US20170111935A1 - Bearer management - Google Patents

Bearer management Download PDF

Info

Publication number
US20170111935A1
US20170111935A1 US15/395,102 US201615395102A US2017111935A1 US 20170111935 A1 US20170111935 A1 US 20170111935A1 US 201615395102 A US201615395102 A US 201615395102A US 2017111935 A1 US2017111935 A1 US 2017111935A1
Authority
US
United States
Prior art keywords
bearer
bearers
network
mobile device
established
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/395,102
Inventor
Ricky Kaura
Youngkyo BAEK
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Samsung Electronics Co Ltd
Original Assignee
Samsung Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Samsung Electronics Co Ltd filed Critical Samsung Electronics Co Ltd
Priority to US15/395,102 priority Critical patent/US20170111935A1/en
Publication of US20170111935A1 publication Critical patent/US20170111935A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • H04W76/007
    • H04W4/22
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/90Services for handling of emergency or hazardous situations, e.g. earthquake and tsunami warning systems [ETWS]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W56/00Synchronisation arrangements
    • H04W56/0005Synchronisation arrangements synchronizing of arrival of multiple uplinks
    • H04W76/064
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/12Setup of transport tunnels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release
    • H04W76/32Release of transport tunnels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release
    • H04W76/34Selective release of ongoing connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release
    • H04W76/34Selective release of ongoing connections
    • H04W76/36Selective release of ongoing connections for reassigning the resources associated with the released connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/50Connection management for emergency connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/15Setup of multiple wireless link connections

Definitions

  • the present invention relates to bearer management in a packet switched (PS) mobile communications network.
  • Embodiments of the invention may be implemented in a 3rd Generation Partnership Project (3GPP) compliant mobile communications system comprising User Equipment (UE) and network equipment.
  • 3GPP 3rd Generation Partnership Project
  • UE User Equipment
  • embodiments of the present invention may be implemented in a 3GPP Long Term Evolution (LTE) and LTE Advanced compliant PS network, though the present invention is not limited to any particular PS network technology.
  • Embodiments of the present invention address issues which arise when the maximum number of bearers that the network supports has already been reached but the UE is unaware of this fact when a further bearer is requested by the UE. This situation can arise when a UE attempts to establish an emergency call causing the network to reject the request.
  • PSAP Public Safety Answering Point
  • 3GPP design specify and standardize technologies for mobile (cellular) wireless communications s.
  • 3GPP produces a series of technical reports (TR) and technical specifications (TS) that define 3GPP technologies.
  • TR technical reports
  • TS technical specifications
  • the focus of 3GPP is currently the specification of standards beyond the 3rd Generation (3G) of mobile networks, and in particular an Evolved Packet System (EPS) offering enhancements over 3G networks, in particular higher data rates.
  • the set of specifications for the EPS comprises two work items: Systems Architecture Evolution (SAE, concerning the core network) and LTE concerning the air interface.
  • SAE Systems Architecture Evolution
  • LTE concerning the air interface.
  • the first set of EPS specifications were released as 3GPP Release 8 in December 2008. Despite LTE strictly referring only to the air interface, LTE is commonly used to refer to the whole of the EPS, including by 3GPP themselves.
  • LTE is used in this sense in the remainder of this specification. LTE enhancements, including LTE Advanced offering still higher data rates compared to LTE, have followed up to and including 3GPP Release 11 in September 2012. LTE Advanced is considered to be a 4th generation (4G) mobile communication system by the International Telecommunication Union (ITU). LTE is an evolution of the 3GPP 3G Universal Mobile Telecommunication System (UMTS) and shares certain high level components and protocols with UMTS. A key difference is that whereas UMTS allows for both PS and Circuit Switched (CS) data transfer, with CS being used for voice calls, LTE is a wholly PS system for the delivery of packet data, regardless of the content of the data packets.
  • 4G 4th generation
  • UMTS 3G Universal Mobile Telecommunication System
  • CS Circuit Switched
  • FIG. 1 shows an overview of an LTE network.
  • the LTE system comprises three high level components: at least one UE 102 , an Evolved UMTS Terrestrial Radio Access Network (E-UTRAN) 104 and an Evolved Packet Core (EPC) 106 .
  • the EPC 106 communicates with Packet Data Networks (PDNs) and servers 108 in the outside world.
  • FIG. 1 shows the key component parts of the EPC 106 . It will be appreciated that FIG.
  • FIG. 1 is a simplification and a typical implementation of LTE will include further components.
  • interfaces between different parts of the LTE system are shown.
  • the double ended arrow indicates the air interface between the UE 102 and the E-UTRAN 104 .
  • media is represented by solid lines and signaling is represented by dashed lines.
  • the UE 102 comprises a communication device, referred to as Mobile Equipment (ME) and a Universal Integrated Circuit Card (UICC) which is a smart card, commonly referred to as the Subscriber Identity Module (SIM) card.
  • the UICC stores identification information which uniquely identifies the UE user.
  • the E-UTRAN 104 comprises a single type of component: the evolved Node B (eNB) which is responsible for handling radio communications between the UE 102 and the EPC 106 across the air interface.
  • eNB evolved Node B
  • An eNB is a base station that controls UEs 102 in one or more cell.
  • eNBs typically there is a plurality of eNBs within an LTE system, and the eNBs comprising the E-UTRAN are connected to the EPC 106 .
  • FIG. 1 Key components of the EPC 106 are shown in FIG. 1 . It will be appreciated that in an LTE network there may be more than one of each component according to the number of UEs 102 , the geographical area of the network and the volume of data to be transported across the network. Data traffic is passed between each eNB and a corresponding Serving Gateway (S-GW) 110 which routes data between the eNB and a PDN Gateway (P-GW) 112 . The P-GW 112 is responsible for connecting a UE to one or more servers or PDNs 108 in the outside world.
  • the Mobility Management Entity (MME) 114 controls the high-level operation of the UE 102 through signaling messages exchanged with the UE 102 through the E-UTRAN 104 .
  • MME Mobility Management Entity
  • Each UE is registered with a single MME. There is no direct signaling pathway between the MME 114 and the UE 102 (communication with the UE 102 being across the air interface via the E-UTRAN 104 ).
  • the air interface can be considered to be split into two levels: the Access Stratum (AS) and the Non Access Stratum (NAS).
  • Signaling messages between the MME 114 and the UE 102 are transported via the NAS protocol.
  • Signaling messages between the MME 114 and the UE 102 comprise EPS Session Management (ESM) protocol messages controlling the flow of data from the UE to the outside world and EPS Mobility Management (EMM) protocol messages controlling the rerouting of signaling and data flows when the UE 102 moves between eNBs within the E-UTRAN.
  • EMM EPS Session Management
  • EMM EPS Mobility Management
  • the MME 114 exchanges signaling traffic with the S-GW 110 to assist with routing data traffic.
  • the MME 114 also communicates with a Home
  • An LTE system transports data from one part of the system to another via bearers.
  • the most important bearer from the perspective of an end user is the EPS bearer between a UE 102 and a P-GW 112 .
  • the EPS bearers are responsible for transporting data between the UE 102 and servers and PDNs outside of the EPC 106 .
  • the term “bearer” will be used generically (including EPS bearers) to refer to any bearer between the UE 102 and another part of the LTE network, and in particular part of the EPC.
  • a bearer may be considered to be a logical or virtual connection between two end points.
  • a bearer may also be considered to be a data pipe between two such end points.
  • Each bearer may be defined in terms of minimum Quality of Service (QoS), minimum data rate, maximum error rate and maximum delay.
  • QoS Quality of Service
  • APN Access Point Name
  • a default EPS bearer is established between the UE and a selected P-GW 112 .
  • Additional PDN connections may later be established between the UE 102 and alternative P-GWs 1125 , which results in the establishment of further default EPS bearers for these PDN connections.
  • Dedicated bearers may be established by the EPC between the UE 102 and a P-GW 112 for which there exists a default bearer, for instance in order to establish a data flow with a higher QoS or minimum bit rate.
  • a UE 102 requests a new bearer for a new data communication session if the required service cannot be provided upon the default bearer. This includes when establishing a new voice call.
  • An LTE network and in particular an MME 114 responsible for that UE 102 , can only support a limited number of bearers per UE 102 .
  • This maximum number of bearers per UE 102 is defined by the LTE specifications based on a protocol limitation defined in sub-clause 11.2.3.15 of 3GPP Technical Specification 24.007 version 11.0.0 Release 11, “Group Core Network and Terminals; Mobile Radio Interface Signaling Layer 3; General Aspects” available from http://www.3gpp.org.
  • the maximum number of bearers in theory cannot exceed 11.
  • Packet Data Protocol For a General Packet Radio Service (GPRS) network, the corresponding limit on Packet Data Protocol (PDP) contexts is defined in sub-clause 10.5.6.2 of 3GPP Technical Specification 24.008 version 11.4.0 Release 11, “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Mobile radio interface Layer 3 specification; Core network protocols; Stage 3” available from http://www.3gpp.org.
  • this limit can vary widely between different LTE implementations.
  • a UE 102 knows only the number of active bearers that it has established with the network, and not the maximum number of available bearers. Referring now to FIG.
  • FIG. 2 illustrates a situation in which the maximum number of bearers for a UE 102 has already been reached, and the UE 102 requests a further bearer.
  • FIG. 2 illustrates a situation in which the UE 102 requests a further bearer in order to allow a user to make an emergency voice call.
  • FIG. 2 shows signaling messages exchanged between a UE 102 and the associated MME 114 with which the UE 102 is registered.
  • the UE has already established a default bearer for a connection to an external PDN (the internet) and a default bearer for a connection to an IP Multimedia Subsystem (IMS).
  • IMS IP Multimedia Subsystem
  • IMS is a separate 3GPP specified network communicating with the EPC for handling real time IP multimedia services for example Voice over IP (VoIP), which is used by LTE for voice calls.
  • VoIP Voice over IP
  • the MME supports a maximum of two bearers per UE. It will be appreciated that in an operational LTE network the maximum number of bearers may be significantly higher. The UE is not aware that the MME supports a maximum of 2 bearers, and that the maximum has already been reached.
  • the UE and the MME are initially in an EMM-IDLE state. This represents a state in which there is no NAS signaling connection between the UE and the network. It will be appreciated that in an alternative scenario the UE may initially be in the EMM-connected state (that is, in a state in which there is a NAS signaling connection between the UE and the network).
  • the user of the UE wishes to make an emergency voice call and takes the necessary action at the UE to cause the UE 102 to request a further bearer.
  • the UE sends a Service Request message to the MME.
  • the service request message is an EMM message forming part of the service request procedure which takes place when the UE is in the EMM-IDLE state but wishes to communicate with the network.
  • the service request message requests that the MME moves the UE to the EMM-CONNECTED state.
  • the UE then sends a PDN Connectivity Request message to the MME.
  • the PDN Connectivity Request message is an ESM message which asks the network to establish a bearer for a connection to an emergency PDN. Note that if the UE was already in EMM-CONNECTED state, then step 210 is omitted.
  • Error code #65 is defined as the max number of EPS bearers per Public Land Mobile Network (PLMN).
  • PLMN Public Land Mobile Network
  • This error code is specified in section 6.5.1.4 of 3GPP Technical Specification 24.301 version 11.4.0 Release 11, “Universal Mobile Telecommunications System (UMTS); LTE; Non-Access-Stratum (NAS) protocol for Evolved Packet System (EPS); Stage 3” available from http://www.3gpp.org. Section 6.5.1.4 of TS 24.301 specifies ESM error codes in the event that a PDN Connectivity Request cannot be accepted by the network.
  • UMTS Universal Mobile Telecommunications System
  • NAS Non-Access-Stratum
  • EPS Evolved Packet System
  • Stage 3 available from http://www.3gpp.org.
  • Section 6.5.1.4 of TS 24.301 specifies ESM error codes in the event that a PDN Connectivity Request cannot be accepted by the network.
  • the UE can then determine the network's maximum number of EPS bearers. This can be stored at the UE, though will be released if the UE is switched off, or the USIM is erased. This is the first time at which the UE becomes aware of the maximum number of bearers supported by the MME.
  • the UE performs explicit deactivation of one of the established PDN connections. Specifically, the UE sends a PDN Disconnect Request message 216 to the MME. The MME then sends a Deactivate EPS Bearer Context Request message 218 from, to which the UE responds with a Deactivate EPS Bearer Context Accept message 220 . Now that there is one less bearer than the maximum available number of bearers, at 222 the UE again sends the PDN Connectivity Request message requesting a bearer for a connection to an emergency PDN.
  • the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information, for example a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer.
  • QoS Quality of Service
  • the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information.
  • Messages 222 to 226 are ESM messages.
  • the emergency PDN connection has been established and the emergency voice call can take place.
  • FIG. 2 is a simplification of signaling messages sent between the UE and the MME, and in particular the encapsulation of EMM and ESM messages within other lower layer protocols between the UE and the E-UTRAN, or between the E-UTRAN and the MME, has been omitted.
  • the PDN Connectivity Request message sent from the UE to the MME at 212 identifies an Access Point Name (APN) and PDN type for the requested bearer, together with further Information Elements (IEs) specifying information specific to the requested PDN connection.
  • API Access Point Name
  • IEs Information Elements
  • Sections 6.5.1.4A and 6.5.1.6 of 3GPP TS 24.301 note that as an exception even if the maximum number of bearers has already been established for the UE, if a further PDN Connectivity Request message is received with the same combination of APN and PDN type as an existing, non-emergency PDN connection then the further PDN Connectivity Request message can be accepted under two limited circumstances.
  • the first circumstance is if all of the IEs in the further PDN Connectivity Request message exactly match those within a previous PDN Connectivity Request message and the MME has not received the Activate Default EPS Bearer Context Accept message 226 from the UE.
  • This relates to a situation in which an Activate Default EPS Bearer Context Request message 224 sent by the MME in response to the earlier PDN Connectivity Request message was not received by the UE, such that the UE has resent the PDN Connectivity Request message.
  • This is a limited error handling exception.
  • the request for a further bearer is in order to make an emergency call (and not to retry a non-emergency call).
  • the second circumstance is if the IEs do not match, and the APN does not support multiple PDN connections.
  • the MME may optionally either deactivate the existing EPS bearer context for the earlier PDN connection locally without notification to the UE and proceed with the requested PDN connectivity procedure, or the MME may respond with error code #55 “multiple PDN connections for a given APN not allowed”.
  • This second circumstance relates to a situation in which the UE has an already established EPS bearer for a particular PDN connection and requests a similar EPS bearer with different operating parameters, for instance QoS or data rate. This cannot relate to an emergency call scenario as the APN is never included in the PDN connectivity request when establishing an emergency PDN connection.
  • the emergency PDN connection is determined through configuration at the MME.
  • the present invention is broadly applicable to PS systems, and is not limited to LTE. Specifically, the present invention is applicable in any PS system in which connections from a mobile device to a server, network component or PDN comprise a logical or virtual connection or data pipe, and the maximum number of such connections is limited.
  • 2G 2nd generation
  • GSM Global System for Mobile Communications
  • UMTS Universal Mobile Communications
  • PDP contexts appear generally the same as EPS bearers from the perspective of the Mobile Station (MS, the equivalent of an LTE UE).
  • MS Mobile Station
  • a PDP context is only requested when the MS wishes to communicate with a server or a PDN in the outside world.
  • the number of PDP contexts that can be established for a single UE is limited, and not known to the MS.
  • Section 6.1.3.0 of 3GPP TS 24.008 specifies how the maximum number of PDP contexts for an MS is determined.
  • the network may respond with an activate PDP context reject message with error code # “maximum number of PDP contexts reached”.
  • section 6.1.3.1.5 part (c) of 3GPP TS 24.008 notes that if an MS initiates a PDP context activation request for an already activated PDP context and all of the details of the request match exactly then the existing activated PDP context is deactivated locally within the network and the network proceeds with the requested PDP context activation. This situation relates to a limited error handling situation in which the MS did not receive the response to the original Activate PDP Context Request message.
  • the network will deactivate the existing PDP context locally within the network and the network proceeds with the requested PDP context activation.
  • NSAPI Network layer Service Access Point Identifier
  • bearer is used in connection with the present invention to refer to any logical or virtual connections between a UE and a component of a mobile communications network or an external server or PDN, and should not be considered to refer only to the particular forms of bearers defined in connection with LTE, despite embodiments of the present invention being described in detail in connection with LTE.
  • An aspect of the present invention provides a method of establishing a bearer in a packet switched mobile wireless communications network comprising a mobile device and a network node, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, the method comprising: determining at the mobile device that an emergency PDN connection is required; and sending a request for a further bearer from the mobile device to the network node; wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises: releasing, at the network node, a bearer previously established for the mobile device within the network; and establishing a bearer for an emergency PDN connection for the mobile device within the network.
  • a method of establishing a bearer within a network node in a packet switched mobile wireless communications network which further comprises a mobile device, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, the method comprising: receiving a request for a further bearer from the mobile device; wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises: releasing a bearer previously established for the mobile device within the network; and establishing a bearer for an emergency PDN connection for the mobile device within the network.
  • Another aspect of the present invention provides a method of establishing a bearer within a network node in a packet switched mobile wireless communications network which further comprises a mobile device, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, with the method comprising receiving a request for a further bearer from the mobile device, wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises: releasing a bearer previously established for the mobile device within the network; and establishing a bearer for an emergency PDN connection for the mobile device within the network.
  • An advantage of embodiments of the present invention is that the time to request a bearer is minimized.
  • embodiments of the present invention help to minimize delays in setting up emergency calls.
  • Another aspect of the invention provides a computer program comprising instructions arranged, when executed, to implement a method and/or apparatus in accordance with any one of the above-described aspects.
  • a further aspect provides machine-readable storage storing such a program.
  • FIG. 1 schematically illustrates an overview of an LTE mobile communication network
  • FIG. 2 illustrates signaling messages exchanged between a UE and an MME in an LTE network illustrating the delay that arises when the maximum number of bearers for a UE has already been established and a further bearer is requested, according to conventional LTE systems;
  • FIG. 3 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the UE obtains information about the maximum number of bearers supported by the MME, in accordance with a first embodiment of the invention
  • FIG. 4 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the UE obtains information about the maximum number of bearers supported by the MME, in accordance with a second embodiment of the invention
  • FIG. 5 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the UE obtains information about the maximum number of bearers supported by the MME, in accordance with a third embodiment of the invention
  • FIG. 6 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the MME arbitrarily and locally deactivates a non-emergency PDN connection, in accordance with a fourth embodiment of the invention.
  • FIG. 7 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the MME arbitrarily and explicitly deactivates a non-emergency PDN connection, in accordance with a fifth embodiment of the invention.
  • the present inventor has identified that there are two main approaches to addressing the problem identified above associated with delay when requesting a new bearer.
  • the present inventor has identified that there are two main approaches to minimizing sources of delay when making an emergency call in a PS network.
  • the first approach is to allow the mobile device to have knowledge of the maximum number of bearers.
  • the first approach requires that the UE is kept aware by NAS protocol messages either about the number of bearers which the MME can accommodate, the number of bearers left that could be established or at the point at which the MME cannot establish any more bearers. Consequently, the UE can pre-emptively take action to locally release a bearer before the UE tries to request a further bearer over the maximum available.
  • the second approach operates upon the network side and does not require the mobile device to have knowledge about the maximum number of bearers.
  • the second approach requires that the network takes action to arbitrarily select a bearer to deactivate.
  • the MME is in an EMM-CONNECTED state, it locally deactivates an EPS bearer and either informs the UE that it needs to send a Tracking Area Update message to synchronize the bearers at the UE and the MME or the MME sends an ESM status message to the UE with the bearer identification of the locally deactivated bearer, requiring the UE to locally deactivate this bearer.
  • the MME sends an explicit EPS bearer deactivation message before/after the emergency PDN connection has been established.
  • a solution requiring knowledge at the UE is provided for an LTE network though LTE EMM messaging.
  • the first embodiment requires that the MME incorporates an information element (IE) in Attach Accept and Tracking Area Update Accept EMM messages indicating the maximum number of EPS bearers which can be established for that UE.
  • IE information element
  • the UE camps in an LTE cell and initiates an initial attachment procedure by sending an Initial Attach Request message 302 to the MME, including an embedded PDN Connectivity Request ESM message corresponding to message 212 in FIG. 2 .
  • the MME replies with an Attach Accept message 304 with an embedded Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for a default EPS bearer allowing the UE to access an Internet APN.
  • the Attach Accept message further incorporates a new IE indicating the maximum number of EPS bearers that may be established for the UE (in this example two).
  • the UE now knows that the network supports a maximum of two bearers in advance of attempting to request more than the maximum number of bearers, and can store the maximum number at this point. There is no precedent in PS networks for a mobile device to have this type of advance knowledge.
  • the UE replies with an Attach Complete message including an embedded Activate Default EPS Bearer Context Accept message to acknowledge the ESM and EMM parts of the Attach Accept message received from the MME, and at point 310 the Internet PDN connection is established for the UE.
  • the UE selects a new cell in a new tracking area with which it was not previously registered causing the UE to send a Tracking Area Update message to the MME at step 312 .
  • the MME responds with a Tracking Area Update Accept message 314 .
  • the Tracking Area Update Accept message 314 further incorporates a new IE indicating the maximum number of EPS bearers that may be established for the UE (in this example two). It will be appreciated that if the MME changes as a result of the UE changing to a new tracking area then the maximum number of bearers may also change necessitating the retransmission of this information in the Tracking Area Accept message 314 .
  • the UE requests a new bearer for an IMS connection.
  • This request for a bearer follows the process described above in connection with FIG. 2 at steps 222 to 226 , differing only in the details of the requested bearer, and so will not be described in detail.
  • an IMS PDN connection is established.
  • the user wishes to make an emergency call.
  • the UE can locally release a non-emergency bearer.
  • the UE and the MME perform a Tracking Area Update Procedure to resynchronize the EPS bearers.
  • the UE and the MME can then establish the Emergency PDN connection as described in connection with FIG. 2 at steps 222 to 226 .
  • the first embodiment of the invention requires modification to 3GPP Attach and Tracking Area Update procedures described in 3GPP TS 24.301.
  • the Attach Accept message and the Tracking Area Update Accept messages described in sections 8.3.6.1 and 8.3.3.1 of 3GPP TS 24.301 respectively require modification.
  • Tables 8.2.1.1 and 8.2.26.1 respectively of 3GPP TS 24.301 define the IEs present within the messages.
  • a further IE with the identifier “Maximum number of bearers” is added.
  • GPRS General Packet Radio Service
  • 3GPP TS 24.008 a Routing Area Update message is used to synchronize the bearers (PDP contexts) between an MS and the Serving GPRS Support Node (SGSN) and information about the maximum number of available PDP contexts may be incorporated into Attach Accept and Routing Area Update Accept messages.
  • the Attach Accept message and the Routing Area Update Accept message are defined in sections 9.4.2 and 9.4.15 of 3GPP TS 24.008 respectively, which define the IEs present within those messages.
  • a further IE with the identifier “Maximum number of bearers” is added.
  • a solution requiring knowledge at the UE is provided for an LTE network though LTE ESM messaging.
  • the UE may be informed how many bearers are left available for that UE each time a bearer is established.
  • the UE only obtains knowledge of the maximum number of EPS bearers which can be established for that UE at the time of establishing the last available bearer, but before the UE requests a further bearer. This information may be included when establishing the bearer or may be included outside of the dialog of establishing a bearer.
  • an ESM Notification message is sent indicating the number of remaining EPS bearers which can be established for that UE, or whether the last bearer has been established. It will be appreciated that for concurrent requests for bearers the UE may only be able to evaluate the maximum number of bearers or the number remaining once all outstanding requests are completed.
  • the ESM Notification message may alternatively indicate that no further bearers can be established for the mobile device in the network, or the maximum number of available bearers.
  • the UE obtains knowledge of the maximum number of EPS bearers which can be established for that UE through an IE in an Attach Accept message (that is, through ESM level information within an EMM message) or through an IE in an Activate Default EPS Bearer Context Request message (an ESM message).
  • the UE camps in an LTE cell and initiates an initial attachment procedure by sending an Initial Attach Request message 402 to the MME, including an embedded PDN Connectivity Request EMM message corresponding to message 302 in FIG. 3 .
  • the MME replies with an Attach Accept message 404 with an embedded Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for a default EPS bearer allowing the UE to access an Internet APN.
  • the Attach Accept message further incorporates a new IE which makes use of the ESM container contained in the Attach Accept EMM message to indicate the number of bearers still available to be established for the UE (in this example the maximum available bearers is two and so after establishing the default Internet APN EPS bearer the number remaining is one). Consequently, at point 406 the UE now knows that the network supports a maximum of two bearers in advance of attempting to request more than the maximum number of bearers, and can store the maximum number (by calculating the number of established bearers plus the number of remaining bearers). There is no precedent in PS networks for a mobile device to have this type of advance knowledge.
  • the UE replies with an Attach Complete message including an embedded Activate Default EPS Bearer Context Accept message to acknowledge the ESM and EMM parts of the Attach Accept message received from the MME, and at point 410 the Internet PDN connection is established for the UE.
  • the UE requests a new bearer for an IMS connection. Now that there is one less bearer than the maximum available number of bearers, at 416 the UE sends a PDN Connectivity Request message requesting a bearer for a connection to an IMS PDN.
  • the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information including a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer.
  • QoS Quality of Service
  • the Activate Default EPS Bearer Context Request message incorporates a new IE which makes use of the ESM container contained in the Activate Default EPS Bearer Context Request message to indicate the number of bearers still available to be established for the UE (the number remaining is now none).
  • the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information.
  • the UE is now aware that no further bearers can be established.
  • an IMS PDN connection is established.
  • the UE retrieves the stored maximum number of bearers which was calculated when the network was able to establish the last bearer and determines that no further bearers can be established.
  • the remainder of the steps of FIG. 4 correspond directly to the correspondingly numbered steps of FIG. 3 , and so will not be described again.
  • an IE indicating the number of remaining bearers available for allocation in an Activate Dedicated EPS Bearer Context Request ESM message when a UE requests a dedicated bearer by sending a Bearer Resource Allocation Request message including an EPS bearer identity for the associated default bearer.
  • the IEs in the Activate Default EPS Bearer Context Request messages and the Activate Dedicated EPS Bearer Context Request messages may inform the UE of the maximum number of bearers allows by the MME (as for the first embodiment of the invention) in place of the remaining number of bearers.
  • the second embodiment of the invention requires modification to the NAS protocol described in 3GPP TS 24.301.
  • the Activate Default EPS Bearer Context Request message and the Activate Dedicated EPS Bearer Context Request message described in sections 8.3.6.1 and 8.3.3.1 of 3GPP TS 24.301 respectively require modification.
  • these messages are sent by the MME to the UE to request activation of a default EPS bearer context or a dedicated EPS bearer context associated with the same PDN address and APN as an already existing default EPS bearer.
  • Tables 8.3.6.1 and 8.3.3.1 respectively of 3GPP TS 24.301 define the IEs present within the messages.
  • Attach Accept message described in section 8.3.6.1 of 3GPP TS 24.301 requires modification.
  • a further IE with the identifier “Number of bearers left” or “Maximum number of bearers” is added.
  • Activate PDP Context Accept and Activate Secondary PDP Context Accept messages may be provided to the MS through Activate PDP Context Accept and Activate Secondary PDP Context Accept messages.
  • the Activate PDP Context Accept message and Activate Secondary PDP Context Accept message are defined in sections 9.5.2 and 9.5.5 of 3GPP TS 24.008 respectively, which define the IEs present within those messages.
  • a further IE with the identifier “Number of bearers left” or “Maximum number of bearers” is added.
  • FIG. 5 a third embodiment of the present invention will now be described in which the UE obtains knowledge of the maximum number of EPS bearers which can be established for that UE through an IE in an Activate Default EPS Bearer Context Request message or an Activate Dedicated EPS Bearer Context Request message (that is, through ESM messaging).
  • the third embodiment of present invention is generally similar to the second embodiment of the invention except that instead of informing the UE of the remaining number of bearers that can be established (or the maximum number that can be established) the UE is only informed when the last available bearer has been established.
  • FIG. 5 a third embodiment of the present invention will now be described in which the UE obtains knowledge of the maximum number of EPS bearers which can be established for that UE through an IE in an Activate Default EPS Bearer Context Request message or an Activate Dedicated EPS Bearer Context Request message (that is, through ESM messaging).
  • the third embodiment of present invention is generally similar to the second embodiment of the invention except that instead of
  • FIG. 5 shows the Activate Default EPS Bearer Context Request or Activate Dedicated EPS Bearer Context Request messages as standalone ESM messages, in the event that the network only allows one bearer, then the last available bearer indication is included in the Activate Default EPS Bearer Context Request included in the ESM container of an Attach Accept EMM message.
  • sending an indication that the last bearer has been allocated avoids the need for the UE to receive (or calculate from the number of bearers remaining indication) and store the maximum amount of bearers before the maximum has been reached.
  • the MME supports a maximum of three bearers.
  • the UE is attached with an Internet PDN connection is established (such that one the available bearers has been used up).
  • the UE requests a new bearer for an IMS connection.
  • the UE sends a PDN Connectivity Request message requesting a bearer for a connection to an IMS PDN.
  • the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information including a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer.
  • QoS Quality of Service
  • no information regarding the available bearers is included in message 508 as the last bearer has not been established.
  • the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. The UE is not yet aware of how many bearers remain to be established.
  • the UE requests a new bearer for a Multimedia Messaging System (MMS) connection.
  • MMS Multimedia Messaging System
  • the UE sends a PDN Connectivity Request message requesting a bearer for a connection to an MMS PDN.
  • the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information including a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer.
  • QoS Quality of Service
  • the Activate Default EPS Bearer Context Request message incorporates a new IE which makes use of the ESM container contained in the Activate Default EPS Bearer Context Request message to indicate that the last remaining bearer has been established for the UE.
  • the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information.
  • the UE is now aware for the first time that no bearers remain to be established, and the UE can determine that the maximum number of bearers available for the UE is equal to the number of currently established bearers.
  • the same use is made of an IE indicating that the last remaining bearer has been allocated in an Activate Dedicated EPS Bearer Context Request message when a UE requests a dedicated bearer by sending a Bearer Resource Allocation Request message including an EPS bearer identity for the associated default bearer.
  • the third embodiment of the invention requires modification to the NAS protocol described in 3GPP TS 24.301.
  • the Activate Default EPS Bearer Context Request message and the Activate Dedicated EPS Bearer Context Request message described in sections 8.3.6.1 and 8.3.3.1 of 3GPP TS 24.301 respectively require modification.
  • these messages are sent by the MME to the UE to request activation of a default EPS bearer context or a dedicated EPS bearer context associated with the same PDN address and APN as an already existing default EPS bearer.
  • Tables 8.3.6.1 and 8.3.3.1 respectively of 3GPP TS 24.301 define the IEs present within the messages.
  • a further IE with the identifier “Last context activated” is added.
  • a Notification message in accordance with section 8.3.18A of 3GPP TS 24.301 may be used to indicate to the UE that the network has reached the maximum number of available bearers (that is, the last remaining bearer has been allocated).
  • a Notification message may be used instead of informing the UE in an Activate Default EPS Bearer Context Request message or Activate Dedicated EPS Bearer Context Request message.
  • a Notification message is a separate ESM message, and its use in this context requires the specification of a new cause value.
  • Activate PDP Context Accept and Activate Secondary PDP Context Accept messages may be provided to the MS through Activate PDP Context Accept and Activate Secondary PDP Context Accept messages.
  • the Activate PDP Context Accept message and Activate Secondary PDP Context Accept message are defined in sections 9.5.2 and 9.5.5 of 3GPP TS 24.008 respectively, which define the IEs present within those messages.
  • a further IE with the identifier “Last context activated” is added.
  • a solution which does not require knowledge at the UE is provided by allowing the network to arbitrarily deactivate a bearer in order to accommodate a requested bearer if the maximum number of bearers has already been established.
  • a non-emergency bearer may be deactivated in order to accommodate an emergency PDN connection.
  • the UE does not need to know that the network has reached the maximum permitted number of bearers until the UE attempts to establish a further PDN connection.
  • the fourth embodiment of the invention does not require any modifications to TS 24.301, and in particular no modifications to EMM or ESM signaling messages between the UE and the MME. After the emergency call has ended a tracking area update procedure can be initiated to resynchronize the bearers between the UE and the MME.
  • the MME supports a maximum of two PDN connections per UE.
  • the UE has already established an Internet PDN connection and an IMS PDN connection, and so the maximum number of bearers has already been established.
  • the UE does not know how many bearers the network supports, and does not know that the maximum has been reached.
  • the user of the UE wishes to make an emergency call.
  • a service request procedure or a tracking area update procedure is performed to move the UE to EMM-CONNECTED state.
  • the UE sends a PDN Connectivity Request message to the MME requesting a further bearer for a connection to an emergency PDN. This corresponds to step 212 of FIG. 2 , in which according to conventional LTE networks the MME responds with a PDN Connectivity Reject message.
  • the MME arbitrarily and locally deactivates a non-emergency PDN connection without notifying the UE to allow the emergency PDN connection to the activated straightaway even though the UE is in the EMM-CONNECTED state.
  • the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer.
  • the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information.
  • the emergency call is established. The UE remains unaware that a bearer has been deactivated. However, the Activate Default EPS Bearer Context Request message includes an indication that a synchronization of bearer contexts procedure is required.
  • the Activate Default EPS Bearer Context Request message described in section 8.3.6.1 of 3GPP TS 24.301 requires modification.
  • Table 8.3.6.1 of 3GPP TS 24.301 defines the IEs present within the message.
  • a further IE with the identifier “Synchronization of contexts required” is added.
  • the emergency call ends.
  • a bearer context synchronization procedure takes place by the UE sending a Tracking Area Update message and the MME responding with a Tracking Area Update Accept message.
  • the network could instead send an ESM Status message containing the EPS bearer id that was deactivated by the network.
  • the ESM Status message is described in section 8.3.15 of 3GPP TS 24.301. Table 8.3.15.1 of 3GPP TS 24.301 defines the IEs present within the message.
  • the ESM Status message is already equipped to allow the inclusion of an EPS bearer id, but requires modification to create a new cause code “Bearer Deactivated Locally by Network”.
  • the UE In response to receiving the ESM Status message the UE locally deactivates the bearer indicated in the ESM status message.
  • a deactivate bearer procedure can be initiated during or after the emergency call.
  • TS 24.301 There is no precedent in TS 24.301 for the network to arbitrarily deactivate an EPS bearer in this way, and no precedent in any PS network for minimizing delays in establishing bearers in this way, and particularly bearers for emergency calls.
  • Steps 602 to 612 are the same as for FIG. 6 .
  • the Activate Default EPS Bearer Context Request message gives no indication that a synchronization of bearer contexts procedure is required.
  • the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer.
  • the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information.
  • the emergency call is established. The UE remains unaware that a bearer has been deactivated.
  • the MME sends a Deactivate EPS Bearer Context Request message to the UE at step 710 indicating which bearer has been deactivated, and the UE updates its locally stored list of bearers and responds at step 712 with a Deactivate EPS Bearer Context Accept message.
  • the explicit deactivation request could be sent in parallel to the emergency call setup. There is no need for synchronization between the setup of the PDN connection and the deactivation.
  • the fifth embodiment of the invention requires no changes to LTE protocols to implement and so may be the preferred implementation option for MME vendors.
  • a synchronization of contexts required procedure may be initiated by the network through Activate PDP Context Accept and Activate Secondary PDP Context Accept messages used to synchronize the bearers (PDP contexts) between an MS and the Serving GPRS Support Node (SGSN).
  • PDP contexts bearers
  • SGSN Serving GPRS Support Node
  • this synchronization may be performed by the network sending a Deactivate PDP Context Request message.
  • the present invention may be implemented in any PS mobile communication system where corresponding bearer management issues arise.
  • the present device is applicable to any PS mobile wireless communications network in which a mobile device (LTE: UE) communicates with a network node, or an external network or server (LTE: P-GW) through a bearer (LTE: EPS bearer) and a limited, unknown number of bearers can be established for that mobile device, and signaling messages are exchanged between the mobile device and a network node (LTE: MME).
  • embodiments of the present invention can be realized in the form of hardware, software or a combination of hardware and software. Any such software may be stored in the form of volatile or non-volatile storage, for example, a storage device like a ROM, whether erasable or rewritable or not, or in the form of memory, for example, RAM, memory chips, device or integrated circuits or on an optically or magnetically readable medium, for example, a CD, DVD, magnetic disk or magnetic tape or the like. It will be appreciated that the storage devices and storage media are embodiments of machine-readable storage that are suitable for storing a program or programs comprising instructions that, when executed, implement embodiments of the present invention.
  • embodiments provide a program comprising code for implementing apparatus or a method as claimed in any one of the claims of this specification and a machine-readable storage storing such a program. Still further, such programs may be conveyed electronically via any medium including a communication signal carried over a wired or wireless connection and embodiments suitably encompass the same.

Abstract

A method is provided of establishing a bearer in a packet switched mobile wireless network comprising a mobile device and a network node, and a corresponding network. Bearer information is sent indicating predetermined maximum number of bearers, remaining number of bearers, or that no more bearers can be established. If no more bearers can be established and a further bearer is required, a previously established bearer is released. If required, a bearer synchronization procedure is performed. A further bearer is then established or, if the mobile device determines that an emergency connection is required, a request is sent for a further bearer to the network node. If a current number of bearers established for the mobile device equals the maximum number of bearers, the network node releases a previously established bearer establish a bearer for an emergency connection.

Description

    PRIORITY
  • This application is a Divisional application of U.S. application Ser. No. 14/652,661, filed with the U.S. Patent and Trademark Office on Jun. 16, 2015, which is allowed, and which is a National Phase Entry of PCT International Application No. PCT/KR2013/011857, which was filed on Dec. 19, 2013, and claims priority to United Kingdom Patent Application No. 1222906.8, which was filed on Dec. 19, 2012, the contents of each of which are incorporated herein by reference.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to bearer management in a packet switched (PS) mobile communications network. Embodiments of the invention may be implemented in a 3rd Generation Partnership Project (3GPP) compliant mobile communications system comprising User Equipment (UE) and network equipment. In particular, embodiments of the present invention may be implemented in a 3GPP Long Term Evolution (LTE) and LTE Advanced compliant PS network, though the present invention is not limited to any particular PS network technology. Embodiments of the present invention address issues which arise when the maximum number of bearers that the network supports has already been reached but the UE is unaware of this fact when a further bearer is requested by the UE. This situation can arise when a UE attempts to establish an emergency call causing the network to reject the request. This causes the UE to request explicit deactivation of a bearer before retrying the establishment of the emergency call. This process delays the establishment of the emergency call. Emergency calls are subject to strict rules and regulation in certain jurisdictions, and emergency calls should be established and routed to Public Safety Answering Points (PSAPs) as quickly as possible to avoid delay and possible litigation because of any delays incurred.
  • 2. Description of the Related Art
  • 3GPP design, specify and standardize technologies for mobile (cellular) wireless communications s. Specifically 3GPP produces a series of technical reports (TR) and technical specifications (TS) that define 3GPP technologies. The focus of 3GPP is currently the specification of standards beyond the 3rd Generation (3G) of mobile networks, and in particular an Evolved Packet System (EPS) offering enhancements over 3G networks, in particular higher data rates. The set of specifications for the EPS comprises two work items: Systems Architecture Evolution (SAE, concerning the core network) and LTE concerning the air interface. The first set of EPS specifications were released as 3GPP Release 8 in December 2008. Despite LTE strictly referring only to the air interface, LTE is commonly used to refer to the whole of the EPS, including by 3GPP themselves. LTE is used in this sense in the remainder of this specification. LTE enhancements, including LTE Advanced offering still higher data rates compared to LTE, have followed up to and including 3GPP Release 11 in September 2012. LTE Advanced is considered to be a 4th generation (4G) mobile communication system by the International Telecommunication Union (ITU). LTE is an evolution of the 3GPP 3G Universal Mobile Telecommunication System (UMTS) and shares certain high level components and protocols with UMTS. A key difference is that whereas UMTS allows for both PS and Circuit Switched (CS) data transfer, with CS being used for voice calls, LTE is a wholly PS system for the delivery of packet data, regardless of the content of the data packets.
  • As noted above, the present invention is not limited to LTE. However, particular embodiments of the present invention may be implemented within an LTE mobile network and detailed descriptions of embodiments of the invention are presented in the context of an LTE network. Therefore, an overview of an LTE network is shown in FIG. 1. The LTE system comprises three high level components: at least one UE 102, an Evolved UMTS Terrestrial Radio Access Network (E-UTRAN) 104 and an Evolved Packet Core (EPC) 106. The EPC 106 communicates with Packet Data Networks (PDNs) and servers 108 in the outside world. FIG. 1 shows the key component parts of the EPC 106. It will be appreciated that FIG. 1 is a simplification and a typical implementation of LTE will include further components. In FIG. 1 interfaces between different parts of the LTE system are shown. The double ended arrow indicates the air interface between the UE 102 and the E-UTRAN 104. For the remaining interfaces media is represented by solid lines and signaling is represented by dashed lines.
  • The UE 102 comprises a communication device, referred to as Mobile Equipment (ME) and a Universal Integrated Circuit Card (UICC) which is a smart card, commonly referred to as the Subscriber Identity Module (SIM) card. The UICC stores identification information which uniquely identifies the UE user.
  • The E-UTRAN 104 comprises a single type of component: the evolved Node B (eNB) which is responsible for handling radio communications between the UE 102 and the EPC 106 across the air interface. An eNB is a base station that controls UEs 102 in one or more cell. Typically there is a plurality of eNBs within an LTE system, and the eNBs comprising the E-UTRAN are connected to the EPC 106.
  • Key components of the EPC 106 are shown in FIG. 1. It will be appreciated that in an LTE network there may be more than one of each component according to the number of UEs 102, the geographical area of the network and the volume of data to be transported across the network. Data traffic is passed between each eNB and a corresponding Serving Gateway (S-GW) 110 which routes data between the eNB and a PDN Gateway (P-GW) 112. The P-GW 112 is responsible for connecting a UE to one or more servers or PDNs 108 in the outside world. The Mobility Management Entity (MME) 114 controls the high-level operation of the UE 102 through signaling messages exchanged with the UE 102 through the E-UTRAN 104. Each UE is registered with a single MME. There is no direct signaling pathway between the MME 114 and the UE 102 (communication with the UE 102 being across the air interface via the E-UTRAN 104). The air interface can be considered to be split into two levels: the Access Stratum (AS) and the Non Access Stratum (NAS). Signaling messages between the MME 114 and the UE 102 are transported via the NAS protocol. Signaling messages between the MME 114 and the UE 102 comprise EPS Session Management (ESM) protocol messages controlling the flow of data from the UE to the outside world and EPS Mobility Management (EMM) protocol messages controlling the rerouting of signaling and data flows when the UE 102 moves between eNBs within the E-UTRAN. The MME 114 exchanges signaling traffic with the S-GW 110 to assist with routing data traffic. The MME 114 also communicates with a Home Subscriber Server (HSS) 116 which stores information about users registered with the network.
  • An LTE system transports data from one part of the system to another via bearers. The most important bearer from the perspective of an end user is the EPS bearer between a UE 102 and a P-GW 112. The EPS bearers are responsible for transporting data between the UE 102 and servers and PDNs outside of the EPC 106. In the remainder of this specification the term “bearer” will be used generically (including EPS bearers) to refer to any bearer between the UE 102 and another part of the LTE network, and in particular part of the EPC.
  • A bearer may be considered to be a logical or virtual connection between two end points. A bearer may also be considered to be a data pipe between two such end points. Each bearer may be defined in terms of minimum Quality of Service (QoS), minimum data rate, maximum error rate and maximum delay. In an LTE network, for each UE 102 when the UE first registers with the network, it either connects to a PDN for the default Access Point Name (APN), which is configured in the HSS, or it connects to a PDN for an APN provided by the UE at time of Attach. On establishing a standalone PDN connection, a default EPS bearer is established between the UE and a selected P-GW 112. Additional PDN connections may later be established between the UE 102 and alternative P-GWs 1125, which results in the establishment of further default EPS bearers for these PDN connections. Dedicated bearers may be established by the EPC between the UE 102 and a P-GW 112 for which there exists a default bearer, for instance in order to establish a data flow with a higher QoS or minimum bit rate.
  • A UE 102 requests a new bearer for a new data communication session if the required service cannot be provided upon the default bearer. This includes when establishing a new voice call. An LTE network, and in particular an MME 114 responsible for that UE 102, can only support a limited number of bearers per UE 102. This maximum number of bearers per UE 102 is defined by the LTE specifications based on a protocol limitation defined in sub-clause 11.2.3.15 of 3GPP Technical Specification 24.007 version 11.0.0 Release 11, “Group Core Network and Terminals; Mobile Radio Interface Signaling Layer 3; General Aspects” available from http://www.3gpp.org. The maximum number of bearers in theory cannot exceed 11. For a General Packet Radio Service (GPRS) network, the corresponding limit on Packet Data Protocol (PDP) contexts is defined in sub-clause 10.5.6.2 of 3GPP Technical Specification 24.008 version 11.4.0 Release 11, “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Mobile radio interface Layer 3 specification; Core network protocols; Stage 3” available from http://www.3gpp.org. However, in practice this limit can vary widely between different LTE implementations. However, as defined by the existing LTE specifications, a UE 102 knows only the number of active bearers that it has established with the network, and not the maximum number of available bearers. Referring now to FIG. 2, this illustrates a situation in which the maximum number of bearers for a UE 102 has already been reached, and the UE 102 requests a further bearer. In particular, FIG. 2 illustrates a situation in which the UE 102 requests a further bearer in order to allow a user to make an emergency voice call.
  • FIG. 2 shows signaling messages exchanged between a UE 102 and the associated MME 114 with which the UE 102 is registered. As noted at 202, the UE has already established a default bearer for a connection to an external PDN (the internet) and a default bearer for a connection to an IP Multimedia Subsystem (IMS). IMS is a separate 3GPP specified network communicating with the EPC for handling real time IP multimedia services for example Voice over IP (VoIP), which is used by LTE for voice calls. As noted at 204 the MME supports a maximum of two bearers per UE. It will be appreciated that in an operational LTE network the maximum number of bearers may be significantly higher. The UE is not aware that the MME supports a maximum of 2 bearers, and that the maximum has already been reached.
  • As noted at 206, the UE and the MME are initially in an EMM-IDLE state. This represents a state in which there is no NAS signaling connection between the UE and the network. It will be appreciated that in an alternative scenario the UE may initially be in the EMM-connected state (that is, in a state in which there is a NAS signaling connection between the UE and the network).
  • At 208 the user of the UE wishes to make an emergency voice call and takes the necessary action at the UE to cause the UE 102 to request a further bearer. At 210 the UE sends a Service Request message to the MME. The service request message is an EMM message forming part of the service request procedure which takes place when the UE is in the EMM-IDLE state but wishes to communicate with the network. The service request message requests that the MME moves the UE to the EMM-CONNECTED state. At 212 the UE then sends a PDN Connectivity Request message to the MME. The PDN Connectivity Request message is an ESM message which asks the network to establish a bearer for a connection to an emergency PDN. Note that if the UE was already in EMM-CONNECTED state, then step 210 is omitted.
  • At 214 the MME responds with a PDN Connectivity Reject message including an error code indicating that the maximum number of bearers supported by the MME for that UE has already been reached (error code #65). Error code #65 is defined as the max number of EPS bearers per Public Land Mobile Network (PLMN). This error code is specified in section 6.5.1.4 of 3GPP Technical Specification 24.301 version 11.4.0 Release 11, “Universal Mobile Telecommunications System (UMTS); LTE; Non-Access-Stratum (NAS) protocol for Evolved Packet System (EPS); Stage 3” available from http://www.3gpp.org. Section 6.5.1.4 of TS 24.301 specifies ESM error codes in the event that a PDN Connectivity Request cannot be accepted by the network. The UE can then determine the network's maximum number of EPS bearers. This can be stored at the UE, though will be released if the UE is switched off, or the USIM is erased. This is the first time at which the UE becomes aware of the maximum number of bearers supported by the MME.
  • In order to make the emergency call, the UE performs explicit deactivation of one of the established PDN connections. Specifically, the UE sends a PDN Disconnect Request message 216 to the MME. The MME then sends a Deactivate EPS Bearer Context Request message 218 from, to which the UE responds with a Deactivate EPS Bearer Context Accept message 220. Now that there is one less bearer than the maximum available number of bearers, at 222 the UE again sends the PDN Connectivity Request message requesting a bearer for a connection to an emergency PDN. This time, at 224 the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information, for example a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer. At 226 the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. Messages 222 to 226 are ESM messages. At 228 the emergency PDN connection has been established and the emergency voice call can take place.
  • It will be appreciated that FIG. 2 is a simplification of signaling messages sent between the UE and the MME, and in particular the encapsulation of EMM and ESM messages within other lower layer protocols between the UE and the E-UTRAN, or between the E-UTRAN and the MME, has been omitted.
  • The PDN Connectivity Request message sent from the UE to the MME at 212 identifies an Access Point Name (APN) and PDN type for the requested bearer, together with further Information Elements (IEs) specifying information specific to the requested PDN connection. Sections 6.5.1.4A and 6.5.1.6 of 3GPP TS 24.301 note that as an exception even if the maximum number of bearers has already been established for the UE, if a further PDN Connectivity Request message is received with the same combination of APN and PDN type as an existing, non-emergency PDN connection then the further PDN Connectivity Request message can be accepted under two limited circumstances.
  • The first circumstance is if all of the IEs in the further PDN Connectivity Request message exactly match those within a previous PDN Connectivity Request message and the MME has not received the Activate Default EPS Bearer Context Accept message 226 from the UE. This relates to a situation in which an Activate Default EPS Bearer Context Request message 224 sent by the MME in response to the earlier PDN Connectivity Request message was not received by the UE, such that the UE has resent the PDN Connectivity Request message. This is a limited error handling exception. Clearly this is of no benefit if the request for a further bearer is in order to make an emergency call (and not to retry a non-emergency call).
  • The second circumstance is if the IEs do not match, and the APN does not support multiple PDN connections. The MME may optionally either deactivate the existing EPS bearer context for the earlier PDN connection locally without notification to the UE and proceed with the requested PDN connectivity procedure, or the MME may respond with error code #55 “multiple PDN connections for a given APN not allowed”. This second circumstance relates to a situation in which the UE has an already established EPS bearer for a particular PDN connection and requests a similar EPS bearer with different operating parameters, for instance QoS or data rate. This cannot relate to an emergency call scenario as the APN is never included in the PDN connectivity request when establishing an emergency PDN connection. The emergency PDN connection is determined through configuration at the MME.
  • It will be appreciated that while the signaling illustrated in FIG. 2 allows a bearer to be requested even if the maximum number of bearers has already been allocated, this is at the expense of unnecessary delay due to the UE having no knowledge of the maximum number of available bearers. Specifically, messages 212 and 214 are sent in order to advise the UE that the maximum number of bearers has already been reached. This results in a delay at the time of requesting the new bearer, largely due to the inherent delay for each signal transmitted across the air interface to and from the E-UTRAN. There has been significant effort to minimize all sources of delay within LTE systems, particularly where real time services including voice calls are concerned. However, delays persist if the maximum number of bearers has already been established. It will be appreciated that the source of delay described above in connection with FIG. 2 applies to all bearer requests. However, establishing an emergency call is particularly time sensitive, especially if a delay is sufficiently long that it is perceptible to the end user. Therefore, throughout the remainder of the present specification the example of establishing an emergency call will used.
  • As noted above, the present invention is broadly applicable to PS systems, and is not limited to LTE. Specifically, the present invention is applicable in any PS system in which connections from a mobile device to a server, network component or PDN comprise a logical or virtual connection or data pipe, and the maximum number of such connections is limited. For instance in 2nd generation (2G)/3G networks based on Global System for Mobile Communications (GSM) or UMTS, in the PS domain the equivalent of an EPS bearer is a PDP context. PDP contexts appear generally the same as EPS bearers from the perspective of the Mobile Station (MS, the equivalent of an LTE UE). One difference is that whereas a default EPS bearer is requested by the MS when registering with the EPC, a PDP context is only requested when the MS wishes to communicate with a server or a PDN in the outside world.
  • The number of PDP contexts that can be established for a single UE is limited, and not known to the MS. Section 6.1.3.0 of 3GPP TS 24.008 specifies how the maximum number of PDP contexts for an MS is determined. Similarly to the situation illustrated for LTE in FIG. 2, upon receipt of an Activate PDP Context Request Message the network may respond with an activate PDP context reject message with error code # “maximum number of PDP contexts reached”.
  • Similarly to the exceptions described above in connection with FIG. 2, section 6.1.3.1.5 part (c) of 3GPP TS 24.008 notes that if an MS initiates a PDP context activation request for an already activated PDP context and all of the details of the request match exactly then the existing activated PDP context is deactivated locally within the network and the network proceeds with the requested PDP context activation. This situation relates to a limited error handling situation in which the MS did not receive the response to the original Activate PDP Context Request message. Alternatively, if the details of the new Activate PDP Context Request Message do not match an existing activated PDP context, but the Network layer Service Access Point Identifier (NSAPI) does match that of an existing PDP context then the network will deactivate the existing PDP context locally within the network and the network proceeds with the requested PDP context activation. Clearly the requirement for the NSAPI to match means that this exception only applies in the event the MS wishes to reinitialize the same PDP context for a unique data session, and is of not benefit in the event that the MS wishes to open a new data session. In the majority of instances, if a further Activate PDP Context Request message is received when the maximum number of PDP contexts has been reached the request causes error code #65 to be returned. Furthermore, these exceptions do not apply to a new Activate PDP Context Request Message with request type “emergency” and there is already a PDN connection for emergency bearer services existing. The trigger for the UE to reuse the same NSAPI and different combination of APN, PDP type and PDP address can arise when the UE itself has reached its maximum number of bearers or when the UE knows that the network has reached its maximum number of bearers. However, this does not apply when the network has reached the maximum number of bearers and the UE does not know that (and the UE has not reached its maximum). Thus, the UE has no cause to reuse an existing NSAPI.
  • The term “bearer” is used in connection with the present invention to refer to any logical or virtual connections between a UE and a component of a mobile communications network or an external server or PDN, and should not be considered to refer only to the particular forms of bearers defined in connection with LTE, despite embodiments of the present invention being described in detail in connection with LTE.
  • SUMMARY OF THE INVENTION
  • It is an aim of embodiments of the present invention to obviate or mitigate one or more of the problems associated with the prior art, whether identified herein or elsewhere. In particular, it is an aim of certain embodiments of the present invention to minimize delay when establishing a new emergency call in a PS network when the maximum number of bearers allowed by the network for the UE has already been established (and the UE is not aware of this).
  • An aspect of the present invention provides a method of establishing a bearer in a packet switched mobile wireless communications network comprising a mobile device and a network node, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, the method comprising: determining at the mobile device that an emergency PDN connection is required; and sending a request for a further bearer from the mobile device to the network node; wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises: releasing, at the network node, a bearer previously established for the mobile device within the network; and establishing a bearer for an emergency PDN connection for the mobile device within the network.
  • According to an eighth aspect of the present invention there is provided a method of establishing a bearer within a network node in a packet switched mobile wireless communications network which further comprises a mobile device, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, the method comprising: receiving a request for a further bearer from the mobile device; wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises: releasing a bearer previously established for the mobile device within the network; and establishing a bearer for an emergency PDN connection for the mobile device within the network.
  • Another aspect of the present invention provides a method of establishing a bearer within a network node in a packet switched mobile wireless communications network which further comprises a mobile device, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, with the method comprising receiving a request for a further bearer from the mobile device, wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises: releasing a bearer previously established for the mobile device within the network; and establishing a bearer for an emergency PDN connection for the mobile device within the network.
  • An advantage of embodiments of the present invention is that the time to request a bearer is minimized. In particular, embodiments of the present invention help to minimize delays in setting up emergency calls. Another aspect of the invention provides a computer program comprising instructions arranged, when executed, to implement a method and/or apparatus in accordance with any one of the above-described aspects. A further aspect provides machine-readable storage storing such a program.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description in conjunction with the accompanying drawings, in which:
  • FIG. 1 schematically illustrates an overview of an LTE mobile communication network;
  • FIG. 2 illustrates signaling messages exchanged between a UE and an MME in an LTE network illustrating the delay that arises when the maximum number of bearers for a UE has already been established and a further bearer is requested, according to conventional LTE systems;
  • FIG. 3 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the UE obtains information about the maximum number of bearers supported by the MME, in accordance with a first embodiment of the invention;
  • FIG. 4 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the UE obtains information about the maximum number of bearers supported by the MME, in accordance with a second embodiment of the invention;
  • FIG. 5 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the UE obtains information about the maximum number of bearers supported by the MME, in accordance with a third embodiment of the invention;
  • FIG. 6 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the MME arbitrarily and locally deactivates a non-emergency PDN connection, in accordance with a fourth embodiment of the invention; and
  • FIG. 7 illustrates signaling messages exchanged between a UE and an MME in an LTE network in which the MME arbitrarily and explicitly deactivates a non-emergency PDN connection, in accordance with a fifth embodiment of the invention.
  • DETAILED DESCRIPTION OF EMBODIMENTS OF THE PRESENT INVENTION
  • Embodiments of the present invention are described in detail with reference to the accompanying drawings. The same reference numbers are used throughout the drawings to refer to the same or like parts. Detailed description of well-known functions and structures incorporated herein may be omitted to avoid obscuring the subject matter of the present invention.
  • The present inventor has identified that there are two main approaches to addressing the problem identified above associated with delay when requesting a new bearer. In particular, the present inventor has identified that there are two main approaches to minimizing sources of delay when making an emergency call in a PS network. The first approach is to allow the mobile device to have knowledge of the maximum number of bearers. For the example of an LTE network, the first approach requires that the UE is kept aware by NAS protocol messages either about the number of bearers which the MME can accommodate, the number of bearers left that could be established or at the point at which the MME cannot establish any more bearers. Consequently, the UE can pre-emptively take action to locally release a bearer before the UE tries to request a further bearer over the maximum available. The second approach operates upon the network side and does not require the mobile device to have knowledge about the maximum number of bearers. For the example of an LTE network, the second approach requires that the network takes action to arbitrarily select a bearer to deactivate. Under the second approach, for an LTE network, although the MME is in an EMM-CONNECTED state, it locally deactivates an EPS bearer and either informs the UE that it needs to send a Tracking Area Update message to synchronize the bearers at the UE and the MME or the MME sends an ESM status message to the UE with the bearer identification of the locally deactivated bearer, requiring the UE to locally deactivate this bearer. Alternatively, the MME sends an explicit EPS bearer deactivation message before/after the emergency PDN connection has been established. A number of embodiments of the invention falling under either the first or second approach will now be described in connection with an example of an LTE network.
  • In accordance with a first embodiment of the invention a solution requiring knowledge at the UE is provided for an LTE network though LTE EMM messaging. The first embodiment requires that the MME incorporates an information element (IE) in Attach Accept and Tracking Area Update Accept EMM messages indicating the maximum number of EPS bearers which can be established for that UE.
  • Referring now to FIG. 3, at step 302 the UE camps in an LTE cell and initiates an initial attachment procedure by sending an Initial Attach Request message 302 to the MME, including an embedded PDN Connectivity Request ESM message corresponding to message 212 in FIG. 2. In response the MME replies with an Attach Accept message 304 with an embedded Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for a default EPS bearer allowing the UE to access an Internet APN. In accordance with the first embodiment of the invention the Attach Accept message further incorporates a new IE indicating the maximum number of EPS bearers that may be established for the UE (in this example two). Consequently, at point 306 the UE now knows that the network supports a maximum of two bearers in advance of attempting to request more than the maximum number of bearers, and can store the maximum number at this point. There is no precedent in PS networks for a mobile device to have this type of advance knowledge. At step 308 the UE replies with an Attach Complete message including an embedded Activate Default EPS Bearer Context Accept message to acknowledge the ESM and EMM parts of the Attach Accept message received from the MME, and at point 310 the Internet PDN connection is established for the UE.
  • At a later point the UE selects a new cell in a new tracking area with which it was not previously registered causing the UE to send a Tracking Area Update message to the MME at step 312. The MME responds with a Tracking Area Update Accept message 314. In accordance with the first embodiment of the invention the Tracking Area Update Accept message 314 further incorporates a new IE indicating the maximum number of EPS bearers that may be established for the UE (in this example two). It will be appreciated that if the MME changes as a result of the UE changing to a new tracking area then the maximum number of bearers may also change necessitating the retransmission of this information in the Tracking Area Accept message 314.
  • At steps 316 to 320 the UE requests a new bearer for an IMS connection. This request for a bearer follows the process described above in connection with FIG. 2 at steps 222 to 226, differing only in the details of the requested bearer, and so will not be described in detail. At point 322 an IMS PDN connection is established.
  • At point 324 the user wishes to make an emergency call. As the UE already has knowledge of the maximum number of bearers, and so is aware that the maximum has now been reached, at point 326 the UE can locally release a non-emergency bearer. At point 328 the UE and the MME perform a Tracking Area Update Procedure to resynchronize the EPS bearers. At point 330 the UE and the MME can then establish the Emergency PDN connection as described in connection with FIG. 2 at steps 222 to 226.
  • It will be appreciated that in accordance with the first embodiment of the invention the delay described in connection with steps 212 to 214 of FIG. 2 does not arise. This is achieved through sending the maximum bearer information as an IE within EMM messages.
  • It will be appreciated that the first embodiment of the invention requires modification to 3GPP Attach and Tracking Area Update procedures described in 3GPP TS 24.301. Specifically, the Attach Accept message and the Tracking Area Update Accept messages described in sections 8.3.6.1 and 8.3.3.1 of 3GPP TS 24.301 respectively require modification. Tables 8.2.1.1 and 8.2.26.1 respectively of 3GPP TS 24.301 define the IEs present within the messages. According to the first embodiment of the invention, a further IE with the identifier “Maximum number of bearers” is added.
  • As an example of the applicability of the first embodiment of the invention to alternative PS networks, for a General Packet Radio Service (GPRS) network in accordance with 3GPP TS 24.008 a Routing Area Update message is used to synchronize the bearers (PDP contexts) between an MS and the Serving GPRS Support Node (SGSN) and information about the maximum number of available PDP contexts may be incorporated into Attach Accept and Routing Area Update Accept messages. The Attach Accept message and the Routing Area Update Accept message are defined in sections 9.4.2 and 9.4.15 of 3GPP TS 24.008 respectively, which define the IEs present within those messages. According to the first embodiment of the invention, a further IE with the identifier “Maximum number of bearers” is added.
  • In accordance with further embodiments of the invention a solution requiring knowledge at the UE is provided for an LTE network though LTE ESM messaging. In contrast to the first embodiment of the invention, the UE may be informed how many bearers are left available for that UE each time a bearer is established. Alternatively, the UE only obtains knowledge of the maximum number of EPS bearers which can be established for that UE at the time of establishing the last available bearer, but before the UE requests a further bearer. This information may be included when establishing the bearer or may be included outside of the dialog of establishing a bearer. When included as part of establishing a bearer, this may be through the inclusion of an IE in an Activate Default EPS Bearer Context Request (as a standalone ESM message and included within the ESM container of the Attach Accept EMM message) or an Activate Dedicated EPS Bearer Context Request ESM message. When included outside of the dialog of establishing a bearer, an ESM Notification message is sent indicating the number of remaining EPS bearers which can be established for that UE, or whether the last bearer has been established. It will be appreciated that for concurrent requests for bearers the UE may only be able to evaluate the maximum number of bearers or the number remaining once all outstanding requests are completed. The ESM Notification message may alternatively indicate that no further bearers can be established for the mobile device in the network, or the maximum number of available bearers.
  • Referring now to FIG. 4, a second embodiment of the present invention will now be described in which the UE obtains knowledge of the maximum number of EPS bearers which can be established for that UE through an IE in an Attach Accept message (that is, through ESM level information within an EMM message) or through an IE in an Activate Default EPS Bearer Context Request message (an ESM message). At step 402 the UE camps in an LTE cell and initiates an initial attachment procedure by sending an Initial Attach Request message 402 to the MME, including an embedded PDN Connectivity Request EMM message corresponding to message 302 in FIG. 3. In response the MME replies with an Attach Accept message 404 with an embedded Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for a default EPS bearer allowing the UE to access an Internet APN.
  • In accordance with the second embodiment of the invention (and in contrast to the first embodiment of the invention described in connection with FIG. 3) the Attach Accept message further incorporates a new IE which makes use of the ESM container contained in the Attach Accept EMM message to indicate the number of bearers still available to be established for the UE (in this example the maximum available bearers is two and so after establishing the default Internet APN EPS bearer the number remaining is one). Consequently, at point 406 the UE now knows that the network supports a maximum of two bearers in advance of attempting to request more than the maximum number of bearers, and can store the maximum number (by calculating the number of established bearers plus the number of remaining bearers). There is no precedent in PS networks for a mobile device to have this type of advance knowledge. At step 408 the UE replies with an Attach Complete message including an embedded Activate Default EPS Bearer Context Accept message to acknowledge the ESM and EMM parts of the Attach Accept message received from the MME, and at point 410 the Internet PDN connection is established for the UE.
  • At steps 412 to 416 the UE requests a new bearer for an IMS connection. Now that there is one less bearer than the maximum available number of bearers, at 416 the UE sends a PDN Connectivity Request message requesting a bearer for a connection to an IMS PDN. At 414 the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information including a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer. Additionally, in accordance with the second embodiment of the invention, the Activate Default EPS Bearer Context Request message incorporates a new IE which makes use of the ESM container contained in the Activate Default EPS Bearer Context Request message to indicate the number of bearers still available to be established for the UE (the number remaining is now none). At 416 the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. The UE is now aware that no further bearers can be established. At point 418 an IMS PDN connection is established.
  • In the event that the user of the UE now wishes to make an emergency call the UE retrieves the stored maximum number of bearers which was calculated when the network was able to establish the last bearer and determines that no further bearers can be established. The remainder of the steps of FIG. 4 correspond directly to the correspondingly numbered steps of FIG. 3, and so will not be described again.
  • In a further extension to the second embodiment of the invention, the same use is made of an IE indicating the number of remaining bearers available for allocation in an Activate Dedicated EPS Bearer Context Request ESM message when a UE requests a dedicated bearer by sending a Bearer Resource Allocation Request message including an EPS bearer identity for the associated default bearer.
  • As an alternative to the second embodiment of the invention, the IEs in the Activate Default EPS Bearer Context Request messages and the Activate Dedicated EPS Bearer Context Request messages may inform the UE of the maximum number of bearers allows by the MME (as for the first embodiment of the invention) in place of the remaining number of bearers.
  • It will be appreciated that the second embodiment of the invention requires modification to the NAS protocol described in 3GPP TS 24.301. Specifically, the Activate Default EPS Bearer Context Request message and the Activate Dedicated EPS Bearer Context Request message described in sections 8.3.6.1 and 8.3.3.1 of 3GPP TS 24.301 respectively require modification. As discussed above, these messages are sent by the MME to the UE to request activation of a default EPS bearer context or a dedicated EPS bearer context associated with the same PDN address and APN as an already existing default EPS bearer. Tables 8.3.6.1 and 8.3.3.1 respectively of 3GPP TS 24.301 define the IEs present within the messages. Additionally, the Attach Accept message described in section 8.3.6.1 of 3GPP TS 24.301 requires modification. According to the second embodiment of the invention, a further IE with the identifier “Number of bearers left” or “Maximum number of bearers” is added.
  • As an example of the applicability of the second embodiment of the invention to alternative PS networks, for a General Packet Radio Service (GPRS) network in accordance with 3GPP TS 24.008 this information may be provided to the MS through Activate PDP Context Accept and Activate Secondary PDP Context Accept messages. The Activate PDP Context Accept message and Activate Secondary PDP Context Accept message are defined in sections 9.5.2 and 9.5.5 of 3GPP TS 24.008 respectively, which define the IEs present within those messages. According to the second embodiment of the invention, a further IE with the identifier “Number of bearers left” or “Maximum number of bearers” is added.
  • Referring now to FIG. 5, a third embodiment of the present invention will now be described in which the UE obtains knowledge of the maximum number of EPS bearers which can be established for that UE through an IE in an Activate Default EPS Bearer Context Request message or an Activate Dedicated EPS Bearer Context Request message (that is, through ESM messaging). The third embodiment of present invention is generally similar to the second embodiment of the invention except that instead of informing the UE of the remaining number of bearers that can be established (or the maximum number that can be established) the UE is only informed when the last available bearer has been established. Although FIG. 5 shows the Activate Default EPS Bearer Context Request or Activate Dedicated EPS Bearer Context Request messages as standalone ESM messages, in the event that the network only allows one bearer, then the last available bearer indication is included in the Activate Default EPS Bearer Context Request included in the ESM container of an Attach Accept EMM message. Advantageously, sending an indication that the last bearer has been allocated avoids the need for the UE to receive (or calculate from the number of bearers remaining indication) and store the maximum amount of bearers before the maximum has been reached.
  • At point 502 of FIG. 5 it is noted that the MME supports a maximum of three bearers. At point 504 it is noted that the UE is attached with an Internet PDN connection is established (such that one the available bearers has been used up).
  • At steps 506 to 510 the UE requests a new bearer for an IMS connection. At 506 the UE sends a PDN Connectivity Request message requesting a bearer for a connection to an IMS PDN. At 508 the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information including a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer. In contrast to the second embodiment of the invention, no information regarding the available bearers is included in message 508 as the last bearer has not been established. At 510 the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. The UE is not yet aware of how many bearers remain to be established.
  • At steps 512 to 516 the UE requests a new bearer for a Multimedia Messaging System (MMS) connection. At 512 the UE sends a PDN Connectivity Request message requesting a bearer for a connection to an MMS PDN. At 514 the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer, together with other information including a Quality of Service (QoS) measure and an IP address associated with the bearer which may be needed by the UE to make use of the bearer. This time, in accordance with the third embodiment of the invention, the Activate Default EPS Bearer Context Request message incorporates a new IE which makes use of the ESM container contained in the Activate Default EPS Bearer Context Request message to indicate that the last remaining bearer has been established for the UE. At 516 the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. At point 518 the UE is now aware for the first time that no bearers remain to be established, and the UE can determine that the maximum number of bearers available for the UE is equal to the number of currently established bearers.
  • In the event that the user of the UE now wishes to make an emergency call the UE is aware that no further bearer can be established until an existing bearer is deactivated. The remainder of the steps of FIG. 5 correspond directly to the correspondingly number steps of FIG. 3, and so will not be described again.
  • In a further extension to the third embodiment of the invention, the same use is made of an IE indicating that the last remaining bearer has been allocated in an Activate Dedicated EPS Bearer Context Request message when a UE requests a dedicated bearer by sending a Bearer Resource Allocation Request message including an EPS bearer identity for the associated default bearer.
  • It will be appreciated that the third embodiment of the invention requires modification to the NAS protocol described in 3GPP TS 24.301. Specifically, the Activate Default EPS Bearer Context Request message and the Activate Dedicated EPS Bearer Context Request message described in sections 8.3.6.1 and 8.3.3.1 of 3GPP TS 24.301 respectively require modification. As discussed above, these messages are sent by the MME to the UE to request activation of a default EPS bearer context or a dedicated EPS bearer context associated with the same PDN address and APN as an already existing default EPS bearer. Tables 8.3.6.1 and 8.3.3.1 respectively of 3GPP TS 24.301 define the IEs present within the messages. According to the third embodiment of the invention, a further IE with the identifier “Last context activated” is added.
  • In a further extension to the third embodiment of the invention, a Notification message in accordance with section 8.3.18A of 3GPP TS 24.301 may be used to indicate to the UE that the network has reached the maximum number of available bearers (that is, the last remaining bearer has been allocated). A Notification message may be used instead of informing the UE in an Activate Default EPS Bearer Context Request message or Activate Dedicated EPS Bearer Context Request message. A Notification message is a separate ESM message, and its use in this context requires the specification of a new cause value.
  • As an example of the applicability of the third embodiment of the invention to alternative PS networks, for a General Packet Radio Service (GPRS) network in accordance with 3GPP TS 24.008 this information may be provided to the MS through Activate PDP Context Accept and Activate Secondary PDP Context Accept messages. The Activate PDP Context Accept message and Activate Secondary PDP Context Accept message are defined in sections 9.5.2 and 9.5.5 of 3GPP TS 24.008 respectively, which define the IEs present within those messages. According to the third embodiment of the invention, a further IE with the identifier “Last context activated” is added.
  • In accordance with a fourth embodiment of the invention a solution which does not require knowledge at the UE is provided by allowing the network to arbitrarily deactivate a bearer in order to accommodate a requested bearer if the maximum number of bearers has already been established. In particular, a non-emergency bearer may be deactivated in order to accommodate an emergency PDN connection. The UE does not need to know that the network has reached the maximum permitted number of bearers until the UE attempts to establish a further PDN connection. Advantageously, the fourth embodiment of the invention does not require any modifications to TS 24.301, and in particular no modifications to EMM or ESM signaling messages between the UE and the MME. After the emergency call has ended a tracking area update procedure can be initiated to resynchronize the bearers between the UE and the MME.
  • Referring to FIG. 6, in accordance with the fourth embodiment at point 602 it is noted that the MME supports a maximum of two PDN connections per UE. At point 604 it is noted that the UE has already established an Internet PDN connection and an IMS PDN connection, and so the maximum number of bearers has already been established. However, in contrast to the above described embodiments of the invention, at point 606 it is noted that the UE does not know how many bearers the network supports, and does not know that the maximum has been reached.
  • At point 608 the user of the UE wishes to make an emergency call. At point 610, if the UE is in the EMM-IDLE state a service request procedure or a tracking area update procedure is performed to move the UE to EMM-CONNECTED state. At step 612 the UE sends a PDN Connectivity Request message to the MME requesting a further bearer for a connection to an emergency PDN. This corresponds to step 212 of FIG. 2, in which according to conventional LTE networks the MME responds with a PDN Connectivity Reject message. However, according to the fourth embodiment of the invention, instead the MME arbitrarily and locally deactivates a non-emergency PDN connection without notifying the UE to allow the emergency PDN connection to the activated straightaway even though the UE is in the EMM-CONNECTED state.
  • At step 616 the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer. At 618 the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. At point 620 the emergency call is established. The UE remains unaware that a bearer has been deactivated. However, the Activate Default EPS Bearer Context Request message includes an indication that a synchronization of bearer contexts procedure is required.
  • To convey to the UE the need to synchronize bearers, the Activate Default EPS Bearer Context Request message described in section 8.3.6.1 of 3GPP TS 24.301 requires modification. Table 8.3.6.1 of 3GPP TS 24.301 defines the IEs present within the message. According to the fourth embodiment of the invention, a further IE with the identifier “Synchronization of contexts required” is added.
  • At point 622 the emergency call ends. At point 624 a bearer context synchronization procedure takes place by the UE sending a Tracking Area Update message and the MME responding with a Tracking Area Update Accept message.
  • As an alternative to the fourth embodiment of the invention, instead of sending the “sync” parameter “in-dialog” as part of an Activate Default EPS Bearer Context Request message the network could instead send an ESM Status message containing the EPS bearer id that was deactivated by the network. The ESM Status message is described in section 8.3.15 of 3GPP TS 24.301. Table 8.3.15.1 of 3GPP TS 24.301 defines the IEs present within the message. The ESM Status message is already equipped to allow the inclusion of an EPS bearer id, but requires modification to create a new cause code “Bearer Deactivated Locally by Network”. In response to receiving the ESM Status message the UE locally deactivates the bearer indicated in the ESM status message.
  • In accordance with a fifth embodiment of the present invention, illustrated in FIG. 7, a deactivate bearer procedure can be initiated during or after the emergency call. There is no precedent in TS 24.301 for the network to arbitrarily deactivate an EPS bearer in this way, and no precedent in any PS network for minimizing delays in establishing bearers in this way, and particularly bearers for emergency calls.
  • Referring to FIG. 7, this is similar to the fourth embodiment of the invention illustrated in FIG. 6, except that the MME records the fact that a bearer has been deactivated and sends a Deactivate EPS Bearer Context Request message after the emergency call has been established. This process of sending a deactivation request is an explicit deactivation, as opposed to the local deactivation discussed above in connection with FIG. 6. Both local deactivation (when the mobile device is in an EMM-Idle mode) and explicit deactivation (when the mobile device is in an EMM-Connected mode) can be considered to be the network node releasing the bearer. Steps 602 to 612 are the same as for FIG. 6. However, at step 702 the Activate Default EPS Bearer Context Request message gives no indication that a synchronization of bearer contexts procedure is required. At step 704 the MME responds with an Activate Default EPS Bearer Context Request message which includes the EPS bearer identity for the newly established EPS bearer. At 706 the UE returns an Activate Default EPS Bearer Context Accept message which acknowledges receipt of the new bearer information. At point 708 the emergency call is established. The UE remains unaware that a bearer has been deactivated. In contrast to the fourth embodiment of the invention, after the emergency call is established the MME sends a Deactivate EPS Bearer Context Request message to the UE at step 710 indicating which bearer has been deactivated, and the UE updates its locally stored list of bearers and responds at step 712 with a Deactivate EPS Bearer Context Accept message. It will be appreciated that the explicit deactivation request could be sent in parallel to the emergency call setup. There is no need for synchronization between the setup of the PDN connection and the deactivation. Advantageously, the fifth embodiment of the invention requires no changes to LTE protocols to implement and so may be the preferred implementation option for MME vendors.
  • As an example of the applicability of the fourth embodiment of the invention to alternative PS networks, for a General Packet Radio Service (GPRS) network in accordance with 3GPP TS 24.008 a synchronization of contexts required procedure may be initiated by the network through Activate PDP Context Accept and Activate Secondary PDP Context Accept messages used to synchronize the bearers (PDP contexts) between an MS and the Serving GPRS Support Node (SGSN). Alternatively this synchronization may be performed by the network sending a Deactivate PDP Context Request message.
  • While embodiments of the present invention described above relate specifically to 3GPP compliant LTE mobile communication systems, and refer to particular 3GPP Technical Specifications, as noted above the present invention is more widely applicable. The present invention may be implemented in any PS mobile communication system where corresponding bearer management issues arise. Specifically, the present device is applicable to any PS mobile wireless communications network in which a mobile device (LTE: UE) communicates with a network node, or an external network or server (LTE: P-GW) through a bearer (LTE: EPS bearer) and a limited, unknown number of bearers can be established for that mobile device, and signaling messages are exchanged between the mobile device and a network node (LTE: MME).
  • It will be appreciated that embodiments of the present invention can be realized in the form of hardware, software or a combination of hardware and software. Any such software may be stored in the form of volatile or non-volatile storage, for example, a storage device like a ROM, whether erasable or rewritable or not, or in the form of memory, for example, RAM, memory chips, device or integrated circuits or on an optically or magnetically readable medium, for example, a CD, DVD, magnetic disk or magnetic tape or the like. It will be appreciated that the storage devices and storage media are embodiments of machine-readable storage that are suitable for storing a program or programs comprising instructions that, when executed, implement embodiments of the present invention. Accordingly, embodiments provide a program comprising code for implementing apparatus or a method as claimed in any one of the claims of this specification and a machine-readable storage storing such a program. Still further, such programs may be conveyed electronically via any medium including a communication signal carried over a wired or wireless connection and embodiments suitably encompass the same.
  • Throughout the description and claims of this specification, the words “comprise” and “contain” and variations of them mean “including but not limited to”, and they are not intended to (and do not) exclude other components, integers or steps. Throughout the description and claims of this specification, the singular encompasses the plural unless the context otherwise requires. In particular, where the indefinite article is used, the specification is to be understood as contemplating plurality as well as singularity, unless the context requires otherwise.
  • Features, integers or characteristics described in conjunction with a particular aspect, embodiment or example of the invention are to be understood to be applicable to any other aspect, embodiment or example described herein unless incompatible therewith. All of the features disclosed in this specification (including any accompanying claims, abstract and drawings), and/or all of the steps of any method or process so disclosed, may be combined in any combination, except combinations where at least some of such features and/or steps are mutually exclusive. The invention is not restricted to the details of any foregoing embodiments. The invention extends to any novel one, or any novel combination, of the features disclosed in this specification (including any accompanying claims, abstract and drawings), or to any novel one, or any novel combination, of the steps of any method or process so disclosed. It will be also be appreciated that, throughout the description and claims of this specification, language in the general form of “X for Y” (where Y is some action, activity or step and X is some means for carrying out that action, activity or step) encompasses means X adapted or arranged specifically, but not exclusively, to do Y.
  • The reader's attention is directed to all papers and documents which are filed concurrently with or previous to this specification in connection with this application and which are open to public inspection with this specification, and the contents of all such papers and documents are incorporated herein by reference.
  • Although embodiments of the present invention have been described in detail hereinabove, it should be clearly understood that many variations and/or modifications of the basic inventive concepts herein taught which may appear to those skilled in the present art will still fall within the spirit and scope of the present invention, as defined in the appended claims.

Claims (8)

What is claimed:
1. A method of establishing a bearer in a packet switched mobile wireless communications network comprising a mobile device and a network node, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, the method comprising:
determining at the mobile device that an emergency PDN connection is required; and
sending a request for a further bearer from the mobile device to the network node;
wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises:
releasing, at the network node, a bearer previously established for the mobile device within the network; and
establishing a bearer for an emergency PDN connection for the mobile device within the network.
2. The method of claim 1, wherein releasing, at the network node, a bearer previously established for the mobile device within the network comprises selecting at the network node a bearer for release which is not for an emergency PDN connection.
3. The method of claim 1, further comprising:
performing a bearer synchronization procedure between the mobile device and the network node after the emergency PDN connection has ended.
4. The method of claim 3, further comprising:
sending from the network node to the mobile device an indication that a bearer synchronization procedure is required while establishing the bearer for the emergency PDN connection; and
initiating at the mobile device the bearer synchronization procedure after the emergency PDN connection has ended.
5. The method of claim 3, further comprising:
sending from the network node to the mobile device an indication that a bearer synchronization procedure is required in a separate session management message; and
initiating at the mobile device the bearer synchronization procedure after the emergency PDN connection has ended.
6. The method of claim 1, further comprising:
initiating at the network node an explicit bearer deactivation procedure between the network node and the mobile device after the bearer for the emergency PDN connection has been established.
7. The method of claim 1 further comprising:
sending from the network node a session management status request containing the bearer identification of the bearer released by the network; and
receiving at the mobile device the session management status request and deactivating the bearer locally in the mobile device.
8. A method of establishing a bearer within a network node in a packet switched mobile wireless communications network which further comprises a mobile device, wherein a predetermined maximum number of bearers can be established for the mobile device within the network, the method comprising:
receiving a request for a further bearer from the mobile device;
wherein if a current number of bearers established for the mobile device is equal to the maximum number of bearers, the method further comprises:
releasing a bearer previously established for the mobile device within the network; and
establishing a bearer for an emergency PDN connection for the mobile device within the network.
US15/395,102 2012-12-19 2016-12-30 Bearer management Abandoned US20170111935A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/395,102 US20170111935A1 (en) 2012-12-19 2016-12-30 Bearer management

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
GB1222906.8 2012-12-19
GB1222906.8A GB2509072B (en) 2012-12-19 2012-12-19 Bearer management
PCT/KR2013/011857 WO2014098492A1 (en) 2012-12-19 2013-12-19 Bearer management
US201514652661A 2015-06-16 2015-06-16
US15/395,102 US20170111935A1 (en) 2012-12-19 2016-12-30 Bearer management

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
PCT/KR2013/011857 Division WO2014098492A1 (en) 2012-12-19 2013-12-19 Bearer management
US14/652,661 Division US9622270B2 (en) 2012-12-19 2013-12-19 Bearer management

Publications (1)

Publication Number Publication Date
US20170111935A1 true US20170111935A1 (en) 2017-04-20

Family

ID=47631004

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/652,661 Expired - Fee Related US9622270B2 (en) 2012-12-19 2013-12-19 Bearer management
US15/395,102 Abandoned US20170111935A1 (en) 2012-12-19 2016-12-30 Bearer management

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US14/652,661 Expired - Fee Related US9622270B2 (en) 2012-12-19 2013-12-19 Bearer management

Country Status (3)

Country Link
US (2) US9622270B2 (en)
GB (1) GB2509072B (en)
WO (1) WO2014098492A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111800889A (en) * 2019-08-27 2020-10-20 维沃移动通信有限公司 Method for processing protocol data unit session, terminal equipment and network equipment
CN112771903A (en) * 2019-01-31 2021-05-07 华为技术有限公司 Method for session establishment and terminal equipment

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015193751A1 (en) * 2014-06-16 2015-12-23 Telefonaktiebolaget L M Ericsson (Publ) Service aware admission control of radio bearers
WO2016000759A1 (en) * 2014-07-01 2016-01-07 Telefonaktiebolaget L M Ericsson (Publ) Method and nodes for handling esm information
US10117279B2 (en) * 2014-10-17 2018-10-30 Mediatek Inc. Method for maintenance of maximum number of bearers when maximum number of bearers reached
US9980310B2 (en) 2014-10-17 2018-05-22 Mediatek Inc. Method for processing unsuccessful PDN establishment request
US9967915B2 (en) * 2015-05-07 2018-05-08 Samsung Electronics Co., Ltd Method of handling multiple PDN/PDP disconnection requests on the same APN
US10616901B2 (en) 2015-05-13 2020-04-07 Lg Electronics Inc. Method of configuring bearer for sending and receiving data in wireless communication system and apparatus supporting the method
US10327277B2 (en) 2015-07-24 2019-06-18 Lg Electronics Inc. PDN connection establishment method and user equipment
US10142923B2 (en) 2016-02-26 2018-11-27 Microsoft Technology Licensing, Llc Using a single packet data network for data transfers to manage network resources
JP6756047B2 (en) * 2016-12-23 2020-09-16 エルジー エレクトロニクス インコーポレイティド Method of performing V2X communication in wireless communication system and device for this
WO2019074334A1 (en) * 2017-10-13 2019-04-18 삼성전자 주식회사 Method and apparatus for transmitting and receiving data in wireless communication system
JP2020088452A (en) * 2018-11-16 2020-06-04 シャープ株式会社 UE, control device, and communication control method
US11343742B2 (en) 2020-05-22 2022-05-24 Blackberry Limited Preserving emergency call during failure to transfer

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060094397A1 (en) * 2004-10-28 2006-05-04 Sharada Raghuram Apparatus and method for connecting an emergency call
US20090124212A1 (en) * 2007-11-13 2009-05-14 Research In Motion Limited Method and apparatus for state/mode transitioning
US20100217855A1 (en) * 2007-10-19 2010-08-26 Hubert Przybysz Methods and apparatuses for notifying an application function of resource restrictions relating to a communication session
US20110194462A1 (en) * 2008-10-21 2011-08-11 Huawei Technologies Co., Ltd. Access control method, access control apparatus and communication system
US20120076121A1 (en) * 2010-09-28 2012-03-29 Noun Choi Releasing Connections with Local GW When UE Moves Out of Residential/Enterprise Network Coverage
US20120182868A1 (en) * 2011-01-13 2012-07-19 Telefonaktiebolaget L M Ericsson (Publ) Multiple Bearer Support Upon Congestion Situations
US20120191862A1 (en) * 2010-07-19 2012-07-26 Movik Networks Content Pre-fetching and CDN Assist Methods in a Wireless Mobile Network
US20120239727A1 (en) * 2011-03-16 2012-09-20 Kddi Corporation Multimedia service network and method for providing the same
US20120257571A1 (en) * 2011-04-07 2012-10-11 Liao Ching-Yu Method of Handling Signaling and Data Transmission for Machine-Type Communication
US20120269099A1 (en) * 2009-10-02 2012-10-25 Research In Motion Limited System and Method for Determining Establishment Causes for Emergency Sessions
US20120327758A1 (en) * 2010-03-22 2012-12-27 Zte Corporation Method, system and device for processing release failure of packet data network
US20130047263A1 (en) * 2011-08-15 2013-02-21 Bank Of America Corporation Method and Apparatus for Emergency Session Validation
US20130136114A1 (en) * 2011-11-29 2013-05-30 Renesas Mobile Corporation Deactivating Existing Bearer/Context For Emergency Bearer Establishment
US20130258998A1 (en) * 2012-03-30 2013-10-03 Qualcomm Incorporated Methods and apparatus for improving data service availability
US20130308527A1 (en) * 2010-09-28 2013-11-21 Research In Motion Limited Method and apparatus for releasing connection with local gw when ue moves out of the residential/enterprise network coverage
US20140018046A1 (en) * 2012-07-13 2014-01-16 Telefonaktiebolaget L M Ericsson (Publ) System and method for offline voicemail deposit
US20140105125A1 (en) * 2012-10-16 2014-04-17 Qualcomm Incorporated Criteria for ue-initiated bearer deactivation when maximum number of active bearers has been reached
US20140128018A1 (en) * 2011-12-30 2014-05-08 Huawei Device Co., Ltd. Time obtaining method and apparatus, and mobile terminal
EP2852243A1 (en) * 2012-06-28 2015-03-25 Huawei Technologies Co., Ltd. Method for transmitting downlink data in lte network, base station, and serving gateway
US20150282248A1 (en) * 2012-10-29 2015-10-01 Lg Electronics Inc. Method and apparatus for releasing connection in wireless communication system
US9554233B2 (en) * 2012-10-05 2017-01-24 Lg Electronics Inc. Method and device for controlling multipriority in wireless communication system
US20170223521A1 (en) * 2012-03-08 2017-08-03 Samsung Electronics Co., Ltd Method for controlling service in radio communication system

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010026538A1 (en) * 2000-01-10 2001-10-04 Jorg Bruss Method and system for exchange of multicall capabilities between terminal and network
US7787855B2 (en) * 2003-03-31 2010-08-31 Motorola, Inc. Establishing emergency sessions in packet data networks for wireless devices having invalid subscriber identities
ATE524945T1 (en) * 2007-03-15 2011-09-15 Nokia Corp APPARATUS, METHOD AND COMPUTER PROGRAM PRODUCTS USING FAST CARRIER PRIORITIZATION IN A MAC-HS PACKET SCHEDULER BASED ON DETECTION OF NECESSARY ACTIVITIES
US8185107B2 (en) * 2007-03-29 2012-05-22 Marvell International Ltd. IP address allocation in evolved wireless networks
EP2218283B1 (en) * 2007-11-02 2015-10-07 BlackBerry Limited Long term evolution user equipment multi-packet data network parameter based connectivity control
KR20100053418A (en) * 2008-11-11 2010-05-20 엘지전자 주식회사 Method of performing handover for emergency call in wireless communication system
US20100297979A1 (en) * 2009-04-14 2010-11-25 Interdigital Patent Holdings, Inc. Method and apparatus for processing emergency calls
KR101528496B1 (en) 2009-04-17 2015-06-15 삼성전자주식회사 Method and system for supporting emergency call using non-access stratum protocol for emergency call in mobile telecommunication system
US8817608B2 (en) 2010-05-31 2014-08-26 Blackberry Limited Method and apparatus for customizing a focus inactivity timer based on network watermark conditions
TWI504303B (en) * 2010-10-05 2015-10-11 Htc Corp Handling apn based congestion control and related communication device
EP2501191B1 (en) * 2011-03-14 2013-10-23 HTC Corporation Methods for handling reachability of a mobile device
US8892144B2 (en) * 2011-10-25 2014-11-18 At&T Intellectual Property I, L.P. Dynamic bearer management
EP2608567A1 (en) * 2011-12-13 2013-06-26 Panasonic Corporation Device triggering and congestion control
CN102625412B (en) * 2012-03-30 2015-07-22 电信科学技术研究院 Congestion control method and equipment
GB2501110A (en) * 2012-04-12 2013-10-16 Nec Corp Packet based emergency connection management
WO2013179097A1 (en) * 2012-05-31 2013-12-05 Nokia Corporation Method and apparatus for signaling load management

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060094397A1 (en) * 2004-10-28 2006-05-04 Sharada Raghuram Apparatus and method for connecting an emergency call
US20100217855A1 (en) * 2007-10-19 2010-08-26 Hubert Przybysz Methods and apparatuses for notifying an application function of resource restrictions relating to a communication session
US20090124212A1 (en) * 2007-11-13 2009-05-14 Research In Motion Limited Method and apparatus for state/mode transitioning
US20110194462A1 (en) * 2008-10-21 2011-08-11 Huawei Technologies Co., Ltd. Access control method, access control apparatus and communication system
US20120269099A1 (en) * 2009-10-02 2012-10-25 Research In Motion Limited System and Method for Determining Establishment Causes for Emergency Sessions
US20120327758A1 (en) * 2010-03-22 2012-12-27 Zte Corporation Method, system and device for processing release failure of packet data network
US20120191862A1 (en) * 2010-07-19 2012-07-26 Movik Networks Content Pre-fetching and CDN Assist Methods in a Wireless Mobile Network
US20120076121A1 (en) * 2010-09-28 2012-03-29 Noun Choi Releasing Connections with Local GW When UE Moves Out of Residential/Enterprise Network Coverage
US20170257905A1 (en) * 2010-09-28 2017-09-07 Blackberry Limited Releasing connections with local gw when ue moves out of residential/enterprise network coverage
US20130308527A1 (en) * 2010-09-28 2013-11-21 Research In Motion Limited Method and apparatus for releasing connection with local gw when ue moves out of the residential/enterprise network coverage
US20120182868A1 (en) * 2011-01-13 2012-07-19 Telefonaktiebolaget L M Ericsson (Publ) Multiple Bearer Support Upon Congestion Situations
US20120239727A1 (en) * 2011-03-16 2012-09-20 Kddi Corporation Multimedia service network and method for providing the same
US20120257571A1 (en) * 2011-04-07 2012-10-11 Liao Ching-Yu Method of Handling Signaling and Data Transmission for Machine-Type Communication
US20130047263A1 (en) * 2011-08-15 2013-02-21 Bank Of America Corporation Method and Apparatus for Emergency Session Validation
US20130136114A1 (en) * 2011-11-29 2013-05-30 Renesas Mobile Corporation Deactivating Existing Bearer/Context For Emergency Bearer Establishment
US20140128018A1 (en) * 2011-12-30 2014-05-08 Huawei Device Co., Ltd. Time obtaining method and apparatus, and mobile terminal
US20170223521A1 (en) * 2012-03-08 2017-08-03 Samsung Electronics Co., Ltd Method for controlling service in radio communication system
US20130258998A1 (en) * 2012-03-30 2013-10-03 Qualcomm Incorporated Methods and apparatus for improving data service availability
EP2852243A1 (en) * 2012-06-28 2015-03-25 Huawei Technologies Co., Ltd. Method for transmitting downlink data in lte network, base station, and serving gateway
US20140018046A1 (en) * 2012-07-13 2014-01-16 Telefonaktiebolaget L M Ericsson (Publ) System and method for offline voicemail deposit
US9554233B2 (en) * 2012-10-05 2017-01-24 Lg Electronics Inc. Method and device for controlling multipriority in wireless communication system
US20140105125A1 (en) * 2012-10-16 2014-04-17 Qualcomm Incorporated Criteria for ue-initiated bearer deactivation when maximum number of active bearers has been reached
US20150282248A1 (en) * 2012-10-29 2015-10-01 Lg Electronics Inc. Method and apparatus for releasing connection in wireless communication system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112771903A (en) * 2019-01-31 2021-05-07 华为技术有限公司 Method for session establishment and terminal equipment
CN111800889A (en) * 2019-08-27 2020-10-20 维沃移动通信有限公司 Method for processing protocol data unit session, terminal equipment and network equipment

Also Published As

Publication number Publication date
GB2509072A (en) 2014-06-25
GB2509072B (en) 2015-08-05
US20150351136A1 (en) 2015-12-03
US9622270B2 (en) 2017-04-11
WO2014098492A1 (en) 2014-06-26
GB201222906D0 (en) 2013-01-30

Similar Documents

Publication Publication Date Title
US20170111935A1 (en) Bearer management
US11026208B2 (en) Base station device, first location management device, terminal device, communication control method, and communication system
US9369928B2 (en) Partial session transfer method and user equipment for the same
EP2501191B1 (en) Methods for handling reachability of a mobile device
US9654954B2 (en) Providing an IMS voice session via a packet switch network and an emergency voice session via a circuit switch network
US9497792B2 (en) Routing of messages for mobile communication devices during emergency calls
CN102714873B (en) Mobile communication method, call control node, priority control node, and mobile management node
KR101960562B1 (en) Methods and apparatus for controlling circuit switched fall back of a mobile station from e-utran to utran/geran in a full-multi-operator core network
US11729840B2 (en) Access point name determination for mission critical services
CN105723798A (en) Method for processing unsuccessful pdn establishment request procedures
CN114902733A (en) Mobility at 5GS to EPS for transmitting data flows for PDU sessions
WO2020064620A1 (en) Communication terminal and method for establishing a communication session
EP3032852B1 (en) Method and apparatus for obtaining authentication information
KR102446520B1 (en) Routing selection method, apparatus, device and system and storage medium
US8982790B2 (en) Overcharging prevention by unsent downlink data volume record
US20140092869A1 (en) Local Gateway Reselection
US9374761B2 (en) Routing terminating call to user equipment via control nodes
CN102238678A (en) Method and system for implementing single radio voice call continuity (SRVCC)
JP6634439B2 (en) SIP control device, mobile communication system and emergency call control method

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE AFTER FINAL ACTION FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: ADVISORY ACTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION