pipe of the drill string. Theother end 42 b of the arm is operable by anactuator 46 to move the opposite end of the arm between the operative and the non-operative position. Here, theactuator 46 is embodied as a hydraulically operable finger engaging on thearm end 42 b. - In
FIGS. 7a and 7b respectively a front view and a side view of an embodiment of atrolley 212 withframe 245 is shown. Same parts are given same reference numerals to which ‘200’ has been added. In embodiments, it is required to transfer mud via amud hose 280 to thetop drive unit 230. To this end, amud connector 282 is provided on thetop drive unit 230.Top drive unit 230 comprises a tubular stem 231. In the shown embodiment, also a wrench device 254 is visible. - According to a preferred aspect of the invention,
mud hose 280 is connected to supportframe 245 via amud hose connector 281. Similarly, other supply lines for electronics, control signals and hydraulics may also be connected to supportframe 245 alone, e.g. via a drag chain or the like. The electronics, control signals, hydraulics and/ or mud are subsequently transferred to thetop drive unit 230 via a mud hose connection 238. Here, amud hose connection 283 is shown, transferring mud from themud hose 280 supported by themud hose connector 281 on thesupport frame 245 to theconventional mud connector 282 on thetop drive unit 230. Hence, the weight of the mud hose (etc.) is no longer supported by the top drive unit, but by thesupport frame 245. - This
mud hose connection 283 can be disconnected from thetop drive unit 230 upon removal of thetop drive unit 230, whilemud hose 280 remains connected to supportframe 245. This is advantageous e.g. during maintenance of the top drive unit, or when an alternative top drive unit is to be installed, or when the trolley and elevator are used for purposes not requiring a top drive unit. - In
FIGS. 8a-f an embodiment of a pipepositioning motion arm 60 supported by the trolley, in particular bysupport frame 45, is shown in in various positions. Such a pipepositioning motion arm 60 is provided to allow a pipe of the drill string to pass in a vertical orientation through the pipe passage of the rotating headclamp, and to position the shoulder of the pipe to allow engagement of the pipe of the drill string below a shoulder by the mobile pipe retainers in the operative position thereof. - It is likewise conceivable that such a pipe positioning motion arm is supported by the drilling tower, i.e as a motion arm assembly 2 as disclosed in WO2014/182160 and as visible in
FIG. 1 . - In
FIG. 8a , an embodiment of a the pipepositioning motion arm 60 is shown per se. The pipepositioning motion arm 60 comprises aninner boom 61, pivotally attached about a horizontalfirst pivot axis 62 to thesupport frame 45, which inner boom is pivotable in a first rotation direction R1 from an upwardly angled parking position, as visible inFIG. 8a , to a substantially vertical downwardly angled position, as visible inFIG. 8 e. - An
outer boom 63 has one end which is pivotally attached to theinner boom 61 about a horizontalsecond pivot axis 64, parallel to and spaced from thefirst pivot axis 62. Theouter boom 63 is pivotable in a second rotation direction, R2, opposite to the first rotation direction R1, between a parking position in which the outer boom and inner boom are essentially parallel, as visible inFIG. 8a , and a position in which theinner boom 61 andouter boom 63 extend essentially in line with each other, as visible inFIG. 8d . It is noted that ‘essentially in line’ is to be interpreted as including an angle of >90°. Further, apipe gripper 65 is provided which is adapted to grip a pipe, whichpipe gripper 65 is pivotally attached to an opposed end of theouter boom 63 opposite the end attached to theinner boom 61 about a horizontal pipegripper pivot axis 66, parallel to thefirst pivot axis 62 and thesecond pivot axis 64, in in a pipe gripper rotation direction R3 corresponding to the first rotation direction R1. - A first pivot drive, here a
hydraulic cylinder 71, is mounted between saidsupport frame 45 and saidinner boom 61 and adapted to pivot theinner boom 61. A second pivot drive, here embodied as parallelhydraulic cylinders 72, is mounted between saidsupport frame 45 and saidouter boom 63, and adapted to pivot theouter boom 63. A pipe gripper drive, here embodied as two parallelhydraulic cylinders 73, is mounted between saidouter boom 63 and saidpipe gripper 65 and adapted to pivot the pipe gripper. Thefirst pivot drive 71,second pivot drive 72 andpipe gripper drive 73 are adapted to operate simultaneously. - Here,
inner boom 61 is provided with anend stopper 68 against which theouter boom 63 is adapted to rest in the parking position, as visible inFIG. 8 a. - In
FIG. 8b , the pipepositioning motion arm 60 has been actuated, allowing thegripper 65 to engage on alift sub 81, in particular below ashoulder 81 b of the lift sub, attached to apipe 80 of a drill string, in a non-vertical orientation, in particular a horizontal orientation, e.g. from a catwalk device. - Lift
sub 81 is a pipe portion specially designed to be added to the drill string for lifting purposes. The lift sub is embodied with at least one shoulder. Here, the lift sub is embodied as a two-shouldered lift sub, comprising anupper shoulder 81 adapted to be engaged by the pipe retainers of a rotating headclamp, and alower shoulder 81 b adapted to be engaged by thegripper 65 of the pipepositioning motion arm 60. Not visible is that the two-shouldered lift sub further comprises a pin which is engaged in abox 80 a ofdrill pipe 80. - An advantage of the shown pipe
positioning motion arm 60 is that the vertical positioning of thelift sub 80, as visible inFIG. 8d , is carried out by a single drive, here the second pivot drive embodied as parallelhydraulic cylinders 72. - In
FIGS. 9 and 10 a trolley and top drive unit of an alternative embodiment of a top drive well drilling installation according to the invention is shown. It is envisaged that the depicted installation is part of an offshore drilling vessel for performing offshore drilling and/or other wellbore related activities, e.g. well intervention. It will be appreciated that, when desired, the invention is also applicable to land based drilling installations. - The top drive well drilling installation comprises a drilling tower, not shown, which is e.g. embodied as a mast with a closed contoured steel structure with at least one firing line 5 outside of the mast itself. For example the mast is arranged adjacent a moonpool of a drilling vessel, or over a larger moonpool with two firing lines along opposed outer faces of the mast as is known in the art.
- In an alternative design the drilling tower is embodied as a derrick with the firing line within the structure of derrick, e.g. the derrick having a lattice structure placed over the moonpool.
- The mast, not shown per se, is provided at the side of the drill floor and is provided with two parallel vertical trolley rails 111 a, 111 b. A
trolley 112 is guided along said trolley rails 111 a, 111 b. - A
top drive unit 130 is attached to thetrolley 112. - The
top drive unit 130 comprises in this example four electrictop drive motors transmission housing 135, a rotary stem orquill 131. As known in the art thequill 131 is connectable, e.g. via a threaded connection, e.g. via a saver sub, to the top end of a drilling tubular aligned with the firing line. Thereby thetop drive unit 130 is able to impart rotary motion and drive torque to a drilling tubulars string. - A
main hoisting device 120 is provided that is adapted to move the trolley with the top drive unit up and down along the vertical trolley rails 111 a, 111 b. For example the trolley and hoisting device have sufficient strength and capacity to handle a load of 1000 tons or more in the firing line. - The
trolley 112 is provided with arigid support frame 145 supporting thetop drive unit 130, at least so as to absorb reaction torque from the motor of the top drive unit. - The
rigid frame structure 45 with upper andlower trolley beams respective trolley rail beams beams trolley 112 and that spans the height between thebeams - This rear frame member 145 c is provided with one or more, here a pair of parallel,
vertical guide rails 160 a, b. Thetop drive unit 130 is provided with achassis 130 a withrollers 130 b or other guide members that cooperate with saidguide rails 160 a, b. - This rear frame member 145 c may be embodied as a box girder.
- From the top end of said rear frame member 145 c a forward cantilevered frame member 145 d extends, away from the mast. At its forward end this frame member 145 d carries a transverse horizontal
top frame member 145 e, generally in a transverse imaginary plane that encompasses the firing line (not shown). - The
top frame member 145 e is provided with connectors, here holes, for connecting thereto a series ofcable sheaves 121 in a side by side arrangement. Thehoisting device 120, as a crown block, is also provided with cable sheaves so that thetrolley 112 is suspended by one or more winch driven cables in a multiple fall arrangement. - The
support frame 145 further comprises left andright frame members right members frame member 145 e, here pivotal about an axis perpendicular to said transverse plane. As is preferred each left andright member frame member 145 e. - A rotatable head
clamp assembly carrier 161 is connected, as is preferred releasably, withhooks 161 b to lower ends of said left andright members carrier 161 supports, here is integrated with, a rotatablehead clamp assembly 162 of which an example is depicted inFIGS. 5, 6 a-c. For example the rotatablehead clamp assembly 162 is designed to handle a firing line load of at least 1000 tons. - As discussed the
vertical guide rails 160 a, 160 b guide thetop drive unit 130 as therollers chassis 130 a ride along saidrails 160 a, b. - In this embodiment, as preferred, the
same guide rails 160 a,b also guide thecarrier 161, here aguidance portion 161 a thereof. Also, as preferred, thesame guide rails 160 a, b guide a wrench and/or clampingdevice 190, which will be discussed later. - In addition to guiding said components, the one or
more guide rails 160 a, b here, as is preferred, also serve the purpose of absorbing any reaction torque that is caused by operation of the installation on the respective component and transmit said torque to theframe 145. - Between the
top drive unit 130 and thetrolley frame 145 there are one or morevertical displacement actuators 140 so that thetop drive unit 130 is vertically mobile relative to the frame by said one or more vertical displacement actuators, here adapted to perform controlled lowering and raising of the top drive unit during make up or breaking of the threaded connection between the quill or rotary stem on the one hand and the tool joint or box member of the tubular suspended from the rotatable head clamp assembly on the other hand. - The trolley is provided with an
auxiliary hoisting device 180 that is adapted to vertically move at least thetop drive unit 130, here also thedevice 190, relative to the frame. It is depicted that thedevice 180 includes a chain hoist device, with a hook that can be coupled to either thetop drive chassis 130 a or thedevice 190 as shown inFIG. 10 . -
Reference numeral 190 indicates a wrench and/or clamp device that allows to retain the tool joint or box member held by theassembly 162 when make-up or break-up of a threaded connection is performed. - In
FIGS. 11a-11c an alternative embodiment of apipe positioning device 260 is shown in various positions allowing the passage of a pipe of the drill string through the pipe passage of the rotating headclamp, shown in relation to the embodiment ofFIGS. 9 and 10 . - The
pipe positioning device 260 is supported by thehooks 161 b of thecarrier 161, which are connected to lower ends of said left andright members carrier 161 supports, here is integrated with, a rotatablehead clamp assembly 162. - The
pipe positioning device 260 is provided to allow apipe 270 of the drill string to pass in a vertical orientation through the pipe passage of the rotating headclamp, and to position the shoulder of the pipe to allow engagement of the pipe of the drill string below a shoulder by the mobile pipe retainers in the operative position thereof. - Here, a
lift sub 271 is attached topipe 270 of the drill string.Lift sub 271 is a pipe portion specially designed to be added to the drill string for lifting purposes. The lift sub is embodied with at least one shoulder. Here, the lift sub is embodied as a two-shouldered lift sub, comprising anupper shoulder 271 a adapted to be engaged by the pipe retainers of a rotating headclamp, and alower shoulder 271 b adapted to be engaged by a gripper of the pipe positioning device. - In
FIG. 11a , it is visible that thepipe positioning device 260 of the shown embodiment comprises apipe gripper 262 mounted pivotably abouthorizontal pivot axis 263 to supportarms arms top frame member 145 e viacylinders carrier 161 of therotating headclamp 162. - In
FIG. 11a , thegripper 262 has engagedlift sub 271, in particular belowshoulder 271 b of the lift sub, in a non-vertical orientation, in particular a horizontal orientation, e.g. from a catwalk device. - In
FIG. 11b ,gripper 262 has rotated aboutpivot axis 263 to bring thepipe 270 withlift sub 271 to the vertical orientation, such that the pipe with lift sub is positioned in line with and below therotating headclamp 162. - In
FIG. 11c ,cylinders gripper 262 with the pipe and lift sub. As such, the pipe with lift sub is stabbed into the rotating headclamp, allowing with the pipe retainers in the non-operative position passage of thelift sub 271 through the pipe passage. By subsequently positioning the pipe retainers in the operative position the retainers engage below theshoulder 271 a of thelift sub 271 of the pipe of the drill string extending through the pipe passage so as to suspend said drill string therefrom.
Claims (16)
1. A top drive well drilling installation comprising:
a drilling tower;
a top drive unit including a tubular stem which is to be connected to an upper end of a drill string for rotation therewith about an axis of the drill string, and a motor adapted to rotate the tubular stem and thereby the connected drill string;
one or more vertical rails supported by the drilling tower;
a trolley guided along said one or more vertical rails, which trolley is provided with a support frame supporting the top drive unit, at least so as to absorb reaction torque from the motor of the top drive unit;
a hoisting device for moving the trolley up and down; and
a rotating headclamp comprising:
an open-centered rotary body defining a pipe passage in line with a drill string axis to allow passage of a pipe of the drill string;
a thrust bearing supporting the rotary body, allowing rotation thereof; and
multiple mobile pipe retainers supported by the rotary body so as to provide an operative and a non-operative position of the rotating headclamp, the pipe retainers being adapted to—in the non-operative position—allow passage of a pipe of the drill string through the pipe passage and—in the operative position—engage below a shoulder of the pipe of the drill string extending through the pipe passage so as to suspend said drill string therefrom;
wherein the support frame is adapted to support the rotating headclamp and absorb the load of the suspended drill string, and
wherein at least the tubular stem is vertically movable relative to the rotating headclamp between an upper remote position allowing the engagement of a pipe of the drill string by the rotating headclamp and a lower connection position allowing the attachment of the tubular stem with the pipe of the drill string while the pipe and/or the drill string is supported by the rotating headclamp.
2. The top drive well drilling installation according to claim 1 , wherein the mobile pipe retainers have a clamping jaw to engage on a pipe.
3. The top drive well drilling installation according to claim 1 , wherein two sets of multiple mobile pipe retainers are provided, each set adapted to retain a different type of pipe, and wherein it is possible to have one set in the non-operative position and the other in the operative position.
4. The top drive well drilling installation according to claim 1 , wherein the mobile pipe retainer is embodied as a lever comprising an arm and a fulcrum, which fulcrum is fixed to the rotary body and wherein one end of the arm is adapted to—in the operative position—engage on the pipe, and in the non-operative position has cleared the area in line with the pipe passage to allow the passage of a pipe of the drill string, and wherein the other end of the arm is operable by an actuator to move the opposite end of the arm between the operative and the non-operative position.
5. The top drive well drilling installation according to claim 1 , wherein the rotary body is embodied as a cylinder with a flanged top end supporting the mobile pipe retainers and wherein the thrust bearing supports the flanged top end of the rotary body.
6. The top drive well drilling installation according to claim 1 wherein the rotating headclamp comprises a housing supporting the rotating headclamp, which housing is supported by the support frame.
7. The top drive well drilling installation according to claim 1 , wherein in the remote position of the tubular stem the rotating headclamp is removable from the support frame.
8. The top drive well drilling installation according to claim 1 , wherein the support frame furthermore supports a centralizer below the rotating headclamp to centralize the drill string.
9. The top drive well drilling installation according to claim 1 , wherein the rotating headclamp is translatably supported in the support frame between an operative position in line with the drill string axis and a parking position remote from the drill string axis.
10. The top drive well drilling installation according to claim 1 , wherein the support frame supports a wrench device for making and breaking connections between the tubular stem and the drill string.
11. The top drive well drilling installation according to claim 1 , wherein the hoisting device comprises a cable and a winch, a crown block, and a travelling block suspended from the crown block by said cable, wherein support frame is suspended from the crown block so as to move up and down upon operation of the winch.
12. The top drive well drilling installation according to claim 1 , wherein the support frame is provided with a mud hose connector.
13. A method for performing a well drilling operation, comprising the step of using the installation according to claim 1 .
14. The method according to claim 13 , for the assembly of a drill string, comprising the steps of:
providing the tubular stem in the upper remote position;
providing the mobile pipe retainers of the rotating headclamp in the non-operative position;
providing a pipe of a drill string, having a shoulder, upwards through the pipe passage of the rotating headclamp;
moving the pipe retainers to the operative position to engage below the shoulder of the pipe extending through the pipe passage, so as to suspend said pipe and/or drill string therefrom; and
moving the tubular stem relative to the rotating headclamp to the lower connection position and attaching the tubular stem with the pipe while the pipe and/or drill string is supported by the rotating headclamp.
15. The method according to claim 13 , wherein a substitute rotating headclamp is provided, comprising the steps of:
providing the tubular stem in the upper remote position;
removing the rotating headclamp from the support frame; and
providing the substitute rotating headclamp in the support frame.
16. The method according to claim 13 , wherein the top drive unit is detachable from the support frame, comprising the following steps:
well drilling by the top drive unit;
detaching the drill string from the tubular stem while remaining supported by the rotating headclamp;
detaching the top drive unit from the support frame; and
tripping the drill string.
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL2015604 | 2015-10-12 | ||
NL2015605 | 2015-10-12 | ||
NL2015605 | 2015-10-12 | ||
NL2015604 | 2015-10-12 | ||
NL2016971 | 2016-06-15 | ||
NL2016971 | 2016-06-15 | ||
PCT/NL2016/050698 WO2017065605A1 (en) | 2015-10-12 | 2016-10-07 | A top drive well drilling installation |
Publications (1)
Publication Number | Publication Date |
---|---|
US20180298693A1 true US20180298693A1 (en) | 2018-10-18 |
Family
ID=57211552
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/767,518 Active US10329841B2 (en) | 2015-10-12 | 2016-10-07 | Wellbore drilling with a trolley and a top drive device |
US15/765,436 Abandoned US20180298693A1 (en) | 2015-10-12 | 2016-10-07 | A top drive well drilling installation |
US15/767,447 Active 2036-10-11 US10718162B2 (en) | 2015-10-12 | 2016-10-07 | Servicing a top drive device of a wellbore drilling installation |
US16/423,862 Abandoned US20190277089A1 (en) | 2015-10-12 | 2019-05-28 | Wellbore drilling with a trolley and a top drive device |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/767,518 Active US10329841B2 (en) | 2015-10-12 | 2016-10-07 | Wellbore drilling with a trolley and a top drive device |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/767,447 Active 2036-10-11 US10718162B2 (en) | 2015-10-12 | 2016-10-07 | Servicing a top drive device of a wellbore drilling installation |
US16/423,862 Abandoned US20190277089A1 (en) | 2015-10-12 | 2019-05-28 | Wellbore drilling with a trolley and a top drive device |
Country Status (5)
Country | Link |
---|---|
US (4) | US10329841B2 (en) |
EP (3) | EP3362634A1 (en) |
CN (4) | CN108138539A (en) |
BR (3) | BR112018007320A2 (en) |
WO (3) | WO2017065604A1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020221926A1 (en) * | 2019-05-02 | 2020-11-05 | Itrec B.V. | A wellbore drilling top drive system and operational methods |
US10876834B2 (en) | 2018-05-11 | 2020-12-29 | Schlumberger Technology Corporation | Guidance system for land rig assembly |
US10995571B2 (en) | 2016-05-25 | 2021-05-04 | Schlumberger Technology Corporation | Image based system for drilling operations |
US11035219B2 (en) | 2018-05-10 | 2021-06-15 | Schlumberger Technology Corporation | System and method for drilling weight-on-bit based on distributed inputs |
US11131540B2 (en) | 2016-01-26 | 2021-09-28 | Schlumberger Technology Corporation | Tubular measurement |
US11391142B2 (en) | 2019-10-11 | 2022-07-19 | Schlumberger Technology Corporation | Supervisory control system for a well construction rig |
US11454069B2 (en) | 2020-04-21 | 2022-09-27 | Schlumberger Technology Corporation | System and method for handling a tubular member |
US11952844B2 (en) | 2019-01-31 | 2024-04-09 | National Oilwell Varco, L.P. | Tubular string building system and method |
US11965405B2 (en) | 2018-03-09 | 2024-04-23 | Schlumberger Technology Corporation | Integrated well construction system operations |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3610121A1 (en) * | 2017-04-10 | 2020-02-19 | Sandvik Mining And Construction USA, LLC | Automated drill bit changer |
WO2019046624A1 (en) * | 2017-08-30 | 2019-03-07 | Oil States Industries, Inc. | Loading arm system |
US11919738B1 (en) * | 2018-04-17 | 2024-03-05 | Roddie, Inc. | Apparatus for lateral cable pulling and pipe replacement |
US11002086B2 (en) | 2018-04-26 | 2021-05-11 | Nabors Drilling Technologies Usa, Inc. | Pipe handler |
US11187049B2 (en) | 2018-09-06 | 2021-11-30 | Schlumberger Technology Corporation | Fingerboard |
CN110552636B (en) * | 2019-08-20 | 2021-01-26 | 宁夏天地奔牛实业集团有限公司 | Raise boring machine taper thread mounting method and device |
US11359439B2 (en) | 2019-10-10 | 2022-06-14 | Schlumberger Technology Corporation | Riser running tool with liquid fill and test |
CN111395947B (en) * | 2020-03-24 | 2022-07-26 | 中国地质装备集团有限公司 | Multi-process top electrically-driven drilling device |
US11230894B1 (en) * | 2020-10-21 | 2022-01-25 | Caterpillar Global Mining Equipment LLC. | Drilling tool loading control system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5036927A (en) * | 1989-03-10 | 1991-08-06 | W-N Apache Corporation | Apparatus for gripping a down hole tubular for rotation |
US20150300103A1 (en) * | 2012-12-05 | 2015-10-22 | Cds-Ip B.V. | Radial Clamping/Sealing System and Drilling System Provided Therewith for (Semi)-Continuous Drilling a Borehole, Drilling Rig Comprising Such System, and Method There For |
Family Cites Families (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1883073A (en) * | 1928-01-04 | 1932-10-18 | Doheny Stone Drill Co | Work-gripping means for well drilling apparatus |
US3588162A (en) * | 1969-07-22 | 1971-06-28 | Byron Jackson Inc | Rotating flapper elevator |
ZA711286B (en) | 1970-03-26 | 1971-11-24 | Dresser Ind | Earth boring machine with multimotor drive |
CA1232898A (en) * | 1985-02-19 | 1988-02-16 | Leon V. Jankowski | Slant service rig |
US4813493A (en) * | 1987-04-14 | 1989-03-21 | Triten Corporation | Hydraulic top drive for wells |
CN1054113A (en) * | 1990-02-19 | 1991-08-28 | 阿塞拜疆石油机器制造科研设计院 | In drilling well, carry out the device of lift work |
US5211251A (en) * | 1992-04-16 | 1993-05-18 | Woolslayer Companies, Inc. | Apparatus and method for moving track guided equipment to and from a track |
US5501286A (en) * | 1994-09-30 | 1996-03-26 | Bowen Tools, Inc. | Method and apparatus for displacing a top drive torque track |
US6085851A (en) * | 1996-05-03 | 2000-07-11 | Transocean Offshore Inc. | Multi-activity offshore exploration and/or development drill method and apparatus |
US6688394B1 (en) * | 1996-10-15 | 2004-02-10 | Coupler Developments Limited | Drilling methods and apparatus |
DE19837692C2 (en) | 1998-08-19 | 2003-04-03 | Bentec Gmbh Drilling & Oilfield Systems | Drilling device, drilling rig and method for drilling an exploration and production well |
EP1125036B1 (en) * | 1998-10-19 | 2003-05-28 | Shell Internationale Researchmaatschappij B.V. | Making up and breaking out of a tubing string in a well while maintaining continuous circulation |
US6766860B2 (en) | 2002-02-22 | 2004-07-27 | Globalsantafe Corporation | Multi-activity offshore drilling facility having a support for tubular string |
US7083004B2 (en) * | 2002-10-17 | 2006-08-01 | Itrec B.V. | Cantilevered multi purpose tower and method for installing drilling equipment |
CA2677247C (en) * | 2003-03-05 | 2012-09-25 | Weatherford/Lamb, Inc. | Casing running and drilling system |
GB2422628B (en) | 2003-09-19 | 2008-05-07 | Weatherford Lamb | Automatic false rotary |
CA2456338C (en) | 2004-01-28 | 2009-10-06 | Gerald Lesko | A method and system for connecting pipe to a top drive motor |
US7188686B2 (en) * | 2004-06-07 | 2007-03-13 | Varco I/P, Inc. | Top drive systems |
ATE430248T1 (en) | 2004-11-30 | 2009-05-15 | Varco Int | UPPER DRIVE UNIT, PIPE GRIPPING DEVICE AND METHOD FOR DRILLING A BORED HOLE |
US7216717B2 (en) * | 2005-02-25 | 2007-05-15 | Blohm + Voss Repair Gmbh | Dual elevator system and method |
NO325084B1 (en) * | 2005-12-02 | 2008-01-28 | Aker Mh As | Top mounted drill |
CA2820242C (en) * | 2005-12-20 | 2015-08-11 | Canrig Drilling Technology, Ltd. | Modular top drive |
US20080203734A1 (en) * | 2007-02-22 | 2008-08-28 | Mark Francis Grimes | Wellbore rig generator engine power control |
US7584810B1 (en) * | 2007-10-08 | 2009-09-08 | Eagle Rock Manufacturing, Llc | Top drive power swivel assembly |
US7493970B1 (en) * | 2007-11-28 | 2009-02-24 | Thomas Nelson McKnight, Jr. | Shock mounted top drive |
EP3241733A1 (en) * | 2008-02-15 | 2017-11-08 | Itrec B.V. | Offshore drilling vessel |
US8468753B2 (en) * | 2008-02-29 | 2013-06-25 | National Oilwell Varco L.P. | Drilling rigs and erection methods |
US20110214919A1 (en) | 2010-03-05 | 2011-09-08 | Mcclung Iii Guy L | Dual top drive systems and methods |
US8607898B2 (en) * | 2010-05-25 | 2013-12-17 | Rodgers Technology, Llc | Force compensator for top drive assembly |
US8955602B2 (en) * | 2010-11-19 | 2015-02-17 | Letourneau Technologies, Inc. | System and methods for continuous and near continuous drilling |
BR112013016804A2 (en) * | 2010-12-30 | 2016-09-27 | Canrig Drilling Tech Ltd | tubular element handling device and methods |
US9194191B2 (en) | 2011-02-28 | 2015-11-24 | Frank's International, Llc | Link carrier apparatus for a drilling rig |
US9017194B2 (en) | 2011-10-11 | 2015-04-28 | Warrior Rig Ltd. | Top drive |
US9010410B2 (en) * | 2011-11-08 | 2015-04-21 | Max Jerald Story | Top drive systems and methods |
CN103958816A (en) * | 2011-11-28 | 2014-07-30 | T&T技术维护公司 | Tubular stand building and discharging system |
US9010443B2 (en) | 2011-11-30 | 2015-04-21 | Halliburton Energy Services, Inc. | Slip bowl load transfer system |
NL2009677C2 (en) * | 2012-10-22 | 2014-04-23 | Itrec Bv | A vessel including a drilling installation, and a method of drilling a well using the same. |
CN203114166U (en) * | 2013-02-06 | 2013-08-07 | 浙江中锐工程机械有限公司 | Medium-and-large hole type engineering driller |
SG11201508906PA (en) * | 2013-05-03 | 2015-11-27 | Itrec Bv | A top drive well drilling installation |
EP2994598B1 (en) * | 2013-05-06 | 2018-01-31 | Itrec B.V. | Wellbore drilling system |
KR101803311B1 (en) | 2013-05-10 | 2018-01-10 | 삼성전자주식회사 | Display appratus and Method for providing User interface thereof |
US9834998B2 (en) | 2013-05-20 | 2017-12-05 | Maersk Drilling A/S | Dual activity off-shore drilling rig |
WO2014193228A2 (en) | 2013-05-27 | 2014-12-04 | Itrec B.V. | Drilling vessel |
EP3114025B1 (en) * | 2014-03-03 | 2020-05-06 | Itrec B.V. | An offshore drilling vessel and method |
NL2012354B1 (en) | 2014-03-03 | 2015-11-26 | Itrec Bv | Offshore drilling system, vessel and methods. |
AU2014203399A1 (en) | 2014-03-21 | 2015-10-08 | Jtb Tools & Oilfield Services Llc | Apparatus and Method for the Installation or Removal of a Rotary Control Device Insert or a Component Thereof |
NL2014988B1 (en) * | 2015-06-18 | 2017-01-23 | Itrec Bv | A drilling rig with a top drive sytem operable in a drilling mode and a tripping mode. |
US10626683B2 (en) * | 2015-08-11 | 2020-04-21 | Weatherford Technology Holdings, Llc | Tool identification |
-
2016
- 2016-10-07 US US15/767,518 patent/US10329841B2/en active Active
- 2016-10-07 CN CN201680059234.0A patent/CN108138539A/en active Pending
- 2016-10-07 CN CN201680059725.5A patent/CN108138540B/en active Active
- 2016-10-07 BR BR112018007320A patent/BR112018007320A2/en not_active Application Discontinuation
- 2016-10-07 CN CN202010588372.6A patent/CN111764834B/en active Active
- 2016-10-07 US US15/765,436 patent/US20180298693A1/en not_active Abandoned
- 2016-10-07 WO PCT/NL2016/050697 patent/WO2017065604A1/en active Application Filing
- 2016-10-07 BR BR112018006285A patent/BR112018006285A2/en not_active Application Discontinuation
- 2016-10-07 EP EP16788572.2A patent/EP3362634A1/en not_active Withdrawn
- 2016-10-07 BR BR112018007191A patent/BR112018007191A2/en not_active Application Discontinuation
- 2016-10-07 WO PCT/NL2016/050698 patent/WO2017065605A1/en active Application Filing
- 2016-10-07 US US15/767,447 patent/US10718162B2/en active Active
- 2016-10-07 WO PCT/NL2016/050696 patent/WO2017065603A1/en active Application Filing
- 2016-10-07 EP EP16788571.4A patent/EP3362633A1/en not_active Withdrawn
- 2016-10-07 EP EP16788570.6A patent/EP3362635A1/en active Pending
- 2016-10-07 CN CN201680067799.3A patent/CN108350726A/en active Pending
-
2019
- 2019-05-28 US US16/423,862 patent/US20190277089A1/en not_active Abandoned
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5036927A (en) * | 1989-03-10 | 1991-08-06 | W-N Apache Corporation | Apparatus for gripping a down hole tubular for rotation |
US20150300103A1 (en) * | 2012-12-05 | 2015-10-22 | Cds-Ip B.V. | Radial Clamping/Sealing System and Drilling System Provided Therewith for (Semi)-Continuous Drilling a Borehole, Drilling Rig Comprising Such System, and Method There For |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11131540B2 (en) | 2016-01-26 | 2021-09-28 | Schlumberger Technology Corporation | Tubular measurement |
US10995571B2 (en) | 2016-05-25 | 2021-05-04 | Schlumberger Technology Corporation | Image based system for drilling operations |
US11965405B2 (en) | 2018-03-09 | 2024-04-23 | Schlumberger Technology Corporation | Integrated well construction system operations |
US11035219B2 (en) | 2018-05-10 | 2021-06-15 | Schlumberger Technology Corporation | System and method for drilling weight-on-bit based on distributed inputs |
US10876834B2 (en) | 2018-05-11 | 2020-12-29 | Schlumberger Technology Corporation | Guidance system for land rig assembly |
US11952844B2 (en) | 2019-01-31 | 2024-04-09 | National Oilwell Varco, L.P. | Tubular string building system and method |
US11913299B2 (en) | 2019-05-02 | 2024-02-27 | Itrec B.V. | Wellbore drilling top drive system and operational methods |
NL2023058B1 (en) * | 2019-05-02 | 2020-11-23 | Itrec Bv | A wellbore drilling top drive system and operational methods. |
WO2020221926A1 (en) * | 2019-05-02 | 2020-11-05 | Itrec B.V. | A wellbore drilling top drive system and operational methods |
US11391142B2 (en) | 2019-10-11 | 2022-07-19 | Schlumberger Technology Corporation | Supervisory control system for a well construction rig |
US11788399B2 (en) | 2019-10-11 | 2023-10-17 | Schlumberger Technology Corporation | Supervisory control system for a well construction rig |
US11814910B2 (en) | 2020-04-21 | 2023-11-14 | Schlumberger Technology Corporation | System and method for handling a tubular member |
US11454069B2 (en) | 2020-04-21 | 2022-09-27 | Schlumberger Technology Corporation | System and method for handling a tubular member |
Also Published As
Publication number | Publication date |
---|---|
CN108138539A (en) | 2018-06-08 |
EP3362633A1 (en) | 2018-08-22 |
US20180298694A1 (en) | 2018-10-18 |
WO2017065604A1 (en) | 2017-04-20 |
US20190277089A1 (en) | 2019-09-12 |
CN111764834B (en) | 2022-11-04 |
EP3362635A1 (en) | 2018-08-22 |
WO2017065603A1 (en) | 2017-04-20 |
CN108138540B (en) | 2020-08-07 |
EP3362634A1 (en) | 2018-08-22 |
CN111764834A (en) | 2020-10-13 |
US10718162B2 (en) | 2020-07-21 |
US10329841B2 (en) | 2019-06-25 |
US20180298695A1 (en) | 2018-10-18 |
CN108138540A (en) | 2018-06-08 |
BR112018006285A2 (en) | 2018-10-16 |
BR112018007191A2 (en) | 2018-10-16 |
WO2017065605A1 (en) | 2017-04-20 |
CN108350726A (en) | 2018-07-31 |
BR112018007320A2 (en) | 2018-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20180298693A1 (en) | A top drive well drilling installation | |
US20230048765A1 (en) | Drilling rig with a top drive system operable in a drilling mode and a tripping mode | |
CA3027868C (en) | Wellbore drilling with a top drive device | |
CA2362866C (en) | Drilling machine and method for sinking a well | |
US10927615B2 (en) | Drilling rig with a top drive system operable in a wellbore drilling mode, tripping mode, and bypassing mode | |
US10060187B2 (en) | Top drive well drilling installation | |
WO2017217848A1 (en) | Wellbore drilling with a top drive device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: ITREC B.V., NETHERLANDS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:VAN DUIVENDIJK, PIETER DIRK MELIS;WIJNING, DIEDERICK BERNARDUS;MAX, NICOLAAS THIJS PIETER;AND OTHERS;REEL/FRAME:046499/0138 Effective date: 20180706 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |