US20170167109A1 - Payload monitoring system - Google Patents

Payload monitoring system Download PDF

Info

Publication number
US20170167109A1
US20170167109A1 US14/964,918 US201514964918A US2017167109A1 US 20170167109 A1 US20170167109 A1 US 20170167109A1 US 201514964918 A US201514964918 A US 201514964918A US 2017167109 A1 US2017167109 A1 US 2017167109A1
Authority
US
United States
Prior art keywords
payload
payload data
board
data
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US14/964,918
Other versions
US9695571B1 (en
Inventor
Xinyu GE
Tao Yu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caterpillar Inc
Original Assignee
Caterpillar Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caterpillar Inc filed Critical Caterpillar Inc
Priority to US14/964,918 priority Critical patent/US9695571B1/en
Assigned to CATERPILLAR INC. reassignment CATERPILLAR INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GE, XINYU, YU, TAO
Priority to DE112016005231.6T priority patent/DE112016005231T5/en
Priority to PCT/US2016/065630 priority patent/WO2017100455A1/en
Priority to CN201680071785.9A priority patent/CN108474196B/en
Publication of US20170167109A1 publication Critical patent/US20170167109A1/en
Application granted granted Critical
Publication of US9695571B1 publication Critical patent/US9695571B1/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/431Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • E02F9/265Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G23/00Auxiliary devices for weighing apparatus
    • G01G23/01Testing or calibrating of weighing apparatus

Abstract

A payload monitoring system on a machine includes a payload sensor configured to generate a plurality of payload data corresponding to a payload amount in a bucket of a machine, the plurality including a first payload data and a second payload data and a controller. The controller is configured to receive the first payload data from the payload sensor and off-board payload data from an off-board system, compare the first payload data to the off-board payload data to generate a payload data offset, receive the second payload data from the payload sensor, and generate an adjusted payload data based on the second payload data and the payload data offset.

Description

    TECHNICAL FIELD
  • The disclosure relates generally to payload monitoring systems, and more particularly, to payload monitoring systems on machines that can generate adjusted payload data based on off-board payload data.
  • BACKGROUND
  • It may be beneficial to optimize the payload arrangement for a heavy duty machine such as a heavy duty excavator or a front shovel. An excavator is designed to operate in substantially-repetitive work cycles. For example, a front shovel or excavator may typically operate in work cycles that include digging, swinging, dumping, and returning steps for operating a bucket to dig and load fragmented rock, earth, minerals, overburden, and the like, for mining purposes. To improve the operation efficiency, a haul machine, such as a large mining truck, may be loaded to full capacity with a minimum number of work cycles of the front shovel.
  • One way to determine the total weight of the material loaded onto a mining truck is to automatically calculate or estimate the total payload delivered to the mining truck by the work tool of an excavator. Monitoring the total weight of each payload can ensure that the mining truck's capacity is fully used.
  • The above concerns have prompted designers to propose various means for more accurately measuring the payload amount in the bucket. One such method is known from U.S. Pat. No. 8,924,094 to Faivre et al. The '094 patent discloses a method of determining a payload including sensing a position of a tool, sensing a boom velocity, and sensing a boom swinging velocity. Thus, the '094 patent discloses determining the payload based on a movement of the bucket and boom. These types of determinations based on movement can include errors because the determinations depend on the operator of the excavator to move the bucket in a particular manner.
  • SUMMARY OF THE INVENTION
  • The disclosure relates to a payload monitoring system on a machine and a method of controlling a payload system on a machine. The payload monitoring system can include payload sensor configured to generate a plurality of payload data corresponding to a payload amount in a bucket of a machine, the plurality of payload data comprising a first payload data and a second payload data. The payload monitoring system can also include a controller configured to receive the first payload data from the payload sensor and off-board payload data from an off-board system, compare the first payload data to the off-board payload data to generate a payload data offset, receive the second payload data from the payload sensor, and generate an adjusted payload data based on the second payload data and the payload data offset.
  • In another embodiment, the payload monitoring system can include a first machine including a bucket, a payload controller, and a payload sensor. The payload controller can be configured to receive the first payload data from the payload sensor and off-board payload data from an off-board system, compare the first payload data to the off-board payload data to generate a payload data offset, receive the second payload data from the payload sensor, and generate an adjusted payload data based on the second payload data and the payload data offset. The payload sensor can be configured to generate a plurality of payload data corresponding to a payload amount in the bucket, wherein the plurality of payload data includes a first payload data and a second payload data. The payload monitoring system can further include an off-board machine including a receiving area and an off-board payload sensor configured to generate off-board payload data.
  • In yet another embodiment, a method of controlling a payload system on a first machine can include providing first payload data from a payload sensor on a first machine having a bucket; providing off-board payload data from an off-board payload sensor on a second machine having a receiving body; generating a payload data offset by comparing the first payload data to the off-board payload data; providing second payload data from the payload sensor; and generating an adjusted payload data based on a second payload data and the payload data offset.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is an illustration of an excavator;
  • FIG. 2 is a depiction of an excavator and a mining truck communicating data at a mining site;
  • FIG. 3 is a diagram of the controller; and
  • FIG. 4 is a flowchart of the disclosed method.
  • DETAILED DESCRIPTION
  • In an embodiment shown in FIG. 1, an excavator 110 is illustrated with a bucket 112. In this figure, the excavator 110 is a front shovel excavator. Although FIG. 1 shows the excavator 110, the excavator 110 can be any loading machine, such as a digger, mechanical shovel, power shovel, front shovel, or loader. The bucket 112 on the excavator 110 can pick up loads of varying amounts. The excavator 110 can control a boom 114, a stick 116, and the bucket 112 to pick up a payload amount in the bucket 112.
  • Referring to FIG. 2, the excavator 110 communicates with a mining truck 210. Although FIG. 2 shows a mining truck, the mining truck 210 can be any receiving machines, such as a dump truck, a hopper, an articulated truck, or other machine capable of receiving the material from the excavator 110. The mining truck 210 can generate payload data, such as off-board payload data 212. Further, the mining truck 210 can send the off-board payload data 212 to the excavator 110. The off-board payload data 212 can be generated by measuring the payload of the mining truck 210. In an embodiment, the off-board payload data 212 can be generated while the mining truck 210 is stationary. This can increase the accuracy of the payload weight measurement. An off-board system 314 on the mining truck 210 can communicate the off-board payload data 212 to the excavator 110.
  • The excavator 110 picks up a payload and performs a load estimation of the payload to generate a plurality of payload data. Usually, the load estimation is performed while the bucket 112 is moving. The load estimation can be derived on a regression model or physical dynamic model. The regression model and physical dynamic model need to be calibrated during a calibration process by assigning proper values to the related coefficients in both models. Furthermore, the load estimation usually requires the operator to move the bucket 112 in a precise manner so that the load estimation can be compared to the calibrated baseline value and the error of estimation is minimized. Without adjusting the model coefficients further during working operations, load estimation on an excavator 110 can be inaccurate because the operator may not move in the precise manner to replicate the typical work cycles utilized during the calibration process. The off-board payload data 212 provided by the stationary mining truck 210 is generally more accurate because the payload and the payload sensors are stationary.
  • Referring to FIG. 3, the excavator 110 can include a controller 310. The controller 310 can receive a first payload data from a payload sensor 312 and off-board payload data 212 from an off-board system 314. For example, the payload sensor 312 can include one or more of a virtual sensor, pressure sensor, and a load cell. In one embodiment, the payload sensor 312 can be a pressure sensor associated with one or more cylinders of the bucket 112, boom 114, and stick 116. In another embodiment, the payload sensor 312 can be a load cell placed between the mating mechanical components of the excavator 110 or on a support structure of the boom 114. In another embodiment, the payload sensor 312 can be a virtual sensor that takes into account data from one or more of pressure sensors, load cells, or positions and velocities of the bucket 112, the boom 114, and the stick 116. The virtual sensor can derive the payload data based on load estimation.
  • The controller 310 can compare the first payload data from the payload sensor 312 to the off-board payload data 212 from the off-board system 314 to generate a payload data offset. In one embodiment, the controller 310 can adjust the coefficients of either the regression model or the physical dynamic model by comparing the first payload data from payload sensor 312 to the off-board payload data 212 using the offset. In one embodiment, the off-board payload data is measured by the off-board system 314 on the mining truck 210 when the mining truck 210 is in a stationary state.
  • The controller 310 can then receive a second payload data from the payload sensor 312. In one embodiment the controller 310 can generate an adjusted payload data based on the second payload data and the payload data offset. In another embodiment, the controller 310 can generate an adjusted payload data by adjusting the coefficients of the load estimation. The controller 310 can also determine a remaining capacity of the mining truck 210 based on the off-board payload data 212.
  • The controller 310 can send the adjusted payload data to the bucket control system 316. The bucket control system 316 can control one or more of the boom 114, the stick 116, and the bucket 112 to increase or decrease the payload amount in the bucket. Improving the accuracy of the payload data improves efficiency of the excavator, which can also reduce fuel consumption. As a result, the efficiency of mine site also increases.
  • This payload data offset can be used to improve the accuracy of the payload data. The excavator 110 can pick up a first payload and generate a first payload data based on the payload sensor 312. The excavator 110 can then deposit the first payload in the mining truck 210. The mining truck 210 includes payload sensors of its own, for example, off-board payload sensors in an off-board system 314. The mining truck 210 can determine the off-board payload weight, or off-board payload data 212, using the off-board sensors and communicate the off-board payload data 212 to controller 310 on the excavator 110.
  • The controller 310 on the excavator 110 can compare the first payload data and the off-board payload data 212 and generate a payload data offset based on the difference between the two amounts. The excavator 110 can pick up a second payload and generate a second payload data based on the payload sensor 312. The controller 310 can generate an adjusted payload data based on the second payload data and the payload data offset. The controller 310 can generate the adjusted payload data one or more times to improve the accuracy of the payload data.
  • In another embodiment, the controller 310 on the excavator 110 can adaptively adjust the coefficients of either the regression model or physical dynamic model by recalibrating the regression model or physical dynamic model with the off-board payload data 212. Because the off-board payload data 212 is typically measured when the mining truck 210 is in a stationary state, the off-board payload data 212 provides an accurate reference value. The excavator 110 can pick up a second payload and generate an adjusted payload data based on the offset or the recalibrated regression model or physical dynamic model.
  • Excavators 110 can increase or decrease the payload amount in the bucket 112 using the bucket control system 316 based on the adjusted payload data. For example, an excavator 110 can decrease the digging capacity of its bucket 112 by turning the bucket 112 towards the stick 116 earlier than at pre-defined full load point. The excavator 110 can then deposit a payload amount to maximize use of the remaining capacity of the mining truck 210.
  • For example, if an excavator 110 needs to load 80 tons of payload material into a mining truck 210, and the excavator 110 picks up 40 tons of payload material according to the payload sensor 312 corresponding to the amount in the bucket 112 on the excavator 110. The excavator 110 deposits its payload in the mining truck 210. The off-board sensors on the mining truck 210 determine that 35 tons of payload material was deposited from the excavator 110. The off-board system 314 can send data corresponding to the payload amount of 35 tons to the controller 310 on the excavator 110. The controller 310 can compare the first payload data, 40 tons, to the off-board payload data 212, 35 tons, and generate a payload data offset, 5 tons.
  • The controller 310 can use the off-board payload data 212 to determine that the mining truck 210 still has a remaining capacity of 45 tons. Further, the controller 310 can receive a second payload data when the excavator 110 picks up a second load, for example, 50 tons. In one embodiment, the controller can generate an adjusted payload data of 45 tons based on the second payload data and the payload data offset. In another embodiment, the controller 310 can generate an adjusted payload data of 45 tons according to the adjusted estimation model which is adaptively modified by the controller 310 as well, after the controller 310 determines that there is 5 ton difference between the first payload data (40 tons) and the off-board payload data 212 (35 tons). Without the adjusted payload data, an operator would assume that the payload amount in the bucket 112 of the excavator 110 would be 5 tons overs the remaining capacity of the mining truck 210. The operator would then have to hold back 5 tons when depositing the payload material in the mining truck 210 or pick up another load that corresponds to the remaining capacity of the mining truck 210 or less. However, because of the adjusted payload data, the operator can deposit the entire payload amount in the bucket 112 of the excavator 110 into the mining truck 210.
  • Alternatively, the controller 310 can send the adjusted payload data to the bucket control system 316. The bucket control system 316 can control one or more of the bucket 112, the stick 116, and the boom 114 to pick up payload to maximize efficiency of the excavator 110 and use of the remaining capacity in the mining truck 210. When the controller 310 can improve the accuracy of the payload data from the load estimation, performance and efficiency improve and fuel consumption is reduced.
  • INDUSTRIAL APPLICABILITY
  • As described, the controller 310 can receive payload data from payload sensor 312 and the off-board system 314. The controller 310 can compare the payload data from the estimation model and the off-board system 314 to either generate a payload data offset or adjust the load estimation using one or more of the offset, the payload data, and the off-board payload data. The controller 310 can then generate an adjusted payload data by applying the offset to the second payload data or by adjusting the coefficients of the load estimation to minimize the error. The controller 310 can send the adjusted payload data to the bucket control system 316. The adjusted payload data enables the excavator 110 to increase efficiency of the excavator 110 and maximize use of the remaining capacity of the mining truck 210.
  • In an embodiment, FIG. 4 discloses a method of controlling a payload system on a machine. At block 402, the method includes providing first payload data. At block 404, the method includes providing off-board payload data 212. The method then includes generating a payload data offset based on the first payload data and the off-board payload data 212, at block 406. Alternatively, the method can include adjusting the load estimation to minimize the difference between the first payload data and the off-board payload data 212.
  • At block 408, the method includes providing second payload data. The method includes generating an adjusted payload data based on the second payload data and the payload data offset, at block 410. In one embodiment, the controller 310 can apply the offset to the second payload data. In another embodiment, the controller 310 can adjust the coefficients of the load estimation to provide an adjusted payload data. The adjusted payload data can be used in many ways. In one embodiment, the adjusted payload data can be sent to the bucket control system 316, which can regulate the amount of payload material in the bucket 112 by controlling one or more of the boom 114, stick 116, and bucket 112.
  • Other aspects, features, and advantages will be apparent upon an examination of the attached Figures and appended claims.
  • The present description is for illustrative purposed only, and should not be construed to narrow the breadth of the present disclosure in any fashion. Thus, those skilled in the art will appreciate that various modifications might be made to the presently disclosed embodiments without departing from the intended spirit and scope of the present disclosure.

Claims (20)

What is claimed is:
1. A payload monitoring system on a machine comprising:
a payload sensor configured to generate a plurality of payload data corresponding to a payload amount in a bucket of a machine, the plurality of payload data comprising a first payload data and a second payload data; and
a controller configured to:
receive the first payload data from the payload sensor and off-board payload data from an off-board system,
compare the first payload data to the off-board payload data to generate a payload data offset,
receive the second payload data from the payload sensor, and
generate an adjusted payload data based on the second payload data and the payload data offset.
2. The payload monitoring system of claim 1, wherein the plurality of payload data is based on a movement of the bucket.
3. The payload monitoring system of claim 1, wherein the machine is an excavator.
4. The payload monitoring system of claim 1, wherein the controller is configured to communicate the adjusted payload data to a bucket control system.
5. The payload monitoring system of claim 4, wherein the bucket control system is configured to regulate the payload amount based on the adjusted payload data.
6. The payload monitoring system of claim 1, wherein the off-board system is configured to communicate the off-board payload data to the controller.
7. A payload monitoring system comprising:
a first machine comprising:
a bucket,
a payload sensor configured to generate a plurality of payload data corresponding to a payload amount in the bucket, the plurality of payload data comprising a first payload data and a second payload data; and
a controller configured to:
receive the first payload data from the payload sensor and off-board payload data from an off-board system,
compare the first payload data to the off-board payload data to generate a payload data offset,
receive the second payload data from the payload sensor, and
generate an adjusted payload data based on the second payload data and the payload data offset; and
an off-board machine comprising:
a receiving area and
an off-board payload sensor configured to generate off-board payload data.
8. The payload monitoring system of claim 7, wherein the first machine is an excavator.
9. The payload monitoring system of claim 7, wherein the controller calculates a weight of a payload based on a movement of the bucket from payload data from the payload sensor.
10. The payload monitoring system of claim 7, wherein the off-board machine is a mining truck.
11. The payload monitoring system of claim 7, wherein the controller is configured to send the adjusted payload data to a bucket control system.
12. The payload monitoring system of claim 11, wherein the bucket control system can adjust the payload amount in the bucket of the first machine based on the adjusted payload data.
13. The payload monitoring system of claim 12, wherein the bucket control system controls one or more of a boom, a stick, and the bucket.
14. A method of controlling a payload system on a first machine, the method comprising:
providing first payload data from a payload sensor on a first machine having a bucket;
providing off-board payload data from an off-board payload sensor on a second machine having a receiving body;
generating a payload data offset by comparing the first payload data to the off-board payload data;
providing second payload data from the payload sensor; and
generating an adjusted payload data based on the second payload data and the payload data offset.
15. The method of claim 14, wherein the first machine comprises an excavator.
16. The method of claim 14, wherein the second machine comprises a mining truck.
17. The method of claim 14, wherein the first payload data and the second payload data are generated based on a movement of the bucket.
18. The method of claim 14, further comprising adjusting a payload amount in the bucket based on the adjusted payload data.
19. The method of claim 14, further comprising generating a remaining capacity on the second machine based on the off-board payload data.
20. The method of claim 19, further comprising communicating the remaining capacity data to the first machine.
US14/964,918 2015-12-10 2015-12-10 Payload monitoring system Active 2035-12-15 US9695571B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US14/964,918 US9695571B1 (en) 2015-12-10 2015-12-10 Payload monitoring system
DE112016005231.6T DE112016005231T5 (en) 2015-12-10 2016-12-08 Payload monitoring system
PCT/US2016/065630 WO2017100455A1 (en) 2015-12-10 2016-12-08 Payload monitoring system
CN201680071785.9A CN108474196B (en) 2015-12-10 2016-12-08 Payload monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US14/964,918 US9695571B1 (en) 2015-12-10 2015-12-10 Payload monitoring system

Publications (2)

Publication Number Publication Date
US20170167109A1 true US20170167109A1 (en) 2017-06-15
US9695571B1 US9695571B1 (en) 2017-07-04

Family

ID=59013527

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/964,918 Active 2035-12-15 US9695571B1 (en) 2015-12-10 2015-12-10 Payload monitoring system

Country Status (4)

Country Link
US (1) US9695571B1 (en)
CN (1) CN108474196B (en)
DE (1) DE112016005231T5 (en)
WO (1) WO2017100455A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109405951A (en) * 2017-08-18 2019-03-01 梅特勒-托利多(常州)精密仪器有限公司 Weighing system and method and storage medium
US20210002852A1 (en) * 2018-03-26 2021-01-07 Sumitomo Construction Machinery Co., Ltd. Shovel
WO2023133629A1 (en) * 2022-01-13 2023-07-20 Suncor Energy Inc. Systems, methods, and media for instructing power shovel operators

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102459523B1 (en) * 2016-04-01 2022-10-27 클라크 이큅먼트 컴파니 Variable engine speed control
US10145725B2 (en) * 2016-04-21 2018-12-04 Caterpillar Inc. Method of calibration of weighing systems
DE102016011530A1 (en) * 2016-09-23 2018-03-29 Liebherr-Mining Equipment Colmar Sas Method for assisting a dredger when loading a transport device and assistance system
JP6704375B2 (en) * 2017-07-13 2020-06-03 日立建機株式会社 Load compensation system
US11299869B2 (en) 2017-10-27 2022-04-12 Hitachi Construction Machinery Co., Ltd. Loading amount accumulation device and loading amount accumulation system
JP6849623B2 (en) * 2018-03-07 2021-03-24 日立建機株式会社 Work machine
JP7245581B2 (en) * 2018-10-10 2023-03-24 株式会社小松製作所 Systems and methods for controlling work machines that load materials onto haul vehicles
US11174618B2 (en) * 2019-02-20 2021-11-16 Caterpillar Inc. System and method for automated payload target tipoff
US11454000B2 (en) * 2020-03-09 2022-09-27 Cnh Industrial America Llc System and method for depositing material at a target location with a work vehicle

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060211535A1 (en) * 2005-03-21 2006-09-21 Caterpillar Inc. Drive system having slip control
US7748489B2 (en) * 2008-10-31 2010-07-06 Deere & Company Agricultural header presence sensor with traction control
US8340872B2 (en) * 2005-12-12 2012-12-25 Caterpillar Inc. Control system and method for capturing partial bucket loads in automated loading cycle

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR910009257B1 (en) 1985-09-07 1991-11-07 히다찌 겡끼 가부시기가이샤 Control system for hydraulically operated construction machinery
JP2925468B2 (en) 1995-01-31 1999-07-28 株式会社小松製作所 Dump loading weight monitoring device
US6114993A (en) 1998-03-05 2000-09-05 Caterpillar Inc. Method for determining and displaying the position of a truck during material removal
US7693633B2 (en) 2005-11-28 2010-04-06 Caterpillar Inc. Machine operational data collection and reporting system
US7627410B2 (en) 2005-12-12 2009-12-01 Caterpillar Inc. Machine payload measurement dial-a-load system
US8311970B2 (en) 2006-04-20 2012-11-13 Cmte Development Limited Payload estimation of weight bearing machinery using multiple model adaptive estimator system and method
JP2008303648A (en) 2007-06-08 2008-12-18 Caterpillar Japan Ltd Work machine warning system
US8386134B2 (en) 2007-09-28 2013-02-26 Caterpillar Inc. Machine to-machine communication system for payload control
US7934329B2 (en) 2008-02-29 2011-05-03 Caterpillar Inc. Semi-autonomous excavation control system
US8156048B2 (en) * 2008-03-07 2012-04-10 Caterpillar Inc. Adaptive payload monitoring system
AU2011208154A1 (en) 2010-01-22 2012-07-19 Hitachi Construction Machinery Co., Ltd. Loading guide system
US8538645B2 (en) 2010-06-23 2013-09-17 Caterpillar Inc. Control system having load-adjusted economy mode
US8606451B2 (en) 2010-10-06 2013-12-10 Caterpillar Global Mining Llc Energy system for heavy equipment
US8527158B2 (en) 2010-11-18 2013-09-03 Caterpillar Inc. Control system for a machine
US8833861B2 (en) 2010-12-03 2014-09-16 Caterpillar Inc. Loading analysis system and method
US9378663B2 (en) 2011-06-27 2016-06-28 Caterpillar Inc. Method and system for mapping terrain using machine parameters
WO2013065415A1 (en) * 2011-11-04 2013-05-10 株式会社小松製作所 Loading system and conveyor
US8924094B2 (en) 2012-10-17 2014-12-30 Caterpillar Inc. System for work cycle detection
US8954243B2 (en) 2013-05-09 2015-02-10 Caterpillar Inc. Dynamic tip-off detection, display and location selection
JP5973676B2 (en) 2015-01-30 2016-08-23 株式会社小松製作所 Construction management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060211535A1 (en) * 2005-03-21 2006-09-21 Caterpillar Inc. Drive system having slip control
US8340872B2 (en) * 2005-12-12 2012-12-25 Caterpillar Inc. Control system and method for capturing partial bucket loads in automated loading cycle
US7748489B2 (en) * 2008-10-31 2010-07-06 Deere & Company Agricultural header presence sensor with traction control

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109405951A (en) * 2017-08-18 2019-03-01 梅特勒-托利多(常州)精密仪器有限公司 Weighing system and method and storage medium
US20210002852A1 (en) * 2018-03-26 2021-01-07 Sumitomo Construction Machinery Co., Ltd. Shovel
WO2023133629A1 (en) * 2022-01-13 2023-07-20 Suncor Energy Inc. Systems, methods, and media for instructing power shovel operators

Also Published As

Publication number Publication date
DE112016005231T5 (en) 2018-07-26
CN108474196B (en) 2021-01-15
WO2017100455A1 (en) 2017-06-15
CN108474196A (en) 2018-08-31
US9695571B1 (en) 2017-07-04

Similar Documents

Publication Publication Date Title
US9695571B1 (en) Payload monitoring system
CN101960075B (en) Adaptive payload monitoring system
US10024710B2 (en) Payload monitoring system
EP3690150A1 (en) Work machinery
JP6314105B2 (en) Trajectory generator and work machine
CN104769188B (en) For including the control system of machine of the wheel loader of scraper blade
WO2015166210A1 (en) Payload weighing apparatus and method
KR102410416B1 (en) working machine
US11306460B2 (en) Work machine
CN109757113A (en) Work machine
KR20190113892A (en) Construction machinery
AU2013318066A1 (en) A method and system for preemptively determining a load weight for mining excavation equipment
CN109680738A (en) A kind of hydraulic crawler excavator material online weighing device and method
CN209585142U (en) A kind of hydraulic crawler excavator material online weighing device and hydraulic crawler excavator
CN110352278A (en) The control method of Work machine and Work machine
CN109682447A (en) A kind of weight of material Dynamic Weighting method in loading shovel
US10794754B2 (en) Loadage correction system
US20180016767A1 (en) Autonomous loading system and method for operating same
CN115917089A (en) Working machine
US11299869B2 (en) Loading amount accumulation device and loading amount accumulation system
JP3907858B2 (en) Work amount display device of hydraulic excavator
CN206655271U (en) Hydraulic Excavator Bucket with function of measuring
SE544305C2 (en) Method and system for estimating a level of stress on a mining and/or construction machine

Legal Events

Date Code Title Description
AS Assignment

Owner name: CATERPILLAR INC., ILLINOIS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GE, XINYU;YU, TAO;REEL/FRAME:037259/0719

Effective date: 20151209

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4