US20170321530A1 - Protecting production wells using natural gas injection - Google Patents
Protecting production wells using natural gas injection Download PDFInfo
- Publication number
- US20170321530A1 US20170321530A1 US15/148,765 US201615148765A US2017321530A1 US 20170321530 A1 US20170321530 A1 US 20170321530A1 US 201615148765 A US201615148765 A US 201615148765A US 2017321530 A1 US2017321530 A1 US 2017321530A1
- Authority
- US
- United States
- Prior art keywords
- well
- pressure
- natural gas
- producing
- psi
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 title claims abstract description 172
- 239000003345 natural gas Substances 0.000 title claims abstract description 85
- 238000002347 injection Methods 0.000 title claims abstract description 42
- 239000007924 injection Substances 0.000 title claims abstract description 42
- 238000004519 manufacturing process Methods 0.000 title claims description 18
- 230000000638 stimulation Effects 0.000 claims abstract description 56
- 239000012530 fluid Substances 0.000 claims abstract description 47
- 238000000034 method Methods 0.000 claims abstract description 29
- 229930195733 hydrocarbon Natural products 0.000 claims description 14
- 150000002430 hydrocarbons Chemical class 0.000 claims description 14
- 239000004215 Carbon black (E152) Substances 0.000 claims description 10
- 238000004891 communication Methods 0.000 claims description 9
- 239000003949 liquefied natural gas Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 description 13
- 238000005755 formation reaction Methods 0.000 description 13
- 230000004888 barrier function Effects 0.000 description 11
- 239000007788 liquid Substances 0.000 description 7
- 239000007789 gas Substances 0.000 description 6
- 239000000126 substance Substances 0.000 description 4
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- 229910002092 carbon dioxide Inorganic materials 0.000 description 2
- 239000001569 carbon dioxide Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- -1 proppant Substances 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/2605—Methods for stimulating production by forming crevices or fractures using gas or liquefied gas
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
- E21B43/168—Injecting a gaseous medium
Definitions
- Embodiments of the invention generally relate to methods and apparatus for protecting a well from stimulation fluid. Particularly, embodiments of the present invention relates to methods and apparatus for injecting natural gas into a well to protect the well against stimulation fluid from a neighboring well.
- a wellbore is formed to access hydrocarbon-bearing formations (e.g., oil and/or natural gas) by the use of drilling.
- the drill string is often rotated by a top drive or rotary table on a surface platform or rig, and/or by a downhole motor mounted towards the lower end of the drill string.
- a section of casing is lowered into the wellbore.
- a cementing operation is then conducted to fill the annulus with cement.
- the combination of cement and casing strengthens the wellbore and facilitates the isolation of certain areas of the formation behind the casing for the production of hydrocarbons.
- Additional completion operations are performed to enable production of well fluids. Examples of such completion operations include the installation of production tubing and various packers to define zones in the wellbore.
- a perforating string may be lowered into the wellbore and fired to create perforations in the surrounding casing and to extend perforations into the surrounding formation.
- a fracturing operation can be performed to enhance the productivity of a formation.
- stimulation fluid is pumped into the wellbore to fracture the formation so that fluid flow conductivity in the formation is improved to provide enhanced fluid flow into the wellbore.
- the stimulation fluid When a well is undergoing a fracturing operation, the stimulation fluid may flow toward and undesirably enter a nearby well.
- the stimulation fluid may damage the well's hydrocarbon productivity.
- the stimulation fluid can significantly reduce the hydrocarbon production volumes, thereby reducing the well's Estimated Ultimate Recovery (EUR) of oil and natural gas reserves.
- the producing well may require costly and time consuming wellbore remediation operations to restore both wellbore integrity and production capability.
- a method of protecting a first well from stimulation fluid of a second well includes shutting in the first well; starting injection of natural gas into the first well to increase a pressure of the first well; treating the second well using a stimulation fluid after starting natural gas injection; and stopping injection of natural gas.
- a method of protecting a producing well from stimulation fluid of a treatment well includes injecting natural gas into the producing well to increase a pressure of the producing well and fractures in communication with perforations of the producing well; and fracturing the treatment well after injecting natural gas into the producing well.
- natural gas is injected into a producing well to act as a barrier against damaging pressure or physical communication of fluid resulting from a stimulation operation at a nearby well.
- FIG. 1 illustrates a hydrocarbon producing field having multiple wells.
- FIG. 2 illustrate an exemplary producing well configured for injection of natural gas.
- FIG. 3 illustrates an exemplary pressure graph of a well undergoing a natural gas injection.
- FIG. 4 illustrates an exemplary pressure graph of an unprotected well exposed to fluid and pressure communications from a nearby well undergoing a fracturing operation.
- FIG. 5 illustrates another exemplary pressure graph of a well undergoing a natural gas injection.
- FIG. 6 illustrates an exemplary wellhead configured for injection of natural gas.
- methods and apparatus are provided to protect a producing well from potentially damaging fluid and/or pressure communications resulting from a stimulation treatment at a nearby well.
- FIG. 1 illustrates a hydrocarbon producing field having treatment well 100 and one or more candidate wells 101 , 102 , 103 .
- the treatment well 100 may be undergoing a stimulation treatment to enhance hydrocarbon production of the treatment well 100 .
- the treatment well 100 may be injected with stimulation fluid such as fracturing fluid or acidizing fluid to increase the effective hydrocarbon drainage area as well as permeability of the producing formation 130 , thereby increasing the recovery of hydrocarbons from the treatment well 100 .
- stimulation fluids may include fluid or gas systems such as but not limited to singular applications of or combinations of water, liquid hydrocarbons, gas, acid, proppant such as sand or solids, chemicals, and additives that are pumped into a treatment well.
- Stimulation fluids can include a gas medium such as but not limited to nitrogen (N 2 ), carbon dioxide (CO 2 ), methane, and combinations thereof.
- stimulation fluid is pumped down the well and flows out perforations or sleeve ports to create artificially induced fractures in the producing formation 130 .
- the treatment well 100 may be a horizontal, vertical, or directional well.
- the candidate wells 101 , 102 , 103 may be producing wells that have been completed and producing hydrocarbons.
- the candidate wells 101 , 102 , 103 may be located at the same or different distances from the treatment well 100 .
- one or more of the candidate wells is located sufficiently near the treatment well 100 such that the stimulation fluid and/or treating pressures from the treatment well 100 may communicate with the candidate wells.
- the candidate well 101 is located sufficiently close such that stimulation fluid from the treatment well 100 may reach and enter the candidate well 101 .
- stimulation fluid may be referred to herein, it is contemplated that stimulation fluid communicating with the candidate well 101 may include liquid, gas, solids such as proppant, chemicals and combinations thereof.
- pressurized gas such as natural gas may be injected into the candidate well 101 to act as a pressure barrier to mitigate and/or minimize ingress of the stimulation fluid and/or treating pressures.
- pressure barrier is a downhole pressure envelope or volume created within the near wellbore region by the injected natural gas.
- FIG. 2 illustrates an exemplary candidate well 101 configured for injection of natural gas.
- the candidate well 101 includes a wellbore 120 , which may be supported by casing, and a production tubing 125 disposed therein.
- the production tubing 125 extends from the wellhead downhole to the producing zone 130 .
- An open annulus may be formed between the casing and the tubing 125 .
- portions of the candidate well 101 may be isolated using, for example, packers.
- the pressure barrier may protect the candidate well 101 from other types of treating fluids flowing from a nearby treatment well.
- the natural gas utilized for injection may be supplied from a variety of sources 135 .
- the natural gas may be taken from a field gas gathering pipeline, another producing well in close proximity to the candidate well, an onsite production facility, or a commercial production facility.
- the natural gas may be liquefied natural gas “LNG,” compressed natural gas “CNG,” or natural gas liquids “NGL” from a nearby production facility or a storage vessel.
- the natural gas may be stored in a pressurized vessel brought to or located at the candidate wellsite.
- a flow meter, or similar device may be used to measure the amount of natural gas supplied to the compressor 141 .
- the natural gas may be injected into a portion of or the entire footage of the wellbore 120 immediately adjacent to the producing formation 130 .
- the natural gas may be injected using a compressor, a pump, or other suitable machine having sufficient power to inject natural gas to increase the pressure in the producing formation 130 to establish a pressure barrier for protecting the candidate well 101 .
- the compressor 141 is either single stage or multiple stages.
- the compressor 141 may optionally be provided as an injection compressor skid package 140 .
- the skid package 140 may include gauges 142 for monitoring the suction pressure and the discharge pressure into the candidate well 101 .
- the skid package 140 may typically include liquid dumps 143 to remove any liquid build up that may occur in the natural gas.
- the liquid dump 143 may be manually or automatically controlled.
- a flow meter 144 may form a part of the skid package 140 .
- the compressor 141 is configured to handle a range of suction pressures from these sources. Further, the compressor 141 is configured to generate sufficient discharge pressures to increase the reservoir pressure sufficiently to create a pressure barrier in the candidate well 101 . If additional discharge pressure is required, the skid package 140 may be equipped with additional discharge boosters. In one embodiment, the compressor 141 can generate discharge pressures ranging from 80 psi to 4,000 psi. In another embodiment, the compressor 141 can generate a discharge pressure that increases the reservoir pressure to a pressure at or below the treating pressure of the stimulation treatment for the treatment well 100 ; for example, between 50% and 100% or between 60% and 90% of the stimulation treatment pressure.
- the discharge pressure into candidate well 101 is below the treating pressure of the formation around the wellbore of the treatment well; for example, between 15% and 50% of the stimulation treatment pressure.
- the pressure of the candidate well 101 is increased from 1.5 ⁇ to 5 ⁇ the shut-in pressure of the candidate well 101 .
- the discharge pressure is less than either the fracture gradient of the producing formation 130 or the rated pressure limitation of the existing wellhead assembly and wellbore tubulars within the candidate well 101 .
- the natural gas may be supplied to the candidate well 101 using any apparatus capable of supplying pressurized natural gas to increase the near wellbore reservoir pressure of the candidate well 101 .
- the natural gas may be stored in a pressurized vessel that is connected to the wellhead 130 via an injection line. When the injection line is opened, the pressurized natural gas may flow through the injection line and enter the candidate well 101 without passing through a compressor.
- the wellhead 130 may be connected to a field gathering pipeline. Natural gas may be allowed to flow from the pipeline to the candidate well 101 without passing through a compressor.
- the candidate well 101 may be injected with natural gas to increase the near wellbore reservoir pressure of the candidate well 101 to mitigate and/or minimize ingress of stimulation fluids and/or pressure from a nearby treatment well 100 .
- the candidate well 101 is shut-in and is allowed to naturally build up a shut-in pressure.
- Exemplary shut-in pressures may be between 100 psi and 1,500 psi.
- the shut-in pressure may be allowed to build for a period of a few days to multiple weeks; for example, 3 days to 12 weeks, or from 1 week to 8 weeks.
- natural gas may also be injected into nearby candidate wells 102 , 103 to similarly create pressure barriers to mitigate or minimize communications such as stimulation fluid and pressure emanating from the treatment well 100 .
- natural gas may be injected into the candidate well 101 .
- a compressor 141 or optionally an injection pressure skid package 140 , is connected to the candidate well 101 .
- the discharge line of the compressor 141 is connected to the wellhead 130 to provide a flow path for the injected natural gas.
- the natural gas source may be connected to the suction side of the compressor 141 .
- a field gathering pipeline 135 may be connected to the compressor 141 to supply the requisite amount of natural gas.
- the natural gas may optionally be processed before being supplied into the compressor 141 .
- the natural gas may flow through a filter or dewatering apparatus before entering the compressor. After entering the compressor 141 , the natural gas may go through multiple stages of compression until the desired discharge pressure is established. Thereafter, the pressurized natural gas is discharged via the discharge line into the candidate well 101 .
- Pressure in the candidate well 101 may be allowed to build up before starting the stimulation treatment for treatment well 100 .
- Natural gas is injected into the candidate well 101 to increase the near wellbore reservoir pressure of the candidate well 101 thereby establishing a pressure barrier to a pressure above the shut-in pressure.
- the pressure in the candidate well 101 is increased to a pressure between 700 psi and 3,500 psi; preferably, built up pressure is between 1,100 psi and 2,300 psi.
- the pressure in the candidate well is increased to a built up pressure at which the pressure in the wellbore is observed to have leveled off, or in some instances, reached maximum pressure build up.
- the length of time required for the injection build up may be between 2 days and 4 weeks; typically, between 4 days and 14 days.
- the stimulation treatment of the treatment well 100 may begin when the pressure in the candidate well 101 has built up to between 800 psi and 2,100 psi; preferably between 1,000 psi and 1,900 psi.
- the pressure of the candidate well 101 may be monitored using the pressure gauge 142 .
- the pressure of the candidate well 101 may be measured using a gauge 132 coupled to the wellhead 130 .
- the stimulation treatment may begin at the toe section of the treatment well 100 and work toward the heel section.
- the stimulation fluid being pumped into the treatment well may include a fluid and proppant.
- the pressure in the candidate well 101 may be maintained during the stimulation treatment of the treatment well 100 .
- the pressure in the candidate well may be maintained within 30%, within 20%, within 10%, or within 5% above or below the built-up pressure.
- the higher natural gas pressure in the candidate well 101 and the near wellbore environment e.g., fractures in the producing formation 130 , acts a pressure barrier that deters fluid or pressure communications, e.g., the flow of the stimulation fluid, from entering the candidate well 101 .
- the pressure barrier provided by the natural gas may mitigate damages to the candidate well 101 as a result of any ingress of stimulation fluid or damaging pressures.
- the injection of natural gas into the candidate well 101 is stopped.
- the injected natural gas is allowed to remain in the candidate well 101 in a shut in status until the candidate well 101 is restored to a producing status.
- the reservoir pressure in the candidate well 101 may be maintained for a period of time after completion of the stimulation treatment to ensure that potential fluid or pressure communications from the treatment well 100 or other treatment wells are minimized or mitigated.
- the injection of natural gas is stopped before completion of the stimulation treatment.
- the natural gas injection may be stopped before the completion of the stimulation treatment if any section, such as the heel section, of the treatment well 100 is sufficiently far away from the candidate well 101 .
- natural gas injection may be stopped before completion of the stimulation treatment if the near wellbore reservoir pressure does not significantly deplete or leak off during shut in period.
- the near wellbore reservoir pressure in the candidate well retains at least 80% of the reservoir pressure at the start of the stimulation treatment; preferably, at least 90% of the reservoir pressure.
- the injection of natural gas into the candidate well 101 may be stopped before commencing the stimulation treatment of the treatment well 100 .
- FIG. 3 illustrates an exemplary pressure graph of a candidate well in which the production is being shut in and undergoing a natural gas injection operation as described herein.
- the candidate well is shut in.
- the pressure of the candidate well at the beginning of shut in is approximately 200 psi.
- the pressure builds naturally to 500 psi, at which time natural gas injection commences. It must be noted the start of the natural gas injection may be independent from the magnitude of the shut-in pressure.
- the discharge pressure increases until it reaches approximately 1,300 psi at time T 3 .
- the pressure in the candidate well has generally leveled off by time T 3 .
- the discharge pressure is generally maintained before and during the stimulation treatment.
- FIG. 4 illustrates an exemplary pressure graph of an unprotected well exposed to fluid and pressure communications from a nearby well undergoing a fracturing operation. As shown, the pressure increase in an unprotected well caused by ingress of stimulation fluid is faster in time and higher in magnitude. The gradual increase shown in FIG.
- FIG. 5 illustrates another example of a pressure graph for a candidate well protected by natural gas injection.
- the candidate well experiences multiple pressure increases caused by ingress of stimulation fluid or pressure.
- the resulting pressure increases are more gradual and smaller in magnitude when compared to the unprotected well of FIG. 4 .
- the compressor or injection source may be shut down at time T 5 .
- FIG. 6 illustrates another embodiment of a wellhead 230 configured for natural gas injection.
- the natural gas may be injected using a compressor 241 having multiple stages.
- the suction side of the compressor 241 is connected to a field gathering line 235 to receive natural gas.
- the natural gas may pass through a coalescing filter 262 prior to entering the compressor 241 . Separated liquid from the filter 262 or the compressor 241 may be directed to a production separator/storage tanks 263 .
- Natural gas is discharged from the compressor 241 to the wellhead 230 via an injection line 261 .
- a gauge 242 such as a Barton Recorder or other suitable gauges, may be connected to the injection line 261 to monitor the discharge pressure into the wellhead 230 .
- the injection line 261 may have an optional tie-in 271 to the wellhead 230 .
- a chemical pump and storage complex 265 may be connected to the injection line 261 to supply one or more chemicals to the wellhead 230 .
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
A method of protecting a first well from stimulation fluid of a second well includes shutting in the first well; starting injection of natural gas into the first well to increase a pressure of the first well; treating the second well using a stimulation fluid after starting natural gas injection; and stopping injection of natural gas.
Description
- Embodiments of the invention generally relate to methods and apparatus for protecting a well from stimulation fluid. Particularly, embodiments of the present invention relates to methods and apparatus for injecting natural gas into a well to protect the well against stimulation fluid from a neighboring well.
- In wellbore construction and completion operations, a wellbore is formed to access hydrocarbon-bearing formations (e.g., oil and/or natural gas) by the use of drilling. The drill string is often rotated by a top drive or rotary table on a surface platform or rig, and/or by a downhole motor mounted towards the lower end of the drill string. After drilling to a predetermined depth, the drill string is removed and a section of casing is lowered into the wellbore. A cementing operation is then conducted to fill the annulus with cement. The combination of cement and casing strengthens the wellbore and facilitates the isolation of certain areas of the formation behind the casing for the production of hydrocarbons.
- Additional completion operations are performed to enable production of well fluids. Examples of such completion operations include the installation of production tubing and various packers to define zones in the wellbore. A perforating string may be lowered into the wellbore and fired to create perforations in the surrounding casing and to extend perforations into the surrounding formation.
- A fracturing operation can be performed to enhance the productivity of a formation. Typically, stimulation fluid is pumped into the wellbore to fracture the formation so that fluid flow conductivity in the formation is improved to provide enhanced fluid flow into the wellbore.
- When a well is undergoing a fracturing operation, the stimulation fluid may flow toward and undesirably enter a nearby well. The stimulation fluid may damage the well's hydrocarbon productivity. In particular, the stimulation fluid can significantly reduce the hydrocarbon production volumes, thereby reducing the well's Estimated Ultimate Recovery (EUR) of oil and natural gas reserves. Also, the producing well may require costly and time consuming wellbore remediation operations to restore both wellbore integrity and production capability.
- This problem is exacerbated by more dense drilling operations. For example, multiple wells have been drilled in close proximity to each other to increase the production of a reservoir. One or more of these wells may be an extended reach horizontal well. Multiple wells have also been drilled on a single drill pad to increase production.
- There is a need, therefore, for apparatus and methods of protecting a well from a nearby well undergoing fracturing or stimulation operations.
- In one embodiment, a method of protecting a first well from stimulation fluid of a second well includes shutting in the first well; starting injection of natural gas into the first well to increase a pressure of the first well; treating the second well using a stimulation fluid after starting natural gas injection; and stopping injection of natural gas.
- In another embodiment, a method of protecting a producing well from stimulation fluid of a treatment well includes injecting natural gas into the producing well to increase a pressure of the producing well and fractures in communication with perforations of the producing well; and fracturing the treatment well after injecting natural gas into the producing well.
- In another embodiment, natural gas is injected into a producing well to act as a barrier against damaging pressure or physical communication of fluid resulting from a stimulation operation at a nearby well.
- So that the manner in which the above recited features of the present invention can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
-
FIG. 1 illustrates a hydrocarbon producing field having multiple wells. -
FIG. 2 illustrate an exemplary producing well configured for injection of natural gas. -
FIG. 3 illustrates an exemplary pressure graph of a well undergoing a natural gas injection. -
FIG. 4 illustrates an exemplary pressure graph of an unprotected well exposed to fluid and pressure communications from a nearby well undergoing a fracturing operation. -
FIG. 5 illustrates another exemplary pressure graph of a well undergoing a natural gas injection. -
FIG. 6 illustrates an exemplary wellhead configured for injection of natural gas. - In one embodiment, methods and apparatus are provided to protect a producing well from potentially damaging fluid and/or pressure communications resulting from a stimulation treatment at a nearby well.
-
FIG. 1 illustrates a hydrocarbon producing field having treatment well 100 and one ormore candidate wells formation 130, thereby increasing the recovery of hydrocarbons from the treatment well 100. Exemplary stimulation fluids may include fluid or gas systems such as but not limited to singular applications of or combinations of water, liquid hydrocarbons, gas, acid, proppant such as sand or solids, chemicals, and additives that are pumped into a treatment well. Stimulation fluids can include a gas medium such as but not limited to nitrogen (N2), carbon dioxide (CO2), methane, and combinations thereof. In one example, stimulation fluid is pumped down the well and flows out perforations or sleeve ports to create artificially induced fractures in the producingformation 130. The treatment well 100 may be a horizontal, vertical, or directional well. - The
candidate wells candidate wells - In one embodiment, pressurized gas such as natural gas may be injected into the candidate well 101 to act as a pressure barrier to mitigate and/or minimize ingress of the stimulation fluid and/or treating pressures. In one embodiment, pressure barrier is a downhole pressure envelope or volume created within the near wellbore region by the injected natural gas.
FIG. 2 illustrates an exemplary candidate well 101 configured for injection of natural gas. As shown, the candidate well 101 includes awellbore 120, which may be supported by casing, and aproduction tubing 125 disposed therein. Theproduction tubing 125 extends from the wellhead downhole to the producingzone 130. An open annulus may be formed between the casing and thetubing 125. Optionally, portions of the candidate well 101 may be isolated using, for example, packers. In addition to stimulation fluid, it is contemplated the pressure barrier may protect the candidate well 101 from other types of treating fluids flowing from a nearby treatment well. - The natural gas utilized for injection may be supplied from a variety of
sources 135. For example, the natural gas may be taken from a field gas gathering pipeline, another producing well in close proximity to the candidate well, an onsite production facility, or a commercial production facility. In another example, the natural gas may be liquefied natural gas “LNG,” compressed natural gas “CNG,” or natural gas liquids “NGL” from a nearby production facility or a storage vessel. In yet another example, the natural gas may be stored in a pressurized vessel brought to or located at the candidate wellsite. A flow meter, or similar device, may be used to measure the amount of natural gas supplied to thecompressor 141. In one embodiment, the natural gas may be injected into a portion of or the entire footage of thewellbore 120 immediately adjacent to the producingformation 130. - In one embodiment, the natural gas may be injected using a compressor, a pump, or other suitable machine having sufficient power to inject natural gas to increase the pressure in the producing
formation 130 to establish a pressure barrier for protecting the candidate well 101. In one example, thecompressor 141 is either single stage or multiple stages. Thecompressor 141 may optionally be provided as an injectioncompressor skid package 140. In addition to thecompressor 141, theskid package 140 may includegauges 142 for monitoring the suction pressure and the discharge pressure into the candidate well 101. Theskid package 140 may typically include liquid dumps 143 to remove any liquid build up that may occur in the natural gas. Theliquid dump 143 may be manually or automatically controlled. In one embodiment, aflow meter 144 may form a part of theskid package 140. Because the natural gas may come from a variety of sources, thecompressor 141 is configured to handle a range of suction pressures from these sources. Further, thecompressor 141 is configured to generate sufficient discharge pressures to increase the reservoir pressure sufficiently to create a pressure barrier in the candidate well 101. If additional discharge pressure is required, theskid package 140 may be equipped with additional discharge boosters. In one embodiment, thecompressor 141 can generate discharge pressures ranging from 80 psi to 4,000 psi. In another embodiment, thecompressor 141 can generate a discharge pressure that increases the reservoir pressure to a pressure at or below the treating pressure of the stimulation treatment for the treatment well 100; for example, between 50% and 100% or between 60% and 90% of the stimulation treatment pressure. In another embodiment, the discharge pressure into candidate well 101 is below the treating pressure of the formation around the wellbore of the treatment well; for example, between 15% and 50% of the stimulation treatment pressure. In yet another embodiment, the pressure of the candidate well 101 is increased from 1.5× to 5× the shut-in pressure of the candidate well 101. In one embodiment, the discharge pressure is less than either the fracture gradient of the producingformation 130 or the rated pressure limitation of the existing wellhead assembly and wellbore tubulars within the candidate well 101. - While a compressor is disclosed in
FIG. 2 , the natural gas may be supplied to the candidate well 101 using any apparatus capable of supplying pressurized natural gas to increase the near wellbore reservoir pressure of the candidate well 101. For example, the natural gas may be stored in a pressurized vessel that is connected to thewellhead 130 via an injection line. When the injection line is opened, the pressurized natural gas may flow through the injection line and enter the candidate well 101 without passing through a compressor. In another example, thewellhead 130 may be connected to a field gathering pipeline. Natural gas may be allowed to flow from the pipeline to the candidate well 101 without passing through a compressor. - In operation, the candidate well 101 may be injected with natural gas to increase the near wellbore reservoir pressure of the candidate well 101 to mitigate and/or minimize ingress of stimulation fluids and/or pressure from a
nearby treatment well 100. Initially, prior to performing a stimulation treatment at the treatment well 100, the candidate well 101 is shut-in and is allowed to naturally build up a shut-in pressure. Exemplary shut-in pressures may be between 100 psi and 1,500 psi. The shut-in pressure may be allowed to build for a period of a few days to multiple weeks; for example, 3 days to 12 weeks, or from 1 week to 8 weeks. It must be noted that natural gas may also be injected intonearby candidate wells treatment well 100. - After the shut-in pressure is allowed to build, natural gas may be injected into the candidate well 101. A
compressor 141, or optionally an injectionpressure skid package 140, is connected to the candidate well 101. In particular, the discharge line of thecompressor 141 is connected to thewellhead 130 to provide a flow path for the injected natural gas. The natural gas source may be connected to the suction side of thecompressor 141. For example, afield gathering pipeline 135 may be connected to thecompressor 141 to supply the requisite amount of natural gas. The natural gas may optionally be processed before being supplied into thecompressor 141. For example, the natural gas may flow through a filter or dewatering apparatus before entering the compressor. After entering thecompressor 141, the natural gas may go through multiple stages of compression until the desired discharge pressure is established. Thereafter, the pressurized natural gas is discharged via the discharge line into the candidate well 101. - Pressure in the candidate well 101 may be allowed to build up before starting the stimulation treatment for treatment well 100. Natural gas is injected into the candidate well 101 to increase the near wellbore reservoir pressure of the candidate well 101 thereby establishing a pressure barrier to a pressure above the shut-in pressure. In one embodiment, the pressure in the candidate well 101 is increased to a pressure between 700 psi and 3,500 psi; preferably, built up pressure is between 1,100 psi and 2,300 psi. In one embodiment, the pressure in the candidate well is increased to a built up pressure at which the pressure in the wellbore is observed to have leveled off, or in some instances, reached maximum pressure build up. The length of time required for the injection build up may be between 2 days and 4 weeks; typically, between 4 days and 14 days.
- In one embodiment, the stimulation treatment of the treatment well 100 may begin when the pressure in the candidate well 101 has built up to between 800 psi and 2,100 psi; preferably between 1,000 psi and 1,900 psi. The pressure of the candidate well 101 may be monitored using the
pressure gauge 142. Optionally, the pressure of the candidate well 101 may be measured using agauge 132 coupled to thewellhead 130. The stimulation treatment may begin at the toe section of the treatment well 100 and work toward the heel section. The stimulation fluid being pumped into the treatment well may include a fluid and proppant. - The pressure in the candidate well 101 may be maintained during the stimulation treatment of the
treatment well 100. For example, the pressure in the candidate well may be maintained within 30%, within 20%, within 10%, or within 5% above or below the built-up pressure. Without wishing to be bound by theory, it is believed that the higher natural gas pressure in the candidate well 101 and the near wellbore environment, e.g., fractures in the producingformation 130, acts a pressure barrier that deters fluid or pressure communications, e.g., the flow of the stimulation fluid, from entering the candidate well 101. In this manner, the pressure barrier provided by the natural gas may mitigate damages to the candidate well 101 as a result of any ingress of stimulation fluid or damaging pressures. - After completion of the stimulation treatment, the injection of natural gas into the candidate well 101 is stopped. The injected natural gas is allowed to remain in the candidate well 101 in a shut in status until the candidate well 101 is restored to a producing status. In another embodiment, the reservoir pressure in the candidate well 101 may be maintained for a period of time after completion of the stimulation treatment to ensure that potential fluid or pressure communications from the treatment well 100 or other treatment wells are minimized or mitigated. In yet another embodiment, the injection of natural gas is stopped before completion of the stimulation treatment. For example, the natural gas injection may be stopped before the completion of the stimulation treatment if any section, such as the heel section, of the
treatment well 100 is sufficiently far away from the candidate well 101. In addition, natural gas injection may be stopped before completion of the stimulation treatment if the near wellbore reservoir pressure does not significantly deplete or leak off during shut in period. For example, the near wellbore reservoir pressure in the candidate well retains at least 80% of the reservoir pressure at the start of the stimulation treatment; preferably, at least 90% of the reservoir pressure. In yet another embodiment, the injection of natural gas into the candidate well 101 may be stopped before commencing the stimulation treatment of thetreatment well 100. -
FIG. 3 illustrates an exemplary pressure graph of a candidate well in which the production is being shut in and undergoing a natural gas injection operation as described herein. At time T1, the candidate well is shut in. In this example, the pressure of the candidate well at the beginning of shut in is approximately 200 psi. Between time T1 and time T2, the pressure builds naturally to 500 psi, at which time natural gas injection commences. It must be noted the start of the natural gas injection may be independent from the magnitude of the shut-in pressure. The discharge pressure increases until it reaches approximately 1,300 psi at time T3. As seen in the graph, the pressure in the candidate well has generally leveled off by time T3. The discharge pressure is generally maintained before and during the stimulation treatment. During the stimulation treatment, ingress of the stimulation fluid and/or stimulation pressures may cause pressure increases in the candidate well. In this example, a pressure increase is seen at time T4, at about 1,600 psi, but eventually will be deemed to not cause significant damage due to the limited duration and magnitude of the pressure increase. The pressure does not increase dramatically as typically seen in unprotected wells.FIG. 4 illustrates an exemplary pressure graph of an unprotected well exposed to fluid and pressure communications from a nearby well undergoing a fracturing operation. As shown, the pressure increase in an unprotected well caused by ingress of stimulation fluid is faster in time and higher in magnitude. The gradual increase shown inFIG. 3 suggests that the pressure arising from the treatment well is buffered by the pressure barrier created by natural gas injection into the candidate well.FIG. 5 illustrates another example of a pressure graph for a candidate well protected by natural gas injection. In this example, the candidate well experiences multiple pressure increases caused by ingress of stimulation fluid or pressure. However, as depicted, the resulting pressure increases are more gradual and smaller in magnitude when compared to the unprotected well ofFIG. 4 . After the completion of the stimulation treatment, the compressor or injection source may be shut down at time T5. -
FIG. 6 illustrates another embodiment of awellhead 230 configured for natural gas injection. The natural gas may be injected using acompressor 241 having multiple stages. The suction side of thecompressor 241 is connected to afield gathering line 235 to receive natural gas. The natural gas may pass through a coalescingfilter 262 prior to entering thecompressor 241. Separated liquid from thefilter 262 or thecompressor 241 may be directed to a production separator/storage tanks 263. Natural gas is discharged from thecompressor 241 to thewellhead 230 via aninjection line 261. Agauge 242, such as a Barton Recorder or other suitable gauges, may be connected to theinjection line 261 to monitor the discharge pressure into thewellhead 230. Theinjection line 261 may have an optional tie-in 271 to thewellhead 230. In another embodiment, a chemical pump andstorage complex 265 may be connected to theinjection line 261 to supply one or more chemicals to thewellhead 230. - While the foregoing is directed to embodiments of the present disclosure, other and further embodiments of the disclosure may be devised without departing from the basic scope thereof, and the scope of the invention is determined by the claims that follow.
Claims (22)
1. A method of protecting a first well from stimulation fluid of a second well, comprising:
shutting in the first well;
starting injection of natural gas into the first well to increase a pressure of the first well;
treating the second well using a stimulation fluid after starting natural gas injection; and
stopping injection of natural gas.
2. The method of claim 1 , wherein the pressure of the first well is allowed to build to a pressure between 100 psi and 1,500 psi prior to starting injection.
3. The method of claim 1 , wherein injection of natural gas comprises injecting the natural gas using a compressor.
4. The method of claim 3 , wherein the natural gas in injected through a wellhead of the first well.
5. The method of claim 3 , where the natural gas is supplied from a field gathering pipeline or a producing well.
6. The method of claim 3 , wherein the natural gas is supplied in a form as one of liquefied natural gas, compressed natural gas, and combinations thereof.
7. The method of claim 1 , wherein the pressure in the first well is increased to a built up pressure between 1,000 psi and 1,900 psi.
8. The method of claim 7 , wherein treating the second well begins after the built up pressure of the first well has increased to between 1,000 psi and 1,900 psi.
9. The method of claim 1 , wherein treating the second well begins after the pressure in the first well has reached equilibrium.
10. The method of claim 1 , wherein the pressure in the first well is increased to a built up pressure between 700 psi and 3,500 psi.
11. The method of claim 9 , further comprising maintaining the pressure in the first well within 30% of built up pressure during treatment of the second well.
12. The method of claim 1 , wherein the natural gas is supplied from a pressurized vessel.
13. The method of claim 12 , wherein the vessel is connected directly to the first well.
14. The method of claim 1 , further comprising producing hydrocarbon from the first well prior to shutting in the first well.
15. The method of claim 14 , further comprising restoring hydrocarbon production of the first well after stopping injection of natural gas.
16. A method of protecting a producing well from stimulation fluid of a treatment well, comprising:
injecting natural gas into the producing well to increase a pressure of the producing well and fractures in communication with perforations of the producing well; and
fracturing the treatment well after injecting natural gas.
17. The method of claim 16 , further comprising shutting in the producing well prior to injecting natural gas.
18. The method of claim 16 , wherein the pressure of the producing well is allowed to build to a pressure between 100 psi and 1,500 psi prior to starting injection of the natural gas.
19. The method of claim 16 , wherein the pressure in the producing well is increased to a built up pressure between 1,000 psi and 1,900 psi.
20. The method of claim 16 , wherein treating the second well begins after the pressure in the first well has reached equilibrium.
21. The method of claim 16 , further comprising increasing a pressure of the natural gas prior to injecting the natural gas into the producing well.
22. A method of protecting a producing well from stimulation fluid of a treatment well, comprising:
producing hydrocarbon from the producing well;
shutting in production of the producing well;
injecting natural gas into the producing well after shutting in the producing well, thereby increasing a pressure of the producing well; and
fracturing the treatment well after injecting natural gas.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/148,765 US20170321530A1 (en) | 2016-05-06 | 2016-05-06 | Protecting production wells using natural gas injection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/148,765 US20170321530A1 (en) | 2016-05-06 | 2016-05-06 | Protecting production wells using natural gas injection |
Publications (1)
Publication Number | Publication Date |
---|---|
US20170321530A1 true US20170321530A1 (en) | 2017-11-09 |
Family
ID=60242503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/148,765 Abandoned US20170321530A1 (en) | 2016-05-06 | 2016-05-06 | Protecting production wells using natural gas injection |
Country Status (1)
Country | Link |
---|---|
US (1) | US20170321530A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10704373B2 (en) * | 2016-11-11 | 2020-07-07 | Halliburton Energy Services, Inc. | Storing and de-liquefying liquefied natural gas (LNG) at a wellsite |
US11326418B2 (en) * | 2017-04-20 | 2022-05-10 | Baker Hughes Holdings Llc | Method and system for managing recovery and re-use of a stimulating fluid from a flowback stream |
US11506037B2 (en) * | 2016-11-11 | 2022-11-22 | Halliburton Energy Services, Inc. | Liquefied natural gas (LNG) re-fracturing |
-
2016
- 2016-05-06 US US15/148,765 patent/US20170321530A1/en not_active Abandoned
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10704373B2 (en) * | 2016-11-11 | 2020-07-07 | Halliburton Energy Services, Inc. | Storing and de-liquefying liquefied natural gas (LNG) at a wellsite |
US11506037B2 (en) * | 2016-11-11 | 2022-11-22 | Halliburton Energy Services, Inc. | Liquefied natural gas (LNG) re-fracturing |
US11326418B2 (en) * | 2017-04-20 | 2022-05-10 | Baker Hughes Holdings Llc | Method and system for managing recovery and re-use of a stimulating fluid from a flowback stream |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10550665B1 (en) | Electronically controlled pressure relief valve system | |
US7237612B2 (en) | Methods of initiating a fracture tip screenout | |
US10422207B2 (en) | Methods for creating multiple hydraulic fractures in oil and gas wells | |
US9328600B2 (en) | Double hydraulic fracturing methods | |
Love et al. | Selectively placing many fractures in openhole horizontal wells improves production | |
US11187058B2 (en) | Pressure relief system for hydraulic pumping operations | |
US20180073341A1 (en) | System For Inhibiting Flow Of Fracturing Fluid In An Offset Wellbore | |
US20190032476A1 (en) | Determining Depth of Loss Zones in Subterranean Formations | |
US20150361782A1 (en) | A method of pressure testing a plugged well | |
CA2552072A1 (en) | Packer cups | |
US20150198009A1 (en) | Remedial technique for maintaining well casing | |
US20170321530A1 (en) | Protecting production wells using natural gas injection | |
US2964109A (en) | Method of eliminating water resistant coating from bore of injection wells | |
US10612678B1 (en) | Method of servicing an electronically controlled PRV system | |
US3791447A (en) | Well methods for sand bridge removal using small diameter tubing | |
Pandey et al. | New fracture-stimulation designs and completion techniques result in better performance of shallow Chittim Ranch wells | |
US20190112902A1 (en) | Treatment isolation in restimulations with inner wellbore casing | |
US20140345869A1 (en) | Moving liner fracturing method | |
RU2620099C1 (en) | Method of increasing productivity of development wells and injection capacity of injection wells | |
RU2631517C1 (en) | Method for mechanised pump operation of wells and device for its implementation | |
RU2538009C1 (en) | Hydraulic fracturing method | |
US10513917B2 (en) | Method for fracturing a formation | |
US11629563B2 (en) | Method and apparatus for maintaining bottom hole pressure during connections | |
US20120152551A1 (en) | Inducing flowback of damaging mud-induced materials and debris to improve acid stimulation of long horizontal injection wells in tight carbonate formations | |
US9410413B2 (en) | Well system with annular space around casing for a treatment operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GENTRY, FRANK EUGENE;BARTON, KIMBERLY;REEL/FRAME:039469/0203 Effective date: 20160815 |
|
AS | Assignment |
Owner name: NOBLE ENERGY, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:STEVENS, DUSTIN J.;POMERANTZ, JONATHAN MAX;CHOUDHARY, NARAYAN JEE;SIGNING DATES FROM 20160916 TO 20160919;REEL/FRAME:039964/0387 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |